REKAPITULASI

BILL OF QUANTITY

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) LINTAS KABUPATEN / KOTA
PAKET : PEMBANGUNAN RESERVOAR SPAM PERUM KORPRI SEMPAJA

LOKASI : KOTA SAMARINDA


TAHUN : 2021

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA (Rp) PAJAK (%) JUMLAH (Rp) TOTAL JUMLAH (Rp)

1 2 3 4 5 6 7 = (5 X 6 ) 8 = (5 + 7 )

1 PEKERJAAN PENDAHULUAN PAKET 1.00 - 10,00 #VALUE! #VALUE!

2 PEKERJAAN UNIT DISTRIBUSI PAKET 1.00 - 10,00 #VALUE! #VALUE!

3 PEKERJAAN BANGUNAN PELENGKAP PAKET 1.00 - 10,00 #VALUE! #VALUE!

4 PEKERJAAN PERPIPAAN & ACCESSORIES PAKET 1.00 - 10,00 #VALUE! #VALUE!

TOTAL NILAI SEBELUM PEMBULATAN #VALUE!

TOTAL NILAI SETELAH PEMBULATAN #VALUE!

TERBILANG : ...................................................................................................................................................................................................................................................................................................................................................... RUPIAH

Samarinda,………………… 2021
Penawar,
PT/CV ……………………….

MATRAI
10.000

……………………………
………………………
BILL OF QUANTITY

KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) LINTAS KABUPATEN / KOTA
PAKET : PEMBANGUNAN RESERVOAR SPAM PERUM KORPRI SEMPAJA
LOKASI : KOTA SAMARINDA
SUMBER DANA : APBD
TAHUN ANGGARAN : 2021

Harga Jumlah
No. Uraian Pekerjaan Satuan Volume Satuan Harga
(Rupiah) (Rupiah)
1 2 3 4 5 6

I. PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Peralatan, Pengukuran dan Pematokan Ls 1.00 - -
2 Pelaporan, Gambar (Shop Drawing+Asbuilt Drawing), Dokumentasi & Ls 1.00 - -
Administrasi Proyek
3. Pelaksanaan Keselamatan Dan Kesehatan Kerja (K3)
a. Penyiapan RKK :
Pembuatan dokumen Rencana Keselamatan Konstruksi Set 1.00 - -
Pembuatan prosedur dan instruksi kerja Lbr 15.00 - -
b. Sosialisasi Dan Promosi :
Simulasi Keselamatan Konstruksi Bh 2.00 - -
Spanduk (Banner) Bh 2.00 - -
Poster Bh 2.00 - -
Papan Informasi K3 Bh 2.00 - -
c. Alat Pelindung Diri (APD) :
Topi pelindung (Safety Helmet) Bh 5.00 - -
Pelindung mata (Goggles, Spectacles) Bh 3.00 - -
Tameng muka (Face Shield) Bh 3.00 - -
Pelindung telinga (Ear Plug, Ear Muff) Bh 5.00 - -
Pelindung pernafasan dan mulut (Masker) KN95 Box 3.00 - -
Sarung tangan (Safety Gloves) Bh 6.00 - -
Sepatu keselamatan (Safety Shoes) Psg 3.00 - -
Rompi keselamatan (Safety Vest) Bh 6.00 - -
d. Asuransi :
Asuransi (BPJS Ketenaga Kerja dan Kesehatan Kerja) Dok 1.00 - -
e. Personil K3 Konstruksi :
Petugas P3K Ump/Bln 1.00 - -
f. Fasilitas alat kesehatan :
Peralatan P3K (Kotak P3K, Obat Luka, Perban) Set 1.00 - -
g. Rambu - Rambu yang diperlukan :
Rambu petunjuk Bh 2.00 - -
Rambu larangan Bh 2.00 - -
Rambu peringatan Bh 2.00 - -
Rambu kewajiban Bh 2.00 - -
Rambu informasi Bh 2.00 - -
Rambu pekerjaan sementara Bh 2.00 - -
h. Konsultasi dengan Ahli terkait Keselamatan Konstruksi :
Ahli K3 Konstruksi Oh 1.00 - -
i. Peralatan terkait Pengendalian Risiko Keselamatan Konstruksi :
Alat Pemadam Api Ringan (APAR) 3Kg Ls 1.00 - -
Bendera K3 Bh 2.00 - -

Jumlah Total I -
Harga Jumlah
No. Uraian Pekerjaan Satuan Volume Satuan Harga
(Rupiah) (Rupiah)
1 2 3 4 5 6

II. PEKERJAAN UNIT DISTRIBUSI


II.1 Pekerjaan Reservoar Kap. 250 M³
II.1.1. Pekerjaan Tanah dan Pasir
1 Galian Tanah Berbatu M³ 297.48 - -
2 Urugan Pasir dipadatkan M³ 6.38 - -
3 Cor Beton Keliling Reservoar ( K 225 ) M³ 2.04 - -
4 Saluran Reservoar M' 47.12 - -

Jumlah Sub Total II.1.1 -

II.1.2. Pekerjaan Beton Reservoar


1 Lantai Beton Bo M³ 12.75 - -
2 Beton Bertulang K-225 utk Lantai Dasar Reservoar, t = 25 cm, M³ 34.88 - -
3 Beton Bertulang K-225 utk Dinding Reservoar t = 20 cm, M³ 27.43 - -
4 Beton Bertulang K-225 utk Plat Penutup Reservoar t = 15 cm, M³ 16.40 - -
5 Beton Bertulang K-225 utk Penyekat t = 20 cm M³ 8.84 - -
6 Water Stop PVC lebar 200 mm M' 43.00 - -

Jumlah Sub Total II.1.2 -

II.1.3. Pekerjaan pipa & Accessories


II.1.3.1. Pekerjaan unit Pipa Inlet
1 Pipa GI Ø 150 mm M' 6.00 - -
2 Bend All Flange 90º (CI) Ø 150 mm Bh 4.00 - -
3 Bend All Flange 45º (CI) Ø 150 mm Bh 2.00 - -
4 Tee All Flange (CI) Ø 150 x 100 mm Bh 2.00 - -
5 Gate Valve All Flange (CI) Ø 150 mm Bh 2.00 - -
6 Flange Las (Steel) Ø 150 mm Bh 4.00 - -
7 Blind Flange Ø 150 mm Bh 2.00 - -
8 Wall Pipe Ø 100 mm Bh 2.00 - -
9 Rubber Packing Ø 150 mm Bh 11.00 - -
10 Mur Baut Bh 88.00 - -

Jumlah Sub Total II.1.3.1 -

II.1.3.2. Pekerjaan unit Pipa Outlet


1 Pipa GI Ø 150 mm M' 6.00 - -
2 Bend All Flange 45º (CI) Ø 150 mm Bh 2.00 - -
3 Gate Valve All Flange (CI) Ø 150 mm Bh 2.00 - -
4 Flange Las (Steel) Ø 150 mm Bh 18.00 - -
5 Wall Pipe Ø 150 mm Bh 2.00 - -
6 Rubber Packing Ø 150 mm Bh 12.00 - -
7 Mur Baut Bh 96.00 - -

Jumlah Sub Total II.1.3.2 -


Harga Jumlah
No. Uraian Pekerjaan Satuan Volume Satuan Harga
(Rupiah) (Rupiah)
1 2 3 4 5 6

II.1.3.3. Pekerjaan unit Pipa Overflow


1 Pipa GI Ø 100 mm M' 6.00 - -
2 Bend All Flange 90º (CI) Ø 100 mm Bh 2.00 - -
3 Flange Las Ø 100 mm Bh 4.00 - -
4 Wall PipeI Ø 100 mm Bh 2.00 - -
5 Rubber Packing Ø 100 mm Bh 4.00 - -
6 Mur Baut Bh 32.00 - -

Jumlah Sub Total II.1.3.3 -

II.1.3.4. Pekerjaan unit Pipa Penguras


1 Pipa (GI) Ø 100 mm M' 12.00 - -
2 Pipa (GI) Ø 150 mm, untuk pembuangan M' 6.00 - -
3 Wall Pipe Ø 100 mm Bh 2.00 - -
4 Gate Valve All Flange (CI) Ø 100 mm Bh 2.00 - -
5 Flange Las Ø 100 mm Bh 10.00 - -
6 Bend All Flange 90º (CI) Ø 100 mm Bh 1.00 - -
7 Tee All Flange (CI) Ø 100 x 100 mm Bh 1.00 - -
8 Reduser All Flange Ø 150 x 100 mm Bh 1.00 - -
7 Rubber Packing Ø 100 mm Bh 6.00 - -
8 Mur Baut Bh 48.00 - -
9 Box Valve Bh 2.00 - -

Jumlah Sub Total II.1.3.4 -


Jumlah Total II -

III. PEKERJAAN BANGUNAN PELENGKAP


III.I Pekerjaan Penataan Lokasi Reservoar
1 Pekerjaan Jalan Masuk & Jalan Lingkungan M² 1.35 - -
2 Pekerjaan Pondasi Keliling Instalasi M' 23.50 - -
3 Pagar BRC Keliling Instalasi M' 19.50 - -
4 Pekerjaan Saluran Drainase Penguras M' 12.00 - -
5 Gorong-Gorong Jalan Masuk Unit 1.00 - -
6 Pintu Masuk Unit 1.00 - -

Jumlah Total III -

IV PEKERJAAN PERPIPAAN & ACCESSORIES


IV.1 Pengadaan dan Pemasangan Pipa
IV.1.1 Pipa HDPE Ø 160 mm, S 8 - SDR 17 (PN 10/PE100)
1 Pengadaan Pipa M' 1,287.00 - -
2 Pemasangan Pipa M' 1,287.00 - -

IV.1.2 Pipa HDPE Ø 90 mm, S 8 - SDR 17 (PN 10/PE100)


1 Pengadaan Pipa M' 1,476.00 - -
2 Pemasangan Pipa M' 1,476.00 - -

Jumlah Sub Total IV.1 -


Harga Jumlah
No. Uraian Pekerjaan Satuan Volume Satuan Harga
(Rupiah) (Rupiah)
1 2 3 4 5 6

IV.2 Pekerjaan Pengadaan dan Pemasangan Accessories Pipa


IV.2.1 Pengadaan Accessories Pipa
1 Equal Tee ( HDPE) Ø 160 x 160 mm Bh 2.00 - -
2 Un Equal Tee ( HDPE) Ø 160 x 90 mm Bh 5.00 - -
3 Equal Tee ( HDPE) Ø 90 x 90 mm Bh 7.00 - -
4 Segmented Bend (HDPE) 45° Ø 160 mm Bh 6.00 - -
5 Segmented Bend (HDPE) 90° Ø 90 mm Bh 1.00 - -
6 Gate Valve All Flange (CI) Ø 160 mm Bh 3.00 - -
7 Gate Valve All Flange (CI) Ø 90 mm Bh 5.00 - -
8 Stub Flange (HDPE) Ø 160 mm Bh 8.00 - -
9 Stub Flange (HDPE) Ø 90 mm Bh 12.00 - -
10 Flange Socket PVC Ø 150 mm Bh 4.00 - -
11 Flange Steel Ø 160 mm Bh 3.00 - -
12 DOP (HDPE) Ø 90 mm Bh 10.00 - -
13 Blind Flange Ø 90 mm Bh 2.00 - -
14 Blind Flange Ø 160 mm Bh 1.00 - -
15 Street Box Ø 160 mm Bh 3.00 - -
16 Street Box Ø 90 mm Bh 5.00 - -
17 Thrust Block Bh 23.00 - -
18 Cor Beton K -175 M³ 10.79 - -
19 Bongkaran Cor beton M³ 10.79 - -
20 Pipa Gip Ø 110 mm untuk Selubung M' 18.00 - -
21 Interkoneksi dengan pipa Exsisting Titik 2.00 - -

Jumlah Sub Total IV.2.1 -

IV.2.2 Pemasangan Accessories Pipa


1 Equal Tee ( HDPE) Ø 160 x 160 mm Bh 2.00 - -
2 Un Equal Tee ( HDPE) Ø 160 x 90 mm Bh 5.00 - -
3 Gate Valve All Flange (CI) Ø 160 mm Bh 3.00 - -
4 Gate Valve All Flange (CI) Ø 90 mm Bh 5.00 - -

Jumlah Sub Total IV.2.2 -


Jumlah Total IV -