1 2 3 4 BLUD
target pendapatan 85,000,000,000.00
93,353,700,301.56 106,422,212,651.00 (13,068,512,349.44) realisasi 93,353,700,301.56
belanja 85,000,000,000.00
PENGGUNAAN SILPA realisasi belanja 106,422,212,651.00
128,958,594,541
142,027,106,890
PA/KPA
PPK SKPD
PPKOM
PPTK
BENDAHARA
PENERIMAAN
PEMBANTU
BENDAHARA
PENGELUARAN
PEMBANTU
PENGAJUAN UP
PENGAJUAN LS
PENGAJUAN GU
PENGAJUAN T-UP
LAPORAN REALISASI ANGGARAN
RSUD CARUBAN Lampiran IV : PERATURAN MENTERI DALAM NEGERI
TAHUN 2023 NOMOR : 61 TAHUN 2007
TANGGAL : 7 NOVEMBER 2007
Urusan Pemerintahan : 1.02
Organisasi : 1-02.0-00.0-00.01 DINAS KESEHATAN
Sub Unit Organisasi : 1-02.0-00.0-00.01.02 RSUD Caruban -
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
URUSAN PEMERINTAHAN WAJIB YANG BERKAITAN
DENGAN PELAYANAN DASAR 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
1.02.01.2.10 PENINGKATAN PELAYANAN BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
1.02.01.2.10.01 Pelayanan dan Penunjang Pelayanan BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
5.1 BELANJA OPERASI 103,858,772,448.00 10,784,501,202.00 26,411,067,420.00 21,341,282,591.00 7,033,673,725.00 7,773,534,772.00 16,698,042,609.00 31,505,251,106.00 90,042,102,319.00 13,816,670,129.00 86.7%
5.1.01 Belanja Pegawai 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99.99 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99.99.9999 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
1.01.02 Belanja Tambahan Penghasilan ASN 42,957,647.00 - - - - - - - - 42,957,647.00 0.0%
1.01.02.01 Tambahan Penghasilan berdasarkan Beban Kerja ASN 42,957,647.00 - - - - - - - - 42,957,647.00 0.0%
1.01.02.01.0001 Tambahan Penghasilan berdasarkan Beban Kerja PNS 42,957,647.00 - - - 42,957,647.00 0.0%
Tambahan Penghasilan berdasarkan Pertimbangan Objektif
1.01.03 Lainnya ASN 31,950,277,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,178,185,686.00 93.2%
1.01.03.06 Belanja Jasa Pelayanan Kesehatan bagi ASN 31,935,027,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,510,499,395.00 7,297,597,362.00 29,760,092,201.00 2,174,935,686.00 93.2%
1.01.03.06.0001 Belanja Jasa Pelayanan Kesehatan bagi ASN 31,935,027,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,510,499,395.00 7,297,597,362.00 29,760,092,201.00 2,174,935,686.00 93.2%
Belanja Jasa Pelayanan Kesehatan bagi ASN 23,894,626,965.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 1,432,132,126.00 1,432,132,126.00 23,894,626,965.00 - 100.0%
Belanja Jasa Pelayanan Kesehatan bagi ASN ( silpa BLUD ) 8,040,400,922.00 - - - 2,170,651,907.00 2,616,446,060.00 1,078,367,269.00 5,865,465,236.00 5,865,465,236.00 2,174,935,686.00 72.9%
Page 4
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Belanja Honorarium Perangkat Unit Kerja Pengadaan Barang dan
1.01.03.07.0003 Jasa (UKPBJ) 15,250,000.00 - - - - - 12,000,000.00 12,000,000.00 12,000,000.00 3,250,000.00 78.7%
Honorarium Tim Pengadaan dan Pemeriksaan Barang
Penyediaan Alat Tulis Kantor
- Honorarium Pejabat Pengadaan Nilai Pagu Pengadaan Di Atas Rp.
250 Juta Sd. Rp. 500 Juta 300,000.00 - - - 300,000.00 300,000.00 300,000.00 - 100.0%
Page 5
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pengadaan linen rumah sakit -
- Honorarium pejabat Pengadaan dan Barang/Jasa 200,000.00 - - - 200,000.00 200,000.00 200,000.00 - 100.0%
-
Pengadaan logistik RS rumah sakit -
- Honorarium pejabat Pengadaan dan Barang/Jasa 4,400,000.00 - - - 4,400,000.00 4,400,000.00 4,400,000.00 - 100.0%
-
Renovasi Bangunan Rumah Sakit -
- Honorarium Pejabat Pengadaan Jasa konsultasi perencanaan dan
pengawasan 600,000.00 - - - 200,000.00 200,000.00 200,000.00 400,000.00 33.3%
- Honorarium Pejabat Pemeriksa Jasa Konsultasi perencanaan dan
pengawasan 600,000.00 - - - 200,000.00 200,000.00 200,000.00 400,000.00 33.3%
- Honorarium Pantia Pengadaan ( konstruksi ) 900,000.00 - - - - - 900,000.00 0.0%
5.1.02 Belanja Barang dan Jasa 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99.99 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99.99.9999 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
1.02 Belanja Barang dan Jasa 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
1.02.01 Belanja Barang 42,872,434,367.00 798,929,564.00 10,729,634,247.00 9,001,132,981.00 3,245,276,240.00 3,572,622,178.00 10,431,405,092.00 17,249,303,510.00 37,779,000,302.00 5,093,434,065.00 88.1%
1.02.01.01 Belanja Barang Pakai Habis 42,872,434,367.00 798,929,564.00 10,729,634,247.00 9,001,132,981.00 3,245,276,240.00 3,572,622,178.00 10,431,405,092.00 17,249,303,510.00 37,779,000,302.00 5,093,434,065.00 88.1%
1.02.01.01.0002 Belanja Bahan-Bahan Kimia 3,758,066,503.00 145,836,268.00 1,218,876,305.00 659,071,014.00 223,484,301.00 202,024,618.00 883,459,070.00 1,308,967,989.00 3,332,751,576.00 425,314,927.00 88.7%
Belanja bahan-Bahan Kimia ( BAHP-farmasi ) 200,922,041.00 - 15,605,950.00 - 6,741,585.00 2,131,200.00 13,266,720.00 22,139,505.00 37,745,455.00 163,176,586.00 18.8%
Belanja bahan-Bahan Kimia ( BAHP CSSD ) 118,777,800.00 - 34,912,500.00 - 17,948,700.00 3,670,500.00 21,619,200.00 56,531,700.00 62,246,100.00 47.6%
Belanja bahan-bahan kimia (Belanja reagen laboratorium ) 3,023,998,970.00 110,405,068.00 857,555,429.00 639,496,026.00 198,794,016.00 199,893,418.00 856,946,042.00 1,255,633,476.00 2,863,089,999.00 160,908,971.00 94.7%
Belanja bahan-bahan kimia pengelolaan linen Rumah Sakit 211,511,055.00 - 183,272,100.00 - - 183,272,100.00 28,238,955.00 86.6%
Belanja bahan-bahan kimia sanitasi 186,369,578.00 35,431,200.00 121,332,530.00 19,574,988.00 - 176,338,718.00 10,030,860.00 94.6%
Bahan kimia pembersih di Instalasi gizi 16,487,059.00 - 6,197,796.00 - 9,575,808.00 9,575,808.00 15,773,604.00 713,455.00 95.7%
1.02.01.01.0004 Belanja Bahan-Bahan Bakar dan Pelumas 262,480,000.00 - 64,111,460.00 36,098,404.00 34,895,451.00 23,037,320.00 65,710,727.00 123,643,498.00 223,853,362.00 38,626,638.00 85.3%
Page 6
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja bahan bakar minyak/gas ( genset , incenerator ) solar dex 9,450,000.00 - - - 9,400,121.00 9,400,121.00 9,400,121.00 49,879.00 99.5%
- Belanja bahan bakar minyak/gas ( ambulans dan kendaraan
operasional ) 253,030,000.00 - 64,111,460.00 36,098,404.00 34,895,451.00 23,037,320.00 56,310,606.00 114,243,377.00 214,453,241.00 38,576,759.00 84.8%
1.02.01.01.0009 Belanja Bahan-Isi Tabung Pemadam Kebakaran 10,234,556.00 - - - 7,568,761.00 7,568,761.00 7,568,761.00 2,665,795.00 74.0%
-
1.02.01.01.0012 Belanja Bahan-Bahan Lainnya 15,605,193,352.00 196,375,422.00 4,146,061,684.00 3,269,277,550.00 1,527,854,560.00 633,527,782.00 4,270,064,786.00 6,431,447,128.00 14,043,161,784.00 1,562,031,568.00 90.0%
Belanja Bahan-Isi Tabung Gas (LPG Instalasi Gizi) 63,761,175.00 5,555,550.00 11,324,775.00 11,111,100.00 7,692,300 13,461,525.00 21,153,825.00 49,145,250.00 14,615,925.00 77.1%
Belanja Bahan Radiologi 468,840,181.00 30,377,592.00 139,555,638.00 113,631,144.00 - 99,557,593.00 84,462,342.00 184,019,935.00 467,584,309.00 1,255,872.00 99.7%
Belanja Bahan Radiologi 286,258,000.00 30,377,592.00 139,555,638.00 113,631,144.00 2,693,626.00 2,693,626.00 286,258,000.00 - 100.0%
Belanja Bahan Radiologi (SILPA) 182,582,181.00 - - - 99,557,593.00 81,768,716.00 181,326,309.00 181,326,309.00 1,255,872.00 99.3%
Belanja Plate 3,890,344,228.00 - 1,163,307,555.00 471,129,336.00 335,933,854.00 49,539,855.00 907,959,586.00 1,293,433,295.00 2,927,870,186.00 962,474,042.00 75.3%
Belanja Plate 1,632,196,140.00 - 1,163,307,555.00 432,687,580.00 36,201,005.00 36,201,005.00 1,632,196,140.00 - 100.0%
Belanja Plate (SILPA) 2,258,148,088.00 - - 38,441,756.00 335,933,854.00 49,539,855.00 871,758,581.00 1,257,232,290.00 1,295,674,046.00 962,474,042.00 57.4%
Belanja Bahan dan Alat Kesehatan Habis Pakai 9,429,519,735.00 134,436,300.00 2,321,486,585.00 2,272,214,601.00 1,046,038,806.00 472,733,709.00 2,691,703,058.00 4,210,475,573.00 8,938,613,059.00 490,906,676.00 94.8%
- Belanja Bahan dan Alat Kesehatan Habis Pakai 8,184,730,290.00 - 2,167,578,396.00 2,049,973,517.00 932,602,299.00 387,763,529.00 2,452,390,450.00 3,772,756,278.00 7,990,308,191.00 194,422,099.00 97.6%
- Gas Oksigen, liquid dan CO2 1,064,211,945.00 134,436,300.00 153,908,189.00 222,241,084.00 113,436,507.00 84,970,180.00 239,312,608.00 437,719,295.00 948,304,868.00 115,907,077.00 89.1%
- Bahan Alat Habis Pakai lainnya 19,277,500.00 - - - - - 19,277,500.00 0.0%
- Bahan Alat Habis Pakai lainnya (silpa) 161,300,000.00 - - - - - 161,300,000.00 0.0%
Belanja bahan Lainnya ( belanja Darah ) 1,500,000,000.00 - 406,080,000.00 329,040,000.00 141,120,000.00 - 558,110,000.00 699,230,000.00 1,434,350,000.00 65,650,000.00 95.6%
Belanja bahan Lainnya ( belanja Darah ) 450,364,624.00 - 406,080,000.00 - 44,284,624.00 44,284,624.00 450,364,624.00 - 100.0%
Belanja bahan Lainnya ( belanja Darah )(SILPA) 1,049,635,376.00 - - 329,040,000.00 141,120,000.00 513,825,376.00 654,945,376.00 983,985,376.00 65,650,000.00 93.7%
Bahan lainnya (laboratorium patologi klinik dan patologi
anatomi) 126,817,965.00 26,005,980.00 55,121,131.00 21,989,859.00 4,761,900.00 4,004,325.00 11,335,875.00 20,102,100.00 123,219,070.00 3,598,895.00 97.2%
Bahan-bahan Lainnya ( CSSD ) 125,910,068.00 - 49,186,000.00 50,161,510.00 3,032,400.00 3,032,400.00 102,379,910.00 23,530,158.00 81.3%
1.02.01.01.0024 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor 380,449,023.00 - 359,786,726.00 - 10,986,780.00 - - 10,986,780.00 370,773,506.00 9,675,517.00 97.5%
ATK perkantoran 379,729,023.00 - 359,786,726.00 - 10,986,780.00 10,986,780.00 370,773,506.00 8,955,517.00 97.6%
BELANJA UNTUK ATK / PENGEMAS DI INSTALASI GIZI
(Isolasi) 720,000.00 - - - - - 720,000.00 0.0%
1.02.01.01.0025 Belanja Alat/Bahan untuk Kegiatan Kantor- Kertas dan Cover 65,106,552.00 9,000,000.00 19,992,000.00 18,000,000.00 - - 15,750,000.00 15,750,000.00 62,742,000.00 2,364,552.00 96.4%
Belanja kertas dan Cover kegiatan perkantoran (kertas Label
Thermal) 61,050,000.00 9,000,000.00 18,000,000.00 18,000,000.00 15,750,000.00 15,750,000.00 60,750,000.00 300,000.00 99.5%
ETIKET DI INSTALASI GIZI 4,056,552.00 - 1,992,000.00 - - 1,992,000.00 2,064,552.00 49.1%
1.02.01.01.0026 Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak 990,183,644.00 - 582,639,275.00 41,726,775.00 12,746,146.00 24,607,863.00 216,832,473.00 254,186,482.00 878,552,532.00 111,631,112.00 88.7%
- Belanja Penggandaan 130,558,422.00 - - 498,300.00 7,275,646.00 8,674,373.00 33,139,948.00 49,089,967.00 49,588,267.00 80,970,155.00 38.0%
Belanja penggandaan kegiatan administrasi perkantoran 103,563,000.00 - - - 6,770,446.00 8,674,373.00 18,828,376.00 34,273,195.00 34,273,195.00 69,289,805.00 33.1%
Belanja penggandaan kegiatan Akreditasi Rumah Sakit 24,164,700.00 - - - 13,914,072.00 13,914,072.00 13,914,072.00 10,250,628.00 57.6%
Belanja penggandaan kegiatan pelatihan internal 2,589,075.00 - - 498,300.00 505,200.00 397,500.00 902,700.00 1,401,000.00 1,188,075.00 54.1%
Belanja penggandaan materi kegiatan value gathering 241,647.00 - - - - - 241,647.00 0.0%
Page 7
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
1.02.01.01.0029 Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer 25,873,545.00 - - - - - 25,873,545.00 0.0%
1.02.01.01.0030 Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor 641,695,130.00 189,729,002.00 272,731,620.00 - 1,853,700.00 58,798,700.00 - 60,652,400.00 523,113,022.00 118,582,108.00 81.5%
- Belanja Alat/Bahan kebersihan 185,233,748.00 - 164,639,640.00 - - 164,639,640.00 20,594,108.00 88.9%
- Belanja Alat/Bahan pengelolaan linen Rumah Sakit 99,190,466.00 - 88,216,980.00 - - 88,216,980.00 10,973,486.00 88.9%
- Belanja Alat/Bahan pengelolaan sampah 355,383,916.00 189,729,002.00 19,875,000.00 - 58,798,700.00 58,798,700.00 268,402,702.00 86,981,214.00 75.5%
- Perabot Kantor 1,887,000.00 - - - 1,853,700.00 1,853,700.00 1,853,700.00 33,300.00 98.2%
1.02.01.01.0031 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Listrik 173,959,755.00 - - 134,883,870.00 20,679,300.00 18,259,500.00 38,938,800.00 173,822,670.00 137,085.00 99.9%
1.02.01.01.0037 Belanja Obat-Obatan-Obat 17,486,385,107.00 - 3,354,546,939.00 3,931,397,023.00 1,379,668,502.00 2,179,284,874.00 4,204,268,476.00 7,763,221,852.00 15,049,165,814.00 2,437,219,293.00 86.1%
Belanja Obat-Obatan 13,682,906,645.00 - 3,354,546,939.00 3,931,397,023.00 1,379,668,502.00 2,179,284,874.00 2,838,009,307.00 6,396,962,683.00 13,682,906,645.00 - 100.0%
Belanja Obat-Obatan (SILPA) 3,803,478,462.00 - - - 1,366,259,169.00 1,366,259,169.00 1,366,259,169.00 2,437,219,293.00 35.9%
1.02.01.01.0043 Belanja Natura dan Pakan-Natura 1,784,917,791.00 223,152,602.00 460,168,689.00 402,162,091.00 - 283,437,952.00 379,286,651.00 662,724,603.00 1,748,207,985.00 36,709,806.00 97.9%
Makanan dan minuman harian pegawai 69,396,250.00 - 33,044,600.00 10,192,600.00 7,934,300.00 14,319,400.00 22,253,700.00 65,490,900.00 3,905,350.00 94.4%
Belanja bahan makanan dan minuman pasien 1,573,996,541.00 207,613,094.00 397,994,824.00 363,873,592.00 255,323,739.00 343,461,508.00 598,785,247.00 1,568,266,757.00 5,729,784.00 99.6%
Belanja Makanan Dan Minuman Pasien ( snack pasien dan minuman
pasien ) 141,525,000.00 15,539,508.00 29,129,265.00 28,095,899.00 20,179,913.00 21,505,743.00 41,685,656.00 114,450,328.00 27,074,672.00 80.9%
1.02.01.01.0052 Belanja Makanan dan Minuman Rapat 430,755,000.00 - 97,863,000.00 45,470,000.00 23,092,000.00 32,114,500.00 84,205,150.00 139,411,650.00 282,744,650.00 148,010,350.00 65.6%
- Belanja makanan dan minuman rapat kegiatan FGD 7,492,500.00 - - - - - 7,492,500.00 0.0%
- Makanan dan minuman Rapat kegiatan administrasi perkantoran 189,810,000.00 - 47,032,000.00 30,684,000.00 12,032,000.00 32,114,500.00 48,262,000.00 92,408,500.00 170,124,500.00 19,685,500.00 89.6%
- Belanja makanan dan minuman rapat kegiatan maintenance dan
surveilans ISO 24,975,000.00 - - - - - 24,975,000.00 0.0%
- Belanja makanan dan minuman rapat kegiatan akreditasi rumah
sakit 26,640,000.00 - - - 24,383,150.00 24,383,150.00 24,383,150.00 2,256,850.00 91.5%
- Belanja Makanan dan Minuman Diklat, Seminar, Lokakarya dan
Sejenisnya 47,452,500.00 - - 14,786,000.00 11,060,000.00 11,560,000.00 22,620,000.00 37,406,000.00 10,046,500.00 78.8%
- Belanja Makanan dan Minuman Bimtek Maintenance dan
surveilens ISO 37,462,500.00 - - - - - 37,462,500.00 0.0%
Page 8
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja Makanan dan Minuman Survey ISO 24,975,000.00 - - - - - 24,975,000.00 0.0%
Belanja Makanan dan Minuman Survey Akreditasi dan survey
simulasi 52,447,500.00 - 50,831,000.00 - - 50,831,000.00 1,616,500.00 96.9%
- Belanja Makanan dan Minuman kegiatan value gathering ( paket
meeting ) 19,500,000.00 - - - - - 19,500,000.00 0.0%
1.02.01.01.0053 Belanja Makanan dan Minuman Jamuan Tamu 92,648,076.00 - 12,927,000.00 1,224,000.00 9,212,000.00 15,904,000.00 14,040,000.00 39,156,000.00 53,307,000.00 39,341,076.00 57.5%
- Belanja Makanan dan minuman tamu kegiatan administrasi umum 41,425,200.00 - 8,472,000.00 1,224,000.00 9,212,000.00 4,464,000.00 14,040,000.00 27,716,000.00 37,412,000.00 4,013,200.00 90.3%
- Belanja makanan dan minuman kegiatan pelayanan sunatan massal 19,980,000.00 - - - 11,440,000.00 11,440,000.00 11,440,000.00 8,540,000.00 57.3%
- Belanja Makanan dan Minuman kegiatan Bimtek , Survey
Akreditasi dan survey simuasi ) 26,612,438.00 - 4,455,000.00 - - 4,455,000.00 22,157,438.00 16.7%
- Belanja Makanan dan Minuman kegiatan Survey ISO ) 4,630,438.00 - - - - - 4,630,438.00 0.0%
1.02.01.01.0054 Belanja Penambah Daya Tahan Tubuh 219,796,650.00 - 47,365,500.00 83,658,000.00 14,486,800.00 20,969,000.00 32,752,000.00 68,207,800.00 199,231,300.00 20,565,350.00 90.6%
1.02.01.01.0061 Belanja Pakaian Sipil Harian 190,210,766.00 - - 171,990,000.00 - 171,990,000.00 18,220,766.00 90.4%
1.02.01.01.0068 Belanja Pakaian Siaga 187,606,987.00 - - - 60,485,000.00 95,100,000.00 155,585,000.00 155,585,000.00 32,021,987.00 82.9%
1.02.02 Belanja Jasa 23,915,780,997.00 3,778,927,820.00 5,251,317,928.00 4,294,033,191.00 1,135,476,566.00 1,384,284,701.00 2,219,794,806.00 4,739,556,073.00 18,063,835,012.00 5,851,945,985.00 75.5%
1.02.02.01 Belanja Jasa Kantor 20,847,981,997.00 3,507,168,029.00 4,765,985,498.00 3,568,973,894.00 989,804,272.00 1,191,852,306.00 1,423,897,758.00 3,605,554,336.00 15,447,681,757.00 5,400,300,240.00 74.1%
Honorarium Narasumber atau Pembahas, Moderator, Pembawa
1.02.02.01.0003 Acara, dan Panitia 306,500,000.00 - - 99,807,200.00 5,000,000.00 - 42,900,000.00 47,900,000.00 147,707,200.00 158,792,800.00 48.2%
- Jasa Narasumber Pelatihan 306,500,000.00 - - 99,807,200.00 5,000,000.00 - 42,900,000.00 47,900,000.00 147,707,200.00 158,792,800.00 48.2%
Jasa Narasumber Pelatihan APAR 22,500,000.00 - - 2,034,000.00 - 2,034,000.00 20,466,000.00 9.0%
Jasa Narasumber Pelatihan BLS 28,800,000.00 - - 1,500,000.00 - 1,500,000.00 27,300,000.00 5.2%
Jasa Narasumber Pelatihan MAKP 35,000,000.00 - - 25,000,000.00 - 25,000,000.00 10,000,000.00 71.4%
Jasa Narasumber Pelatihan PPI 7,200,000.00 - - - - - 7,200,000.00 0.0%
Jasa Narasumber Pelatihan PPGD EMT 100,000,000.00 - - 66,973,200.00 - 66,973,200.00 33,026,800.00 67.0%
Jasa Narasumber bimtek keuangan 5,000,000.00 - - 2,100,000.00 - 2,100,000.00 2,900,000.00 42.0%
Jasa Narasumber pelatihan SKP 5,000,000.00 - - 2,200,000.00 - 2,200,000.00 2,800,000.00 44.0%
Jasa narasumber kegiatan FGD 58,000,000.00 - - - 5,000,000.00 42,900,000.00 47,900,000.00 47,900,000.00 10,100,000.00 82.6%
Jasa instruktur kegiatan value gathering 45,000,000.00 - - - - - 45,000,000.00 0.0%
Page 9
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Honor PPK Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp. 2,5 Miliar 1,500,000.00 - - - 1,500,000.00 1,500,000.00 1,500,000.00 - 100.0%
Honor bendahara pengeluaran (Nilai Pagu Dana Di Atas Rp. 1
Miiar Sd. Rp. 2,5 Miliar) 1,350,000.00 - - - 1,350,000.00 1,350,000.00 1,350,000.00 - 100.0%
Honor bendahara pengeluaran pembantu (Nilai Pagu Dana Di Atas
Rp. 1 Miiar Sd. Rp. 2,5 Miliar) 1,200,000.00 - - - 1,200,000.00 1,200,000.00 1,200,000.00 - 100.0%
Honor staf teknis ( Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp.
2,5 Miliar) 2,700,000.00 - - - 2,550,000.00 2,550,000.00 2,550,000.00 150,000.00 94.4%
Honorarium PPTK ( Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp.
2,5 Miliar) 1,350,000.00 - - - 1,350,000.00 1,350,000.00 1,350,000.00 - 100.0%
Panitia Pelaksana Kegiatan - NNilai Pagu Dana Di Atas Rp. 1
Miiar Sd. Rp. 2,5 Miliar ( Tim Teknis ) 7,875,000.00 - - - 7,875,000.00 7,875,000.00 7,875,000.00 - 100.0%
Penyediaan Alat Tulis Kantor - Panitia Pelaksana Kegiatan / Teknis 275,000.00 - - - - - 275,000.00 0.0%
Penyediaan Barang Cetakan & penggandaan - Panitia Pelaksana
Kegiatan/Tim Teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan Peralatan Kantor - Panitia Pelaksana Kegiatan/Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Mebeuleur Rumah sakit - Panitia Pelaksana Kegiatan/Tim
teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan Pakaian kerja Lapangan - Panitia Pelaksana Kegiatan/Tim
Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Jasa Pengangkutan dan pengolahan sampah medis RS -
Panitia Pelaksana Kegiatan / Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin/berkala IPAL dan Sarana Sanitasi -
Panitia Pelkasana Kegiatan/Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin/berkala alat alat kesehatan RS -
Panitia Pelaksana Kegiatan/Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Page 10
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pengadaan Pakaian pasien dan pakaian kerja lapangan - Panitia
Pelaksana Kegiatan / Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin berkala perlengkapan RS - Panitia
Pelasana kegiatan 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin berkala taman RS - Panitia Pelaksana
Kegiatan / Tim Teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan alat kesehatan/alat kedokteran RS - Panitia Pelaksana
Kegiatan/Tim Teknis - - - - - -
Pengadaan gelang identitas pasien - Panitia Pelaksana Kegiatan/Tim
Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan jasa kebersihan - Panitia Pelaksana Kegiatan/Tim Teknis 425,000.00 - - - - - 425,000.00 0.0%
Pengadaan bahan dan alat kebersihan - Panitia Pelaksana
Kegiatan/Tim Tehnis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan bahan pengelolaan linen - Panitia Pelaksana Kegiatan /
Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan peralatan pengelolaan sampah - Panitia Pelaksana
Kegiatan / Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan linen rumah sakit - Panitia Pelaksana Kegiatan/Tim
Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan logistik RS rumah sakit - Panitia Pelaksana Kegiatan /
Tim Tehnis - - - - - -
Renovasi Bangunan Rumah Sakit - Panitia Pelaksana Kegiatan / Tim
Teknis - - - - - -
Pembangunan Paviliun - panitia pelaksana kegiatan 17,325,000.00 - - - 16,650,000.00 16,650,000.00 16,650,000.00 675,000.00 96.1%
Pembangunan Parkir beratap - Panitia Pelaksana Kegiatan 7,875,000.00 - - - - - 7,875,000.00 0.0%
Pembuatan Taman - Panitia Pelaksana Kegiatan 7,875,000.00 - - - - - 7,875,000.00 0.0%
Belanja Bahan - Bahan Kimia (BAHP CSSD) - Tim tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan - Bahan Kimia (Reagen Lab) - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan - Bahan Kimia (Reagen Lab PA) - Tim tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan Radiologi - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Kertas Label Termal - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Alat Listrik - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Natura dan Pakan Natura - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Modal Alat Bengkel dan Alat Ukur - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Modal Alat Kantor dan Rumah Tangga - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
1.02.02.01.0006 Honorarium Penyuluhan atau Pendampingan 37,000,000.00 - - - - - 34,500,000.00 34,500,000.00 34,500,000.00 2,500,000.00 93.2%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Ketua Tim ) 3,750,000.00 - - - 3,750,000.00 3,750,000.00 3,750,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Sekretaris Tim ) 3,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Anggota Tim ) 15,750,000.00 - - - 14,000,000.00 14,000,000.00 14,000,000.00 1,750,000.00 88.9%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Ketua Tim ) 3,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Sekretaris Tim ) 2,500,000.00 - - - 2,500,000.00 2,500,000.00 2,500,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Anggota Tim ) 9,000,000.00 - - - 8,250,000.00 8,250,000.00 8,250,000.00 750,000.00 91.7%
1.02.02.01.0014 Belanja Jasa Tenaga Kesehatan 7,016,000,000.00 1,279,548,000.00 1,555,024,000.00 1,080,777,000.00 352,759,000.00 375,259,000.00 407,759,000.00 1,135,777,000.00 5,051,126,000.00 1,964,874,000.00 72.0%
- Belanja Jasa Tenaga Ahli ( penepri ) dokter spesialis 60,000,000.00 - - - 60,000,000.00 0.0%
- Insentif Dokter 120,000,000.00 - - 22,500,000.00 - 22,500,000.00 55,000,000.00 77,500,000.00 100,000,000.00 20,000,000.00 83.3%
a. Intensif Tenaga Ahli (Dokter Spesialis) 60,000,000.00 - - - 55,000,000.00 55,000,000.00 55,000,000.00 5,000,000.00 91.7%
b. Intensif Tenaga Ahli (Dokter Interensif) 60,000,000.00 - - 22,500,000.00 22,500,000.00 22,500,000.00 45,000,000.00 15,000,000.00 75.0%
- Honorarium tenaga kontrak BLUD 6,812,000,000.00 1,279,548,000.00 1,555,024,000.00 1,058,277,000.00 352,759,000.00 352,759,000.00 352,759,000.00 1,058,277,000.00 4,951,126,000.00 1,860,874,000.00 72.7%
a. Dokter Spesialis ( 3 orang x 13 bulan ) 195,000,000.00 45,000,000.00 50,000,000.00 30,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 30,000,000.00 155,000,000.00 40,000,000.00 79.5%
b. Perawat dan tenaga lain ( 280 x 13 bulan ) 6,552,000,000.00 1,227,048,000.00 1,495,024,000.00 1,020,777,000.00 340,259,000.00 340,259,000.00 340,259,000.00 1,020,777,000.00 4,763,626,000.00 1,788,374,000.00 72.7%
c. Dokter umum/Dokter gigi ( 2 orang x 13 bulan ) 65,000,000.00 7,500,000.00 10,000,000.00 7,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 7,500,000.00 32,500,000.00 32,500,000.00 50.0%
Page 11
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
1.02.02.01.0029 Belanja Jasa Tenaga Ahli 210,000,000.00 5,000,000.00 45,000,000.00 10,000,000.00 - 5,000,000.00 25,000,000.00 30,000,000.00 90,000,000.00 120,000,000.00 42.9%
- Belanja Jasa Tenaga Ahli ( fisikawan medis ) 30,000,000.00 5,000,000.00 5,000,000.00 10,000,000.00 5,000,000.00 5,000,000.00 10,000,000.00 30,000,000.00 - 100.0%
-Honorarium Dewan Pengawas 180,000,000.00 - 40,000,000.00 - 20,000,000.00 20,000,000.00 60,000,000.00 120,000,000.00 33.3%
-
1.02.02.01.0030 Belanja Jasa Tenaga Kebersihan 10,000,000.00 - 3,500,000.00 - - 2,800,000.00 1,600,000.00 4,400,000.00 7,900,000.00 2,100,000.00 79.0%
Honorarium Pegawai Honorer/Tidak Tetap Kategori Umum ( Jasa
Petugas Kebersihan Kegiatan) 10,000,000.00 - 3,500,000.00 - 2,800,000.00 1,600,000.00 4,400,000.00 7,900,000.00 2,100,000.00 79.0%
1.02.02.01.0036 Belanja Jasa Audit/Surveillance ISO 82,200,000.00 - 20,400,000.00 - - - - - 20,400,000.00 61,800,000.00 24.8%
- Belanja jasa audit kegiatan sertifikasi Akreditasi Rumah Sakit 22,200,000.00 - 20,400,000.00 - - 20,400,000.00 1,800,000.00 91.9%
- Belanja sertifikasi SMM ISO kegiatan Maintenance dan Surveilans
ISO 60,000,000.00 - - - - - 60,000,000.00 0.0%
1.02.02.01.0039 Belanja Jasa Tenaga Informasi dan Teknologi 60,000,000.00 - - - 10,000,000.00 - 15,000,000.00 25,000,000.00 25,000,000.00 35,000,000.00 41.7%
Honorarium Sub Profesional (Programmer Senior) 60,000,000.00 - - - 10,000,000.00 15,000,000.00 25,000,000.00 25,000,000.00 35,000,000.00 41.7%
1.02.02.01.0042 Belanja Jasa Pelaksanaan Transaksi Keuangan 9,650,000.00 - 500,000.00 500,000.00 250,000.00 - 1,282,500.00 1,532,500.00 2,532,500.00 7,117,500.00 26.2%
Biaya Beban Jasa Transaksi Keuangan ( Tranfer ) 6,500,000.00 - - - 32,500.00 32,500.00 32,500.00 6,467,500.00 0.5%
Beban Jasa Transaksi Keuangan (Cek giro ) 3,150,000.00 - 500,000.00 500,000.00 250,000.00 1,250,000.00 1,500,000.00 2,500,000.00 650,000.00 79.4%
1.02.02.01.0047 Belanja Jasa Penyelenggaraan Acara 41,400,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 38,400,000.00 7.2%
- Belanja Jasa Penyelenggaraan Acara Rekrutmen Pegawai BLUD 18,000,000.00 - - - - - 18,000,000.00 0.0%
- Honorarium Instruktur Senam Kegiatan Olahraga/Olimpiade
Siswa/Festival Seni Siswa Dan Sejenisnya 23,400,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 20,400,000.00 12.8%
1.02.02.01.0048 Belanja Jasa Kontribusi Asosiasi 15,000,000.00 - 3,300,000.00 - - - - - 3,300,000.00 11,700,000.00 22.0%
Belanja Iuran Asosiasi 15,000,000.00 - 3,300,000.00 - - 3,300,000.00 11,700,000.00 22.0%
1.02.02.01.0050 Belanja Jasa Kalibrasi 296,650,000.00 24,125,000.00 23,765,000.00 8,230,000.00 18,481,500.00 146,183,500.00 7,492,500.00 172,157,500.00 228,277,500.00 68,372,500.00 77.0%
- Jasa Kalibrasi/pengujian/pengukuran peralatan
kesehatan/kedokteran 200,000,000.00 - 2,400,000.00 2,700,000.00 144,130,000.00 7,492,500.00 151,622,500.00 156,722,500.00 43,277,500.00 78.4%
- Jasa pengujian ( air bersih, air minum, swab , udara , air limbah, air
laundry 60,000,000.00 - 21,090,000.00 3,330,000.00 18,481,500.00 2,053,500.00 20,535,000.00 44,955,000.00 15,045,000.00 74.9%
- Jasa pemantauan mutu eksternal laboratorium 20,000,000.00 17,800,000.00 - - - 17,800,000.00 2,200,000.00 89.0%
- Jasa Pemeriksaan kultur kuman 16,650,000.00 6,325,000.00 275,000.00 2,200,000.00 - 8,800,000.00 7,850,000.00 52.9%
1.02.02.01.0051 Belanja Jasa Pengolahan Sampah 541,569,000.00 - 167,940,780.00 181,631,520.00 46,138,260.00 - 137,132,730.00 183,270,990.00 532,843,290.00 8,725,710.00 98.4%
Jasa pengangkutan dan pengolahan sampah medis 541,569,000.00 - 167,940,780.00 181,631,520.00 46,138,260.00 137,132,730.00 183,270,990.00 532,843,290.00 8,725,710.00 98.4%
1.02.02.01.0055 Belanja Jasa Iklan/Reklame, Film, dan Pemotretan 87,004,550.00 - 31,550,000.00 14,900,000.00 1,500,000.00 6,000,000.00 17,250,000.00 24,750,000.00 71,200,000.00 15,804,550.00 81.8%
1.02.02.01.0059 Belanja Tagihan Telepon 36,000,000.00 2,756,902.00 2,721,939.00 2,924,507.00 1,047,571.00 912,058.00 952,131.00 2,911,760.00 11,315,108.00 24,684,892.00 31.4%
1.02.02.01.0060 Belanja Tagihan Air 132,000,000.00 26,744,000.00 24,756,000.00 26,658,250.00 9,923,250.00 8,390,250.00 7,983,500.00 26,297,000.00 104,455,250.00 27,544,750.00 79.1%
1.02.02.01.0061 Belanja Tagihan Listrik 1,440,000,000.00 321,612,440.00 353,720,220.00 372,758,079.00 112,706,860.00 138,965,880.00 139,551,840.00 391,224,580.00 1,439,315,319.00 684,681.00 100.0%
1.02.02.01.0062 Belanja Langganan Jurnal/Surat Kabar/Majalah 12,720,000.00 - 5,170,000.00 2,110,000.00 3,165,000.00 2,110,000.00 5,275,000.00 12,555,000.00 165,000.00 98.7%
1.02.02.01.0063 Belanja Kawat/Faksimili/Internet/TV Berlangganan 145,000,000.00 33,695,460.00 33,697,118.00 33,695,460.00 11,226,308.00 11,193,081.00 18,743,081.00 41,162,470.00 142,250,508.00 2,749,492.00 98.1%
1.02.02.01.0064 Belanja Paket/Pengiriman 470,000.00 - 84,000.00 37,500.00 84,000.00 168,000.00 252,000.00 373,500.00 96,500.00 79.5%
1.02.02.01.0067 Belanja Pembayaran Pajak, Bea, dan Perizinan 21,550,000.00 - 5,344,650.00 - 8,929,950.00 3,540,000.00 - 12,469,950.00 17,814,600.00 3,735,400.00 82.7%
Belanja Pajak Kendaraan Bermotor 15,000,000.00 - 5,344,650.00 - 8,929,950.00 8,929,950.00 14,274,600.00 725,400.00 95.2%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk Radiografi Umum 600,000.00 - - - 140,000.00 140,000.00 140,000.00 460,000.00 23.3%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk Pesawat sinar-X Penunjang Terapi 550,000.00 - - - - - 550,000.00 0.0%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk CT-SCAN 900,000.00 - - - - - 900,000.00 0.0%
Ijin penggunaan dalam Radiologi diagnostik ( Mobile X-ray Unit) 1,500,000.00 - - - 1,040,000.00 1,040,000.00 1,040,000.00 460,000.00 69.3%
Page 12
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk C-Arm 1,500,000.00 - - - 1,040,000.00 1,040,000.00 1,040,000.00 460,000.00 69.3%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Konvensional
untuk X-Ray 1,500,000.00 - - - 1,320,000.00 1,320,000.00 1,320,000.00 180,000.00 88.0%
1.02.02.01.0077 Belanja jasa pelayanan Kesehatan bagi Non ASN 10,006,568,447.00 1,813,686,227.00 2,489,511,791.00 1,573,644,378.00 408,592,573.00 493,608,537.00 478,097,476.00 1,380,298,586.00 7,257,140,982.00 2,749,427,465.00 72.5%
Belanja jasa pelayanan Kesehatan bagi Non ASN 7,143,341,028.00 1,813,686,227.00 2,489,511,791.00 1,573,644,378.00 478,097,476.00 478,097,476.00 6,354,939,872.00 788,401,156.00 89.0%
Belanja jasa pelayanan Kesehatan bagi Non ASN (silpa blud) 2,863,227,419.00 - - - 408,592,573.00 493,608,537.00 902,201,110.00 902,201,110.00 1,961,026,309.00 31.5%
1.02.02.02 Belanja Iuran Jaminan/Asuransi 1,486,159,000.00 271,759,791.00 306,705,310.00 354,303,151.00 108,802,292.00 106,227,857.00 185,468,111.00 400,498,260.00 1,333,266,512.00 152,892,488.00 89.7%
1.02.02.02.0005 Belanja Iuran Jaminan Kesehatan bagi Non ASN 1,033,034,000.00 185,545,472.00 225,691,194.00 283,078,420.00 85,060,715.00 80,127,877.00 159,368,131.00 324,556,723.00 1,018,871,809.00 14,162,191.00 98.6%
Belanja Iuran Jaminan Kesehatan bagi ASN dan Non ASN 1,033,034,000.00 185,545,472.00 225,691,194.00 283,078,420.00 85,060,715.00 80,127,877.00 159,368,131.00 324,556,723.00 1,018,871,809.00 14,162,191.00 98.6%
1.02.02.02.0006 Belanja Iuran Jaminan Kecelakaan Kerja bagi Non ASN 453,125,000.00 86,214,319.00 81,014,116.00 71,224,731.00 23,741,577.00 26,099,980.00 26,099,980.00 75,941,537.00 314,394,703.00 138,730,297.00 69.4%
Belanja Premi Asuransi Ketenagakerjaan ( perbulan per orang = Rp
145.000) 453,125,000.00 86,214,319.00 81,014,116.00 71,224,731.00 23,741,577.00 26,099,980.00 26,099,980.00 75,941,537.00 314,394,703.00 138,730,297.00 69.4%
1.02.02.04 Belanja Sewa Peralatan dan Mesin 65,700,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 - 700,000.00 11,570,000.00 36,911,300.00 28,788,700.00 56.2%
1.02.02.04.0036 Belanja Sewa Kendaraan Bermotor Penumpang 10,000,000.00 - - - - - - - - 10,000,000.00 0.0%
Sewa Bus 10,000,000.00 - - - - - 10,000,000.00 0.0%
1.02.02.04.0037 Belanja Sewa Kendaraan Bermotor Angkutan Barang 700,000.00 - - - - - 700,000.00 700,000.00 700,000.00 - 100.0%
Sewa Mobilitas Darat Pick Up 700,000.00 - - - 700,000.00 700,000.00 700,000.00 - 100.0%
1.02.02.04.0117 Belanja Sewa Alat Kantor Lainnya 55,000,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 - - 10,870,000.00 36,211,300.00 18,788,700.00 65.8%
Belanja Sewa Alat Kantor Lainnya 55,000,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 10,870,000.00 36,211,300.00 18,788,700.00 65.8%
1.02.02.08 Belanja Jasa Konsultansi Konstruksi 879,675,000.00 - 104,641,920.00 265,387,236.00 - 24,104,538.00 450,944,937.00 475,049,475.00 845,078,631.00 34,596,369.00 96.1%
Page 13
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja jasa konsultasi pengawasan pekerjaan taman( Belanja
Konsultasi Pengawasan diatas 100 juta s/d 200 juta) 5,550,000.00 - - - - - 5,550,000.00 0.0%
- Belanja jasa konsultasi pengawasan pembangunan gedung RS
( paviliun ) Biaya Konstruksi Fisik > 6.900.000.000 s/d
7.000.000.000 195,360,000.00 - - - 195,200,160.00 195,200,160.00 195,200,160.00 159,840.00 99.9%
- Belanja jasa konsultasi pengawasan pekerjaan pemasangan lift - - - - - -
- Belanja jasa konsultasi pengawasan pekerjaan rehap gedung rawat
jalan rs 88,800,000.00 - - - 88,589,100.00 88,589,100.00 88,589,100.00 210,900.00 99.8%
1.02.02.09 Belanja Jasa Konsultansi Non Konstruksi 127,000,000.00 - - 54,912,810.00 - - 64,047,000.00 64,047,000.00 118,959,810.00 8,040,190.00 93.7%
1.02.02.09.0006 Belanja Jasa Konsultansi Berorientasi Bidang-Keuangan 55,000,000.00 - - 54,912,810.00 - - - - 54,912,810.00 87,190.00 99.8%
Belanja jasa akuntan publik audit laporan keuangan 55,000,000.00 - - 54,912,810.00 - 54,912,810.00 87,190.00 99.8%
1.02.02.09.0011 Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Survei 22,000,000.00 - - - - - 19,647,000.00 19,647,000.00 19,647,000.00 2,353,000.00 89.3%
Belanja jasa survey IKM 22,000,000.00 - - - 19,647,000.00 19,647,000.00 19,647,000.00 2,353,000.00 89.3%
1.02.02.09.0014 Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Khusus 50,000,000.00 - - - - - 44,400,000.00 44,400,000.00 44,400,000.00 5,600,000.00 88.8%
Belanja jasa penyusunan dokumen perijinan 50,000,000.00 - - - 44,400,000.00 44,400,000.00 44,400,000.00 5,600,000.00 88.8%
1.02.02.11 Belanja Beasiswa Pendidikan PNS 60,000,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
1.02.02.11.0002 Belanja Beasiswa Tugas Belajar S2 60,000,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
Beban Beasiswa Pendidikan PNS Lainnya 60,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
1.02.03 Belanja Pemeliharaan 4,335,271,300.00 345,851,497.00 869,521,377.00 972,143,481.00 409,794,012.00 188,575,333.00 1,260,708,197.00 1,859,077,542.00 4,046,593,897.00 288,677,403.00 93.3%
1.02.03.02 Belanja Pemeliharaan Peralatan dan Mesin 1,268,537,100.00 19,513,800.00 96,879,120.00 327,260,000.00 172,400,779.00 37,974,350.00 529,996,916.00 740,372,045.00 1,184,024,965.00 84,512,135.00 93.3%
Belanja Pemeliharaan Alat Besar-Alat Bantu-Electric Generating
1.02.03.02.0022 Set 17,000,000.00 - - - 10,376,169.00 - 3,441,000.00 13,817,169.00 13,817,169.00 3,182,831.00 81.3%
Pemeliharaan Genset Penggantian spare part dan servis ( kali ) 17,000,000.00 - - - 10,376,169.00 3,441,000.00 13,817,169.00 13,817,169.00 3,182,831.00 81.3%
Page 14
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pemeliharaan AC Gedung/Kantor Pemeliharaan AC central, servis
dan penggantian Spare part 40,000,000.00 - 10,017,750.00 9,462,750.00 20,257,500.00 20,257,500.00 39,738,000.00 262,000.00 99.3%
-
1.02.03.03 Belanja Pemeliharaan Gedung dan Bangunan 3,066,734,200.00 326,337,697.00 772,642,257.00 644,883,481.00 237,393,233.00 150,600,983.00 730,711,281.00 1,118,705,497.00 2,862,568,932.00 204,165,268.00 93.3%
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung
1.02.03.03.0006 Tempat Kerja-Bangunan Kesehatan 2,497,678,600.00 233,990,666.00 644,343,307.00 450,507,449.00 216,397,583.00 116,995,333.00 632,443,666.00 965,836,582.00 2,294,678,004.00 203,000,596.00 91.9%
- Belanja Pemeliharan Gedung dan Bangunan 500,000,000.00 - 199,632,292.00 99,521,450.00 99,402,250.00 101,444,008.00 200,846,258.00 500,000,000.00 - 100.0%
- Belanja Pemeliharan Gedung dan Bangunan (silpa BLUD) 500,000,000.00 - - - 297,008,992.00 297,008,992.00 297,008,992.00 202,991,008.00 59.4%
- Belanja Pemeliharaan kebersihan Rumah Sakit ( 12 bulan ) 1,497,678,600.00 233,990,666.00 444,711,015.00 350,985,999.00 116,995,333.00 116,995,333.00 233,990,666.00 467,981,332.00 1,497,669,012.00 9,588.00 100.0%
1.02.04 Belanja Perjalanan Dinas 734,550,250.00 - 24,427,983.00 7,564,305.00 72,475,000.00 11,606,500.00 263,635,119.00 347,716,619.00 379,708,907.00 354,841,343.00 51.7%
1.02.04.01 Belanja Perjalanan Dinas Dalam Negeri 734,550,250.00 - 24,427,983.00 7,564,305.00 72,475,000.00 11,606,500.00 263,635,119.00 347,716,619.00 379,708,907.00 354,841,343.00 51.7%
1.02.04.01.0001 Belanja Perjalanan Dinas Biasa 257,207,500.00 - 12,284,000.00 3,345,000.00 47,374,500.00 9,566,500.00 139,152,976.00 196,093,976.00 211,722,976.00 45,484,524.00 82.3%
a. Belanja Perjalanan Dinas Biasa 137,297,500.00 - 6,719,500.00 - - 9,011,500.00 116,264,377.00 125,275,877.00 131,995,377.00 5,302,123.00 96.1%
- Belanja Perjalanan Dinas Luar 117,698,000.00 - 6,719,500.00 - 9,011,500.00 101,035,548.00 110,047,048.00 116,766,548.00 931,452.00 99.2%
- Belanja Perjalanan Dinas luar daerah akreditasi 19,599,500.00 - - - 15,228,829.00 15,228,829.00 15,228,829.00 4,370,671.00 77.7%
b. Belanja Transportasi dan Akomodasi 119,910,000.00 - 5,564,500.00 3,345,000.00 47,374,500.00 555,000.00 22,888,599.00 70,818,099.00 79,727,599.00 40,182,401.00 66.5%
- Belanja Transportasi dan akomodasi petugas kalibrasi 48,110,000.00 - - - 45,210,000.00 555,000.00 45,765,000.00 45,765,000.00 2,345,000.00 95.1%
- Belanja transportasi dan akomodasi surveyor kegiatan akreditasi
Rumah Sakit 3,500,000.00 - 3,400,000.00 - - 3,400,000.00 100,000.00 97.1%
- Belanja transportasi dan akomodasi pengambil sample ( air bersih,
air limbah, dll ) 19,150,000.00 - 2,164,500.00 1,665,000.00 2,164,500.00 1,332,000.00 3,496,500.00 7,326,000.00 11,824,000.00 38.3%
- Belanja transportasi dan akomodasi petugas perijinan sarana dan
prasarana RS 19,150,000.00 - - - - - 19,150,000.00 0.0%
- Belanja transportasi dan akomodasi narasumber kegiatan pelatihan
internal 30,000,000.00 - - 1,680,000.00 21,556,599.00 21,556,599.00 23,236,599.00 6,763,401.00 77.5%
1.02.04.01.0003 Belanja Perjalanan Dinas Dalam Kota 29,075,000.00 - 1,450,000.00 - - 2,040,000.00 7,380,000.00 9,420,000.00 10,870,000.00 18,205,000.00 37.4%
- Belanja perjalanan dinas dalam kota kegiatan Akreditasi Rumah
Sakit 4,275,000.00 - - - - - 4,275,000.00 0.0%
- Belanja perjalanan dinas dalam kota kegiatan administrasi
perkantoran 24,800,000.00 - 1,450,000.00 - 2,040,000.00 7,380,000.00 9,420,000.00 10,870,000.00 13,930,000.00 43.8%
- Belanja perjalanan dinas dalam kota kegiatan Pelayanan Home Care
Geriantri - - - - - -
-
1.02.04.01.0005 Belanja Perjalanan Dinas Paket Meeting Luar Kota 448,267,750.00 - 10,693,983.00 4,219,305.00 25,100,500.00 - 117,102,143.00 142,202,643.00 157,115,931.00 291,151,819.00 34.2%
- Belanja perjalanan dinas kegiatan Pendidikan dan Pelatihan
Eksternal 240,200,000.00 - 10,693,983.00 4,219,305.00 25,100,500.00 106,442,143.00 131,542,643.00 146,455,931.00 93,744,069.00 61.0%
- Belanja perjalanan dinas kegiatan Pendidikan dan Pelatihan Internal 25,000,000.00 - - - 10,660,000.00 10,660,000.00 10,660,000.00 14,340,000.00 42.6%
Page 15
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja perjalanan dinas luar daerah kegiatan bimtek Akreditasi
Rumah Sakit 55,167,750.00 - - - - - 55,167,750.00 0.0%
- Belanja Perjalanan Dinas luar daerah Studi Banding 63,950,000.00 - - - - - 63,950,000.00 0.0%
- Belanja perjalanan dinas luar daerah kegiatan value gathering 63,950,000.00 - - - - - 63,950,000.00 0.0%
5.2 BELANJA MODAL 19,059,541,376.00 460,664,000.00 193,644,445.00 2,686,915,563.00 3,720,858,315.00 1,312,654,700.00 8,005,373,309.00 13,038,886,324.00 16,380,110,332.00 2,679,431,044.00 85.9%
( SILPA BLUD )
5.2.02 Belanja Modal Peralatan dan Mesin 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99.99 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99.99.9999 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
2.02.03 Belanja Modal Alat Bengkel dan Alat Ukur 12,385,752.00 - 7,144,737.00 - - - - - 7,144,737.00 5,241,015.00 57.7%
2.02.03.01 Belanja Modal Alat Bengkel Bermesin 12,385,752.00 - 7,144,737.00 - - - - - 7,144,737.00 5,241,015.00 57.7%
Belanja Modal Perkakas Konstruksi Logam yang Transportable
2.02.03.01.0002 (Berpindah) 10,272,978.00 - 5,295,477.00 - - - - - 5,295,477.00 4,977,501.00 51.5%
Mesin Potong ( Kayu, Besi dan Aluminium ) 4,198,221.00 - 3,698,520.00 - - 3,698,520.00 499,701.00 88.1%
Mesin Bor Listrik (Rotary Hammer) 1,810,309.00 - 1,596,957.00 - - 1,596,957.00 213,352.00 88.2%
Tang Potong Kabel Hidrolik 4,264,448.00 - - - - - 4,264,448.00 0.0%
2.02.03.01.0006 Belanja Modal Perkakas Bengkel Kayu 2,112,774.00 - 1,849,260.00 - - - - - 1,849,260.00 263,514.00 87.5%
Mesin Gergaji Circular 2,112,774.00 - 1,849,260.00 - - 1,849,260.00 263,514.00 87.5%
2.02.05 Belanja Modal Alat Kantor dan Rumah Tangga 467,794,497.00 - 186,499,708.00 55,326,063.00 126,917,085.00 - 55,686,480.00 182,603,565.00 424,429,336.00 43,365,161.00 90.7%
2.02.05.01 Belanja Modal Alat Kantor 129,298,935.00 - 58,344,784.00 - 11,322,000.00 - 49,148,580.00 60,470,580.00 118,815,364.00 10,483,571.00 91.9%
2.02.05.01.0003 Belanja Modal Alat Reproduksi (Penggandaan) 25,626,348.00 - - - - - 25,019,400.00 25,019,400.00 25,019,400.00 606,948.00 97.6%
Mesin Foto Copy 25,626,348.00 - - - 25,019,400.00 25,019,400.00 25,019,400.00 606,948.00 97.6%
2.02.05.01.0004 Belanja Modal Alat Penyimpan Perlengkapan Kantor 41,808,879.00 - 41,483,884.00 - - - - - 41,483,884.00 324,995.00 99.2%
Almari arsip 2 Pintu Sliding ( kaca ) 41,808,879.00 - 41,483,884.00 - - 41,483,884.00 324,995.00 99.2%
Lemari Dialyser - - - - - -
2.02.05.01.0005 Belanja Modal Alat Kantor Lainnya 61,863,708.00 - 16,860,900.00 - 11,322,000.00 - 24,129,180.00 35,451,180.00 52,312,080.00 9,551,628.00 84.6%
Alat kantor lainnya 1,185,569.00 - - - - - 1,185,569.00 0.0%
Penghancur Kertas 6,638,188.00 - 5,547,780.00 - - 5,547,780.00 1,090,408.00 83.6%
LCD Proyektor 27,442,530.00 - 8,049,720.00 - 16,008,420.00 16,008,420.00 24,058,140.00 3,384,390.00 87.7%
Bed Elevator - - - - - - -
Layar Projector 3,797,421.00 - 3,263,400.00 - - 3,263,400.00 534,021.00 85.9%
Fingerspot Access Door 22,800,000.00 - - - 11,322,000.00 8,120,760.00 19,442,760.00 19,442,760.00 3,357,240.00 85.3%
2.02.05.02 Belanja Modal Alat Rumah Tangga 338,495,562.00 - 128,154,924.00 55,326,063.00 115,595,085.00 - 6,537,900.00 122,132,985.00 305,613,972.00 32,881,590.00 90.3%
2.02.05.02.0001 Belanja Modal Mebel 66,675,924.00 - 66,225,924.00 - - - - - 66,225,924.00 450,000.00 99.3%
Meja Kantor 1/2 Biro Uk. 120 x 75 x 75 cm 18,437,544.00 - 18,347,544.00 - - 18,347,544.00 90,000.00 99.5%
Kursi Tunggu 4 Seat/Bangku 48,238,380.00 - 47,878,380.00 - - 47,878,380.00 360,000.00 99.3%
2.02.05.02.0003 Belanja Modal Alat Pembersih 69,300,646.00 - 13,597,500.00 - 45,100,000.00 - - 45,100,000.00 58,697,500.00 10,603,146.00 84.7%
Container Sampah Pemecah 6m3 54,198,192.00 - - - 45,100,000.00 45,100,000.00 45,100,000.00 9,098,192.00 83.2%
Mesin Cuci 16 Kg 11,500,000.00 - 10,660,440.00 - - 10,660,440.00 839,560.00 92.7%
Vacuum Cleaner 3,602,454.00 - 2,937,060.00 - - 2,937,060.00 665,394.00 81.5%
2.02.05.02.0004 Belanja Modal Alat Pendingin 87,970,794.00 - - 18,844,359.00 65,389,085.00 - - 65,389,085.00 84,233,444.00 3,737,350.00 95.8%
AC Mobile 1,700,000.00 - - - - - 1,700,000.00 0.0%
AC 1 PK 30,272,725.00 - - - 30,272,725.00 30,272,725.00 30,272,725.00 - 100.0%
AC 2 PK 35,116,360.00 - - - 35,116,360.00 35,116,360.00 35,116,360.00 - 100.0%
Frezzer 12,382,050.00 - - 12,376,500.00 - 12,376,500.00 5,550.00 100.0%
Page 16
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Lemari Es 180 liter, 1 pintu 8,499,659.00 - - 6,467,859.00 - 6,467,859.00 2,031,800.00 76.1%
-
2.02.05.02.0005 Belanja Modal Alat Dapur 18,426,000.00 - - 11,766,000.00 - - 6,537,900.00 6,537,900.00 18,303,900.00 122,100.00 99.3%
Kompor Gas 1 tungku 3,885,000.00 - - 3,885,000.00 - 3,885,000.00 - 100.0%
Blender 2,220,000.00 - - 2,220,000.00 - 2,220,000.00 - 100.0%
Food Processor 1,221,000.00 - - 1,221,000.00 - 1,221,000.00 - 100.0%
Rak Piring Alumunium 4,440,000.00 - - 4,440,000.00 - 4,440,000.00 - 100.0%
Water Jug thermos 1,498,500.00 - - - 1,498,500.00 1,498,500.00 1,498,500.00 - 100.0%
Coffee warmer 2 tungku 1,332,000.00 - - - 1,332,000.00 1,332,000.00 1,332,000.00 - 100.0%
Electrik & gass rool top chafing dish ( 2 fungsi ) 1,498,500.00 - - - 1,487,400.00 1,487,400.00 1,487,400.00 11,100.00 99.3%
Pemanas soup elektrik 10 lt 1,498,500.00 - - - 1,443,000.00 1,443,000.00 1,443,000.00 55,500.00 96.3%
Coffee decanter ( teko ) 333,000.00 - - - 305,250.00 305,250.00 305,250.00 27,750.00 91.7%
Panci sayur ( stainless steel ) 499,500.00 - - - 471,750.00 471,750.00 471,750.00 27,750.00 94.4%
2.02.05.02.0006 Belanja Modal Alat Rumah Tangga Lainnya ( Home Use ) 96,122,198.00 - 48,331,500.00 24,715,704.00 5,106,000.00 - - 5,106,000.00 78,153,204.00 17,968,994.00 81.3%
Televisi 32 inch, Full HD, Tuner Digital 21,596,988.00 - 21,192,000.00 - - 21,192,000.00 404,988.00 98.1%
Tangga lipat 1,275,945.00 - - 1,214,784.00 - 1,214,784.00 61,161.00 95.2%
Lemari linen bahan stainlesstel, berpintu 27,245,454.00 - 27,139,500.00 - - 27,139,500.00 105,954.00 99.6%
Tandon Air 3,785,489.00 - - 3,409,920.00 - 3,409,920.00 375,569.00 90.1%
Loudspeaker 8,856,302.00 - - 8,658,000.00 - 8,658,000.00 198,302.00 97.8%
Brachet TV 5,292,000.00 - - - 5,106,000.00 5,106,000.00 5,106,000.00 186,000.00 96.5%
Sound system pengeras suara 4,440,000.00 - - 4,440,000.00 - 4,440,000.00 - 100.0%
Mic wireless 7,000,000.00 - - 6,993,000.00 - 6,993,000.00 7,000.00 99.9%
Sound Audio Ruang Rapat 16,630,020.00 - - - - - 16,630,020.00 0.0%
2.02.07 Belanja Modal Alat Kedokteran dan Kesehatan 1,571,568,883.00 - - 24,908,400.00 - 31,450,000.00 1,072,757,711.00 1,104,207,711.00 1,129,116,111.00 442,452,772.00 71.8%
- 2.02.07.01.0001 Belanja Modal Alat Kedokteran Umum 1,571,568,883.00 - - 24,908,400.00 - 31,450,000.00 1,072,757,711.00 1,104,207,711.00 1,129,116,111.00 442,452,772.00 71.8%
Antropometri Set 27,588,666.00 - - - 23,650,000.00 23,650,000.00 23,650,000.00 3,938,666.00 85.7%
Gunting conjungtiva 2,353,200.00 - - - 2,353,200.00 2,353,200.00 2,353,200.00 - 100.0%
Lewis lens Loop 1,842,600.00 - - - 1,842,600.00 1,842,600.00 1,842,600.00 - 100.0%
Lens Loop 5,394,600.00 - - - 5,394,600.00 5,394,600.00 5,394,600.00 - 100.0%
Beer cillia 2,375,400.00 - - - 2,375,400.00 2,375,400.00 2,375,400.00 - 100.0%
Tenotomy 35,342,400.00 - - - 35,342,400.00 35,342,400.00 35,342,400.00 - 100.0%
Tensimeter digital 16,222,500.00 - - - - - 16,222,500.00 0.0%
Stetoscope 40,655,480.00 - - - 38,610,000.00 38,610,000.00 38,610,000.00 2,045,480.00 95.0%
Head Lamp 2,400,000.00 - - - - - 2,400,000.00 0.0%
Otoscope mini 23,136,200.00 - - - 6,700,000.00 6,700,000.00 6,700,000.00 16,436,200.00 29.0%
Inner sheat 24 48,791,720.00 - - - 43,861,513.00 43,861,513.00 43,861,513.00 4,930,207.00 89.9%
Blender Obat 5,336,000.00 - - - 5,000,000.00 5,000,000.00 5,000,000.00 336,000.00 93.7%
Set Rawat luka 82,320,000.00 - - - 55,832,000.00 55,832,000.00 55,832,000.00 26,488,000.00 67.8%
TLD 50,204,301.00 - - 24,908,400.00 23,882,760.00 23,882,760.00 48,791,160.00 1,413,141.00 97.2%
Termogun ( Termometer Gun) 43,956,000.00 - - - 11,520,000.00 11,520,000.00 11,520,000.00 32,436,000.00 26.2%
Timbangan bayi 2,414,000.00 - - - 2,400,000.00 2,400,000.00 2,400,000.00 14,000.00 99.4%
Lampu tindakan 27,972,000.00 - - - 23,200,000.00 23,200,000.00 23,200,000.00 4,772,000.00 82.9%
Pengukur tinggi badan 2,444,333.00 - - - 1,700,000.00 1,700,000.00 1,700,000.00 744,333.00 69.5%
Medicine Cabinet 19,766,478.00 - - - 18,950,000.00 18,950,000.00 18,950,000.00 816,478.00 95.9%
Overbed Table 14,954,810.00 - - - 13,471,500.00 13,471,500.00 13,471,500.00 1,483,310.00 90.1%
Dressing trolley 143,278,245.00 - - - 143,228,220.00 143,228,220.00 143,228,220.00 50,025.00 100.0%
Standar Infus 98,041,856.00 - - - 90,200,000.00 90,200,000.00 90,200,000.00 7,841,856.00 92.0%
Examination Table - - - - - - -
Bed periksa (2 section) 20,879,100.00 - - - 12,500,000.00 12,500,000.00 12,500,000.00 8,379,100.00 59.9%
Timbangan berat badan dan tinggi badan 14,943,000.00 - - - 14,865,000.00 14,865,000.00 14,865,000.00 78,000.00 99.5%
Vidio Laringoscope 70,000,000.00 - - - 67,359,250.00 67,359,250.00 67,359,250.00 2,640,750.00 96.2%
Loop AV Shunt 55,600,000.00 - - - 55,600,000.00 55,600,000.00 55,600,000.00 - c
Suction Pump 40,142,040.00 - - - - - 40,142,040.00 0.0%
Kursi Roda 29,526,000.00 - - - 26,640,000.00 26,640,000.00 26,640,000.00 2,886,000.00 90.2%
Brankar/Bed Transfer/emergency bed - - - - - - -
Page 17
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Emergency Set 72,000,000.00 - - - 65,300,000.00 65,300,000.00 65,300,000.00 6,700,000.00 90.7%
Sutter Bipolar 36,773,000.00 - - - 34,830,268.00 34,830,268.00 34,830,268.00 1,942,732.00 94.7%
Basic ortodontic set 51,415,200.00 - - - - - 51,415,200.00 0.0%
Dressing trolley - - - - - - -
Biopsi tang 20,533,100.00 - - - - - 20,533,100.00 0.0%
Tampon tang 7,565,000.00 - - - - - 7,565,000.00 0.0%
Minor basic set 92,982,800.00 - - - 42,725,000.00 42,725,000.00 42,725,000.00 50,257,800.00 45.9%
Spekulum vagina kecil 1,160,050.00 - - - - - 1,160,050.00 0.0%
Spekulum vagina besar 1,160,050.00 - - - - - 1,160,050.00 0.0%
Ligasure Impact curved 23,940,000.00 - - - - - 23,940,000.00 0.0%
Mortar 16cm 635,000.00 - - - - - 635,000.00 0.0%
Latex Mattress-KK-001 83,874,000.00 - - - 83,874,000.00 83,874,000.00 83,874,000.00 - 100.0%
Emergency bed 97,086,150.00 - - - 94,000,000.00 94,000,000.00 94,000,000.00 3,086,150.00 96.8%
Humidifier 4,257,900.00 - - - - - 4,257,900.00 0.0%
Meja Mayo 8,602,500.00 - - - 8,350,000.00 8,350,000.00 8,350,000.00 252,500.00 97.1%
Forcep stone 37,565,110.00 - - - - - 37,565,110.00 0.0%
Tabung O2 6 m3 1,665,000.00 - - - - - 1,665,000.00 0.0%
Dilator 6,013,890.00 - - - - - 6,013,890.00 0.0%
NIV full face Masks 5,726,140.00 - - - - - 5,726,140.00 0.0%
Resucitators Adult 4,600,000.00 - - - 4,600,000.00 4,600,000.00 4,600,000.00 - 100.0%
Heacting set 85,000,000.00 - - - 44,050,000.00 44,050,000.00 44,050,000.00 40,950,000.00 51.8%
Alkes Lainnya 1,133,064.00 - - - - - 1,133,064.00 0.0%
2.02.10 Belanja Modal Komputer 891,372,821.00 460,664,000.00 - 28,500,000.00 2,758,350.00 - 381,696,510.00 384,454,860.00 873,618,860.00 17,753,961.00 98.0%
2.02.10.01.0002 Belanja Modal personal Komputer 777,021,621.00 398,950,000.00 - 28,500,000.00 - - 344,145,510.00 344,145,510.00 771,595,510.00 5,426,111.00 99.3%
PC unit 257,497,800.00 128,500,000.00 - - 128,704,500.00 128,704,500.00 257,204,500.00 293,300.00 99.9%
Server 214,778,000.00 212,000,000.00 - - - 212,000,000.00 2,778,000.00 98.7%
Notebook Intel Core i5 153,735,000.00 30,700,000.00 - 28,500,000.00 92,241,000.00 92,241,000.00 151,441,000.00 2,294,000.00 98.5%
Ncomputing L300 27,750,000.00 27,750,000.00 - - - 27,750,000.00 - 100.0%
Laptop (Up To 12Th Gen Intel® Core™ I7 · Up To Windows ) 43,720,721.00 - - - 43,711,800.00 43,711,800.00 43,711,800.00 8,921.00 100.0%
Mikrotik Routerboard CR317-1G-16S+RM 10,147,500.00 - - - 10,146,510.00 10,146,510.00 10,146,510.00 990.00 100.0%
UPS C 3000VA LCD 230V 47,392,600.00 - - - 47,385,900.00 47,385,900.00 47,385,900.00 6,700.00 100.0%
Memory 16 GB 2933 MHz SNPTFYHPC 22,000,000.00 - - - 21,955,800.00 21,955,800.00 21,955,800.00 44,200.00 99.8%
2.02.10.02.0003 Belanja Modal Peralatan Personal Computer 114,351,200.00 61,714,000.00 - - 2,758,350.00 - 37,551,000.00 40,309,350.00 102,023,350.00 12,327,850.00 89.2%
Printer , Ecotank 21,116,640.00 18,800,000.00 - - - 18,800,000.00 2,316,640.00 89.0%
Printer Scanner 69,042,000.00 35,514,000.00 - - 23,676,000.00 23,676,000.00 59,190,000.00 9,852,000.00 85.7%
Monitor 19 inci 7,432,560.00 7,400,000.00 - - - 7,400,000.00 32,560.00 99.6%
Printer Argox 2140 2,760,000.00 - - - 2,758,350.00 2,758,350.00 2,758,350.00 1,650.00 99.9%
Scanner Smart office 14,000,000.00 - - - 13,875,000.00 13,875,000.00 13,875,000.00 125,000.00 99.1%
5.2.03 Belanja Modal Gedung dan Bangunan 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99.99 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99.99.9999 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03 Belanja Modal Gedung dan Bangunan 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01 Belanja Modal Bangunan Gedung 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01.01 Belanja Modal Bangunan Gedung Tempat Kerja 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01.01.0006 Belanja Modal Bangunan Kesehatan 10,516,934,397.00 - - 2,578,181,100.00 2,276,610,000.00 1,221,236,950.00 3,199,789,063.00 6,697,636,013.00 9,275,817,113.00 1,241,117,284.00 88.2%
1 m2 Pembangunan Rawat Inap (2lt) 7,397,368,970.00 - - 1,951,380,000.00 2,276,610,000.00 2,276,610,000.00 4,553,220,000.00 6,504,600,000.00 892,768,970.00 87.9%
1 m2 Rehab. Sedang Rawat Jalan (2 lt ) 2,513,847,547.00 - - 626,801,100.00 731,267,950.00 843,043,063.00 1,574,311,013.00 2,201,112,113.00 312,735,434.00 87.6%
1 m2 Rehab. Sedang Ruang Gawat Darurat (2lt) 360,794,256.00 - - - 360,090,000.00 360,090,000.00 360,090,000.00 704,256.00 99.8%
1 m2 Rehab. Ringan Ruang Gawat Darurat (2lt)- Akses jalan IGD 130,018,750.00 - - - 129,879,000.00 129,879,000.00 129,879,000.00 139,750.00 99.9%
1 m2 rehab ringan gedung sederhana (gas medik) 114,904,874.00 - - - 80,136,000.00 80,136,000.00 80,136,000.00 34,768,874.00 69.7%
2.03.01.01.0033 Belanja Modal Bangunan Fasilitas Umum 3,680,710,193.00 - - - 883,368,000.00 - 2,355,648,000.00 3,239,016,000.00 3,239,016,000.00 441,694,193.00 88.0%
1 m2 Pembangunan Parkir Beratap 3,680,710,193.00 - - - 883,368,000.00 2,355,648,000.00 3,239,016,000.00 3,239,016,000.00 441,694,193.00 88.0%
2.03.01.01.0036 Belanja Modal Taman 1,796,687,043.00 - - - 431,204,880.00 - 878,795,545.00 1,310,000,425.00 1,310,000,425.00 486,686,618.00 72.9%
Pekerjaan Lanscape Taman - - - - - - -
Page 18
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pembuatan Taman Depan RS 1,796,687,043.00 - - - 431,204,880.00 878,795,545.00 1,310,000,425.00 1,310,000,425.00 486,686,618.00 72.9%
5.2.05 Belanja Modal Aset Tetap Lainnya 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99.99 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99.99.9999 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08 Belanja Modal Aset Tidak Berwujud 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08.01 Belanja Modal Aset Tidak Berwujud 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08.01.0005 Belanja Modal Software 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
Pembuatan/Pengembangan Aplikasi/Software 61,043,895.00 - - - 59,967,750.00 59,967,750.00 59,967,750.00 1,076,145.00 98.2%
Pembuatan/Pengembangan Aplikasi/Software (persediaan dan
indikator mutu) 61,043,895.00 - - - 61,000,000.00 61,000,000.00 61,000,000.00 43,895.00 99.9%
1.02.02.2.01.05.5.1.02 Belanja Barang dan Jasa 7,875,114.00 - - - - - 7,650,000.00 7,650,000.00 7,650,000.00 225,114.00 97.1%
1.02.02.2.01.05.5.1.02.01 Belanja Barang 114.00 - - - - - - - - 114.00 0.0%
1.02.02.2.01.05.5.1.02.01.01 Belanja Barang Pakai Habis 114.00 - - - - - - - - 114.00 0.0%
Belanja Alat/Bahan untuk Kegiatan Kantor - Bahan Cetak
1.02.02.2.01.05.5.1.02.01.01.0026 (DTU-DAU) (Mandatory) 114.00 - - - - - - - - 114.00 0.0%
Pembulatan 114.00 - - - - - 114.00 0.0%
Page 19
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Beban Jasa Konsultasi Pengawasan konstruksi - - - - - -
1.02.02.2.01.05.5.2 BELANJA MODAL 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3 Belanja Modal Gedung dan Bangunan 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01 Belanja Modal Bangunan Gedung 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01.01 Belanja Modal Bangunan Gedung Tempat Kerja 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01.01.0006 Belanja Modal Bangunan Kesehatan (DTU-DAU) (Mandatory) 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1 m2 Pembangunan ICU/ICCU/UGD/CMU (Tak Bertingkat) 5,151,174,886.00 - - 1,236,281,973.00 1,442,328,968.00 1,442,328,968.00 2,884,657,936.00 4,120,939,909.00 1,030,234,977.00 80.0%
Beban Jasa Konsultasi Pengawasan konstruksi 149,850,000.00 - - - 91,480,650.00 91,480,650.00 91,480,650.00 58,369,350.00 61.0%
Beban Jasa Konsultasi Perencanaan Konstruksi 177,600,000.00 - - 99,780,000.00 - 99,780,000.00 77,820,000.00 56.2%
- DBHCHT 7,274,050,560.00 - 4,568,000,000.00 426,081,000.00 260,000,000.00 1,626,881,300.00 297,850,000.00 2,184,731,300.00 7,178,812,300.00 95,238,260.00 98.7%
Bed ICU 127,843,150.00 - - 123,062,000.00 - 123,062,000.00 4,781,150.00 96.3%
Bed Periksa 14,481,000.00 - - 14,388,500.00 - 14,388,500.00 92,500.00 99.4%
Bed Transportasi 147,498,750.00 - - 133,630,500.00 - 133,630,500.00 13,868,250.00 90.6%
Blood Wamer 171,693,668.00 - - 155,000,000.00 - 155,000,000.00 16,693,668.00 90.3%
Cold Module And Embedding Module 260,530,000.00 - - - 260,000,000.00 260,000,000.00 260,000,000.00 530,000.00 99.8%
Dental X Ray 311,534,500.00 - - - 297,850,000.00 297,850,000.00 297,850,000.00 13,684,500.00 95.6%
Endoscopy 3,522,200,000.00 - 3,516,000,000.00 - - 3,516,000,000.00 6,200,000.00 99.8%
PACS Radiologi System 1,626,881,331.00 - - - 1,626,881,300.00 1,626,881,300.00 1,626,881,300.00 31.00 100.0%
USG 1,052,409,911.00 - 1,052,000,000.00 - - 1,052,000,000.00 409,911.00 100.0%
- Pembulatan PACS -
Pembulatan 38,978,250.00 - - - - - 38,978,250.00 0.0%
JUMLAH 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
SP2D APBD 38,177,593,957.00 4,023,624,593.00 11,669,931,613.00 7,207,902,391.00 1,810,656,886.00 7,305,254,084.00 3,587,524,672.00 12,703,435,642.00 35,604,894,239.00 2,572,699,718.00 93.3%
SP2D BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
JUMLAH 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
APBD APBD 38,177,593,957.00 4,023,624,593.00 11,669,931,613.00 7,207,902,391.00 1,810,656,886.00 7,305,254,084.00 3,587,524,672.00 12,703,435,642.00 35,604,894,239.00 2,572,699,718.00 93.3%
5.1 BELANJA OPERASI 20,290,740,211.00 4,023,624,593.00 7,101,931,613.00 4,296,759,418.00 1,438,696,886.00 1,439,987,567.00 1,490,853,774.00 4,369,538,227.00 19,791,853,851.00 498,886,360.00 97.5%
5.1.01 BELANJA PEGAWAI 20,282,865,097.00 4,023,624,593.00 7,101,931,613.00 4,296,759,418.00 1,438,696,886.00 1,439,987,567.00 1,483,203,774.00 4,361,888,227.00 19,784,203,851.00 498,661,246.00 97.5%
5.1.02 BELANJA BARANG DAN JASA 7,875,114.00 - - - - - 7,650,000.00 7,650,000.00 7,650,000.00 225,114.00 97.1%
5.2 BELANJA MODAL 17,886,853,746.00 - 4,568,000,000.00 2,911,142,973.00 371,960,000.00 5,865,266,517.00 2,096,670,898.00 8,333,897,415.00 15,813,040,388.00 2,073,813,358.00 88.4%
5.2.01 BELANJA TANAH
5.2.02 BELANJA PERALATAN DAN MESIN 12,408,228,860.00 - 4,568,000,000.00 1,575,081,000.00 371,960,000.00 4,422,937,549.00 562,861,280.00 5,357,758,829.00 11,500,839,829.00 907,389,031.00 92.7%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN
Page 20
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
5.2.05 BELANJA ASET TETAP LAINNYA
BLUD BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
5.1 BELANJA OPERASI 103,858,772,448.00 10,784,501,202.00 26,411,067,420.00 21,341,282,591.00 7,033,673,725.00 7,773,534,772.00 16,698,042,609.00 31,505,251,106.00 90,042,102,319.00 13,816,670,129.00 86.7%
5.1.01 BELANJA PEGAWAI 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.02 BELANJA BARANG DAN JASA 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.2 BELANJA MODAL 19,059,541,376.00 460,664,000.00 193,644,445.00 2,686,915,563.00 3,720,858,315.00 1,312,654,700.00 8,005,373,309.00 13,038,886,324.00 16,380,110,332.00 2,679,431,044.00 85.9%
5.2.01 BELANJA TANAH
5.2.02 BELANJA PERALATAN DAN MESIN 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN
5.2.05 BELANJA ASET TETAP LAINNYA 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
TOTAL TOTAL 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
5.1 BELANJA OPERASI 124,149,512,659.00 14,808,125,795.00 33,512,999,033.00 25,638,042,009.00 8,472,370,611.00 9,213,522,339.00 18,188,896,383.00 35,874,789,333.00 109,833,956,170.00 14,315,556,489.00 88.5%
5.1.01 BELANJA PEGAWAI 52,276,100,631.00 9,884,416,914.00 16,638,097,498.00 11,362,296,051.00 3,609,348,793.00 4,056,433,627.00 4,005,703,169.00 11,671,485,589.00 49,556,296,052.00 2,719,804,579.00 94.8%
5.1.02 BELANJA BARANG DAN JASA 71,873,412,028.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,183,193,214.00 24,203,303,744.00 60,277,660,118.00 11,595,751,910.00 83.9%
5.2 BELANJA MODAL 36,946,395,122.00 460,664,000.00 4,761,644,445.00 5,598,058,536.00 4,092,818,315.00 7,177,921,217.00 10,102,044,207.00 21,372,783,739.00 32,193,150,720.00 4,753,244,402.00 87.1%
5.2.01 BELANJA TANAH - - - - - - - - - -
5.2.02 BELANJA PERALATAN DAN MESIN 15,351,350,813.00 460,664,000.00 4,761,644,445.00 1,683,815,463.00 501,635,435.00 4,454,387,549.00 2,073,001,981.00 7,029,024,965.00 13,935,148,873.00 1,416,201,940.00 90.8%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 21,472,956,519.00 - - 3,914,243,073.00 3,591,182,880.00 2,663,565,918.00 7,968,042,226.00 14,222,791,024.00 18,137,034,097.00 3,335,922,422.00 84.5%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN - - - - - - - - - -
5.2.05 BELANJA ASET TETAP LAINNYA 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00
12,565,188,926.00 16,391,443,556.00 28,668,757,570.00
38,274,643,478.00 - - (377,816,980.00)
up 163,016,980.00
up apbd 210,000,000.00
pengembalian (4,800,000.00)
4,800,000.00
-
Drg.FARID AMIRUDIN, M.Kes SITI WURYANI, SE SRI MARYANI,SE YULI ENDAH YUSTIANA
NIP. 196806282002121002 NIP. 1976303222011012006 NIP. 198406072010012033 NIP. 198407262002122002
Page 21
hasil rapat staf bersama bapak PJ Bupati madiun
1 Laporan bapak pj akan dievaluasi tiap 3 bulan
2 akan aka rekrutmen pppk dari ijasah sd-s1
3 Rsud caruban kedepan akan menjadi pelayanan yg bagaimana ,
pendapatan rs bisa digunakan untuk pemda akan tetapi harus melihat likuiditas rs dipertimbangkan
Bagian Tata Usaha
ada beberapa yang belum diselesaiakn
1 taman depan rs ada yang belum diselesaiakan 100%, dan akan disanggupi untuk diselesaikan dengan den
2 Kegiatan bagian tata usaha adalah menunjang kegiatan pelayanan , untuk pergeseran ini perlu dikomuni
3 Untuk SK pejabat, tim teknis per bidang membuat sendiri sendiri per bidang , maka sk yang ada dibagian
Direktur
Semua kegiatan saling berhubungan satu dengan yang lain, jadi perlu peningkatan koordinasi.
Bidang Penunjang
Tahun 2023 yang menjadi masalah pokok yakni
1 Antrian pendaftaran, masih perlu perbaikan di tahun 2024
E-Rekam medis sampai saat ini belum lengkap/ error terutama laporan operasi dan resume medis, sehin
Bagian pokok yang terjadi di IT yakni SDM IT tidak ada yang memiliki keahlian IT , dengan adanya surat e
Untuk mengadaan tenaga IT bila untuk mengdigitalisasi pelayanan akan menyerap dana yang cuku besar
PACS ini setelah dievaluasi belum terkoneksi dengan SIMRS rumah sakit, harusnya ini menjadi salah satu
SDM IT perlu dicukupi , IT menjadi prioritas dan perlu pengganggaran yang cukup besar
2 Kenyamanan adalah AC , yang selama ini AC ada banyak keluhan yang tdk dingin, Perlu dievaluasi tata ca
Prilaku/ disiplin pegawai. Di linen ada sistem di pihak ke3 atau tetap menggunakan BLUD, perlu ada radio
3 Bidang penunjang Medis
Penghematan dari semua lini , penghematan di pemakaian obat, BAHP di laboratorium. Dengan mengev
Peningjatan disarana laboratorium dengan jarak yang berjauhan
Radiologi untuk menggabungkan PACS perlu SDM yang bisa mengatasi hal ini
Antrol ini masih menjadi tren kendala , perlu komunikasi dengan pihak BPJS terkait dengan IT
Di laboratorium ada beberapa dokter ini memeriksakan melebihi klaim pembayaran BPJS
Perlu evaluasi penggunaan pemeriksaan laboratorium, apakah pemeriksaan itu diperlukan atau tidak
4 Bidang penunjang non medis
Radio pemancar ini bisa diguanakan diberbagasi sarpras /inventaris lainnya
Ac banyak keluhan , data AC perlu disiapkan untuk melihat kelayakkan AC
Programmer IT ini harus digitalisasi Rumah Sakit, kekurangan SDM di IT seorang Programmer yang ada se
Ditahun 2024 akan diusulkan seorang Programer IT
PACS ini merupakan tanggungjawab dari vendor penyedia sampai bisa mengkonekting/brijing dengan SIM
Bila dari dalam belum bisa mencukupi programer maka perlu bekerjasama dengan pihak ke3
AC perlu dieva;uasi bila sering rusak rusak perlu di evaluasi apakah AC nya atau pemeriharaan nya yang b
Evaluasi pembinaan pegawai ini dibina oleh atasan langsung, bila sudah maksimal maka akan di tangani
Merujuk dengan dokter yang sama ,ini yang merujuk yang salah.
mikro belum bisa dilaksanakan untuk tahun ini perlu dipersiapkan saprasnya.
Bidang Pelayanan :
1 Belanja DBHCHT dan Dak mencapai 100%
Jumlah SDM keperawatan ini kurang, dengan adanya pembangunan gedung baru dan pelaksanaan perlu
Efisiensi ini perlu dilakukan secara komitmen dan bersama
Evaluasi pemakaian antibiotik, obat, BAHV dan lainnya dengan akan mengaktifkan tim untuk kendali mu
ditahun 2024 untuk mengatasi kekurangan SDM perawat dengan menjadikan satu Asoka, bougenvile, fla
Kru di pinang dan bougenvile ini jadi satu dengan menjadi kelas 1
Paviliun anggrek sendiri
ruang perawat bisa dibangunkan seperti di cemara
Pelayanan Broncoscopy segera di aktifkan , sedangkan untuk pelatihan endoscopy berserta perawatnya
dr Santi perlu di support untuk kegiatan endoscopy
Persiapan onkologi perlu dipersiapka SDM dan saprasnya
Dipelayanan ini banyak kegiatan ini yang tidak bisa jalan sebab banyak kegiatan
Usulan untuk bendahara bantu sebaiknya tidak dari bidang pelayanan, bila di RS lain Kefarmasian ini mas
2 Kedisiplinan dokter dalam jadwal sesuai dengan Hfis, bila pensyaratkan hadir maka perlu disiapkan saran
3 Usulan untuk bendahara bantu sebaiknya tidak dari bidang pelayanan, bila di RS lain Kefarmasian ini mas
4 kehadiran dikaitkan dengan remun , maka remunya akan diberikan selama 3 hari saja , contoh absensi
Absensi ini perlu dievaluasi
Pelatihan dari usulan dokter dokter seperti yang dulu yakni di subsidi sebesar 1,5 juta per orang, atau pe
Banyak keluhan dari pasien terkait dengan merujuk ke RS lain yang ditangani oleh dokter yang sama, apa
Hasil oprasi di Swasta dan di pemerintahan ada selisih
perlu punishment dilaksanakan secara tertip, kadang dokter yang aktif masuk tapi remunnya tidak sama
untuk obat dan farmasi itu akan dikembalikan ke penunjang
masalah yang disampaikan dari bidang pelayanan, untuk dokter dokter ini jangan dilepaskan sendiri , ini
dengan adanya jadwal jadwal dokter yang dibentuk oleh dokter dokter sendiri.dibeberapa poli mohon di
teror terhadap dokter yang berniat baik , untuk peningkatan RS. Mohon dicari siapa pelakunya teror ini
Moorning report medis ini perlu ada diikuti oleh manajemen bisa datang langsung atau melalui zoom
Tim yang diusulkan untuk aktif kembali disemua lini
Kendali Mutu dan biaya pelayanan perlu diaktifkan.Pelayanan operasi yang mahal dikerjakan di RS yang
Perlu Tim investigasi untuk menangani dokter yang bermasalah
Pelatihan dokter atau seminar perlu disuport baiayanya. Pada saat pembelian alkes perlu dicantumkan d
Dokter harus hadir di jam kerja
Dokter itu perlu ada teguran, mungkin mereka tidak tau bila merujuk dengan dokter yang sama maka itu
Bila fround dan terjadi denda maka dendanya akan ditanggung oleh dokter tersebut.
Tahun 2024
tenaga sekuriti sudah di buat tenaga administrasi, yang bisa berkomputer itu ada 2 orang
Direncanakan untuk atahun 2025 farmasi dikembalikan ke bidang penunjang
Pejabat pengadaan di wajibkan untuk mengikuti ujian kompetensi level b atau c
Bisa ikut ujian kompetensi melalui diklat
Kalau ada onkologi maka perlu tempat tersendiri untuk oplosan obat kemo , perlu direncanakan secara fi
onkologi perlu perawat dan tenaga farmasi untuk pelatihan pendukung dokter onkologi
onkologi itu banyak di type B, tidak di type C
kan untuk segera dilakukan perekrutan di tahun 2024
pertimbangkan
erasi dan resume medis, sehingga masih kesulitan untuk membuat satu data satu sehat (sesuai anjuran dari pemerintah)
ian IT , dengan adanya surat edaran untuk tes programer dari tenaga BLUD, akan tetapi sampai batas waktunya tdka ada yang mendaftar
enyerap dana yang cuku besar.
arusnya ini menjadi salah satu di pihak ketiga
cukup besar
dingin, Perlu dievaluasi tata cara dan pemeliharaan AC .Standar ruang 20-24 c
gunakan BLUD, perlu ada radio pemancar untuk mendeteksi barang barang yang pindah tempat.
orang Programmer yang ada sekarang adalah seorang aplikator dan jaringan instalasi
di RS lain Kefarmasian ini masuk di penunjang, untuk dokter ini masuk ke pelayanan sedangkan unitnya masuk ke penunjang
dir maka perlu disiapkan sarana dan saprasn ya
di RS lain Kefarmasian ini masuk di penunjang, untuk dokter ini masuk ke pelayanan sedangkan unitnya masuk ke penunjang
3 hari saja , contoh absensi
sar 1,5 juta per orang, atau pelatihan yang sesuai alatnya baru bisa dikaitkan dengan penggunanya
ani oleh dokter yang sama, apabila ini dilakukan secara terus menerus maka RSUD Caruban akan di denda oelh BPJS
ian alkes perlu dicantumkan dalam kontrak terkait peningkatan SDM sesuai penggunaan alat tersebut
tu ada 2 orang
suk ke penunjang
LAPORAN REALISASI ANGGARAN
RSUD CARUBAN Lampiran IV : PERATURAN MENTERI DALAM NEGERI
TAHUN 2023 NOMOR : 61 TAHUN 2007
TANGGAL : 7 NOVEMBER 2007
Urusan Pemerintahan : 1.02
Organisasi : 1-02.0-00.0-00.01 DINAS KESEHATAN
Sub Unit Organisasi : 1-02.0-00.0-00.01.02 RSUD Caruban -
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
URUSAN PEMERINTAHAN WAJIB YANG BERKAITAN
DENGAN PELAYANAN DASAR 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
1.02.01.2.10 PENINGKATAN PELAYANAN BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
1.02.01.2.10.01 Pelayanan dan Penunjang Pelayanan BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
5.1 BELANJA OPERASI 103,858,772,448.00 10,784,501,202.00 26,411,067,420.00 21,341,282,591.00 7,033,673,725.00 7,773,534,772.00 16,698,042,609.00 31,505,251,106.00 90,042,102,319.00 13,816,670,129.00 86.7%
5.1.01 Belanja Pegawai 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99.99 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.01.99.99.9999 Belanja Pegawai BLUD 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
1.01.02 Belanja Tambahan Penghasilan ASN 42,957,647.00 - - - - - - - - 42,957,647.00 0.0%
1.01.02.01 Tambahan Penghasilan berdasarkan Beban Kerja ASN 42,957,647.00 - - - - - - - - 42,957,647.00 0.0%
1.01.02.01.0001 Tambahan Penghasilan berdasarkan Beban Kerja PNS 42,957,647.00 - - - 42,957,647.00 0.0%
Tambahan Penghasilan berdasarkan Pertimbangan Objektif
1.01.03 Lainnya ASN 31,950,277,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,178,185,686.00 93.2%
1.01.03.06 Belanja Jasa Pelayanan Kesehatan bagi ASN 31,935,027,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,510,499,395.00 7,297,597,362.00 29,760,092,201.00 2,174,935,686.00 93.2%
1.01.03.06.0001 Belanja Jasa Pelayanan Kesehatan bagi ASN 31,935,027,887.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,510,499,395.00 7,297,597,362.00 29,760,092,201.00 2,174,935,686.00 93.2%
Belanja Jasa Pelayanan Kesehatan bagi ASN 23,894,626,965.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 1,432,132,126.00 1,432,132,126.00 23,894,626,965.00 - 100.0%
Belanja Jasa Pelayanan Kesehatan bagi ASN ( silpa BLUD ) 8,040,400,922.00 - - - 2,170,651,907.00 2,616,446,060.00 1,078,367,269.00 5,865,465,236.00 5,865,465,236.00 2,174,935,686.00 72.9%
Page 30
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Belanja Honorarium Perangkat Unit Kerja Pengadaan Barang dan
1.01.03.07.0003 Jasa (UKPBJ) 15,250,000.00 - - - - - 12,000,000.00 12,000,000.00 12,000,000.00 3,250,000.00 78.7%
Honorarium Tim Pengadaan dan Pemeriksaan Barang
Penyediaan Alat Tulis Kantor
- Honorarium Pejabat Pengadaan Nilai Pagu Pengadaan Di Atas Rp.
250 Juta Sd. Rp. 500 Juta 300,000.00 - - - 300,000.00 300,000.00 300,000.00 - 100.0%
Page 31
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pengadaan linen rumah sakit -
- Honorarium pejabat Pengadaan dan Barang/Jasa 200,000.00 - - - 200,000.00 200,000.00 200,000.00 - 100.0%
-
Pengadaan logistik RS rumah sakit -
- Honorarium pejabat Pengadaan dan Barang/Jasa 4,400,000.00 - - - 4,400,000.00 4,400,000.00 4,400,000.00 - 100.0%
-
Renovasi Bangunan Rumah Sakit -
- Honorarium Pejabat Pengadaan Jasa konsultasi perencanaan dan
pengawasan 600,000.00 - - - 200,000.00 200,000.00 200,000.00 400,000.00 33.3%
- Honorarium Pejabat Pemeriksa Jasa Konsultasi perencanaan dan
pengawasan 600,000.00 - - - 200,000.00 200,000.00 200,000.00 400,000.00 33.3%
- Honorarium Pantia Pengadaan ( konstruksi ) 900,000.00 - - - - - 900,000.00 0.0%
5.1.02 Belanja Barang dan Jasa 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99.99 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.1.02.99.99.9999 Belanja Barang dan Jasa BLUD 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
1.02 Belanja Barang dan Jasa 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
1.02.01 Belanja Barang 42,872,434,367.00 798,929,564.00 10,729,634,247.00 9,001,132,981.00 3,245,276,240.00 3,572,622,178.00 10,431,405,092.00 17,249,303,510.00 37,779,000,302.00 5,093,434,065.00 88.1%
1.02.01.01 Belanja Barang Pakai Habis 42,872,434,367.00 798,929,564.00 10,729,634,247.00 9,001,132,981.00 3,245,276,240.00 3,572,622,178.00 10,431,405,092.00 17,249,303,510.00 37,779,000,302.00 5,093,434,065.00 88.1%
1.02.01.01.0002 Belanja Bahan-Bahan Kimia 3,758,066,503.00 145,836,268.00 1,218,876,305.00 659,071,014.00 223,484,301.00 202,024,618.00 883,459,070.00 1,308,967,989.00 3,332,751,576.00 425,314,927.00 88.7%
Belanja bahan-Bahan Kimia ( BAHP-farmasi ) 200,922,041.00 - 15,605,950.00 - 6,741,585.00 2,131,200.00 13,266,720.00 22,139,505.00 37,745,455.00 163,176,586.00 18.8%
Belanja bahan-Bahan Kimia ( BAHP CSSD ) 118,777,800.00 - 34,912,500.00 - 17,948,700.00 3,670,500.00 21,619,200.00 56,531,700.00 62,246,100.00 47.6%
Belanja bahan-bahan kimia (Belanja reagen laboratorium ) 3,023,998,970.00 110,405,068.00 857,555,429.00 639,496,026.00 198,794,016.00 199,893,418.00 856,946,042.00 1,255,633,476.00 2,863,089,999.00 160,908,971.00 94.7%
Belanja bahan-bahan kimia pengelolaan linen Rumah Sakit 211,511,055.00 - 183,272,100.00 - - 183,272,100.00 28,238,955.00 86.6%
Belanja bahan-bahan kimia sanitasi 186,369,578.00 35,431,200.00 121,332,530.00 19,574,988.00 - 176,338,718.00 10,030,860.00 94.6%
Bahan kimia pembersih di Instalasi gizi 16,487,059.00 - 6,197,796.00 - 9,575,808.00 9,575,808.00 15,773,604.00 713,455.00 95.7%
1.02.01.01.0004 Belanja Bahan-Bahan Bakar dan Pelumas 262,480,000.00 - 64,111,460.00 36,098,404.00 34,895,451.00 23,037,320.00 65,710,727.00 123,643,498.00 223,853,362.00 38,626,638.00 85.3%
Page 32
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja bahan bakar minyak/gas ( genset , incenerator ) solar dex 9,450,000.00 - - - 9,400,121.00 9,400,121.00 9,400,121.00 49,879.00 99.5%
- Belanja bahan bakar minyak/gas ( ambulans dan kendaraan
operasional ) 253,030,000.00 - 64,111,460.00 36,098,404.00 34,895,451.00 23,037,320.00 56,310,606.00 114,243,377.00 214,453,241.00 38,576,759.00 84.8%
1.02.01.01.0009 Belanja Bahan-Isi Tabung Pemadam Kebakaran 10,234,556.00 - - - 7,568,761.00 7,568,761.00 7,568,761.00 2,665,795.00 74.0%
-
1.02.01.01.0012 Belanja Bahan-Bahan Lainnya 15,605,193,352.00 196,375,422.00 4,146,061,684.00 3,269,277,550.00 1,527,854,560.00 633,527,782.00 4,270,064,786.00 6,431,447,128.00 14,043,161,784.00 1,562,031,568.00 90.0%
Belanja Bahan-Isi Tabung Gas (LPG Instalasi Gizi) 63,761,175.00 5,555,550.00 11,324,775.00 11,111,100.00 7,692,300 13,461,525.00 21,153,825.00 49,145,250.00 14,615,925.00 77.1%
Belanja Bahan Radiologi 468,840,181.00 30,377,592.00 139,555,638.00 113,631,144.00 - 99,557,593.00 84,462,342.00 184,019,935.00 467,584,309.00 1,255,872.00 99.7%
Belanja Bahan Radiologi 286,258,000.00 30,377,592.00 139,555,638.00 113,631,144.00 2,693,626.00 2,693,626.00 286,258,000.00 - 100.0%
Belanja Bahan Radiologi (SILPA) 182,582,181.00 - - - 99,557,593.00 81,768,716.00 181,326,309.00 181,326,309.00 1,255,872.00 99.3%
Belanja Plate 3,890,344,228.00 - 1,163,307,555.00 471,129,336.00 335,933,854.00 49,539,855.00 907,959,586.00 1,293,433,295.00 2,927,870,186.00 962,474,042.00 75.3%
Belanja Plate 1,632,196,140.00 - 1,163,307,555.00 432,687,580.00 36,201,005.00 36,201,005.00 1,632,196,140.00 - 100.0%
Belanja Plate (SILPA) 2,258,148,088.00 - - 38,441,756.00 335,933,854.00 49,539,855.00 871,758,581.00 1,257,232,290.00 1,295,674,046.00 962,474,042.00 57.4%
Belanja Bahan dan Alat Kesehatan Habis Pakai 9,429,519,735.00 134,436,300.00 2,321,486,585.00 2,272,214,601.00 1,046,038,806.00 472,733,709.00 2,691,703,058.00 4,210,475,573.00 8,938,613,059.00 490,906,676.00 94.8%
- Belanja Bahan dan Alat Kesehatan Habis Pakai 8,184,730,290.00 - 2,167,578,396.00 2,049,973,517.00 932,602,299.00 387,763,529.00 2,452,390,450.00 3,772,756,278.00 7,990,308,191.00 194,422,099.00 97.6%
- Gas Oksigen, liquid dan CO2 1,064,211,945.00 134,436,300.00 153,908,189.00 222,241,084.00 113,436,507.00 84,970,180.00 239,312,608.00 437,719,295.00 948,304,868.00 115,907,077.00 89.1%
- Bahan Alat Habis Pakai lainnya 19,277,500.00 - - - - - 19,277,500.00 0.0%
- Bahan Alat Habis Pakai lainnya (silpa) 161,300,000.00 - - - - - 161,300,000.00 0.0%
Belanja bahan Lainnya ( belanja Darah ) 1,500,000,000.00 - 406,080,000.00 329,040,000.00 141,120,000.00 - 558,110,000.00 699,230,000.00 1,434,350,000.00 65,650,000.00 95.6%
Belanja bahan Lainnya ( belanja Darah ) 450,364,624.00 - 406,080,000.00 - 44,284,624.00 44,284,624.00 450,364,624.00 - 100.0%
Belanja bahan Lainnya ( belanja Darah )(SILPA) 1,049,635,376.00 - - 329,040,000.00 141,120,000.00 513,825,376.00 654,945,376.00 983,985,376.00 65,650,000.00 93.7%
Bahan lainnya (laboratorium patologi klinik dan patologi
anatomi) 126,817,965.00 26,005,980.00 55,121,131.00 21,989,859.00 4,761,900.00 4,004,325.00 11,335,875.00 20,102,100.00 123,219,070.00 3,598,895.00 97.2%
Bahan-bahan Lainnya ( CSSD ) 125,910,068.00 - 49,186,000.00 50,161,510.00 3,032,400.00 3,032,400.00 102,379,910.00 23,530,158.00 81.3%
1.02.01.01.0024 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor 380,449,023.00 - 359,786,726.00 - 10,986,780.00 - - 10,986,780.00 370,773,506.00 9,675,517.00 97.5%
ATK perkantoran 379,729,023.00 - 359,786,726.00 - 10,986,780.00 10,986,780.00 370,773,506.00 8,955,517.00 97.6%
BELANJA UNTUK ATK / PENGEMAS DI INSTALASI GIZI
(Isolasi) 720,000.00 - - - - - 720,000.00 0.0%
1.02.01.01.0025 Belanja Alat/Bahan untuk Kegiatan Kantor- Kertas dan Cover 65,106,552.00 9,000,000.00 19,992,000.00 18,000,000.00 - - 15,750,000.00 15,750,000.00 62,742,000.00 2,364,552.00 96.4%
Belanja kertas dan Cover kegiatan perkantoran (kertas Label
Thermal) 61,050,000.00 9,000,000.00 18,000,000.00 18,000,000.00 15,750,000.00 15,750,000.00 60,750,000.00 300,000.00 99.5%
ETIKET DI INSTALASI GIZI 4,056,552.00 - 1,992,000.00 - - 1,992,000.00 2,064,552.00 49.1%
1.02.01.01.0026 Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan Cetak 990,183,644.00 - 582,639,275.00 41,726,775.00 12,746,146.00 24,607,863.00 216,832,473.00 254,186,482.00 878,552,532.00 111,631,112.00 88.7%
- Belanja Penggandaan 130,558,422.00 - - 498,300.00 7,275,646.00 8,674,373.00 33,139,948.00 49,089,967.00 49,588,267.00 80,970,155.00 38.0%
Belanja penggandaan kegiatan administrasi perkantoran 103,563,000.00 - - - 6,770,446.00 8,674,373.00 18,828,376.00 34,273,195.00 34,273,195.00 69,289,805.00 33.1%
Belanja penggandaan kegiatan Akreditasi Rumah Sakit 24,164,700.00 - - - 13,914,072.00 13,914,072.00 13,914,072.00 10,250,628.00 57.6%
Belanja penggandaan kegiatan pelatihan internal 2,589,075.00 - - 498,300.00 505,200.00 397,500.00 902,700.00 1,401,000.00 1,188,075.00 54.1%
Belanja penggandaan materi kegiatan value gathering 241,647.00 - - - - - 241,647.00 0.0%
Page 33
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
1.02.01.01.0029 Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer 25,873,545.00 - - - - - 25,873,545.00 0.0%
1.02.01.01.0030 Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor 641,695,130.00 189,729,002.00 272,731,620.00 - 1,853,700.00 58,798,700.00 - 60,652,400.00 523,113,022.00 118,582,108.00 81.5%
- Belanja Alat/Bahan kebersihan 185,233,748.00 - 164,639,640.00 - - 164,639,640.00 20,594,108.00 88.9%
- Belanja Alat/Bahan pengelolaan linen Rumah Sakit 99,190,466.00 - 88,216,980.00 - - 88,216,980.00 10,973,486.00 88.9%
- Belanja Alat/Bahan pengelolaan sampah 355,383,916.00 189,729,002.00 19,875,000.00 - 58,798,700.00 58,798,700.00 268,402,702.00 86,981,214.00 75.5%
- Perabot Kantor 1,887,000.00 - - - 1,853,700.00 1,853,700.00 1,853,700.00 33,300.00 98.2%
1.02.01.01.0031 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Listrik 173,959,755.00 - - 134,883,870.00 20,679,300.00 18,259,500.00 38,938,800.00 173,822,670.00 137,085.00 99.9%
1.02.01.01.0037 Belanja Obat-Obatan-Obat 17,486,385,107.00 - 3,354,546,939.00 3,931,397,023.00 1,379,668,502.00 2,179,284,874.00 4,204,268,476.00 7,763,221,852.00 15,049,165,814.00 2,437,219,293.00 86.1%
Belanja Obat-Obatan 13,682,906,645.00 - 3,354,546,939.00 3,931,397,023.00 1,379,668,502.00 2,179,284,874.00 2,838,009,307.00 6,396,962,683.00 13,682,906,645.00 - 100.0%
Belanja Obat-Obatan (SILPA) 3,803,478,462.00 - - - 1,366,259,169.00 1,366,259,169.00 1,366,259,169.00 2,437,219,293.00 35.9%
1.02.01.01.0043 Belanja Natura dan Pakan-Natura 1,784,917,791.00 223,152,602.00 460,168,689.00 402,162,091.00 - 283,437,952.00 379,286,651.00 662,724,603.00 1,748,207,985.00 36,709,806.00 97.9%
Makanan dan minuman harian pegawai 69,396,250.00 - 33,044,600.00 10,192,600.00 7,934,300.00 14,319,400.00 22,253,700.00 65,490,900.00 3,905,350.00 94.4%
Belanja bahan makanan dan minuman pasien 1,573,996,541.00 207,613,094.00 397,994,824.00 363,873,592.00 255,323,739.00 343,461,508.00 598,785,247.00 1,568,266,757.00 5,729,784.00 99.6%
Belanja Makanan Dan Minuman Pasien ( snack pasien dan minuman
pasien ) 141,525,000.00 15,539,508.00 29,129,265.00 28,095,899.00 20,179,913.00 21,505,743.00 41,685,656.00 114,450,328.00 27,074,672.00 80.9%
1.02.01.01.0052 Belanja Makanan dan Minuman Rapat 430,755,000.00 - 97,863,000.00 45,470,000.00 23,092,000.00 32,114,500.00 84,205,150.00 139,411,650.00 282,744,650.00 148,010,350.00 65.6%
- Belanja makanan dan minuman rapat kegiatan FGD 7,492,500.00 - - - - - 7,492,500.00 0.0%
- Makanan dan minuman Rapat kegiatan administrasi perkantoran 189,810,000.00 - 47,032,000.00 30,684,000.00 12,032,000.00 32,114,500.00 48,262,000.00 92,408,500.00 170,124,500.00 19,685,500.00 89.6%
- Belanja makanan dan minuman rapat kegiatan maintenance dan
surveilans ISO 24,975,000.00 - - - - - 24,975,000.00 0.0%
- Belanja makanan dan minuman rapat kegiatan akreditasi rumah
sakit 26,640,000.00 - - - 24,383,150.00 24,383,150.00 24,383,150.00 2,256,850.00 91.5%
- Belanja Makanan dan Minuman Diklat, Seminar, Lokakarya dan
Sejenisnya 47,452,500.00 - - 14,786,000.00 11,060,000.00 11,560,000.00 22,620,000.00 37,406,000.00 10,046,500.00 78.8%
- Belanja Makanan dan Minuman Bimtek Maintenance dan
surveilens ISO 37,462,500.00 - - - - - 37,462,500.00 0.0%
Page 34
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja Makanan dan Minuman Survey ISO 24,975,000.00 - - - - - 24,975,000.00 0.0%
Belanja Makanan dan Minuman Survey Akreditasi dan survey
simulasi 52,447,500.00 - 50,831,000.00 - - 50,831,000.00 1,616,500.00 96.9%
- Belanja Makanan dan Minuman kegiatan value gathering ( paket
meeting ) 19,500,000.00 - - - - - 19,500,000.00 0.0%
1.02.01.01.0053 Belanja Makanan dan Minuman Jamuan Tamu 92,648,076.00 - 12,927,000.00 1,224,000.00 9,212,000.00 15,904,000.00 14,040,000.00 39,156,000.00 53,307,000.00 39,341,076.00 57.5%
- Belanja Makanan dan minuman tamu kegiatan administrasi umum 41,425,200.00 - 8,472,000.00 1,224,000.00 9,212,000.00 4,464,000.00 14,040,000.00 27,716,000.00 37,412,000.00 4,013,200.00 90.3%
- Belanja makanan dan minuman kegiatan pelayanan sunatan massal 19,980,000.00 - - - 11,440,000.00 11,440,000.00 11,440,000.00 8,540,000.00 57.3%
- Belanja Makanan dan Minuman kegiatan Bimtek , Survey
Akreditasi dan survey simuasi ) 26,612,438.00 - 4,455,000.00 - - 4,455,000.00 22,157,438.00 16.7%
- Belanja Makanan dan Minuman kegiatan Survey ISO ) 4,630,438.00 - - - - - 4,630,438.00 0.0%
1.02.01.01.0054 Belanja Penambah Daya Tahan Tubuh 219,796,650.00 - 47,365,500.00 83,658,000.00 14,486,800.00 20,969,000.00 32,752,000.00 68,207,800.00 199,231,300.00 20,565,350.00 90.6%
1.02.01.01.0061 Belanja Pakaian Sipil Harian 190,210,766.00 - - 171,990,000.00 - 171,990,000.00 18,220,766.00 90.4%
1.02.01.01.0068 Belanja Pakaian Siaga 187,606,987.00 - - - 60,485,000.00 95,100,000.00 155,585,000.00 155,585,000.00 32,021,987.00 82.9%
1.02.02 Belanja Jasa 23,915,780,997.00 3,778,927,820.00 5,251,317,928.00 4,294,033,191.00 1,135,476,566.00 1,384,284,701.00 2,219,794,806.00 4,739,556,073.00 18,063,835,012.00 5,851,945,985.00 75.5%
1.02.02.01 Belanja Jasa Kantor 20,847,981,997.00 3,507,168,029.00 4,765,985,498.00 3,568,973,894.00 989,804,272.00 1,191,852,306.00 1,423,897,758.00 3,605,554,336.00 15,447,681,757.00 5,400,300,240.00 74.1%
Honorarium Narasumber atau Pembahas, Moderator, Pembawa
1.02.02.01.0003 Acara, dan Panitia 306,500,000.00 - - 99,807,200.00 5,000,000.00 - 42,900,000.00 47,900,000.00 147,707,200.00 158,792,800.00 48.2%
- Jasa Narasumber Pelatihan 306,500,000.00 - - 99,807,200.00 5,000,000.00 - 42,900,000.00 47,900,000.00 147,707,200.00 158,792,800.00 48.2%
Jasa Narasumber Pelatihan APAR 22,500,000.00 - - 2,034,000.00 - 2,034,000.00 20,466,000.00 9.0%
Jasa Narasumber Pelatihan BLS 28,800,000.00 - - 1,500,000.00 - 1,500,000.00 27,300,000.00 5.2%
Jasa Narasumber Pelatihan MAKP 35,000,000.00 - - 25,000,000.00 - 25,000,000.00 10,000,000.00 71.4%
Jasa Narasumber Pelatihan PPI 7,200,000.00 - - - - - 7,200,000.00 0.0%
Jasa Narasumber Pelatihan PPGD EMT 100,000,000.00 - - 66,973,200.00 - 66,973,200.00 33,026,800.00 67.0%
Jasa Narasumber bimtek keuangan 5,000,000.00 - - 2,100,000.00 - 2,100,000.00 2,900,000.00 42.0%
Jasa Narasumber pelatihan SKP 5,000,000.00 - - 2,200,000.00 - 2,200,000.00 2,800,000.00 44.0%
Jasa narasumber kegiatan FGD 58,000,000.00 - - - 5,000,000.00 42,900,000.00 47,900,000.00 47,900,000.00 10,100,000.00 82.6%
Jasa instruktur kegiatan value gathering 45,000,000.00 - - - - - 45,000,000.00 0.0%
Page 35
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Honor PPK Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp. 2,5 Miliar 1,500,000.00 - - - 1,500,000.00 1,500,000.00 1,500,000.00 - 100.0%
Honor bendahara pengeluaran (Nilai Pagu Dana Di Atas Rp. 1
Miiar Sd. Rp. 2,5 Miliar) 1,350,000.00 - - - 1,350,000.00 1,350,000.00 1,350,000.00 - 100.0%
Honor bendahara pengeluaran pembantu (Nilai Pagu Dana Di Atas
Rp. 1 Miiar Sd. Rp. 2,5 Miliar) 1,200,000.00 - - - 1,200,000.00 1,200,000.00 1,200,000.00 - 100.0%
Honor staf teknis ( Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp.
2,5 Miliar) 2,700,000.00 - - - 2,550,000.00 2,550,000.00 2,550,000.00 150,000.00 94.4%
Honorarium PPTK ( Nilai Pagu Dana Di Atas Rp. 1 Miiar Sd. Rp.
2,5 Miliar) 1,350,000.00 - - - 1,350,000.00 1,350,000.00 1,350,000.00 - 100.0%
Panitia Pelaksana Kegiatan - NNilai Pagu Dana Di Atas Rp. 1
Miiar Sd. Rp. 2,5 Miliar ( Tim Teknis ) 7,875,000.00 - - - 7,875,000.00 7,875,000.00 7,875,000.00 - 100.0%
Penyediaan Alat Tulis Kantor - Panitia Pelaksana Kegiatan / Teknis 275,000.00 - - - - - 275,000.00 0.0%
Penyediaan Barang Cetakan & penggandaan - Panitia Pelaksana
Kegiatan/Tim Teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan Peralatan Kantor - Panitia Pelaksana Kegiatan/Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Mebeuleur Rumah sakit - Panitia Pelaksana Kegiatan/Tim
teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan Pakaian kerja Lapangan - Panitia Pelaksana Kegiatan/Tim
Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Jasa Pengangkutan dan pengolahan sampah medis RS -
Panitia Pelaksana Kegiatan / Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin/berkala IPAL dan Sarana Sanitasi -
Panitia Pelkasana Kegiatan/Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin/berkala alat alat kesehatan RS -
Panitia Pelaksana Kegiatan/Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Page 36
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pengadaan Pakaian pasien dan pakaian kerja lapangan - Panitia
Pelaksana Kegiatan / Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin berkala perlengkapan RS - Panitia
Pelasana kegiatan 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan Pemeliharaan rutin berkala taman RS - Panitia Pelaksana
Kegiatan / Tim Teknis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan alat kesehatan/alat kedokteran RS - Panitia Pelaksana
Kegiatan/Tim Teknis - - - - - -
Pengadaan gelang identitas pasien - Panitia Pelaksana Kegiatan/Tim
Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan jasa kebersihan - Panitia Pelaksana Kegiatan/Tim Teknis 425,000.00 - - - - - 425,000.00 0.0%
Pengadaan bahan dan alat kebersihan - Panitia Pelaksana
Kegiatan/Tim Tehnis 275,000.00 - - - - - 275,000.00 0.0%
Pengadaan bahan pengelolaan linen - Panitia Pelaksana Kegiatan /
Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan peralatan pengelolaan sampah - Panitia Pelaksana
Kegiatan / Tim Teknis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan linen rumah sakit - Panitia Pelaksana Kegiatan/Tim
Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Pengadaan logistik RS rumah sakit - Panitia Pelaksana Kegiatan /
Tim Tehnis - - - - - -
Renovasi Bangunan Rumah Sakit - Panitia Pelaksana Kegiatan / Tim
Teknis - - - - - -
Pembangunan Paviliun - panitia pelaksana kegiatan 17,325,000.00 - - - 16,650,000.00 16,650,000.00 16,650,000.00 675,000.00 96.1%
Pembangunan Parkir beratap - Panitia Pelaksana Kegiatan 7,875,000.00 - - - - - 7,875,000.00 0.0%
Pembuatan Taman - Panitia Pelaksana Kegiatan 7,875,000.00 - - - - - 7,875,000.00 0.0%
Belanja Bahan - Bahan Kimia (BAHP CSSD) - Tim tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan - Bahan Kimia (Reagen Lab) - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan - Bahan Kimia (Reagen Lab PA) - Tim tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Bahan Radiologi - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Kertas Label Termal - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Alat Listrik - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Natura dan Pakan Natura - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Modal Alat Bengkel dan Alat Ukur - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
Belanja Modal Alat Kantor dan Rumah Tangga - Tim Tehnis 400,000.00 - - - 400,000.00 400,000.00 400,000.00 - 100.0%
1.02.02.01.0006 Honorarium Penyuluhan atau Pendampingan 37,000,000.00 - - - - - 34,500,000.00 34,500,000.00 34,500,000.00 2,500,000.00 93.2%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Ketua Tim ) 3,750,000.00 - - - 3,750,000.00 3,750,000.00 3,750,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Sekretaris Tim ) 3,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana kurang dari 5 M ( Anggota Tim ) 15,750,000.00 - - - 14,000,000.00 14,000,000.00 14,000,000.00 1,750,000.00 88.9%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Ketua Tim ) 3,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Sekretaris Tim ) 2,500,000.00 - - - 2,500,000.00 2,500,000.00 2,500,000.00 - 100.0%
Honorarium pendampingan kejaksaan bidang infrastruktur - Pagu
dana lebih dari 5 M ( Anggota Tim ) 9,000,000.00 - - - 8,250,000.00 8,250,000.00 8,250,000.00 750,000.00 91.7%
1.02.02.01.0014 Belanja Jasa Tenaga Kesehatan 7,016,000,000.00 1,279,548,000.00 1,555,024,000.00 1,080,777,000.00 352,759,000.00 375,259,000.00 407,759,000.00 1,135,777,000.00 5,051,126,000.00 1,964,874,000.00 72.0%
- Belanja Jasa Tenaga Ahli ( penepri ) dokter spesialis 60,000,000.00 - - - 60,000,000.00 0.0%
- Insentif Dokter 120,000,000.00 - - 22,500,000.00 - 22,500,000.00 55,000,000.00 77,500,000.00 100,000,000.00 20,000,000.00 83.3%
a. Intensif Tenaga Ahli (Dokter Spesialis) 60,000,000.00 - - - 55,000,000.00 55,000,000.00 55,000,000.00 5,000,000.00 91.7%
b. Intensif Tenaga Ahli (Dokter Interensif) 60,000,000.00 - - 22,500,000.00 22,500,000.00 22,500,000.00 45,000,000.00 15,000,000.00 75.0%
- Honorarium tenaga kontrak BLUD 6,812,000,000.00 1,279,548,000.00 1,555,024,000.00 1,058,277,000.00 352,759,000.00 352,759,000.00 352,759,000.00 1,058,277,000.00 4,951,126,000.00 1,860,874,000.00 72.7%
a. Dokter Spesialis ( 3 orang x 13 bulan ) 195,000,000.00 45,000,000.00 50,000,000.00 30,000,000.00 10,000,000.00 10,000,000.00 10,000,000.00 30,000,000.00 155,000,000.00 40,000,000.00 79.5%
b. Perawat dan tenaga lain ( 280 x 13 bulan ) 6,552,000,000.00 1,227,048,000.00 1,495,024,000.00 1,020,777,000.00 340,259,000.00 340,259,000.00 340,259,000.00 1,020,777,000.00 4,763,626,000.00 1,788,374,000.00 72.7%
c. Dokter umum/Dokter gigi ( 2 orang x 13 bulan ) 65,000,000.00 7,500,000.00 10,000,000.00 7,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 7,500,000.00 32,500,000.00 32,500,000.00 50.0%
Page 37
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
1.02.02.01.0029 Belanja Jasa Tenaga Ahli 210,000,000.00 5,000,000.00 45,000,000.00 10,000,000.00 - 5,000,000.00 25,000,000.00 30,000,000.00 90,000,000.00 120,000,000.00 42.9%
- Belanja Jasa Tenaga Ahli ( fisikawan medis ) 30,000,000.00 5,000,000.00 5,000,000.00 10,000,000.00 5,000,000.00 5,000,000.00 10,000,000.00 30,000,000.00 - 100.0%
-Honorarium Dewan Pengawas 180,000,000.00 - 40,000,000.00 - 20,000,000.00 20,000,000.00 60,000,000.00 120,000,000.00 33.3%
-
1.02.02.01.0030 Belanja Jasa Tenaga Kebersihan 10,000,000.00 - 3,500,000.00 - - 2,800,000.00 1,600,000.00 4,400,000.00 7,900,000.00 2,100,000.00 79.0%
Honorarium Pegawai Honorer/Tidak Tetap Kategori Umum ( Jasa
Petugas Kebersihan Kegiatan) 10,000,000.00 - 3,500,000.00 - 2,800,000.00 1,600,000.00 4,400,000.00 7,900,000.00 2,100,000.00 79.0%
1.02.02.01.0036 Belanja Jasa Audit/Surveillance ISO 82,200,000.00 - 20,400,000.00 - - - - - 20,400,000.00 61,800,000.00 24.8%
- Belanja jasa audit kegiatan sertifikasi Akreditasi Rumah Sakit 22,200,000.00 - 20,400,000.00 - - 20,400,000.00 1,800,000.00 91.9%
- Belanja sertifikasi SMM ISO kegiatan Maintenance dan Surveilans
ISO 60,000,000.00 - - - - - 60,000,000.00 0.0%
1.02.02.01.0039 Belanja Jasa Tenaga Informasi dan Teknologi 60,000,000.00 - - - 10,000,000.00 - 15,000,000.00 25,000,000.00 25,000,000.00 35,000,000.00 41.7%
Honorarium Sub Profesional (Programmer Senior) 60,000,000.00 - - - 10,000,000.00 15,000,000.00 25,000,000.00 25,000,000.00 35,000,000.00 41.7%
1.02.02.01.0042 Belanja Jasa Pelaksanaan Transaksi Keuangan 9,650,000.00 - 500,000.00 500,000.00 250,000.00 - 1,282,500.00 1,532,500.00 2,532,500.00 7,117,500.00 26.2%
Biaya Beban Jasa Transaksi Keuangan ( Tranfer ) 6,500,000.00 - - - 32,500.00 32,500.00 32,500.00 6,467,500.00 0.5%
Beban Jasa Transaksi Keuangan (Cek giro ) 3,150,000.00 - 500,000.00 500,000.00 250,000.00 1,250,000.00 1,500,000.00 2,500,000.00 650,000.00 79.4%
1.02.02.01.0047 Belanja Jasa Penyelenggaraan Acara 41,400,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 38,400,000.00 7.2%
- Belanja Jasa Penyelenggaraan Acara Rekrutmen Pegawai BLUD 18,000,000.00 - - - - - 18,000,000.00 0.0%
- Honorarium Instruktur Senam Kegiatan Olahraga/Olimpiade
Siswa/Festival Seni Siswa Dan Sejenisnya 23,400,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 20,400,000.00 12.8%
1.02.02.01.0048 Belanja Jasa Kontribusi Asosiasi 15,000,000.00 - 3,300,000.00 - - - - - 3,300,000.00 11,700,000.00 22.0%
Belanja Iuran Asosiasi 15,000,000.00 - 3,300,000.00 - - 3,300,000.00 11,700,000.00 22.0%
1.02.02.01.0050 Belanja Jasa Kalibrasi 296,650,000.00 24,125,000.00 23,765,000.00 8,230,000.00 18,481,500.00 146,183,500.00 7,492,500.00 172,157,500.00 228,277,500.00 68,372,500.00 77.0%
- Jasa Kalibrasi/pengujian/pengukuran peralatan
kesehatan/kedokteran 200,000,000.00 - 2,400,000.00 2,700,000.00 144,130,000.00 7,492,500.00 151,622,500.00 156,722,500.00 43,277,500.00 78.4%
- Jasa pengujian ( air bersih, air minum, swab , udara , air limbah, air
laundry 60,000,000.00 - 21,090,000.00 3,330,000.00 18,481,500.00 2,053,500.00 20,535,000.00 44,955,000.00 15,045,000.00 74.9%
- Jasa pemantauan mutu eksternal laboratorium 20,000,000.00 17,800,000.00 - - - 17,800,000.00 2,200,000.00 89.0%
- Jasa Pemeriksaan kultur kuman 16,650,000.00 6,325,000.00 275,000.00 2,200,000.00 - 8,800,000.00 7,850,000.00 52.9%
1.02.02.01.0051 Belanja Jasa Pengolahan Sampah 541,569,000.00 - 167,940,780.00 181,631,520.00 46,138,260.00 - 137,132,730.00 183,270,990.00 532,843,290.00 8,725,710.00 98.4%
Jasa pengangkutan dan pengolahan sampah medis 541,569,000.00 - 167,940,780.00 181,631,520.00 46,138,260.00 137,132,730.00 183,270,990.00 532,843,290.00 8,725,710.00 98.4%
1.02.02.01.0055 Belanja Jasa Iklan/Reklame, Film, dan Pemotretan 87,004,550.00 - 31,550,000.00 14,900,000.00 1,500,000.00 6,000,000.00 17,250,000.00 24,750,000.00 71,200,000.00 15,804,550.00 81.8%
1.02.02.01.0059 Belanja Tagihan Telepon 36,000,000.00 2,756,902.00 2,721,939.00 2,924,507.00 1,047,571.00 912,058.00 952,131.00 2,911,760.00 11,315,108.00 24,684,892.00 31.4%
1.02.02.01.0060 Belanja Tagihan Air 132,000,000.00 26,744,000.00 24,756,000.00 26,658,250.00 9,923,250.00 8,390,250.00 7,983,500.00 26,297,000.00 104,455,250.00 27,544,750.00 79.1%
1.02.02.01.0061 Belanja Tagihan Listrik 1,440,000,000.00 321,612,440.00 353,720,220.00 372,758,079.00 112,706,860.00 138,965,880.00 139,551,840.00 391,224,580.00 1,439,315,319.00 684,681.00 100.0%
1.02.02.01.0062 Belanja Langganan Jurnal/Surat Kabar/Majalah 12,720,000.00 - 5,170,000.00 2,110,000.00 3,165,000.00 2,110,000.00 5,275,000.00 12,555,000.00 165,000.00 98.7%
1.02.02.01.0063 Belanja Kawat/Faksimili/Internet/TV Berlangganan 145,000,000.00 33,695,460.00 33,697,118.00 33,695,460.00 11,226,308.00 11,193,081.00 18,743,081.00 41,162,470.00 142,250,508.00 2,749,492.00 98.1%
1.02.02.01.0064 Belanja Paket/Pengiriman 470,000.00 - 84,000.00 37,500.00 84,000.00 168,000.00 252,000.00 373,500.00 96,500.00 79.5%
1.02.02.01.0067 Belanja Pembayaran Pajak, Bea, dan Perizinan 21,550,000.00 - 5,344,650.00 - 8,929,950.00 3,540,000.00 - 12,469,950.00 17,814,600.00 3,735,400.00 82.7%
Belanja Pajak Kendaraan Bermotor 15,000,000.00 - 5,344,650.00 - 8,929,950.00 8,929,950.00 14,274,600.00 725,400.00 95.2%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk Radiografi Umum 600,000.00 - - - 140,000.00 140,000.00 140,000.00 460,000.00 23.3%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk Pesawat sinar-X Penunjang Terapi 550,000.00 - - - - - 550,000.00 0.0%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk CT-SCAN 900,000.00 - - - - - 900,000.00 0.0%
Ijin penggunaan dalam Radiologi diagnostik ( Mobile X-ray Unit) 1,500,000.00 - - - 1,040,000.00 1,040,000.00 1,040,000.00 460,000.00 69.3%
Page 38
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Intervensional
untuk C-Arm 1,500,000.00 - - - 1,040,000.00 1,040,000.00 1,040,000.00 460,000.00 69.3%
Tarif ijin Penggunaan dalam Radiologi Diagnostik dan Konvensional
untuk X-Ray 1,500,000.00 - - - 1,320,000.00 1,320,000.00 1,320,000.00 180,000.00 88.0%
1.02.02.01.0077 Belanja jasa pelayanan Kesehatan bagi Non ASN 10,006,568,447.00 1,813,686,227.00 2,489,511,791.00 1,573,644,378.00 408,592,573.00 493,608,537.00 478,097,476.00 1,380,298,586.00 7,257,140,982.00 2,749,427,465.00 72.5%
Belanja jasa pelayanan Kesehatan bagi Non ASN 7,143,341,028.00 1,813,686,227.00 2,489,511,791.00 1,573,644,378.00 478,097,476.00 478,097,476.00 6,354,939,872.00 788,401,156.00 89.0%
Belanja jasa pelayanan Kesehatan bagi Non ASN (silpa blud) 2,863,227,419.00 - - - 408,592,573.00 493,608,537.00 902,201,110.00 902,201,110.00 1,961,026,309.00 31.5%
1.02.02.02 Belanja Iuran Jaminan/Asuransi 1,486,159,000.00 271,759,791.00 306,705,310.00 354,303,151.00 108,802,292.00 106,227,857.00 185,468,111.00 400,498,260.00 1,333,266,512.00 152,892,488.00 89.7%
1.02.02.02.0005 Belanja Iuran Jaminan Kesehatan bagi Non ASN 1,033,034,000.00 185,545,472.00 225,691,194.00 283,078,420.00 85,060,715.00 80,127,877.00 159,368,131.00 324,556,723.00 1,018,871,809.00 14,162,191.00 98.6%
Belanja Iuran Jaminan Kesehatan bagi ASN dan Non ASN 1,033,034,000.00 185,545,472.00 225,691,194.00 283,078,420.00 85,060,715.00 80,127,877.00 159,368,131.00 324,556,723.00 1,018,871,809.00 14,162,191.00 98.6%
1.02.02.02.0006 Belanja Iuran Jaminan Kecelakaan Kerja bagi Non ASN 453,125,000.00 86,214,319.00 81,014,116.00 71,224,731.00 23,741,577.00 26,099,980.00 26,099,980.00 75,941,537.00 314,394,703.00 138,730,297.00 69.4%
Belanja Premi Asuransi Ketenagakerjaan ( perbulan per orang = Rp
145.000) 453,125,000.00 86,214,319.00 81,014,116.00 71,224,731.00 23,741,577.00 26,099,980.00 26,099,980.00 75,941,537.00 314,394,703.00 138,730,297.00 69.4%
1.02.02.04 Belanja Sewa Peralatan dan Mesin 65,700,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 - 700,000.00 11,570,000.00 36,911,300.00 28,788,700.00 56.2%
1.02.02.04.0036 Belanja Sewa Kendaraan Bermotor Penumpang 10,000,000.00 - - - - - - - - 10,000,000.00 0.0%
Sewa Bus 10,000,000.00 - - - - - 10,000,000.00 0.0%
1.02.02.04.0037 Belanja Sewa Kendaraan Bermotor Angkutan Barang 700,000.00 - - - - - 700,000.00 700,000.00 700,000.00 - 100.0%
Sewa Mobilitas Darat Pick Up 700,000.00 - - - 700,000.00 700,000.00 700,000.00 - 100.0%
1.02.02.04.0117 Belanja Sewa Alat Kantor Lainnya 55,000,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 - - 10,870,000.00 36,211,300.00 18,788,700.00 65.8%
Belanja Sewa Alat Kantor Lainnya 55,000,000.00 - 3,685,200.00 21,656,100.00 10,870,000.00 10,870,000.00 36,211,300.00 18,788,700.00 65.8%
1.02.02.08 Belanja Jasa Konsultansi Konstruksi 879,675,000.00 - 104,641,920.00 265,387,236.00 - 24,104,538.00 450,944,937.00 475,049,475.00 845,078,631.00 34,596,369.00 96.1%
Page 39
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja jasa konsultasi pengawasan pekerjaan taman( Belanja
Konsultasi Pengawasan diatas 100 juta s/d 200 juta) 5,550,000.00 - - - - - 5,550,000.00 0.0%
- Belanja jasa konsultasi pengawasan pembangunan gedung RS
( paviliun ) Biaya Konstruksi Fisik > 6.900.000.000 s/d
7.000.000.000 195,360,000.00 - - - 195,200,160.00 195,200,160.00 195,200,160.00 159,840.00 99.9%
- Belanja jasa konsultasi pengawasan pekerjaan pemasangan lift - - - - - -
- Belanja jasa konsultasi pengawasan pekerjaan rehap gedung rawat
jalan rs 88,800,000.00 - - - 88,589,100.00 88,589,100.00 88,589,100.00 210,900.00 99.8%
1.02.02.09 Belanja Jasa Konsultansi Non Konstruksi 127,000,000.00 - - 54,912,810.00 - - 64,047,000.00 64,047,000.00 118,959,810.00 8,040,190.00 93.7%
1.02.02.09.0006 Belanja Jasa Konsultansi Berorientasi Bidang-Keuangan 55,000,000.00 - - 54,912,810.00 - - - - 54,912,810.00 87,190.00 99.8%
Belanja jasa akuntan publik audit laporan keuangan 55,000,000.00 - - 54,912,810.00 - 54,912,810.00 87,190.00 99.8%
1.02.02.09.0011 Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Survei 22,000,000.00 - - - - - 19,647,000.00 19,647,000.00 19,647,000.00 2,353,000.00 89.3%
Belanja jasa survey IKM 22,000,000.00 - - - 19,647,000.00 19,647,000.00 19,647,000.00 2,353,000.00 89.3%
1.02.02.09.0014 Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Khusus 50,000,000.00 - - - - - 44,400,000.00 44,400,000.00 44,400,000.00 5,600,000.00 88.8%
Belanja jasa penyusunan dokumen perijinan 50,000,000.00 - - - 44,400,000.00 44,400,000.00 44,400,000.00 5,600,000.00 88.8%
1.02.02.11 Belanja Beasiswa Pendidikan PNS 60,000,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
1.02.02.11.0002 Belanja Beasiswa Tugas Belajar S2 60,000,000.00 - - - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
Beban Beasiswa Pendidikan PNS Lainnya 60,000,000.00 - - - 3,000,000.00 3,000,000.00 3,000,000.00 57,000,000.00 5.0%
1.02.03 Belanja Pemeliharaan 4,335,271,300.00 345,851,497.00 869,521,377.00 972,143,481.00 409,794,012.00 188,575,333.00 1,260,708,197.00 1,859,077,542.00 4,046,593,897.00 288,677,403.00 93.3%
1.02.03.02 Belanja Pemeliharaan Peralatan dan Mesin 1,268,537,100.00 19,513,800.00 96,879,120.00 327,260,000.00 172,400,779.00 37,974,350.00 529,996,916.00 740,372,045.00 1,184,024,965.00 84,512,135.00 93.3%
Belanja Pemeliharaan Alat Besar-Alat Bantu-Electric Generating
1.02.03.02.0022 Set 17,000,000.00 - - - 10,376,169.00 - 3,441,000.00 13,817,169.00 13,817,169.00 3,182,831.00 81.3%
Pemeliharaan Genset Penggantian spare part dan servis ( kali ) 17,000,000.00 - - - 10,376,169.00 3,441,000.00 13,817,169.00 13,817,169.00 3,182,831.00 81.3%
Page 40
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pemeliharaan AC Gedung/Kantor Pemeliharaan AC central, servis
dan penggantian Spare part 40,000,000.00 - 10,017,750.00 9,462,750.00 20,257,500.00 20,257,500.00 39,738,000.00 262,000.00 99.3%
-
1.02.03.03 Belanja Pemeliharaan Gedung dan Bangunan 3,066,734,200.00 326,337,697.00 772,642,257.00 644,883,481.00 237,393,233.00 150,600,983.00 730,711,281.00 1,118,705,497.00 2,862,568,932.00 204,165,268.00 93.3%
Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung
1.02.03.03.0006 Tempat Kerja-Bangunan Kesehatan 2,497,678,600.00 233,990,666.00 644,343,307.00 450,507,449.00 216,397,583.00 116,995,333.00 632,443,666.00 965,836,582.00 2,294,678,004.00 203,000,596.00 91.9%
- Belanja Pemeliharan Gedung dan Bangunan 500,000,000.00 - 199,632,292.00 99,521,450.00 99,402,250.00 101,444,008.00 200,846,258.00 500,000,000.00 - 100.0%
- Belanja Pemeliharan Gedung dan Bangunan (silpa BLUD) 500,000,000.00 - - - 297,008,992.00 297,008,992.00 297,008,992.00 202,991,008.00 59.4%
- Belanja Pemeliharaan kebersihan Rumah Sakit ( 12 bulan ) 1,497,678,600.00 233,990,666.00 444,711,015.00 350,985,999.00 116,995,333.00 116,995,333.00 233,990,666.00 467,981,332.00 1,497,669,012.00 9,588.00 100.0%
1.02.04 Belanja Perjalanan Dinas 734,550,250.00 - 24,427,983.00 7,564,305.00 72,475,000.00 11,606,500.00 263,635,119.00 347,716,619.00 379,708,907.00 354,841,343.00 51.7%
1.02.04.01 Belanja Perjalanan Dinas Dalam Negeri 734,550,250.00 - 24,427,983.00 7,564,305.00 72,475,000.00 11,606,500.00 263,635,119.00 347,716,619.00 379,708,907.00 354,841,343.00 51.7%
1.02.04.01.0001 Belanja Perjalanan Dinas Biasa 257,207,500.00 - 12,284,000.00 3,345,000.00 47,374,500.00 9,566,500.00 139,152,976.00 196,093,976.00 211,722,976.00 45,484,524.00 82.3%
a. Belanja Perjalanan Dinas Biasa 137,297,500.00 - 6,719,500.00 - - 9,011,500.00 116,264,377.00 125,275,877.00 131,995,377.00 5,302,123.00 96.1%
- Belanja Perjalanan Dinas Luar 117,698,000.00 - 6,719,500.00 - 9,011,500.00 101,035,548.00 110,047,048.00 116,766,548.00 931,452.00 99.2%
- Belanja Perjalanan Dinas luar daerah akreditasi 19,599,500.00 - - - 15,228,829.00 15,228,829.00 15,228,829.00 4,370,671.00 77.7%
b. Belanja Transportasi dan Akomodasi 119,910,000.00 - 5,564,500.00 3,345,000.00 47,374,500.00 555,000.00 22,888,599.00 70,818,099.00 79,727,599.00 40,182,401.00 66.5%
- Belanja Transportasi dan akomodasi petugas kalibrasi 48,110,000.00 - - - 45,210,000.00 555,000.00 45,765,000.00 45,765,000.00 2,345,000.00 95.1%
- Belanja transportasi dan akomodasi surveyor kegiatan akreditasi
Rumah Sakit 3,500,000.00 - 3,400,000.00 - - 3,400,000.00 100,000.00 97.1%
- Belanja transportasi dan akomodasi pengambil sample ( air bersih,
air limbah, dll ) 19,150,000.00 - 2,164,500.00 1,665,000.00 2,164,500.00 1,332,000.00 3,496,500.00 7,326,000.00 11,824,000.00 38.3%
- Belanja transportasi dan akomodasi petugas perijinan sarana dan
prasarana RS 19,150,000.00 - - - - - 19,150,000.00 0.0%
- Belanja transportasi dan akomodasi narasumber kegiatan pelatihan
internal 30,000,000.00 - - 1,680,000.00 21,556,599.00 21,556,599.00 23,236,599.00 6,763,401.00 77.5%
1.02.04.01.0003 Belanja Perjalanan Dinas Dalam Kota 29,075,000.00 - 1,450,000.00 - - 2,040,000.00 7,380,000.00 9,420,000.00 10,870,000.00 18,205,000.00 37.4%
- Belanja perjalanan dinas dalam kota kegiatan Akreditasi Rumah
Sakit 4,275,000.00 - - - - - 4,275,000.00 0.0%
- Belanja perjalanan dinas dalam kota kegiatan administrasi
perkantoran 24,800,000.00 - 1,450,000.00 - 2,040,000.00 7,380,000.00 9,420,000.00 10,870,000.00 13,930,000.00 43.8%
- Belanja perjalanan dinas dalam kota kegiatan Pelayanan Home Care
Geriantri - - - - - -
-
1.02.04.01.0005 Belanja Perjalanan Dinas Paket Meeting Luar Kota 448,267,750.00 - 10,693,983.00 4,219,305.00 25,100,500.00 - 117,102,143.00 142,202,643.00 157,115,931.00 291,151,819.00 34.2%
- Belanja perjalanan dinas kegiatan Pendidikan dan Pelatihan
Eksternal 240,200,000.00 - 10,693,983.00 4,219,305.00 25,100,500.00 106,442,143.00 131,542,643.00 146,455,931.00 93,744,069.00 61.0%
- Belanja perjalanan dinas kegiatan Pendidikan dan Pelatihan Internal 25,000,000.00 - - - 10,660,000.00 10,660,000.00 10,660,000.00 14,340,000.00 42.6%
Page 41
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
- Belanja perjalanan dinas luar daerah kegiatan bimtek Akreditasi
Rumah Sakit 55,167,750.00 - - - - - 55,167,750.00 0.0%
- Belanja Perjalanan Dinas luar daerah Studi Banding 63,950,000.00 - - - - - 63,950,000.00 0.0%
- Belanja perjalanan dinas luar daerah kegiatan value gathering 63,950,000.00 - - - - - 63,950,000.00 0.0%
5.2 BELANJA MODAL 19,059,541,376.00 460,664,000.00 193,644,445.00 2,686,915,563.00 3,720,858,315.00 1,312,654,700.00 8,005,373,309.00 13,038,886,324.00 16,380,110,332.00 2,679,431,044.00 85.9%
( SILPA BLUD )
5.2.02 Belanja Modal Peralatan dan Mesin 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99.99 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.02.99.99.9999 Belanja Modal Peralatan dan Mesin BLUD 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
2.02.03 Belanja Modal Alat Bengkel dan Alat Ukur 12,385,752.00 - 7,144,737.00 - - - - - 7,144,737.00 5,241,015.00 57.7%
2.02.03.01 Belanja Modal Alat Bengkel Bermesin 12,385,752.00 - 7,144,737.00 - - - - - 7,144,737.00 5,241,015.00 57.7%
Belanja Modal Perkakas Konstruksi Logam yang Transportable
2.02.03.01.0002 (Berpindah) 10,272,978.00 - 5,295,477.00 - - - - - 5,295,477.00 4,977,501.00 51.5%
Mesin Potong ( Kayu, Besi dan Aluminium ) 4,198,221.00 - 3,698,520.00 - - 3,698,520.00 499,701.00 88.1%
Mesin Bor Listrik (Rotary Hammer) 1,810,309.00 - 1,596,957.00 - - 1,596,957.00 213,352.00 88.2%
Tang Potong Kabel Hidrolik 4,264,448.00 - - - - - 4,264,448.00 0.0%
2.02.03.01.0006 Belanja Modal Perkakas Bengkel Kayu 2,112,774.00 - 1,849,260.00 - - - - - 1,849,260.00 263,514.00 87.5%
Mesin Gergaji Circular 2,112,774.00 - 1,849,260.00 - - 1,849,260.00 263,514.00 87.5%
2.02.05 Belanja Modal Alat Kantor dan Rumah Tangga 467,794,497.00 - 186,499,708.00 55,326,063.00 126,917,085.00 - 55,686,480.00 182,603,565.00 424,429,336.00 43,365,161.00 90.7%
2.02.05.01 Belanja Modal Alat Kantor 129,298,935.00 - 58,344,784.00 - 11,322,000.00 - 49,148,580.00 60,470,580.00 118,815,364.00 10,483,571.00 91.9%
2.02.05.01.0003 Belanja Modal Alat Reproduksi (Penggandaan) 25,626,348.00 - - - - - 25,019,400.00 25,019,400.00 25,019,400.00 606,948.00 97.6%
Mesin Foto Copy 25,626,348.00 - - - 25,019,400.00 25,019,400.00 25,019,400.00 606,948.00 97.6%
2.02.05.01.0004 Belanja Modal Alat Penyimpan Perlengkapan Kantor 41,808,879.00 - 41,483,884.00 - - - - - 41,483,884.00 324,995.00 99.2%
Almari arsip 2 Pintu Sliding ( kaca ) 41,808,879.00 - 41,483,884.00 - - 41,483,884.00 324,995.00 99.2%
Lemari Dialyser - - - - - -
2.02.05.01.0005 Belanja Modal Alat Kantor Lainnya 61,863,708.00 - 16,860,900.00 - 11,322,000.00 - 24,129,180.00 35,451,180.00 52,312,080.00 9,551,628.00 84.6%
Alat kantor lainnya 1,185,569.00 - - - - - 1,185,569.00 0.0%
Penghancur Kertas 6,638,188.00 - 5,547,780.00 - - 5,547,780.00 1,090,408.00 83.6%
LCD Proyektor 27,442,530.00 - 8,049,720.00 - 16,008,420.00 16,008,420.00 24,058,140.00 3,384,390.00 87.7%
Bed Elevator - - - - - - -
Layar Projector 3,797,421.00 - 3,263,400.00 - - 3,263,400.00 534,021.00 85.9%
Fingerspot Access Door 22,800,000.00 - - - 11,322,000.00 8,120,760.00 19,442,760.00 19,442,760.00 3,357,240.00 85.3%
2.02.05.02 Belanja Modal Alat Rumah Tangga 338,495,562.00 - 128,154,924.00 55,326,063.00 115,595,085.00 - 6,537,900.00 122,132,985.00 305,613,972.00 32,881,590.00 90.3%
2.02.05.02.0001 Belanja Modal Mebel 66,675,924.00 - 66,225,924.00 - - - - - 66,225,924.00 450,000.00 99.3%
Meja Kantor 1/2 Biro Uk. 120 x 75 x 75 cm 18,437,544.00 - 18,347,544.00 - - 18,347,544.00 90,000.00 99.5%
Kursi Tunggu 4 Seat/Bangku 48,238,380.00 - 47,878,380.00 - - 47,878,380.00 360,000.00 99.3%
2.02.05.02.0003 Belanja Modal Alat Pembersih 69,300,646.00 - 13,597,500.00 - 45,100,000.00 - - 45,100,000.00 58,697,500.00 10,603,146.00 84.7%
Container Sampah Pemecah 6m3 54,198,192.00 - - - 45,100,000.00 45,100,000.00 45,100,000.00 9,098,192.00 83.2%
Mesin Cuci 16 Kg 11,500,000.00 - 10,660,440.00 - - 10,660,440.00 839,560.00 92.7%
Vacuum Cleaner 3,602,454.00 - 2,937,060.00 - - 2,937,060.00 665,394.00 81.5%
2.02.05.02.0004 Belanja Modal Alat Pendingin 87,970,794.00 - - 18,844,359.00 65,389,085.00 - - 65,389,085.00 84,233,444.00 3,737,350.00 95.8%
AC Mobile 1,700,000.00 - - - - - 1,700,000.00 0.0%
AC 1 PK 30,272,725.00 - - - 30,272,725.00 30,272,725.00 30,272,725.00 - 100.0%
AC 2 PK 35,116,360.00 - - - 35,116,360.00 35,116,360.00 35,116,360.00 - 100.0%
Frezzer 12,382,050.00 - - 12,376,500.00 - 12,376,500.00 5,550.00 100.0%
Page 42
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Lemari Es 180 liter, 1 pintu 8,499,659.00 - - 6,467,859.00 - 6,467,859.00 2,031,800.00 76.1%
-
2.02.05.02.0005 Belanja Modal Alat Dapur 18,426,000.00 - - 11,766,000.00 - - 6,537,900.00 6,537,900.00 18,303,900.00 122,100.00 99.3%
Kompor Gas 1 tungku 3,885,000.00 - - 3,885,000.00 - 3,885,000.00 - 100.0%
Blender 2,220,000.00 - - 2,220,000.00 - 2,220,000.00 - 100.0%
Food Processor 1,221,000.00 - - 1,221,000.00 - 1,221,000.00 - 100.0%
Rak Piring Alumunium 4,440,000.00 - - 4,440,000.00 - 4,440,000.00 - 100.0%
Water Jug thermos 1,498,500.00 - - - 1,498,500.00 1,498,500.00 1,498,500.00 - 100.0%
Coffee warmer 2 tungku 1,332,000.00 - - - 1,332,000.00 1,332,000.00 1,332,000.00 - 100.0%
Electrik & gass rool top chafing dish ( 2 fungsi ) 1,498,500.00 - - - 1,487,400.00 1,487,400.00 1,487,400.00 11,100.00 99.3%
Pemanas soup elektrik 10 lt 1,498,500.00 - - - 1,443,000.00 1,443,000.00 1,443,000.00 55,500.00 96.3%
Coffee decanter ( teko ) 333,000.00 - - - 305,250.00 305,250.00 305,250.00 27,750.00 91.7%
Panci sayur ( stainless steel ) 499,500.00 - - - 471,750.00 471,750.00 471,750.00 27,750.00 94.4%
2.02.05.02.0006 Belanja Modal Alat Rumah Tangga Lainnya ( Home Use ) 96,122,198.00 - 48,331,500.00 24,715,704.00 5,106,000.00 - - 5,106,000.00 78,153,204.00 17,968,994.00 81.3%
Televisi 32 inch, Full HD, Tuner Digital 21,596,988.00 - 21,192,000.00 - - 21,192,000.00 404,988.00 98.1%
Tangga lipat 1,275,945.00 - - 1,214,784.00 - 1,214,784.00 61,161.00 95.2%
Lemari linen bahan stainlesstel, berpintu 27,245,454.00 - 27,139,500.00 - - 27,139,500.00 105,954.00 99.6%
Tandon Air 3,785,489.00 - - 3,409,920.00 - 3,409,920.00 375,569.00 90.1%
Loudspeaker 8,856,302.00 - - 8,658,000.00 - 8,658,000.00 198,302.00 97.8%
Brachet TV 5,292,000.00 - - - 5,106,000.00 5,106,000.00 5,106,000.00 186,000.00 96.5%
Sound system pengeras suara 4,440,000.00 - - 4,440,000.00 - 4,440,000.00 - 100.0%
Mic wireless 7,000,000.00 - - 6,993,000.00 - 6,993,000.00 7,000.00 99.9%
Sound Audio Ruang Rapat 16,630,020.00 - - - - - 16,630,020.00 0.0%
2.02.07 Belanja Modal Alat Kedokteran dan Kesehatan 1,571,568,883.00 - - 24,908,400.00 - 31,450,000.00 1,072,757,711.00 1,104,207,711.00 1,129,116,111.00 442,452,772.00 71.8%
- 2.02.07.01.0001 Belanja Modal Alat Kedokteran Umum 1,571,568,883.00 - - 24,908,400.00 - 31,450,000.00 1,072,757,711.00 1,104,207,711.00 1,129,116,111.00 442,452,772.00 71.8%
Antropometri Set 27,588,666.00 - - - 23,650,000.00 23,650,000.00 23,650,000.00 3,938,666.00 85.7%
Gunting conjungtiva 2,353,200.00 - - - 2,353,200.00 2,353,200.00 2,353,200.00 - 100.0%
Lewis lens Loop 1,842,600.00 - - - 1,842,600.00 1,842,600.00 1,842,600.00 - 100.0%
Lens Loop 5,394,600.00 - - - 5,394,600.00 5,394,600.00 5,394,600.00 - 100.0%
Beer cillia 2,375,400.00 - - - 2,375,400.00 2,375,400.00 2,375,400.00 - 100.0%
Tenotomy 35,342,400.00 - - - 35,342,400.00 35,342,400.00 35,342,400.00 - 100.0%
Tensimeter digital 16,222,500.00 - - - - - 16,222,500.00 0.0%
Stetoscope 40,655,480.00 - - - 38,610,000.00 38,610,000.00 38,610,000.00 2,045,480.00 95.0%
Head Lamp 2,400,000.00 - - - - - 2,400,000.00 0.0%
Otoscope mini 23,136,200.00 - - - 6,700,000.00 6,700,000.00 6,700,000.00 16,436,200.00 29.0%
Inner sheat 24 48,791,720.00 - - - 43,861,513.00 43,861,513.00 43,861,513.00 4,930,207.00 89.9%
Blender Obat 5,336,000.00 - - - 5,000,000.00 5,000,000.00 5,000,000.00 336,000.00 93.7%
Set Rawat luka 82,320,000.00 - - - 55,832,000.00 55,832,000.00 55,832,000.00 26,488,000.00 67.8%
TLD 50,204,301.00 - - 24,908,400.00 23,882,760.00 23,882,760.00 48,791,160.00 1,413,141.00 97.2%
Termogun ( Termometer Gun) 43,956,000.00 - - - 11,520,000.00 11,520,000.00 11,520,000.00 32,436,000.00 26.2%
Timbangan bayi 2,414,000.00 - - - 2,400,000.00 2,400,000.00 2,400,000.00 14,000.00 99.4%
Lampu tindakan 27,972,000.00 - - - 23,200,000.00 23,200,000.00 23,200,000.00 4,772,000.00 82.9%
Pengukur tinggi badan 2,444,333.00 - - - 1,700,000.00 1,700,000.00 1,700,000.00 744,333.00 69.5%
Medicine Cabinet 19,766,478.00 - - - 18,950,000.00 18,950,000.00 18,950,000.00 816,478.00 95.9%
Overbed Table 14,954,810.00 - - - 13,471,500.00 13,471,500.00 13,471,500.00 1,483,310.00 90.1%
Dressing trolley 143,278,245.00 - - - 143,228,220.00 143,228,220.00 143,228,220.00 50,025.00 100.0%
Standar Infus 98,041,856.00 - - - 90,200,000.00 90,200,000.00 90,200,000.00 7,841,856.00 92.0%
Examination Table - - - - - - -
Bed periksa (2 section) 20,879,100.00 - - - 12,500,000.00 12,500,000.00 12,500,000.00 8,379,100.00 59.9%
Timbangan berat badan dan tinggi badan 14,943,000.00 - - - 14,865,000.00 14,865,000.00 14,865,000.00 78,000.00 99.5%
Vidio Laringoscope 70,000,000.00 - - - 67,359,250.00 67,359,250.00 67,359,250.00 2,640,750.00 96.2%
Loop AV Shunt 55,600,000.00 - - - 55,600,000.00 55,600,000.00 55,600,000.00 - c
Suction Pump 40,142,040.00 - - - - - 40,142,040.00 0.0%
Kursi Roda 29,526,000.00 - - - 26,640,000.00 26,640,000.00 26,640,000.00 2,886,000.00 90.2%
Brankar/Bed Transfer/emergency bed - - - - - - -
Page 43
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Emergency Set 72,000,000.00 - - - 65,300,000.00 65,300,000.00 65,300,000.00 6,700,000.00 90.7%
Sutter Bipolar 36,773,000.00 - - - 34,830,268.00 34,830,268.00 34,830,268.00 1,942,732.00 94.7%
Basic ortodontic set 51,415,200.00 - - - - - 51,415,200.00 0.0%
Dressing trolley - - - - - - -
Biopsi tang 20,533,100.00 - - - - - 20,533,100.00 0.0%
Tampon tang 7,565,000.00 - - - - - 7,565,000.00 0.0%
Minor basic set 92,982,800.00 - - - 42,725,000.00 42,725,000.00 42,725,000.00 50,257,800.00 45.9%
Spekulum vagina kecil 1,160,050.00 - - - - - 1,160,050.00 0.0%
Spekulum vagina besar 1,160,050.00 - - - - - 1,160,050.00 0.0%
Ligasure Impact curved 23,940,000.00 - - - - - 23,940,000.00 0.0%
Mortar 16cm 635,000.00 - - - - - 635,000.00 0.0%
Latex Mattress-KK-001 83,874,000.00 - - - 83,874,000.00 83,874,000.00 83,874,000.00 - 100.0%
Emergency bed 97,086,150.00 - - - 94,000,000.00 94,000,000.00 94,000,000.00 3,086,150.00 96.8%
Humidifier 4,257,900.00 - - - - - 4,257,900.00 0.0%
Meja Mayo 8,602,500.00 - - - 8,350,000.00 8,350,000.00 8,350,000.00 252,500.00 97.1%
Forcep stone 37,565,110.00 - - - - - 37,565,110.00 0.0%
Tabung O2 6 m3 1,665,000.00 - - - - - 1,665,000.00 0.0%
Dilator 6,013,890.00 - - - - - 6,013,890.00 0.0%
NIV full face Masks 5,726,140.00 - - - - - 5,726,140.00 0.0%
Resucitators Adult 4,600,000.00 - - - 4,600,000.00 4,600,000.00 4,600,000.00 - 100.0%
Heacting set 85,000,000.00 - - - 44,050,000.00 44,050,000.00 44,050,000.00 40,950,000.00 51.8%
Alkes Lainnya 1,133,064.00 - - - - - 1,133,064.00 0.0%
2.02.10 Belanja Modal Komputer 891,372,821.00 460,664,000.00 - 28,500,000.00 2,758,350.00 - 381,696,510.00 384,454,860.00 873,618,860.00 17,753,961.00 98.0%
2.02.10.01.0002 Belanja Modal personal Komputer 777,021,621.00 398,950,000.00 - 28,500,000.00 - - 344,145,510.00 344,145,510.00 771,595,510.00 5,426,111.00 99.3%
PC unit 257,497,800.00 128,500,000.00 - - 128,704,500.00 128,704,500.00 257,204,500.00 293,300.00 99.9%
Server 214,778,000.00 212,000,000.00 - - - 212,000,000.00 2,778,000.00 98.7%
Notebook Intel Core i5 153,735,000.00 30,700,000.00 - 28,500,000.00 92,241,000.00 92,241,000.00 151,441,000.00 2,294,000.00 98.5%
Ncomputing L300 27,750,000.00 27,750,000.00 - - - 27,750,000.00 - 100.0%
Laptop (Up To 12Th Gen Intel® Core™ I7 · Up To Windows ) 43,720,721.00 - - - 43,711,800.00 43,711,800.00 43,711,800.00 8,921.00 100.0%
Mikrotik Routerboard CR317-1G-16S+RM 10,147,500.00 - - - 10,146,510.00 10,146,510.00 10,146,510.00 990.00 100.0%
UPS C 3000VA LCD 230V 47,392,600.00 - - - 47,385,900.00 47,385,900.00 47,385,900.00 6,700.00 100.0%
Memory 16 GB 2933 MHz SNPTFYHPC 22,000,000.00 - - - 21,955,800.00 21,955,800.00 21,955,800.00 44,200.00 99.8%
2.02.10.02.0003 Belanja Modal Peralatan Personal Computer 114,351,200.00 61,714,000.00 - - 2,758,350.00 - 37,551,000.00 40,309,350.00 102,023,350.00 12,327,850.00 89.2%
Printer , Ecotank 21,116,640.00 18,800,000.00 - - - 18,800,000.00 2,316,640.00 89.0%
Printer Scanner 69,042,000.00 35,514,000.00 - - 23,676,000.00 23,676,000.00 59,190,000.00 9,852,000.00 85.7%
Monitor 19 inci 7,432,560.00 7,400,000.00 - - - 7,400,000.00 32,560.00 99.6%
Printer Argox 2140 2,760,000.00 - - - 2,758,350.00 2,758,350.00 2,758,350.00 1,650.00 99.9%
Scanner Smart office 14,000,000.00 - - - 13,875,000.00 13,875,000.00 13,875,000.00 125,000.00 99.1%
5.2.03 Belanja Modal Gedung dan Bangunan 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99.99 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.03.99.99.9999 Belanja Modal Gedung dan Bangunan BLUD 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03 Belanja Modal Gedung dan Bangunan 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01 Belanja Modal Bangunan Gedung 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01.01 Belanja Modal Bangunan Gedung Tempat Kerja 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
2.03.01.01.0006 Belanja Modal Bangunan Kesehatan 10,516,934,397.00 - - 2,578,181,100.00 2,276,610,000.00 1,221,236,950.00 3,199,789,063.00 6,697,636,013.00 9,275,817,113.00 1,241,117,284.00 88.2%
1 m2 Pembangunan Rawat Inap (2lt) 7,397,368,970.00 - - 1,951,380,000.00 2,276,610,000.00 2,276,610,000.00 4,553,220,000.00 6,504,600,000.00 892,768,970.00 87.9%
1 m2 Rehab. Sedang Rawat Jalan (2 lt ) 2,513,847,547.00 - - 626,801,100.00 731,267,950.00 843,043,063.00 1,574,311,013.00 2,201,112,113.00 312,735,434.00 87.6%
1 m2 Rehab. Sedang Ruang Gawat Darurat (2lt) 360,794,256.00 - - - 360,090,000.00 360,090,000.00 360,090,000.00 704,256.00 99.8%
1 m2 Rehab. Ringan Ruang Gawat Darurat (2lt)- Akses jalan IGD 130,018,750.00 - - - 129,879,000.00 129,879,000.00 129,879,000.00 139,750.00 99.9%
1 m2 rehab ringan gedung sederhana (gas medik) 114,904,874.00 - - - 80,136,000.00 80,136,000.00 80,136,000.00 34,768,874.00 69.7%
2.03.01.01.0033 Belanja Modal Bangunan Fasilitas Umum 3,680,710,193.00 - - - 883,368,000.00 - 2,355,648,000.00 3,239,016,000.00 3,239,016,000.00 441,694,193.00 88.0%
1 m2 Pembangunan Parkir Beratap 3,680,710,193.00 - - - 883,368,000.00 2,355,648,000.00 3,239,016,000.00 3,239,016,000.00 441,694,193.00 88.0%
2.03.01.01.0036 Belanja Modal Taman 1,796,687,043.00 - - - 431,204,880.00 - 878,795,545.00 1,310,000,425.00 1,310,000,425.00 486,686,618.00 72.9%
Pekerjaan Lanscape Taman - - - - - - -
Page 44
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Pembuatan Taman Depan RS 1,796,687,043.00 - - - 431,204,880.00 878,795,545.00 1,310,000,425.00 1,310,000,425.00 486,686,618.00 72.9%
5.2.05 Belanja Modal Aset Tetap Lainnya 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99.99 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
5.2.05.99.99.9999 Belanja Modal Aset Tetap Lainnya BLUD 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08 Belanja Modal Aset Tidak Berwujud 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08.01 Belanja Modal Aset Tidak Berwujud 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
2.05.08.01.0005 Belanja Modal Software 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
Pembuatan/Pengembangan Aplikasi/Software 61,043,895.00 - - - 59,967,750.00 59,967,750.00 59,967,750.00 1,076,145.00 98.2%
Pembuatan/Pengembangan Aplikasi/Software (persediaan dan
indikator mutu) 61,043,895.00 - - - 61,000,000.00 61,000,000.00 61,000,000.00 43,895.00 99.9%
1.02.02.2.01.05.5.1.02 Belanja Barang dan Jasa 7,875,114.00 - - - - - 7,650,000.00 7,650,000.00 7,650,000.00 225,114.00 97.1%
1.02.02.2.01.05.5.1.02.01 Belanja Barang 114.00 - - - - - - - - 114.00 0.0%
1.02.02.2.01.05.5.1.02.01.01 Belanja Barang Pakai Habis 114.00 - - - - - - - - 114.00 0.0%
Belanja Alat/Bahan untuk Kegiatan Kantor - Bahan Cetak
1.02.02.2.01.05.5.1.02.01.01.0026 (DTU-DAU) (Mandatory) 114.00 - - - - - - - - 114.00 0.0%
Pembulatan 114.00 - - - - - 114.00 0.0%
Page 45
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
Beban Jasa Konsultasi Pengawasan konstruksi - - - - - -
1.02.02.2.01.05.5.2 BELANJA MODAL 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3 Belanja Modal Gedung dan Bangunan 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01 Belanja Modal Bangunan Gedung 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01.01 Belanja Modal Bangunan Gedung Tempat Kerja 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1.02.02.2.01.05.5.2.3.01.01.0006 Belanja Modal Bangunan Kesehatan (DTU-DAU) (Mandatory) 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
1 m2 Pembangunan ICU/ICCU/UGD/CMU (Tak Bertingkat) 5,151,174,886.00 - - 1,236,281,973.00 1,442,328,968.00 1,442,328,968.00 2,884,657,936.00 4,120,939,909.00 1,030,234,977.00 80.0%
Beban Jasa Konsultasi Pengawasan konstruksi 149,850,000.00 - - - 91,480,650.00 91,480,650.00 91,480,650.00 58,369,350.00 61.0%
Beban Jasa Konsultasi Perencanaan Konstruksi 177,600,000.00 - - 99,780,000.00 - 99,780,000.00 77,820,000.00 56.2%
- DBHCHT 7,274,050,560.00 - 4,568,000,000.00 426,081,000.00 260,000,000.00 1,626,881,300.00 297,850,000.00 2,184,731,300.00 7,178,812,300.00 95,238,260.00 98.7%
Bed ICU 127,843,150.00 - - 123,062,000.00 - 123,062,000.00 4,781,150.00 96.3%
Bed Periksa 14,481,000.00 - - 14,388,500.00 - 14,388,500.00 92,500.00 99.4%
Bed Transportasi 147,498,750.00 - - 133,630,500.00 - 133,630,500.00 13,868,250.00 90.6%
Blood Wamer 171,693,668.00 - - 155,000,000.00 - 155,000,000.00 16,693,668.00 90.3%
Cold Module And Embedding Module 260,530,000.00 - - - 260,000,000.00 260,000,000.00 260,000,000.00 530,000.00 99.8%
Dental X Ray 311,534,500.00 - - - 297,850,000.00 297,850,000.00 297,850,000.00 13,684,500.00 95.6%
Endoscopy 3,522,200,000.00 - 3,516,000,000.00 - - 3,516,000,000.00 6,200,000.00 99.8%
PACS Radiologi System 1,626,881,331.00 - - - 1,626,881,300.00 1,626,881,300.00 1,626,881,300.00 31.00 100.0%
USG 1,052,409,911.00 - 1,052,000,000.00 - - 1,052,000,000.00 409,911.00 100.0%
- Pembulatan PACS -
Pembulatan 38,978,250.00 - - - - - 38,978,250.00 0.0%
JUMLAH 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
SP2D APBD 38,177,593,957.00 4,023,624,593.00 11,669,931,613.00 7,207,902,391.00 1,810,656,886.00 7,305,254,084.00 3,587,524,672.00 12,703,435,642.00 35,604,894,239.00 2,572,699,718.00 93.3%
SP2D BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
JUMLAH 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
APBD APBD 38,177,593,957.00 4,023,624,593.00 11,669,931,613.00 7,207,902,391.00 1,810,656,886.00 7,305,254,084.00 3,587,524,672.00 12,703,435,642.00 35,604,894,239.00 2,572,699,718.00 93.3%
5.1 BELANJA OPERASI 20,290,740,211.00 4,023,624,593.00 7,101,931,613.00 4,296,759,418.00 1,438,696,886.00 1,439,987,567.00 1,490,853,774.00 4,369,538,227.00 19,791,853,851.00 498,886,360.00 97.5%
5.1.01 BELANJA PEGAWAI 20,282,865,097.00 4,023,624,593.00 7,101,931,613.00 4,296,759,418.00 1,438,696,886.00 1,439,987,567.00 1,483,203,774.00 4,361,888,227.00 19,784,203,851.00 498,661,246.00 97.5%
5.1.02 BELANJA BARANG DAN JASA 7,875,114.00 - - - - - 7,650,000.00 7,650,000.00 7,650,000.00 225,114.00 97.1%
5.2 BELANJA MODAL 17,886,853,746.00 - 4,568,000,000.00 2,911,142,973.00 371,960,000.00 5,865,266,517.00 2,096,670,898.00 8,333,897,415.00 15,813,040,388.00 2,073,813,358.00 88.4%
5.2.01 BELANJA TANAH
5.2.02 BELANJA PERALATAN DAN MESIN 12,408,228,860.00 - 4,568,000,000.00 1,575,081,000.00 371,960,000.00 4,422,937,549.00 562,861,280.00 5,357,758,829.00 11,500,839,829.00 907,389,031.00 92.7%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 5,478,624,886.00 - - 1,336,061,973.00 - 1,442,328,968.00 1,533,809,618.00 2,976,138,586.00 4,312,200,559.00 1,166,424,327.00 78.7%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN
Page 46
REALISASI
Prosentase
' Kode Rekening Nama Kegiatan PAK TRIWULAN I TRIWULAN II TRIWULAN III TRIWULAN IV TOTAL SISA ANGGARAN
OKTOBER NOPEMBER DESEMBER Pencairan
2 3 4 8 12 16 17 18 19 20 21 22 23
5.2.05 BELANJA ASET TETAP LAINNYA
BLUD BLUD 122,918,313,824.00 11,245,165,202.00 26,604,711,865.00 24,028,198,154.00 10,754,532,040.00 9,086,189,472.00 24,703,415,918.00 44,544,137,430.00 106,422,212,651.00 16,496,101,173.00 86.6%
5.1 BELANJA OPERASI 103,858,772,448.00 10,784,501,202.00 26,411,067,420.00 21,341,282,591.00 7,033,673,725.00 7,773,534,772.00 16,698,042,609.00 31,505,251,106.00 90,042,102,319.00 13,816,670,129.00 86.7%
5.1.01 BELANJA PEGAWAI 31,993,235,534.00 5,860,792,321.00 9,536,165,885.00 7,065,536,633.00 2,170,651,907.00 2,616,446,060.00 2,522,499,395.00 7,309,597,362.00 29,772,092,201.00 2,221,143,333.00 93.1%
5.1.02 BELANJA BARANG DAN JASA 71,865,536,914.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,175,543,214.00 24,195,653,744.00 60,270,010,118.00 11,595,526,796.00 83.9%
5.2 BELANJA MODAL 19,059,541,376.00 460,664,000.00 193,644,445.00 2,686,915,563.00 3,720,858,315.00 1,312,654,700.00 8,005,373,309.00 13,038,886,324.00 16,380,110,332.00 2,679,431,044.00 85.9%
5.2.01 BELANJA TANAH
5.2.02 BELANJA PERALATAN DAN MESIN 2,943,121,953.00 460,664,000.00 193,644,445.00 108,734,463.00 129,675,435.00 31,450,000.00 1,510,140,701.00 1,671,266,136.00 2,434,309,044.00 508,812,909.00 82.7%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 15,994,331,633.00 - - 2,578,181,100.00 3,591,182,880.00 1,221,236,950.00 6,434,232,608.00 11,246,652,438.00 13,824,833,538.00 2,169,498,095.00 86.4%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN
5.2.05 BELANJA ASET TETAP LAINNYA 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
TOTAL TOTAL 161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00 88.2%
5.1 BELANJA OPERASI 124,149,512,659.00 14,808,125,795.00 33,512,999,033.00 25,638,042,009.00 8,472,370,611.00 9,213,522,339.00 18,188,896,383.00 35,874,789,333.00 109,833,956,170.00 14,315,556,489.00 88.5%
5.1.01 BELANJA PEGAWAI 52,276,100,631.00 9,884,416,914.00 16,638,097,498.00 11,362,296,051.00 3,609,348,793.00 4,056,433,627.00 4,005,703,169.00 11,671,485,589.00 49,556,296,052.00 2,719,804,579.00 94.8%
5.1.02 BELANJA BARANG DAN JASA 71,873,412,028.00 4,923,708,881.00 16,874,901,535.00 14,275,745,958.00 4,863,021,818.00 5,157,088,712.00 14,183,193,214.00 24,203,303,744.00 60,277,660,118.00 11,595,751,910.00 83.9%
5.2 BELANJA MODAL 36,946,395,122.00 460,664,000.00 4,761,644,445.00 5,598,058,536.00 4,092,818,315.00 7,177,921,217.00 10,102,044,207.00 21,372,783,739.00 32,193,150,720.00 4,753,244,402.00 87.1%
5.2.01 BELANJA TANAH - - - - - - - - - -
5.2.02 BELANJA PERALATAN DAN MESIN 15,351,350,813.00 460,664,000.00 4,761,644,445.00 1,683,815,463.00 501,635,435.00 4,454,387,549.00 2,073,001,981.00 7,029,024,965.00 13,935,148,873.00 1,416,201,940.00 90.8%
5.2.03 BELANJA GEDUNG DAN BANGUNAN 21,472,956,519.00 - - 3,914,243,073.00 3,591,182,880.00 2,663,565,918.00 7,968,042,226.00 14,222,791,024.00 18,137,034,097.00 3,335,922,422.00 84.5%
5.2.04 BELANJA JALAN,IRIGASI DAN JARINGAN - - - - - - - - - -
5.2.05 BELANJA ASET TETAP LAINNYA 122,087,790.00 - - - - 59,967,750.00 61,000,000.00 120,967,750.00 120,967,750.00 1,120,040.00 99.1%
161,095,907,781.00 15,268,789,795.00 38,274,643,478.00 31,236,100,545.00 12,565,188,926.00 16,391,443,556.00 28,290,940,590.00 57,247,573,072.00 142,027,106,890.00 19,068,800,891.00
12,565,188,926.00 16,391,443,556.00 28,668,757,570.00
38,274,643,478.00 - - (377,816,980.00)
up 163,016,980.00
up apbd 210,000,000.00
pengembalian (4,800,000.00)
4,800,000.00
-
Drg.FARID AMIRUDIN, M.Kes SITI WURYANI, SE SRI MARYANI,SE YULI ENDAH YUSTIANA
NIP. 196806282002121002 NIP. 1976303222011012006 NIP. 198406072010012033 NIP. 198407262002122002
Page 47
Tabel 3.2 Rincian Rencana Bisnis dan Anggaran
NO URAIAN JUMLAH
1 PENDAPATAN LAYANAN 87,100,000,000.00
Pendapatan JKN Rp. 72,600,000,000.00
Pendapatan UMUM Rp. 10,000,000,000.00
Pendapatan Farmasi /Obat Rp. 1,500,000,000.00
Pendapatan BPJS Tenaga Kerja Rp. 500,000,000.00
Pendapatan Jasa Raharja Rp. 2,500,000,000.00
Pendapatan Asuransi /sejenisnya Rp. -
2 PENDAPATAN HIBAH
Pendapatan HIbah Rp. -
4 APBD 6,561,736,200.00
Dana DAK Fisik Rp. 1,500,000,000.00
Dana DBHCHT Rp. 5,061,736,200.00
B BELANJA
BELANJA OPERASI
1 BELANJA PEGAWAI
Honorarium
2 Belanja Barang dan Jasa Rp. 59,798,969,824.00
Belanja Barang dan Jasa BLUD Rp. 59,798,969,824.00
Belanja Barang dan Jasa BLUD Rp.
Belanja Barang dan Jasa BLUD Rp.
Belanja Barang dan Jasa Rp.
Belanja Barang Rp.
3 Belanja Barang Pakai Habis Rp. 35,586,812,329.00
Belanja Bahan-Bahan Kimia Rp. 2,521,859,441.00
Belanja bahan-Bahan Kimia ( BAHP-farmasi ) Rp. 84,776,383.00
REOKO ENDO FROS Rp.
CAPORIT (KLORIN) Rp.
NACL 1000 ML Rp.
G BOND Rp.
GENBODY COVID-19 Rp.
GARAM 5,5 KG Rp.
PEMUTIH 1 L Rp.
TRICARB C-50 Rp.
Belanja bahan-bahan kimia lainnya ( farmasi ) Rp. 3,330,000.00
Rp.
Belanja bahan-Bahan Kimia ( BAHP CSSD ) Rp. 152,323,300.00
Detergen Washer Rp.
Cairan pengering Washer Rp.
Cairan Enzymatik Rp.
Cairan DTT(Disinfeksi Tingkat Tinggi) Rp.
Pelumas Instrumen Rp.
Garam Rp.
Rp.
Belanja bahan-bahan kimia (Belanja reagen laboratoRp. 1,670,575,328.00
Bilirubin D/T Rp.
Creatin mtd4+1 3x80 ml Rp.
Urea mtd 3x80 ml Rp.
Uric acid mtd 4x100 ml Rp.
Cholesterol mtd 4x100 ml Rp.
Trigliserid 4x100 ml Rp.
HDL mtd 4x100 ml Rp.
Glukose mtd 4x100 ml Rp.
Total prot mtd 4x100 ml Rp.
Sgot mtd 3x80 1x60 ml Rp.
Sgpt mtd 3x80 1x60 ml Rp.
Control mtd 10 X 5 ml Rp.
Multi Calibrator mtd 10 X 3ml Rp.
Golongan darah A Rp.
Golongan darah B Rp.
Salmonella O Rp.
Salmonella H Rp.
Salmonella A Rp.
Salmonella B Rp.
Verify 10 Rp.
Verify 4 Rp.
Buffer ph 7,4 Rp.
Wright Rp.
Giemsa Rp.
EDTA Rp.
cal 3 Rp.
cal 4 Rp.
WASH Rp.
Diluen 5 Diff Rp.
CH/Diff lyse Rp.
EZ Rp.
Probe Rp.
Diluen Mittic Rp.
Hematologi cleanser Rp.
LH lyse 100 Rp.
Control 5 DIFF Rp.
Acid 5 Rp.
Cleaning 4 Rp.
Rinse Elip Rp.
Cellclean/15 Rp.
Sulfo Rp.
lycer wdf Rp.
flourecel wdf Rp.
XN Check L1,L2,L3 Rp.
PPT/Inovin 10 Rp.
APTT/Actin 10 Rp.
CaCl2 10 Rp.
Control plasma Rp.
Cell clean 1 Rp.
Cell clean 2 Rp.
Rp.
Rp.
Belanja bahan-bahan kimia (Belanja reagen laborat Rp. 227,910,750.00
Giemza Rp.
Metanol Rp.
Buffer formalin 10% Rp.
Alkohol 96% Rp.
Ethanol Rp.
Xilol Rp.
Parafin Rp.
EZ-Mount Rp.
Eosin Alkohol Rp.
Mayer Hematoksilin Rp.
Papaniculau stain Rp.
Rp.
Belanja bahan-bahan kimia pengelolaan linen Rumah Rp. 199,293,600.00
Oxy Bost @20 ltr Rp.
Surfactant @ 20 liter Rp.
Liquid Detergent @20 ltr Rp.
Parfum Laundry @5 ltr Rp.
Neutralizer @20 ltr Rp.
Softener @20 ltr Rp.
Alkali @20 ltr Rp.
Desinfectan @5 ltr Rp.
Rp.
Belanja bahan-bahan kimia sanitasi Rp. 182,184,880.00
Handscrub 4% @ 5 ltr Rp.
Desinfektan permukaan tisu Rp.
Desinfektan permukaan spray Rp.
Handrub @ 500 ml Rp.
Pengharum ruangan (Matic Reffil 250 ml) Rp.
Chemical Sterillisator Ruangan @ 1 ltr Rp.
Rp.
Rp.
Bahan kimia pembersih di Instalasi gizi Rp. 4,795,200.00
Detergent anti noda 400 gr Rp.
Pemutih Rp.
Sabun cuci bentuk cream, 1 dus isi 24 @ 270 gr Rp.
Cairan pencuci piring (Double Power Lime, 200 ml refRp.
Rp.
Belanja Bahan-Bahan Bakar dan Pelumas Rp. 294,703,500.00
- Belanja bahan bakar minyak/gas ( genset , inceneraRp.
Solar Dex Rp.
- Belanja bahan bakar minyak/gas ( ambulans dan k Rp.
Pertamax Rp.
Bio solar Rp.
Pertalite Rp.
Pertamax turbo Rp.
Rp.
5.1.02.01.01.0005 Belanja Bahan-Bahan Baku Rp. 957,000.00
Bambu, Pring, Dia. 10 - 12 cm. Panjang 6 Meter Rp.
Rp.
Rp.
Belanja Bahan-Isi Tabung Pemadam Kebakaran Rp. 17,499,361.00
pengisian Appar 4,5 kg Rp.
pengisian Appar 6 kg Rp.
Alat Pemadam Api Ringan (Kapasitas 25 Kg (Refill) Rp.
Rp.
Belanja Bahan-Bahan Lainnya Rp. 14,967,861,753.00
Belanja Bahan-Isi Tabung Gas Rp.
LPG berat 15 kg ( di Instalasi gizi ) Rp.
Rp.
Belanja Bahan Radiologi Rp. 400,610,000.00
FILM RADIOLOGI CT SCAN Rp.
FILM RADIOLOGI CR SMALL Rp.
FILM RADIOLOGI CR MEDIUM Rp.
FILM RADIOLOGI DR SMALL Rp.
FILM RADIOLOGI DR MEDIUM Rp.
Rp.
Belanja Plate Rp. 2,240,110,754.00
3,5 MM CORTICAL SCREW - OF 510 16 Rp.
3,5 MM CORTICAL SCREW - OF 510 18 Rp.
3,5 MM CORTICAL SCREW - OF 510 20 Rp.
3,5 MM CORTICAL SCREW - OF 510 22 Rp.
3,5 MM CORTICAL SCREW - OF 510 36 Rp.
3,5 MM CORTICAL SCREW - OF 510 40 Rp.
3.5 MM CORTICAL SCREW - OF 510 14 Rp.
3.5 MM CORTICAL SCREW - OF 510 24 Rp.
3.5 MM CORTICAL SCREW - OF 510 30 Rp.
3.5 MM CORTICAL SCREW - OF 510 32 Rp.
4,5 MM CORTICAL SCREW - OF 50026 Rp.
4,5 MM CORTICAL SCREW - OF 50030 Rp.
4,5 MM CORTICAL SCREW - OF 50032 Rp.
4,5 MM CORTICAL SCREW - OF 50034 Rp.
4,5 MM CORTICAL SCREW - OF 50036 Rp.
4,5 MM CORTICAL SCREW - OF 50040 Rp.
4,5 MM CORTICAL SCREW - OF 50042 Rp.
4,5 MM CORTICAL SCREW - OF 50044 Rp.
4,5 MM CORTICAL SCREW - OF 50050 Rp.
4.5 MM CORTICAL SCREW - OF 50024 Rp.
4.5 MM CORTICAL SCREW - OF 50026 Rp.
4.5 MM CORTICAL SCREW - OF 50028 Rp.
4.5 MM CORTICAL SCREW - OF 50030 Rp.
4.5 MM CORTICAL SCREW - OF 50032 Rp.
4.5 MM CORTICAL SCREW - OF 50034 Rp.
4.5 MM CORTICAL SCREW - OF 50036 Rp.
4.5 MM CORTICAL SCREW - OF 50038 Rp.
4.5 MM CORTICAL SCREW - OF 50040 Rp.
4.5 MM MALLEOLAR SCREWS - OF 513 35 Rp.
4.5 MM MALLEOLAR SCREWS - OF 513 50 Rp.
4.5 MM MALLEOLAR SCREWS - OF 513 55 Rp.
4.5 MM MALLEOLAR SCREWS - OF 513 70 Rp.
A2FN NAIL FEMUR SET - SPI Rp.
ACRYLIC SET (Powder + Liquid) Rp.
BIPOLAR 39 Rp.
BIPOLAR 44 Rp.
BIPOLAR 46 Rp.
BIPOLAR HIP PROSTHESIS 45 Rp.
BIPOLAR HIP PROSTHESIS 49 Rp.
BONE GRAFT Rp.
BONECEMENT Rp.
BROAD / WIDE PLATES ACP HOLES - OF 1021 07 Rp.
BROAD / WIDE PLATES ACP HOLES - OF 1021 08 Rp.
BROAD / WIDE PLATES ACP HOLES - OF 1021 09 Rp.
BROAD / WIDE PLATES ACP HOLES - OF 1021 10 Rp.
BROAD / WIDE PLATES ACP HOLES - OF 1021 12 Rp.
CANCELLOUS FULL dia 4 MM - OF 511 18 Rp.
CANCELLOUS FULL dia 4 MM - OF 511 20 Rp.
CANCELLOUS FULL dia 4 MM - OF 511 36 Rp.
CANCELLOUS SCREW FULL THREAD 60 mm PBJ Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50135 Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50140 Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50160 Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50165 Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50170 Rp.
CANCELLOUS SCREWS FULL THREAD - OF 50175 Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CLAVICULA RECONSTACTION PLATE (TYPE D) - OF 10Rp.
CORTEX SCREW 4,5 - 34 mm PBJ Rp.
CORTEX SCREW 4,5 - 36 mm PBJ Rp.
DRILL BIT 2.5 Rp.
DRILL BIT 2.7 Rp.
DRILL BIT 3.2 Rp.
INTERLOCKING NAIL FEMUR - SPI Rp.
INTERLOCKING NAIL FEMUR SET - DMS Rp.
INTERLOCKING PFNA - SPI Rp.
K WIRE 1.0 Rp.
K WIRE 1.2 Rp.
K WIRE 1.4 Rp.
K WIRE 1.6 Rp.
K WIRE 1.8 Rp.
K WIRE 2.0 Rp.
K WIRE 2.2 Rp.
MULTI CONDILAR PLATES Holes ACP - OF 10581 R/6Rp.
NARROW PLATES ACP HOLES - OF 1020 07 Rp.
NARROW PLATES ACP HOLES - OF 1020 08 Rp.
NARROW PLATES ACP HOLES - OF 1020 09 Rp.
NARROW PLATES ACP HOLES - OF 1020 10 Rp.
ONE THIRD TUB PLATE - OF 1030 04 Rp.
ONE THIRD TUB PLATE - OF 1030 06 Rp.
RECONSTRACTION CURVED PLATE DIA 4,5 - SPI - 4 Rp.
S WIRE 1.0 Rp.
S WIRE 1.2 Rp.
S WIRE 1.4 Rp.
S WIRE 1.6 Rp.
SCHANZ SCREW 100 MM Rp.
SCHANZ SCREW 130 MM Rp.
SCHANZ SCREW 150 MM Rp.
SCHANZ SCREW 180 MM Rp.
SCHANZ SCREW 75 MM Rp.
SMALL BONE A PLATES - OF 1042 04 Rp.
SMALL BONE A PLATES - OF 1042 06 Rp.
SMALL BONE A PLATES - OF 1042 07 Rp.
SMALL BONE A PLATES - OF 1042 08 Rp.
SMALL BONE B PLATES - OF 1043 08 Rp.
SMALL T PLATE LOW PROFILE HOLE 3 Rp.
SMALL T PLATE LOW PROFILE HOLE 4 Rp.
SMALL T PLATE LOW PROFILE HOLE 5 Rp.
SMALL T PLATES - OF 1046 03 Rp.
SMALL T PLATES - OF 1046 04 Rp.
T PLATES tebal 3mm - OF 1051 04 Rp.
T PLATES tebal 3mm - OF 1051 05 Rp.
T PLATES tebal 3mm - OF 1051 06 Rp.
THORACOLUMBAL ORTHOSIS Rp.
TIBIA LATERAL PLATE HOLE 5 Rp.
TIBIA LATERAL PLATE HOLE 6 Rp.
TIBIA LATERAL PLATE HOLE 7 Rp.
TLC HOLE 4 - PBJ Rp.
TROCHANTER PLATE B - OF 1072 10 B Rp.
WASHER 6,5 Rp.
A2FN NAIL FEMUR SHORT SET - DMS Rp.
ELASTIC NAIL 4.0 X 440 MM - DMS Rp.
END CAP for ELASTIC NAIL - DMS Rp.
MULTILOC HUMERAL NAIL L - DMS Rp.
A2FN NAIL FEMUR SHORT SET - DMS Rp.
INTERLOCKING NAIL TIBIA SET - DMS Rp.
TKR SET - DMS Rp.
Belanja Plate lainnya Rp.
Rp.
Belanja Bahan dan Alat Kesehatan Habis Pakai Rp. 8,612,914,822.00
ADVANTIME 1 Rp.
ADVANTIME 3-0 Rp.
ALKOHOL 70% Rp.
ALKOHOL SWAB Rp.
APRONT Rp.
APRONT LENGAN PANJANG Rp.
BAYCIDE HIGH LEVEL Rp.
BAYZIME DETERGEN Rp.
BETADINE Rp.
BETADINE SOLUTION 60 ML Rp.
BREATHING CIRCUIT Rp.
BUFFER FORMALIN 10% Rp.
CHLORO TULLE Rp.
CHROMIC 0 Rp.
CUTICELL CLASSIC 10 x 10 Rp.
CUTTING LOOP STORZ MONO Rp.
DERMALON 2-0 Rp.
DERMALON 3-0 Rp.
DERMALON 4-0 Rp.
DISPOSABLE NEEDLE Rp.
ECOSORB 2 Rp.
ELECTRODE ECG Rp.
ENDOTRACHEAL TUBE Rp.
EQUIWAX 2,5 GR Rp.
ESU PAD PENCILS COUTER Rp.
ETHYL CHLORIDE Rp.
FILAPEAU 2-0 Rp.
FILAPEAU 3-0 Rp.
FILAPEAU 4-0 Rp.
GELAS KUMUR Rp.
GLOVES STERIL Rp.
GLOVES STERIL ORTHOPAEDIC Rp.
GUEDEL AIRWAY Rp.
GUTTA PERCHA SURE ENDO 0.04 Rp.
H2O2 3% Rp.
HARTRANS TAPE Rp.
HME FILTER Rp.
IV DRESSING Rp.
JACKSON REESE DEWASA Rp.
JAM STERILE WATER Rp.
KANTONG PLASTIK 12x0,3x30 Rp.
KAPAS PEMBALUT 250 GR Rp.
KARET GELANG Rp.
KASA HYDROFIL DRC 40x80 CM Rp.
KASA HYDROPHYL 40x80 Rp.
KASA PEMBALUT 4x5 Rp.
KASA STERIL 7,5x7,5 CM Rp.
KERTAS ECG 63x30 Rp.
KERTAS ECG C-110 Rp.
KERTAS USG Rp.
LAP SPONGE Rp.
LEUKOPLAST Rp.
LUBRICATING JELLY Rp.
MASKER ANASTHESI Rp.
MASKER BEDAH Rp.
MESS BB5 Rp.
METRACIDE 1 LTR Rp.
METRAZYME Rp.
NURSE CAP Rp.
OPTIME PGA 0 Rp.
OPTIME PGA 1 Rp.
OPTIME PGA 2 Rp.
OPTIME PGA 2-0 Rp.
OPTIME PGA 3-0 Rp.
PHARMAFIX 10x500 CM Rp.
PHARMAFIX 15x500 CM Rp.
PLAIN 2-0 Rp.
PLAIN 3/0 Rp.
PLAIN 4/0 Rp.
PLESTERIN Rp.
PLESTERIN BULAT Rp.
POLIWASH 5 L Rp.
POLYMED POLYVAC Rp.
POLYSORB 2-0 Rp.
POSTOFIX 10 x 15 CM Rp.
POSTOFIX 6 x 7 CM Rp.
POT URINE STERILE Rp.
PROLENE BLU 100 CM Rp.
PROLENE BLU 2-0 Rp.
SARUNG TANGAN NON STERIL Rp.
SILICON LARYNGEAL MASK Rp.
SILK 0 Rp.
SILK 1 Rp.
SILK 2-0 Rp.
SILK 3-0 Rp.
SILK 4-0 Rp.
SODASORB Rp.
SPINAL EGEMEN QUENCKE 25 Rp.
SPUIT 1 CC INSULIN Rp.
SPUIT 1 CC TUBERCULIN Rp.
SPUIT 10 CC Rp.
SPUIT 3 CC Rp.
SPUIT 5 CC Rp.
SUCTION CONNECTING Rp.
UNDERPAD 60 X 90 Rp.
USG GEL 250 ML Rp.
VIGILENZ CROMIC 2-0 Rp.
VIGILENZ PLAIN 2 Rp.
Paket Hemodialisa Lengkap Rp.
Citra-Lock Rp.
Paket 2C-Hd Rp.
ARM SLING - L Rp.
ARM SLING - M Rp.
ARM SLING - S Rp.
BACTERIA HME FILTER WITH PAPER WITH SOFT CAPRp.
Blood Set Rp.
BREATHING CIRCUIT - ADULT Rp.
BREATHING CIRCUIT - NEONATAL Rp.
BREATHING CIRCUIT - PEDIATRIC Rp.
CAPSUL KOSONG NO.0 Rp.
CAPSUL KOSONG NO.00 Rp.
CAPSUL KOSONG NO.1 Rp.
CAPSUL KOSONG NO.2 Rp.
CAPSUL KOSONG NO.3 Rp.
CATHETER MOUNT Rp.
CATHY 18 Rp.
CATHY 20 Rp.
CATHY 22 Rp.
CERVICAL COLLAR UNIVERSAL Rp.
CHLORO TULLE Rp.
Colostomy bag no 5 Rp.
Condom Catheter L-OM Rp.
CUTICELL CLASSIC 10 X 10 CM Rp.
DJ STENTS 5 FR OPEN WITH GUIDEWIRE Rp.
ELASTOMULL HAFT 10CM x 4M Rp.
ELASTOMULL HAFT 8CM X 4M Rp.
ENEMA SET - ONEMED Rp.
ETT 7,0 WITH CUFF Rp.
EXTENSION TUBE 150 CM Rp.
FLEET ENEMA 133 ML Rp.
FM CREPE 3 Rp.
FM CREPE 4 Rp.
FM CREPE 6 Rp.
FOLEY CATHETER 2-WAY CH.08 Rp.
FOLEY CATHETER 2-WAY CH.10 Rp.
FOLEY CATHETER 2-WAY CH.12 Rp.
FOLEY CATHETER 2-WAY CH.14 Rp.
FOLEY CATHETER 2-WAY CH.16 Rp.
FOLEY CATHETER 2-WAY CH.18 Rp.
FOLEY CATHETER 2-WAY CH.20 Rp.
FOLEY CATHETER 3-WAY CH.24 Rp.
GIPSONA 3/" Rp.
GYPSONA 4\" Rp.
GYPSONA 6\" Rp.
INFUSION SET OI - 34 MICRODRIP Rp.
INSTOPPER Rp.
JACKSON REEVES - ANAK Rp.
JACKSON REEVES - DEWASA Rp.
KASA STERIL Rp.
KORSET XL Rp.
KORSET XXL Rp.
KRUCK UK L Rp.
KRUCK UK M Rp.
LAMANARIA _UK L Rp.
LAMANARIA _UK M Rp.
MASKER ANASTESI SIZE 4 Rp.
MASKER ANASTESI SIZE 5 Rp.
MASKER NEBULIZER ANAK Rp.
MASKER NEBULIZER DEWASA Rp.
MASKER NON REBRITING ANAK Rp.
MASKER NON REBRITING DEWASA Rp.
MASKER O2 DEWASA Rp.
MAYO TUBE 4/090 (KUNING) Rp.
NASAL O2 ANAK Rp.
NASAL O2 BAYI Rp.
NASAL O2 DEWASA Rp.
NGT 12 Rp.
NGT 14 Rp.
NGT 16 Rp.
NGT 5 ( 100 CM ) Rp.
NGT 5 ( 40 CM ) Rp.
NGT 8 ( 100 CM ) Rp.
NGT 8 ( 40 CM ) Rp.
OTSU Y - SET ADAPTOR Rp.
PEN NEEDLE (Easy Flow) Rp.
PESARIUM NO. 6,5 Rp.
PESARIUM NO.6 Rp.
PESARIUM NO.7 Rp.
PESARIUM NO.7,5 Rp.
POLYBAN 3 Rp.
POLYBAN 4 Rp.
POLYBAN 6 Rp.
POLYWIN IV CANNULA 26 Rp.
POT PLASTIK 20 ML Rp.
POT PLASTIK 30 ML Rp.
SERENITY CERVICAL COLLAR Rp.
SPALK 100 X 10 CM Rp.
SPALK 40 X 10 CM Rp.
SPALK 40 X 8 CM Rp.
SPALK 50 X 10 CM Rp.
SPALK 50 X 8 CM Rp.
SPALK 60 X 10 CM Rp.
SPALK 60 X 8 CM Rp.
SPALK 80 X 10 CM Rp.
SPALK 90 X 10 CM Rp.
SPALK ANAK 12 X 5 CM Rp.
SPALK ANAK 15 X 7 CM Rp.
SPALK ANAK 7 X 5 CM Rp.
SPUIT 1 CC INSULIN 100 U Rp.
SPUIT 1 CC TUBERCULIN Rp.
SPUIT 10 CC Rp.
SPUIT 20 CC Rp.
SPUIT 3 CC Rp.
SPUIT 5 CC Rp.
SPUIT 50 CC Rp.
SPUIT 50 CC CATHETER TIP Rp.
SPUIT ABG PRESET 3 CC - BD Rp.
STIKPAN PLASTIK DELUXE BLUE Rp.
STOCKINET 3\\\" Rp.
STOCKINET 4\\\" Rp.
SUCTION CATH 10 - HOSPITECH Rp.
SUCTION CATH 12 Rp.
SURFLO 24 - ecath Rp.
TENSOPLAST - STK - ADULT Rp.
TENSOPLAST - STK - CHILD Rp.
THORASIC CATHETER WITH TROCAR 24 / WSD Rp.
THREE WAY STOPCOCK Rp.
THREE WAY STOPCOCK WITH TUBING Rp.
TRANSPORE Rp.
UMBILICAL CATHETER 3,5 Fr Rp.
UMBILICAL CATHETER 5 Fr Rp.
URIN BAG STERIL - UP Rp.
URINAL LAKI LAKI Rp.
URINAL PEREMPUAN Rp.
WING NEEDLE 21 Rp.
WING NEEDLE 23 Rp.
Gas Oksigen Tabung - 1 M3 Rp.
Gas Oksigen Tabung - 2 M3 Rp.
Gas Oksigen Tabung - 6 M3 Rp.
Liquid Rp.
Gas CO² - 4 kg Rp.
Bahan Alat Habis Pakai lainnya Rp. 32,000,000.00
Rp.
Bahan lainnya (laboratorium patologi klinik ) Rp. 1,993,346,389.00
Vacum serum blood collec 4 ml Rp.
Tabung reaksi Rp.
Reaction cuvet Rp.
Cover glass Rp.
Obyek glass Rp.
K Termal 5,7 Rp.
K Termal 8 Rp.
Yellow tipe 1000 Rp.
Blue tipe 1000 Rp.
Short spl 0,8 1000 Rp.
Short spl 3 ml 1000 Rp.
Mikrosenfuge 500 Rp.
Vacum edta 2,ml 100 Rp.
Vacum edta0.5ml 50 Rp.
Na Citrat vakum 100 Rp.
HBA1C 25 test Rp.
HCG 50 test Rp.
HCV 50 test Rp.
VDRL 50 test Rp.
IGG/IGM 25 test Rp.
HIV 50 test Rp.
ISTAT G3+ 25 test Rp.
Diabcheck Rp.
countour gda stik Rp.
Multidrug 5 25 test Rp.
Multidrug 5 answer Rp.
HbsAg nnswer 50 test Rp.
HbsAg SD 30 test Rp.
TSH 25 test Rp.
T3 25 test Rp.
T4 25 test Rp.
CRP 25 test Rp.
D Dimer 25 test Rp.
ERBA Rp.
Cell Pack Rp.
Rp.
Bahan lainnya (laboratorium patologi anatomi) Rp. 42,015,720.00
Kaset tanpa tutup Rp.
Coverglass ukuran (60x24mm) Rp.
Objekglass Rp.
Pisau Mikrotom Rp.
Kertas saring Rp.
Rp.
Bahan-bahan Lainnya ( CSSD ) Rp. 113,596,068.00
Steam indicator class 5 Rp.
Bowie Dick Test Pack Rp.
3 Lines labels CD 23 Rp.
Washer Indikator Rp.
Indikator Tape Rp.
Biological Indikator Rp.
Kasa Gulung DRC Rp.
Pouches gusset 10 cm Rp.
Pouches flat 25 cm Rp.
Wrapping paper crepe biru 100x100 Rp.
Thermal Register Roll Rp.
Tinta hand labeler Rp.
Rp.
Belanja bahan Lainnya ( belanja Darah ) Rp. 1,500,000,000.00
Belanja Darah Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tuli Rp. 421,725,736.00
ATK perkantoran Rp.
Amplop 90 (kabinet) isi 100 Rp.
Amplop 104 (tanggung) iso 100 Rp.
Box File Plastik Rp.
Buku Expedisi isi 100 lembar Rp.
Buku Expedisi isi 200 lembar Rp.
Buku Agenda KM Deluxe 2016 Rp.
Buku Folio isi 100 lembar Rp.
Buku Folio isi 200 lembar Rp.
Binder Clip 105 Rp.
Binder Clip 155 Rp.
Binder Clip 200 Rp.
Binder Clip 260 Rp.
Ballpoint Biasa (Hitam) Rp.
Ballpoint Biasa ( Merah ) Rp.
Ballpoint Biasa (Biru) Rp.
Ballpoint Sejenis Pentel Rp.
Cutter K-200 Rp.
Cutter A-300 Rp.
Isi Cutter Kecil Rp.
Isi Cutter Besar Rp.
Correction Tipe x Pen Rp.
Correction Tipe x Kertas Rp.
Gunting Besar Rp.
Isi Stapples No 10 Rp.
Kertas Continuous Form 2 Ply Rp.
Kertas Continuous Form 3 Ply Rp.
Kertas Hvs A4 70 Gram Rp.
Kertas Hvs A4 80 Gram Rp.
Kertas Hvs F4 70 Gram Rp.
Kertas Hvs F4 70 Gram Include Potong Rp.
Ordner 1466 F SFL Rp.
Ordner jumbo Rp.
Paper Clips No 1 Rp.
Penggaris 30 cm Rp.
Penghapus kecil Rp.
Pensil 2 B Rp.
Snelhecter Map Kertas Rp.
Snelhecter Map Plastik Rp.
Stop Map Kertas Folio Rp.
Spidol Permanen Rp.
Spidol Whiteboard (Boardmarker) Rp.
Stabilo Rp.
Stamp Pad Rp.
Staples Kecil Hd 10 Rp.
Staples Besar HD 12A/13 (Tuas Jilid) Rp.
Steples Tembak Rp.
Refill Stempel Ungu Rp.
Isolasi Bening Besar Rp.
Isolasi Bening 12 Mm Rp.
Plakband 2'( Hitam) Rp.
Plakband 1,5' (hitam ) Rp.
Post It/Notes Plastik Rp.
Ordner Plastik Rp.
Post It/Notes Kertas besar Rp.
Isolasi Kertas Rp.
Isolasi Kertas 1" Rp.
Double Tape Besar 2" Hijau Rp.
Map Kancing Plastik Rp.
Cover ID Card bahan plastik Rp.
Buku Kwitansi Besar 100 lembar Rp.
Kertas Label No 12 (110) Rp.
Kertas Label No 12 (109) Rp.
Tinta Printer 100 Hitam Rp.
Tinta Printer 100 Merah Rp.
Tinta Printer 100 Kuning Rp.
Tinta Printer 100 Biru Rp.
Tinta Printer 664 Hitam Rp.
Tinta Printer 003 Hitam Rp.
Tinta Printer 003 Biru Rp.
Tinta Printer 003 Kuning Rp.
Tinta Printer 003 Merah Rp.
Refill Stempel Flash Ungu Rp.
Karet Gelang Rp.
Stop Map Plastik Rp.
Refill Ballpoint Hitam Rp.
Refill Ballpoint Biru Rp.
Buku Tulis Rp.
Tinta Printer 774 Hitam Rp.
Kertas Foto Glossy Rp.
Ballpoint Meja Rp.
Plastik Sampul Jilid Rp.
Lem Kertas besar Rp.
Plastik Pres laminating Rp.
Stempel Rp.
Belanja ATK lainnya Rp.
Rp.
BELANJA UNTUK ATK / PENGEMAS DI INSTALASI GIZRp. 720,000.00
Isolasi plastik Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor- Kertas dRp. 126,156,552.00
Belanja kertas dan Cover kegiatan perkantoran Rp.
Kertas Label thermal Rp.
Rp.
ETIKET DI INSTALASI GIZI Rp. 4,056,552.00
Etiket Label Diet print Rp.
Etiket Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor- Bahan CRp. 1,042,872,265.00
- Belanja piagam pelatihan Sertifikat Bimtek/Pelati Rp. 3,196,800.00
kertas label Rp.
- Belanja cetak kartu pasien Rp.
Rp.
- Belanja cetak blangko rekam medis, map, amplop, Rp. 805,632,200.00
BENDEL STATUS FORM UMUM (termasuk biaya set)Rp.
BENDEL STATUS FORM PONEK (termasuk biaya set) Rp.
BENDEL STATUS FORM BAYI (termasuk biaya set) Rp.
BENDEL STATUS FORM RAJAL (termasuk biaya set) Rp.
BENDEL STATUS FORM UGD (termasuk biaya set) Rp.
StopMap Rekam Medis Rp.
Amplop Ct Scan Rp.
Amplop Kabinet Besar Rp.
Amplop Radiologi Besar Rp.
Amplop USG Rp.
Bukti Pengambilan dan Penyerahan Linen Rp.
Buku Register Radiologi Rp.
Etiket Kocok Dahulu Rp.
Etiket Tablet Rp.
Form Askep Ansietas Rp.
Form Askep Bersihan Jalan Nafas Tidak Efektif Rp.
Form Askep Hypertermia Rp.
Form Askep Nyeri Akut Rp.
Form Atas Permintaan Sendiri (Aps) Rp.
Form Bon Pengambilan BAHP Rp.
Form Catatan Anestesi Rp.
Form Catatan Pemakaian Obat Rp.
Form Catatan Perkembangan Pasien Terintegrasi (C Rp.
Form Catatan Pre Operasi Rp.
Form ceklist keselamatan bedah Rp.
Form Deteksi Dini Covid 19 Rp.
Form DPJP Rp.
Form Persetujuan Tindakan Transfusi Darah pasien Rp.
d
Form Laborat Rp.
Form Lembar Konsultasi Rp.
Form Penandaan Operasi Pria Rp.
Form Penandaan Operasi Wanita Rp.
Form Pendaftaran Pasien Baru Rp.
Form Penempelan Hasil EKG, Eeg, Foto Audiometri Rp.
From Pengajian Pra Anestesi Rp.
From Penolakan Tindakan Kedokteran Rp.
From Permintaan Obat Dan Alkes Rp.
From Permintaan Radiologi Rp.
From Permintaan Rawat Inap Rp.
From Pernyataan Serah Terima Jenazah Rp.
From Persetujuan Anestesi Sedasi Rp.
From Persetujuan Operasi Rp.
From Tindakan Kedokteran Pasien Dialisis Rp.
From Rekam Keperawatan Intensif Rp.
From Resume Pasien Jaminan Kesehatan Nasional Rp.
Form Resume Poliklinik ( Summary List ) Rp.
Form Salinan Resep Rp.
Form Sertifikat Kematian Rp.
Form Surat Keterangan Opname Rp.
Form Surat Keterangan Rawat Inap Rp.
Form surat Pemeriksaan NST / CTG Rp.
Form Transfer Pasien Antar Ruang Perawatan Rp.
Form. Catatan Penggunaan Dan Perawatan Mesin Rp.
Form. Data Demografi Pasien Dialisis Rp.
Form. Pengkajian Ulang Resiko Jatuh Dewasa Rp.
Form. Observasi Tranfusi Darah Rp.
Form. Pemakaian BAHP ( GA ) Rp.
Form. Pemakaian BAHP ( SAB ) Rp.
Form. Pernyataan Kesanggupan Biaya (3 x 24 jam) Rp.
Form. Pernyataan Pindah Kelas Perawatan Rp.
Form. Rencana Perawatan Dialisis Rp.
Form. Surat Keterangan Kesehatan Rp.
Form. Surat keterangan Kesehatan Mata Rp.
Form. Surat Keterangan Sakit Rp.
Form.Bayi Baru Lahir Rp.
Form.Identifikasi Bayi Baru Lahir Rp.
Form.Patologi Anatomi Rp.
Form.Pernyataan Kesanggupan Pembiayaan Umum Rp.
Form Askep Hipotermia Rp.
Form. Monitoring HD Rp.
Form. Assemen Awal Medis Dialisis Rp.
Kartu Stock Rp.
Label Nomor Pengambilan Obat Rp.
Stiker High Alert Kecil Rp.
StopMap Merah Tua Rumah Sakit Rp.
Form Keterangan Pemeriksaan Kesehatan Jiwa Rp.
Form Keterangan Pemeriksaan Jiwa Rp.
Kartu Pengobatan Pasien TB Rp.
Form Persetujuan Tindakan Tranfusi Darah Rp.
Form Persetujuan Tindakan Kedokteran Rp.
Form Surat Jalan Hemodialisa Rp.
Form Label Indentitas Rp.
Form Buku TBC Rp.
Form Pengkajian Resiko Jatuh Anak Rp.
Form Persetujuan Tindakan Fiksasi Makanik Rp.
Form Pengkajian Keperawatan Jiwa Rp.
Form Surat Pernyataan Keluarga Pasien Rp.
Form Evaluasi Keperawatan Jiwa Rp.
Stopmap Hijau Rumah Sakit Rp.
Form Pengkajian Gigi Dan Mulut (1 sisi) Rp.
Form Pengkajian Ulang Resiko Jatuh Anak Rp.
Form Pengkajian Restrain Jiwa Rp.
Form Rencana Asuhan Keperawatan Jiwa Waham Rp.
Form Rencana Asuhan Keperawatan Jiwa Bunuh DirRp.
Form Rencana Asuhan keperawatan Jiwa Perilaku KRp.
Form Rencana Asuhan keperawatan Jiwa Koping Tida Rp.
Form Rencana Asuhan keperawatan Jiwa Isolasi SosiRp.
Form Rencana Asuhan keperawatan Jiwa Harga DiriRp.
Form Rencana Asuhan keperawatan Jiwa GangguanRp. P
Form Rencana Asuhan keperawatan Jiwa GangguanRp.
Form Pengkajian Resiko Jatuh Pasien Geriatri Rp.
Form Pengkajian Dan Intervensi Resiko Jatuh (Get Rp.
Form Serah Terima Pasien Kepada Keluarga Rp.
Form Pengkajian Keperawatan Jiwa (Laporan OperasRp.
Form Ews Anak Rp.
Form Ews Dewasa Rp.
Form Ews Obsertetri Rp.
Form Permintaan/Pembambilan Atk Dan Cetakan Rp.
Form pemberian edukasi rawat inap Rp.
Form Rekonsiliasi Obat Rp.
Form Pasien Terintegrasi Rp.
Form Pernyataan Persetujuan Umum Rp.
Form Laporan Operasi PAB Rp.
Form Pernyataan Penyerahan Organ Rp.
Form Pemeriksaan TB Rp.
Form Instalasi Farmasi Rp.
Form etiket instalasi radiologi Rp.
sticker lasa Rp.
Buku unit dialisis Rp.
Form saran pengaduan rawat inap Rp.
Form saran pengaduan IGD Rp.
Form saran pengaduan rawat Jalan Rp.
Form pengkajian instalasi Kebidanan Rp.
Stiker Inventaris Rp.
Stiker Diet Gizi Rp.
Etiket Snack Rp.
Etiket Snack DM Pagi Rp.
Etiket Snack DM Sore Rp.
Belanja Cetakan Lainnya Rp.
Rp.
- Belanja cetak leaflet , poster, stiker, kalender, ba Rp. 46,801,750.00
Cetak Kalender OPD Rp.
Rp.
Belanja cetak leaflet Rp.
Leaflet Ap120 Gram, Fullcolor, 2 Muka Rp.
Rp.
Belanja cetak poster Rp.
Poster Termasuk Biaya Design Rp.
Poster Tipis UV 50 x 70 cm Rp.
Rp.
Belanja cetak stiker Rp.
Stiker Cutting Rp.
Rp.
- Belanja bahan dekorasi ( spanduk, banner ) kegia Rp.
Banner/Spanduk/Vinnyl Fl 300 Gsm Rp.
Banner/Spanduk/Vinnyl Fl 440 Gsm Korcin Rp.
Rp.
Belanja Penggandaan Rp. 146,658,750.00
- Belanja penggandaan kegiatan administrasi perka Rp.
Photo Copy HVS A4/F4 70 gr Rp.
- Belanja penggandaan kegiatan Akreditasi Rumah SRp.
Photo Copy HVS A4/F4 70 gr Rp.
- Belanja penggandaan kegiatan pelatihan internal Rp.
Photo Copy HVS A4/F4 70 gr Rp.
Rp.
Belanja Penjilidan Rp. 6,464,085.00
Jilid Softcover F4; tebal 3-7 cm Rp.
Jilid Softcover F4; tebal 1-2 cm Rp.
Jilid Softcover A4; tebal 1-2 cm Rp.
Jilid Softcover F4; tebal 8-13 cm Rp.
Jilid Biasa, Mika + Lakban 3 s/d 7 cm Rp.
Jilid Semi Hardcover A3, tbl s/d 3 cm Rp.
Rp.
Belanja Papan Rp. 21,898,080.00
Papan nama tulisan akrilik gantung Rp.
Papan nama tulisan akrilik frame Rp.
Rp.
Belanja ID card Rp. 610,000.00
ID CARD (TAMU/SURVEYOR) Rp.
ID CARD (PENUNGGU PASIEN) Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Benda P Rp. 7,605,858.00
Materai Materai 10000 Rp.
Perangko Kilat Biasa Rp.
Perangko Kilat Express Rp.
Perangko Kilat Khusus Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan K Rp. 25,873,545.00
Pita Komputer Epson kecil Rp.
Pita Komputer Epson Lq-1031 Rp.
Pita Komputer Epson Kecil + Cartridge Rp.
Cartridge Ribbon Cartridge LX 310 Rp.
Cartridge LQ 2190 Ribbon Cartridge Rp.
Flash Disk 32 GB Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Rp. 521,833,371.00
- Belanja Alat/Bahan kebersihan Rp. 191,314,298.00
Timba plastik uk. 80 liter Rp.
Bak plastik uk. 30 liter Rp.
Keset bludru Rp.
Dispenser tissue handtowel Rp.
Dispenser handsoap Rp.
Tissue handtowel 120 sheet Rp.
Tissue Kotak Rp.
Pengharum ruangan ( stela air fresener alat matic) Rp.
Container box ukuran L Rp.
Container box ukuran M Rp.
Spillkit Rp.
Pressure sprayer @ 2 liter Rp.
Rp.
- Belanja Alat/Bahan pengelolaan linen Rumah SakitRp. 94,197,850.00
Kantong plastik 0,4X80X100 Natural/Bening Rp.
Plastik laundry Rp.
Keranjang cucian Loundry Box L Rp.
Tempat sampah injak greenleaf 120 liter warna biruRp.
Tempat sampah injak greenleaf 120 liter warna kunRp.
Rp.
- Belanja Alat/Bahan pengelolaan sampah Rp. 236,321,223.00
Kantong sampah plastik 0,4x80x100 hitam sablon Rp.
Kantong sampah plastik 0,4x80x100 kuning sablon Rp.
Kresek sampah plastik jumbo hitam sablon Rp.
Tas Kresek plastik jumbo kuning sablon Rp.
Tempat sampah injak 36 liter grey Rp.
Tempat sampah injak 36 liter yellow Rp.
Tempat sampah injak 70 liter grey Rp.
Tempat sampah injak 70 liter yellow Rp.
Safety box kapasitas 12,5 liter Rp.
Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat ListrRp.
Embodos Kotak Hitam Rp.
Fiting Plafound Rp.
Isolasi Kabel Rp.
Konektor TC 2 Baut Rp.
Kabel Ties 15 cm nylon Rp.
Kabel Ties 10 cm nylon Rp.
Kabel Ties 30 cm nylon Rp.
Kabel NYM 2x1,5 mm Rp.
Kabel NYM 2x2,5 mm Rp.
Kabel NYM 3x2,5 mm Rp.
Kabel NYYHY 3x0,75 mm Rp.
Kabel NYA 2,5 mm Rp.
Klem Kabel 6 mm Rp.
Klem Kabel 9 mm Rp.
Klem Kabel 10 mm Rp.
Klem Kabel 12 mm Rp.
Lampu LED 8 W Rp.
Lampu LED 4 W Rp.
Lampu LED 14,5 W Rp.
Lampu LED 19 W Rp.
Lampu Sorot LED 50 W Rp.
Lampu Sorot LED 30 W Rp.
Lampu PJU LED 30 W Rp.
MCB 1 Phase (6/10/16 A) Rp.
MCCB 800 A 50 KA Rp.
MCCB 1250 A 50 KA Rp.
Kabel Duct TC 4 Rp.
Saklar Seri 16A 250V Rp.
Saklar Engkel 16A 250V Rp.
Stop Kontak 16A 250V Rp.
Steker Broco 16A 250V Rp.
Steker T Broco 13A 250V Rp.
Stop Kontak 4 lubang Rp.
Stop Kontak 1 Lubang Rp.
Stop Kontak 2 Lubang Rp.
Lampu Downlight 7,5 W Rp.
Battery , Alkaline AA2 1,5V Rp.
Battery Alkaline AAA3 1,5V Rp.
Battery Kotak Alkaline 9V Rp.
Switch hub Rp.
alat listrik Lainnya Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor- Perlen Rp.
Plakat Akrilik 35 Rp.
Plakat Bahan : kayu 12 Rp.
Rp.
Belanja Alat/Bahan untuk Kegiatan Kantor-Alat/BahRp.
Belanja peralatan upacara dan hari besar nasional Rp.
Bendera Merah Putih 210 Cm X 100 Cm Rp.
Rp.
Belanja Karangan Bunga Rp.
Papan Bunga Digital Printing Uk. 250 x 150 cm 1 titi Rp.
Rp.
Belanja penutup badan Rp.
Scot kain petugas Rp.
Baju pasien setelan/piyama Rp.
Baju pasien atasan/kimono Rp.
Baju pasien operasi Rp.
sarung pasien Rp.
Rp.
Belanja Barang Peralatan Rumah Tangga Rp.
Choper Rp.
Wajan Teflon Besar Rp.
Wajan Cetak Teflon Rp.
Container sayur Rp.
Container Bumbu Rp.
Panci Besar Rp.
Wajan Besar Rp.
Telenan Rp.
Lepek Lauk Rp.
Mangkok Sayur Rp.
Mangkok Bubur Rp.
Capit Makanan besar Rp.
Capit Makanan kecil Rp.
Toples Susu Rp.
Toples Bumbu Rp.
Nampan VIP Rp.
Jampel Rp.
Tempat Sample Makanan Rp.
Serok tanggung Rp.
Serok Kecil Rp.
Irus Sayur Rp.
Timbangan Kue Rp.
Botol Minyak Rp.
Chafing disk jumbo Rp.
Regulator Rp.
Rp.
Peralatan Kantor Rp.
Wall Fan Rp.
Kursi Rapat ( Kursi Susun ) Rp.
Tabung APAR 4,5 kg Rp.
Rp.
BAHAN PENGEMAS MAKANAN DAN PEMBERSIH DI IN
Rp.
Gelas Minum Rp.
Cup Lauk Mika Rp.
Box Mika Rp.
Plastik 18 an Rp.
Plastik Es Rp.
Plastik Klip Besar Rp.
Plastik Klip Kecil Rp.
Plastik Opp 11 an Rp.
Plastik Opp 14 an Rp.
Plastik Sealer Rp.
Plastik Wraping Rp.
Kertas Nasi Rp.
Kotak Nasi Disposible Rp.
Kresek Jumbo Rp.
Kresek Putih Rp.
Sarung Tangan Plastik Rp.
Sendok Plastik Rp.
Spon Rp.
Tisu Warna Rp.
Rp.
Belanja Gelang Pasien Rp.
Gelang identitas pasien Rp.
Rp.
Belanja Linen Pasien Rp.
Bed cover set Rp.
Sprei Rp.
Sprei box bayi Rp.
Perlak Rp.
Perlak bersalin Rp.
Perlak bayi Rp.
Selimut Rp.
Stik laken Rp.
Sarung bantal Rp.
Sarung bantal bayi Rp.
Handuk kecil Rp.
Handuk besar Rp.
Duk kecil Rp.
Duk besar Rp.
Duk bungkus Rp.
Duk lubang Rp.
Duk mata Rp.
Fiksasi pasien Rp.
Penutup jenazah Rp.
Penutup keranda Rp.
Penutup alat Rp.
Taplak makan pasien Rp.
Rp.
Belanja hospital curtain Rp.
Gorden +rel Rp.
Kain sketsel Rp.
Rp.
Belanja Obat-Obatan-Obat Rp.
ACARBOSE 100 MG Rp.
ACARBOSE 50 MG Rp.
ACETYLCYSTEINE 200 MG Rp.
ACYCLOVIR 400 MG Rp.
ACYCLOVIR 5% CREAM Rp.
ADALAT OROS 30 MG Rp.
AKILEN TT Rp.
ALLOPURINOL 100 MG Rp.
ALLOPURINOL 300 MG Rp.
ALPRAZOLAM 0,5 MG Rp.
ALPRAZOLAM 1 MG Rp.
AMBROXOL 30 MG Rp.
AMBROXOL HCL 15MG/5ML SYR Rp.
AMIKACIN INJ 250 MG Rp.
AMINOFUSIN HEPAR INF Rp.
AMINOLEBAN INJ 500 ML Rp.
AMINOPHYLLINE INJ Rp.
AMIODARONE 200 MG Rp.
AMIODARONE HCL INJ Rp.
AMITRIPTYLINE 25 MG Rp.
AMLODIPINE 10 MG Rp.
AMLODIPINE 5 MG Rp.
AMOXYCILLIN 500 MG Rp.
AMOXYCILLIN SYR 125 MG Rp.
ANALSIK Rp.
ANTASIDA DOEN Rp.
ANTASIDA DOEN SUSP 60 ML Rp.
ANTIHEMOROID SUPP 2 GR Rp.
ARCAPEC TAB Rp.
ARINIA 10 MG Rp.
ARIXTRA INJ 2,5 MG/0,5 ML Rp.
ASAM FOLAT 400 MCG Rp.
ASAM MEFENAMAT 500 MG Rp.
ASAM TRANEKSAMAT 500 MG Rp.
ASAM TRANEKSAMAT INJ 250 MG Rp.
ASAM TRANEKSAMAT INJ 500 MG Rp.
ASERING INF 500 ML Rp.
ASTHENOF 5 ML Rp.
ATORVASTATIN 20 MG Rp.
ATROPINE 0,25 MG INJ Rp.
AVAMYS NASAL SPRAY Rp.
AZITHROMYCIN 500 MG Rp.
BACTESYN INJ 0,75 GR Rp.
BAQUINOR 0,3% EYE DROP Rp.
BETADINE OBAT KUMUR 190 ML Rp.
BETAHISTINE 6 MG Rp.
BETAMETASON CREAM 5 GR Rp.
BIOSAVE 5 ML INJ - E KAT Rp.
BISACODYL 5 MG Rp.
BISOPROLOL 2,5 MG Rp.
BISOPROLOL 5 MG Rp.
BRALIFEX PLUS EYE DROP Rp.
BRILINTA 90 MG Rp.
BUSCOPAN 10 MG Rp.
BUSCOPAN INJ Rp.
CA GLUCONAS 10% INJ Rp.
CA POLYSTYRENE SULFONATE Rp.
CALCITRIOL 0.5 MCG Rp.
CALCIUM LACTAT 500 MG Rp.
CALITOZ KAPLET Rp.
CANDESARTAN 16 MG Rp.
CANDESARTAN 8 MG Rp.
CAPSINAT 500 Rp.
CAPTOPRIL 25 MG Rp.
CARBAMAZEPINE 200 MG Rp.
CARPINE 2% ED Rp.
CARVEDILOL 6.25 MG Rp.
CATARLENT 5 ML ED Rp.
CEFADROXYL 500 MG Rp.
CEFADROXYL SYR 125 MG Rp.
CEFADROXYL SYR 250 MG Rp.
CEFIXIME 100 MG Rp.
CEFIXIME SYR 30 ML Rp.
CEFOTAXIME 1 GR INJ Rp.
CEFTAZIDIME INJ 1 GR Rp.
CEFTRIAXONE 1 GR INJ Rp.
CELECOXIB 100 MG Rp.
CELECOXIB 200 MG Rp.
CENFRESH MDS Rp.
CETIRIZINE 10 MG Rp.
CETIRIZINE SYR 60 ML Rp.
CHLOR.MALEAT (CTM) Rp.
CHLORPROMAZINE 100 MG Rp.
CIPROFLOXACIN 500 MG Rp.
CIPROFLOXACIN INF 200 MG Rp.
CITICHOLINE 500 MG Rp.
CITICHOLINE INJ 1000 MG Rp.
CITICHOLINE INJ 500 MG Rp.
CLINDAMYCIN 300 MG Rp.
CLOBAZAM 10 MG Rp.
CLOPIDOGREL 75 MG Rp.
CLOZAPINE 100 MG Rp.
CLOZAPINE 25 MG Rp.
CODEIN 10 MG Rp.
CODEIN 20 MG Rp.
COLCHICINE 0.5 MG Rp.
COLSANCETINE INJ 1 GR Rp.
COMAFUSIN HEPAR INF Rp.
COMBIVENT 2,5 ML UDV Rp.
CONCOR 1,25 MG Rp.
CONVER 2% MDS Rp.
COTRIMOXAZOLE FORTE Rp.
CURCUMA 20 MG TAB Rp.
CURCUMA PLUS SYR Rp.
DEPAKOTE ER 500 MG Rp.
DESOXIMETASONE 0,25 % CR Rp.
DEXAMETHASON 0,5 MG Rp.
DEXAMETHASON INJ Rp.
DIAZEPAM 2 MG Rp.
DIAZEPAM 5 MG Rp.
DIAZEPAM 5 MG/ML INJ Rp.
DIGOXIN 0,25 MG Rp.
DILTIAZEM 30 MG Rp.
DIMENHYDRINATE 50 MG Rp.
DIPHENHYDRAMIN INJ Rp.
DIVALPROEX SODIUM 250 MG Rp.
DOBUTAMINE HCL 250 MG/5 ML Rp.
DOMPERIDONE 10 MG Rp.
DOMPERIDONE SYR 60 ML Rp.
DOPAMET 250 MG Rp.
DULCOLAX 10 MG SUPPO Rp.
ECOSOL NACL 0,9% 100 ML Rp.
EFLIN TAB Rp.
ELXION 10 MG Rp.
EPERISONE HCL 50 MG Rp.
EPHEDRIN HCL INJ Rp.
EPINEPHRINE INJ 0,1 % Rp.
ERGOTAMINE COFFEIN Rp.
ESTA - 2 Rp.
ETHAMBUTOL 500 MG Rp.
EZELIN Rp.
FARGOXIN INJ Rp.
FARNORMIN Rp.
FENOFIBRATE 100 MG Rp.
FENOFIBRATE 300 MG Rp.
FENTANYL 0,05 MG/ML 2 ML Rp.
FIBRION 1500000 IU Rp.
FIMA MANNITOL 20% INF - JKN Rp.
FLAMAR EYE DROP Rp.
FLIXOTIDE NEBULES 0,5 MG/2 ML Rp.
FLUCONAZOLE 150 MG Rp.
FLUNARIZINE HCL 10 MG Rp.
FLUNARIZINE HCL 5 MG Rp.
FLUOXETINE 20 MG Rp.
FOROTIC TT Rp.
FORUMEN TT Rp.
FRESOFOL 1% INJ Rp.
FUKRICIN EYE DROP Rp.
FURAMIN INJ Rp.
FUROSEMIDE 40 MG Rp.
FUROSEMIDE INJ Rp.
FUTROLIT INF Rp.
GABAPENTIN 100 MG Rp.
GABAPENTIN 300 MG Rp.
GABAXA 100 Rp.
GALVUS 50 MG Rp.
GARAM INGGRIS 30 GR Rp.
GEMFIBROZIL 300 MG Rp.
GENOINT 0,3% SALEP MATA 3,5 GR Rp.
GENTAMYCIN 0,1% SK Rp.
GENTAMYCIN 40 MG INJ Rp.
GLAUSETA Rp.
GLIBENCLAMIDE 5 MG Rp.
GLICLAZIDE 80 MG Rp.
GLIMEPIRIDE 1 MG Rp.
GLIMEPIRIDE 2 MG Rp.
GLIMEPIRIDE 3 MG Rp.
GLIMEPIRIDE 4 MG Rp.
GLIQUIDONE 30 MG Rp.
GLUCOSAMINE MPL 250 MG Rp.
GLUCOSAMINE MPL 500 MG Rp.
HALOPERIDOL 0,5 MG Rp.
HALOPERIDOL 1,5 MG Rp.
HALOPERIDOL 5 MG Rp.
HEMAPO 3000 IU INJ Rp.
HERBESSER CD 100 MG Rp.
HERBESSER CD 200 MG Rp.
HERVIS EYE OINT Rp.
HEXIOL INJ 350 MG/ ML Rp.
HOMATRO 2% 5 ML Rp.
HUMAN ALBUMIN 20% 100 ML Rp.
HUMAN IMMUNOGLOBULIN INJ Rp.
HYDROCHLORTHIAZIDE (HCT) 25 MG Rp.
HYDROCORTISONE CR 2,5% Rp.
HYDROXYCHLOROQUINE 200 MG Rp.
HYDROXYUREA MEDAC 500 MG Rp.
HYOCINE-N-BUTYLBROMIDE INJ Rp.
IBUPROFEN 400 MG Rp.
IBUPROFEN SUSP 100 MG/5 ML Rp.
INVICLOT INJ Rp.
IOPAMIRO 370 - 50 ML Rp.
ISONIAZIDE 100 MG Rp.
ISONIAZIDE 300 MG Rp.
ISOSORBIDE DINITRAT 5 MG Rp.
KALIUM DIKLOFENAK 50 MG Rp.
KETOCONAZOLE 2% CREAM Rp.
KETOCONAZOLE 200 MG Rp.
KETOPROFEN 100 MG Rp.
KETOROLAC INJ 30 MG Rp.
KSR Rp.
LAKTULOSA SYR 60 ML Rp.
LANSOPRAZOLE 30 MG Rp.
LANSOPRAZOLE INJ Rp.
LANTUS SOLOSTAR Rp.
LATANOPROST EYE DROP Rp.
LAVIT-C 1000 MG INJ Rp.
L-BIO SACHET Rp.
LEVEMIR FLEX PEN Rp.
LEVOCIN EYE DROP Rp.
LEVOFLOXACIN 500 MG Rp.
LEVOFLOXACIN INFUS 100 ML Rp.
LEVOPAR Rp.
LEVOTHYROXINE 100 MG Rp.
LIDOCAIN 2% INJ Rp.
LISINOPRIL 10 MG Rp.
LISINOPRIL 5 MG Rp.
LODOMER INJ 5 MG Rp.
LOPERAMIDE HCl 2 MG Rp.
LORATADINE 10 MG Rp.
LORAZEPAM 2 MG Rp.
LOVENOX 0,4 ML Rp.
LOVENOX 0,6 ML Rp.
MAPROTILINE 50 MG Rp.
MARIMER ISOTONIC Rp.
MECOBALAMIN 500 MCG Rp.
MECOBALAMIN INJ 500 MCG Rp.
MELIDOX TAB Rp.
MELOXICAM 15 MG Rp.
MELOXICAM 7,5 MG Rp.
MEPROVENT Rp.
MERLOPAM 2 MG Rp.
MEROPENEM 1 GR INJ Rp.
MESTINON 60 MG Rp.
METAMIZOL INJ Rp.
METFORMIN 500 MG Rp.
METHYLERGOMETRIN 0,125 MG Rp.
METHYLPREDNISOLON INJ 125 MG Rp.
METHYLPREDNISOLONE 16 MG Rp.
METHYLPREDNISOLONE 4 MG Rp.
METHYLPREDNISOLONE 8 MG Rp.
METOCLOPRAMIDE 10 MG Rp.
METOCLOPRAMIDE INJ 10 MG/2 ML Rp.
METRONIDAZOLE 500 MG Rp.
METRONIDAZOLE INF 100 ML Rp.
METRONIDAZOLE SYR 125 MG Rp.
MICONAZOL 2% CREAM Rp.
MICROBAR BARIUM SULPHATE 250 GR Rp.
MICROGEST 100 MG Rp.
MICROGEST 200 MG Rp.
MIDAZOLAM HCL 1 MG/ML INJ Rp.
MINIASPI 80 MG Rp.
MISOPROSTOL 200 MCG Rp.
MORFIN 10 MG/ML INJ Rp.
MST CONTINUS 10 MG Rp.
MYDRIATIL 1% 5 ML Rp.
NA BICARBONAT 500 MG Rp.
NA DIKLOFENAK 50 MG Rp.
NATACEN MDS Rp.
NEO KAOLANA SYR Rp.
NICARDIPINE 1 MG/ ML INJ Rp.
NIFEDIPINE 10 MG Rp.
NIMODIPINE INF Rp.
NIMOTOP Rp.
NITROKAF RETARD 2,5 MG Rp.
NITROKAF RETARD 5 MG Rp.
NOREPINEPHRINE INJ Rp.
NOVOMIX-30 FLEX PEN Rp.
NOVORAPID FLEX PEN Rp.
NTG 1 MG INJ Rp.
NYSTATIN DROP 12 ML Rp.
OBH SYR 100 ML Rp.
OCTALBIN 25% 100 CC Rp.
OMEPRAZOLE 20 MG Rp.
OMEPRAZOLE INJ 40 MG Rp.
ONDANSETRON 4 MG Rp.
ONDANSETRON 4 MG/2 ML INJ Rp.
OPTALENT ED Rp.
ORALIT 200 Rp.
OTEDE Rp.
OTILON TT Rp.
OTOPAIN EAR DROP Rp.
OTSU D10 - 1/5 NS Rp.
OTSU D40 Rp.
OTSU KA-EN 3B INF 500 ML Rp.
OTSU KA-EN MG3 INF 500 ML Rp.
OTSU KCL 7,46 Rp.
OTSU MEYLON 25 ML Rp.
OTSU MGSO4 20 Rp.
OTSU SALIN 3 Rp.
OXYTOCIN INJ 10 IU/ML Rp.
PAMOL SUPP 125 MG Rp.
PAMOL SUPP 250 MG Rp.
PARACETAMOL 500 MG Rp.
PARACETAMOL INF 10 MG/ML Rp.
PARACETAMOL SYR Rp.
PETHIDIN HCL 50 MG/ML Rp.
PHENOBARBITAL 30 MG Rp.
PHENYTOIN 100 MG Rp.
PHENYTOIN INJ 50 MG Rp.
PIOGLITAZONE 15 MG Rp.
PIOGLITAZONE 30 MG Rp.
PIRACETAM 1 GR INJ Rp.
PIRACETAM 3 GR INJ Rp.
PIRACETAM 800 MG Rp.
PLAVIX 300 MG - JKN Rp.
PLETAAL 100 MG Rp.
POLYDEMICIN ED Rp.
PRAMIFROL 0.375 MG Rp.
PRAMIPEXOLE 0,125 MG Rp.
PREDNISON 5 MG Rp.
PREGABALIN 75 MG Rp.
PRIMET 25 MG Rp.
PROCAINE BENZILPENCILLIN INJ Rp.
PROINFARK 10 ML Rp.
PROPOFOL 10 MG/ML INJ Rp.
PROPRANOLOL 10 MG Rp.
PROPRANOLOL 40 MG Rp.
PROPYLTHIOURACYL (PTU) 100 MG Rp.
PROTOFEN 100 MG SUPP Rp.
PYRAZINAMIDE 500 MG Rp.
RAMIPRIL 2,5 MG Rp.
RAMIPRIL 5 MG Rp.
RANITIDIN 150 MG Rp.
RANITIDIN INJ 25 MG Rp.
REGUMEN Rp.
RENXAMIN INFUS 200 ML Rp.
RESFAR 25 ML INJEKSI Rp.
RIFAMPICIN 450 MG Rp.
RIFAMPICIN 600 MG Rp.
RISPERIDONE 2 MG Rp.
RISPERIDONE 3 MG Rp.
RYZODEG FLEX TOUCH Rp.
SALBUTAMOL 2 MG Rp.
SALBUTAMOL 4 MG Rp.
SANBE TEARS 8 ML Rp.
SATORIA WFI 25 ML Rp.
SIBITAL INJ Rp.
SIKZONOATE INJ 25 MG Rp.
SILDENAFIL 50 MG Rp.
SILOXAN 5 ML ED Rp.
SIMVASTATIN 20 MG Rp.
SIRPLUS 0,1 GR Rp.
SOLVINEX 2 MG INJ Rp.
SOMATOSTATIN LYOMARK 3 MG INJ Rp.
SOROQUIN XR 300 MG Rp.
SPIRONOLAKTON 100 MG Rp.
SPIRONOLAKTON 25 MG Rp.
SUCRALFATE SYR Rp.
SULFADIAZIN SILVER CREAM 35 GR Rp.
SULFITIS Rp.
SUPRASMA INHALER Rp.
TABLET TAMBAH DARAH Rp.
TAMOFEN 10 MG Rp.
TAMSULOSIN HCL 0.4 MG Rp.
TANAPRESS 10 Rp.
TANAPRESS 5 Rp.
TARIVID OTIC SOLUTION Rp.
TEBOKAN SPECIAL 80 MG Rp.
TELMISARTAN 40 MG Rp.
TELMISARTAN 80 MG Rp.
TENOFOVIR 300 MG Rp.
TETAGAM P 250 IU X 1 ML INJ Rp.
THIAMAZOLE 10 MG Rp.
TIMOLOL 0,5% - FERRON Rp.
TONOR 0,5% MDS Rp.
TRAMADOL 50 MG Rp.
TRAMADOL INJ 50 MG/ML Rp.
TRIAMCINOLONE 10 MG/ML INJ Rp.
TRIFLUOPERAZINE 5 MG Rp.
TRIHEXYPHENIDYL 2 MG Rp.
TROPIN 1% ED Rp.
UPERIO FCT 50 MG Rp.
UROGRAFIN 76% 20 ML INJ Rp.
URSODEOXYCHOLIC ACID 250 MG Rp.
VALPROIC ACID 250 MG SYR Rp.
VALSARTAN 160 MG Rp.
VALSARTAN 80 MG Rp.
VASACON MDS Rp.
VENTOLIN NEBULES 2,5 MG Rp.
VERAPAMIL Rp.
VIT B COMPLEK Rp.
VIT B6 10 MG Rp.
VIT C (ASCORBID ACID) 250 MG Rp.
VIT K 10 MG Rp.
VIT K INJ 10 MG Rp.
VIT K INJ 2 MG Rp.
VITROLENTA 5 ML Rp.
VOLULYTE 6% INF Rp.
WARFARIN 2 MG Rp.
WIDA D10% Rp.
WIDA D5 Rp.
WIDA D5-1/2 NS Rp.
WIDA D5-1/4 NS Rp.
WIDA KN-2 Rp.
WIDA NS 1000 ML Rp.
WIDA NS 500 ML Rp.
WIDA RL Rp.
XITROL EYE OINT Rp.
ZINC SULFATE SYR 60 ML Rp.
ZINC SULPHATE 20 MG Rp.
ATROPIN INJ Rp.
EPHEDRIN HCL Rp.
EPINEPHRIN INJ Rp.
FENTANYL 0,05 MG/ML 2 ML Rp.
KETAMIN INJEKSI Rp.
LIDOCAIN Rp.
LIDODEX 5% INJ Rp.
METHYLERGOMETRIN INJ Rp.
MIDAZOLAM HCL Rp.
NACL 500 ML Rp.
NEOSTIGMINE INJ Rp.
OXYTOCIN Rp.
PEHACAIN Rp.
PROANES 1% Rp.
PROPOFOL INJ Rp.
RINGER LAKTAT 500 ML Rp.
ROCULAX INJ Rp.
WATER FOR INJEKSI 1 LT Rp.
WATER FOR INJEKSI 25 ML Rp.
Belanja Obat Lainnya Rp.
Rp.
Belanja Natura dan Pakan-Natura Rp.
Belanja minuman pegawai Rp.
Air Minum Dalam Kemasan , Galon, 19 liter Rp.
Air Mineral , 19 Liter, Plus Galon Rp.
Air Mineral , Botol, 600 ml Rp.
Air Mineral Gelas Rp.
Air Mineral Botol 330 ml Rp.
Rp.
Belanja bahan makanan dan minuman pasien Rp.
Bahan Makanan Kering Rp.
Air Mineral Gelas Rp.
Air Minum dalam kemasan Rp.
Sari Kacang Hijau Rp.
Susu Bayi usia 6 - 12 bulan Rp.
Susu Bayi Bebas Lactosa Rp.
Susu anak usia 1 - 5 tahun Rp.
Susu Diit DM Rp.
Susu Diit Ginjal Rp.
Susu Diit Hati Rp.
Susu Diit Hemodialisis Rp.
Susu Diit Stroke Rp.
Susu Diit TKTP Rp.
Susu Diit Saluran Pernafasan Rp.
Susu UHT Rp.
Susu Makanan Cair Rp.
Susu Ibu Hamil dan Menyusui Rp.
Tehh Rp.
Beras IR 64 Super Rp.
Bumbu Instan Rp.
Crakers Rp.
Garam Diit Rp.
Garam Halus Rp.
Gula Diit Rp.
Gula Merah Rp.
Gula Merah Diit Rp.
Gula Pasir Rp.
Kecap Manis Rp.
Minyak Goreng Rp.
Roti Tawar Rp.
Saori Saos Tiram Rp.
Saori Saos Teriyaki Rp.
Saus Tomat Rp.
Tepung Beras Rp.
Tepung Maizena Rp.
Tepung Terigu Rp.
Kacang Hijau Rp.
Rp.
BAHAN MAKANAN BASAH Rp.
Ayam Kaldu Rp.
Ayam Potong Rp.
Bakso Ayam Rp.
Bakso daging Rp.
Daging Giling Rp.
Daging Sapi Rp.
Galantin Ayam Rp.
Kekian Ayam Rp.
Putih Telur Rp.
Rolade Daging Rp.
Rolade Tuna Rp.
Tahu Putih Rp.
Tempe Rp.
Telur Asin Rp.
Telur Ayam Rp.
Telur Puyuh Rp.
Tetelan Tulang Rp.
Tuna Rp.
Bayam Rp.
Brokoli Rp.
Buncis Rp.
Bunga Kol Rp.
Daun Jeruk Rp.
Daun Kemangi Rp.
Daun Ketela Rambat Rp.
Daun Pandan Rp.
Daun Pre Rp.
Daun Salam Rp.
Daun Sere Rp.
Daun Sledri Rp.
Gambas Rp.
Jagung Manis Rp.
Jamur Kering Rp.
Kacang Panjang Rp.
Kacang Polong Rp.
Kacang Merah Rp.
Kangkung Rp.
Kapri Rp.
Kelapa Tua Rp.
Kentang Rp.
Kubis Rp.
Labu Air Rp.
Labu Kuning Rp.
Labu Siam Rp.
Pepaya muda Rp.
Sawi ijo Rp.
Sawi Putih Rp.
Tauge Kedelai Rp.
Tauge Panjang Rp.
Tauge Pendek Rp.
Terong Rp.
Timun Rp.
Tomat Rp.
Ubi Rambat Rp.
Wortel Rp.
Apel Rp.
Jeruk Kreprok Rp.
Melon Rp.
Pear Rp.
Pepaya Rp.
Pisang Ambon Rp.
Pisang Kepok Rp.
Pisang Susu Rp.
Semangka Rp.
Air Kelapa Rp.
Asam Jawa Rp.
Bawang Merah Rp.
Bawang Putih Rp.
Bawang Bombay Rp.
Bawang Merah Goreng Rp.
Cabe Merah Rp.
Cabe Rawit Rp.
Cengkeh Rp.
Jahe Rp.
Jinten Rp.
Kayu Manis Rp.
Kembang Lawang Rp.
Kemiri Rp.
Ketumbar Bubuk Rp.
Kluwak Rp.
Kunci Rp.
Kunyit Rp.
Lengkuas Rp.
Merica Bubuk Rp.
Pala Rp.
Rp.
Belanja Makanan Dan Minuman Pasien ( snack pasi Rp. 154,734,000.00
Snack Gurih Rp.
Snack Manis Rp.
Rp.
Rp.
Belanja Makanan dan Minuman Rapat Rp. 261,757,500.00
- Belanja makanan dan minuman rapat kegiatan FGDRp. 7,908,750.00
Nasi Kotak Biasa Rp.
Snack Kotak Biasa Rp.
Rp.
- Makanan dan minuman Rapat kegiatan administraRp. 58,275,000.00
Snack Kotak Biasa Rp.
Rp.
- Belanja makanan dan minuman rapat kegiatan maiRp. 5,827,500.00
Snack Kotak Biasa Rp.
Rp.
- Belanja makanan dan minuman rapat kegiatan akreRp. 6,798,750.00
Snack Kotak Biasa Rp.
Rp.
Belanja Makanan dan Minuman Diklat, Seminar, LokRp. 50,088,750.00
Nasi kotak Rp.
Snack Rp.
Rp.
Belanja Makanan dan Minuman Bimtek Maintenance Rp. 31,635,000.00
Nasi kotak Rp.
Snack Rp.
Rp.
Belanja Makanan dan Minuman Survey ISO Rp. 26,362,500.00
Nasi kotak Rp.
Snack Rp.
Rp.
Belanja Makanan dan Minuman Survey Akreditasi daRp. 55,361,250.00
Nasi kotak Rp.
Snack Rp.
Belanja Makanan dan Minuman kegiatan value gather
Rp. 19,500,000.00
Rp.
Belanja Makanan dan Minuman Jamuan Tamu Rp. 101,172,876.00
- Belanja Makanan dan minuman tamu kegiatan ad Rp. 48,840,000.00
Prasmanan VVIP Rp.
Prasmanan biasa Rp.
Nasi Kotak VIP Rp.
Snack Kotak VIP Rp.
Snack Tamu Transit VIP Rp.
Rp.
- Belanja makanan dan minuman kegiatan pelayanaRp. 21,090,000.00
Nasi Kotak Biasa Rp.
Snack Kotak Biasa Rp.
Rp.
Belanja Makanan dan Minuman kegiatan Bimtek , Sur
Rp. 26,612,438.00
Snack Tamu Transit VIP Rp.
Prasmanan biasa Rp.
Rp.
Belanja Makanan dan Minuman kegiatan Survey ISORp. 4,630,438.00
Snack Tamu Transit VIP Rp.
Prasmanan biasa Rp.
Rp.
Belanja Penambah Daya Tahan Tubuh Rp. 240,611,925.00
Nasi kotak Rp.
Snack Rp.
Rp.
Belanja Pakaian Sipil Harian Rp.
Rp.
Belanja Pakaian Siaga Rp. 208,757,607.00
Baju petugas ruangan (uk S-5L) Rp.
Baju operasi setelan (uk S-5L) Rp.
Jaz operasi water repellent Rp.
Celemek Rp.
Jaz laborat Rp.
Rp.
Belanja Pakaian Batik Tradisional Rp.
Kain Batik Kain Batik Khas Kabupaten Madiun Rp.
Rp.
Belanja Jasa Rp. 19,459,385,470.00
Belanja Jasa Kantor Rp. 17,226,981,470.00
Honorarium Narasumber atau Pembahas, Moderator Rp. 246,500,000.00
-Jasa Narasumber Pelatihan Rp.
Jasa Narasumber Pelatihan APAR Rp.
Jasa Narasumber Pelatihan BLS Rp.
Jasa Narasumber Pelatihan Manajemen Ruangan Rp.
Jasa Narasumber Pelatihan PPI Rp.
Jasa Narasumber Pelatihan PPGD EMT Rp.
Jasa Narasumber bimtek keuangan Rp.
Jasa Narasumber pelatihan teknik Venaseksi Rp.
- Belanja jasa narasumber kegiatan FGD Rp.
Rp.
Rp.
Honorarium Tim Pelaksana Kegiatan dan SekretariatRp.
Rp.
Rp.
Belanja Jasa Tenaga Kesehatan Rp. 6,087,200,000.00
- Belanja Jasa Tenaga Ahli ( penepri ) dokter spesialiRp. 60,000,000.00
- Insentif Dokter Rp. 120,000,000.00
a. Intensif Tenaga Ahli (Dokter Spesialis) Rp.
b. Intensif Tenaga Ahli (Dokter Interensif) Rp.
- Honorarium tenaga kontrak BLUD Rp. 5,907,200,000.00
a. Dokter Spesialis ( 3 orang x 13 bulan ) Rp.
b. Perawat dan tenaga lain ( 233 x 13 bulan ) Rp.
c. Dokter umum/Dokter gigi ( 2 orang x 13 bulan ) Rp.
d. Programer ( 3 orang x 13 bulan ) Rp.
Rp.
Belanja Jasa Tenaga Ahli Rp. 214,800,000.00
- Belanja Jasa Tenaga Ahli ( fisikawan medis ) Rp.
Rp.
-Honorarium Dewan Pengawas Rp.
Honorarium Ketua Dewan Pengawas Rp.
Honorarium Sekretaris Dewan Pengawas Rp.
Honorarium Anggota Dewan Pengawas Rp.
Honorarium Anggota Komite Teknis Dewan Penga Rp.
Rp.
Belanja Tenaga Ahli (Jasa pelatih Senam/OltradisionRp. 4,800,000.00
Rp.
Belanja Jasa Tenaga Kebersihan Rp.
Honorarium Pegawai Honorer/Tidak Tetap Kategori Rp.
Rp.
Belanja Jasa Audit/Surveillance ISO Rp. 62,200,000.00
- Belanja jasa audit kegiatan sertifikasi Akreditasi R Rp.
Tarif Survei Akreditasi Rumah Sakit Rp.
- Belanja sertifikasi SMM ISO kegiatan MaintenanceRp.
Belanja Jasa Audit/Surveillance ISO Rp.
Rp.
Belanja Jasa Tenaga Informasi dan Teknologi Rp. 60,000,000.00
Honorarium Sub Profesional (Programmer Senior) Rp.
Rp.
Belanja Jasa Pelaksanaan Transaksi Keuangan Rp. 9,650,000.00
Biaya Beban Jasa Transaksi Keuangan ( Tranfer ) Rp.
Beban Jasa Transaksi Keuangan (Cek giro ) Rp.
Rp.
Belanja Jasa Penyelenggaraan Acara Rp. 18,000,000.00
Belanja Jasa Penyelenggaraan Acara Rekrutmen Pe Rp.
Rp.
Belanja Jasa Kontribusi Asosiasi Rp. 15,000,000.00
Belanja Iuran Asosiasi Rp.
Rp.
Belanja Jasa Kalibrasi Rp. 276,750,000.00
- Jasa Kalibrasi/pengujian/pengukuran peralatan k Rp.
- Jasa pengujian ( air bersih, air minum, swab , udaraRp.
- Jasa pemantauan mutu eksternal laboratorium Rp.
- Jasa Pemeriksaan kultur kuman Rp.
Rp.
Belanja Jasa Pengolahan Sampah Rp. 756,000,000.00
Jasa pengangkutan dan pengolahan sampah medis Rp.
Rp.
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan Rp. 62,004,550.00
Belanja Jasa Iklan/Reklame, Film, dan Pemotretan Rp.
Rp.
Belanja Tagihan Telepon Rp. 36,000,000.00
Belanja Tagihan Telepon Rp.
Rp.
Belanja Tagihan Air Rp. 132,000,000.00
Belanja Tagihan Air Rp.
Rp.
Belanja Tagihan Listrik Rp. 1,500,000,000.00
Belanja Tagihan Listrik Rp.
Rp.
Belanja Langganan Jurnal/Surat Kabar/Majalah Rp. 12,720,000.00
Belanja Langganan Jurnal/Surat Kabar/Majalah Rp.
Rp.
Belanja Kawat/Faksimili/Internet/TV Berlangganan Rp. 145,000,000.00
Belanja Kawat/Faksimili/Internet/TV Berlangganan Rp.
Rp.
Belanja Paket/Pengiriman Rp. 470,000.00
Belanja Paket/Pengiriman Rp.
Rp.
Belanja Pembayaran Pajak, Bea, dan Perizinan Rp. 20,809,700.00
Belanja Pajak Kendaraan Bermotor Rp.
Tarif ijin Radiologi Diagnostik PRP ( Baru ) Rp.
Tarif ijin Radiologi Intervensional PRP ( Baru ) Rp.
Rp.
Belanja Medical Check Up Rp. 237,500,000.00
Belanja jasa pemeriksaan kesehatan dan vaksinasi Rp.
Rp.
Belanja jasa pelayanan Kesehatan bagi Non ASN Rp. 7,323,877,220.00
Belanja jasa pelayanan Kesehatan bagi Non ASN Rp.
Rp.
Rp.
Belanja Iuran Jaminan/Asuransi Rp. 1,339,399,000.00
Belanja Iuran Jaminan Kesehatan bagi Non ASN Rp. 886,274,000.00
Belanja Iuran Jaminan Kesehatan bagi ASN dan NonRp.
Rp.
Belanja Iuran Jaminan Kecelakaan Kerja bagi Non A Rp. 453,125,000.00
Belanja Premi Asuransi Ketenagakerjaan ( perbulan Rp.
Rp.
Belanja Sewa Peralatan dan Mesin Rp. 55,000,000.00
Rp.
Belanja Sewa Alat Kantor Lainnya Rp.
Belanja Sewa Alat Kantor Lainnya Rp.
Rp.
Rp.
Belanja Jasa Konsultansi Konstruksi Rp.
Belanja Jasa Konsultansi Perencanaan Rekayasa-Jas Rp.
- Belanja jasa konsultasi perencanaan pekerjaan rehRp.
- Belanja jasa konsultasi perencanaan pekerjaan pe Rp.
- Belanja jasa konsultasi perencanaan pekerjaan RehRp.
Rp.
Belanja Jasa Konsultansi Pengawasan Rekayasa-Jas Rp.
- Belanja jasa konsultasi pengawasan pekerjaan rehaRp.
- Belanja jasa konsultasi pengawasan pekerjaan pemRp.
- Belanja jasa konsultasi pengawasan pekerjaan RehRp.
Rp.
Belanja Jasa Konsultansi Non Konstruksi Rp.
Belanja Jasa Konsultansi Berorientasi Bidang-Keuan Rp.
Belanja jasa akuntan publik audit laporan keuanganRp.
Rp.
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Rp.
Belanja jasa survey IKM Rp.
Rp.
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Rp.
Belanja jasa penyusunan dokumen perijinan Rp.
Rp.
Belanja Beasiswa Pendidikan PNS Rp.
Belanja Beasiswa Tugas Belajar S2 Rp.
Beban Beasiswa Pendidikan PNS Lainnya Rp.
Rp.
Belanja Kursus/Pelatihan, Sosialisasi, Bimbingan Te Rp.
Belanja Kursus Singkat/Pelatihan Rp.
- Bimbingan Akreditasi Rp.
- Belanja kursus/pelatihan/bimtek/workshop ( pelaya Rp.
- Biaya pendaftaran kursus/pelatihan/bimtek/worksRp.
- Bimbingan Teknis ISO Rp.
Rp.
Belanja Pemeliharaan Rp.
Belanja Pemeliharaan Peralatan dan Mesin Rp.
Belanja Pemeliharaan Alat Besar-Alat Bantu-ElectricRp.
Pemeliharaan Sarana Kantor Genset 450 KVA Unit /Rp.
Rp.
Belanja Pemeliharaan Alat Angkutan-Alat Angkuta Rp.
Belanja Pemeliharaan Alat Angkutan-Alat Angkuta Rp.
Rp.
Belanja Pemeliharaan Alat Kantor dan Rumah Tangga Rp.
Belanja pemeliharaan Printer CANON / IP2770 ModiRp.
Belanja pemeliharaan Printer EPSON / L 120/ L1110Rp.
Belanja pemeliharaan Printer CANON / MP287 ModiRp.
Power Suply Rp.
Pemeliharaan Pc Komputer Rp.
Service Monitor Komputer Rp.
Pemeliharaan Note Book Rp.
Pemeliharaan komputer lain-lain dan alat kantor la Rp.
Mouse + Keyboard Rp.
Rp.
Belanja Pemeliharaan Alat Kantor dan Rumah TanggRp.
Pemeliharaan AC Gedung/Kantor Pemeliharaan Portab Rp.
Pemeliharaan AC Gedung/Kantor Pemeliharaan AC cen Rp.
Rp.
Belanja Pemeliharaan Alat Kantor dan Rumah Tang Rp.
Pemeliharaan/perbaikan ringan Alat Rumah TanggaRp.
Pemeliharaan/perbaikan sedang Alat Rumah TanggaRp.
Belanja pemeliharaan lift Rp.
Rp.
Belanja Pemeliharaan Alat Kedokteran dan Kesehat Rp.
Belanja Pemeliharaan Alat Kedokteran dan Kesehat Rp.
Rp.
Belanja Pemeliharaan Komputer-Komputer Unit-Kom Rp.
Pemeliharaan soft ware SIM RS Rp.
Rp.
Belanja Pemeliharaan Gedung dan Bangunan Rp.
Belanja Pemeliharaan Bangunan Gedung-BangunanRp.
- Belanja Pemeliharan Gedung dan Bangunan Rp.
- Belanja Pemeliharaan kebersihan Rumah Sakit ( 12Rp.
Rp.
Belanja Pemeliharaan Bangunan Gedung-BangunanRp.
Belanja Pemeliharaan taman Rp.
Rp.
Belanja Pemeliharaan Instalasi-Instalasi Air Kotor-InRp.
Belanja Pemeliharaan Instalasi-Instalasi Air Kotor-InRp.
Rp.
Belanja Perjalanan Dinas Rp.
Belanja Perjalanan Dinas Dalam Negeri Rp.
Belanja Perjalanan Dinas Biasa Rp.
a. Belanja Perjalanan Dinas Biasa Rp.
Penginapan Di Prov. Jatim staf,PTT,Non PNS Rp.
Penginapan Di Prov. Jatim Eselon III, Eselon IV Rp.
Biaya Taksi Perjalanan Dinas Dalam Negeri Provinsi Rp.
Uang Harian Perjalanan Dinas Luar Daerah ( Eselon 3Rp.
Uang Harian Perjalanan Dinas Luar Daerah ( Eselon 3Rp.
Uang Harian Perjalanan Dinas Luar Daerah ( Eselon IV Rp.
Uang Harian Perjalanan Dinas Luar Daerah ( Gol III )Rp.
Uang Harian Perjalanan Dinas Luar Daerah ( Gol I,II,PRp.
Uang Harian Perjalanan Dinas Luar Daerah ( pengemu Rp.
Satuan biaya transportasi darat ibukota provinsi k Rp.
Belanja Jasa Jalan Tol (mobil golongan I) Rp.
Rp.
Penginapan Di Prov. DKI Jakarta Eselon III/GolonganRp.
Penginapan Di Prov. DKI Jakarta Eselon IV/GolonganRp.
Biaya Taksi Perjalanan Dinas Dalam Negeri D.K.I. JakRp.
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.DKI
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.DK
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.DKI
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.DKI
Tarif Tiket Kereta Api Madiun - Gambir Gajayana (EkRp.
Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri Rp.
Belanja Jasa Jalan Tol (mobil golongan I) Rp.
Rp.
Penginapan Di Prov. Jawa Tengah Eselon III/GolongaRp.
Penginapan Di Prov. Jawa Tengah Eselon IV/Golongan Rp.
Penginapan Di Prov. Jawa Tengah Golongan I/II Rp.
Biaya Taksi Perjalanan Dinas Luar Daerah Di Jawa T Rp.
Uang Harian Perjalanan Dinas Luar Daerah provinsi Rp.
Tarif Tiket Kereta Api Madiun - Yogyakarta GajayanaRp.
Tarif Tiket Kereta Api Madiun - Yogyakarta Sancaka Rp.
Rp.
Penginapan Di Prov. Jawa Barat Eselon III/GolonganRp.
Biaya Taksi Perjalanan Dinas Luar Daerah Di Jawa BaRp.
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.
Tarif Tiket Kereta Api Madiun - Bandung Turangga (ERp.
Rp.
Penginapan Di Prov. Bali Eselon III/Golongan IV Rp.
Biaya Taksi Perjalanan Dinas Dalam Negeri Bali Rp.
Uang Harian Perjalanan Dinas Luar Daerah Provinsi BRp.
Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri Rp.
Rp.
Penginapan Di Prov. Yogyakarta Eselon III/GolonganRp.
Biaya Taksi Perjalanan Dinas Dalam Negeri Provinsi Rp.
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.
Tarif Tiket Kereta Api Madiun - Gambir Gajayana (EkRp.
Rp.
- Belanja Perjalanan Dinas luar daerah akreditasi Rp.
Penginapan Di Prov. DKI Jakarta Eselon III/GolonganRp.
Penginapan Di Prov. DKI Jakarta Eselon IV/GolonganRp.
Penginapan Di Prov. DKI Jakarta Golongan I/II Rp.
Biaya Taksi Perjalanan Dinas Dalam Negeri D.K.I. JakRp.
Uang Harian Perjalanan Dinas Luar Daerah Provinsi Rp.
Tarif Tiket Kereta Api Madiun - Gambir Gajayana (EkRp.
Biaya Tiket Pesawat Perjalanan Dinas Dalam Negeri Rp.
Rp.
b. Belanja Transportasi dan Akomodasi Rp.
- Belanja Transportasi dan akomodasi petugas kalibrRp.
- Belanja transportasi dan akomodasi surveyor kegi Rp.
- Belanja transportasi dan akomodasi pengambil sample
Rp.
- Belanja transportasi dan akomodasi petugas perij Rp.
- Belanja transportasi dan akomodasi narasumber keRp.
Rp.
c. Belanja perjalanan dinas kegiatan Pendidikan danRp.
d. Belanja perjalanan dinas luar daerah kegiatan bi Rp.
Rp.
Belanja Perjalanan Dinas Dalam Kota Rp.
- Belanja perjalanan dinas dalam kota kegiatan AkreRp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. RI p.
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iv &Rp.
- Belanja perjalanan dinas dalam kota kegiatan admiRp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. RI p.
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iv &Rp.
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iii Rp.
- Belanja perjalanan dinas dalam kota kegiatan Pel Rp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah
Rp.
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. RI p.
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. Rp. Ii
Rp.
Belanja Perjalanan Dinas Paket Meeting Luar Kota Rp.
- Belanja Perjalanan Dinas luar daerah Studi Bandin Rp.
- Belanja perjalanan dinas luar daerah kegiatan valuRp.
Rp.
Rp.
Belanja Uang dan/atau Jasa untuk Diberikan kepadaRp.
Belanja Uang yang Diberikan kepada Pihak Ketiga/PRp.
Belanja Penanganan Dampak Sosial Kemasyarakata Rp.
Tarif perawatan jenazah Mr X Rp.
Rp.
BELANJA MODAL Rp.
Rp.
Belanja Modal Peralatan dan Mesin Rp.
Belanja Modal Peralatan dan Mesin BLUD Rp.
Belanja Modal Peralatan dan Mesin BLUD Rp.
Belanja Modal Peralatan dan Mesin BLUD Rp.
Belanja Modal Alat Besar Rp.
Belanja Modal Alat Bantu Rp.
Belanja Modal Pompa Rp.
Pompa Air ( celup ) Rp.
Rp.
Belanja Modal Alat Bantu Lainnya Rp.
Panel LVSDP 1000 KVA Rp.
Rp.
Belanja Modal Alat Kantor dan Rumah Tangga Rp.
Belanja Modal Alat Kantor Rp.
Belanja Modal Alat Penyimpan Perlengkapan Kanto Rp.
Almari arsip 2 Pintu sliding, 100 (H) x 200 (W) x 45 Rp.
Rak obat Besi Rp.
Standar lemari Rak Obat ( 100 laci ) Rp.
Lemari penyimpanan Narkotika Rp.
Lemari Arsip Filling Cabinet Bergerak Mekanik Rp.
Rp.
Belanja Modal Alat Kantor Lainnya Rp.
Alat kantor lainnya Rp.
Penghancur Kertas Crosscut 2100ST Unit Rp.
Alat Finger Scan ( Finger spot ) Rp.
Rp.
Belanja Modal Alat Rumah Tangga Rp.
Belanja Modal Mebel Rp.
Meja Kantor 1/2 Biro Rp.
Kursi Tunggu 4 Seat/Bangku Rp.
Meja Kursi rapat set Rp.
Rp.
Belanja Modal Alat Pembersih Rp.
Mesin Cuci 16 Kg Rp.
Rp.
Belanja Modal Alat Pendingin Rp.
Ac Floor Standing 5 Pk Rp.
AC 1 PK Rp.
AC 2 PK Rp.
Lemari Es 1 pintu Rp.
Showcase Rp.
Rp.
Belanja Modal Alat Dapur Rp.
Food Processor Rp.
Food Trolley Rp.
Kompor Gas 1 tungku Rp.
Magic Com Rp.
Blender Rp.
Rp.
Belanja Modal Alat Rumah Tangga Lainnya ( Home URp.
TelevisiLed Full Hd Smart Tv 32 Inch Android Rp.
Brachet TV Rp.
Rp.
Rp.
Belanja Modal Alat Kedokteran dan Kesehatan Rp.
Belanja Modal Alat Kedokteran Umum Rp.
alat kdokteran lain-lain Rp.
Bed Pasien Rp.
Kursi Roda Rp.
ECG 6 chanel Rp.
Bed Transport Rp.
Timbangan Bayi Rp.
Rp.
Belanja Modal Komputer Rp.
Belanja Modal personal Komputer Rp.
PC unit Rp.
CCTV Camera Rp.
Rp.
Belanja Modal Peralatan Personal Computer Rp.
Printer , Ecotank Rp.
Printer Ecotank L5290 A4 Wi-Fi All-In-One Ink Tank Rp.
Monitor 20Mk400A Rp.
UNIFI Rp.
Printer dot matrik LX 310 Rp.
Rp.
Belanja Modal Gedung dan Bangunan Rp.
Belanja Modal Gedung dan Bangunan BLUD Rp.
Belanja Modal Gedung dan Bangunan BLUD Rp.
Belanja Modal Gedung dan Bangunan BLUD Rp.
Belanja Modal Gedung dan Bangunan Rp.
Belanja Modal Bangunan Gedung Rp.
Belanja Modal Bangunan Gedung Tempat Kerja Rp.
Belanja Modal Pagar Rp.
1 M Pembangunan Pagar Belakang rumah Negara TiRp.
Rp.
Belanja Modal Bangunan Kesehatan Rp.
1 m2 Rehap sedang Rawat Inap Rp.
1 m2 Rehap ringan gedung sederhana ( gas medik ) Rp.
1 m2 Rehab. Sedang Selasar Luar Beratap/Teras (TakRp.
Rp.
Belanja Modal Taman Rp.
Pembuatan Taman Depan RS Rp.
RINCIAN PENDAPATAN DI SIPD
BLUD APBD
JANUARI 1,500,000,000
PEBRUARI 7,850,000,000
MARET 7,850,000,000 500,000,000.00
APRIL 7,850,000,000 500,000,000.00
MEI 7,850,000,000 500,000,000.00
JUNI 7,850,000,000 500,000,000.00
JULI 7,900,000,000 500,000,000.00
88,000,000,000.00 AGUSTUS 7,900,000,000 2,000,000,000.00
7,333,333,333.33 SEPTEMBER 7,900,000,000 2,000,000,000.00
OKTOBER 7,850,000,000 61,736,200.00
NOPEMBER 7,850,000,000
DESEMBER 7,850,000,000
88,000,000,000 6,561,736,200.00
- 6,561,736,200.00
59,798,969,824.00
59,798,969,824.00
59,798,969,824.00
59,798,969,824.00
59,798,969,824.00
35,586,812,329.00
35,586,812,329.00
2,521,859,441.00
84,776,383.00
2,906,191.00
483,154.00
17,316,000.00
5,927,400.00
8,072,426.00
1,998,000.00
5,994,000.00
38,749,212.00
3,330,000.00
152,323,300.00
23,100,000.00
3,652,000.00
48,394,275.00
75,024,525.00
1,320,000.00
832,500.00
1,670,575,328.00
10,655,983.00
56,277,000.00
47,690,362.00
80,403,836.00
6,609,517.00
14,129,483.00
2,888,662.00
11,417,131.00
5,236,918.00
31,802,349.00
31,802,349.00
26,943,557.00
14,263,289.00
594,641.00
594,641.00
2,081,247.00
2,081,247.00
2,081,247.00
2,081,247.00
19,821,425.00
3,567,849.00
1,309,520.00
7,928,564.00
9,297,609.00
6,937,492.00
37,264,245.00
37,264,245.00
56,292,798.00
133,199,867.00
249,749,760.00
9,428,562.00
9,514,290.00
36,630,000.00
2,304,943.00
154,606,998.00
15,592,845.00
33,537,809.00
43,607,123.00
19,821,412.00
10,674,470.00
62,913,490.00
79,041,679.00
93,323,250.00
19,733,300.00
50,850,099.00
24,663,978.00
6,084,265.00
9,776,702.00
50,791,602.00
25,410,431.00
-
-
227,910,750.00
9,324,000.00
6,382,500.00
68,598,000.00
7,592,400.00
75,480,000.00
33,300,000.00
14,052,600.00
1,526,250.00
3,885,000.00
3,885,000.00
3,885,000.00
199,293,600.00
44,400,000.00
33,882,750.00
39,960,000.00
17,760,000.00
15,096,000.00
25,308,000.00
21,090,000.00
1,796,850.00
182,184,880.00
41,318,400.00
20,775,000.00
21,725,280.00
58,051,000.00
4,884,000.00
35,431,200.00
4,795,200.00
666,000.00
166,500.00
77,700.00
3,885,000.00
294,703,500.00
51,030,000.00
51,030,000.00
243,673,500.00
92,205,500.00
68,000.00
100,000.00
151,300,000.00
957,000.00
957,000.00
17,499,361.00
6,238,200.00
4,238,191.00
7,022,970.00
-
14,967,861,753.00
65,268,000.00
65,268,000.00
400,610,000.00
114,030,000.00
42,360,000.00
77,620,000.00
68,850,000.00
97,750,000.00
-
2,240,110,754.00
28,673,154.00
162,843,873.00
16,230,087.00
5,951,032.00
2,164,012.00
1,623,009.00
541,003.00
541,003.00
8,115,044.00
1,082,006.00
3,787,020.00
13,525,073.00
10,279,055.00
13,525,073.00
4,869,026.00
4,869,026.00
3,246,017.00
3,787,020.00
1,623,009.00
2,164,012.00
1,082,006.00
3,246,017.00
5,951,032.00
9,738,052.00
18,394,099.00
8,656,046.00
5,410,029.00
3,246,017.00
1,176,094.00
2,352,188.00
1,764,141.00
588,047.00
35,988,520.00
12,937,057.00
28,226,290.00
28,226,290.00
28,226,290.00
28,226,290.00
28,226,290.00
6,586,134.00
43,683,551.00
3,269,545.00
6,539,090.00
6,539,090.00
6,539,090.00
3,269,537.00
14,701,173.00
3,528,282.00
1,764,141.00
1,008,080.00
3,528,282.00
2,940,235.00
2,940,235.00
2,940,235.00
2,940,235.00
1,764,141.00
3,269,545.00
6,539,090.00
6,539,090.00
6,539,090.00
6,539,090.00
9,808,625.00
392,032.00
392,032.00
25,403,638.00
25,403,638.00
21,169,698.00
71,977,040.00
29,122,364.00
31,026,518.00
70,565,764.00
47,043,842.00
35,282,882.00
35,282,882.00
23,521,921.00
35,282,882.00
35,282,882.00
6,539,090.00
9,808,635.00
13,078,180.00
3,269,545.00
9,808,635.00
8,609,022.00
14,348,371.00
3,269,545.00
8,232,672.00
12,937,057.00
1,176,096.00
2,352,192.00
3,528,282.00
3,528,282.00
3,528,282.00
3,528,282.00
10,043,859.00
7,174,185.00
7,174,185.00
7,174,185.00
8,609,022.00
1,434,837.00
26,156,360.00
26,156,360.00
26,156,360.00
22,886,815.00
3,269,545.00
3,269,545.00
6,539,090.00
3,269,545.00
8,400,682.00
3,528,286.00
3,528,286.00
7,056,572.00
4,480,364.00
3,269,545.00
5,645,256.00
58,244,728.00
17,921,456.00
4,480,364.00
31,362,546.00
29,122,364.00
58,244,728.00
56,004,546.00
500,000,000.00
8,612,914,822.00
5,729,784.00
27,029,264.00
14,906,295.00
27,575,730.00
38,628,000.00
13,792,660.00
94,762,537.00
80,000,053.00
25,976,338.00
3,816,680.00
19,440,140.00
8,762,895.00
19,730,250.00
22,316,022.00
4,628,034.00
60,439,500.00
9,729,701.00
25,359,415.00
9,729,701.00
5,750,910.00
3,715,201.00
7,716,522.00
33,743,663.00
4,351,644.00
46,200,420.00
3,178,818.00
10,909,080.00
34,314,558.00
4,842,912.00
532,800.00
247,192,560.00
81,599,918.00
37,192,770.00
3,096,900.00
2,147,184.00
4,195,800.00
18,206,775.00
125,252,400.00
3,496,500.00
21,433,105.00
13,170,150.00
1,263,232.00
1,307,025.00
25,216,722.00
27,912,559.00
11,594,394.00
157,176,766.00
50,160,013.00
8,249,992.00
18,443,205.00
47,424,528.00
21,023,475.00
6,382,881.00
10,073,250.00
61,435,170.00
17,194,921.00
55,816,285.00
6,889,653.00
4,896,026.00
19,731,759.00
45,795,968.00
77,733,569.00
36,791,711.00
17,454,528.00
29,569,334.00
44,770,818.00
6,118,076.00
48,742,009.00
10,230,080.00
7,543,289.00
589,327.00
14,412,240.00
832,500.00
6,589,564.00
4,595,400.00
15,151,500.00
11,881,440.00
9,160,410.00
33,705,078.00
388,611,000.00
26,569,903.00
2,997,000.00
30,929,759.00
44,212,943.00
14,529,096.00
5,166,588.00
3,161,802.00
27,000,972.00
2,619,045.00
2,317,680.00
3,116,880.00
26,373,600.00
2,344,320.00
36,233,730.00
32,447,520.00
291,072.00
30,863,586.00
3,707,968.00
2,738,935,615.00
15,641,147.00
304,395,300.00
8,008,650.00
3,696,300.00
1,540,125.00
13,565,171.00
88,299,750.00
28,771,200.00
15,934,050.00
15,934,050.00
6,180,480.00
8,205,120.00
137,640.00
199,800.00
1,386,000.00
26,593,380.00
27,912,060.00
113,974,245.00
51,172,110.00
2,578,752.00
1,248,750.00
516,883.00
-
11,655,000.00
3,178,185.00
2,547,450.00
2,637,360.00
7,481,678.00
3,285,600.00
31,126,343.00
2,164,500.00
15,104,880.00
47,896,056.00
36,315,648.00
6,901,092.00
17,252,730.00
6,556,770.00
10,490,832.00
92,450,457.00
-
1,967,031.00
12,692,295.00
859,140.00
5,913,600.00
5,521,032.00
2,038,182.00
2,498,166.00
4,162,500.00
24,907,334.00
5,860,800.00
780,000.00
1,695,276.00
10,472,850.00
14,169,150.00
15,510,557.00
1,026,922.00
1,827,840.00
1,827,840.00
10,805,850.00
6,483,510.00
842,490.00
63,186,750.00
374,625.00
6,280,713.00
2,747,250.00
305,250.00
21,062,250.00
734,997.00
1,471,993.00
29,359,944.00
2,813,384.00
781,274.00
2,115,383.00
9,375,282.00
56,740,200.00
20,319,660.00
1,165,500.00
466,200.00
1,165,500.00
466,200.00
467,532.00
1,810,188.00
1,081,584.00
21,538,440.00
80,940.00
110,880.00
3,750,000.00
8,824,500.00
3,296,700.00
2,997,000.00
2,331,000.00
5,827,500.00
6,826,500.00
10,389,600.00
7,242,750.00
15,984,000.00
2,930,400.00
3,396,600.00
832,500.00
3,771,225.00
5,311,350.00
65,571,363.00
3,736,260.00
157,069,440.00
147,311,208.00
7,662,630.00
610,988.00
3,313,350.00
2,472,525.00
2,440,170.00
3,188,394.00
299,700.00
7,789,003.00
16,919,175.00
7,201,658.00
3,675,075.00
2,114,772.00
44,923,032.00
9,615,375.00
3,152,045.00
720,390.00
360,195.00
33,406,560.00
955,444.00
116,039.00
2,778,719.00
4,939,944.00
500,500.00
643,500.00
33,462,000.00
897,121,550.00
1,430,000.00
32,000,000.00
1,993,346,389.00
27,605,700.00
3,634,140.00
28,951,020.00
3,964,298.00
2,114,273.00
7,928,597.00
1,982,155.00
8,269,500.00
5,151,510.00
19,820,160.00
64,215,720.00
9,510,480.00
51,282,000.00
15,335,760.00
14,745,240.00
336,962,700.00
792,762.00
21,407,238.00
2,973,191.00
43,606,905.00
5,892,935.00
118,595,786.00
158,571,226.00
102,564,000.00
27,499,806.00
84,764,928.00
4,040,844.00
85,891,800.00
47,578,507.00
17,544,993.00
54,458,487.00
4,393,158.00
122,815,728.00
330,356,824.00
158,124,018.00
42,015,720.00
6,073,920.00
16,428,000.00
2,664,000.00
16,650,000.00
199,800.00
113,596,068.00
9,504,000.00
5,220,000.00
12,600,000.00
932,400.00
965,700.00
11,988,000.00
23,490,000.00
7,277,760.00
19,613,208.00
16,550,000.00
175,000.00
5,280,000.00
1,500,000,000.00
1,500,000,000.00
421,725,736.00
421,005,736.00
1,060,050.00
1,072,260.00
748,140.00
1,314,240.00
3,956,040.00
353,535.00
2,637,360.00
7,742,250.00
11,655,000.00
826,950.00
960,413.00
1,548,038.00
13,597,500.00
2,331,000.00
3,108,000.00
444,000.00
106,560.00
140,250.00
83,250.00
105,653.00
1,057,275.00
140,970.00
631,313.00
9,365,625.00
7,770,000.00
85,164,750.00
691,530.00
401,543.00
93,573,000.00
11,696,625.00
7,070,700.00
1,625,040.00
953,798.00
294,705.00
40,454.00
1,048,950.00
18,204,000.00
9,035,400.00
3,063,600.00
5,550,000.00
1,598,400.00
629,370.00
234,765.00
1,168,830.00
597,402.00
395,160.00
1,209,900.00
3,774,000.00
2,397,600.00
992,340.00
442,890.00
1,387,500.00
2,181,150.00
111,000.00
141,747.00
85,048.00
1,585,913.00
2,886,000.00
444,000.00
803,640.00
666,000.00
8,325,000.00
5,088,240.00
2,544,120.00
2,544,120.00
2,544,120.00
7,992,000.00
666,000.00
399,600.00
399,600.00
399,600.00
83,188.00
1,307,025.00
7,092,900.00
1,400,598.00
1,400,598.00
266,400.00
7,242,750.00
1,318,680.00
388,500.00
247,530.00
826,950.00
1,118,880.00
6,476,850.00
26,030,065.00
720,000.00
720,000.00
126,156,552.00
122,100,000.00
122,100,000.00
4,056,552.00
2,058,552.00
1,998,000.00
1,042,872,265.00
3,196,800.00
805,632,200.00
132,600,000.00
17,000,000.00
8,840,000.00
25,000,000.00
5,000,000.00
262,500,000.00
18,000,000.00
1,350,000.00
72,000,000.00
9,600,000.00
11,250,000.00
400,000.00
200,000.00
200,000.00
750,000.00
750,000.00
750,000.00
750,000.00
750,000.00
7,875,000.00
5,250,000.00
650,000.00
16,800,000.00
625,000.00
2,500,000.00
1,875,000.00
3,750,000.00
1,875,000.00
5,000,000.00
1,875,000.00
625,000.00
625,000.00
2,500,000.00
1,000,000.00
1,000,000.00
750,000.00
750,000.00
3,750,000.00
5,000,000.00
3,750,000.00
1,000,000.00
500,000.00
1,250,000.00
3,000,000.00
28,125,000.00
4,200,000.00
625,000.00
3,750,000.00
625,000.00
1,500,000.00
375,000.00
2,800,000.00
3,000,000.00
3,360,000.00
6,250,000.00
1,500,000.00
1,000,000.00
1,000,000.00
1,000,000.00
1,125,000.00
700,000.00
1,000,000.00
625,000.00
625,000.00
1,000,000.00
1,000,000.00
375,000.00
750,000.00
375,000.00
2,500,000.00
3,360,000.00
17,000,000.00
2,100,000.00
1,000,000.00
450,000.00
625,000.00
625,000.00
2,275,000.00
1,875,000.00
1,875,000.00
1,875,000.00
125,000.00
1,500,000.00
1,875,000.00
625,000.00
2,500,000.00
1,250,000.00
2,500,000.00
2,250,000.00
1,500,000.00
750,000.00
250,000.00
250,000.00
250,000.00
280,000.00
250,000.00
280,000.00
250,000.00
250,000.00
280,000.00
250,000.00
250,000.00
250,000.00
280,000.00
850,000.00
850,000.00
850,000.00
250,000.00
900,000.00
625,000.00
1,960,000.00
700,000.00
1,250,000.00
125,000.00
280,000.00
1,250,000.00
125,000.00
4,928,000.00
300,000.00
280,000.00
280,000.00
280,000.00
900,000.00
2,700,000.00
525,000.00
525,000.00
350,000.00
350,000.00
22,444,200.00
-
46,801,750.00
23,448,750.00
6,050,000.00
6,050,000.00
5,808,000.00
3,498,000.00
2,310,000.00
-
11,495,000.00
11,495,000.00
11,610,600.00
4,395,600.00
7,215,000.00
146,658,750.00
116,550,000.00
27,195,000.00
2,913,750.00
6,464,085.00
703,740.00
1,173,825.00
750,360.00
586,080.00
2,664,000.00
586,080.00
21,898,080.00
7,246,080.00
14,652,000.00
610,000.00
210,000.00
400,000.00
7,605,858.00
7,020,000.00
96,903.00
295,815.00
193,140.00
25,873,545.00
3,896,100.00
2,331,000.00
1,332,000.00
3,534,240.00
11,247,075.00
3,533,130.00
521,833,371.00
191,314,298.00
14,785,200.00
2,637,360.00
3,205,125.00
12,698,400.00
5,742,000.00
59,780,160.00
67,932,000.00
2,935,118.00
1,158,840.00
1,380,840.00
16,788,750.00
2,270,505.00
94,197,850.00
43,136,500.00
38,278,350.00
2,553,000.00
5,115,000.00
5,115,000.00
-
236,321,223.00
58,691,250.00
67,488,000.00
19,980,000.00
16,783,200.00
9,583,200.00
7,091,568.00
8,864,460.00
6,648,345.00
41,191,200.00
218,988,015.00
177,600.00
943,500.00
222,000.00
2,081,250.00
222,000.00
166,500.00
277,500.00
4,995,000.00
4,856,250.00
8,325,000.00
7,992,000.00
1,665,000.00
166,500.00
222,000.00
255,300.00
305,250.00
15,262,500.00
7,881,000.00
20,812,500.00
5,550,000.00
2,220,000.00
1,665,000.00
13,320,000.00
4,995,000.00
32,190,000.00
17,760,000.00
832,500.00
1,398,600.00
799,200.00
819,180.00
666,000.00
566,100.00
1,970,250.00
258,075.00
832,500.00
5,550,000.00
14,918,400.00
7,192,800.00
1,498,500.00
4,957,260.00
22,200,000.00
1,924,518.00
1,185,480.00
739,038.00
833,512,186.00
399,600.00
399,600.00
11,000,000.00
11,000,000.00
85,440,000.00
12,210,000.00
19,950,000.00
27,930,000.00
19,950,000.00
5,400,000.00
-
18,373,275.00
1,665,000.00
915,750.00
915,750.00
721,500.00
249,750.00
999,000.00
666,000.00
1,831,500.00
999,000.00
999,000.00
1,198,800.00
222,000.00
222,000.00
333,000.00
97,125.00
1,998,000.00
111,000.00
166,500.00
49,950.00
49,950.00
49,950.00
444,000.00
416,250.00
2,220,000.00
832,500.00
98,201,178.00
12,670,650.00
72,150,000.00
13,380,528.00
99,007,318.00
7,312,680.00
2,637,360.00
424,000.00
599,400.00
1,105,560.00
1,537,350.00
943,500.00
3,889,440.00
5,794,200.00
6,283,710.00
6,526,800.00
526,140.00
29,137,500.00
3,046,950.00
2,331,000.00
1,118,880.00
23,310,000.00
532,800.00
1,950,048.00
54,000,000.00
54,000,000.00
281,068,016.00
16,898,000.00
34,222,000.00
1,386,000.00
30,054,556.00
7,770,000.00
720,000.00
37,647,500.00
13,029,500.00
10,055,500.00
1,187,500.00
2,800,000.00
3,080,000.00
19,625,000.00
35,640,000.00
32,750,000.00
9,240,000.00
7,085,460.00
6,944,000.00
1,215,000.00
768,000.00
7,700,000.00
1,250,000.00
186,022,799.00
175,015,300.00
11,007,499.00
11,692,230,184.00
166,200.00
1,363,635.00
22,364,300.00
1,701,000.00
928,125.00
156,052,292.00
11,543,822.00
23,076,900.00
6,120,000.00
3,861,000.00
13,590,000.00
3,102,228.00
910,500.00
6,709,200.00
15,760,823.00
3,683,613.00
17,275,200.00
10,370,700.00
711,900.00
579,000.00
7,726,800.00
2,257,800.00
844,200.00
521,978.00
2,271,060.00
2,770,560.00
6,707,520.00
1,657,500.00
20,010,000.00
274,675,050.00
67,587,975.00
4,452,000.00
10,394,400.00
24,710,400.00
5,139,120.00
10,490,400.00
15,840,000.00
18,303,516.00
60,245,250.00
2,577,000.00
6,924,000.00
3,000,000.00
19,209,390.00
19,419,777.00
5,590,963.00
2,587,200.00
445,500.00
284,625,000.00
81,000.00
39,168,300.00
10,708,920.00
69,366,528.00
624,225.00
30,609,900.00
8,295,000.00
44,248,896.00
17,076,600.00
18,486,000.00
15,151,500.00
6,741,000.00
32,241,330.00
40,523,040.00
241,488,000.00
1,155,000.00
367,500.00
1,282,842.00
178,678,500.00
6,973,500.00
7,260,000.00
1,785,600.00
2,079,000.00
41,625,333.00
5,138,624.00
7,353,000.00
278,506,800.00
94,248,000.00
22,275,000.00
71,775,000.00
21,609,869.00
161,700.00
329,175.00
3,830.00
649,500.00
2,591,739.00
17,503,200.00
31,080,000.00
75,487,500.00
58,740,000.00
21,818,160.00
8,613,600.00
113,449,225.00
14,352,000.00
15,325,200.00
22,500,000.00
32,640,000.00
486,750.00
10,186,470.00
7,121,700.00
1,725,735.00
34,290,000.00
-
5,040,000.00
67,918,500.00
316,350.00
26,919,000.00
2,401,200.00
733,500.00
19,800,000.00
12,993,750.00
2,932,398.00
2,101,896.00
4,365,630.00
543,600.00
-
22,577,400.00
11,583,000.00
23,100,000.00
2,129,400.00
742,680.00
9,256,500.00
4,541,250.00
223,823,600.00
15,672,000.00
5,845,920.00
7,350,000.00
514,140.00
1,818,000.00
13,875.00
7,770,000.00
9,432,000.00
219,741,000.00
8,699,625.00
4,903,425.00
10,003,950.00
2,406,600.00
24,235,200.00
306,000,000.00
15,367,200.00
13,932,000.00
19,454,160.00
3,116,880.00
8,731,800.00
4,044,600.00
351,900.00
420,750.00
449,230.00
226,160.00
8,001,720.00
186,219,000.00
21,600,000.00
25,997,400.00
33,924,960.00
72,547,200.00
43,981,200.00
635,034,816.00
42,749,532.00
304,950.00
225,000.00
5,420,174.00
1,872,882.00
1,138,500.00
57,967,200.00
61,500.00
955,200.00
2,349,000.00
18,377,604.00
4,263,000.00
3,313,800.00
43,891,500.00
35,929,200.00
628,425.00
166,500.00
1,028,000.00
324,000.00
136,800,000.00
51,300,000.00
24,720,000.00
576,060.00
18,348,300.00
653,697.00
461,550,000.00
89,100,000.00
1,776,000.00
34,875.00
4,455,000.00
2,924,250.00
5,791,560.00
18,691,200.00
635,250.00
36,625,838.00
15,330,150.00
202,500.00
1,473,525.00
2,347,800.00
5,493,501.00
195,554.00
546,120.00
64,864,800.00
16,939,410.00
45,313,200.00
31,005,464.00
9,281,250.00
113,472,000.00
32,040,000.00
83,715,750.00
47,952,000.00
11,767,680.00
214,935,000.00
48,707,144.00
794,871.00
14,102,370.00
77,435,820.00
2,643,300.00
10,091,565.00
3,001,500.00
2,175,000.00
48,451,700.00
27,223.00
196,500.00
1,614,375.00
7,483,080.00
24,449,880.00
23,839,200.00
6,014,250.00
36,920,625.00
1,230,768.00
8,712,000.00
5,445,000.00
7,245,000.00
4,202,400.00
445,500.00
111,888,000.00
21,195,000.00
23,100,000.00
5,999,994.00
375,000.00
46,974,978.00
1,789,875.00
13,465,500.00
3,825,000.00
32,175.00
5,197,500.00
1,342,073.00
21,226,952.00
31,888.00
72,162.00
15,750,000.00
3,036,960.00
1,512,000.00
923,786.00
4,123,350.00
3,638,250.00
265,512.00
240,000.00
326,251.00
7,517,475.00
742,500.00
238,478.00
1,833,975.00
4,617,600.00
495,000.00
1,806,525.00
581,850.00
274,290,000.00
9,108,000.00
34,417,548.00
122,220,000.00
217,149,375.00
19,519,500.00
3,811,500.00
4,346,784.00
238,500,000.00
38,426,700.00
111,154,725.00
3,442,500.00
41,373,750.00
70,541,184.00
110,889.00
705,600.00
3,318,190.00
6,009,600.00
1,261,800.00
37,800,000.00
4,139,640.00
1,935,000.00
12,867,120.00
1,215,000.00
1,289,160.00
15,561,720.00
3,686,925.00
3,767,274.00
2,317,640.00
14,277,375.00
28,674,000.00
3,681,815.00
997,500.00
1,132,950.00
7,559,100.00
9,093,750.00
3,375,900.00
6,813,000.00
9,900,000.00
27,914,000.00
1,900,431.00
1,730,800.00
2,133,000.00
10,711,386.00
1,372,500.00
1,365,000.00
115,385.00
29,163,750.00
123,750.00
3,143,520.00
6,404,850.00
113,630.00
3,600,896.00
594,225.00
3,003,000.00
2,434,500.00
4,568,625.00
2,214,450.00
2,795,535.00
7,076,250.00
18,115,200.00
242,940.00
89,622,000.00
20,407,009.00
4,623,300.00
10,233,756.00
1,156,200.00
595,700.00
134,400,000.00
11,313,120.00
9,405,000.00
31,222,620.00
9,587,700.00
882,450.00
21,402,545.00
69,445,152.00
19,059,033.00
2,108,700.00
58,800.00
496,584,000.00
31,973,476.00
75,600,000.00
4,452,000.00
19,893,000.00
46,844,100.00
1,298,990.00
2,475,000.00
27,170,000.00
1,505,200.00
3,241,050.00
15,681,600.00
4,500,000.00
13,162,500.00
841,500.00
14,945,850.00
22,248,000.00
8,820,000.00
42,047,910.00
112,302,000.00
6,527,400.00
85,680,000.00
876,960.00
46,428,525.00
1,123,875.00
2,010,000.00
4,130,033.00
3,105,000.00
300,449.00
2,029,860.00
451,282.00
5,893,290.00
5,621,850.00
2,004,750.00
2,694,002.00
212,910.00
3,463,200.00
276,675.00
11,404,800.00
1,917,600.00
366,300.00
392,700.00
4,191,750.00
2,276,505.00
10,050,900.00
6,558,750.00
25,929,000.00
2,160,000.00
7,456,500.00
31,380,000.00
16,075,725.00
3,377,250.00
93,290,400.00
356,138,100.00
62,947,500.00
6,035,729.00
1,386,000.00
198,551.00
520,086.00
3,891,571.00
2,726,990.00
36,683,280.00
2,625,006.00
5,246,998.00
94,967,438.00
520,086.00
3,332,997.00
7,011,232.00
362,970.00
1,689,009.00
753,929.00
4,875,103.00
17,800,182.00
23,640,336.00
16,650,000.00
28,262,709.00
2,887,909.00
200,000,000.00
2,078,909,136.00
74,090,500.00
49,500,000.00
1,931,875.00
9,619,500.00
5,795,625.00
7,243,500.00
1,850,084,636.00
16,843,140.00
6,937,500.00
879,120.00
532,800.00
865,800.00
532,800.00
83,116,800.00
23,816,160.00
13,240,080.00
2,362,968.00
60,357,360.00
9,324,000.00
18,328,320.00
531,868.00
105,161,400.00
719,280.00
3,143,520.00
109,890,000.00
452,880.00
1,165,500.00
3,241,200.00
4,928,400.00
4,262,400.00
8,463,750.00
4,875,120.00
7,825,500.00
5,927,400.00
23,060,250.00
2,375,400.00
1,625,040.00
1,625,040.00
1,369,296.00
6,813,180.00
412,920.00
719,280.00
2,331,000.00
905,760.00
97,902,000.00
17,888,760.00
11,988,000.00
28,804,500.00
139,860,000.00
21,312,000.00
21,938,040.00
7,492,500.00
24,175,800.00
84,448,800.00
44,400,000.00
37,740,000.00
8,325,000.00
149,850,000.00
11,100,000.00
2,220,000.00
82,459,125.00
6,965,250.00
9,723,600.00
14,985,000.00
15,616,000.00
102,120.00
2,097,900.00
4,412,250.00
127,650.00
2,727,000.00
153,180.00
416,250.00
1,600,620.00
8,358,300.00
15,762,000.00
2,897,100.00
15,651,000.00
4,506,215.00
7,409,250.00
7,659,000.00
6,093,900.00
13,653,000.00
10,878,000.00
6,243,750.00
4,495,500.00
2,664,000.00
19,980,000.00
7,492,500.00
13,875,000.00
6,299,250.00
1,665,000.00
5,550,000.00
1,665,000.00
7,536,900.00
5,328,000.00
13,986,000.00
2,897,100.00
48,701,250.00
5,439,000.00
1,692,750.00
31,080,000.00
2,342,100.00
25,308,000.00
32,634,000.00
5,661,000.00
2,830,500.00
29,970,000.00
999,000.00
852,480.00
22,688,400.00
22,688,400.00
6,959,700.00
1,296,480.00
1,862,136.00
2,674,656.00
399,600.00
1,553,112.00
499,500.00
499,500.00
399,600.00
10,949,040.00
1,212,120.00
1,482,960.00
331,668.00
267,001.00
759,501.00
2,823,840.00
888,000.00
154,734,000.00
86,469,000.00
68,265,000.00
261,757,500.00
7,908,750.00
4,995,000.00
2,913,750.00
58,275,000.00
5,827,500.00
6,798,750.00
50,088,750.00
31,635,000.00
18,453,750.00
31,635,000.00
19,980,000.00
11,655,000.00
26,362,500.00
16,650,000.00
9,712,500.00
55,361,250.00
34,965,000.00
20,396,250.00
19,500,000.00
101,172,876.00
48,840,000.00
13,875,000.00
3,330,000.00
19,980,000.00
8,880,000.00
2,775,000.00
21,090,000.00
13,320,000.00
7,770,000.00
26,612,438.00
5,300,438.00
21,312,000.00
4,630,438.00
1,300,438.00
3,330,000.00
240,611,925.00
94,905,000.00
145,706,925.00
208,757,607.00
112,287,600.00
30,300,004.00
49,950,000.00
7,020,003.00
9,200,000.00
-
-
19,459,385,470.00
17,226,981,470.00
246,500,000.00
246,500,000.00
22,500,000.00
28,800,000.00
35,000,000.00
7,200,000.00
100,000,000.00
5,000,000.00
10,000,000.00
38,000,000.00
6,087,200,000.00
60,000,000.00
120,000,000.00
60,000,000.00
60,000,000.00
5,907,200,000.00
195,000,000.00
5,452,200,000.00
65,000,000.00
195,000,000.00
214,800,000.00
30,000,000.00
180,000,000.00
48,000,000.00
15,000,000.00
72,000,000.00
45,000,000.00
4,800,000.00
10,500,000.00
10,500,000.00
62,200,000.00
22,200,000.00
40,000,000.00
60,000,000.00
60,000,000.00
9,650,000.00
6,500,000.00
3,150,000.00
18,000,000.00
18,000,000.00
15,000,000.00
15,000,000.00
276,750,000.00
190,100,000.00
50,000,000.00
20,000,000.00
16,650,000.00
756,000,000.00
756,000,000.00
62,004,550.00
62,004,550.00
36,000,000.00
36,000,000.00
132,000,000.00
132,000,000.00
1,500,000,000.00
1,500,000,000.00
12,720,000.00
12,720,000.00
145,000,000.00
145,000,000.00
470,000.00
470,000.00
20,809,700.00
15,000,000.00
2,519,700.00
3,290,000.00
237,500,000.00
237,500,000.00
7,323,877,220.00
7,323,877,220.00
1,339,399,000.00
886,274,000.00
886,274,000.00
453,125,000.00
453,125,000.00
55,000,000.00
55,000,000.00
55,000,000.00
204,240,000.00
115,995,000.00
69,375,000.00
27,750,000.00
18,870,000.00
88,245,000.00
52,170,000.00
21,645,000.00
14,430,000.00
127,000,000.00
55,000,000.00
55,000,000.00
22,000,000.00
22,000,000.00
50,000,000.00
50,000,000.00
30,000,000.00
30,000,000.00
30,000,000.00
476,765,000.00
476,765,000.00
20,000,000.00
395,515,000.00
26,250,000.00
35,000,000.00
4,010,002,025.00
909,047,000.00
28,182,000.00
28,182,000.00
140,000,000.00
140,000,000.00
-
95,865,000.00
33,000,000.00
3,960,000.00
6,600,000.00
1,650,000.00
4,125,000.00
2,750,000.00
2,530,000.00
33,000,000.00
8,250,000.00
115,000,000.00
75,000,000.00
40,000,000.00
-
160,000,000.00
80,000,000.00
20,000,000.00
60,000,000.00
250,000,000.00
250,000,000.00
-
120,000,000.00
120,000,000.00
3,100,955,025.00
2,508,250,850.00
500,000,000.00
2,008,250,850.00
342,704,175.00
342,704,175.00
250,000,000.00
250,000,000.00
717,770,000.00
717,770,000.00
574,760,000.00
112,027,500.00
1,328,000.00
2,152,000.00
776,000.00
1,560,000.00
1,900,000.00
3,700,000.00
3,600,000.00
3,500,000.00
3,000,000.00
1,225,000.00
25,000,000.00
3,968,000.00
2,920,000.00
852,000.00
1,530,000.00
1,500,000.00
1,440,000.00
1,470,000.00
1,685,250.00
8,022,000.00
2,500,000.00
1,908,000.00
1,200,000.00
1,200,000.00
225,000.00
2,880,000.00
1,023,750.00
504,000.00
-
2,012,000.00
498,000.00
1,140,000.00
483,000.00
1,980,000.00
477,000.00
1,290,000.00
1,979,000.00
-
-
-
-
-
1,984,000.00
1,460,000.00
1,460,000.00
1,024,000.00
7,200,000.00
1,123,500.00
5,348,000.00
130,564,750.00
48,110,000.00
25,954,750.00
19,150,000.00
19,150,000.00
18,200,000.00
277,000,000.00
55,167,750.00
15,110,000.00
2,280,000.00
320,000.00
600,000.00
640,000.00
720,000.00
10,975,000.00
1,400,000.00
2,625,000.00
2,800,000.00
3,150,000.00
1,000,000.00
1,855,000.00
280,000.00
525,000.00
560,000.00
490,000.00
127,900,000.00
63,950,000.00
63,950,000.00
25,000,000.00
25,000,000.00
25,000,000.00
25,000,000.00
4,995,381,550.00
3,091,466,073.00
3,091,466,073.00
3,091,466,073.00
3,091,466,073.00
170,000,000.00
170,000,000.00
14,000,000.00
14,000,000.00
156,000,000.00
156,000,000.00
801,537,243.00
345,946,617.00
224,417,057.00
7,010,427.00
6,000,000.00
50,000,000.00
5,701,630.00
155,705,000.00
121,529,560.00
100,000,000.00
15,096,000.00
6,433,560.00
455,590,626.00
136,038,469.00
11,369,819.00
40,198,650.00
84,470,000.00
10,879,998.00
10,879,998.00
229,569,119.00
39,950,000.00
60,545,450.00
35,116,360.00
36,962,309.00
56,995,000.00
61,249,800.00
1,221,000.00
49,816,800.00
5,550,000.00
3,330,000.00
1,332,000.00
17,853,240.00
15,682,080.00
2,171,160.00
1,855,691,750.00
-
250,682,000.00
1,190,739,500.00
101,232,000.00
146,400,000.00
161,810,250.00
4,828,000.00
264,237,080.00
168,748,900.00
128,748,900.00
40,000,000.00
95,488,180.00
21,116,640.00
39,420,540.00
-
30,400,000.00
4,551,000.00
1,903,915,477.00
1,903,915,477.00
1,903,915,477.00
1,903,915,477.00
1,903,915,477.00
1,903,915,477.00
1,903,915,477.00
359,167,895.00
359,167,895.00
1,417,398,104.00
1,135,864,308.00
79,417,448.00
202,116,348.00
127,349,478.00
127,349,478.00
RSUD CARUBAN KABUPATEN MADIUN
RINCIAN ANGGARAN KAS PENDAPATAN DI SIPD
TAHUN ANGGARAN 2024
Belanja Bahan dan Alat Kesehatan Habis Pakai 8,612,914,822.00 PLY 8,612,914,822
ADVANTIME 1 5,729,784.00
ADVANTIME 3-0 27,029,264.00
ALKOHOL 70% 14,906,295.00
ALKOHOL SWAB 27,575,730.00
APRONT 38,628,000.00
APRONT LENGAN PANJANG 13,792,660.00
BAYCIDE HIGH LEVEL 94,762,537.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
BAYZIME DETERGEN 80,000,053.00
BETADINE 25,976,338.00
BETADINE SOLUTION 60 ML 3,816,680.00
BREATHING CIRCUIT 19,440,140.00
BUFFER FORMALIN 10% 8,762,895.00
CHLORO TULLE 19,730,250.00
CHROMIC 0 22,316,022.00
CUTICELL CLASSIC 10 x 10 4,628,034.00
CUTTING LOOP STORZ MONO 60,439,500.00
DERMALON 2-0 9,729,701.00
DERMALON 3-0 25,359,415.00
DERMALON 4-0 9,729,701.00
DISPOSABLE NEEDLE 5,750,910.00
ECOSORB 2 3,715,201.00
ELECTRODE ECG 7,716,522.00
ENDOTRACHEAL TUBE 33,743,663.00
EQUIWAX 2,5 GR 4,351,644.00
ESU PAD PENCILS COUTER 46,200,420.00
ETHYL CHLORIDE 3,178,818.00
FILAPEAU 2-0 10,909,080.00
FILAPEAU 3-0 34,314,558.00
FILAPEAU 4-0 4,842,912.00
GELAS KUMUR 532,800.00
GLOVES STERIL 247,192,560.00
GLOVES STERIL ORTHOPAEDIC 81,599,918.00
GUEDEL AIRWAY 37,192,770.00
GUTTA PERCHA SURE ENDO 0.04 3,096,900.00
H2O2 3% 2,147,184.00
HARTRANS TAPE 4,195,800.00
HME FILTER 18,206,775.00
IV DRESSING 125,252,400.00
JACKSON REESE DEWASA 3,496,500.00
JAM STERILE WATER 21,433,105.00
KANTONG PLASTIK 12x0,3x30 13,170,150.00
KAPAS PEMBALUT 250 GR 1,263,232.00
KARET GELANG 1,307,025.00
KASA HYDROFIL DRC 40x80 CM 25,216,722.00
KASA HYDROPHYL 40x80 27,912,559.00
KASA PEMBALUT 4x5 11,594,394.00
KASA STERIL 7,5x7,5 CM 157,176,766.00
KERTAS ECG 63x30 50,160,013.00
KERTAS ECG C-110 8,249,992.00
KERTAS USG 18,443,205.00
LAP SPONGE 47,424,528.00
LEUKOPLAST 21,023,475.00
LUBRICATING JELLY 6,382,881.00
MASKER ANASTHESI 10,073,250.00
MASKER BEDAH 61,435,170.00
MESS BB5 17,194,921.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
METRACIDE 1 LTR 55,816,285.00
METRAZYME 6,889,653.00
NURSE CAP 4,896,026.00
OPTIME PGA 0 19,731,759.00
OPTIME PGA 1 45,795,968.00
OPTIME PGA 2 77,733,569.00
OPTIME PGA 2-0 36,791,711.00
OPTIME PGA 3-0 17,454,528.00
PHARMAFIX 10x500 CM 29,569,334.00
PHARMAFIX 15x500 CM 44,770,818.00
PLAIN 2-0 6,118,076.00
PLAIN 3/0 48,742,009.00
PLAIN 4/0 10,230,080.00
PLESTERIN 7,543,289.00
PLESTERIN BULAT 589,327.00
POLIWASH 5 L 14,412,240.00
POLYMED POLYVAC 832,500.00
POLYSORB 2-0 6,589,564.00
POSTOFIX 10 x 15 CM 4,595,400.00
POSTOFIX 6 x 7 CM 15,151,500.00
POT URINE STERILE 11,881,440.00
PROLENE BLU 100 CM 9,160,410.00
PROLENE BLU 2-0 33,705,078.00
SARUNG TANGAN NON STERIL 388,611,000.00
SILICON LARYNGEAL MASK 26,569,903.00
SILK 0 2,997,000.00
SILK 1 30,929,759.00
SILK 2-0 44,212,943.00
SILK 3-0 14,529,096.00
SILK 4-0 5,166,588.00
SODASORB 3,161,802.00
SPINAL EGEMEN QUENCKE 25 27,000,972.00
SPUIT 1 CC INSULIN 2,619,045.00
SPUIT 1 CC TUBERCULIN 2,317,680.00
SPUIT 10 CC 3,116,880.00
SPUIT 3 CC 26,373,600.00
SPUIT 5 CC 2,344,320.00
SUCTION CONNECTING 36,233,730.00
UNDERPAD 60 X 90 32,447,520.00
USG GEL 250 ML 291,072.00
VIGILENZ CROMIC 2-0 30,863,586.00
VIGILENZ PLAIN 2 3,707,968.00
Paket Hemodialisa Lengkap 2,738,935,615.00
Citra-Lock 15,641,147.00
Paket 2C-Hd 304,395,300.00
ARM SLING - L 8,008,650.00
ARM SLING - M 3,696,300.00
ARM SLING - S 1,540,125.00
BACTERIA HME FILTER WITH PAPER WITH SOFT CAP 13,565,171.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Blood Set 88,299,750.00
BREATHING CIRCUIT - ADULT 28,771,200.00
BREATHING CIRCUIT - NEONATAL 15,934,050.00
BREATHING CIRCUIT - PEDIATRIC 15,934,050.00
CAPSUL KOSONG NO.0 6,180,480.00
CAPSUL KOSONG NO.00 8,205,120.00
CAPSUL KOSONG NO.1 137,640.00
CAPSUL KOSONG NO.2 199,800.00
CAPSUL KOSONG NO.3 1,386,000.00
CATHETER MOUNT 26,593,380.00
CATHY 18 27,912,060.00
CATHY 20 113,974,245.00
CATHY 22 51,172,110.00
CERVICAL COLLAR UNIVERSAL 2,578,752.00
CHLORO TULLE 1,248,750.00
Colostomy bag no 5 516,883.00
Condom Catheter L-OM -
CUTICELL CLASSIC 10 X 10 CM 11,655,000.00
DJ STENTS 5 FR OPEN WITH GUIDEWIRE 3,178,185.00
ELASTOMULL HAFT 10CM x 4M 2,547,450.00
ELASTOMULL HAFT 8CM X 4M 2,637,360.00
ENEMA SET - ONEMED 7,481,678.00
ETT 7,0 WITH CUFF 3,285,600.00
EXTENSION TUBE 150 CM 31,126,343.00
FLEET ENEMA 133 ML 2,164,500.00
FM CREPE 3 15,104,880.00
FM CREPE 4 47,896,056.00
FM CREPE 6 36,315,648.00
FOLEY CATHETER 2-WAY CH.08 6,901,092.00
FOLEY CATHETER 2-WAY CH.10 17,252,730.00
FOLEY CATHETER 2-WAY CH.12 6,556,770.00
FOLEY CATHETER 2-WAY CH.14 10,490,832.00
FOLEY CATHETER 2-WAY CH.16 92,450,457.00
FOLEY CATHETER 2-WAY CH.18 -
FOLEY CATHETER 2-WAY CH.20 1,967,031.00
FOLEY CATHETER 3-WAY CH.24 12,692,295.00
GIPSONA 3/" 859,140.00
GYPSONA 4\" 5,913,600.00
GYPSONA 6\" 5,521,032.00
INFUSION SET OI - 34 MICRODRIP 2,038,182.00
INSTOPPER 2,498,166.00
JACKSON REEVES - ANAK 4,162,500.00
JACKSON REEVES - DEWASA 24,907,334.00
KASA STERIL 5,860,800.00
KORSET XL 780,000.00
KORSET XXL 1,695,276.00
KRUCK UK L 10,472,850.00
KRUCK UK M 14,169,150.00
LAMANARIA _UK L 15,510,557.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
LAMANARIA _UK M 1,026,922.00
MASKER ANASTESI SIZE 4 1,827,840.00
MASKER ANASTESI SIZE 5 1,827,840.00
MASKER NEBULIZER ANAK 10,805,850.00
MASKER NEBULIZER DEWASA 6,483,510.00
MASKER NON REBRITING ANAK 842,490.00
MASKER NON REBRITING DEWASA 63,186,750.00
MASKER O2 DEWASA 374,625.00
MAYO TUBE 4/090 (KUNING) 6,280,713.00
NASAL O2 ANAK 2,747,250.00
NASAL O2 BAYI 305,250.00
NASAL O2 DEWASA 21,062,250.00
NGT 12 734,997.00
NGT 14 1,471,993.00
NGT 16 29,359,944.00
NGT 5 ( 100 CM ) 2,813,384.00
NGT 5 ( 40 CM ) 781,274.00
NGT 8 ( 100 CM ) 2,115,383.00
NGT 8 ( 40 CM ) 9,375,282.00
OTSU Y - SET ADAPTOR 56,740,200.00
PEN NEEDLE (Easy Flow) 20,319,660.00
PESARIUM NO. 6,5 1,165,500.00
PESARIUM NO.6 466,200.00
PESARIUM NO.7 1,165,500.00
PESARIUM NO.7,5 466,200.00
POLYBAN 3 467,532.00
POLYBAN 4 1,810,188.00
POLYBAN 6 1,081,584.00
POLYWIN IV CANNULA 26 21,538,440.00
POT PLASTIK 20 ML 80,940.00
POT PLASTIK 30 ML 110,880.00
SERENITY CERVICAL COLLAR 3,750,000.00
SPALK 100 X 10 CM 8,824,500.00
SPALK 40 X 10 CM 3,296,700.00
SPALK 40 X 8 CM 2,997,000.00
SPALK 50 X 10 CM 2,331,000.00
SPALK 50 X 8 CM 5,827,500.00
SPALK 60 X 10 CM 6,826,500.00
SPALK 60 X 8 CM 10,389,600.00
SPALK 80 X 10 CM 7,242,750.00
SPALK 90 X 10 CM 15,984,000.00
SPALK ANAK 12 X 5 CM 2,930,400.00
SPALK ANAK 15 X 7 CM 3,396,600.00
SPALK ANAK 7 X 5 CM 832,500.00
SPUIT 1 CC INSULIN 100 U 3,771,225.00
SPUIT 1 CC TUBERCULIN 5,311,350.00
SPUIT 10 CC 65,571,363.00
SPUIT 20 CC 3,736,260.00
SPUIT 3 CC 157,069,440.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
SPUIT 5 CC 147,311,208.00
SPUIT 50 CC 7,662,630.00
SPUIT 50 CC CATHETER TIP 610,988.00
SPUIT ABG PRESET 3 CC - BD 3,313,350.00
STIKPAN PLASTIK DELUXE BLUE 2,472,525.00
STOCKINET 3\\\" 2,440,170.00
STOCKINET 4\\\" 3,188,394.00
SUCTION CATH 10 - HOSPITECH 299,700.00
SUCTION CATH 12 7,789,003.00
SURFLO 24 - ecath 16,919,175.00
TENSOPLAST - STK - ADULT 7,201,658.00
TENSOPLAST - STK - CHILD 3,675,075.00
THORASIC CATHETER WITH TROCAR 24 / WSD 2,114,772.00
THREE WAY STOPCOCK 44,923,032.00
THREE WAY STOPCOCK WITH TUBING 9,615,375.00
TRANSPORE 3,152,045.00
UMBILICAL CATHETER 3,5 Fr 720,390.00
UMBILICAL CATHETER 5 Fr 360,195.00
URIN BAG STERIL - UP 33,406,560.00
URINAL LAKI LAKI 955,444.00
URINAL PEREMPUAN 116,039.00
WING NEEDLE 21 2,778,719.00
WING NEEDLE 23 4,939,944.00
Gas Oksigen Tabung - 1 M3 500,500.00
Gas Oksigen Tabung - 2 M3 643,500.00
Gas Oksigen Tabung - 6 M3 33,462,000.00
Liquid 897,121,550.00
Gas CO² - 4 kg 1,430,000.00
Bahan Alat Habis Pakai lainnya 32,000,000.00
1.02.01.01.0024 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Tulis Kantor 421,725,736.00 TU 421,725,736.00
ATK perkantoran 421,005,736.00
Amplop 90 (kabinet) isi 100 1,060,050.00
Amplop 104 (tanggung) iso 100 1,072,260.00
Box File Plastik 748,140.00
Buku Expedisi isi 100 lembar 1,314,240.00
Buku Expedisi isi 200 lembar 3,956,040.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Buku Agenda KM Deluxe 2016 353,535.00
Buku Folio isi 100 lembar 2,637,360.00
Buku Folio isi 200 lembar 7,742,250.00
Binder Clip 105 11,655,000.00
Binder Clip 155 826,950.00
Binder Clip 200 960,413.00
Binder Clip 260 1,548,038.00
Ballpoint Biasa (Hitam) 13,597,500.00
Ballpoint Biasa ( Merah ) 2,331,000.00
Ballpoint Biasa (Biru) 3,108,000.00
Ballpoint Sejenis Pentel 444,000.00
Cutter K-200 106,560.00
Cutter A-300 140,250.00
Isi Cutter Kecil 83,250.00
Isi Cutter Besar 105,653.00
Correction Tipe x Pen 1,057,275.00
Correction Tipe x Kertas 140,970.00
Gunting Besar 631,313.00
Isi Stapples No 10 9,365,625.00
Kertas Continuous Form 2 Ply 7,770,000.00
Kertas Continuous Form 3 Ply 85,164,750.00
Kertas Hvs A4 70 Gram 691,530.00
Kertas Hvs A4 80 Gram 401,543.00
Kertas Hvs F4 70 Gram 93,573,000.00
Kertas Hvs F4 70 Gram Include Potong 11,696,625.00
Ordner 1466 F SFL 7,070,700.00
Ordner jumbo 1,625,040.00
Paper Clips No 1 953,798.00
Penggaris 30 cm 294,705.00
Penghapus kecil 40,454.00
Pensil 2 B 1,048,950.00
Snelhecter Map Kertas 18,204,000.00
Snelhecter Map Plastik 9,035,400.00
Stop Map Kertas Folio 3,063,600.00
Spidol Permanen 5,550,000.00
Spidol Whiteboard (Boardmarker) 1,598,400.00
Stabilo 629,370.00
Stamp Pad 234,765.00
Staples Kecil Hd 10 1,168,830.00
Staples Besar HD 12A/13 (Tuas Jilid) 597,402.00
Steples Tembak 395,160.00
Refill Stempel Ungu 1,209,900.00
Isolasi Bening Besar 3,774,000.00
Isolasi Bening 12 Mm 2,397,600.00
Plakband 2'( Hitam) 992,340.00
Plakband 1,5' (hitam ) 442,890.00
Post It/Notes Plastik 1,387,500.00
Ordner Plastik 2,181,150.00
Post It/Notes Kertas besar 111,000.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Isolasi Kertas 141,747.00
Isolasi Kertas 1" 85,048.00
Double Tape Besar 2" Hijau 1,585,913.00
Map Kancing Plastik 2,886,000.00
Cover ID Card bahan plastik 444,000.00
Buku Kwitansi Besar 100 lembar 803,640.00
Kertas Label No 12 (110) 666,000.00
Kertas Label No 12 (109) 8,325,000.00
Tinta Printer 100 Hitam 5,088,240.00
Tinta Printer 100 Merah 2,544,120.00
Tinta Printer 100 Kuning 2,544,120.00
Tinta Printer 100 Biru 2,544,120.00
Tinta Printer 664 Hitam 7,992,000.00
Tinta Printer 003 Hitam 666,000.00
Tinta Printer 003 Biru 399,600.00
Tinta Printer 003 Kuning 399,600.00
Tinta Printer 003 Merah 399,600.00
Refill Stempel Flash Ungu 83,188.00
Karet Gelang 1,307,025.00
Stop Map Plastik 7,092,900.00
Refill Ballpoint Hitam 1,400,598.00
Refill Ballpoint Biru 1,400,598.00
Buku Tulis 266,400.00
Tinta Printer 774 Hitam 7,242,750.00
Kertas Foto Glossy 1,318,680.00
Ballpoint Meja 388,500.00
Plastik Sampul Jilid 247,530.00
Lem Kertas besar 826,950.00
Plastik Pres laminating 1,118,880.00
Stempel 6,476,850.00
Belanja ATK lainnya 26,030,065.00
1.02.01.01.0025 Belanja Alat/Bahan untuk Kegiatan Kantor- Kertas dan Cover 126,156,552.00 PNJ 126,156,552.00
Belanja kertas dan Cover kegiatan perkantoran 122,100,000.00
Kertas Label thermal 122,100,000.00
- Belanja bahan dekorasi ( spanduk, banner ) kegiatan promosi dan inform 11,610,600.00 TU 11,610,600.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Banner/Spanduk/Vinnyl Fl 300 Gsm 4,395,600.00
Banner/Spanduk/Vinnyl Fl 440 Gsm Korcin 7,215,000.00
1.02.01.01.0029 Belanja Alat/Bahan untuk Kegiatan Kantor-Bahan Komputer 25,873,545.00 PNJ 25,873,545.00
Pita Komputer Epson kecil 3,896,100.00
Pita Komputer Epson Lq-1031 2,331,000.00
Pita Komputer Epson Kecil + Cartridge 1,332,000.00
Cartridge Ribbon Cartridge LX 310 3,534,240.00
Cartridge LQ 2190 Ribbon Cartridge 11,247,075.00
Flash Disk 32 GB 3,533,130.00
1.02.01.01.0031 Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Listrik 218,988,015.00 PNJ 218,988,015.00
Embodos Kotak Hitam 177,600.00
Fiting Plafound 943,500.00
Isolasi Kabel 222,000.00
Konektor TC 2 Baut 2,081,250.00
Kabel Ties 15 cm nylon 222,000.00
Kabel Ties 10 cm nylon 166,500.00
Kabel Ties 30 cm nylon 277,500.00
Kabel NYM 2x1,5 mm 4,995,000.00
Kabel NYM 2x2,5 mm 4,856,250.00
Kabel NYM 3x2,5 mm 8,325,000.00
Kabel NYYHY 3x0,75 mm 7,992,000.00
Kabel NYA 2,5 mm 1,665,000.00
Klem Kabel 6 mm 166,500.00
Klem Kabel 9 mm 222,000.00
Klem Kabel 10 mm 255,300.00
Klem Kabel 12 mm 305,250.00
Lampu LED 8 W 15,262,500.00
Lampu LED 4 W 7,881,000.00
Lampu LED 14,5 W 20,812,500.00
Lampu LED 19 W 5,550,000.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Lampu Sorot LED 50 W 2,220,000.00
Lampu Sorot LED 30 W 1,665,000.00
Lampu PJU LED 30 W 13,320,000.00
MCB 1 Phase (6/10/16 A) 4,995,000.00
MCCB 800 A 50 KA 32,190,000.00
MCCB 1250 A 50 KA 17,760,000.00
Kabel Duct TC 4 832,500.00
Saklar Seri 16A 250V 1,398,600.00
Saklar Engkel 16A 250V 799,200.00
Stop Kontak 16A 250V 819,180.00
Steker Broco 16A 250V 666,000.00
Steker T Broco 13A 250V 566,100.00
Stop Kontak 4 lubang 1,970,250.00
Stop Kontak 1 Lubang 258,075.00
Stop Kontak 2 Lubang 832,500.00
Lampu Downlight 7,5 W 5,550,000.00
Battery , Alkaline AA2 1,5V 14,918,400.00
Battery Alkaline AAA3 1,5V 7,192,800.00
Battery Kotak Alkaline 9V 1,498,500.00
Switch hub 4,957,260.00
alat listrik Lainnya 22,200,000.00
1.02.01.01.0034 Belanja Alat/Bahan untuk Kegiatan Kantor- Perlengkapan Pendukung Olahra 1,924,518.00 TU 1,924,518.00
Plakat Akrilik 35 1,185,480.00
Plakat Bahan : kayu 12 739,038.00
BAHAN PENGEMAS MAKANAN DAN PEMBERSIH DI INSTALASI GIZI 107,058,170.00 PNJ 107,058,170.00
Gelas Minum 7,312,680.00
Cup Lauk Mika 2,637,360.00
Box Mika 224,000.00
Plastik 18 an 299,700.00
Plastik Es 1,842,600.00
Plastik Klip Besar 922,410.00
Plastik Klip Kecil 377,400.00
Plastik Opp 11 an 5,834,160.00
Plastik Opp 14 an 8,691,300.00
Plastik Sealer 6,981,900.00
Plastik Wraping 6,526,800.00
Kertas Nasi 526,140.00
Kotak Nasi Disposible 29,137,500.00
Kresek Jumbo 3,046,950.00
Kresek Putih 3,496,500.00
Sarung Tangan Plastik 279,720.00
Sendok Plastik 23,310,000.00
Spon 532,800.00
Tisu Warna 5,078,250.00
Belanja Makanan Dan Minuman Pasien ( snack pasien dan minuman pasien 154,734,000.00 PNJ 154,734,000.00
Snack Gurih 86,469,000.00
Snack Manis 68,265,000.00
- Belanja makanan dan minuman kegiatan pelayanan sunatan massal PLY 21,090,000.00
Nasi Kotak Biasa 13,320,000.00
Snack Kotak Biasa 7,770,000.00
1.02.02.01.0004 Honorarium Tim Pelaksana Kegiatan dan Sekretariat Tim Pelaksana Kegiatan -
1.02.02.01.0039 Belanja Jasa Tenaga Informasi dan Teknologi 60,000,000.00 PNJ 60,000,000.00
Honorarium Sub Profesional (Programmer Senior) 60,000,000.00
1.02.02.01.0077 Belanja jasa pelayanan Kesehatan bagi Non ASN 7,046,046,295.00 TU-D 7,046,046,295.00
Belanja jasa pelayanan Kesehatan bagi Non ASN 7,046,046,295.00
1.02.02.02.0006 Belanja Iuran Jaminan Kecelakaan Kerja bagi Non ASN 453,125,000.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Belanja Premi Asuransi Ketenagakerjaan ( perbulan per orang = Rp 145.000) 453,125,000.00
1.02.02.08.0019 Belanja Jasa Konsultansi Pengawasan Rekayasa-Jasa Pengawas Pekerjaan K 88,245,000.00 TU 88,245,000.00
- Belanja jasa konsultasi pengawasan pekerjaan rehap rawat inap ( biaya
52,170,000.00
Konstruksi Fisik > 1.200.000.000 s/d 1.300.000.000)
1.02.03.02.0036 Belanja Pemeliharaan Alat Angkutan-Alat Angkutan Darat Bermotor-Kenda 140,000,000.00 TU 140,000,000.00
Belanja Pemeliharaan Alat Angkutan-Alat Angkutan Darat Bermotor-
Kendaraan Bermotor Penumpang 140,000,000.00
-
1.02.03.02.0117 Belanja Pemeliharaan Alat Kantor dan Rumah Tangga-Alat Kantor-Alat Kanto 95,865,000.00 PNJ 95,865,000.00
Belanja pemeliharaan Printer CANON / IP2770 Modif 33,000,000.00
Belanja pemeliharaan Printer EPSON / L 120/ L1110 3,960,000.00
Belanja pemeliharaan Printer CANON / MP287 Modif 6,600,000.00
Power Suply 1,650,000.00
Pemeliharaan Pc Komputer 4,125,000.00
Service Monitor Komputer 2,750,000.00
Pemeliharaan Note Book 2,530,000.00
Pemeliharaan komputer lain-lain dan alat kantor lainnya 33,000,000.00
Mouse + Keyboard 8,250,000.00
1.02.03.02.0121 Belanja Pemeliharaan Alat Kantor dan Rumah Tangga-Alat Rumah Tangga-Ala 115,000,000.00 PNJ 115,000,000.00
Pemeliharaan AC Gedung/Kantor Pemeliharaan Portable/Split, servis dan
75,000,000.00
Penggantian Spare Part
Pemeliharaan AC Gedung/Kantor Pemeliharaan AC central, servis dan
40,000,000.00
penggantian Spare part
-
1.02.03.02.0123 Belanja Pemeliharaan Alat Kantor dan Rumah Tangga-Alat Rumah Tangga-Al 160,000,000.00 PNJ 160,000,000.00
Pemeliharaan/perbaikan ringan Alat Rumah Tangga 80,000,000.00
Pemeliharaan/perbaikan sedang Alat Rumah Tangga 20,000,000.00
Belanja pemeliharaan lift 60,000,000.00
1.02.03.02.0232 Belanja Pemeliharaan Alat Kedokteran dan Kesehatan-Alat Kedokteran-Alat 250,000,000.00 PNJ 250,000,000.00
Belanja Pemeliharaan Alat Kedokteran dan Kesehatan-Alat Kedokteran-
Alat Kedokteran Lainnya 250,000,000.00
-
1.02.03.02.0406 Belanja Pemeliharaan Komputer-Komputer Unit-Komputer Unit Lainnya 120,000,000.00 PNJ 120,000,000.00
Pemeliharaan soft ware SIM RS 120,000,000.00
1.02.03.04.0083 Belanja Pemeliharaan Instalasi-Instalasi Air Kotor-Instalasi Air Kotor Lainnya 250,000,000.00 PNJ 250,000,000.00
Uang Harian Perjalanan Dinas Luar Daerah ( Eselon 3 ) Provinsi Jatim 1,900,000.00
Uang Harian Perjalanan Dinas Luar Daerah ( Eselon IV, Gol IV ) Provinsi
Jatim 3,700,000.00
Uang Harian Perjalanan Dinas Luar Daerah ( Gol III ) Provinsi Jatim 3,600,000.00
Uang Harian Perjalanan Dinas Luar Daerah ( Gol I,II,PPPK ) Provinsi Jatim 3,500,000.00
Uang Harian Perjalanan Dinas Luar Daerah ( pengemudi ) Provinsi Jatim 3,000,000.00
Satuan biaya transportasi darat ibukota provinsi ke kabupaten /kota dalam
provinsi yang sama 1,225,000.00
Belanja Jasa Jalan Tol (mobil golongan I) 25,000,000.00
c. Belanja perjalanan dinas kegiatan Pendidikan dan Pelatihan Eksternal 277,000,000.00 TU-D 277,000,000.00
d. Belanja perjalanan dinas luar daerah kegiatan bimtek Akreditasi
Rumah Sakit 55,167,750.00 PLY 55,167,750.00
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah Jarak Tempuh (21
- 35 Km) Bupati, Wabup, Es.Iib, Es. Iii (Ka Skpd), Es. Iii ( Bukan Ka ), Es. Iv &
G. Iv, Pns G. Iii, Pns G. Ii, I & Pppk, Pengemudi 600,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. Iii 640,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iv & G. Iv 720,000.00
- Belanja perjalanan dinas dalam kota kegiatan administrasi perkantoran 10,975,000.00 TU 10,975,000.00
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah Jarak Tempuh (21
- 35 Km) Bupati, Wabup, Es.Iib, Es. Iii (Ka Skpd), Es. Iii ( Bukan Ka ), Es. Iv &
G. Iv, Pns G. Iii, Pns G. Ii, I & Pppk, Pengemudi 2,625,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. Iii 2,800,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iv & G. Iv 3,150,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Es. Iii (Bukan Ka) 1,000,000.00
- Belanja perjalanan dinas dalam kota kegiatan Pelayanan Home Care
Geriantri 1,855,000.00 TU 1,855,000.00
Biaya Transportasi Darat Perjalanan Dinas Dalam Daerah Jarak Tempuh (21
- 35 Km) Bupati, Wabup, Es.Iib, Es. Iii (Ka Skpd), Es. Iii ( Bukan Ka ), Es. Iv &
G. Iv, Pns G. Iii, Pns G. Ii, I & Pppk, Pengemudi 525,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. Iii 560,000.00
Uang Harian Perjalanan Dinas Dalam Daerah Pns G. Ii , I & Pppk 490,000.00
1.02.04.01.0005 Belanja Perjalanan Dinas Paket Meeting Luar Kota 127,900,000.00 TU-D 127,900,000.00
- Belanja Perjalanan Dinas luar daerah Studi Banding 63,950,000.00
- Belanja perjalanan dinas luar daerah kegiatan value gathering 63,950,000.00
1.02.05 Belanja Uang dan/atau Jasa untuk Diberikan kepada Pihak Ketiga/Pihak Lain 25,000,000.00 PNJ 25,000,000.00
1.02.05.01 Belanja Uang yang Diberikan kepada Pihak Ketiga/Pihak Lain/Masyarakat 25,000,000.00
1.02.05.01.0004 Belanja Penanganan Dampak Sosial Kemasyarakatan 25,000,000.00
Tarif perawatan jenazah Mr X 25,000,000.00 -
5.2 BELANJA MODAL 4,995,381,550.00 Belanja Modal Peralatan dan Mesin 3,091,466,073.00
2.02.05.02.0006 Belanja Modal Alat Rumah Tangga Lainnya ( Home Use ) 17,853,240.00 PNJ 17,853,240.00
TelevisiLed Full Hd Smart Tv 32 Inch Android 15,682,080.00
Brachet TV 2,171,160.00
2.02.07 Belanja Modal Alat Kedokteran dan Kesehatan 1,855,691,750.00 PLY 1,855,691,750.00
2.02.07.01.0001 Belanja Modal Alat Kedokteran Umum -
alat kdokteran lain-lain 250,682,000.00
RINCIAN PERHITUNGAN ###
KODE REKENING BELANJA URAIAN BELANJA
TOTAL
Bed Pasien 1,190,739,500.00
Kursi Roda 101,232,000.00
ECG 6 chanel 146,400,000.00
Bed Transport 161,810,250.00
Timbangan Bayi 4,828,000.00
Modal #REF!
Jaspel ASN 80,000,000,000
Barang/jasa BLUD
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
0 3069020
3801410
2027533
3303300
1289860
457314
6399994
3,200,000,000
92,000,000,000 92,000,000,000
5303298
103080
3855575
242067
6686056
315191
539846
159720
657875
150150
150150
9530950
632500
5720
6067967
1261517
3833291
3488542
53,100 2196549
5,624,226 618665
1823250
1777391
321402
35200
62405
43120
15400
49280
40,910 63001
112500
?????? 5590200
2501513
4137299
??????? 624947
260700
????? 62,545 34999
23073
5720000
562502
96199
1620582
480995
1406405
32,250 3314516
28,932 2079689
26455
132000
78843
58,300 1282600
3,200,000,000
92,000,000,000 92,000,000,000
19,091 136501
19,091 955505
19,091 546003
90998
139997
0
0
18,500 83700
200091
120604
75240
141847
10,341 149647
165000
5089513
110001
4625916
2460692
628,091 7935858
1981980
254,546 49614
0
112070
2589985
888009
372483
1205147
824032
5891829
1606862
308792
18,614 1330901
227,376 1394998
362699
125840
197588
197588
197588
2696998
21875013
50260
2223152
10575
159980
3112414
1146717
3,200,000,000
92,000,000,000 92,000,000,000
1227600
3603600
132363
861310
1123204
2805789
1995008
177363
7000070
1750766
0
720086
2729984
27,273 623109
42,727 4296292
96800
5,455 38399
93000
1368039
184800
1763850
3420560
780780
765336
792672
391470
1781410
227771
832874
blm ada di ssh 984947
Blm ada di SSH 824978
2319999
2875907
5479650
3732868
314,182 box 1329161
1706991
20,000 0
3119917
2488137
6887239
401698
Blm ada di SSH 594000
54285
128700
313565
199584
37,184 3272192
5,455 0
3,200,000,000
92,000,000,000 92,000,000,000
5,455 0
3754608
38399
93000
186,105 614147
430544
45,500 600600
19,023 478051
5,500 pcs 924000
244200
50875
10175
308690
0
1188000
297743
365953
120796
104729
798600
2363445
8237480
2824455
2245255
204442
79860
18782
6050
269500
314955
168300
65340
650375
325600
3222932
798336
2434080
1949376
319150
364741
151613
552305
7764752
95300
86636
1197900
236500
158556
201354
3,200,000,000
92,000,000,000 92,000,000,000
55000
1604391
308000
101767
614833
1008741
1681235
83490
8275529
148500
286310
181500
60500
2238500
29175
89955
1688748
68152
88263
100624
806753
65221
1077495
392,858
209,523
196,430
3,200,000,000
92,000,000,000 92,000,000,000
583,985
11,752,736
15,714,266
4,714,987
32,738,064
15,669,948
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
-
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
3,200,000,000
92,000,000,000 92,000,000,000
5.428.800.000
306,000,000 P3K pembayaran 5bulan
4,890,600,000 Kebutuhan plus penambahan BLUD
BLUD skrg 196
P3K 34
162+70
3,200,000,000
92,000,000,000 92,000,000,000
usul SBU
usul SBU
3,200,000,000
92,000,000,000 92,000,000,000
#REF!
3,200,000,000
92,000,000,000 92,000,000,000
4,400,000,000
12,000,000,000 #REF!
3,627,391,046 #REF!
1,226,881,004
1,864,585,069
epson L 5290
7,000,000,000
#REF!
1,263,900,250 1,263