INSPECTION AND TEST PLAN (ITP)

SAND BLASTING DAN PAINTING PIPE SUPPORT


No : ITP-AM-001

PR - PERBAIKAN SUPPORT & PIPA Ø16" LINE 1-2-3 SEI WAIN


DI SOMBER ( KM-3,5 )

NO KONTRAK : No.SP 3950130964


TANGGAL BERALAKU KONTRAK : 01 Juli 2021 s/d 6 Mei 2022

29 July 2021 IGN STY ASA


A Issue For Information
P. Eng PM DIR. MA - 4 Stat Eng UTL
Dibuat Diperiksa Disetujui Disetujui Disetujui Disetujui
REV. Status Dokumen Tanggal
PT. Aman Niaga PERTAMINA RU V
INSPECTION AND TEST PLAN (ITP)
SAND BLASTING DAN PAINTING PIPE SUPPORT

NO Description ACEPTENCE CRETERIA INSPECTION


PT AMAN NIAGA HEMPEL PTM RU V
1 Incoming Material
1. Type of Paints H W R/I
2. Batch Number
3. Solvent Thinner
4. Expire Date
5. Sand Blast Material

2 Equipment 1. Visual Good Condition H W R/I


2. Calibration
3 Surface Preparation 1. Grade of preparation steel cleaning H W M
(Sand Blasting) 2. Free weld spatter, contamination oil, grease and
dust.
3. Type of cleaning and surface near white blast
cleanlinesss (SSPC SP10/SA 2.5)
4. Weather condition and Dew Point.

4 Coating Application 1. Relative Humidity (RH) 85% Max H W M/W


2. Surface Temperature.
3. Coating sequent.
4. WFT and DFT base on specification.
5. Visual No Sagging, holyday, cracking and dry
spray.
6. Visual Inspection.
7. Thickness Inspection.
INSPECTION AND TEST PLAN (ITP)
SAND BLASTING DAN PAINTING PIPE SUPPORT

H = Hold
Pekerjaan tidak boleh dilanjutkan ke tahap berikutnya sebelum adanya persetujuan
(approval) dari pihak-pihak terkait atas tahap pekerjaan sebelumnya yang baru saja
diselesaikan.

W = Witness Point
Pihak-pihak terkait hendak menyaksikan (witnessing) proses pengerjaan suatu tahap pekerjaan

R = Review Document
Dokumen pada suatu tahap pekerjaan diminta untuk diperiksa (review) dan disetujui
(approval)

M = Monitoring
Pihak-pihak terkait melakukan inspeksi secara random.

I = Information
Sebagai informasi saja

Prepared by, Reviewed by, Approved by,

Adi Wirawan