FAKULTAS TEKNIK
Jurusan Teknik: Mesin, Sipil, Elektro, Industri, Informatika dan D3 Elektro
Jl. Raya Tlogomas 246 Malang 65114 – Jawa Timur Telp. (0341) 464318, 46319.
Fax. (0341) 460435, 460782 Extantion: 127 GKB.3 – L-3
LEMBAR ASISTENSI
(TUGAS BESAR BAJA)
- Interpolasi
6. 24/12/2021
- Jarak gording dinding 6/4 sesuai dengan
gambar
- Cek nilai Pu (90,6)
terdapat 6 nodal
atau nodalnya
soal
pembebanan
tinggi kuda-kuda
Dengan Kemiringan
( )
Ls √
Lg
= 1,22 m
PERHITUNGAN PEMBEBANAN GORDING
= x 10,95 x 5
= 27,38 Kg
RDx = 27,38 x cos 20°
= 25,73 Kg
RDy =( ( ))
=( ( ))
= 4,68 Kg
qD = 10,95 Kg/m => MD = .qD.L2
= x 10,95 x 52
= 34,22 Kg
MDx = 34,22 x cos 20°
= 32,16 Kg
MDy = ( ( ) )
=( ( ) )
= 2,93 Kg
2. Beban Hidup
• Berat pekerja = 100 Kg (SNI-1727-2013 Tabel 4-1)
PL = 100 Kg => RL = .PL
= x 100
= 50 Kg
RLx = 50 x sin 20°
= 17,10 Kg
RLy = 50 x cos 20°
= 46,98 Kg
PL = 100 Kg => ML = .PL.L
= x 100 x 5
= 125 Kg
MLx = 125 x sin 20°
= 42,75 Kg
MLy = 125 x cos 20°
= 117,46 Kg
3. Beban Angin Tertutup (Bangunan Gedung Tertutup)
• Beban angin yang berkerja :
qh (beban angin) = 45 Kg/m2
Sudut atap (Ø) = 20°
G/faktor tiupan angin = 0,85 (pasal 26.9.1 SNI-1727-2013)
hrata-rata = = 8,09 m
h/L = = 0,4 m
Interpolasi 2
4. Kombinasi Pembebanan
Pembebanan dasar reaksi (reaction basic load)
A. Arah Sejajar Bidang Atap
1. Kombinasi Dasar 1
RUx = (1,2).(RDx) + (0,5).(RLx)
= (1,2).(25,73) + (0,5).(17,10)
= 39,43 Kg
2. Kombinasi Dasar 2
RUx = (1,2).(RDx) + (1).(RLx) + (0,5).(RWx)
= (1,2).(25,73) + (1).(17,10) + (0,5).(19,125)
= 48,99 Kg
3. Kombinasi Dasar 3
RUx = (1,2).(RDx) + (0,5).(RLx) + (1,0).(RWx)
= (1,2).(25,73) + (0,5).(17,10) + (1,0).(19,125)
= 58,55 Kg
4. Kombinasi Dasar 4
RUx = (0,9).(RDx) + (1,0).(RWx)
= (0,9).(25,73) + (1,0).(19,125)
= 42,28 Kg
B. Arah Sejajar Bidang Atap
RUy = (1,4).(RDy)
= (1,4).(4,68)
= 6,55 kg
1. Kombinasi Dasar 1
RUy1 = (1,2).(RDy) + (0,5).(RLy)
= (1,2).(4,68) + (0,5).(48,98)
= 30,11 kg
2. Kombinasi Dasar 2
RUy2 = (1,2).(RDy) + (1).(RLy) + (0,5).(RWy) (angin datang)
= (1,2).(4,68) + (1).(48,98) + (0,5).(0)
= 54,6 kg
RUy2 = (1,2).(RDy) + (1).(RLy) + (0,5).(RWy) (angin pergi)
= (1,2).(4,68) + (1).(48,98) + (0,5).(0)
= 54,6 kg
3. Kombinasi Dasar 3
RUy3 = (1,2).(RDy) + (0,5).(RLy) + (1,0).(RWy) (angin datang)
= (1,2).(4,68) + (0,5).(48,98)+ (1,0).(0)
= 30,11 kg
RUy3 = (1,2).(RDy) + (0,5).(RLy) + (1,0).(RWy) (angin pergi)
= (1,2).(4,68) + (0,5).(48,98)+ (1,0).(0)
= 30,11 kg
4. Kombinasi Dasar 4
RUy4 = (0,9).(RDy) + (1,0).(RWy) (angin datang)
= (0,9).(4,68) + (1,0).(0)
= 4,21 kg
RUy4 = (0,9).(RDy) + (1,0).(RWy) (angin pergi)
= (0,9).(4,68) + (1,0).(0)
= 4,21 kg
Kombinasi Momen
1. Arah Tegak Lurus Bidang Atap
MUx =(1,4).(MDx)
=(1,4).(32,16)
=45,02 kg.m
Kombinasi Dasar 1
MUx1 = (1,2).(MDx) + (0,5).(MLx)
= (1,2).(32,16) + (0,5).(42,75)
= 59,97 kg.m’
Kombinasi Dasar 2
MUx2 = (1,2).(MDx) + (1).(MLx) + (0,5).(MWx) (angin datang)
= (1,2).(32,16) + (1).(42,75) + (0,5).(23,91)
= 92,3 kg.m’
MUx2 = (1,2).(MDx) + (1).(MLx) + (0,5).(MWx) (angin pergi)
= (1,2).(32,16) + (1).(42,75) + (0,5).(44,83)
= 103,76 kg.m’
Kombinasi Dasar 3
MUx3 = (1,2).(MDx) + (0,5).(MLx) + (1,0).(MWx) (angin datang)
= (1,2).(32,16) + (0,5).(42,75) + (1,0).(23,91)
= 83,88 kg.m’
MUx3 = (1,2).(MDx) + (0,5).(MLx) + (1,0).(MWx) (angin pergi)
= (1,2).(32,16) + (0,5).(42,75) + (1,0).(44,83)
= 104,8 kg.m’
Kombinasi Dasar 4
MUx4 = (0,9).(MDx) + (1,0).(MWx) (angin datang)
= (0,9).(32,16) + (1,0).(23,91)
= 52,55 Kg.m’
MUx4 = (0,9).(MDx) + (1,0).(MWx) (angin pergi)
= (0,9).(32,16) + (1,0).(44,83)
= 73,77 kg.m’
2. Momen Arah Tegak Lurus Bidang Atap
MUy = (1,4).(MDy)
= (1,4).(2,93)
= 4,10 kg.m
Kombinasi Dasar 1
MUy1 = (1,2).(MDy) + (0,5).(MLy)
= (1,2).(2,93) + (0,5).(117,46)
= 62,25 kg.m’
Kombinasi Dasar 2
MUy2 = (1,2).(MDy) + (1).(MLy) + (0,5).(MWy) (angin datang)
= (1,2).(2,93) + (1).(117,46) + (0,5).(0)
= 120,98 kg.m’
MUy2 =(1,2).(MDy) + (1,6).(MLy) + (0,5).(MWy) (angin pergi)
= (1,2).(2,93) + (1,6).(117,46)+ (0,5).(0)
= 191,45 kg.m’
Kombinasi Dasar 3
MUy3 = (1,2).(MDy) + (0,5).(MLy) + (1,0).(MWy) (angin datang)
= (1,2).(2,93) + (0,5).(117,46) + (1).(0)
= 62,25 kg.m’
MUy3 = (1,2).(MDy) + (0,5).(MLy) + (1,0).(MWy) (angin pergi)
= (1,2).(2,93) + (0,5).(117,46) + (1,0).(0)
= 62,25 kg.m’
Kombinasi Dasar 4
MUy4 = (0,9).(MDy) + (1,0).(MWy) (angin datang)
= (0,9).(2,93) + (1,0).(0)
= 2,63 kg.m’
MUy4 = (0,9).(MDy) + (1,0).(MWy) (angin pergi)
= (0,9).(2,93) + (1,0).(0)
= 2,63 kg.m’
*Untuk perhitungan reaksi arah Y dan momen arah X dan Y disajikan pada tebel
berikut :
MLx = 42,75 Kg
MUx
MWx (datang) = 59,97 92,3 103,76 83,88 104,8 52,55 73,77 104,8
(Kg)
23,91 Kg
MWx (pergi) = 44,83
Kg
MDy = 2,93 Kg
MLy = 117,46 Kg
MUy
MWy (datang) = 0 62,25 120,98 191,45 62,25 62,25 2,63 2,63 191,45
(Kg)
Kg
MWy (pergi) = 0 Kg
PERENCANAAN GORDING ATAP
Diambil profil C-Channel C100 x 50 x 20 dengan tebal 2,0 mm
Keterangan :
t = 2,0 mm Zx = 14,3 cm3 Cy = 1,87 cm q = 3,56 Kg/m
2 3
A = 4,54 cm Zy = 5,4 cm Sx = 4,48 cm H = 100 mm
Ix = 71 cm4 rx = 3,97 cm B = 50 mm J = 605 cm4
Iy = 17 cm4 ry = 1,93 cm C = 20 mm Cw = 444 mm
Zx ={ } { } { }
={ } { } { }
= 10,66 cm3
Zy ={ } { } { }
={ } { }
{ }
= 8,34 cm3
Pelelehan :
Mn = Mp = FyZx (F2-1)
Keterangan :
Fy = tegangan leleh minimum yang disyaratkan dari tipe yang digunakan, ksi
(Mpa)
Mnx = Mp = Zx x Fy
Mny = Mp = Zy x Fy
+ < 1,0
+ < 1,0
= 20,8 mm
qD = 10,95Kg/m => qDx = (10,95).sin 20° = 3,74 Kg/m
qDy = (10,95).cos 20° = 10,28 Kg/m
∆x =
∆y =
∆y =√ ( )
=√
= 14,09 mm
∆y < ∆max =14,09 mm < 20,8mm OK
Jadi gording dengan profil C100x50x20, dengan tebal 2,0 mm dapat digunakan
karena telah memenuhi persyaratan terhadap pengaruh biaksial dan lendutan izin
yang ditentukan.
PERENCANAAN SAG-ROD
Karena dipasang sagrod pada tengah bentang, maka besarnya RUy untuk perhitungan
sagrod harus dihitung ulang.
= ≤ 300
= = 0,51 cm
.d maka, d =
= 4 x 0,51
= 2,04 cm = 20,4 mm ≈ 20 mm
Ag = x π x d2
= x 3,14 x 22
= 3,14 cm2
I = x π x d4
= x 3,14 x 24
= 0,785 cm4
imin =√
=√
= 0,5 cm
Ø Pn = 0,9 . Ag . Fy > Pu
90,6Kg
Ø20 mm
90,6 Kg
1. Beban Mati
Jarak antar gording = = 1,25 m
= . (9,635).(5) = 24,088 Kg
= . (9,635).(5)2 = 30,109 Kg
2. Beban Angin
Didapat Cp = (0,8) untuk angin datang, dan (-0,5) untuk angin pergi.
= . 37,332 . 52
= 116,663 Kg.m
Beban Angin Pergi (Angin Hisap)
qh = q x G x Cp x jarak gording
= 45 x 0,85 x (-0,5) x 1,22
= -23,333 Kg/m
Mwx = 0 Mwy = . qw . L2
= . (-23,333) . 52
= -72,914 Kg.m
Momen Akibat Beban Tetap
• Arah tegak lurus bidang dinding
MUx = (1,4).(MDx) MUy = (1,4).(MDy)
= (1,4).(116,663) = (1,4).(29,654)
= 163,3275 Kg.m = 41,515 Kg.m
Keterangan :
Zx = { } { } { }
={ } { } { }
= 18,966 cm3
Zy = { } { } { }
={ } { }
{ }
= 9,507 cm3
Keterangan :
Fy = tegangan leleh minimum yang disyaratkan dari tipe yang digunakan, ksi
(Mpa)
Mnx = Mp = Zx x Fy
Mny = Mp = Zy x Fy
+ < 1,0
272 29 72 82
+ < 1,0
Pada Atap
Beban angin yang digunakan dalam desain SPBAU untuk bangunan gedung tertutupi
atau tertutup sebagian tidak boleh kecil dari 16 lb/ft2 (0,77 kN/m2) dikalikan dengan luas
dinding bangunan gedung dan 8 lb/ft2 (0,38 kN/m2) dikalikan dengan luas atap bangunan
gedung yang terproyeksi pada bidang vertikal tegak lurus terhadap arah angin yang
diasumsikan. Beban dinding dan atap harus diterapkan secara simultan. Gaya angin desain
untuk bangunan gedung terbuka harus tidak kurang dari 16 lb/ft2 (0,77 kN/m2) dikalikan
dengan luas Af
=½ x L x H
=½ x 20 x 3,64
= 36,397 m2
Angin Datang
- Tekanan angin datang : q = 45kg/m2 (dari soal)
P = q x G x Cp
= 7,65 Kg/m2
= 36,397 x 7,65
= 278,437 kg
= x 278,437
= 46,406 kg
Angin Pergi
Tekanan angin pergi q = 45 kg/m2 (dari soal)
p = q x G x Cp
= 45 x 0,85 x 0,6
= 22,95 Kg/m2
Beban angin permukaan : (W) =AxP
= 36,397 x 22,95
= 835,38 kg
Beban angin pernodal (6 nodal) : (Wa) = x W
= x 835,38 kg
= 139,23 kg (Persimpul)
6,119 m
5m
Tan-1 = 24,89°
∑
Menghitung reaksi Angin pergi
λ= < 300
= < 300
Pn = ∅ ( 𝑦 . )
Dimana :
Fy = 2447,32 kg/cm2
Ag = 18,76 cm2
∅= 0,9
Pn = 0,9 (2447,32 kg/cm2 x 18,76 cm2)
= 41320,55 kg
= 41320,55 kg > 𝑷𝒖
= 41320,55 kg > 563,128 kg (OK)
Cek Kapasitas penampang pada Kondisi Runtuh Tarik
∅Pn = Fu . Ae
Dimana :
Fu = 3772,95 kg/cm2
Penampang Efektif (Ae) = An . U
Luas Penampang netto An = A penampang – A baut
A lubang ≤ 15% A penampang
¼ x 3,14 x d2 ≤ 15% ( 18,76 𝑐𝑚2)
d2 (0,78) ≤ 2,814 𝑐𝑚²
d √( ) = 1,89 cm ≈ 2 cm
Anetto = Ag – n d t
=18,76 cm² - (1 x 2 cm x 0,8 cm )
= 18,76 cm² - 1,6 cm2
= 17,16 cm2
Ae = An . U
= 17,16 cm2 x 0,8
= 13,73 cm²
= 1373
mm² Jadi, Pn = ∅
( Fu . Ae )
= 0,75 (3772,95 kg/cm2 x 13,73 cm²)
= 38851,95 kg
= 38851,95 kg > 𝑷𝒖
= 38851,95 kg > 563,128 kg (OK)
PERHITUNGAN IKATAN ANGIN (Bracing)
PADA DINDING
Pada Dinding
Beban angin dinding tepi
=BxH
= 5 x 6 = 30 m2
Angin Datang
Tekanan angin datang : q = 45 kg/m2 (dari soal)
p = q x G x Cp
= 45 x 0,85 x 0,8
= 30,6 Kg/m2
Beban angin permukaan : (W) =AxP
= 30 x 30,6
= 918 kg
Beban angin pernodal (4 nodal) : (Wa) = x W
= x 918
= 229,5 kg
Angin Pergi
Tekanan angin pergi q = 45 kg/m2 (dari soal)
p = q x G x Cp
= 45 x 0,85 x 0,5
= 19,125 Kg/m2
Beban angin permukaan : (W) =AxP
= 30 x 19,125
= 537,75 kg
Beban angin pernodal (4 nodal) : (Wa) = x 537,75 W
= x 537,75
= 143,4375 kg
= 1,2
Tan-1 = 50,19°
B = 175 mm ix = 1,17 cm
t1 = 12 mm iy = 1,17 cm
t2 = 9 mm Zx = 91,8 cm3
r = 15 mm Zy = 91,8 cm3
Cek Kelangsingan Bracing
Panjang batang , lk = √ = 7,81025 m = 781,025 cm
λ= < 300
< 300
Pn = ∅c x Fcr x Ag
Dimana Fcr adalah :
Bila √( ) √( )
= 3,23286 MPa
( ) ( )
Fcr =0,877 Fe
= 0,877 x 3,23 MPa
= 2,835 MPa
Pn = ∅c x Fcr x Ag
= 0,9 x 2,84 x 3031
= 7747,24 N
= 7747,24 kg > kg OK
PERHITUNGAN BEBAN PADA KUDA-KUDA
Perhitungan Beban Pada Kuda-Kuda
Beban mati
Beban Sendiri
Jumlah simpul = 53
Berat batang tepi atas &bawah digunakan siku L 200x200x15
Berat batang tegak digunakan siku L 90x90x10
Berat batang diagonal digunakan siku L 90x90x10
Dari perhitungan menggunakan STAAD-PRO didapatkan:
Berat total kuda-kuda = 3256,422 kg
Berat tiap simpul kuda-kuda = 61,44 kg
Beban gording
R = (RD+50)
R =(( x 12 x 4)+50)
R = 74 kg ( Bagian tepi )
R = (74 kg x 2 ) = 148 kg ( Bagian Tengah )
Beban Angin
Datang :
Rw = 25,5 Kg (Tepi) Rw = 51 Kg (Tengah)
Pergi :
Rw = 51 Kg (Tepi) Rw = 102 Kg (Tengah)
Rekapitulasi gaya batang
Batang tegak
r= √( ) = √( ) = 21,75
E
≤ 4,71
Fy
200000
36,35 ≤ 4,71
1x350
36,35 ≤ 112,59
2E
Fe =
2
2 2000000
=
36,35 2
= 1493,90 Karena Fe < Fy maka Fe=3500 kg/cm2
Fcr = Fy
= 3500
= 2303 kg/cm2
Pn = Ø (Fcr . Ag)
= 0,9 ( 2303 x (2x17) )
= 70471 kg > Pu = 2097.17 kg (OK)
Cek Penampang Batang Tarik (Beam 46) (L = 98,5 cm)
r= √( ) = √( ) = 21,75
E
≤ 4,71
Fy
200000
27,68 ≤ 4,71
1x350
27,68 ≤ 112,59
2E
Fe =
2
2 2000000
=
27,68 2
= 25763 Karena Fe < Fy maka Fe=3500 kg/cm2
Fcr = Fy
= 3500
= 2303 kg/cm2
Pn = Ø (Fcr . Ag)
= 0,9 ( 2303 x (2x17) )
= 70471 kg > Pu = 4896.54 kg (OK)
Cek Penampang Batang Tarik (Beam 74) (L = 75 cm)
r= √( ) = √( ) = 21,75
E
≤ 4,71
Fy
200000
139,59 > 4,71
350
139,59 > 112,59
2E
Fe =
2
2 2000000
=
139,592
= 1013,03 Karena Fe < Fy maka Fe=3500 kg/cm2
Fcr =
= 0,877 3500
= 3069,5
Pn = Ø (Fcr . Ag)
= 0,9 ( 3069,5 x (4 x 57,75) )
= 638149 kg > Pu = 6892.41 kg (OK)
Cek Penampang Batang Tarik (L = 1220 cm)
lk
= < 300
i min
1220
= < 300 = 139,59 < 300 (OK)
8,74
Cek Kapasitas Penampang pada Kondisi Leleh
Fy = 3500 kg/cm2
Fu = 4500 kg/cm2
Pu = 3723,542 Kg
Pn = Ø (Fy . Ag)
= 0,9 ( 3500 x (4 x 57,75))
= 727650 kg > Pu = 4799.89 kg (OK)
Kesimpulan : Profil L 200 x 200 x 15 dapat digunakan pada batang tepi kuda kuda.