Anda di halaman 1dari 4

Contoh Perhitungan Dinding Penahan Tanah

D1 5O
0O

H1
Tekanan Tanah Aktif

MT
H2

C
D3 D2

Tekanan Tanah Aktif

1. Asumsi
H1 tanah = 2m
H2 = 1/4 H1 = 1/4*2 = 0,5 m diambil 0,5m
D1 = 1/5 H1 = 1/5*2 = 0,4 m diambil 0,4m
D2 = 3/2 D1 = 3/2*0,4 = 0,6m diambil 0,6m
D3 = 3/2 D2 = 1,5*0,6 = 0,9m diambil 0,8m
2. Data Tanah
Tekanan tanah aktif
 1 = 1,65 t/m3
 1 = 28 o
C1 = 0
Tekanan tanah pasif
 2 = 1,55 t/m3
 2 = 21 o
C2 = 3,5 t/m3
Berat jenis batu kali = 2,2 t/m3
M.A.T terletak pada -3,5 m di bawah dasar pondasi
3. Penyelesaian
HI = H1 + H2 = 2 + 0,5 = 2,5 m
Gaya aktif menurut Rankine per pias
 cos  - cos 2 − cos 2 
Ka = cos   
 cos  + cos 2 − cos 2 
 
 cos 5 - cos 2 5 − cos 2 28 
= cos 5 
 cos 5 + cos 2 5 − cos 2 28 
 
 0,9961 - 0,9924 − 0,7796 
= 0,9961*  
 0,9961 + 0,9924 − 0,7796 
 
0,9961 − 0,4613
= 0,9961 * = 0,366
0,9961 + 0,4613
1
Pa =
2
( ) * Ka = 1,265 * (2,5) * 0,366 = 1,8872
* HI
2 2

Pv = Pa*sin5o = 1,8872 * 0,0871 = 0,1645 ton/m


Ph = Pa*cos 5o = 1,8872 * 0,9962 =1,8800 ton/m

4. Faktor keamanan terhadap Guling


Tabel Momen Perlawanan
Luas (m2) W,per pias (ton) X(Lengan Momen
Bidang momen)(m) terhadap C (tm)
1 1,4*0,5 = 0,7 1,54 0,7 1,078
2 2*0,4 = 0,8 1,76 1,2 2,112
3 0,5*0,2*2 =0,2 0,44 0,933 0,411
 V = 3,75  MR = 3,601

HI   2,5 
Momen Guling, Mo = Ph *   = 1,8800 *   = 1,567tm
 3   3 

M R 3,601
FK (guling) = = = 2,298 > (1,5 – 2) (OK)
MO 1,567
5. Faktor keamanan terhadap geser
digunakan k1 = k2 = 2/3
D = Tinggi MT sampai dasar pondasi = H2 = 0,5 m
B = Panjang Dasar pondasi = D2 + D3 = 1,4m
    21 
Kp = tan2 *  45 + 2  = tan 2 *  45 +  = 2,12
 2  2

1
Pp = ( * Kp *  2 * D 2 ) +( 2*C2* Kp *D )
2
1
= ( * 2,12 *1,55 * 0,5 2 ) +( 2*3,5* 2,12 *0,5 )
2
= 0,411 + 5,096 = 5,507 t/m
(V ) tan(k1 *  2 ) + (B * k 2 * c2 ) + Pp
FK(gs) =
Pa * cos 
2 2
(3,52) tan( * 21) + (1,4 * * 3,5) + 5,507
= 3 3
1,88
0,877 + 3,267 + 5,507
= = 5,133 > 1,5 (OK)
1,88
6. Faktor keamanan terhadap daya dukung

B  MR −  MO 1,4 3,601 − 1,567


e= − = −
2 V 2 3,75

B
= 0,158m < = 0,233
6

q ujung/tumit =
V 1  6e  = 3,75 1  6 * 0,158 
B  B 1,4  1,4 
= 2,679 * 1,677 = 4,492 t/m2
= 2,679 * 0,33 = 0,865 t/m2
1
Qult = (c*Nc*Fcd*Fci ) + (q*Nq*Fqd*Fqi) + ( *  2 * BI * N * Fd * Fi )
2
Untuk  2 = 21 o dari tabel faktor daya dari Vesic (1973)
Didapat Nc = 15,82 Nq = 7,07 N  = 6,20
q =  2 * D = 1,55 * 0,5 = 0,775 t/m3
BI = B-2e = 1,4 – 2*0,158 = 1,084m
D 0,5
Fcd = 1 + 0,4 I
= 1 + 0,4 = 1,185
B 1,084
D
Fqd = 1 + 2 tan  2 (1-sin  2 )2 *
BI
0,5
= 1 + (2 tan 21 (1-sin21)2 * )
1,084
= 1+ ( 2 * 0,384*(1-0,358)2 * 0,461)
= 1 + (0,317*0,461) = 1,145
F d = 1

 Pa * cos    1,880 
 0 = tan -1   = tan -1   = 26,63 o
 EV   3,75 
sehingga,
2 2
 o   26,63o 
Fci = Fqi = 1 − o  = 1 −  = 0,496
 90   90 o 
2 2
 o   26,63o 
Fi = 1 − o  = 1 −  = 0,07187
    21o 
1
Qult = (c*Nc*Fcd*Fci ) + (q*Nq*Fqd*Fqi) + ( *  2 * BI * N * Fd * Fi )
2
= (3,5 * 15,82 * 1,185 * 0,496) + (0,775 * 7,07 * 1,145 * 0,496) +
1
( * 1,55 * 1,084 * 6,2 *1 * 0,07187)
2
= 32,544 + 3,112 + 0,374 =36,0303

q ult 36,0303
FK(dd) = = = 8,0209 >3 (OK)