Cek Stock Persedian Barang dan Aksesoris Perpipaan Di Gud

No Kode Barang Nama Barang Satuan Saldo Akhir Barang


Per 29 Februari 2024

1 101,023 Pipa GI Ø 12" Meter 14.2

2 101,024 Pipa GI Ø 2" Medium A Meter 87

3 101,001 Pipa GI Ø 4" Meter 20

4 101,002 Pipa GI Ø 6" Meter 38.6

5 101,003 Pipa GI Ø 8" Medium " A" Meter 12

6 101,047 Pipa HDPE Ø 6" Meter 248

7 101,018 Pipa PVC O PN 10 dia Ø 6" Meter 1,386

8 101,032 Pipa PVC Ø 6" AW ( 4 meter ) Meter 85

9 101,016 Pipa PVC Ø 6" S 12,5 Meter 31

10 204,049 Pipa HDPE Ø 8 " Meter 210


11 - Pipa HDPE Ø 10 " Meter -

12 - Pipa PVC Ø 12" AW ( 4 meter ) Meter -

Mengetahui
Ka.Sub Bag Umum

Sri Wahyuni

Menyetujui
Ka.Bag Adm dan Keuangan

Suci Ratnaningsih
n Aksesoris Perpipaan Di Gudang Beji ( 7 Maret 2024 )

Selisih Keterangan
Cek Di Lapangan
Barang (-/+) Dari Petugas Gudang

12 -2.2 Barang Sudah Diketemukan di Gudang Beji

156 69 Pencarian OP yang belum masuk di sistem

Terdapat kekeliruan di sistem , ada selisih antara tahun 2021 ke


42 22 saldo tahun 2022 sebanyak 6 meter .
Dan kekurangan pencarian OP yang belum masuk sistem

59.5 20.9 Pencarian OP yang belum masuk di sistem

Proses transaksi baru di input sama keuangan ada tambahan pipa


10 0 3 batang (18 meter ) . Ada pengeluaran di sistem unit depok 14
meter dan trandist pusat 6 meter .

246 -2 Adendum pemasangan jaringan pada SPK

Telah di temukan bon yang belum masuk sistem di tahun 2020


Sebanyak 84 meter , jadi sisa kekurangan pipa sebanyak 166
meter .
BA Pernyataan dari pihak petugas Gudang tentang kekeliruan
1,136 -250
dalam pengambilan Pipa PVC O PN 10 dia Ø 6" dengan Pipa PVC Ø
6" S 12,5

Ada pipa di Bimomartani di ambil dari bagian produksi sebanyak 3


76 3 batang ( 12 meter ) , tidak jadi di pakai dan mau di kembalikan bon
sementara .

BA Pernyataan dari pihak petugas Gudang tentang kekeliruan


198 167 dalam pengambilan Pipa PVC O PN 10 dia Ø 6" dengan Pipa PVC Ø
6" S 12,5

216 6 Penyesuian saldo akhir di sistem sesuai kondisi riil


90 90 Tidak Masuk ke Sistem

48 48 Tidak Masuk ke Sistem

Sleman ,….................................
Dibuat Oleh
Ka.Sie Perbekalan

Nubertus Jatmiko

Menyetujui
Ka.Bag Adm dan Keuangan

Suci Ratnaningsih
166

9
14.2 12.0 -2.2
87.0 156.0 69.0
20.0 42.0 22.0
38.6 59.5 20.9
12.0 10.0 0.0
248.0 246.0 -2.0
1386.0 1136.0 -250.0
85.0 76.0 3.0
31.0 198.0 167.0
210.0 216.0 6.0
- 90.0 90.0
- 48.0 48.0
6893000000 42,973,000,000
175000000 8,390,000,000
1322000000
8,390,000,000 51,363,000,000

142.58% 20,156,275,368
47,342,000,000 67,498,275,368

8,011,000,000 5,902,772,088 73.68% -2,108,227,912


55,331,000,000 73,401,047,456 132.66% 18,070,047,456

42,973,000,000 61,556,923,622 143.25% 18,583,923,622


8,390,000,000 6,031,972,607 71.89% -2,358,027,393
51,363,000,000 67,597,896,229 131.61% 16,234,896,229
64,256,488,550.00 62,018,728,800.00 96.52% -2,237,759,750.00
1,980,820,000.00 5,479,546,568.00 276.63% 3,498,726,568.00
2,248,608,000.00 5,902,772,087.83 262.51% 3,654,164,087.83
68,485,916,550.00 73,401,047,455.83 107.18% 4,915,130,905.83

15,638,636,000.00 13,959,647,264.52 89.26% -1,678,988,735.48


5,003,690,000.00 4,212,428,734.36 84.19% -791,261,265.64
15,036,792,000.00 16,181,015,199.52 107.61% 1,144,223,199.52
28,453,788,000.00 27,212,832,423.98 95.64% -1,240,955,576.02
64,132,906,000.00 61,565,923,622.38 96.00% -2,566,982,377.62
PPh
159,559,323,537.00 263,531,508.00 -2.2 14.2 12
13,822,106,997 139,645,513.00 69 87 156
145,737,216,540 29,645,781.00 22 20 42
6,165,676,457 989,875,808.00 20.9 38.6 59.5
165,724,999,994 1,422,698,610.00 0 12 10
917,529,289.00 -2 248 246
2,340,227,899 -250 1386 1136
3 85 76
167 31 198
6 210 216
90 - 90
48 - 48
172 2,132 2,290