ANALISA BIAYA ANGKUT BAHAN BAKAR

(Solar, Premium, Solar dan Minyak Tanah)


Lokasi : Fef - Mega Kab. Tambrauw

Harga Beli BBM / Solar di Sorong Rp. 9,025.00


LANGKAH - I
Angkut ke Lokasi (Bamuswaiman - Bamusbama)

Sewa Truck / Jam = Rp. 550,000.00


Excapator / Jam = Rp. 880,000.00
Buldozer / Jam = Rp. 950,000.00
Rp. 2,380,000.00
Jarak Angkut ke Lokasi = 4.000 km
Kecepatan rata-rata (pergi/pulang) = 2.75 km/jam
Kapasitas angkut = 3,000.00 Ltr
Volume susut 2 % = 60.00 Ltr
Kapasitas Bersih = 2,940.00 Ltr
Waktu tempuh = 2 x 4.00 / 2.75
= 2.91 Jam
Biaya angkut = 2.91 x Rp. 2,380,000.00 / 2,940.00
= Rp. 2,354.98

LANGKAH - II
Angkut ke Lokasi (Bamusbama - Syubun)
Excapator / Jam = Rp. 550,000.00
Buldozer / Jam = Rp. 950,000.00
Rp. 1,500,000.00
Jarak Angkut ke Lokasi = 20.000 km 33.33
Kecepatan rata-rata (pergi/pulang) = 0.60 km/jam
Kapasitas angkut = 3,000.00 Ltr
Volume susut 2 % = 60.00 Ltr
Kapasitas Bersih = 2,940.00 Ltr
Waktu tempuh = 2 x 20 / 1
= 66.67 Jam
Waktu bongkar muat = 1.0 Jam
Total Waktu = 1.0 + 66.67
= 67.67 Jam
Biaya angkut = 67.67 x Rp. 1,500,000.00 / 2,940.00
= Rp. 34,523.81

Biaya kemasan untuk pengangkutan/ stock di lokasi


Harga drum per buah = Rp. 125,000.00
Kapasitas drum = 200 Ltr
Biaya kemasan (stok) = Rp. 125,000.00 / 10 / 200
= Rp. 62.50
Biaya pengisian ke dalam drum
Jumlah Pekerja = 4 orang
Upah pekerja = Rp. 50,000.00 perhari
Biaya pengisian = Rp. 50,000.00 x 4.00 / 2,940
= Rp. 68.03
Biaya kemasan + Pengisian = Rp. 43.75 + 68.03
= Rp. 111.78
Total biaya angkut = Rp. 37,053.07

Harga Beli BBM / Solar di Sorong Rp. 46,078.07


ANALISA BIAYA ANGKUT BAHAN NON BBM
(Aspal, Semen, Besi Beton, Paku, Baut, Cat dll.)
Lokasi : Fef - Mega Kab. Tambrauw

Angkut ke Lokasi
Sewa Truck / Jam = Rp. 550,000.00
Jarak Angkut ke lokasi = 4.000 km
Kecepatan rata-rata = 3 km/jam
Kapasitas angkut 1 Dump Truck = 3,000 kg (ltr.)
Volume susut 2 % = 60.00 kg (ltr.)
Kapasitas Bersih = 2,940.00 kg (ltr.)
Waktu tempuh = 2 x 4 / 3
= 2.91 Jam
Waktu bongkar muat = 1.0 Jam
Total Waktu = 2.9 + 1.00
= 3.91 Jam
Biaya angkut = 3.91 x Rp. 550,000 / 2,940
= Rp. 731.29

Biaya muat - bongkar


Jumlah Pekerja = 4 orang
Upah pekerja = Rp. 50,000.00 perhari
Biaya muat - bongkar = Rp. 50,000.00 x 4.00 / 2,940
= Rp. 68.03

Total Biaya Angkut = Rp. 799.32 / kg ( ltr. )


ANALISA BIAYA ANGKUT BAHAN BAKAR
(Solar, Premium, Solar dan Minyak Tanah)
Lokasi : Fef - Mega Kab. Tambrauw

LANGKAH - I Harga Solar Beli Di Sorong Rp. 0.00


Angkut BBM ke Lokasi ( SORONG - MEGA)

Sewa kapal Angkut (termasuk Ijin2nya) = Rp. 10,000,000.00

Jarak Angkut ke Lokasi = 110.00 km


Kecepatan rata-rata (pergi/pulang) = 20.00 km/jam
Kapasitas angkut = 20,000.00 Ltr
Volume susut 2 % = 400.00 Ltr
Kapasitas Bersih = 19,600.00 Ltr
Waktu tempuh = 0.25 x 110.00 / 20.00
= 1.38 Jam
Waktu bongkar muat = 3.0 Jam
Total Waktu = 3.0 + 1.38
= 4.38 Jam
Biaya angkut = 4.38 x Rp. 10,000,000.00 / 19,600.00
= Rp. 2,232.14 /ltr
Harga Solar Di Sorong Rp. 2,232.14
LANGKAH - I
Angkut BBM ke Lokasi (MEGA - BAMUSBAMA)

Excapator / Jam = Rp. #REF!


Buldozer / Jam = Rp. #REF!
Rp. #REF!

Jarak Angkut ke Lokasi = 13.000 km 21.67


Kecepatan rata-rata (pergi/pulang) = 0.60 km/jam
Kapasitas angkut = 3,000.00 Ltr
Volume susut 2 % = 60.00 Ltr
Kapasitas Bersih = 2,940.00 Ltr
Waktu tempuh = 2 x 13 / 1
= 43.33 Jam
Waktu bongkar muat = 1.0 Jam
Total Waktu = 1.0 + 43.33
= 44.33 Jam
Biaya angkut = 44.33 x Rp. #REF! / 2,940.00
= Rp. #REF!

LANGKAH - I
Angkut BBM ke Lokasi (MEGA - BAMUSBAMA)

Excapator / Jam = Rp. #REF!


Buldozer / Jam = Rp. #REF!
Rp. #REF!

Jarak Angkut ke Lokasi = 13.000 km 21.67


Kecepatan rata-rata (pergi/pulang) = 0.60 km/jam
Kapasitas angkut = 3,000.00 Ltr
Volume susut 2 % = 60.00 Ltr
Kapasitas Bersih = 2,940.00 Ltr
Waktu tempuh = 2 x 13 / 1
= 43.33 Jam
Waktu bongkar muat = 1.0 Jam
Total Waktu = 1.0 + 43.33
= 44.33 Jam
Biaya angkut = 44.33 x Rp. #REF! / 2,940.00
= Rp. #REF!

Biaya kemasan untuk pengangkutan/ stock di lokasi


Harga drum per buah = Rp. 125,000.00
Kapasitas drum = 200 Ltr
Biaya kemasan (stok) = Rp. 125,000.00 / 10 / 200
= Rp. 62.50
Biaya pengisian ke dalam drum
Jumlah Pekerja = 4 orang
Upah pekerja = Rp. 50,000.00 perhari
Biaya pengisian = Rp. 50,000.00 x 4.00 / 19,600
= Rp. 10.20
Biaya kemasan + Pengisian = Rp. 43.75 + 10.20
= Rp. 53.95
Total biaya angkut = Rp. #REF!
ANALISA BIAYA ANGKUT BAHAN NON BBM
(Aspal, Semen, Besi Beton, Paku, Baut, Cat dll.)
Lokasi : Fef - Mega Kab. Tambrauw

Angkut ke Lokasi
Sewa Truck / Jam = Rp. #REF!
Jarak Angkut ke lokasi = 110.000 km
Kecepatan rata-rata = 20 km/jam
Kapasitas angkut 1 Dump Truck = 3,000 kg (ltr.)
Volume susut 2 % = 60.00 kg (ltr.)
Kapasitas Bersih = 2,940.00 kg (ltr.)
Waktu tempuh = 2 x 110 / 20
= 11.00 Jam
Waktu bongkar muat = 1.0 Jam
Total Waktu = 11.0 + 1.00
= 12.00 Jam
Biaya angkut = 12.00 x Rp. #REF! / 2,940
= Rp. #REF!

Biaya muat - bongkar


Jumlah Pekerja = 4 orang
Upah pekerja = Rp. 50,000.00 perhari
Biaya muat - bongkar = Rp. 50,000.00 x 4.00 / 2,940
= Rp. 68.03

Total Biaya Angkut = Rp. #REF! / kg ( ltr. )


ANALISA HARGA SATUAN BIAYA PERALATAN

#REF! : #REF!
#REF! : #REF!
#REF! : #REF!
#REF! : #REF!

TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA
ALAT ALAT ALAT UMUR JAM HARGA SISA PENGEMBALIAN BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL
TOTAL BIAYA SEWA
ALAT KERJA ALAT ALAT MODAL PENGENBALAN DAN BIAYA BAHAN MINYAK BIAYA KOEF. BIAYA OPERATOR PEMB BIAYA
ALAT PER JAM
KODE 1 TAHUN MODAL LAIN 2 PASTI / JAM BAKAR PELUMAS /SOPIR OPERATOR OPERASI
NO JENIS PERALATAN PEMBULATAN
ALAT ( HP ) ( Tahun ) ( Tahun ) ( Tahun ) ( Rp ) /SOPIR
(10%xB) i(I+i)^A (B-C)Xd 0,002xB (e1+e2) 0.125 0.01 0.125 gl x B 1 Org Per 1 Org Per F+G+H+I E+J
(I+i)^A-I W W s/d s/d fl x HP x H BBM s/d W Jam Kerja Jam Kerja
0.175 0.02 + f2 x HP x H Oil 0.175
HP Cp B A W B C D e1 e2 E fl f2 F gl G H I J K L

1 BULDOZER D 65 E-12/SI E 04 155 60.00 M3/JAM 1,860,000,000 5.00 2,000 1,860,000,000 186,000,000 0.2638 220,800.60 1,860.00 222,660.60 0.125 0.010 473,437.43 0.125 116,250 13,571 10,714 600,401.43 823,062.03 823,000.00
2 COMPRESOR 4000-6000 L/M E 05 80 - 60,000,000 5.00 2,000 60,000,000 6,000,000 0.2638 7,122.60 60.00 7,182.60 0.125 0.010 244,354.80 0.125 3,750 13,571 10,714 272,389.80 279,572.40 279,000.00
3 CONCRETE MIXER 0,3 - 0,6 E 06 15 500.00 Liter 33,000,000 4.00 2,000 33,000,000 3,300,000 0.3155 4,685.18 33.00 4,718.18 0.125 0.010 45,816.53 0.125 2,063 13,571 10,714 72,164.03 76,882.20 76,000.00
4 CRANE 10 - 15 TON E 07 150 5.00 Ton 975,000,000 5.00 2,000 975,000,000 97,500,000 0.2638 115,742.25 975.00 116,717.25 0.125 0.010 458,165.25 0.125 60,938 13,571 10,714 543,387.75 660,105.00 660,000.00
5 DUMP TRUCK E 08 125 2.50 M3 350,000,000 5.00 2,000 350,000,000 35,000,000 0.2638 41,548.50 350.00 41,898.50 0.125 0.010 381,804.38 0.125 21,875 13,571 10,714 427,964.38 469,862.88 469,000.00
6 DUMP TRUCK E 09 100 0.80 M3 235,000,000 5.00 2,000 235,000,000 23,500,000 0.2638 27,896.85 235.00 28,131.85 0.125 0.010 305,443.50 0.125 14,688 13,571 10,714 344,416.00 372,547.85 372,000.00
7 EXCAVATOR 80 - 140 TON E 10 38 2.00 M3 1,170,000,000 5.00 2,000 1,170,000,000 117,000,000 0.2638 138,890.70 1,170.00 140,060.70 0.125 0.010 116,068.53 0.125 73,125 13,571 10,714 213,478.53 353,539.23 353,000.00
8 FLADBED TRUCK E 11 100 125.00 M3 133,000,000 5.00 2,000 133,000,000 13,300,000 0.2638 15,788.43 133.00 15,921.43 0.125 0.010 305,443.50 0.125 8,313 13,571 10,714 338,041.00 353,962.43 353,000.00
9 GENERATOR SET E 12 175 KVA 85,000,000 5.00 2,000 85,000,000 8,500,000 0.2638 10,090.35 85.00 10,175.35 0.125 0.010 534,526.13 0.125 5,313 13,571 10,714 564,123.63 574,298.98 574,000.00
10 MOTOR GREDER . 100 HP E 13 121 1.60 1,500,000,000 5.00 2,000 1,500,000,000 150,000,000 0.2638 178,065.00 1,500.00 179,565.00 0.125 0.010 369,586.64 0.125 93,750 13,571 10,714 487,621.64 667,186.64 667,000.00
11 TRUCK LOADER 75-100 HP E 14 90 1.70 M3 1,100,000,000 5.00 2,000 1,100,000,000 110,000,000 0.2638 130,581.00 1,100.00 131,681.00 0.125 0.010 274,899.15 0.125 68,750 13,571 10,714 367,934.15 499,615.15 499,000.00
12 WHEEL LOADER E 15 144 8.00 M3 1,300,000,000 5.00 2,000 1,300,000,000 130,000,000 0.2638 154,323.00 1,300.00 155,623.00 0.125 0.010 439,838.64 0.125 81,250 13,571 10,714 545,373.64 700,996.64 700,000.00
13 THREE WHEEL ROLLER 6-8 TON E 16 55 8.00 Ton 1,200,000,000 5.00 2,000 1,200,000,000 120,000,000 0.2638 142,452.00 1,200.00 143,652.00 0.125 0.010 167,993.93 0.125 75,000 13,571 10,714 267,278.93 410,930.93 410,000.00
14 TANDEM ROLLER 6-10 TON E 17 104 10.00 Ton 800,000,000 5.00 2,000 800,000,000 80,000,000 0.2638 94,968.00 800.00 95,768.00 0.125 0.010 317,661.24 0.125 50,000 13,571 10,714 391,946.24 487,714.24 487,000.00
15 TIRE ROLLER E 18 60 7.00 Ton 1,040,000,000 5.00 1,800 1,040,000,000 104,000,000 0.2638 137,176.00 1,155.56 138,331.56 0.125 0.010 183,266.10 0.125 72,222 13,571 10,714 279,773.32 418,104.88 418,000.00
16 VIBRATOR ROLLER 6-7 TON E 19 130 Ton 850,000,000 4.00 2,000 850,000,000 85,000,000 0.3155 120,678.75 850.00 121,528.75 0.125 0.010 397,076.55 0.125 53,125 13,571 10,714 474,486.55 596,015.30 596,000.00
17 CONCRETE VIBRATOR E 20 10 42,000,000 4.00 1,000 42,000,000 4,200,000 0.3155 11,925.90 84.00 12,009.90 0.125 0.010 30,544.35 0.125 5,250 13,571 10,714 60,079.35 72,089.25 72,000.00
18 STONE CRUSHER E 21 220 50.00 Ton/Jam 590,000,000 5.00 2,000 590,000,000 59,000,000 0.2638 70,038.90 590.00 70,628.90 0.125 0.010 671,975.70 0.125 36,875 13,571 10,714 733,135.70 803,764.60 803,000.00
19 WATER PUMP 70-100 CM E 22 6 36,000,000 2.00 2,000 36,000,000 3,600,000 0.5762 9,334.44 36.00 9,370.44 0.125 0.010 18,326.61 0.125 2,250 13,571 10,714 44,861.61 54,232.05 54,000.00
20 WATER TANKER 3000-4500 L E 23 100 4,000.00 Liter 296,000,000 5.00 2,000 296,000,000 29,600,000 0.2638 35,138.16 296.00 35,434.16 0.125 0.010 305,443.50 0.125 18,500 13,571 10,714 348,228.50 383,662.66 383,000.00
21 WATER TANK (SOLAR) E 23A 100 4,000.00 Liter 296,000,000 5.00 2,000 296,000,000 29,600,000 0.2638 35,138.16 296.00 35,434.16 0.125 0.010 305,443.50 0.125 18,500 13,571 10,714 348,228.50 383,662.66 383,000.00
22 PEDESTRIAN ROLLER E 24 11 1.00 Ton 33,000,000 4.00 2,000 33,000,000 3,300,000 0.3155 4,685.18 33.00 4,718.18 0.125 0.010 33,598.79 0.125 2,063 13,571 10,714 59,946.29 64,664.46 64,000.00
23 TAMPER E 25 5 0.50 Ton 21,000,000 4.00 1,000 21,000,000 2,100,000 0.3155 5,962.95 42.00 6,004.95 0.125 0.010 15,272.18 0.125 2,625 13,571 10,714 42,182.18 48,187.13 48,000.00
24 JACK HAMMER E 26 3 1,250,000,000 4.00 1,000 1,250,000,000 125,000,000 0.3155 354,937.50 2,500.00 357,437.50 0.125 0.010 9,163.31 0.125 156,250 13,571 10,714 189,698.31 547,135.80 547,000.00
25 GENSET E 26 A 20 475,000,000 6.00 2,000 475,000,000 47,500,000 0.2296 49,077.00 475.00 49,552.00 0.125 0.010 61,088.70 0.125 29,688 13,571 10,714 115,061.20 164,613.20 164,000.00
26 MOBIL MOLEN E 23 B 125 5.00 M3 775,000,000 5.00 2,000 775,000,000 77,500,000 0.2638 92,000.25 775.00 92,775.25 0.125 0.010 381,804.38 0.125 48,438 13,571 10,714 454,526.88 547,302.13 547,000.00
27 FULVI MIXER E 27 75 85,000,000 5.00 2,000 85,000,000 8,500,000 0.2638 10,090.35 85.00 10,175.35 0.125 0.010 229,082.63 0.125 5,313 13,571 10,714 258,680.13 268,855.48 268,000.00
28 GRESS CUTTER 3 75,000,000 4.00 2,000 75,000,000 7,500,000 0.3155 10,648.13 75.00 10,723.13 0.125 0.010 9,163.31 0.125 4,688 13,571 10,714 38,135.81 48,858.93 48,000.00
29 PILE DRIVER 120 3.50 Ton 550,000,000 5.00 1,600 550,000,000 55,000,000 0.2638 81,613.12 687.50 82,300.62 0.125 0.010 366,532.20 0.125 42,969 13,571 10,714 433,785.95 516,086.58 516,000.00
30 TRILLER 140 20.00 Ton 650,000,000 5.00 1,600 650,000,000 65,000,000 0.2638 96,451.88 812.50 97,264.38 0.125 0.010 427,620.90 0.125 50,781 13,571 10,714 502,687.15 599,951.53 599,000.00
31 FORKLIFT 100 5.00 Ton 175,000,000 5.00 1,600 175,000,000 17,500,000 0.2638 25,967.81 218.75 26,186.56 0.125 0.010 305,443.50 0.125 13,672 13,571 10,714 343,400.38 369,586.94 369,000.00
32 WELDING SET 30 90,000,000 5.00 1,600 90,000,000 9,000,000 0.2638 13,354.88 112.50 13,467.38 0.125 0.010 91,633.05 0.125 7,031 13,571 10,714 122,949.30 136,416.68 136,000.00
33 WELDING SET 220 4,500,000,000 5.00 1,500 4,500,000,000 450,000,000 0.2638 712,260.00 6,000.00 718,260.00 0.125 0.010 671,975.70 0.125 375,000 13,571 10,714 1,071,260.70 1,789,520.70 1,789,000.00
34 ALAT BANTU 1 Ls 10,000 - - 10,000 - - - - - - - - - - - - - 10,000.00 10,000.00

KETERANGAN
1 Tingkat Suku Bunga : 0.10 % PerTahun
Upah Operator/Supir/Mekanik : 13,571 Rp/orang Per Jam
Upah Pemb./Supir/Mekanik : 10,714 Rp/orang Per Jam
Harga Bahan Bakar bensin : 20,681 Rp/Liter Per Liter
Harga Bahan Bakar Solar : 20,181 Rp/Liter Per Liter
Minyak Pelumas : 53,181 Rp/Liter Per Liter
INFORMASI UMUM
No. URAIAN INFORMASI

1. Nama Proyek : Pematangan Tanah Rumah DPR

2. Nama Paket : Pematangan Tanah Rumah DPR

3. Nomor Paket :

4. Lokasi pekerjaan : Periksa peta lokasi pekerjaan

5. Kondisi jalan lama : Rusak berat

6. Panjang Fungsional ( lihat sketsa di bawah ) : 2 Kilometer

7. Lebar jalan lama ( bahu + perkerasan + bahu ) : ( -- + -- + -- ) dalam meter

8. Lebar Rencana ( bahu + perkerasan + bahu ) : ( 1.0 + 4 + 1.0 ) dalam meter

9. Penampang jalan, jenis dan volume pekerjaan pokok : Lihat lampiran.

10. Jangka waktu pelaksanaan pekerjaan : 180 hari kalender


Atau : 6 bulan

11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 3.2955 Kilometer
Perhitungan didasarkan pada sketsa di bawah ini : L = {(c+a/2)*a + (c+b/2)*b} / (a+b)
5.00 Km = a C 0.50 Km = b
A 1.00 Km = c B
Base Camp --> D

12. Jam kerja efektif dalam 1 hari 7 jam


13. Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
14. Tingkat Suku Bunga Investasi Alat 20 %
15. Biaya Umum dan Keuntungan; PPn 10 %

16. METHODE PELAKSANAAN


16.a. Mobilisasi dilaksanakan sesuai ketentuan yang tercantum dalam Dokumen Tender.
16.b. Pekerjaan Tanah dilaksanakan untuk Pembentukan Badan jalan.
16.c. Pekerjaan Kayu di laksanakan untuk pembuatan jembatan sementara
16.d.
16.e.

17. Lokasi Quarry Periksa lampiran.

18.
9

BESIC PRICE

DAFTAR HARGA SATUAN UPAH DAN BAHAN

TAHUN ANGGARAN 2011

TRIWULAN - I

KABUPATEN TAMBRAUW

A. DAFTAR HARGA SATUAN UPAH

No. URAIAN KODE SATUAN SAUSAPOR PEF MIYAH SYUJAK YEMBUN KWOR ABUN PER JAM (Rp,-)

1 Mandor L061 HARI 105,000.00 105,000.00 105,000.00 105,000.00 105,000.00 105,000.00 105,000.00 15,000.00 /Jam
2 Makanik L071 HARI 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 12,857.14 /Jam
3 Pembantu Mekanik L072 HARI 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 10,714.29 /Jam
4 Kepala tukang L073 HARI 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 13,571.43 /Jam
5 Tukang L079 HARI 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 12,857.14 /Jam
6 Operator L081 HARI 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 13,571.43 /Jam
7 Pembantu Operator L082 HARI 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 10,714.29 /Jam
8 Supir L091 HARI 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 12,857.14 /Jam
9 Pembantu supir L092 HARI 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 9,285.71 /Jam
10 Pekerja L106 HARI 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 10,714.29 /Jam

B. DAFTAR HARGA SATUAN BAHAN

No. URAIAN KODE SATUAN SAUSAPOR PEF MIYAH SYUJAK YEMBUN KWOR ABUN PER JAM (Rp,-)

a b c d e f g h i j k l

1 Bahan Bakar Bensin [ BBM ] Ltr 7,950.00 42,000.00 75,000.00 55,000.00 11,500.00 10,900.00 12,400.00 Base Camp
2 Bahan Bakar Solar [ BBM ] Ltr 9,280.00 44,752.50 79,125.00 57,252.00 11,940.00 10,315.00 11,877.50
3 Minyak Pelumas [ Oli ] Ltr 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
4 Kayu kls I [ Kayu Besi ] M3 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00 2,000,000.00
5 kayu kls II [ Kayu Matoa ] M3 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00
6 kayu Lombok M3 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00
7 kayu Log M' 425,000.00 500,000.00 650,000.00 550,000.00 460,000.00 450,000.00 485,000.00
8 kayu Bakar M3 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00 375,000.00
9 Batu Gunung M3 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00
10 Batu Pecah 1-2 M3 662,500.00 850,000.00 850,000.00 850,000.00 875,000.00 825,000.00 950,000.00
11 Batu Pecah 2-3 M3 596,250.00 800,000.00 800,000.00 800,000.00 787,500.00 742,500.00 855,000.00
12 Batu Pecah 3-5 M3 596,250.00 750,000.00 750,000.00 750,000.00 787,500.00 742,500.00 855,000.00
13 Aggregat kasar [ Dicuci ] M3 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
14 Batu Tela Bh 2,320.00 12,252.50 21,857.00 15,752.50 3,065.00 2,890.00 3,327.50
15 Abu Batu M3 596,250.00 - - - 787,500.00 742,500.00 855,000.00
10

a b c d e f g h i j k l
16 Pasir Cor M3 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 225,000.00 255,000.00
17 Pasir Plester M3 215,000.00 215,000.00 215,000.00 215,000.00 215,000.00 215,000.00 215,000.00
18 Pasir Pasang M3 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
19 Sirtu M3 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00
20 Tanah Timbunan Biasa M3 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00
21 Urugan Pilihan M3 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00
22 Pasir Urug M3 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00
23 Semen 50 kg Zak 106,000.00 560,000.00 1,000,000.00 720,000.00 140,000.00 132,000.00 152,000.00
24 Semen 40 kg Zak 90,100.00 476,000.00 850,000.00 612,000.00 119,000.00 112,200.00 129,200.00
25 Semen Warna 50 kg zak 145,750.00 770,000.00 1,375,000.00 990,000.00 192,500.00 181,500.00 209,000.00
26 Semen Warna 40 kg zak 119,250.00 630,000.00 1,125,000.00 810,000.00 157,500.00 148,500.00 171,000.00
27 Seng BJLS 30 6 Kaki Lbr 79,500.00 420,000.00 750,000.00 540,000.00 105,000.00 99,000.00 114,000.00
28 Seng BJLS 30 7 kaki Lbr 92,750.00 490,000.00 875,000.00 630,000.00 122,500.00 115,500.00 133,000.00
29 Seng BJLS 30 8 kaki Lbr 106,000.00 560,000.00 1,000,000.00 720,000.00 140,000.00 132,000.00 152,000.00
30 Seng BJLS 20 6 kaki Lbr 51,675.00 273,000.00 487,500.00 351,000.00 68,250.00 64,350.00 74,100.00
31 Seng BJLS 20 7 kaki Lbr 59,625.00 315,000.00 562,500.00 405,000.00 78,750.00 74,250.00 85,500.00
32 Seng BJLS 20 8 kaki Lbr 68,900.00 364,000.00 650,000.00 468,000.00 91,000.00 85,800.00 98,800.00
33 Seng Plat Bjls 30 Lbr 165,000.00 - - - - - -
34 Atap Diamond Roof 2 mm Lbr 66,250.00 350,000.00 625,000.00 450,000.00 87,500.00 82,500.00 95,000.00
35 Atap Diamond Roof 3 mm Lbr 79,500.00 420,000.00 750,000.00 540,000.00 105,000.00 99,000.00 114,000.00
36 Nok Omega Lbr 43,060.00 227,500.00 406,250.00 292,500.00 56,875.00 53,625.00 61,750.00
37 Paku Diamond Roof Kg 36,440.00 192,500.00 343,750.00 247,500.00 48,125.00 45,375.00 52,250.00
38 Besi Beton Ulir Kg 23,320.00 123,200.00 220,000.00 158,400.00 30,800.00 29,040.00 33,440.00
39 Besi Beton Kg 21,340.00 112,700.00 201,250.00 144,900.00 28,175.00 26,565.00 30,590.00
40 Kawat Ikat Kg 31,800.00 168,000.00 300,000.00 216,000.00 42,000.00 39,600.00 45,600.00
41 Paku Biasa Kg 23,187.50 122,500.00 218,750.00 157,500.00 30,625.00 28,875.00 33,250.00
42 Paku Seng Kg 31,800.00 168,000.00 300,000.00 216,000.00 42,000.00 39,600.00 45,600.00
43 Paku Triples Kg 31,800.00 168,000.00 300,000.00 216,000.00 42,000.00 39,600.00 45,600.00
44 Kaca Polos Bening 5 mm Lbr 298,125.00 1,575,000.00 2,812,500.00 2,025,000.00 393,750.00 371,250.00 427,500.00
45 Kaca Riben 5 mm Lbr 331,250.00 1,750,000.00 3,125,000.00 2,250,000.00 437,500.00 412,500.00 475,000.00
46 Kaca Polos Bening 3 mm Lbr 251,750.00 1,330,000.00 2,375,000.00 1,710,000.00 332,500.00 313,500.00 361,000.00
47 Kaca Riben 3 mm Lbr 291,500.00 1,540,000.00 3,750,000.00 1,980,000.00 385,000.00 363,000.00 418,000.00
48 Kaca Nako Lbr 16,565.00 87,500.00 156,250.00 112,500.00 21,875.00 20,625.00 23,750.00
49 Stang NAKO 5 Lbr Set 192,125.00 1,015,000.00 1,812,500.00 1,305,000.00 253,750.00 239,250.00 275,500.00
50 Stang Nako 7 Lbr Set 225,250.00 1,190,000.00 2,125,000.00 1,530,000.00 297,500.00 280,500.00 323,000.00
51 Cat Tembok [Biasa] kg 9,275.00 49,000.00 87,500.00 63,000.00 12,250.00 11,550.00 13,300.00
52 Cat Tembok [Metrolite] Kg 23,190.00 122,500.00 218,750.00 157,500.00 30,625.00 28,875.00 33,250.00
53 Cat kayu Kg 53,000.00 280,000.00 500,000.00 360,000.00 70,000.00 66,000.00 76,000.00
54 Cat Meni Kg 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
55 Minyak Cat/ Tinner Kg 30,475.00 161,000.00 287,500.00 207,000.00 40,250.00 37,950.00 43,700.00
56 Plitur Kg 36,440.00 192,500.00 343,750.00 247,500.00 48,125.00 45,375.00 52,250.00
57 Plamir kayu Kg 43,725.00 231,000.00 412,500.00 297,000.00 57,750.00 54,450.00 62,700.00
58 Dempul kayu Kg 29,815.00 157,500.00 281,250.00 202,500.00 39,375.00 37,125.00 42,750.00
59 Plamir Tembok 4 Kg Kg 53,000.00 280,000.00 500,000.00 360,000.00 70,000.00 66,000.00 76,000.00
60 Amplas / Lbr 3,975.00 21,000.00 37,500.00 27,000.00 5,250.00 4,950.00 5,700.00
61 Tripleks 3mm Lbr 59,625.00 315,000.00 562,500.00 405,000.00 78,750.00 74,250.00 85,500.00
11

a b c d e f g h i j k l

62 Tripleks 4mm Lbr 82,815.00 437,500.00 781,250.00 562,500.00 109,375.00 103,125.00 118,750.00
63 Gypsum 9mm Lbr 100,700.00 532,000.00 950,000.00 684,000.00 133,000.00 125,400.00 144,400.00
64 Tripleks 6mm Lbr 119,250.00 630,000.00 1,125,000.00 810,000.00 157,500.00 148,500.00 171,000.00
65 Tripleks 9mm Lbr 192,125.00 1,015,000.00 1,812,500.00 1,305,000.00 253,750.00 239,250.00 275,500.00
66 Teakwood Pintu Lbr 125,875.00 665,000.00 1,187,500.00 855,000.00 166,250.00 156,750.00 180,500.00
67 Teakwood Lebar Lbr 178,875.00 945,000.00 1,687,500.00 1,215,000.00 236,250.00 222,750.00 256,500.00
68 Multi plek 12 mm Lbr 198,750.00 1,050,000.00 1,875,000.00 1,350,000.00 262,500.00 247,500.00 285,000.00
69 Kloset Jongkok KIA Bh 298,125.00 1,575,000.00 2,812,500.00 2,025,000.00 393,750.00 371,250.00 427,500.00
70 Kloset Jongkok Biasa Bh 145,750.00 770,000.00 1,375,000.00 990,000.00 192,500.00 181,500.00 209,000.00
71 Kloset Duduk Bh 2,120,000.00 11,200,000.00 20,000,000.00 14,400,000.00 2,800,000.00 2,640,000.00 3,040,000.00
72 Kuas Biasa 3'' Bh 19,875.00 105,000.00 187,500.00 135,000.00 26,250.00 24,750.00 28,500.00
73 Kuas Rol Bh 39,750.00 210,000.00 375,000.00 270,000.00 52,500.00 49,500.00 57,000.00
74 Pewarna Plitur Bks 6,625.00 35,000.00 62,500.00 45,000.00 8,750.00 8,250.00 9,500.00
75 Engsel Pintu Bh 59,625.00 315,000.00 562,500.00 405,000.00 78,750.00 74,250.00 85,500.00
76 Engsel Jendela Bh 39,750.00 210,000.00 375,000.00 270,000.00 52,500.00 49,500.00 57,000.00
77 Grendel Besar Bh 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
78 Grendel Kecil Bh 23,190.00 122,500.00 218,750.00 157,500.00 30,625.00 28,875.00 33,250.00
79 Kait angin Bh 16,565.00 87,500.00 156,250.00 112,500.00 21,875.00 20,625.00 23,750.00
80 Kawat Las 2,6 mm DOS 331,250.00 1,750,000.00 3,125,000.00 2,250,000.00 437,500.00 412,500.00 475,000.00
81 Teak Oil kg 46,375.00 245,000.00 437,500.00 315,000.00 61,250.00 57,750.00 66,500.00
82 Keramik Warna Dos 99,375.00 525,000.00 937,500.00 675,000.00 131,250.00 123,750.00 142,500.00
83 Keramik Polos Dos 79,500.00 420,000.00 750,000.00 540,000.00 105,000.00 99,000.00 114,000.00
84 Aspal Kg 12,920.00 68,252.50 121,875.00 87,752.50 17,065.00 16,090.00 18,527.50
85 Sekring Kas 2 Grup Unit 159,000.00 840,000.00 1,500,000.00 1,080,000.00 210,000.00 198,000.00 228,000.00
86 Sekring kas 1 Grup Unit 99,375.00 525,000.00 937,500.00 675,000.00 131,250.00 123,750.00 142,500.00
87 Kabel NYA 4 mm Rol 728,750.00 3,850,000.00 6,875,000.00 4,950,000.00 962,500.00 907,500.00 1,045,000.00
88 Kabel NYA 21/2 mm Enterna Rol 463,750.00 2,450,000.00 4,375,000.00 3,150,000.00 612,500.00 577,500.00 665,000.00
89 Isolator Tali Rami Bh 1,325.00 7,000.00 12,500.00 9,000.00 1,750.00 1,650.00 1,900.00
90 Saklar Double Bh 36,440.00 192,500.00 343,750.00 247,500.00 48,125.00 45,375.00 52,250.00
91 Saklar Engkel Bh 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
92 Stop Kontak Bh 36,440.00 192,500.00 343,750.00 247,500.00 48,125.00 45,375.00 52,250.00
93 Fitting Bh 16,570.00 87,505.00 156,250.00 112,505.00 21,875.00 20,630.00 23,755.00
94 Lampu Pijar 30 Watt Bh 46,375.00 245,000.00 437,500.00 315,000.00 61,250.00 57,750.00 66,500.00
95 Lampu Pijar 20 Watt Bh 43,065.00 227,500.00 406,250.00 292,500.00 56,875.00 53,625.00 61,750.00
96 Lampu TL 40 Watt Bh 159,000.00 840,000.00 1,500,000.00 1,080,000.00 210,000.00 198,000.00 228,000.00
97 Lampu TL 2O Watt Bh 112,625.00 595,000.00 1,062,500.00 765,000.00 148,750.00 140,250.00 161,500.00
98 Besi Plat 3mm Lbr 1,457,500.00 7,700,000.00 13,750,000.00 9,900,000.00 1,925,000.00 1,815,000.00 2,090,000.00
99 Besi Plat 5mm Lbr 2,318,750.00 12,250,000.00 21,875,000.00 15,750,000.00 3,062,500.00 2,887,500.00 3,325,000.00
100 Kran Air 1/2 '' Bh 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
101 Seal Tip Besar Rol 16,565.00 87,500.00 156,250.00 112,500.00 21,875.00 20,625.00 23,750.00
102 Sikat Besi Bh 33,125.00 175,000.00 312,500.00 225,000.00 43,750.00 41,250.00 47,500.00
103 Pipa PVC RR dia 2'' M' 79,500.00 420,000.00 750,000.00 540,000.00 105,000.00 99,000.00 114,000.00
104 Pipa PVC RR dia 3'' M' 178,857.00 945,000.00 1,687,500.00 1,215,000.00 236,250.00 222,750.00 256,500.00
105 Pipa PVC RR dia 4'' M' 258,375.00 1,365,000.00 2,437,500.00 1,755,000.00 341,250.00 321,750.00 370,500.00
106 Pipa PVC RR dia 6'' M' 662,500.00 3,500,000.00 6,250,000.00 4,500,000.00 875,000.00 825,000.00 950,000.00
12

a b c d e f g h i j k l

107 Pipa Gip Med A dia 1/2'' M' 89,440.00 472,500.00 843,750.00 607,500.00 118,125.00 111,375.00 128,250.00
108 PiPa Gip Med A dia 3/4'' M' 107,325.00 567,000.00 1,012,500.00 729,000.00 141,750.00 133,650.00 153,900.00
109 Pipa Gip Med A dia 1'' M' 129,190.00 682,500.00 1,218,750.00 877,500.00 170,625.00 160,875.00 185,250.00
110 Pipa Gip Med A dia 2'' M' 253,075.00 1,337,000.00 2,387,500.00 1,719,000.00 334,250.00 315,150.00 362,900.00
111 Pipa Gip Med A dia 3'' M' 455,800.00 2,408,000.00 4,300,000.00 3,096,000.00 602,000.00 567,600.00 653,600.00
112 Pipa Gip Med A dia 4'' M' 559,150.00 2,954,000.00 5,275,000.00 3,798,000.00 738,500.00 696,300.00 801,800.00
113 Pipa Gip Med A dia 6'' M' 851,975.00 4,501,000.00 8,037,500.00 5,787,000.00 1,125,250.00 1,060,950.00 1,221,700.00
114 Pipa Gip Med A dia 8'' M' 1,162,025.00 6,139,000.00 10,962,500.00 7,893,000.00 1,534,750.00 1,447,050.00 1,666,300.00
115 Pipa Gip Med A dia 10'' M' 1,603,250.00 8,470,000.00 15,125,000.00 10,890,000.00 2,117,500.00 1,996,500.00 2,299,000.00
116 Pipa scren dia 200 M' 2,683,125.00 14,175,000.00 25,312,500.00 18,255,000.00 3,543,750.00 3,341,250.00 3,847,500.00
117 Pipa scren dia 250 M' 3,478,125.00 18,375,000.00 32,812,500.00 23,625,000.00 4,593,750.00 4,331,250.00 4,987,500.00
118 Bend RR 90/45 drj dia 6'' bh 655,875.00 3,465,000.00 6,187,500.00 4,455,000.00 866,250.00 816,750.00 940,500.00
119 Bend RR 90/45 drj dia 4'' bh 556,500.00 2,940,000.00 5,250,000.00 3,780,000.00 735,000.00 693,000.00 798,000.00
120 Bend RR 90/45 drj dia 3'' bh 516,750.00 2,730,000.00 4,875,000.00 3,510,000.00 682,500.00 643,500.00 741,000.00
121 Bend RR 90/45 drj dia 2'' bh 357,750.00 1,890,000.00 3,375,000.00 2,430,000.00 472,500.00 445,500.00 513,000.00
122 Refair Sochet RR PVC 6 '' bh 592,275.00 3,129,000.00 5,587,500.00 4,023,000.00 782,250.00 737,550.00 849,300.00
123 Refair Sochet RR PVC 4'' bh 524,700.00 2,772,000.00 4,950,000.00 3,564,000.00 693,000.00 653,400.00 752,400.00
124 Refair Sochet RR PVC 3'' bh 312,700.00 1,652,000.00 2,950,000.00 2,124,000.00 413,000.00 389,400.00 448,400.00
125 Refair Sochet RR PVC 2'' bh 215,975.00 1,141,000.00 2,037,500.00 1,467,000.00 285,250.00 268,950.00 309,700.00
126 Flange Spigat RR dia 6'' BH 457,125.00 2,415,000.00 4,312,500.00 3,105,000.00 603,750.00 569,250.00 655,500.00
127 Flange Spigat RR dia 4'' BH 351,125.00 1,855,000.00 3,312,500.00 2,385,000.00 463,750.00 437,250.00 503,500.00
128 Flange Spigat RR dia 3'' BH 294,815.00 1,557,500.00 2,781,250.00 2,002,500.00 389,375.00 367,125.00 422,750.00
129 Flange Spigat RR dia 2'' BH 199,415.00 1,053,500.00 1,881,250.00 1,354,500.00 263,375.00 248,325.00 285,950.00
130 Dop PVC dia 2'' BH 72,875.00 385,000.00 687,500.00 495,000.00 96,250.00 90,750.00 104,500.00
131 Dop PVC dia3'' BH 94,075.00 497,000.00 887,500.00 639,000.00 124,250.00 117,150.00 134,900.00
132 Dop PVC dia 4'' BH 152,375.00 805,000.00 1,437,500.00 1,035,000.00 201,250.00 189,750.00 218,500.00
133 Dop PVC dia 6'' BH 218,625.00 1,155,000.00 2,062,500.00 1,485,000.00 288,750.00 272,250.00 313,500.00
134 Gate Valve GIP dia 8'' BH 7,679,700.00 40,572,000.00 72,450,000.00 52,164,000.00 10,143,000.00 9,563,400.00 11,012,400.00
135 Gate valve GIP dia 6'' BH 6,733,650.00 35,574,000.00 63,525,000.00 45,738,000.00 8,893,500.00 8,385,300.00 9,655,800.00
136 Gate Valve GIP dia 4'' BH 5,509,350.00 29,106,000.00 51,975,000.00 37,422,000.00 7,276,500.00 6,860,700.00 7,900,200.00
137 Gate Valve GIP dia 3'' BH 4,674,600.00 24,696,000.00 44,100,000.00 31,752,000.00 6,174,000.00 5,821,200.00 6,703,200.00
138 Gate Valve GIP dia 2'' BH 2,003,400.00 10,584,000.00 18,900,000.00 13,608,000.00 2,646,000.00 2,494,800.00 2,872,800.00
139 Flange GIP dia 12'' BH 489,590.00 2,586,500.00 4,618,750.00 3,325,500.00 646,625.00 609,675.00 702,050.00
140 Flange GIP dia 10'' BH 456,465.00 2,411,500.00 4,306,250.00 3,100,500.00 602,875.00 568,425.00 654,550.00
141 Flange GIP dia 8'' BH 378,290.00 1,998,500.00 3,568,750.00 2,569,500.00 499,625.00 471,075.00 542,450.00
142 Flange GIP dia 6'' BH 312,040.00 1,648,500.00 2,943,750.00 2,119,500.00 412,125.00 388,575.00 447,450.00
143 Flange GIP dia 4'' BH 267,650.00 1,414,000.00 2,525,000.00 1,818,000.00 353,500.00 333,300.00 383,800.00
144 Flange GIP dia 3'' BH 255,065.00 1,347,500.00 2,406,250.00 1,732,500.00 336,875.00 317,625.00 365,750.00
145 Flange GIP dia 2'' BH 188,150.00 994,000.00 1,775,000.00 1,278,000.00 248,500.00 234,300.00 269,800.00
146 Sochet GIP 6'' BH 245,125.00 1,295,000.00 2,312,500.00 1,665,000.00 323,750.00 305,250.00 351,500.00
147 Sochet GIP 4'' BH 165,625.00 875,000.00 1,562,500.00 1,125,000.00 218,750.00 206,250.00 237,500.00
148 Sochet GIP 3'' BH 119,250.00 630,000.00 1,125,000.00 810,000.00 157,500.00 148,500.00 171,000.00
149 Sochet GIP 2'' BH 68,900.00 364,000.00 650,000.00 468,000.00 91,000.00 85,800.00 98,800.00
150 Tee All Flange 8'' x 6'' BH 2,059,050.00 10,878,000.00 19,425,000.00 13,986,000.00 2,719,500.00 2,564,100.00 2,952,600.00
151 Tee All Flange 6'' x 4 '' BH 1,547,600.00 8,176,000.00 14,600,000.00 10,512,000.00 2,044,000.00 1,927,200.00 2,219,200.00
13

a b c d e f g h i j k l

152 Tee All Flange 6'' x 3'' BH 1,436,300.00 7,588,000.00 13,550,000.00 9,756,000.00 1,897,000.00 1,788,600.00 2,059,600.00
153 Tee All Flange 6'' x 2'' BH 979,840.00 5,176,500.00 9,243,750.00 6,655,500.00 1,294,125.00 1,220,175.00 1,405,050.00
154 Tee All Flange 3'' x 2'' BH 824,150.00 4,354,000.00 7,775,000.00 5,598,000.00 1,088,500.00 1,026,300.00 1,181,800.00
155 Tee All Flange 3''x 3 '' BH 924,190.00 4,882,500.00 8,718,750.00 6,277,500.00 1,220,625.00 1,150,875.00 1,325,250.00
156 Tee All Flange 4''x 3'' BH 1,213,700.00 6,412,000.00 11,450,000.00 8,244,000.00 1,603,000.00 1,511,400.00 1,740,400.00
157 Tee All Flange 4''x 3'' BH 1,319,040.00 6,968,500.00 12,443,750.00 8,959,500.00 1,742,125.00 1,642,575.00 1,891,450.00
158 Elbow Gip dia 8'' - 90/45 derajat BH 715,500.00 3,780,000.00 6,750,000.00 4,860,000.00 945,000.00 891,000.00 1,026,000.00
159 Elbow Gip dia 6'' -90/ 45 derajat BH 443,875.00 2,345,000.00 4,187,500.00 3,015,000.00 586,250.00 552,750.00 636,500.00
160 Elbow GIP dia 4'' -90/ 45 derajat BH 251,750.00 1,330,000.00 2,375,000.00 1,710,000.00 332,500.00 313,500.00 361,000.00
161 Elbow Gip dia 3'' -90/45 derajat BH 218,625.00 1,155,000.00 2,062,500.00 1,485,000.00 288,750.00 272,250.00 313,500.00
162 Elbow Gip dia 2'' -90/45 derajat BH 145,750.00 770,000.00 1,375,000.00 990,000.00 192,500.00 181,500.00 209,000.00
163 Clem sadle GIP dia 2'' x 3/4 BH 144,095.00 761,252.50 1,359,375.00 978,752.50 190,315.00 179,440.00 206,627.50
164 Clem sadle Gip dia 2''x 1 BH 196,765.00 1,039,500.00 1,856,250.00 1,336,500.00 259,875.00 245,025.00 282,150.00
165 Clem sadle Gip dia 3''x 2 BH 233,200.00 1,232,000.00 2,200,000.00 1,584,000.00 308,000.00 290,400.00 334,400.00
166 Clem sadle GIP dia 4'' x 2 BH 278,250.00 1,470,000.00 2,625,000.00 1,890,000.00 367,500.00 346,500.00 399,000.00
167 Clem sadle Gip dia 2'' x 2 BH 212,000.00 1,120,000.00 2,000,000.00 1,440,000.00 280,000.00 264,000.00 304,000.00
168 Reduser All Flange 6''x 4'' BH 2,060,375.00 10,885,000.00 19,437,500.00 13,995,000.00 2,721,250.00 2,565,750.00 2,954,500.00
169 Reduser All Flange 4''x 3'' BH 1,616,500.00 8,540,000.00 15,250,000.00 10,980,000.00 2,135,000.00 2,013,000.00 2,318,000.00
170 Reduser All Flange 8''x 6'' BH 2,550,625.00 13,475,000.00 24,062,500.00 17,325,000.00 3,368,750.00 3,176,250.00 3,657,500.00
171 Dop Gip dia 2'' BH 99,375.00 525,000.00 937,500.00 675,000.00 131,250.00 123,750.00 142,500.00
172 Kran dia 3/4'' BH 70,225.00 371,000.00 662,500.00 477,000.00 92,750.00 87,450.00 100,700.00
173 Stop Kran dia 3/4'' BH 140,450.00 742,000.00 1,325,000.00 954,000.00 185,500.00 174,900.00 201,400.00
174 Water Meter dia 3/4'' BH 1,490,625.00 7,875,000.00 14,062,500.00 10,125,000.00 1,968,750.00 1,856,250.00 2,137,500.00
175 Water Meter dia 1/2'' BH 1,291,875.00 6,825,000.00 12,187,500.00 8,775,000.00 1,706,250.00 1,608,750.00 1,852,500.00
176 Karet Pelapis M' 21,000.00
177 Kunci Taman 2 Slag BH 225,000.00
178 Bak Vibreglass BH 559,000.00

MENGETAHUI Di Periksa Oleh : #REF!


KEPALA DINAS PEKERJAAN UMUM, PEJABAT PELAKSANA TEHKNIS KEGIATAN #REF!
PERTAMBANGAN DAN ENERGI RUAS JALAN FEF-MEGA #REF!
KABUPATEN TAMBRAUW

#REF! #REF! #REF!


#REF! #REF! #REF!
PEMERINTAH KABUPATEN TAMBRAUW
DINAS PEKERJAAN UMUM, PERTAMBANGAN DAN ENERGI
ALAMAT : KONTOR SEMENTARA JL. WARFAKNIK NO. 01 SAUSAPOR

DOKUME
N:

HASIL PERKIRAAN SENDIRI (HPS)


& OEWNEER ESTIMATE (OE)

PAKET :
PEMBANGUNAN JALAN & JEMBATAN
RUAS : FEF - SYUDJAK
TARGET : 6,5 KM

PEMBANGUNAN INFRASTRUKTUR
JALAN & JEMBATAN
PEMERINTAH KABUPATEN TAMBRAUW
TAHUN ANGGARAN 2011
ANALISA BIAYA ANGKUT BAHAN BAKAR MINYAK (BBM)
(Solar, Premium, Olie dan Minyak Tanah)
Lokasi : FEF - SIAKWA - KABUPATEN TAMBRAUW
Harga BBM Tiba Di FEF berdasarkan BESIC PRICE Triwulan ke II 2012 Rp. 25,810
LANGKAH I : PROSES / KEMASAN / BONGKAR MUAT
CATATAN :
- BBM muat disorong selanjutnya Diangkut menggunakan Kapal kayu menuju Mega
- BBM diangkut dengan mobil tanki dan disuling kedalam drum-drum

Biaya kemasan untuk pengangkutan/ stock di lokasi


Jumlah BBM yang Dikemas = 15,000.00 Ton
Harga drum per buah = Rp. 140,000.00
Kapasitas drum = 200 Ltr
Biaya kemasan (stok) = Rp. 140,000.00 / 10 / 200
= Rp. 70.00 /ltr
Biaya Pengisian/Bongkar ke dalam drum
Jumlah Pekerja = Rp. 5 orang
Upah pekerja = Rp. 75,000.00 perhari
Biaya pengisian = Rp. 75,000.00 x 5.00 / 15,000
= Rp. 25.00
Biaya kemasan + Pengisian = Rp. 70.00 / liter + 25.00 /ltr = Rp95

Harga BBM tiba di SORONG diAtas kapal kayu Rp. 25,905.00


LANGKAH - II : (SORONG - MEGA)
CATATAN :
- BBM Diangkut menggunakan Kapal kayu kapasitas 20 Ton
- Kapal Kayu, untuk sekali lari memuat BBM sebanyak = 15 Ton (15.000 ltr)
- Ongkos Sewa kapal Sudah termasuk Semua Ijin dalam Pelayaran laut.
- BBM dibongkar dipelabuhan Mega dengan cara memindahkan dari kapal kayu lombot, atau terkadang
dengan membuang drum-drum pinggir laut selanjutnya diangkat dengan tenaga manusia.

Sewa Kapal/1 kali Lari = Rp. 18,000,000.00 = Rp. 18,000,000.00

Jarak Angkut ke Lokasi = ± 60.000 mill


Kecepatan rata-rata (pergi/pulang) = ± 25.00 Knot
Kapasitas angkut = ± 15,000.00 Ltr
Volume susut 2 % = ± 300.00 Ltr
Kapasitas Bersih = ± 14,700.00 Ltr
Waktu tempuh = ± 2 x 60.00 / 25.00
= 4.80 Jam
Biaya angkut = ± 4.80 x Rp. 18,000,000.00 / 14,700.00
Biaya kemasan = Rp. 267.55
Biaya Angkutan = Rp. 6,145.10

Harga BBM tiba di MEGA Rp. 32,050.10


LANGKAH - III : (MEGA - FEF / KM 72)
CATATAN :
- BBM Diangkut menggunakan Truck, untuk sekali lari (1 Ret.) memuat BBM = 6 Drum (1200 ltr)
- Kecepatan Dump Truck antara 10 - 20 Km/jam dirata-ratakan berdasarkan Kondisi Medan Jalan

Sewa Truck / Jam = Rp. 450,000.00 = Rp. 450,000.00


Jarak Angkut ke Lokasi = ± 72.000 km
Kecepatan rata-rata (pergi/pulang) = ± 15.00 km/jam
Kapasitas angkut = ± 1,200.00 Ltr
Volume susut 2 % = ± 24.00 Ltr
Kapasitas Bersih = ± 1,176.00 Ltr
Waktu tempuh = ± 2 x 72.00 / 15.00
= 9.60 Jam
Biaya angkut = ± 9.60 x Rp. 450,000.00 / 1,176.00
= Rp. 3,673.47
Harga BBM tiba di FEF Rp. 35,723.57

LANGKAH - IV : (FEF - SIAKWA AKHIR PROYEK )


CATATAN :
- BBM Diangkut menggunakan Truck, untuk sekali lari (1 Ret.) memuat BBM = 6 Drum (1200 ltr)
- Kecepatan Dump Truck 5 Km/jam dirata-ratakan berdasarkan Kondisi Jalan

Sewa Truck / Jam = Rp. 450,000.00 = Rp. 450,000.00


Jarak Angkut ke Lokasi = ± 9.700 km
Kecepatan rata-rata (pergi/pulang) = ± 5.00 km/jam
Kapasitas angkut = ± 1,200.00 Ltr
Volume susut 2 % = ± 24.00 Ltr
Kapasitas Bersih = ± 1,176.00 Ltr
Waktu tempuh = ± 2 x 9.70 / 5.00
= 3.88 Jam
Biaya angkut = ± 3.88 x Rp. 450,000.00 / 1,176.00
= Rp. 1,484.69

Harga BBM tiba di SYUBUN KM 68 Rp. 37,208.27

LANGKAH - V : (UJUNG JALAN - KELOKASI)


CATATAN :- BBM dimobilisasi dengan menggunakan Buldozer dan Excapator
- BBM didalam tangki Kapasitas 3 ton ditarik diatas Bantalan Kayu oleh Buldoser,
- Buldoser tidak mampu menempuh perjalanan P/P tanpa pengawalan dari Excapator

Excapator / Jam = Rp. 820,000.00


Buldozer / Jam = Rp. 900,000.00 = Rp. 1,720,000.00
Jarak Angkut ke Lokasi = ± 3.000 km
Kecepatan rata-rata (pergi/pulang) = ± 0.90 km/jam
Kapasitas angkut = ± 3,000.00 Ltr
Volume susut 2 % = ± 60.00 Ltr
Kapasitas Bersih = ± 2,940.00 Ltr
Waktu tempuh = ± 2 x 3.00 / 0.90
= 6.67 Jam
Biaya angkut = ± 6.67 x Rp. 1,720,000.00 / 2,940.00
= Rp. 3,900.23
Harga BBM / Solar Tiba dilokasi Rp. 41,108.49
LANGKAH - IV : PROSES/KEMASAN/BONGKAR MUAT DILOKASI
Biaya kemasan untuk pengangkutan/ stock di lokasi
Harga drum per buah = Rp. 140,000.00
Kapasitas drum = 200 Ltr
Biaya kemasan (stok) = Rp. 140,000.00 / 10 / 200
= Rp. 70.00
Biaya pengisian ke dalam drum
Jumlah Pekerja = Rp. 5 orang
Upah pekerja = Rp. 75,000.00 perhari
Biaya pengisian = Rp. 75,000.00 x 5.00 / 2,940
= Rp. 127.55
Biaya kemasan + Pengisian = Rp. 70.00 127.55
= Rp. 197.55

Ongkos Angkutan BBM Tiba Dilokasi /Ltr Rp. 15,566.04

Total Harga BBM+Angkutan tiba di lokasi /ltr Rp. 41,376.04


Item Pembayaran No. : : 4.1 (2)
Jenis Pekerjaan : : Lapis Pondasi Agregat Kelas B
Satuan Pekerjaan : : M3
Analisa EI-512

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A ASUMSI
1 Pekerjaan dilakukan dengan alat berat (cara mekanik)
2 Lokasi Pekerjaan : sepanjang jalan
3 Kondisi existing Jalan : sedang
4 Jarak rata-rata Base Camp ke Lokasi pekerjaan L 20.00 Km
5 Tebal lapis agregat padat t 0.20 M
6 Faktor kembang material (Padat-Lepas) Fk 1.20 -
7 Jam kerja efektif / hari Tk 7.00 Jam
8 Proporsi pencampuran - Agregat Kasar Ak 35.00 %
- Agregat Halus Ah 20.00 %
- Sirtu St 45.00 %
B URUTAN KERJA
1 Wheel Loader mencampur & memuat Agregat kedalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan
Material dihampar dengan menggunakan Motor Grader
3 Hamparan Material disiram air dengan Water Tank Truck (sebelum
pelaksanaan pemadatan) dan dipadatkan dg. Mengg. Tandem Roller & PTR
4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan
dan level permukaan dg mengg. Alat bantu.

C PEMAKAIAN BAHAN, ALAT DAN TENAGA


C.1 BAHAN
1 - Agregat Kasar = Ak x 1 m3 x Fk M.03 0.4200 M3
- Agregat Halus = Ah x 1 m3 x Fk M.04 0.2400 M3
- Sirtu = St x 1 m3 x Fk M16 0.5400 M3
C.2 ALAT
1 WHEEL LOADER 1.0 - 1,6 M3 Err:504

Kapasitas Bucket V 1.50 M3


Factor Bucket Fb 0.90 -
Factor Efisiensi alat Fa 0.83 -

Waktu Siklus : Ts1


- Memuat T1 1.50 Menit
- Lain-lain T2 0.50 Menit
Ts1 2.00 Menit

Kap. Prod. / Jam = V x Fb x Fa x 60 Q1 28.01 M3


Ts1 x Fk

Koefisien Alat / M3 = 1 : Q1 Err:504 0.0357 Jam

2 ### Err:504
Kapasitas bak V 6.00 M3
Factor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km / Jam
Kecepatan rata-rata kosong v2 60.00 Km / Jam

Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 T1 30.00 Menit
- Waktu tempuh kosong = (L : v2) x 60 T2 20.00 Menit
- Lain-lain = T3 3.00 Menit

Ts2 52.98 Menit

Kap. Prod. / Jam = V x Fa x 60 Q2 4.70 M3 / Jam


Ts2 x Fk

Koefisien Alat / M3 = 1 : Q2 Err:504 0.2128 Jam

3 MOTOR GRADER >100 HP Err:504


Panjang hamparan Lh 50.00 M
Lebar efektif kerja Blade b 2.40 M
Factor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 6.00 Lintasan 3 x pp
Waktu Siklus :
- Perataan 1 x lintasan = Lh : (v x 1000) x 60 T1 0.75 Menit
- Lain-lain T2 1.00 Menit
Ts3 1.75 Menit

Kap. Prod. / Jam = Lh x b x t x Fa x 60 Q3 113.83 M3 / Jam


n x Ts3

Koefisien Alat / M3 = 1 : Q3 Err:504 0.0088 Jam

4 TANDEM ROLLER 6 - 8 T Err:504


Kecepatan rata-rata alat v 3.00 Km / Jam
Lebar efektif kerja pemadatan b 1.20 M
Jumlah lintasan n 8.00 Lintasan
Factor Efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4 74.70 M3


n

Koefisien Alat / M3 = 1 : Q4 Err:504 0.0134 Jam

4 TIRE ROLLER 8 - 10 T Err:504


Kecepatan rata-rata alat v 5.00 Km / Jam
Lebar efektif kerja pemadatan b 1.50 M
Jumlah lintasan n 4.00 Lintasan
Factor Efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4 311.25 M3/Jam


n

Koefisien Alat / M3 = 1 : Q4 Err:504 0.0032 Jam

5 TANKI AIR 3000 - 4500 L Err:504


Volume Tanki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Pengisian tangki / jam n 1.00 Kali
Factor efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = V x n x Fa Q5 47.43 M3


Wc

Koefisien Alat / M3 = 1 : Q5 Err:504 0.0211 Jam

C3 ALAT BANTU
Diperlukan alat-alat bantu =
- Kereta Dorong = 2 Buah Lump Sum
- Sekop = 3 Buah
- Garpu = 2 Buah

1 TENAGA
Produksi menentukan = WHEEL LOADER 1.0 - 1,6 M3 Q1 28.01 M3 / Jam
Produksi Galian / hari = Tk x Q1 Qt 196.09 M3
Kebutuhan Tenaga =
- Pekerja P 7.00 Orang
- Mandor M 1.00 Orang

Koefisien Tenaga / M3 =
- Pekerja = (Tk x P) : Qt Err:504 0.2499 Jam
- Mandor = (Tk x M) : Qt Err:504 0.0357 Jam

2 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


(Lampiran)

3 ANALISA HARGA Satuan Pekerjaan


Didapat Harga Satuan Pekerjaan :

Err:504 / : M3

4 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan =

5 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = #REF! : M3
Item Pembayaran No. : : 5.1 (2)
Jenis Pekerjaan : : Lapis Pondasi Agregat Kelas B
Satuan Pekerjaan : : M3
Analisa EI-512

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A ASUMSI
1 Pekerjaan dilakukan dengan alat berat (cara mekanik)
2 Lokasi Pekerjaan : sepanjang jalan
3 Kondisi existing Jalan : sedang
4 Jarak rata-rata Base Camp ke Lokasi pekerjaan L 20.00 Km
5 Tebal lapis agregat padat t 0.20 M
6 Faktor kembang material (Padat-Lepas) Fk 1.20 -
7 Jam kerja efektif / hari Tk 7.00 Jam
8 Proporsi pencampuran - Agregat Kasar Ak 35.00 %
- Agregat Halus Ah 20.00 %
- Sirtu St 45.00 %
B URUTAN KERJA
1 Wheel Loader mencampur & memuat Agregat kedalam Dump Truck di Base Camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan
Material dihampar dengan menggunakan Motor Grader
3 Hamparan Material disiram air dengan Water Tank Truck (sebelum
pelaksanaan pemadatan) dan dipadatkan dg. Mengg. Tandem Roller & PTR
4 Selama pemadatan, sekelompok pekerja akan merapikan tepi hamparan
dan level permukaan dg mengg. Alat bantu.

C PEMAKAIAN BAHAN, ALAT DAN TENAGA


C.1 BAHAN
1 - Agregat Kasar = Ak x 1 m3 x Fk M.03 0.4200 M3
- Agregat Halus = Ah x 1 m3 x Fk M.04 0.2400 M3
- Sirtu = St x 1 m3 x Fk M16 0.5400 M3 0.78
C.2 ALAT 0.65
1 WHEEL LOADER 1.0 - 1,6 M3 Err:504

Kapasitas Bucket V 1.50 M3


Factor Bucket Fb 0.90 -
Factor Efisiensi alat Fa 0.83 -

Waktu Siklus : Ts1


- Memuat T1 1.50 Menit
- Lain-lain T2 0.50 Menit
Ts1 2.00 Menit

Kap. Prod. / Jam = V x Fb x Fa x 60 Q1 28.01 M3


Ts1 x Fk

Koefisien Alat / M3 = 1 : Q1 Err:504 0.0357 Jam

2 ### Err:504
Kapasitas bak V 6.00 M3
Factor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km / Jam
Kecepatan rata-rata kosong v2 60.00 Km / Jam

Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 T1 30.00 Menit
- Waktu tempuh kosong = (L : v2) x 60 T2 20.00 Menit
- Lain-lain = T3 3.00 Menit

Ts2 52.98 Menit

Kap. Prod. / Jam = V x Fa x 60 Q2 4.70 M3 / Jam


Ts2 x Fk

Koefisien Alat / M3 = 1 : Q2 Err:504 0.2128 Jam

3 MOTOR GRADER >100 HP Err:504


Panjang hamparan Lh 50.00 M
Lebar efektif kerja Blade b 2.40 M
Factor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata alat v 4.00 Km / Jam
Jumlah lintasan n 6.00 Lintasan 3 x pp
Waktu Siklus :
- Perataan 1 x lintasan = Lh : (v x 1000) x 60 T1 0.75 Menit
- Lain-lain T2 1.00 Menit
Ts3 1.75 Menit

Kap. Prod. / Jam = Lh x b x t x Fa x 60 Q3 113.83 M3 / Jam


n x Ts3

Koefisien Alat / M3 = 1 : Q3 Err:504 0.0088 Jam


4 TANDEM ROLLER 6 - 8 T Err:504
Kecepatan rata-rata alat v 3.00 Km / Jam
Lebar efektif kerja pemadatan b 1.20 M
Jumlah lintasan n 8.00 Lintasan
Factor Efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4 74.70 M3


n

Koefisien Alat / M3 = 1 : Q4 Err:504 0.0134 Jam

4 TIRE ROLLER 8 - 10 T Err:504


Kecepatan rata-rata alat v 5.00 Km / Jam
Lebar efektif kerja pemadatan b 1.50 M
Jumlah lintasan n 4.00 Lintasan
Factor Efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (v x 1000) x b x t x Fa Q4 311.25 M3/Jam


n

Koefisien Alat / M3 = 1 : Q4 Err:504 0.0032 Jam

5 TANKI AIR 3000 - 4500 L Err:504


Volume Tanki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Pengisian tangki / jam n 1.00 Kali
Factor efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = V x n x Fa Q5 47.43 M3


Wc

Koefisien Alat / M3 = 1 : Q5 Err:504 0.0211 Jam

C3 ALAT BANTU
Diperlukan alat-alat bantu =
- Kereta Dorong = 2 Buah Lump Sum
- Sekop = 3 Buah
- Garpu = 2 Buah

1 TENAGA
Produksi menentukan = WHEEL LOADER 1.0 - 1,6 M3 Q1 28.01 M3 / Jam
Produksi Galian / hari = Tk x Q1 Qt 196.09 M3
Kebutuhan Tenaga =
- Pekerja P 7.00 Orang
- Mandor M 1.00 Orang

Koefisien Tenaga / M3 =
- Pekerja = (Tk x P) : Qt Err:504 0.2499 Jam
- Mandor = (Tk x M) : Qt Err:504 0.0357 Jam

2 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


(Lampiran)

3 ANALISA HARGA Satuan Pekerjaan


Didapat Harga Satuan Pekerjaan :

Err:504 / : M3

4 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan =

5 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan = #REF! : M3
Item Pembayaran No. : : 6.6.(1)
Jenis Pekerjaan : : Lataston- Lapis Aus ( HRS-WC)
Satuan Pekerjaan : : M3
Analisa EI-661

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A ASUMSI
1 Pekerjaan dilakukan dengan alat berat (cara mekanik)
2 Lokasi Pekerjaan : sepanjang jalan
3 Kondisi existing Jalan : sedang
4 Jarak rata-rata Base Camp ke Lokasi pekerjaan L 15.00 Km
5 Tebal rata-rata Lapen t 0.055 M Tabel 6.6.3
6 Jam kerja efektif / hari Tk 7.00 Jam
7 Faktor kehilangan material - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi)
- Agregat Kasar 3 - 5 Cm Ak 133.00 Kg / M2 Tabel 6.6.3
- Agregat Pengunci 1 - 2 Cm Ap 25.00 Kg / M2 Tabel 6.6.3
- Asphalt As1 5.20 Kg / M2 Tabel 6.6.3
As2 94.55 Kg / M3 (As1 : t)
9 Berat Jenis Bahan
- Agregat D1 1.80 Ton / M3
- Aspal D2 1.01 Ton / M3

B URUTAN KERJA
1 Permukaan dasar dibersihkan dan disemprot aspal cair bila diperlukan
2 Agregat Kasar dimuat ke dalam Dump Truck dengan menggunakan
Wheel Loader (di Base Camp)
3 Agregat Kasar ditebarkan (manual) sesuai tebal yang diperlukan dan
dipadatkan dengan 3 Wheel Roller (6-8 ton) Min. 6 lintasan
4 Aspal disemprotkan diatas Agregat Kasar yang telah diratakan
menggunakan Aspal Sprayer (merata)
5 Agregat pengunci ditebarkan dan dipadatkan dengan cara yang sama
dengan pemadatan Agregat Kasar

C PEMAKAIAN BAHAN, ALAT DAN TENAGA


C.1 BAHAN
1 Agregat Kasar = {(Ak : 1000 : tM3) x Fh1) : D1 Err:504 1.4778 M3
2 Agregat Halus = [{Ap : 1000 : tM3) x Fh1] : D1 Err:504 0.2778 M3
3 Aspal = {(As : tM3) x Fh2} Err:504 99.2727 Kg

C.2 ALAT
1 WHEEL LOADER 1.0 - 1,6 M3 Err:504
Kapasitas Bucket V 1.50 M3
Factor Bucket Fb 0.90 -
Factor Efisiensi alat Fa 0.83 -

Waktu Siklus :
- Memuat T1 2.00 Menit
- Lain-lain T2 0.50 Menit
Ts1 2.50 Menit

Kap. Prod. / Jam = V x Fb x Fa x 60 Q1 26.89 M3


Ts1

Koefisien Alat / M3 = 1 : Q1 Err:504 0.0372 Jam

4 #REF! Err:504
Kapasitas Bak V 3.00 M3
Factor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km / Jam
Kecepatan rata-rata kosong v2 50.00 Km / Jam

Waktu Siklus :
- Mengisi Bak T1 10.00 Menit
- Angkut = (L: v1) x 60 T2 22.50 Menit
- Tunggu + Dump + Putar = T3 15.00 Menit
- Kembali = (L : v2) x 60 T4 18.00 Menit
Ts2 65.50 Menit

Kap. Prod. / Jam = V x Fa x 60 Q2 2.28 M3


Ts2

Koefisien Alat / M3 = 1 : Q2 Err:504 0.4384 Jam


Item Pembayaran No. : : 6.6.(1)
Jenis Pekerjaan : : Lataston- Lapis Aus ( HRS-WC)
Satuan Pekerjaan : : M3
Analisa EI-661

No. URAIAN KODE KOEF. SATUAN KETERANGAN

5 THREE WHEEL ROLLER 6 - 8 T Err:504


Kecepatan rata-rata alat V 3.00 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 8.00 Lintasan
Faktor efisiensi alat Fa 0.83 -

Kap. Prod. / Jam = (Vx1000) x b x t x Fa Q3 20.54 M3


n

Koefisien Alat / M3 = 1 : Q3 Err:504 0.0487 Jam

6 ASPHALT SPRAYER Err:504


Kapasitas Alat V 800.00 Liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus (termasuk proses pemanasan) Ts3 2.00 Jam

Kap. Prod. / Jam = V x Fa x D2 Q6 3.55 M3


Ts3 x As2

Koefisien Alat / M3 = 1 : Q7 Err:504 0.2820 Jam

C3 ALAT BANTU
Diperlukan alat-alat bantu =
- Kereta Dorong = 3 Buah Lump Sump
- Sekop = 5 Buah
- Sapu = 5 Buah
- Sikat = 3 Buah
- Karung = 5 Buah
- Cerek Aspal = 3 Buah
- Kaleng Aspal = 3 Buah

1 TENAGA
Produksi menentukan = WHEEL LOADER 1.0 - 1,6 M3 Q1 26.89 M3 / Jam
Produksi Galian / hari = Tk x Q1 Qt 188.24 M3
Kebutuhan Tenaga =
- Pekerja P 20.00 Orang
- Mandor M 2.00 Orang

Koefisien Tenaga / M3 =
- Pekerja = (Tk x P) : Qt Err:504 0.7437 Jam
- Mandor = (Tk x M) : Qt Err:504 0.0744 Jam

2 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


(Lampiran)

3 ANALISA HARGA Satuan Pekerjaan


Didapat Harga Satuan Pekerjaan :

Err:504 / : M3

4 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan =

5 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan =
Item Pembayaran No. : : 8.4 (6)
Jenis Pekerjaan : : PATOK KILOMETER
Satuan Pekerjaan : : Buah

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A ASUMSI
1 Pekerjaan dilakukan dengan manual
2 Lokasi Pekerjaan : sepanjang jalan
3 Bahan dasar (Patok beton cetak) diangkut ke lokasi
dengan Truck
4 Jarak rata-rata Base Camp ke Lokasi pekerjaan L 20.00 Km
5 Jam kerja efektif / hari Tk 7.00 Jam
6 Faktor Kehilangan Bahan Fh 1.05 -
7 Tulangan Praktis Rc 50.00 Kg/M3

B URUTAN KERJA
1 Kesatuan Pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan

C PEMAKAIAN BAHAN, ALAT DAN TENAGA


C.1 BAHAN
1 Patok Beton K-275 Err:504 0.1654 M3
2 Baja Tulangan Err:504 20.6800 Kg
3 Baut dan material lain - Ls
4 Rel pengaman 0 1.0500 M'

C.2 ALAT
1 DUMP TRUCK Err:504
Kapasitas 1 X angkut Cp 30.00 Buah
-
Waktu Siklus =
- Muat = Atur, Ikat, Dll T1 15.00 Menit
- Angkut = (2 x L : 25 Km/Jam) x 60 T2 47.98 Menit
- Menurunkan = Rata-rata 2,5 Menit / buah T3 15.00 Menit
- Lain-lain = Geser, atur, tunggu, dll T4 15.00 Menit
Ts 92.98 Menit

Kap. Prod. / Jam = Cp : (Ts : 60) Q1 19.36 Buah

Koefisien Alat / M2 = 1 : Q1 Err:504 0.0517 Jam

C3 ALAT BANTU
Diperlukan alat-alat bantu =
- Kunci baut = 2 Buah
- Pacul / Sekop = 4 Buah

1 TENAGA
Produksi pasang pagar pengaman dalam 1 hari = Tk x Q1 Qt 135.51
Kebutuhan Tenaga =
- Pekerja P 4.00 Orang
- Mandor M 1.00 Orang
- Tukang Tb 2.00 Orang

Koefisien Tenaga / M3 =
- Pekerja = (Tk x P) : Qt Err:504 0.2066 Jam
- Mandor = (Tk x M) : Qt Err:504 0.0517 Jam
- Tukang = (Tk x Tb) : Qt Err:504 0.1033 Jam

2 HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


(Lampiran)

3 ANALISA HARGA Satuan Pekerjaan


Didapat Harga Satuan Pekerjaan :
Err:504 / : Buah

4 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan =

5 VOLUME PEKERJAAN YANG DIPERLUKAN


Volume Pekerjaan =
Item Pembayaran No. : 9.19
Jenis Pekerjaan : PEKERJAAN HARIAN
SATUAN PEMBAYARAN : JAM

No. URAIAN KODE KOEF. SATUAN KETERANGAN

A URAIAN PERALATAN
1 Jenis Peralatan #REF! Err:504
2 Tenaga Pw 6.00 HP
3 Kapasitas Cp - -
4 Alat Baru = a. Umur Ekonomis A 2.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1 Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2 Faktor Angsuran Modal = I x (1+I)^A' D 0.65455 Pertahun


(1+I)^A' - 1
3 Biaya Pasti per Jam

a. Biaya Pengembalian Modal = (B - C) x D E #REF! Rupiah


W
b. Asuransi, dll = 0.002 x B F #REF! Rupiah
W
Biaya Pasti per Jam =(E+F) G #REF! Rupiah

C. BIAYA OPERASI PER JAM KERJA

1 Bahan Bakar = (0.125 - 0,175Ltr/HP/Jam) x Pw x Ms H1 #REF! Rupiah


Bahan Bakar Pemanasan Material = 12 x 0,7 Cp x Ms

2 Pelumas = (0.01 - 0,02Ltr/HP/Jam) x Pw x Mp I #REF! Rupiah

3 Perawatan dan = (12.5 % - 17.5%) x B K #REF! Rupiah


Perbaikan W
4 Operator = (1 Orang / Jam) x U1 L #REF! Rupiah
5 Pembantu Operator = (3 Orang / Jam) x U2 M #REF! Rupiah

Biaya Operasi Per Jam =(H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = T #REF! Rupiah

E. LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % /Thn
2 Upah Operator / Sopir U1 #REF! Rp/Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 #REF! Rp/Jam
4 Bahan Bakar Bensin Mb #REF! Liter
5 Bahan Bakar Solar Ms #REF! Liter
6 Minyak Pelumas Mp #REF! Liter
Existing
Rencana
Chart Title
14

12

10

8
Axis Title

-
1 2 3 4 5 6 7 8 9 10 11 12 13
Axis Title
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M08 - Urugan Pilihan
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : Rusak/ Sedang
3 Jarak Quarry ke lokasi Base Camp L 5 Km
4 Harga Satuan Urugan Pilihan di Quarry M08 1.00 M3 #REF!
5 Harga Satuan Dasar Excavator E10 1.00 Jam #REF!
6 Harga Satuan Dasar Dump Truck E08 1.00 Jam #REF!

II URUTAN KERJA
1 Material tanah biasa digali dengan Excavator
2 Excavator sekaligus memuat material Urugan Pilihan hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut Sirtu ke lokasi Base Camp

III PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menggali/memuat T1 0.50 menit
-Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod./jam =
V x Fb x Fa x 60 Q1 22.41
Ts1

Biaya Excavator/M3 = (1:Q1)xHarga Sat. E10 H1 #REF! Rupiah

DUMP TRUCK (E08)


Kapasitas V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km/Jam
Kecepatan rata-rata kosong v2 50.00 Km/Jam
waktu siklus Ts2
- Waktu tempuh isi = (L/V1) x 60 T1 7.50 menit
- Waktu tempuh kosong = (L/V2) x 60 T2 6.00 menit
- Muat = (V/Q1) x 60 T3 10.71 menit
- Lain-lain T4 1.00 menit
Ts2 25.21 menit
Kap. Prod./jam =
V x Fa x 60 Q2 7.90 M3/Jam
Ts2

Biaya Dump Truck/M3 = (1 : Q2) x Harga Sat. Alat E0 H.A. #REF! Rupiah

IV HARGA SATUAN DASAR BAHAN DILOKASI


BASE CAMP

Harga Satuan Dasar Material Urugan Pilihan =

(Harga Sat. M44 + Harga Op. Alat E10 + Harga Op. E M44 #REF! Rupiah

Dibulatkan M44 #REF! Rupiah


ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M09 - Material Pilihan Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : Rusak/ Sedang
3 Jarak Quarry ke lokasi Base Camp L 3 Km
4 Harga Satuan Material Pilihan di Quarry M44 1.00 M3 #REF!
5 Harga Satuan Dasar Excavator E10 1.00 Jam #REF!
6 Harga Satuan Dasar Dump Truck E08 1.00 Jam #REF!

II URUTAN KERJA
1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat Material Pilihan hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut Material pilihan ke lokasi Base Camp

III PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Menggali/memuat T1 0.50 menit
-Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod./jam =
V x Fb x Fa x 60 Q1 22.41
Ts1

Biaya Excavator/M3 = (1:Q1)xHarga Sat. E10 H1 #REF! Rupiah

DUMP TRUCK (E08)


Kapasitas V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 40.00 Km/Jam
Kecepatan rata-rata kosong v2 50.00 Km/Jam
waktu siklus Ts2
- Waktu tempuh isi = (L/V1) x 60 T1 7.50 menit
- Waktu tempuh kosong = (L/V2) x 60 T2 6.00 menit
- Muat = (V/Q1) x 60 T3 10.71 menit
- Lain-lain T4 1.00 menit
Ts2 25.21 menit
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M09 - Material Pilihan Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp)

Kap. Prod./jam =
V x Fa x 60 Q2 7.90 M3/Jam
Ts2

Biaya Dump Truck/M3 = (1 : Q2) x Harga Sat. Alat E0 H.A. #REF! Rupiah

IV HARGA SATUAN BAHAN DILOKASI


BASE CAMP

Harga Satuan Dasar Material Pilihan =

(Harga Sat. M44 + Harga Op. Alat E10 + Harga Op. E M44 #REF! Rupiah

Dibulatkan M44 #REF! Rupiah