TIME SCHEDULE

Nomor : 001 / SBP-TEK/III/2012


Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik : 0

BOBOT 1 2 3 4 5 6 7
NO URAIAN PEKERJAAN
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

I PEKERJAAN PERSIAPAN 1.23 1.23 1.23


II PEKERJAAN STRUKTUR LANTAI 1 10.89 2.724 2.724 2.724 2.724 10.89
III PEKERJAAN STRUKTUR LANTAI 2 7.73 1.933 1.933 1.933 1.933 7.73
IV PEKERJAAN STRUKTUR LANTAI 3 3.85 0.962 0.962 0.962 0.962 3.85
V ### #REF! ### ### #REF!
VI PEKERJAAN ARSITEKTUR LANTAI 1 15.12 1.89 1.89 1.89 1.89 1.89 1.89 1.89 1.89 15.12
VII PEKERJAAN ARSITEKTUR LANTAI 2 14.86 1.857 1.857 1.857 1.857 1.857 1.857 1.857 1.857 14.86
VIII PEKERJAAN ARSITEKTUR LANTAI 3 14.86 1.857 1.857 1.857 1.857 1.857 1.857 1.857 1.857 14.86
IX PEKERJAAN ATAP 3.10 0.775 0.775 0.775 0.775 3.10
X ### #REF! ### #REF!
XI PEKERJAAN INSTALASI LISTRIK 5.82 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 0.342 5.82
XII PLUMBING 4.60 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 0.271 4.60
XIII KAMAR MANDI, PANTRY & ALAT SANITAIR 6.15 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 0.362 6.15
XIV ### #REF! ### ### ### #REF! #REF!
#REF! 0.00 3.95 2.72 2.72 2.72 1.93 1.93 3.82 3.82 3.46 3.83 3.83 3.83 ### ### ### 2.83 2.83 2.83 4.69 4.69 2.83 2.83 2.83 2.83 ### ### ### #REF! #REF!
Rencana 0 3.95 6.67 9.40 12.12 14.05 15.99 19.81 23.63 27.10 30.92 34.75 38.57 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### #REF!
Aktual

100

90

80

70

60
Row 26
50

40
38.57
30 34.75
30.92
27.10
20 23.63
19.81
15.99
10 14.05
12.12
9.40
6.67
0 3.95
10 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
PERHITUNGAN LUAS RUANG
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur dan arsitektur
Proyek : Rumah Tinggal
Lokasi : Puri syailendra kavling blok 33
Luas m2 : 315.480
Pemilik : Mei Lin Liem

PANJANG LEBAR LUAS


NO RUANGAN
M' M' M2
I LANTAI DASAR
1 Teras Belakang 8.600 1.200 5.160
2 R. Tidur 1 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
3 R. Tidur 2 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
4 R. Tidur 3 3.600 6.300 22.680
Toilet 1.850 1.700 3.145
Pantry 1.750 1.700 2.975
Jumlah Luas Lt dasar m2 89.160
LANTAI SATU
1 Balkon Belakang 8.600 1.200 5.160
2 R. Tidur 4 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
Balkon Depan 2.000 1.200 1.200
3 R. Tidur 5 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
Balkon Depan 2.000 1.200 1.200
4 R. Tidur 6 3.600 6.300 22.680
Toilet 1.850 1.700 3.145
Pantry 1.750 1.700 2.975
5 Balkon Depan 2.000 1.200 1.200
6 Tangga 4.500 2.150 4.837
Jumlah Luas Lt Satu m2 97.598
LANTAI DUA
1 Balkon Belakang 8.600 1.200 5.160
2 R. Tidur 7 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
Balkon Depan 2.000 1.200 1.200
3 R. Tidur 8 3.450 6.300 21.735
Toilet 1.700 1.700 2.890
Pantry 1.750 1.700 2.975
Balkon Depan 2.000 1.200 1.200
4 R. Tidur 9 3.600 6.300 22.680
Toilet 1.850 1.700 3.145
Pantry 1.750 1.700 2.975
5 Balkon Depan 2.000 1.200 1.200
Jumlah Luas Lt Dua m2 92.760
LANTAI TIGA
1 R. Tidur 1 4.000 2.700 10.800
PERHITUNGAN LUAS RUANG
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur dan arsitektur
Proyek : Rumah Tinggal
Lokasi : Puri syailendra kavling blok 33
Luas m2 : 315.480
Pemilik : Mei Lin Liem

PANJANG LEBAR LUAS


NO RUANGAN
M' M' M2
2 R. Tidur 2 4.000 2.700 10.800
3 Toilet 2.500 1.500 3.750
4 Dapur 2.500 1.200 1.500
5 Teras 10.500 1.450 7.613
2.500 1.200 1.500
Jumlah Luas Lt Dua m2 35.963
315.480
KERAMIK PLIN
PLAPON LIST
M2
1.1
10.320 19.6
21.735 19.5

21.735 19.5

0.000 0 155

21.735 19.5

2.975 6.9

3.250 2.650
1.350 1.300
1.350 1.350
0.600 0.950
KERAMIK PLIN
PLAPON LIST
M2
780 No. Ukuran Keramik/Granit Ruangan Luas

###

###
ANALISA HARGA KUSEN,PINTU DAN JENDELA
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur dan arsitektur
Proyek : Rumah Tinggal
Lokasi : Puri syailendra kavling blok 33
Pemilik : Mei Lin Liem

No Uraian Pekerjaan Satuan Volume


1 Pintu Utama uk 180 x 240 cm
Kaca polos 12 mm m2 4.32
Daun pintu kaca fith fiting +Dorma Bts 84+PT 10 lgkp+handel 60cm unit 2.000
Silicon ls 1.000
1 1 Unit Pemasangan Kusen Pintu Tipe P1
Kusen 6/15 Kayu Samarinda Oven m3 0.066
Daun Pintu Double megateak 231x 82x3,5 cm kayu kamper samarinda oven KW1 bh 1
Upah Pemasangan
- Kusen ls 1
- Daun Pintu ls 1
Assesories
Kunci Pintu ex dekson
- Handel dks 105-100-028 bh 1
Body LHR dks 8585 Sn +Cly dks 60 mm BKsn bh 1
Engsel Pintu 4" ex Maven bh 2
Fhinishing Woodstain Pinogar
Kusen m' 6.90
Daun Pintu bh 1
2 1 Unit Pemasangan Kusen Pintu TipeAL- P2
Kusen almunium 4"alexsindo black m1 4.900
Daun Pintu Kaca frame almunium 210x72cm (kunci+engsel) bh 1.000
Kaca es 5 mm m2 1.200
3 1 Unit Pemasangan Kusen AL-PG1
Kusen almunium 4"alexsindo black m1 4.900
Daun Pintu kaca bh 1.000
Kaca es 5 mm m2 1.200
Karet kaca m1 2.400
silicon m 1
7.200
4 Jendela AL-J1
Kusen almunium 4"alexsindo black m1 5.600
Daun jendela casmen 60 x 60 cm bh 1.000
Kaca polos 5 mm m2 1.080
Karet kaca m1 5.200
silicon m 1
6.000
Jendela AL-J2
Kusen almunium 4"alexsindo black m1 14.720
Daun Jendela Kaca frame almunium 60x60cm (kunci+engsel) bh 2.000
Kaca polos 5 mm m2 2.160
Karet kaca m1 4.800
silicon m 1
14.400
Jendela J3
Almunium U m1 6.000
Kaca polos 8 mm m 2
2.240
silicon m1 6.000
7
Sanvio,cv
arsitecture design,contraktor
022 70416292
ANALISA HARGA KUSEN,PINTU DAN JENDELA
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur dan arsitektur
Proyek : Rumah Tinggal
Lokasi : Puri syailendra kavling blok 33
Pemilik : Mei Lin Liem
Jendela J4
Almunium U m1 5.600
Kaca polos 8 mm m2 1.920
silicon m 1
5.600
Jendela J5
Almunium U m1 3.800
Kaca polos 5 mm m 2
0.480
silicon m1 3.800
Jendela J6
Almunium U m1 5.920
Kaca polos 5 mm m2 1.380
silicon m 1
5.800
Jendela AL-V1
Kusen almunium 4"alexsindo black m1 2.400
Daun Jendela Kaca frame almunium 60x60cm (kunci+engsel) bh 2.000
Kaca polos 5 mm m2 0.360
Karet kaca m1 2.400
silicon m 1
2.400

No Tipe Pintu Volume Luas Volume Daun


Lobang Kusen Pintu Jendela

Lantai Bawah 41.215 40.800 #REF! 8.000


PD1 1 3.995 8.400 4.000
PD2 1 3.760
PJ1 1 3.130
PJ2 1 6.933
P1 2 4.230 7.200 1
P2 1 1.880 7.000 #REF!
J1 5 7.875 7.000 1.000
J2 1 1.085 11.200 3.000
V1 2 0.720 2.400
V2 2 1.380
Jex 1 6.228
Lantai Atas 32.733 62.350 #REF! 6.000
PD2 1 3.760 7.000 1
P1 4 8.460 6.000 #REF!
P2 2 3.760 6.000
J2 4 6.300 25.200 1.000
J2 1 1.085 10.600 3.000
JK1 1 1.400
V1 1 0.360 7.550 2.000
V2 2 1.380
8
Sanvio,cv
arsitecture design,contraktor
022 70416292
ANALISA HARGA KUSEN,PINTU DAN JENDELA
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur dan arsitektur
Proyek : Rumah Tinggal
Lokasi : Puri syailendra kavling blok 33
Pemilik : Mei Lin Liem
Jex 1 6.228 #VALUE! ### ###

9
Sanvio,cv
arsitecture design,contraktor
022 70416292
Harga satuan Jumlah
8,971,000 4.32 4.32
450,000 1,944,000 0
3,500,000 7,000,000
27,000 27,000 0
Jumlah 2,322,853 2.16 19.44
9,700,000 642,528 6.90
937,200 937,200

25,000 25,000
55,000 55,000

88,150 88,150
119,925 119,925
31,775 63,550

35,000 241,500
150,000 150,000
Jumlah 1,319,500 1.47 13.23
75,000 367,500
850,000 850,000
85,000 102,000
Jumlah 1,519,500 2.16 17.28
75,000 367,500
1,050,000 1,050,000
85,000 102,000
3,200 7,680
3,200 23,040
Jumlah 886,840 0.96 2.88
75,000 420,000
350,000 350,000
75,000 81,000
3,200 16,640
3,200 19,200
Jumlah 1,966,000 2.24 2.24
75,000 1,104,000
350,000 700,000
75,000 162,000
3,200 15,360
3,200 46,080
Jumlah 486,000 2.24
25,000 150,000
150,000 336,000
3,200 19,200
10
Sanvio,cv
arsitecture design,contraktor
022 70416292
Jumlah 428,000 1.92 7.68
25,000 140,000
150,000 288,000
3,200 17,920
Jumlah 131,000 0.48 3.84
25,000 95,000
75,000 36,000
3,200 12,160
Jumlah 270,060 1.38 1.38
25,000 148,000
75,000 103,500
3,200 18,560
Jumlah 422,360 0.36 2.88
75,000 180,000
100,000 200,000
75,000 27,000
3,200 7,680
3,200 7,680 75.17

Kaca 5 mm Engsel Kunci Rambuncis Slot Tanam


Pintu 4" 3"

9.975 #REF! 4.000 2.000 4.000 3.000


3.36 5 1 3

1 1
#REF!
4.725 1 1
1.89 3 3

5.040 #REF! 6.000 1.000 6.000 0.000


1 1
#REF!

1.89 1 1
1.89 3 3

1.26 2 2

11
Sanvio,cv
arsitecture design,contraktor
022 70416292
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! ###

12
Sanvio,cv
arsitecture design,contraktor
022 70416292
ANALISA 1 M3 COR BETON BERTULANG
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas bangunan : #REF! m2
Lokasi : Puri syailendra kavling blok 33
Pemilik :

1m3 Cor Straust Pile ¢ 30 t=6 4¢13,¢8-1700


Besi D13 : 58.88064 x 8,146 = 479,632
Besi ¢8-200 : 11.3232 x 8,146 = 92,237
Kawat Besi : 1.428 x 13,225 = 18,885
Upah besi : 70.20384 x 1,100 = 77,224
Bekisting papan : 0 x 262,111 = 0
Upah Bekisting+bongkar : 0 x 15,000 = 0
Cor Beton : 1.025 x 675,200 = 692,080
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 1,377,933
1m3 Cor Pile Cap 70x70x30 D13-200 beton K225
Besi D13 : 99.008 x 8,146 = 806,503
Kawat Besi : 1.02 x 13,225 = 13,489
Upah besi : 99.008 x 1,100 = 108,909
Bekisting papan : 0 x 262,111 = 0
Upah Bekisting+bongkar : 0x 15,000 = 0
Cor Beton : 1.025 x 675,200 = 692,080
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1x 2,500 = 2,500
Jumlah 1,638,856
1m3 Cor Pile Cap100x100x30 ¢12-200 beton K 225
Besi ¢12 : 138.38947 x 8,146 = 1,127,298
Kawat Besi : 1.02 x 13,225 = 13,489
Upah besi : 138.38947 x 1,100 = 152,228
Bekisting papan : 0 x 262,111 = 0
Upah Bekisting+bongkar : 0 x 15,000 = 0
Cor Beton : 1.05 x 675,200 = 708,960
Mesin Molen : 1.05 x 15,000 = 15,750
Peralatan 1 x 2,500 = 2,500
Jumlah 2,020,225
1m3 Cor Sloof 15/30 4 ¢13,2¢10; ¢8-170 beton K-225
Besi D13 : 92.444444 x 8,146 = 753,037
Besi ¢10 : 27.422222 x 8,146 = 223,377
Besi ¢8-200 : 29.333333 x 8,146 = 238,944
Kawat Besi : 1.53 x 13,225 = 20,234
Upah besi : 149.2 x 1,100 = 164,120
Bekisting papan : 0.336 x 524,223 = 176,139
Upah Bekisting+bongkar : 1x 15,000 = 15,000
Cor Beton : 1.025 x 675,200 = 692,080
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1x 2,500 = 2,500
Jumlah 2,300,806
1m3 Cor Sloof 15/20 4 ¢10; ¢8-170 beton K-225
Besi ¢10 : 82.266667 x 8,146 = 670,131
Besi ¢8-200 : 34 x 8,146 = 276,958
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 116.26667 x 1,100 = 127,893
Bekisting papan : 0.462 x 524,223 = 242,191
Upah Bekisting+bongkar : 1 x 15,000 = 15,000
Cor Beton : 1.025 x 675,200 = 692,080
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 2,058,315
1m3 Cor Kolom 13/25 4¢13,2¢10;¢8-170 beton K-225
Besi D13'4'¢10 : 46.222222 x 8,146 = 376,519
ANALISA 1 M3 COR BETON BERTULANG
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas bangunan : #REF! m2
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Besi ¢8-200 : 12.444444 x 8,146 = 101,370
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 58.666667 x 1,100 = 64,533
Bekisting papan : 0.2 x 524,223 = 104,845
Upah Bekisting+bongkar : 1 x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 1,355,453
1m3 Cor Kolom 15/60 12¢13,;¢8-170 beton K-225
Besi D13'4'¢10 : 138.66667 x 8,146 = 1,129,556
Besi ¢8-200 : 30.444444 x 8,146 = 247,995
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 169.11111 x 1,100 = 186,022
Bekisting papan : 0.4 x 524,223 = 209,689
Upah Bekisting+bongkar : 1 x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 2,481,448
1m3 Cor Kolom 13/40 4D13,2¢10 ¢8-170 beton K225
Besi D16,D13 : 80 x 8,146 = 651,667
Besi ¢10 : 23.730769 x 8,146 = 193,307
Besi ¢8-200 : 36.538462 x 8,146 = 297,636
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 140.26923 x 1,000 = 140,269
Bekisting papan : 0.3076923 x 524,223 = 161,299
Upah Bekisting+bongkar : 1x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1x 2,500 = 2,500
Jumlah 2,152,364
1m3 Cor balok beton 15/30 4D13,2¢10 ;sk ¢8-100/200
Besi ,D13,¢ 10 : 92.444444 x 8,146 = 753,037
Besi ¢10 : 27.422222 x 8,146 = 223,377
Besi ¢8-200 : 33.333333 x 8,146 = 271,528
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 153.2 x 1,000 = 153,200
Bekisting papan : 0.3333333 x 524,223 = 174,741
Tiang penyanggah 0.126 x 524,223 = 66,052
Upah Bekisting+bongkar : 1x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1x 2,500 = 2,500
Jumlah 2,350,120
1m3 Cor balok beton 15/20 4D13;sk ¢8-10/200
Besi D13 : 138.66667 x 8,146 = 1,129,556
Besi ¢8-200 : 30.666667 x 8,146 = 249,806
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 169.33333 x 1,000 = 169,333
Bekisting papan : 0.3666667 x 524,223 = 192,215
Tiang penyanggah 0.126 x 524,223 = 66,052
Upah Bekisting+bongkar : 1 x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 2,515,147
1m3 Cor balok beton 15/40 4D13,2¢10 ;sk ¢8-100/200
ANALISA 1 M3 COR BETON BERTULANG
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas bangunan : #REF! m2
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Besi ,D13,¢ 10 : 69.333333 x 8,146 = 564,778
Besi ¢10 : 20.566667 x 8,146 = 167,533
Besi ¢8-200 : 31.666667 x 8,146 = 257,951
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 121.56667 x 1,000 = 121,567
Bekisting papan : 0.3166667 x 524,223 = 166,004
Tiang penyanggah 0.126 x 524,223 = 66,052
Upah Bekisting+bongkar : 1 x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 2,052,070
1m3 Cor lantai beton ¢8-170
Besi ¢10-170 : 96 x 8,146 = 782,000
Kawat Besi : 1.428 x 13,225 = 18,885
Upah besi : 96 x 1,100 = 105,600
Bekisting papan : 8.333 x 110,000 = 916,630
Tiang penyanggah 0.42 x 524,223 = 220,173
Upah Bekisting+bongkar : 1.5 x 15,000 = 22,500
Cor Beton : 1.025 x 675,200 = 692,080
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1 x 2,500 = 2,500
Jumlah 2,775,743

1m3 Cor kolom praktis beton10/10 4D13;sk ¢8-10/200


Besi 4 ¢ 8 : 160 x 8,146 = 1,303,333
Besi ¢6-200 : 35.52 x 8,146 = 289,340
Kawat Besi : 1.224 x 13,225 = 16,187
Upah besi : 195.52 x 1,100 = 215,072
Bekisting papan : 0.4 x 524,223 = 209,689
Upah Bekisting+bongkar : 1x 15,000 = 15,000
Cor Beton : 1.025 x 643,047 = 659,123
Mesin Molen : 1.025 x 15,000 = 15,375
Peralatan 1x 2,500 = 2,500
Jumlah 2,453,058
REKAPITULASI ANGGARAN B I A YA
Nomor : /SBP-TEK/II/2010
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas bangunan : 315.48 m2
Lokasi : Puri syailendra kavling blok 33
Pemilik : Mei Lin Liem

BOBOT Maret 2010 April 2010


NO URAIAN PEKERJAAN
1 2 3 4 5
I PEKERJAAN PERSIAPAN 0.79 0.79
II PEKERJAAN STRUKTUR LANTAI 1 12.18
III PEKERJAAN STRUKTUR LANTAI 2 6.28
IV PEKERJAAN STRUKTUR LANTAI 3 5.32
V ### 4.25
VI PEKERJAAN ARSITEKTUR LANTAI 1 11.79
VII PEKERJAAN ARSITEKTUR LANTAI 2 10.56
VIII PEKERJAAN ARSITEKTUR LANTAI 3 10.56
IX PEKERJAAN ATAP 2.83
X ### 1.22
XI PEKERJAAN INSTALASI LISTRIK 6.71
XII PLUMBING 5.65
XIII KAMAR MANDI, PANTRY & ALAT SANITAIR 19.49
XIV PEKERJAAN LAIN-LAIN 2.38
JUMLAH 100.00 0.79 0 0 0 0
Kumulatif 0.79 0.79 0.79 0.79 0.79
Rencana
Aktual

Bandung, Februari 2010


Mengetahui, Yang membuat
PT. Saylendra Bangun Persada

Sigit budiarto Kardinal


Direktur
April 2010 Mei 2010 Jun-10 Jul-10 Agustus 2010 Sep-10
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Sep-10 Oct-10 Nov-10
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

0 0 0 0
0.79 0.79 0.79 0.79

210
52.5

115995
127594.5
42 43 44 45 46 47 48 49 50 51 52 53
REKAPITULASI ANGGARAN B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas bangunan : 315.48 m2
Lokasi : Puri syailendra kavling blok 33
Pemilik :

NO URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN
II PEKERJAAN STRUKTUR LANTAI 1
III PEKERJAAN STRUKTUR LANTAI 2
IV PEKERJAAN STRUKTUR LANTAI 3
V PEKERJAAN STRUKTUR LANTAI 4
VI PEKERJAAN ARSITEKTUR LANTAI 1
VII PEKERJAAN ARSITEKTUR LANTAI 2
VIII PEKERJAAN ARSITEKTUR LANTAI 3
IX PEKERJAAN ARSITEKTUR LANTAI 4
X PEKERJAAN ATAP
IX PEKERJAAN INSTALASI LISTRIK
X PLUMBING
XI KAMAR MANDI, PANTRY & ALAT SANITAIR
XII PEKERJAAN LAIN-LAIN
JUMLAH
Jasa Konstruksi 10 %
Grand total
HARGA PER M2

Bandung, Maret 2012


Mengetahui, Yang membuat
PT. Saylendra Bangun Persada

Sigit budiarto
Direktur

Catatan :
1 Pekerjaan Dinding Batu Templek untuk benteng
Volume = 82.8 m2 Rp 140,000 Rp11,592,000
JUMLAH
RP
10,413,727 1.23 19,505,013
92,598,683 10.89 ###
65,730,031 7.73 ###
32,705,938 3.85 ###
7,801,708 0.92
128,482,588 15.12 ###
126,276,358 14.86 ###
126,276,358 14.86 ### 2669667.59
43,055,113 5.07
26,350,093 3.10 96,117,813
49,445,500 5.82 ### ###
39,122,753 4.60 ###
52,249,771 6.15 ###
49,454,000 5.82 ###
849,962,622 100.00 2694188.6
84,996,262 Err:522
934,958,885
2,963,607

Bandung, Maret 2012


Yang membuat
R E N C A N A A N G G A R A N B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Harga satuan Jmh Harga
No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah
I PEKERJAAN PERSIAPAN Total I 10,413,727
Pekerjaan Persiapan, Sarana dan Penunjang diantaranya untuk
Biaya-biaya:
1 Pembersihan lahan 130.00 m2 919 119,438
2 Pembuatan Gudang 0.00 m2 101,880 0
3 Pekerjaan Bouwplank 43.00 ls 24,063 1,034,709
4 Air Kerja Jet Pam dalam 30m' + pompa sumitsu 500 watt 1.00 titik 8,489,580 8,489,580
5 Pembersihan akhir + buang brangkal 1.00 ls 770,000 770,000
II PEKERJAAN STRUKTUR LANTAI 1 Total II 92,598,683
1 Pekerjaan Tanah
a Galian tanah Pondasi batu kali menerus 6.44 m3 37,550 241,822
b Galian Pile cap 9.00 m3 37,550 337,950
c Galian Tanah Pondasi Straust ¢30 cm t=700 cm' 84.00 m' 37,550 3,154,200
d Galian Tanah Pondasi Straust ¢30 cm t=250 cm' 24.00 m' 37,550 901,200
e Urugan pasir pondasi pile cap t = 5 cm dipadatkan 0.44 m3 64,339 28,373
f Lantai kerja pondasi pile cap t=5cm 0.44 m3 27,168 11,981
2 Pasangan Pondasi Batu Belah 1 Pc : 3 Ps 3.22 m3 357,180 1,150,120
3 Urugan Kembali Pondasi 1.61 m3 7,906 12,728
4 Cor Straust Pile ¢ 30 t=7 4 D13,¢8-1700 5.94 m3 1,377,933 8,184,922
5 Cor Straust Pile ¢ 30 t=2,5 4 D13,¢8-1700 2.97 m3 1,377,933 4,092,461
6 Cor Pile Cap90x90x25 D13-200+ pedestal beton K 225 2.43 m3 2,020,225 4,909,147
7 Cor Pile Cap60x60x25 D12-200+ pedestal beton K 225 0.72 m3 1,616,180 1,163,650
8 Cor Sloof S1 15/30 4¢13,2¢10;¢8-200 beton K-225 2.48 m3 2,480,077 6,150,591
9 Cor Sloof S2 15/20 4¢10;¢8-200 beton K-226 1.16 m3 2,110,010 2,447,612
10 Cor Kolom K1 15/60 8¢13,2¢10;¢8-200 beton K-225 4.05 m3 2,853,665 11,557,344
11 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.76 m3 2,085,099 1,576,335
12 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 3.81 m3 2,702,638 10,297,052
13 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 0.59 m3 2,515,147 1,475,134
14 Cor Balok B4 15/15 4D8 ; sk ¢8-100/170 0.64 m3 2,137,875 1,368,240
15 Cor Topi beton atas Pintu 0.48 m3 2,144,057 1,029,147
16 Cor Lantai Beton t=12 cm m8 K-225 11.71 m3 2,775,743 32,508,674
III PEKERJAAN STRUKTUR LANTAI 2 Total III 65,730,031
1 Cor Kolom K1 15/60 8¢13,2¢10;¢8-200 beton K-225 4.05 m3 2,853,665 11,557,344
2 Cor Kolom K3 15/25 4¢10,2¢10;¢8-200 beton K-225 0.90 m3 2,252,999 2,027,699
3 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.76 m3 2,085,099 1,576,335
4 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 3.81 m3 2,702,638 10,297,052
5 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 0.59 m3 2,515,147 1,475,134
6 Cor Topi beton atas Pintu 0.48 m3 2,144,057 1,029,147
7 Cor Lantai Beton t=12 cm m8 K-225 11.13 m3 2,775,743 30,897,355
8 Cor Tangga Utama ¢10-170 beton K225 2.48 m3 2,775,743 6,869,965
IV PEKERJAAN STRUKTUR LANTAI 3 Total IV 32,705,938
1 Cor Kolom K2 15/30 4¢13,2¢10;¢8-200 beton K-225 1.57 m3 2,608,735 4,108,758
2 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.17 m3 2,085,099 347,169
3 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 3.81 m3 2,702,638 10,297,052
4 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 0.59 m3 2,515,147 1,475,134
5 Cor Topi beton atas Pintu 0.48 m3 2,144,057 1,029,147
6 Cor Lantai Beton t=12 cm m8 K-225 5.57 m3 2,775,743 15,448,677
V PEKERJAAN STRUKTUR LANTAI 4 Total IV 7,801,708
1 Cor Kolom K3 15/25 4¢10,2¢10;¢8-200 beton K-225 2.04 m3 2,252,999 4,591,521
2 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.14 m3 2,085,099 300,254
3 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 0.63 m3 2,702,638 1,702,662
4 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 0.48 m3 2,515,147 1,207,271
VI PEKERJAAN ARSITEKTUR LANTAI 1 Total V 128,482,588
Pekerjaan dinding Sub Total 35,227,993
1 Pas dinding bata merah 1/2 bt 1;5 257.55 m2 74,558 19,202,320
2 Pas Plesteran 463.59 m2 23,625 10,952,144
3 Pas acian dinding 463.59 m2 10,944 5,073,529
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total 24,683,379
Kunci ex dekson, Engsel 4" ex Mafen, Slot tanam Rambuncis,Tkaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 3.00 bh 2,322,853 6,968,559
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP

Page 22 of 71
R E N C A N A A N G G A R A N B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Harga satuan Jmh Harga
No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe P2 uk.80x 235 pintu megateak formika 231 x 62 x 3,5 cm 3.00 bh 2,276,310 6,828,930
3 Tipe AL-PD1 kusen almunium alxsindo 4" black uk.140 x 235 cm pintu kaca frame almunium 3.00 bh 2,659,125 7,977,375
4 TipeV1 3.00 bh 609,505 1,828,515
5 TipeV2 9.00 bh 120,000 1,080,000
Pekerjaan Plafond Sub Total 29,562,582
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 273.54 m2 93,969 25,704,390
2 Pekerjaan List Gipsum 10 cm 206.10 m2 18,720 3,858,192
Pekerjaan Lantai Sub Total 27,091,141
- Pasir Urug 4.46 m3 125,000 557,250
- Granit 60x60 ex Eleganza Polished 75.07 m2 177,799 13,348,271
- Plint Lantai 10 x 60 ex Eleganza polished 206.10 m' 59,266 12,214,802
- Granit 40x40 ex Ivori esenza Unpolished 9.60 m2 101,127 970,818
Pekerjaan Pengecatan Sub Total 11,917,494
1 Cat dinding Exterior ex Dullux watershield 181.00 m2 19,800 3,583,751
2 Cat dinding Interior ex Dullux 347.69 m2 15,000 5,215,388
3 Cat Plafond ex jotun 273.54 m3 11,400 3,118,356
VI PEKERJAAN ARSITEKTUR LANTAI 2 Total VI 126,276,358
Pekerjaan dinding Sub Total 35,227,993
1 Pas dinding bata merah 1/2 bt 1;5 257.55 m2 74,558 19,202,320
2 Pas Plesteran 463.59 m2 23,625 10,952,144
3 Pas acian dinding 463.59 m2 10,944 5,073,529
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total 24,323,379
Kunci ex dekson, Engsel 4" ex Mafen, Slot tanam Rambuncis,Tkaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 3.00 bh 2,322,853 6,968,559
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe P2 uk.80x 235 pintu megateak formika 231 x 62 x 3,5 cm 3.00 bh 2,276,310 6,828,930
3 Tipe AL-PD1 kusen almunium alxsindo 4" black uk.140 x 235 cm pintu kaca frame almunium 3.00 bh 2,659,125 7,977,375
4 TipeV1 3.00 bh 609,505 1,828,515
5 TipeV2 9.00 bh 80,000 720,000
Pekerjaan Plafond Sub Total 29,562,582
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 273.54 m2 93,969 25,704,390
2 Pekerjaan List Gipsum 10 cm 206.10 m2 18,720 3,858,192
Pekerjaan Lantai Sub Total 26,533,891
- Pasir Urug 0.00 m3 125,000 0
- Granit 60x60 ex Eleganza Polished 75.07 m2 177,799 13,348,271
- Plint Lantai 10 x 60 ex Eleganza polished 206.10 m' 59,266 12,214,802
- Granit 40x40 ex Ivori esenza Unpolished 9.60 m2 101,127 970,818
Pekerjaan Pengecatan Sub Total 10,628,514
1 Cat dinding Exterior ex Dullux watershield 115.90 m2 19,800 2,294,771
2 Cat dinding Interior ex Dullux 347.69 m2 15,000 5,215,388
3 Cat Plafond ex jotun 273.54 m3 11,400 3,118,356
VII PEKERJAAN ARSITEKTUR LANTAI 3 Total VII 126,276,358
Pekerjaan dinding Sub Total 35,227,993
1 Pas dinding bata merah 1/2 bt 1;5 257.55 m2 74,558 19,202,320
2 Pas Plesteran 463.59 m2 23,625 10,952,144
3 Pas acian dinding 463.59 m2 10,944 5,073,529
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total 24,323,379
Kunci ex dekson, Engsel 4" ex Mafen, Slot tanam Rambuncis,Tkaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 3.00 bh 2,322,853 6,968,559
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe P2 uk.80x 235 pintu megateak formika 231 x 62 x 3,5 cm 3.00 bh 2,276,310 6,828,930
3 Tipe AL-PD1 kusen almunium alxsindo 4" black uk.140 x 235 cm pintu kaca frame almunium 3.00 bh 2,659,125 7,977,375
4 TipeV1 3.00 bh 609,505 1,828,515
5 TipeV2 9.00 bh 80,000 720,000
Pekerjaan Plafond Sub Total 29,562,582
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 273.54 m2 93,969 25,704,390
2 Pekerjaan List Gipsum 10 cm 206.10 m2 18,720 3,858,192
Pekerjaan Lantai Sub Total 26,533,891
- Pasir Urug 0.00 m3 125,000 0

Page 23 of 71
R E N C A N A A N G G A R A N B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Harga satuan Jmh Harga
No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah
- Granit 60x60 ex Eleganza Polished 75.07 m2 177,799 13,348,271
- Plint Lantai 10 x 60 ex Eleganza polished 206.10 m' 59,266 12,214,802
- Granit 40x40 ex Ivori esenza Unpolished 9.60 m2 101,127 970,818
Pekerjaan Pengecatan Sub Total 10,628,514
1 Cat dinding Exterior ex Dullux watershield 115.90 m2 19,800 2,294,771
2 Cat dinding Interior ex Dullux 347.69 m2 15,000 5,215,388
3 Cat Plafond ex jotun 273.54 m3 11,400 3,118,356
VII PEKERJAAN ARSITEKTUR LANTAI 4 Total VII 43,055,113
Pekerjaan dinding Sub Total 14,060,547
1 Pas dinding bata merah 1/2 bt 1;5 97.85 m2 74,558 7,295,465
2 Pas Plesteran 195.70 m2 23,625 4,623,341
3 Pas acian dinding 195.70 m2 10,944 2,141,741
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total 15,828,896
Kunci ex dekson, Engsel 4" ex Mafen, Slot tanam Rambuncis,Tkaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 2.00 bh 2,322,853 4,645,706
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe P2 uk.80x 235 pintu megateak formika 231 x 62 x 3,5 cm 1.00 bh 2,276,310 2,276,310
3 Tipe AL-PD1 kusen almunium alxsindo 4" black uk.140 x 235 cm pintu kaca frame almunium 3.00 bh 2,659,125 7,977,375
4 TipeV1 1.00 bh 609,505 609,505
5 TipeV2 4.00 bh 80,000 320,000
Pekerjaan Plafond Sub Total 3,033,580
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 25.35 m2 93,969 2,382,124
2 Pekerjaan List Gipsum 10 cm 34.80 m2 18,720 651,456
Pekerjaan Lantai Sub Total 6,672,760
- Pasir Urug 0.00 m3 125,000 0
- Granit 60x60 ex Eleganza Polished 21.60 m2 177,799 3,840,462
- Plint Lantai 10 x 60 ex Eleganza polished 34.80 m' 59,266 2,062,470
- Granit 40x40 ex Ivori esenza Unpolished 7.61 m2 101,127 769,828
Pekerjaan Pengecatan Sub Total 3,459,330
1 Cat dinding Exterior ex Dullux watershield 48.93 m2 19,800 968,715
2 Cat dinding Interior ex Dullux 146.78 m2 15,000 2,201,625
3 Cat Plafond ex jotun 25.35 m3 11,400 288,990
VIII PEKERJAAN ATAP Total VIII 26,350,093
1 Rangka atap Steel strus 110.25 m2 132,000 14,553,000
2 Penutup atap genteng beton plat ex CP 110.25 m2 65,941 7,269,995
3 Bubungan Genteng Beton ex Cp 44.00 m' 67,570 2,973,098
4 Bubungan apex (tiga arah) ex CP 0.00 bh 44,275 0
5 Ujung Bubungan ex CP 4.00 bh 31,500 126,000
6 Lispang GRC 30 cm 20.40 m' 70,000 1,428,000
IX PEKERJAAN INSTALASI LISTRIK Total IX 49,445,500
LISTRIK LANTAI 1 15,570,500
1 Box panel Induk LP 20 x 40 x 60 1.00 bh 1,700,000 1,700,000
2 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 1,500,000 1,500,000
3 Box Heger 6 grup, Mcb 6 A (3 bh) 3.00 bh 420,000 1,260,000
4 Digital Matering 1 pas 3.00 bh 600,000 1,800,000
5 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 24.00 bh 156,000 3,744,000
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 6.00 bh 185,250 1,111,500
7 Lampu dinding carport + Instalasi 5.00 bh 135,000 675,000
8 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 12.00 bh 135,000 1,620,000
9 Telepon Clipsal +instalasi 3.00 bh 190,000 570,000
10 Tv Clipsal + instalasi +spliter 3.00 bh 190,000 570,000
11 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 3.00 bh 205,000 615,000
12 Saklar Seri ex Clipsal E 2000 9.00 bh 45,000 405,000
LISTRIK LANTAI 2 14,736,000
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 1,500,000 1,500,000
2 Box Heger 6 grup, Mcb 6 A (3 bh) 3.00 bh 420,000 1,260,000
3 Digital Matering 1 pas 3.00 bh 600,000 1,800,000
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 24.00 bh 135,000 3,240,000
5 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 6.00 bh 171,000 1,026,000
6 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 12.00 bh 190,000 2,280,000
7 Telepon Clipsal +instalasi 3.00 bh 190,000 570,000
8 Tv Clipsal + instalasi +spliter 3.00 bh 190,000 570,000
9 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 3.00 bh 260,000 780,000

Page 24 of 71
R E N C A N A A N G G A R A N B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Harga satuan Jmh Harga
No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah
10 Saklar Seri ex Clipsal E 2000 9.00 bh 190,000 1,710,000
LISTRIK LANTAI 3 14,736,000
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 1,500,000 1,500,000
2 Box Heger 6 grup, Mcb 6 A (3 bh) 3.00 bh 420,000 1,260,000
3 Digital Matering 1 pas 3.00 bh 600,000 1,800,000
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 24.00 bh 135,000 3,240,000
5 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 6.00 bh 171,000 1,026,000
6 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 12.00 bh 190,000 2,280,000
7 Telepon Clipsal +instalasi 3.00 bh 190,000 570,000
8 Tv Clipsal + instalasi +spliter 3.00 bh 190,000 570,000
9 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 3.00 bh 260,000 780,000
10 Saklar Seri ex Clipsal E 2000 9.00 bh 190,000 1,710,000
LISTRIK LANTAI 4 4,403,000
1 Box Heger 6 grup, Mcb 6 A (3 bh) 3.00 bh 420,000 1,260,000
2 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 4.00 bh 135,000 540,000
3 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 3.00 bh 171,000 513,000
4 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 6.00 bh 190,000 1,140,000
5 Telepon Clipsal +instalasi 0.00 bh 190,000 0
6 Tv Clipsal + instalasi +spliter 2.00 bh 190,000 380,000
7 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 0.00 bh 260,000 0
8 Saklar Seri ex Clipsal E 2000 3.00 bh 190,000 570,000
X PLUMBING Total X 39,122,753
PLUMBING LANTAI 1
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 124.00 m' 12,750 1,581,000
Pipa 3/4' ex triliun aw 28.80 m' 11,000 316,800
Pipa 1/2' ex Triliun aw 4.00 m' 9,750 39,000
Acessoris Rucika 1.00 ls 450,000 450,000
2 Instalasi air panas wespex 152.80 m' 35,000 5,348,000
3 Instalasi air kotor
Pipa 2 " ex triliun D 15.75 14,750 232,312
Pipa 3" air talang dan air floor drain ex Triliun D 45.00 m' 21,000 945,000
Pipa 4"ex Triliun D 45.00 m' 29,750 1,338,750
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 300,000 300,000
PLUMBING LANTAI 2
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 69.50 m' 12,750 886,125
Pipa 3/4' ex triliun aw 21.60 m' 11,000 237,600
Pipa 1/2' ex Triliun aw 4.00 m' 9,750 39,000
Acessoris Rucika 1.00 ls 450,000 450,000
2 Instalasi air panas wespex 91.10 m' 35,000 3,188,500
3 Instalasi air kotor
Pipa 2 " ex triliun D 7.87 14,750 116,156
Pipa 3" air talang dan air floor drain ex Triliun D 22.50 m' 21,000 472,500
Pipa 4"ex Triliun D 22.50 m' 29,750 669,375
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 300,000 300,000
PLUMBING LANTAI 3
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 34.75 m' 12,750 443,063
Pipa 3/4' ex triliun aw 32.00 m' 11,000 352,000
Pipa 1/2' ex Triliun aw 4.00 m' 9,750 39,000
Acessoris Rucika 1.00 ls 450,000 450,000
2 Instalasi air panas wespex 45.55 m' 35,000 1,594,250
3 Instalasi air kotor
Pipa 2 " ex triliun D 7.87 14,750 116,156
Pipa 3" air talang dan air floor drain ex Triliun D 22.50 m' 21,000 472,500
Pipa 4"ex Triliun D 22.50 m' 29,750 669,375
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 300,000 300,000
PLUMBING LANTAI 4
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 13.90 m' 12,750 177,225
Pipa 3/4' ex triliun aw 12.80 m' 11,000 140,800
Pipa 1/2' ex Triliun aw 3.00 m' 9,750 29,250
Acessoris Rucika 1.00 ls 200,000 200,000
2 Instalasi air panas wespex 0.00 m' 35,000 0
3 Instalasi air kotor
Pipa 2 " ex triliun D 3.94 14,750 58,078

Page 25 of 71
R E N C A N A A N G G A R A N B I A YA
Nomor : 001 / SBP-TEK/III/2012
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 315.48
Lokasi : Puri syailendra kavling blok 33
Pemilik :
Harga satuan Jmh Harga
No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah
Pipa 3" air talang dan air floor drain ex Triliun D 11.25 m' 21,000 236,250
Pipa 4"ex Triliun D 11.25 m' 29,750 334,688
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 300,000 300,000
4 Solar water heater. ex Sun rain kapaitas 200 L TZBB 18.16 1.00 m' 13,500,000 13,500,000
5 Torn kapasitas 1 m3 Dolpin + pelampung +Hider 1.00 m' 2,300,000 2,300,000
6 Pompa pendorong 125 watt+ Instalasi 1.00 bh 500,000 500,000
XI KAMAR MANDI, PANTRY & ALAT SANITAIR Total XI 52,249,771
1 Kamar mandi Ruang tidur 170 x 170 cm t=280cm, Lt I (9 unit)
Keramik dinding 20/45 ex Roman 150.48 m2 141,726 21,326,856
Keramik lantai 30x30 ex Roman anpolished 18.45 m2 120,467 2,222,610
Closed Duduk ex toto Putih 9.00 bh 1,256,375 11,307,375
Jet Spry 9.00 bh 70,000 630,000
Shower ex +Head panas dingin 9.00 bh 1,223,750 11,013,750
Floor Drain 9.00 bh 47,000 423,000
2 Pantry (9 unit)
Keramik dinding 30/60 ex esenza 9.18 m2 187,157 1,718,101
Meja granit 60 x 600 cm 1.02 m2 450,000 459,000
Zink 1.00 bh 200,000 200,000
Keran Dapur (dingin) 1.00 bh 200,000 200,000
3 Dapur lantai 4
Keramik dinding 20 x 25 ex mulia 2.00 m2 85,000 170,000
Keramik meja dapur 20x20 1.20 m2 65,000 78,000
Zink 1.00 bh 120,000 120,000
Keran Zink 1.00 bh 40,000 40,000
4 Kamar mandi lantai 4 250 x 150 cm
Keramik dinding 20/45 14.4 m2 113,380 1,632,678
Keramik lantai 30x30 3.75 m2 96,373 361,400
Closed Jongkok ex ina Putih 1.00 bh 300,000 300,000
Floor Drain 1.00 bh 47,000 47,000
XII PEKERJAAN LAIN-LAIN Total XII 49,454,000
1 Relling Tangga besi hollow 2/4,4/4 tebal 1.8 mm + head reling Kayu kamper 12.50 m' 630,000 7,875,000
2 Relling balkon besi hollow + besi tempa 13.20 m' 420,000 5,544,000
3 Relling balkon besi hollow 9.60 m' 350,000 3,360,000
4 Tangga Putar 11.25 m' 1,500,000 16,875,000
5 Septik tank 200 cm x 300 cm x 150 cm 1.00 ls 3,700,000 3,700,000
6 Rembasan 200 cm x 300 cm x 150 cm 1.00 ls 3,700,000 3,700,000
7 Canofi Solar Tap 24.00 m2 350,000 8,400,000

Page 26 of 71
Opname Bobot
Pkrjaan Pkrjaan

0.014 0.014
0.000 0.000
0.122 0.122
0.000 0.999
0.000 0.091

0.028
0.040
0.371
0.106
0.003
0.001
0.135
0.001
0.963
0.481
0.578
0.137
0.724
0.288
1.360
0.185
1.211
0.174
0.161
0.121
3.825

1.360
0.239
0.185
1.211
0.174
0.121
3.635
0.808

0.483
0.041
1.211
0.174
0.121
1.818

0.540
0.035
0.200
0.142

2.259
1.289
0.597

0.820

Page 27 of 71
Opname Bobot
Pkrjaan Pkrjaan

0.803
0.939
0.215
0.127

3.024
0.454

0.066
1.570
1.437
0.114

0.422
0.614
0.367

2.259
1.289
0.597

0.820

0.803
0.939
0.215
0.085

3.024
0.454

0.000
1.570
1.437
0.114

0.270
0.614
0.367

2.259
1.289
0.597

0.820

0.803
0.939
0.215
0.085

3.024
0.454

0.000

Page 28 of 71
Opname Bobot
Pkrjaan Pkrjaan
1.570
1.437
0.114

0.270
0.614
0.367

0.858
0.544
0.252

0.547

0.268
0.939
0.072
0.038

0.280
0.077

0.452
0.243
0.091

0.114
0.259
0.034

1.712
0.855
0.350
0.000
0.015
0.168

0.200
0.176
0.148
0.212
0.440
0.131
0.079
0.191
0.067
0.067
0.072
0.048

0.176
0.148
0.212
0.381
0.121
0.268
0.067
0.067
0.092

Page 29 of 71
Opname Bobot
Pkrjaan Pkrjaan
0.201

0.176
0.148
0.212
0.381
0.121
0.268
0.067
0.067
0.092
0.201

0.148
0.064
0.060
0.134
0.000
0.045
0.000
0.067

0.186
0.037
0.005
0.053
0.629

0.027
0.111
0.158
0.035

0.104
0.028
0.005
0.053
0.375

0.014
0.056
0.079
0.035

0.052
0.041
0.005
0.053
0.188

0.014
0.056
0.079
0.035

0.021
0.017
0.003
0.024

0.007

Page 30 of 71
Opname Bobot
Pkrjaan Pkrjaan
0.028
0.039
0.035
1.588
0.271
0.059

2.509
0.261
1.330
0.074
1.296
0.050

0.202
0.054
0.024
0.024

0.020
0.009
0.014
0.005

0.192
0.043
0.035
0.006

0.927
0.652
0.395
1.985
0.435
0.435
0.988
100.000

Page 31 of 71
ANALISA HARGA SATUAN PEKERJAAN
Nomor : 05/Rab/VI/2007
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 654.98
Lokasi : Puri Syailendra
Pemilik : Cacok kuswiyono
Harga Jumlah Harga Jumlah Harga
No Uraian pekerjaan Sat Koef satuan Bahan upah Bahan-Upah
(Rp) (Rp) (Rp) (Rp)
a b c d e f g h

1M2 PEKERJAAN PEMBERSIHAN


Pekerja org 0.0200 28,500.00 570.00
mandor org 0.0050 47,500.00 237.50
Total 0.00 807.50 807.50
1M' PEKERJAAN GUDANG
Kaso Albasia m3 0.0150 600,000.00 9,000.00
Papan Albasia m3 0.0300 455,000.00 13,650.00
Triplek 3 mm m2 1.1000 15,162.45 16,678.70
Paku kg 0.0200 17,500.00 350.00
Seng gelombang lb 0.5000 44,500.00 22,250.00
Pekerja org 0.1500 28,500.00 4,275.00 4,275.00
Tukan Kayu org 0.3500 37,000.00 12,950.00 12,950.00
Mandor org 0.0200 47,500.00 950.00 950.00
Total 71,103.70 18,175.00 89,278.70
1 unit jet pum kedalaman 30m'
pipa 4" maspion aw abu bt 4.0000 185,000.00 740,000.00
pipa2" maspion aw abu bt 4.0000 142,500.00 570,000.00
Pipa 1maspion aw abu bt 14.0000 47,500.00 665,000.00
Drat dalam 1"&drat luar 1" bh 28.0000 8,000.00 224,000.00
siltip bh 10.0000 4,000.00 40,000.00
lem pipa kl 1.0000 35,000.00 35,000.00
tali injuk ikat 3.0000 2,500.00 7,500.00
Pompa gronfost 350 wat unit 1.0000 1,150,000.00 1,150,000.00
upah kerja bor +set pompa m' 30.0000 100,000.00 3,000,000.00
3,431,500.00 3,000,000.00 6,431,500.00
1 M2 PAGAR PENGAMAN PROYEK
Seng Gelombang BJLS 28 ( 80 x 180 cm ) second lbr 1.1000 22,250.00 24,475.00
Kayu Borneo Super m3 0.0150 2,750,000.00 41,250.00
Paku 5 - 7 kg 0.0200 17,500.00 350.00
Pengecatan Cat Minyak 2 x Bagian Luar m2 1.0800 6,500.00 7,020.00
Ongkos pasang ls 1.0000 4,000.00 4,000.00
Total 73,095.00 4,000.00 77,095.00
3 1M' PEKERJAAN BOUWPLANK
Kaso Albasia m3 0.0120 600,000.00 7,200.00
Papan Albasia m3 0.0080 455,000.00 3,640.00
Paku kg 0.0200 17,500.00 350.00
Alat bantu ls 1.0000 500.00 500.00
Pekerja org 0.1000 28,500.00 2,850.00
Tukan Kayu org 0.2200 37,000.00 8,140.00
Mandor org 0.0050 47,500.00 237.50
Total 11,690.00 11,227.50 22,917.50
4 1M3 GALAIN TANAH KEDALAMA 1 M'
Pekerja org 0.8000 42,750.00 34,200.00
Mandor org 0.0400 71,250.00 2,850.00
Alat bantu ls 1.0000 500.00 500.00
Total 500.00 37,050.00 37,550.00
5 1M3 URUGAN TANAH KEMBALI
Pekerja org 0.1920 28,500.00 5,472.00
Mandor org 0.0190 47,500.00 902.50
Alat bantu ls 1.0000 500.00 500.00
Total 500.00 6,374.50 6,874.50
6 1M' GALAIAN STRAUST ¢ 30 CM
Pekerja org 0.7500 28,500.00 21,375.00
Mandor org 0.0550 47,500.00 2,612.50
Alat bantu ls 1.0000 1,500.00 1,500.00
Total 1,500.00 23,987.50 25,487.50
7 1 M3 URUGAN PASIR
Pasir Urug m3 1.1500 45,000.00 51,750.00

71
RAB
by.Sanvio,telp.022 70416292
a b c d e f g h
Alat bantu ls 1.0000 500.00 500.00
Pekerja org 0.3000 28,500.00 8,550.00
Mandor org 0.0100 47,500.00 475.00
Total 52,250.00 9,025.00 61,275.00
8 1 M3 PASANGAN ANSTAMPING
Batu belah m3 1.1500 91,666.67 105,416.67
Alat bantu ls 1.0000 750.00 750.00
Pekerja org 0.7800 28,500.00 22,230.00
Tukang tembok org 0.3900 35,000.00 13,650.00
Mandor org 0.0390 47,500.00 1,852.50
Total 106,166.67 37,732.50 143,899.17
1 M3 URUGAN TANAH KEMBALI
Pekerja Setengah Terampil 0.1920 28,500.00 5,472.00
Mandor 0.0190 47,500.00 902.50
Alat Bantu 1.0000 500.00 500.00
Total 500.00 6,374.50 6,874.50
9 1 M3 PASANGAN BATU BELAH 1 Pc : 4 Ps
Batu Belah m3 1.0500 91,666.67 96,250.00
Pasir pasang m3 0.5200 91,666.67 47,666.67
Semen Portland kg 103.0000 1,060.00 109,180.00
Alat Bantu ls 1.0000 1,500.00 1,500.00
Pekerja org 1.5000 28,500.00 42,750.00
Tukang Tembok org 0.6800 35,000.00 23,800.00
Mandor org 0.0750 47,500.00 3,562.50

Total 254,596.67 70,112.50 324,709.17


10 1 M2 PASANGAN BATA MERAH 1/2 BATA 1 PC : 3 PS
Bata merah jati wangi bh 72.0000 400.00 28,800.00
Pasir Pasang m3 0.0400 91,666.67 3,666.67
Semen Portland kg 14.3700 1,060.00 15,232.20
Alat bantu ls 1.0000 750.00 750.00
Pekerja org 0.3200 28,500.00 9,120.00
Tukang tembok org 0.1100 35,000.00 3,850.00
Mandor org 0.0150 47,500.00 712.50
Total 48,448.87 13,682.50 62,131.37
11 1 M2 PASANGAN BATA MERAH 1/2 BATA 1 PC : 5 PS
Bata merah jati wangi bh 70.0000 400.00 28,000.00
Pasir Pasang m3 0.0850 91,666.67 7,791.67
Semen Portland kg 9.6800 1,060.00 10,260.80
Alat bantu ls 1.0000 750.00 750.00
Pekerja org 0.3200 28,500.00 9,120.00
Tukang tembok org 0.1100 35,000.00 3,850.00
Mandor org 0.0150 47,500.00 712.50
Total 46,802.47 13,682.50 60,484.97

12 1 M2 PLESTERAN 1 PC : 3 PS TEBAL 15 MM
Pasir pasang m3 0.0410 91,666.67 3,758.33
Semen Portland kg 9.4800 1,060.00 10,048.80
Alat Bantu ls 1.0000 750.00 750.00
Pekerja org 0.1000 28,500.00 2,850.00
Tukang tembok org 0.1600 35,000.00 5,600.00
Mandor org 0.0130 47,500.00 617.50
Total 14,557.13 9,067.50 23,624.63
13 1 M2 PLESTERAN 1 PC : 5 PS TEBAL 15 MM
Pasir pasang m3 0.0210 91,666.67 1,925.00
Semen Portland kg 5.3200 1,060.00 5,639.20
Alat Bantu ls 1.0000 750.00 750.00
Pekerja org 0.1000 28,500.00 2,850.00
Tukang tembok org 0.1600 35,000.00 5,600.00
Mandor org 0.0130 47,500.00 617.50
Total 8,314.20 9,067.50 17,381.70
14 1M3 PASANGAN KUSEN PINTU DAN JENDELA
Kayu Samarinda oven m' 1.0500 85,000.00 89,250.00
Lem Kayu kg 0.0500 5,500.00 275.00
Paku/Pasek kg 0.0300 17,500.00 525.00
Alat bantu ls 1.0000 1,000.00 1,000.00
Pekerja org 0.0600 28,500.00 1,710.00
Tukang Kayu org 0.2500 37,000.00 9,250.00

71
RAB
by.Sanvio,telp.022 70416292
a b c d e f g h
Mandor org 0.0250 47,500.00 1,187.50
Total 91,050.00 12,147.50 103,197.50
15 1M2 PASANGAN PINTU PANEL JATI
Papan Kayu Jati Jabar m3 0.0600 85,000.00 5,100.00
Lem Kayu kg 0.1500 5,500.00 825.00
Paku/Pasek kg 0.1200 17,500.00 2,100.00
Alat bantu ls 1.0000 25,000.00 25,000.00
Pekerja org 0.5000 28,500.00 14,250.00
Tukang Kayu org 2.5000 37,000.00 92,500.00
Mandor org 1.0000 47,500.00 47,500.00
Total 33,025.00 154,250.00 187,275.00
16 1M2 PASANGAN PINTU DAN JENDELA KAYU JATI JABAR
Papan Kayu Jati Jabar m3 0.0350 85,000.00 2,975.00
Lem Kayu kg 0.1500 5,500.00 825.00
Paku/Pasek kg 0.1200 17,500.00 2,100.00
Alat bantu ls 1.0000 25,000.00 25,000.00
Pekerja org 0.5000 28,500.00 14,250.00
Tukang Kayu org 2.2000 37,000.00 81,400.00
Mandor org 1.0000 47,500.00 47,500.00
Total 30,900.00 143,150.00 174,050.00
17 1M2 KACA RAYBEN 5 MM
Kaca rayben 5 mm m2 1.1000 85,000.00 93,500.00
Pekerja org 0.0150 28,500.00 427.50
Tukang Kayu org 0.1600 37,000.00 5,920.00
Mandor org 0.0080 47,500.00 380.00
Total 93,500.00 6,727.50 100,227.50
18 1M2 KACA POLOS 5 MM
Kaca polos 5 mm m2 1.1000 70,000.00 77,000.00
Pekerja org 0.0150 28,500.00 427.50
Tukang Kayu org 0.1600 37,000.00 5,920.00
Mandor org 0.0080 47,500.00 380.00
Total 77,000.00 6,727.50 83,727.50
19 1BH PASANG ENGSEL PINTU
Engsel pintu bh 1.0000 10,500.00 10,500.00
Pekerja org 0.0150 28,500.00 427.50
Tukang Kayu org 0.1600 37,000.00 5,920.00
Mandor org 0.0080 47,500.00 380.00
Total 10,500.00 6,727.50 17,227.50
20 1BH PASANG ENGSEL PINTU
Engsel Jendela bh 1.0000 15,000.00 15,000.00
Pekerja org 0.0100 28,500.00 285.00
Tukang Kayu org 0.1200 37,000.00 4,440.00
Mandor org 0.0040 47,500.00 190.00
Total 15,000.00 4,915.00 19,915.00
21 1BH PASANG KUNCI PINTU
Kunci Pintu bh 1.0000 265,000.00 265,000.00
Pekerja org 0.0100 28,500.00 285.00
Tukang Kayu org 0.5100 37,000.00 18,870.00
Mandor org 0.0050 47,500.00 237.50
Total 265,000.00 19,392.50 284,392.50
22 1BH PASANG KUNCI KAMAR MANDI
Kunci Pintu bh 1.0000 160,000.00 160,000.00
Pekerja org 0.0100 28,500.00 285.00
Tukang Kayu org 0.5100 37,000.00 18,870.00
Mandor org 0.0050 47,500.00 237.50
Total 160,000.00 19,392.50 179,392.50
23 1BH PASANG SPRING KNIP
Spring knip bh 1.0000 17,500.00 17,500.00
Pekerja org 0.0150 28,500.00 427.50
Tukang Kayu org 0.1500 37,000.00 5,550.00
Mandor org 0.0080 47,500.00 380.00
Total 17,500.00 6,357.50 23,857.50
24 1BH PASANG HAK ANGIN JENDELA
Hak angin bh 1.0000 35,000.00 35,000.00
Pekerja org 0.0150 28,500.00 427.50
Tukang Kayu org 0.1500 37,000.00 5,550.00
Mandor org 0.0080 47,500.00 380.00
Total 35,000.00 6,357.50 41,357.50
25 1 M2 PASANGAN ATAP GETENG EX CP,CISANGKAN

71
RAB
by.Sanvio,telp.022 70416292
a b c d e f g h
Genteng beton plat m2 10.0000 6,000.00 60,000.00
Pekerja org 0.1000 28,500.00 2,850.00
Tukang Tembok org 0.0300 37,000.00 1,110.00
Mandor org 0.0080 47,500.00 380.00
Total 60,000.00 4,340.00 64,340.00
26 1 M2 PASANGAN BUBUNGAN EX CP,CISANGKAN
Bubungan m2 3.5000 18,500.00 64,750.00
Pasir Pasang m2 0.0320 91,666.67 2,933.33
Semen Portland kg 8.0000 1,060.00 8,480.00
Alat Bantu ls 1.0000 1,000.00 1,000.00
Pekerja org 0.1500 28,500.00 4,275.00
Tukang Tembok org 0.0830 37,000.00 3,071.00
Mandor org 0.0080 47,500.00 380.00
Total 77,163.33 7,726.00 84,889.33
1 M2 RANGKA HOLLOW 2/4 PLAFOND
Besi Hollow 2/4 kg 0.00
Paku mur kg 0.00
Alat Bantu ls 0.00
Pekerja org 28,500.00
Tukang org 37,000.00
Mandor org 47,500.00
Total
1M2 PASANGAN PLAFOND GIPSUM T=9MM
Board gipsum m2 0.3610 55,000.00 19,855.00
Paku gipsum kg 0.0500 17,500.00 875.00
Dempul kg 0.1000 17,500.00 1,750.00
Kain m' 4.0000 160.00 640.00
Alat bantu ls 1.0000 750.00 750.00
Pekerja org 0.0351 28,500.00 1,000.35
Tukang org 0.0800 37,000.00 2,960.00
Mandor org 0.0015 47,500.00 71.25
Total 23,870.00 4,031.60 27,901.60
1M' PASANGAN LIST GIPSUM
List gipsum 7 cm m2 1.0500 9,000.00 9,450.00
Dempul kg 0.0100 2,500.00 25.00
Alat bantu ls 1.0000 500.00 500.00
Pekerja org 0.0350 28,500.00 997.50
Tukang org 0.0450 37,000.00 1,665.00
Mandor org 0.0015 47,500.00 71.25
Total 9,975.00 2,733.75 12,708.75
1M' PASANGAN LIST GIPSUM
List gipsum 10 cm m2 1.1000 11,000.00 12,100.00
Dempul kg 0.0100 17,500.00 175.00
Alat bantu ls 1.0000 750.00 750.00
Pekerja org 0.0350 28,500.00 997.50
Tukang org 0.0450 37,000.00 1,665.00
Mandor org 0.0015 47,500.00 71.25
Total 13,025.00 2,733.75 15,758.75
1M3 CORAN BETON 1 PC : 2 PS : 3 KR
Semen Portland kg 325.0000 1,060.00 344,500.00
Pasir Beton m3 0.7540 136,363.64 102,818.18
Split 1/2 m3 0.8500 136,363.64 115,909.09
Alat Bantu ls 1.0000 10,000.00 10,000.00
Pekerja org 1.7000 28,500.00 48,450.00
Tukang org 0.3850 37,000.00 14,245.00
Mandor org 0.1500 47,500.00 7,125.00
Total 573,227.27 69,820.00 643,047.27
1KG BESI TERPASANG
Besi Beton Rata-Rata kg 1.0500 8,145.83 8,553.12
Kawat Beton kg 0.0100 13,225.00 132.25
alat Bantu ls 1.0000 750.00 750.00
Pekerja org 0.0250 28,500.00 712.50
Tukang Besi Beton Terampil org 0.0250 37,000.00 925.00
Mandor org 0.0050 47,500.00 237.50
Total 9,435.37 1,875.00 11,310.37
1M3 BEKISTING UNTUK SLOOF 13/30
Papan albasia m3 1.1000 455,000.00 500,500.00
paku kg 0.3000 17,500.00 5,250.00
alat bantu ls 1.0000 750.00 750.00

71
RAB
by.Sanvio,telp.022 70416292
a b c d e f g h
pekerja org 0.2500 28,500.00 7,125.00
tukang org 0.2800 37,000.00 10,360.00
mandor org 0.0050 47,500.00 237.50
Total 506,500.00 17,722.50 524,222.50
1M2 BEKISTING UNTUK KOLOM
Multiplek 12 mm m2 0.2500 130,000.00 32,500.00
Kayu balok m3 0.0150 2,750,000.00 41,250.00
paku kg 0.4000 17,500.00 7,000.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.2500 28,500.00 7,125.00
tukang org 0.2800 37,000.00 10,360.00
mandor org 0.0050 47,500.00 237.50
Total 81,500.00 17,722.50 99,222.50
1 M2 LANTAI KERAMIK 60X60 ASIA TILE
keramik lantai 60 x60 asia tile m2 1.1000 115,000.00 126,500.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
145,062.80 17,910.00 162,972.80
1 M2 LANTAI KERAMIK 60X60 ANPOLISHED
keramik lantai 60 x60 asia tile m2 1.1000 86,805.56 95,486.11
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
114,048.91 17,910.00 131,958.91
1 M2 LANTAI KERAMIK 40X40 POLISHED
keramik lantai40 X 40 granito m2 1.1000 75,000.00 82,500.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
101,062.80 17,910.00 118,972.80
1 M2 LANTAI KERAMIK30 X 30 POLISHED
keramik lantai 30 x30 GEOVANI m2 1.1000 70,000.00 77,000.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
95,562.80 17,910.00 113,472.80
1 M2 LANTAI DINDING 25X 33 POLISHED
keramik lantai 25 X 33GEOVANI m2 1.1000 47,000.00 51,700.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
70,262.80 17,910.00 88,172.80
1 M2 LANTAI DINDING 20X 40 POLISHED
keramik lantai 20 X 40 m2 1.1000 70,000.00 77,000.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
semen warna kg 0.5000 3,800.00 1,900.00
alat bantu ls 1.0000 750.00 750.00

71
RAB
by.Sanvio,telp.022 70416292
a b c d e f g h
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.3300 37,000.00 12,210.00
mandor org 0.0300 47,500.00 1,425.00
95,562.80 17,910.00 113,472.80
1 M2 LANTAI Batu sikat
Batu sikat Lampung m2 1.1000 37,500.00 41,250.00
semen kg 11.3800 1,060.00 12,062.80
pasir pasang m3 0.0420 91,666.67 3,850.00
alat bantu ls 1.0000 750.00 750.00
pekerja org 0.1500 28,500.00 4,275.00
tukang org 0.9300 37,000.00 34,410.00
mandor org 0.1000 47,500.00 4,750.00
57,912.80 43,435.00 101,347.80

1M2 PEKERJAAN PENGECATAN INTERIOR & PLAFOND


Cat dasar m2 0.1500 8,500.00 1,275.00
amplas m' 0.0500 2,000.00 100.00
Cat tembok DIAMON m2 0.3000 35,000.00 10,500.00
Rol bh 0.0150 12,500.00 187.50
Kwas. bh 0.0150 3,500.00 52.50
Alat bantu ls 1.0000 1,000.00 1,000.00
pekerja org 0.0510 28,500.00 1,453.50
tukang org 0.0500 37,000.00 1,850.00
mandor org 0.0200 47,500.00 950.00
11,840.00 4,253.50 16,093.50
1M2 PEKERJAAN PENGECATAN EXTERIOR
Cat dasar m2 0.1500 8,500.00 1,275.00
amplas m' 0.0500 2,000.00 100.00
Cat tembok DULUX m2 0.3000 45,000.00 13,500.00
Rol bh 0.0150 12,500.00 187.50
Kwas. bh 0.0150 3,500.00 52.50
Alat bantu ls 1.0000 1,000.00 1,000.00
pekerja org 0.0510 28,500.00 1,453.50
tukang org 0.0500 37,000.00 1,850.00
mandor org 0.0200 47,500.00 950.00
14,840.00 4,253.50 19,093.50
ANALISA KAMAR MANDI BAWAH TANGGA
150 X 200 CM Tinggi Keramik =200 cm
Keramik dinding 25/33 ex genova m2 15.0700 88,172.80 1,328,764.10
List genova m' 6.3000 78,000.00 491,400.00
Keramik lantai 30x30 ex genova anpolished m2 3.0000 113,472.80 340,418.40
Closed Duduk ex toto putih bh 1.0000 1,250,000.00 1,250,000.00
Jet Spry bh 1.0000 60,000.00 60,000.00
Floor Drain bh 1.0000 45,000.00 45,000.00
Upah kerja set klosed+jetspray ls 1.0000 35,000.00 35,000.00
3,515,582.50 35,000.00 3,550,582.50

71
RAB
by.Sanvio,telp.022 70416292
DAFTAR HARGA SATUAN BAHAN DAN UPAH
Nomor : 05/Rab/VIII/2007
Pekerjaan : Struktur, arsitektur
Proyek : Rumah tinggal
Luas m2 : 654.98
Lokasi : Kavling DPR Ciwaruga
Pemilik : Ibu Diah
No Uraian Bahan Satuan Harga satuan
Rp.
A UPAH KERJA PEGAWAI HARIAN LEPAS
Pekerja/laden org 28,500
Tukan tembok org 35,000
Tukang Kayu org 37,000
Mandor org 47,500
A BAHAN AGREGAT KASAR & BAHAN PEUTUP DINDING
1 Tanah urug m3
2 Pasir urug m3 45,000
3 Pasir pasang m3 91,667
4 Pasir beton m3 136,364
5 Batu belah m3 91,667
6 Batu Split 1/2 m3 136,364
7 Batu Split 2/3 m3 136,364
8 Batu Bali Grey m2 150,000
9 Semen Holcim kg 1,060
10 Semen Warna putih kg 3,500
11 Semen warna muda kg 3,800
12 Batu Sirip m2 145,000
13 Batu Andesit bakar m2 145,000
14 Bata merah indramayu bh 450
15 Bata merah garut bh 400
B BAHAN LOGAM
1 Besi Beton U -24, ¢ 6 - 22 mm kg 8,146 10416.667
2 Besi Beton U -32 (ulir) D 8 - D 22 mm kg 8,146
3 Kawat beton kg 13,225
4 Rangka Atap Steel Strus m2 140,000
5 Seng gelombang BJLS 25 uk 90 x 180 cm 44,500
6 Paku 1/2 " - 1 " 18,500
7 Paku 2"-12" 17,500
8 Paku Gipsum 17,500
C BAHAN PENGUNCI/PENGANTUNG DAN KACA
1 Engsel pintu 4" ex fino bh 10,500
2 Engsel jendela 3 " ex. 15,000
3 Spring Knip 17,500
4 Hak angin jendela 35,000
5 Kunci pintu double slak ex. Fino 85,02 F 265,000
6 Kunci pintu double slaksilinder KM ex. SES 160,000
7 Tarikan Pintu 225,000
8 Rel Pintu maraton 175,000
9 Kaca Rayben brown 5 mm 85,000
10 Kaca polos 5 mm 70,000
11 Kaca es 5 mm 72,000
12 Glass Block warna coklat
D BAHAN KAYU/KAYU LAPIS DAN PLAPOND
1 Kayu Kaso Albasia m3 600,000
2 Kayu Papan Albasia m3 455,000
3 Kayu Balok borneo 4/6,5/7 m 3
2,750,000
4 Kayu Balok borneo 6/12,8/12 m3 2,750,000
5 Kayu Papan Borneo Super 3/30 m3 2,750,000
6 Lisplang GRC m3 55,000
7 Kayu Papan Kamper Samarinda 3/30 m3 7,300,000
8 Kayu Balok Kamper Samarinda 6/15 (kusen) m3 7,300,000
9 Kayu Balok Jati Jabar 6/15 (Kusen) m' 85,000
10 Dolken dia 5-7 cm m3 7,500
11 Triplek 3 mm uk 120 x 240 cm lbr 42,000
12 Triplek 4 mm uk 120 x 240 cm lbr 54,000
13 Triplek 6 mm uk 120 x 240 cm lbr 75,000
14 Multiplek 9 mm uk 120 x 240 cm lbr 95,000
15 Multiplek 12 mm uk 120 x 240 cm lbr 130,000
16 Teakwood 4 mm uk 120 x 240 lbr 85,000
17 Melamin 4 mm uk 120 x 240 lbr 54,000
18 Gipsum Jaya Board lbr 56,000
19 Gipsum Elepan lbr 55,000
20 List Gipsum 7 cm m' 9,000
21 List Gipsum 10 cm m' 11,000
22 Dempul Gipsum kg 17,500
23 Kain Kasa gipsum m' 160
24 pipa 4" maspion aw abu bt 185,000
25 pipa2" maspion aw abu bt 142,500
26 Pipa 1maspion aw abu bt 47,500
27 Drat dalam 1"&drat luar 1" bh 8,000
28 siltip bh 4,000
29 lem pipa kg 35,000
30 tali injuk ikat 2,500
31 Pompa gronfost 350 wat unit 1,150,000
BAHAN PENUTUP ATAP
Genteng plat beton ex cp bh 6,000
Nok beton bh 18,500
Nok apex bh 28,500
Nok ujung bh 20,000
BAHAN PENUTUP LANTAI
Batu sikat lampung m2 37,500
Granit RRC 60x60 86,806
Keramik granito40x40 75,000
Keramik asia tile 60 x60 115,000
keramik dinding 25/33 geovani 47,000
Keramik dinding 30/60 granito 110,000
Keramik lantai 30x30 anpolised geovani 45,000
BAHAN FINISHING
Cat dasar nipon 8,500
Cat maxilite 11,250
Cat Mowilex 45,000
Cat Diamon water shill 35,000
Cat Dullux watershill 45,000
Cat vinilex 12,500
tiner 12,500
dempul kayu impra 24,500
meni 12,500
Cat Kayu seiv 26,500
Cat Kayu avian 25,000
Rol Cat 12,500
Kwas Cat 3,500
Cape 2,500
amplas 2,000
BAHAN SANITER
Klosed jongkok toto 175,000
Klosed Duduk toto,standar lengkap ,putih 1,250,000
Klosed Duduk toto,standar lengkap ,warna 1,450,000
Jetspray 60,000
Floor drain stanlis SunEi 45,000
Floor drain standar lokal 12,000
Wastapel toto 2,500,000
Buthtup 7,500,000
Head shower toto 450,000
Head shower sunEi 225,000
12.48
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah
I PEKERJAAN PERSIAPAN Total I
1 Pembersihan lahan 187 m###
2
0.019 0.02 0.02
2 Pembuatan Gudang 22.50 m###
2
0.248 0.25 0.25
3 Pekerjaan Bouwplank 60.00 ls### 0.170 0.17 0.17
4 Air Kerja Jet Pam dalam 30m' + pompa sumitsu 250 watt 1.00 titik
### 0.757 0.76 0.76
5 Pembersihan akhir + buang brangkal 1.00 ls### 0.082
II PEKERJAAN STRUKTUR LANTAI BAWAH Total II
1 Pekerjaan Tanah
a Galian tanah Basement 85.86 m###
3
0.379 0.38 0.38
b Galian tanah Pondasi batu kali menerus 21.00 m###
3
0.093 0.09 0.09
c Galian Pile cap 7.35 m###
3
0.032 0.03 0.03
d Galian Tanah Pondasi Straust ¢30 cm t=2.5 m' 90.00 m'### 0.270 0.27 0.27
e Urugan pasir pondasi pile cap t = 5 cm dipadatkan 0.73 m###
3
0.006 0.01 0.01
f Lantai kerja pondasi pile cap t=5cm 0.73 m###
3
0.002 0.00 0.00
2 Pasangan Pondasi Batu Belah 1 Pc : 3 Ps 3.50 m###
3
0.134 0.13 0.13
3 Urugan Kembali Pondasi 1.75 m###
3
0.001 0.00 0.00
4 Buangan Tanah 85.86 m###
3
0.081 0.08 0.08
5 Cor Straust Pile ¢ 30 t=3 4 D13,¢8-1700 6.36 m###
3
1.031 1.03 1.03
6 Cor Pile Cap70x70x25 D13-200+ pedestal beton K 225 3.67 ###
m3 0.709 0.35 0.71
7 Cor Dinding penahan tanah t=10 cm T=150cm 5.10 m###
3
1.666 0.83 1.67
8 Cor Sloof S1 13/30 4¢13,2¢10;¢8-200 beton K-225 6.51 m###
3
1.763 0.53 1.76
9 Cor Sloof S2 13/20 4¢10;¢8-200 beton K-226 0.98 m###
3
0.202 0.10 0.20
10 Cor Kolom K1 15/40 4¢13,2¢10;¢8-200 beton K-225 1.73 m###
3
0.439 0.25 0.31
11 Cor Kolom K2 13/30 4¢13,2¢10;¢8-200 beton K-225 3.22 m###
3
0.941 0.24
12 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.85 m###
3
0.209 0.02 0.10
13 Cor balok beton B1 15/40 6D13, ;sk ¢8-100/170 2.27 m###
3
0.660 0.07 0.10
14 Cor balok beton B2 15/30 4D13, 2¢10;sk ¢8-100/170 2.60 m###
3
0.719 0.07 0.11
15 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 0.27 m###
3
0.079 0.01 0.01
16 Cor Lantai Beton t=12 cm m8 K-225 (Basement) 4.96 m###
3
1.618 0.81 1.62
17 Cor Topi beton atas Jendela 0.96 m###
3
0.314
18 Cor Balok Janggutan 0.30 m###
3
0.093
19 Cor Lantai Beton t=12 cm m8 K-225 11.44 m###
3
3.737
20 Cor Tangga Service basement ¢10-170 beton K225 1.10 m###
3
0.359 0.09
21 Cor Tangga Utama ¢10-170 beton K225 2.20 m###
3
0.718
III PEKERJAAN STRUKTUR LANTAI ATAS Total III
1 Cor Kolom K3 13/25 4D13;¢8-170 beton K225 2.27 m###
3
0.362
2 Cor Kolom Praktis 10/15 4¢8;¢6-170 beton K175 0.41 m###
3
0.100
3 Cor balok + ring balk beton 15/20 4D13, ;sk ¢8-100/200 3.92 m###
3
1.215
4 Cor Plat Dak + talang beton t=10 cm ¢8-170 Beton K225 3.27 m###
3
1.016
5 Cor Tangga Service basement ¢10-170 beton K225 1.10 m###
3
0.341
6 Pekerjaan Waterproofing Bitumen 0.000
a Talang Dak beton, plat beton,Ruang jemuran 54.70 m###
2
0.270
b Lantai kamar mandi 12.00 m###
2
0.059
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah

IV PEKERJAAN ARSITEKTUR LANTAI BAWAH Total IV


Pekerjaan dinding
1 Pas dinding bata merah 1/2 bt 1;5 ### m###
2
#VALUE! #VALUE!
2 Pas Plesteran ### m###
2
#VALUE!
3 Pas acian dinding ### m###
2
#VALUE!
4 Acian beton 20.00 m###
2
0.022
5 Batu Bali Brown 12.00 m###
2
0.304
Pekerjaan Kusen,Pintu, Daun Jendela
kamper samarinda oven fhinising melamik, kaca polos 5 mm
Kunci ex Fino HRE 85.02 F, Engsel 4" ex Fino, Slot tanam Rambuncis,Tarikan ex Fino
1 Tipe P1(Double teakwood ) L=90cm T=290 cm #REF! bh### #REF! #REF! #REF!
2 Tipe P2 (Double Teakwood) L=90cm T=240cm #REF! bh### #REF! #REF! #REF!
3 Tipe P3 (Double Teakwood) L=80cm T=215cm #REF! bh### #REF! #REF! #REF!
4 Tipe PJ1 (Double Teakwood) L=100cm T=290cm #REF! bh### #REF! #REF! #REF!
5 Tipe PJ2 #REF! bh### #REF! #REF! #REF!
6 Tipe PL1 #REF! bh### #REF! #REF! #REF!
7 Tipe PL2 #REF! bh### #REF! #REF! #REF!
8 Tipe J1 #REF! bh### #REF! #REF! #REF!
9 Tipe J2 #REF! bh### #REF! #REF! #REF!
10 Tipe J3 0.00 bh### #REF! #REF! #REF!
11 Tipe J4 0.00 bh### #REF! #REF! #REF!
12 Jendela v1 1.00 m###
2
#REF! #REF! #REF!
13 Pintu Garasi 7.70 m###
2
0.362 0.09 0.02
Jumlah #REF! #REF!

Bandung, 20 September 2008


Yang melaporkan

Kardinal
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah

Pekerjaan Plafond
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 (lantai Basemnt) #REF! m###
2
#REF!
2 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 ### m###
2
#VALUE!
Sub Total
Pekerjaan Lantai
1 Lantai Basement
- Pasir Urug #REF! m###
3
#REF!
- Batu sikat corak batu alam (Carport) #REF! m###
2
#REF!
- Keramik 40x40 ex roman unpolished warna abu (garasi) #REF! m###
2
#REF!
- Keramik 40x40 ex roman polished warna Ivori (Coridor,r.tidur) ### m###
2
#VALUE!
- Keramik 30x30 ex roman unpolished warna abu (Tangga) 7.20 m###
2
0.076
Lantai Bawah
- Pasir Urug ### m###
3
#VALUE!
- Granit 60x60 ex Aurora Waffle Polished ### m###
2
#VALUE!
- (r.tamu,r.makan,r. hall tangga,r.keluarga,r. tidur tamu,dapur) 0.000
- Plint Lantai kayu 5cm ### m'### #VALUE!
- Keramik 40x40 ex Granito espreso (teras depan,belakang )warna gelap Unpolish ### m###
2
#VALUE!
- LantaiTangga (kayu Kamper t=1.5 cm) 26.10 m###
2
0.580
Sub Total
Pekerjaan Pengecatan
1 Cat dinding Exterior ex Dulux watershill ### m###
2
#VALUE!
2 Cat dinding Interior ex Mowilex ### m###
2
#VALUE!
3 Cat Plafond ex Mowilek #REF! m###
3
#REF!
Sub Total
V PEKERJAAN ARSITEKTUR ATAS Total V
Pekerjaan dinding
1 Pas dinding bata merah 1/2 bt 1;5 ### m###
2
#VALUE!
2 Pas Plesteran ### m###
2
#VALUE!
3 Pas acian dinding ### m###
2
#VALUE!
Sub Total
Pekerjaan Kusen,Pintu, Daun Jendela
kamper samarinda oven fhinising melamik, kaca polos 5 mm
Kunci ex Fino HRE 85.02 F, Engsel 4" ex Fino, Slot tanam Rambuncis,Tarikan ex Fino
1 Tipe P1(Double teakwood ) L=90cm T=290 cm #REF! bh### #REF!
2 Tipe P2 (Double Teakwood) L=90cm T=240cm #REF! bh### #REF!
3 Tipe P3 (Double Teakwood) L=80cm T=215cm #REF! bh### #REF!
4 Tipe PJ1 (Double Teakwood) L=100cm T=290cm #REF! bh### #REF!
5 Tipe PJ2 #REF! bh### #REF!
6 Tipe PL1 #REF! bh### #REF!
7 Tipe PL2 #REF! bh### #REF!
8 Tipe J1 #REF! bh### #REF!
9 Tipe J2 #REF! bh### #REF!
10 Tipe J3 #REF! bh### #REF!
11 Tipe J4 #REF! bh### #REF!
12 Jendela v1 #REF! m###
2
#REF!
Sub Total
Pekerjaan Plafond
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah
1 Pekerjaan Plafond Gipsum 9mm Ex Elepand+rangka hollow 2/4 ### m###
2
#VALUE!
Sub Total

Pekerjaan Lantai
1 Pasir Urug ### m###
3
#VALUE!
2 Granit 60x60 ex RRC baleno (Hall) ### m###
2
#VALUE!
3 Plint Lantai kayu #REF! m'### #REF!
4 Lantai Parquet (kamar tidur) ### m###
2
#VALUE!
5 Balkon Granito espiro 40 x40 #REF! m'### #REF!
Sub Total
Pekerjaan Pengecatan
1 Cat dinding Exterior ex Dulux watershill ### m###
2
#VALUE!
2 Cat dinding Interior ex Mowilex ### m###
2
#VALUE!
3 Cat Plafond ex Mowilek ### m###
2
#VALUE!
4 Cat Lisplang 40.53 m'### 0.065
Sub total
VI PEKERJAAN ATAP Total VI
1 Rangka atap Steel strus 119.62 m###
2
1.858
2 Penutup atap genteng beton plat ex CP 119.62 m###
2
0.951
3 Bubungan Genteng Beton ex Cp 27.51 m'### 0.288
4 Bubungan apex (tiga arah) ex CP 3.00 bh### 0.014
5 Ujung Bubungan ex CP 4.00 bh### 0.015
6 Lispang GRC 30 cm 36.54 m'### 0.158
VII PEKERJAAN INSTALASI LISTRIK Total VII
LISTRIK LANTAI BASTMEN
Sub Panel & Daya
Box panel Presto 8 grup 2.00 bh### 0.033
MCB 25A,16A,10A 4.00 bh### 0.017
Titik Lampu
Titik Lampu Down ligth 3' outbow, 18 watt+instalasi+fhiting 5.00 bh### 0.076
Titik Lampu Tl outbow 40 watt 2.00 bh### 0.021
Lampu Taman+instalasi 1.00 bh### 0.043
Outlet
Stop kontak Brocoplano+ Instalasi 4.00 bh### 0.059
Tv broco plano + instalasi 1.00 bh### 0.015
Saklar Tunggal 1.00 bh### 0.005
Saklar Seri 4.00 bh### 0.027
LISTRIK LANTAI BAWAH
Sub Panel & Daya
Box panel Presto 4 grup 1.00 bh### 0.013
MCB 10 A 4.00 bh### 0.017
Titik Lampu
Titik Lampu Down ligth 4'&3', 18 watt+instalasi+fhiting 23.00 bh### 0.352
Lampu Wastapel 1.00 bh### 0.025
Lampu sorot taman 4.00 bh### 0.071
Lampu Taman 4.00 bh### 0.173
Outlet
Stop kontak Brocoplano+ Instalasi 11.00 bh### 0.149
Telepon brocoplano +instalasi 3.00 bh### 0.044
Tv brocoplano + instalasi 6.00 bh### 0.089
Saklar Seri 8.00 bh### 0.054
Saklar Hotel 2.00 bh### 0.020
LISTRIK LANTAI ATAS
Box panel Presto 4 grup 1.00 bh### 0.013
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah
MCB 10 A 4.00 bh### 0.017
Titik Lampu
Titik Lampu Down ligth 4'&3', 18 watt+instalasi+fhiting 20.00 bh### 0.306
Titik Lampu fhiting broco+lampu 11 watt 2.00 bh### 0.021
Lampu Wastapel 2.00 bh### 0.049
Outlet
Stop kontak Brocoplano+ Instalasi 12.00 bh### 0.162
Telepon brocoplano +instalasi 7.00 bh### 0.104
Tv broco plano + instalasi 7.00 bh### 0.104
Saklar Tunggal 1.00 bh### 0.006
Saklar Seri 6.00 bh### 0.041
Saklar Hotel 1.00 bh### 0.010
Penangkal petir 1.00 ### 0.179
VIII PLUMBING Total VIII
1 Instalasi Air Bersih
Pipa 1 ex maspion aw 20.00 m'### 0.048
Pipa 3/4' ex maspiom aw 40.00 m'### 0.090
Pipa 1/2' ex maspion aw 15.00 m'### 0.029
Acessoris Rucika 1.00 ls### 0.053
2 Instalasi air panas 72.00 m'### 0.402
3 Solar water heater. ex Sun rain kapaitas 200 L TZBB 18.16 1.00 m'### 1.118
4 Torn Galvanis kapasitas 1 m3 + Stop kontak+pelampung 2.00 m'### 0.529
5 Pompa pendorong 125 watt+ Instalasi 1.00 bh### 0.041
6 Instalasi air kotor + talang 3 "
Pipa 3"ex maspion aw 55.50 m'### 0.222
Pipa 4"ex maspion aw 40.47 m'### 0.169
Acessoris 1.00 ls### 0.071
IX KAMAR MANDI, DAPUR & ALAT SANITAIR Total IX
1 Kamar mandi Bawah Tangga 150 X 250 CM T=220 cm, Lt dasar
Keramik dinding 30/60 ex Granito TILE 14.08 m###
2
0.188
Keramik lantai 40x40 ex Castillo anpolished 5.1 m###
2
0.058
Closed Duduk ex toto Putih 1 bh### 0.135
Jet Spry 1 bh### 0.008
Wastapel Ex HGC+ Kran panas dinging 1 bh### 0.082
Floor Drain 1 bh### 0.006
2 Kamar mandi Pembantu 125 X 200 CM T=220 cm, Lt bastmen
Keramik dinding 30/30 ex genova ivori 7.15 m###
2
0.069
Keramik lantai 30x30 ex genova anpolished 1.80 m###
2
0.017
Closed jongkok ex Toto White 1 m'### 0.018
Keran 2 bh### 0.008
Floor Drain 1 bh### 0.006
3 Kamar mandi anak 200 x 250 cm t240cm, Lt atas
Keramik dinding 30/60 ex Granito TILE 17.28 m###
2
0.231
Keramik lantai 60x60 ex Castilo anpolished 6 m###
2
0.068
Closed duduk exToto White 1 bh### 0.156
Jet Spry 1 bh### 0.008
Wastapel Ex Hgc Kran panas dinging + Kaca Cermin 1 bh### 0.100
Shower ex RRC+Head panas dingin 1 bh### 0.262
Floor Drain 1 bh### 0.008
4 Kamar mandi R. Utama 200 x 350 cm t240cm, Lt atas
Keramik dinding 30/60 ex Granito TILE 23.00 m###
2
0.441
Keramik lantai 60x60 ex Castilo anpolished 8.40 m###
2
0.161
Closed duduk ex Toto White 1.00 m###
2
0.156
Jet Spry 1.00 bh### 0.008
Shower ex RRC+Head panas dingin 1.00 bh### 0.262
Wastapel Ex Hgc Kran panas dinging + Kaca Cermin 1.00 bh### 0.300
Floor Drain 1.00 bh### 0.008
5 Dapur
Keramik dinding 30/60 ex Granito TILE 3.60 m###
2
0.069
LAPORAN PROGRES
Nomor : 001 / SBP-TEK/III/2012
Proyek : Struktur, arsitektur
Luas m2 :
Lokasi :
Pemilik :
Periode :
Harga satuan Progres
Bobot
No ITEM PEKERJAAN Volume Sat
Pkrjaan Minggu III Minggu IV
Bhn & Upah
Meja granit 60 x 600 cm 6.00 m###
2
0.318
Zink 1.00 bh### 0.024
Kran Panas dingin 1.00 bh### 0.024
Pintu lemari bawah meja multiplek 9mm lapis kayu megatik 6.00 m'### 0.265
X PEKERJAAN LAIN-LAIN Total X
Relling Tangga besi +head reling Kayu kamper 9.10 m'### 0.567
Relling balkon besihollow 4.00 m'### 0.165
Septik tank 150 cm x 200 cm x 150 cm+ rembasan 150 cm x 150 cm 150 cm 1.00 ls### 0.218
Canofi Jemuran 20.00 m###
2
0.588
Tangga ke Torn 1.00 ls### 0.059
PAGAR
Jembatan grill Besi 5.50 m'### 0.204
Batu templek Pagar depan 4.00 m'### 0.064

#VALUE!
RENCANA ANGGARAN BIAYA
Nomor : 008/SBP-TEK/IV/2009
Pekerjaan : Struktur, arsitektur
Proyek : KERJA TAMBAH
Luas m2 : 220
Lokasi : Puri Syailendra Kavling 4A
Pemilik : Ibu Dadi

Harga satuan Jmh Harga Bobot


No ITEM PEKERJAAN Volume Sat
Bhn & Upah Bhn & Upah Pkrjaan
I PEKERJAAN BONGKARAN Total I 2,600,877
1 Bongkaran Tangga 1 ls 1,800,000 1,800,000 ###
2 Bongkaran dinding 15.00 m2 13,392 200,877 ###
3 Bongkaran topi beton 1.00 ls 350,000 350,000
4 Buang brangkal 1.00 ls 250,000 250,000 ###
II PEKERJAAN ARSITEKTUR Total II 22,517,603
1 Cor Tangga Utama ¢10-170 beton K225 2.25 m3 2,775,743 6,245,423 ###
2 Cor balok beton B1 15/40 6D13, ;sk ¢8-100/170 0.48 m3 2,775,743 1,332,357 ###
2 Cor Plat lantai 12 cm 0.41 m3 2,775,743 1,144,994 ###
Pekerjaan dinding
1 Pas dinding bata merah 1/2 bt 1;5 27.00 m2 67,662 1,826,877 ###
2 Pas Plesteran 54.00 m2 25,625 1,383,730 ###
3 Pas acian dinding 54.00 m 2
9,175 495,423 ###
4 Ringbalk 15/20 0.57 m3 1,979,034 1,128,050 ###
5 Plafon givsum 3.75 m2 83,900 314,625 ###
6 List gipsum 4.00 m' 17,000 68,000 ###
7 Lantai granit ezzensa 60 x60 3.75 m 2
243,500 913,125 ###
8 Reling tangga + reling balkon 4.00 m' 650,000 2,600,000 ###
9 Perombakan kusen pintu PJ1 1.00 bh 75,000 75,000 ###
10 tangga teras depan 2.50 m' 350,000 875,000
11 Pintu Panel 235 cm x105 cm 1.00 bh 1,375,000 1,375,000 ###
12 Rombak Jendela kaca PJ1 2.00 bh 150,000 300,000 ###
13 Pemindahan Pintu Kamar tidur anak 1.00 bh 75,000 75,000 ###
14 Cat genteng warna merah 110 m2 21500 2,365,000 ###
TOTAL 25,118,480
JASA KONSTRUKSI 10 % 2,511,848
GRAND TOTAL 27,630,328
DIBULATKAN 25,800,000
(dua puluh lima juta delapan ratus ribu rupiah)

Bandung, Januari 2009


Disetujui, Yang membuat

Ibu Yani priyatni Kardinal


Owner

Mengetahui,
PT. Syailendra Bangun Perasda
Tia Setia Budhi
Direktur
#REF!

#VALUE! #VALUE!
#VALUE! 1,800,000
#VALUE! 200,877

#VALUE! 250,000
#VALUE! #VALUE!
#VALUE!
60.00
RENCANA ANGGARAN PELAKSANAAN
Nomor :
Pekerjaan : Mekanikal Elektrikal
Proyek :
Luas m2 :
Lokasi : Puri syailendra kavling 21
Pemilik :

Harga satuan Harga satuan Jmh Harga Jmh Harga Jlh Harga
No ITEM PEKERJAAN Volume Sat
Bahan Upah Bahan Upah Bhn+Upah
PEKERJAAN INSTALASI LISTRIK Total 0
LISTRIK LANTAI 1
1 Box panel Induk LP 20 x 40 x 60 1.00 bh
2 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh
3 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh
4 Digital Matering 1 pas 8.00 bh
5 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh
6 Lampu T 5 20.00 bh
7 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh
8 Lampu taman + instalasi 1.00 bh
9 Lampu dinding carport + Instalasi 4.00 bh
10 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh
11 Box telepon 1.00
12 Telepon Clipsal +instalasi 9.00 bh
13 Tv Clipsal + instalasi +spliter 17.00 bh
14 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh
15 Saklar Seri ex Clipsal E 2000 23.00 bh
16 Saklar tunggal ex Clipsal E 2000 bh
17 Saklar Hotel ex Clipsal E 2000 1.00 bh
LISTRIK LANTAI 2
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh
2 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh
3 Digital Matering 1 pas 8.00 bh
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh
5 Lampu T 5 20.00 bh
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh
7 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh
8 Box telepon 1.00
9 Telepon Clipsal +instalasi 9.00 bh
10 Tv Clipsal + instalasi +spliter 17.00 bh
11 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh
12 Saklar Seri ex Clipsal E 2000 23.00 bh
RENCANA ANGGARAN PELAKSANAAN
Nomor :
Pekerjaan : Mekanikal Elektrikal
Proyek :
Luas m2 :
Lokasi : Puri syailendra kavling 21
Pemilik :

Harga satuan Harga satuan Jmh Harga Jmh Harga Jlh Harga
No ITEM PEKERJAAN Volume Sat
Bahan Upah Bahan Upah Bhn+Upah
LISTRIK LANTAI 3
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh
2 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh
3 Digital Matering 1 pas 8.00 bh
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh
5 Lampu T 5 20.00 bh
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh
7 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh
8 Box telepon 1.00
9 Telepon Clipsal +instalasi 9.00 bh
10 Tv Clipsal + instalasi +spliter 17.00 bh
11 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh
12 Saklar Seri ex Clipsal E 2000 23.00 bh
LISTRIK TOP FLOOR
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh
2 Box Heger 6 grup, Mcb 6 A (3 bh) 0.00 bh
3 Digital Matering 1 pas 0.00 bh
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh
5 Lampu T 5 0.00 bh
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 4.00 bh
7 Lampu taman + instalasi 0.00 bh
8 Lampu dinding carport + Instalasi 0.00 bh
9 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 6.00 bh
10 Box telepon 0.00
11 Telepon Clipsal +instalasi 1.00 bh
12 Tv Clipsal + instalasi +spliter 1.00 bh
13 Saklar Seri ex Clipsal E 2000 4.00 bh
14 Saklar Hotel ex Clipsal E 2000 1.00 bh
Jumlah

Bandung,…………………….
Yang mengajukan
16

33
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
I PEKERJAAN PERSIAPAN Total I
Pekerjaan Persiapan, Sarana dan Penunjang diantaranya untuk
Biaya-biaya:
1 Pembersihan lahan 228.25 m2 0.025 0.025 0.025
2 Pembuatan Gudang 22.50 m2 0.270 0.270 0.270
3 Pekerjaan Bouwplank 72.00 ls 0.204 0.204 0.204
4 Air Kerja Jet Pam dalam 30m' + pompa sumitsu 500 watt 1.00 titik 0.832 0.416 0.416
5 Pembersihan akhir + buang brangkal 1.00 ls 0.082
II PEKERJAAN STRUKTUR LANTAI 1 Total II
1 Pekerjaan Tanah
b Galian tanah Pondasi batu kali menerus 9.80 m3 0.043 0.043 0.043
c Galian Pile cap 12.00 m3 0.053 0.053 0.053
d Galian tanah 342.38 m3 1.513 1.513 1.513
e Buangan tanah ke luar site 513.56 m3 0.756 0.756 0.756
f Galian Tanah Pondasi Straust ¢30 cm t=700 cm' 168.00 m' 0.742 0.742 0.742
g Urugan pasir pondasi pile cap t = 5 cm dipadatkan 0.59 m3 0.004 0.004 0.004
h Lantai kerja pondasi pile cap t=5cm 0.59 m3 0.002 0.002 0.002
2 Pasangan Pondasi Batu Belah 1 Pc : 3 Ps 10.50 m3 0.401 0.401 0.401
3 Urugan Kembali Pondasi 5.25 m3 0.004 0.004 0.004
4 Cor Straust Pile ¢ 30 t=3 4 D13,¢8-1700 11.88 m3 1.926 1.926 1.926
5 Cor dinding penahan tanah tebal 10 cm Tinggi 150 cm m3 0.000
6 Cor Pile Cap90x90x25 D13-200+ pedestal beton K 225 4.86 m3 1.155 1.155 1.155
7 Cor Sloof S1 15/30 4¢13,2¢10;¢8-200 beton K-225 5.63 m3 1.641 1.641 1.641
8 Cor Sloof S2 15/20 4¢10;¢8-200 beton K-226 1.53 m3 0.380 0.380 0.380
9 Cor Kolom K1 15/60 8¢13,2¢10;¢8-200 beton K-225 8.10 m3 2.365 2.365 2.365
10 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 2.92 m3 0.715 0.715 0.715
11 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 7.53 m3 2.082 2.082 2.082
12 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 1.62 m3 0.479 0.479 0.479
13 Cor Topi beton atas Jendela 0.78 m3 0.197 0.197
14 Cor Lantai Beton t=12 cm m8 K-225 ### m3 ### #VALUE! ###
15 Cor Tangga Utama ¢10-170 beton K225 2.60 m3 0.849 0.849
III PEKERJAAN STRUKTUR LANTAI 2 Total III
1 Cor Kolom K1 15/60 8¢13,2¢10;¢8-200 beton K-225 8.10 m3 2.260 2.260 2.260
2 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 2.92 m3 0.715 0.715 0.715
3 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 7.53 m3 2.459 2.459 2.459
4 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 1.62 m3 0.529 0.529 0.529
5 Cor Topi beton atas Jendela 0.78 m3 0.197 0.197
6 Cor Lantai Beton t=12 cm m8 K-225 ### m3 ### #VALUE! ###
7 Cor Tangga Utama ¢10-170 beton K225 2.60 m3 0.849 0.849
IV PEKERJAAN STRUKTUR LANTAI 3 Total III
1 Cor Kolom K1 15/30 4¢13,2¢10;¢8-200 beton K-225 4.08 m3 1.080 1.080 1.080
2 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 3.00 m3 0.756 0.756 0.756
3 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 7.53 m3 2.459 2.459
4 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 1.62 m3 0.529 0.529
5 Cor Topi beton atas Jendela 0.78 m3 0.197 0.197
6 Cor Lantai Beton t=12 cm m8 K-225 ### m3 ### ###
7 Cor Tangga Utama ¢10-170 beton K225 2.60 m3 0.849 0.849
Jumlah
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini

V PEKERJAAN STRUKTUR LANTAI ATAP Total III


1 Cor Kolom K1 15/60 8¢13,2¢10;¢8-200 beton K-225 1.68 m3 0.470 0.470
2 Cor Kolom Praktis 10/12 4¢8;¢6-170 beton K175 0.56 m3 0.181 0.181
3 Cor balok beton B1 15/40 6D13, 2¢10;sk ¢8-100/170 7.53 m3 1.899 1.899
4 Cor Balok Anak B3 15/20 4D13 ; sk ¢8-100/170 ### m3 ### ###
5 Cor Topi beton atas Jendela 2.60 m3 0.849 0.849
6 Waterfrofoing dak lantai top floor ex cemen aid #REF! m2 #REF! #REF!
VI PEKERJAAN ARSITEKTUR LANTAI 1
Pekerjaan dinding Sub Total
1 Pas dinding bata merah 1/2 bt 1;5 485.00 m2 3.545 3.545 3.545
2 Pas Plesteran 970.00 m2 2.696 2.426
3 Pas acian dinding 970.00 m2 1.249 0.999
4 Batu templek radom 23.00 m2 0.406 0.406
5 Batu Andesit bakar Corak acak 6.28 m2 0.186 0.186

Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total
Kunci ex dekson, Engsel 4" ex Mafen, Slot tanam Rambuncis,Tkaca 5 mm polos
1 Pintu Utama uk 170x235 (Daun pintu solid kayu kamper samarinda) 1.00 bh 1.055 0.844
Body kunci dekxson DKS 8585 SN, silinder CYL FBSN 60mm SN
Tarikan 70 cm stailes
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 9.00 bh 2.460 1.968
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
3 Tipe AL-PG1 kusen almunium alxsindo 4" black uk.80 x 235 cm pintu kaca frame almunium 8.00 bh 1.430 1.430
4 Tipe AL-P2 kusen almunium alexsindo 4" black uk.70 x 210 cm pintu kaca es frame almunium 9.00 bh 1.397 1.397
5 Tipe AL-J1 uk 160 x 60 x 4" alexsindo black +Casmen+kaca 5mm 3.00 bh 0.313 0.313
6 Tipe Al-J2 uk 160x 140 x 4"alexsindo black Daun jendela casment 1.00 bh 0.231 0.231
7 Jendela tanpa frame-J3 kaca 8 mm uk 140 x 160 cm 2.00 bh 0.114 0.114
8 Jendela tanpa kaca frame-J5 kaca 5 mm uk.30 x 160 cm 8.00 bh 0.123 0.123
9 Jendela tanpa kaca frame-J6 kaca 5 mm uk. 60 x 230 1.00 bh 0.032 0.032
10 Jendela V1 almunium alexsindo black 4"jendela casmen 9.00 bh 0.447 0.447
Pekerjaan Plafond Sub Total
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 ### m2 ### ###
3 Pekerjaan plafond inderex Gipsum 9mm Ex elepand+rangka hollow 2/4 15.36 m1 0.121 0.000
2 Pekerjaan List Gipsum 10 cm #REF! m2 #REF! #REF!
Pekerjaan Lantai Sub Total
- Pasir Urug ### m3 ### ###
- Keramik 40x40 ex Roman alexsa cream G449233 Polished (kamar tidur) ### m2 ### ###
- Plint Lantai 10 x 40 ex Roman alexsa cream G 449233 polished ### m' ### ###
- Granit RRC 80x80 ex Garuda (coridor) ### m2 ### ###
- Plin 10x80 ex Granit RRC (coridor) ### ### ###
- Keramik 33,3x33,3 ex Roman Sierra G365022(teras ) ### m2 ### ###
Pekerjaan Pengecatan Sub Total
1 Cat dinding Exterior ex Dullux watershield 242.50 m2 0.471 0.400
2 Cat dinding Interior ex Dullux 727.50 m2 1.070 0.909
3 Cat Plafond ex jotun ### m3 ### ###
Jumlah
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini

VII PEKERJAAN ARSITEKTUR LANTAI 2


Pekerjaan dinding Sub Total
1 Pas dinding bata merah 1/2 bt 1;5 485.00 m2 3.545 3.545 3.545
2 Pas Plesteran 970.00 m2 2.696 2.426
3 Pas acian dinding 970.00 m2 1.249 0.999
4 Batu Andesit bakar 6.28 m2 0.186 0.186
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total
Kunci ex dekson, Engsel 4" ex Fino, Slot tanam Rambuncis,Tarikan ex Fino kaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 9.00 bh 2.460 2.091
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe AL-PG1 kusen almunium alxsindo 4" black uk.80 x 235 cm pintu kaca frame almunium 9.00 bh 1.609 1.609
3 Tipe AL-P2 kusen almunium alxsindo 4" black uk.70 x 210 cm pintu kaca es frame almunium 9.00 bh 1.397 1.397
4 Tipe AL-J1 uk 160 x 60 x 4" alxsindo black +Casmen+kaca 5mm 3.00 bh 0.313 0.313
5 Tipe Al-J2 uk 160x 140 x 4"alexsindo black Daun jendela casment 0.00 bh 0.000 0.000
6 Jendela tanpa frame-J3 kaca 8 mm uk 140 x 160 cm 1.00 bh 0.057 0.057
7 Jendela tanpa kaca frame-J5 kaca 5 mm uk.30 x 160 cm 8.00 bh 0.123 0.123
8 Jendela tanpa kaca frame-J6 kaca 5 mm uk. 60 x 230 1.00 bh 0.032 0.032
9 Jendela V1 almunium alexsindo black 4"jendela casmen 9.00 bh 0.447 0.447
Pekerjaan Plafond Sub Total
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 ### m2 ### ###
2 Pekerjaan plafond inderex Gipsum 9mm Ex elepand+rangka hollow 2/4 15.36 m1 0.121 0.000
3 Pekerjaan List Gipsum 10 cm #REF! m2 #REF! #REF!
Pekerjaan Lantai Sub Total
- Pasir Urug ### m3 ### ###
- Keramik 40x40 ex Roman alexsa cream G449233 Polished (kamar tidur) ### m2 ### ###
- Plint Lantai 10 x 40 ex Roman alexsa cream G 449233 polished ### m' ### ###
- Keramik 40x40 ex Roman Alexsa rosso G449534 (coridor,tangga) ### m2 ### ###
- Plin 10x40 ex Roman Alexsa rosso G449534 (coridor) ### ### ###
- Keramik 33,3x33,3 ex Roman Sierra G365022(teras ) ### m2 ### ###
Pekerjaan Pengecatan Sub Total
1 Cat dinding Exterior ex Dullux watershield 242.50 m2 0.471 0.400
2 Cat dinding Interior ex Dullux 727.50 m2 1.070 0.909
3 Cat Plafond ex jotun ### m3 ### ###
IX PEKERJAAN ARSITEKTUR LANTAI 3
Pekerjaan dinding Sub Total
1 Pas dinding bata merah 1/2 bt 1;5 485.00 m2 3.900 3.900 3.900
2 Pas Plesteran 970.00 m2 2.966 2.669
3 Pas acian dinding 970.00 m2 1.374 1.099
4 Batu Andesit bakar 6.28 m2 0.205 0.205
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total
Kunci ex dekson, Engsel 4" ex Fino, Slot tanam Rambuncis,Tarikan ex Fino kaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 9.00 bh 2.460 1.968
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe AL-PG1 kusen almunium alxsindo 4" black uk.80 x 235 cm pintu kaca frame almunium 9.00 bh 1.609 1.609
3 Tipe AL-P2 kusen almunium alxsindo 4" black uk.70 x 210 cm pintu kaca es frame almunium 9.00 bh 1.397 1.397
4 Tipe AL-J1 uk 160 x 60 x 4" alxsindo black +Casmen+kaca 5mm 3.00 bh 0.313 0.313
5 Tipe Al-J2 uk 160x 140 x 4"alexsindo black Daun jendela casment 0.00 bh 0.000 0.000
6 Jendela tanpa frame-J3 kaca 8 mm uk 140 x 160 cm 1.00 bh 0.057 0.057
7 Jendela tanpa kaca frame-J5 kaca 5 mm uk.30 x 160 cm 8.00 bh 0.123 0.123
8 Jendela tanpa kaca frame-J6 kaca 5 mm uk. 60 x 230 1.00 bh 0.032 0.032
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
9 Jendela V1 almunium jendela casmen 9.00 bh 0.447 0.447
Jumlah

Pekerjaan Plafond Sub Total


1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 ### m2 ### ###
2 Pekerjaan plafond inderex Gipsum 9mm Ex elepand+rangka hollow 2/4 15.36 m1 0.133 0.000
3 Pekerjaan List Gipsum 10 cm ### m2 ### ###
Pekerjaan Lantai Sub Total
- Pasir Urug ### m3 ### ###
- Keramik 40x40 ex Roman alexsa cream G449233 Polished (kamar tidur) ### m2 ### ###
- Plint Lantai 10 x 40 ex Roman alexsa cream G 449233 polished ### m' ### ###
- Keramik 40x40 ex Roman Alexsa rosso G449534 (coridor,tangga) ### m2 ### ###
- Plin 10x40 ex Roman Alexsa rosso G449534 (coridor) ### ### ###
- Keramik 33,3x33,3 ex Roman Sierra G365022(teras ) ### m2 ### ###
Pekerjaan Pengecatan Sub Total
1 Cat dinding Exterior ex Dullux watershield 242.50 m2 0.518 0.440
2 Cat dinding Interior ex Dullux 727.50 m2 1.070 0.963
3 Cat Plafond ex jotun ### m3 ### ###
X PEKERJAAN ARSITEKTUR LANTAI ATAP
Pekerjaan dinding Sub Total
1 Pas dinding bata merah 1/2 bt 1;5 196.00 m2 1.576 1.576
2 Pas Plesteran 392.00 m2 1.199 1.079
3 Pas acian dinding 392.00 m2 0.555 0.444
4 Batu Andesit bakar 6.28 m2 0.205 0.205
Pekerjaan Kusen,Pintu, Daun Jendela Kamper samarinda oven KW 1 ex tobindo Sub Total
Kunci ex dekson, Engsel 4" ex Fino, Slot tanam Rambuncis,Tarikan ex Fino kaca 5 mm polos
1 Tipe P1 kusen uk.80x 235 pintu double megateak 82 x 240 x 3,5 cm 2.00 bh 0.547 0.465
Body kunci dekxson DKS 8585 SN, silinder CYL DKS 60mm SN
Tarikan HDL Roses AE 105-100-028 SN+NP
Engsel 4" Mapen stanlies 3 bh perpintu
2 Tipe AL-P2 kusen almunium alxsindo 4" black uk.70 x 210 cm pintu kaca es frame almunium 1.00 bh 0.155 0.155
3 Tipe AL-J1 uk 160 x 60 x 4" alxsindo black +Casmen+kaca 5mm 2.00 bh 0.209 0.209
4 Jendela tanpa kaca frame-J6 kaca 5 mm uk. 60 x 230 0.00 bh 0.000 0.000
5 Jendela V1 almunium jendela casmen 1.00 bh 0.050 0.050
Pekerjaan Plafond Sub Total
1 Pekerjaan Plafond Gipsum 9mm Ex elepand+rangka hollow 2/4 ### m2 ### ###
2 Pekerjaan List Gipsum 10 cm #REF! m2 #REF! #REF!
Pekerjaan Lantai Sub Total
- Pasir Urug ### m3 ### ###
- Keramik 40x40 ex Roman alexsa cream G449233 Polished (kamar tidur) ### m2 ### ###
- Plint Lantai 10 x 40 ex Roman alexsa cream G 449233 polished ### m' ### ###
- Keramik 40x40 ex Roman Alexsa rosso G449534 (tangga) 17.00 m2 0.262 0.262
- Plin 10x40 ex Roman Alexsa rosso G449534 (coridor) ### ### ###
- Keramik 33,3x33,3 ex Roman Sierra G365022(teras+r cuci ) ### m2 ### ###
Pekerjaan Pengecatan Sub Total
1 Cat dinding Exterior ex Dullux watershield 294.00 m2 0.628 0.534
2 Cat dinding Interior ex Dullux 98.00 m2 0.144 0.123
3 Cat Plafond ex jotun ### m1 ### ###
4 Cat lisplang ### m1 ### ###
XI PEKERJAAN ATAP
1 Rangka atap Steel strus 45.20 m2 0.665 0.665
2 Penutup atap metalroof 45.20 m2 0.452 0.452
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
3 Bubungan metalroof 8.00 m' 0.066 0.066
4 Lispang GRC 30 cm 13.65 m' 0.120 0.120
5 Canofi Jemuran 500 x 400 cm 20.00 m2 0.824 0.824

XII PEKERJAAN INSTALASI LISTRIK Total VII


LISTRIK LANTAI 1
1 Box panel Induk LP 20 x 40 x 60 1.00 bh 0.200 0.070
2 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 0.176 0.062
3 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh 0.445 0.156
4 Digital Matering 1 pas 8.00 bh 0.565
5 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh 0.918 0.918
6 Lampu T 5 20.00 bh 0.318
7 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh 0.109 0.109
8 Lampu taman + instalasi 1.00 bh 0.043
9 Lampu dinding carport + Instalasi 4.00 bh 0.064
10 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh 0.445 0.289
11 Box telepon 1.00 0.014 0.007
12 Telepon Clipsal +instalasi 9.00 bh 0.201 0.101
13 Tv Clipsal + instalasi +spliter 17.00 bh 0.380 0.190
14 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh 0.217 0.109
15 Saklar Seri ex Clipsal E 2000 23.00 bh 0.122 0.104
16 Saklar tunggal ex Clipsal E 2000 bh 0.000 0.000
17 Saklar Hotel ex Clipsal E 2000 1.00 bh 0.006 0.006
LISTRIK LANTAI 2
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 0.176 0.088
2 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh 0.445 0.222
3 Digital Matering 1 pas 8.00 bh 0.565
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh 0.794 0.794
5 Lampu T 5 20.00 bh 0.318
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh 0.101 0.101
7 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh 0.626 0.313
8 Box telepon 1.00 0.022 0.011
9 Telepon Clipsal +instalasi 9.00 bh 0.201 0.101
10 Tv Clipsal + instalasi +spliter 17.00 bh 0.380 0.190
11 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh 0.275 0.138
12 Saklar Seri ex Clipsal E 2000 23.00 bh 0.514 0.257
LISTRIK LANTAI 3
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 0.176 0.044
2 Box Heger 6 grup, Mcb 6 A (3 bh) 9.00 bh 0.445 0.111
3 Digital Matering 1 pas 8.00 bh 0.565
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 50.00 bh 0.794 0.794
5 Lampu T 5 20.00 bh 0.318
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh 0.101 0.101
7 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 28.00 bh 0.626 0.313
8 Box telepon 1.00 0.022 0.011
9 Telepon Clipsal +instalasi 9.00 bh 0.201 0.101
10 Tv Clipsal + instalasi +spliter 17.00 bh 0.380 0.190
11 Stop kontak AC ex Clipsal E2000 + Instalasi Pembuangan 9.00 bh 0.275 0.138
12 Saklar Seri ex Clipsal E 2000 23.00 bh 0.514 0.257
LISTRIK TOP FLOOR
1 Box Heger 12 grup, Mcb 6 A (12 bh) 1.00 bh 0.176 0.088
2 Box Heger 6 grup, Mcb 6 A (3 bh) 0.00 bh 0.000 0.000
3 Digital Matering 1 pas 0.00 bh 0.000
4 Titik Lampu Down ligth 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 5.00 bh 0.079 0.079
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
5 Lampu T 5 0.00 bh 0.000
6 Titik Lampu Down ligth outbow 4'' osiwa , 11 watt osram + instalasi 3 x 2,5 mm 4.00 bh 0.080 0.080
7 Lampu taman + instalasi 0.00 bh 0.000
8 Lampu dinding carport + Instalasi 0.00 bh 0.000
9 Stop kontak ex Clipsal E2000 + Instalasi 3 x 2.5 6.00 bh 0.134 0.067
10 Box telepon 0.00 0.000 0.000
11 Telepon Clipsal +instalasi 1.00 bh 0.022 0.011
12 Tv Clipsal + instalasi +spliter 1.00 bh 0.022 0.011
13 Saklar Seri ex Clipsal E 2000 4.00 bh 0.089 0.045
14 Saklar Hotel ex Clipsal E 2000 1.00 bh 0.022 0.011
XIII PLUMBING Total VIII
PLUMBING LANTAI 1
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 155 m' 0.233 0.209
Pipa 3/4' ex triliun aw 32.00 m' 0.041 0.037
Pipa 1/2' ex Triliun aw 4.00 m' 0.005 0.004
Acessoris Rucika 1.00 ls 0.053 0.048
2 Instalasi air panas wespex 187.00 m' 0.770
3 Instalasi air kotor
Pipa 2 " ex triliun D 84.00 0.146 0.131
Pipa 3" air talang dan air floor drain ex Triliun D 240.00 m' 0.593 0.534
Pipa 4"ex Triliun D 240.00 m' 0.840 0.756
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 0.035 0.032
PLUMBING LANTAI 2
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 139 m' 0.209 0.188
Pipa 3/4' ex triliun aw 32.00 m' 0.041 0.037
Pipa 1/2' ex Triliun aw 4.00 m' 0.005 0.004
Acessoris Rucika 1.00 ls 0.053 0.048
2 Instalasi air panas wespex 171.00 m' 0.704 0.634
3 Instalasi air kotor
Pipa 2 " ex triliun D 8.00 0.014 0.012
Pipa 3" air talang dan air floor drain ex Triliun D 16.00 m' 0.040 0.036
Pipa 4"ex Triliun D 16.00 m' 0.056 0.050
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 0.035 0.032
PLUMBING LANTAI 3
1 Instalasi Air Bersih
Pipa 1 ex Triliun aw 131 m' 0.197 0.177
Pipa 3/4' ex triliun aw 32.00 m' 0.041 0.037
Pipa 1/2' ex Triliun aw 4.00 m' 0.005 0.004
Acessoris Rucika 1.00 ls 0.053 0.048
2 Instalasi air panas wespex 163.00 m' 0.671 0.537
3 Instalasi air kotor
Pipa 2 " ex triliun D 8.00 0.014 0.012
Pipa 3" air talang dan air floor drain ex Triliun D 16.00 m' 0.040 0.036
Pipa 4"ex Triliun D 16.00 m' 0.056 0.050
Acessoris 2",3",4" (keni,T,Vitrex) 1.00 ls 0.035 0.032
4 Solar water heater. ex Sun rain kapaitas 200 L TZBB 18.16 3.00 m' 4.765 4.765
5 Torn kapasitas 1 m3 Dolpin + pelampung +Hider 6.00 m' 1.624 1.624
6 Pompa pendorong 125 watt+ Instalasi 1.00 bh 0.059 0.059
XIV KAMAR MANDI, DAPUR & ALAT SANITAIR Total IX
1 Kamar mandi Bawah Tangga 190 X 260 CM T=200 cm, Lt dasar
Keramik dinding 20/40 ex Roman malaka brown W40540 7.6 m2 0.101 0.101
Keramik dinding 20/40 ex Roman malaka Beige W40501 5.434 m2 0.073 0.073
Keramik lantai 20x20 ex Roman G227701 Universal Cream 9.00 m2 0.093 0.093
Closed Duduk ex toto tipe white CW 421 14.08 bh 1.574
Jet Spry 5.10 bh 0.042
Wastapel Ex totoLW 240 CJ 1.00 bh 0.153
Floor Drain 1.00 bh 0.008 0.008
2 Kamar mandi Ruang tidur 135 x 170 cm t=280cm, Lt I (7 unit)
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
Keramik dinding 20/40 ex Roman malaka brown W4050 34.50 m2 0.461 0.461
Keramik dinding 20/40 ex Roman malaka Beige W40501 83.01 m2 0.861 0.861
Keramik lantai 20x20 ex Roman G227701 Universal Cream 22.89m2 2.558 2.558
Waterfroofing ex cemend aid lantai kamar mandi 22.89m2 0.189 0.189
Closed Duduk ex toto tipe white CW 421 7.00bh 0.782
Jet Spry 7.00bh 0.058
Wastapel Ex toto L 34 7.00bh 0.618
Shower exToto +Head panas dingin 7.00bh 1.524
Cermin 7.00bh 0.206
Tirai 7.00bh 0.165
Floor Drain 7.00 bh 0.055 0.055
3 Dapur
Keramik dinding 33,/50 Roman PWA 50508 pre cut cleopatra beige 4.50 m2 0.069 0.069
Meja granit 60 x 600 cm 4.50 m2 0.238 0.238
Zink 1.00 bh 0.024 0.024
Keran Dapur (dingin) 1.00 bh 0.024 0.024
4 Kamar mandi Ruang tidur 135 x 170 cm t=280cm, Lt 2 (9 unit)
Keramik dinding 20/40 ex Roman malaka brown W4050 44.35 m2 0.592 0.592
Keramik dinding 20/40 ex Roman malaka Beige W40501 106.72 m2 1.425 1.425
Keramik lantai 20x20 ex Roman G227701 Universal Cream 29.43 m2 0.305 0.305
Waterfroofing ex cemend aid lantai kamar mandi 29.43 m2 0.242 0.242
Closed Duduk ex toto tipe white CW 421 9.00 bh 1.006
Jet Spry 9.00 bh 0.074
Wastapel Ex toto L 34 9.00 bh 0.794
Shower exToto +Head panas dingin 9.00 bh 1.959
Cermin 9.00 bh 0.265
Tirai 9.00 bh 0.212
Floor Drain 9.00 bh 0.071 0.071
5 Kamar mandi Ruang tidur 135 x 170 cm t=280cm, Lt 3I (9 unit)
Keramik dinding 20/40 ex Roman malaka brown W4050 44.35m2 0.592 0.592
Keramik dinding 20/40 ex Roman malaka Beige W40501 106.72m2 1.425 1.425
Keramik lantai 20x20 ex Roman G227701 Universal Cream 29.43m2 0.305 0.305
Waterfroofing ex cemend aid lantai kamar mandi 29.43m2 0.242 0.242
Closed Duduk ex toto tipe white CW 421 9.00bh 1.006
Jet Spry 9.00bh 0.074
Wastapel Ex toto L 34 9.00bh 0.794
Shower exToto +Head panas dingin 9.00bh 1.959
Cermin 9.00bh 0.265
Tirai 9.00bh 0.212
Floor Drain 9.00 bh 0.071 0.071
6 Kamar mandi Ruang tidur 135 x 170 cm t=280cm, Lt top foor
Keramik dinding 20/40 ex Roman malaka brown W4050 4.93 m2 0.066 0.066
Keramik dinding 20/40 ex Roman malaka Beige W40501 11.86 m2 0.158 0.158
Keramik lantai 20x20 ex Roman G227701 Universal Cream 3.27 m2 0.034 0.034
Waterfroofing ex cemend aid lantai kamar mandi 3.27 m2 0.027 0.027
Closed Duduk ex toto tipe white CW 421 1.00 bh 0.112
Jet Spry 1.00 bh 0.008
Wastapel Ex toto L 34 1.00 bh 0.088
Shower exToto +Head panas dingin 1.00 bh 0.218
Cermin 11.00 bh 0.324
Tirai 1.00 bh 0.024
Floor Drain 1.00 bh 0.008 0.008
XV PEKERJAAN LAIN-LAIN Total X
Relling Tangga besi hollow 2/4,4/4 tebal 1.8 mm + head reling Kayu kamper 49.50 m' 3.669 2.201
Reling tangga teras depan besi hollow 2/4 tebal 1.8 mm fhinising cat
Septik tank 200 cm x 300 cm x 150 cm 1.00 ls 0.435 0.435
Rembasan 200 cm x 300 cm x 150 cm 1.00 ls 0.435 0.435
Carport Paping block 900 x 500 cm t=8 cm 45.00 m2 0.688 0.619
Taman 36.00 m2 0.360
Jembatan grill Besi 11.00 m' 0.582 0.582
LAPORAN PROGRES
Nomor : Bandung,…………………..
Pekerjaan : Struktur, arsitektur PIHAK KE I Bpk. YANA
Proyek : Rumah tinggal Pengawas
Luas m2 :
Lokasi : Puri syailendra kavling blok 33 PIHAK KE II CECEP
Tanggal : 01/April/2011
Minggu ke :

Bobot Progres
No ITEM PEKERJAAN Volume Sat
Pkrjaan Mng lalu Mng ini
### #VALUE! ###
1.41

#VALUE!
LAPORAN PROGRES KAVLING 21

Nilai kontrak : Rp1,566,125,000


SPK NO: : 03/SPK/ADM-SBP/III/2010
Mulai SPK : 22-Mar-10
Masa berlaku SPK : 210 Hari kalender
Berakhir SPK : 22 November 2010
Keterlambatan : 5 bulan
Finalty keterlamabatan : 5 % dari nilai kontrak Sesuai SPK
Progres sampai tanggal 1 april 2011 : 85%

1 Pembayaran Progres 85% x nilai kontrak


85% x 1.566.125.000,- = 1,329,640,125

2 Termyn yg sudah di terima pihak kontraktor : Termin ke I = 626,450,000


Termin ke II = 578,450,000
Jumlah = 1,204,900,000

3 Potongan Kasbon yg belum di bayar pihak kontraktor :


a. Material kusen (tobindo) = 20,520,000
b. Finalty keterlambatan pekerjaan
5 % dari nilai kontrak = 78,306,250
c. Borongan upah stel pintu 59 buah = 4,825,000
d Borongan melamik 21,000,000
Jumlah 124,651,250

Jumlah 2 + 3 = 1,329,551,250

Saldo = 88,875

Bandung, 6 april 2011


PT.SYAILENDRA BANGUN PERSADA
Cara pembayaran : Termiyn ke I progres 45 % dibayar 40 % dari nilai kontrak atau Rp. 626,450,000,-
Termyn ke 2 progres 90 % dibayar 40 % dari nilai kontrak atau Rp. 626,450,000,-
Termyn ke 3 progres 100 % dibayar 15 % dari nilai kontrak atau Rp. 234,918,750,-
Sisa 5 % dari nilai kontrak atau Rp. 78.306.250,- dibayar setelah masa retensi selama 90 hari

Pembayaran : Termy ke 1 sebesar : 626,450,000


Termy ke 2 sebesar : 578,450,000 (48.000.000,-)
:
Kusen tobindo : 20,520,000
Saniter (Home galeri) : 83,790,450

Total pengeluaran : 1,309,210,450

Saldo dana nilai kontrak : 256,914,550

Progres sampai tanggal 1 april 2011 : 85%

Borongan Stel pintu : 4,825,000


Borongan pasang wastafel
Sisa Borongan melamik kusen dan pintu : 21,399,000
254,062,500

253,973,625

170,073,625
atau Rp. 626,450,000,-
atau Rp. 626,450,000,-
k atau Rp. 234,918,750,-
etelah masa retensi selama 90 hari

Tgl pembayaran :
Tgl pembayaran :

Tgl pembayaran :
Tgl pembayaran :