VISUAL INSPECTION REPORT

EQUIPMENT :
TAG NO. :
NO DOKUMENTATION RESULT INSPECTION & RECCOMENDATION

1
TURN AROUND RU-III 2023

Test Package no :

Date : / 11 / 2023

Subject : PRESSURE TEST RECORD Project No.

LINE UNDER TEST :

P & ID NO. :

OPERATING PRESS (S/T) : / (Kg/cm²/G)


DESIGN PRESSURE (S/T) : / (Kg/cm²/G)
TEST PRESSURE : (Kg/cm²/G) Air Temp : °C
DURATION OF TEST : (Minuts)
START OF TEST :
DATE OF TEST :
TEST MEDIUM :

RECORDING INST./PRESSURE GAUGE : CHECK CALIBRATION Yes N/A

TAST RESULT : ACCEPTED / REJECTED

ATTACHED : AIR AND TEMPERATUR CHART Yes N/A

Remarks : : Pressure (Kg/cm²)

Note : Maintaned test pressure shall be minimum . . . . Minutes / Hours or more after inspector finish inspected of line

PT. BRIKASA RU-III

Print Name

Signature

Date
LEAK TEST CHART RECORD

PROJECT TURN AROUND RU-III 2023

ITEM NO.

PART TUBE SIDE SHELL SIDE

DESIGN PRESS Kg / cm² Kg / cm²

TEST PRESS Kg / cm² Kg / cm²

HOLDING TIME Min

PT. BRIKASA PREPARED BY Name Sign

PT. KPI RU-III APPROVED BY Name Sign


INSPECTION RECORD
PROJECT NAME :
COMPANY NAME : PT. PERTAMINA RU-III CONTRACTOR NAME : PT. SRIJASA BRIKA PERKASA
LOCATION : PALEMBANG DISCIPLINE : STATIONERY WORK
INSPECTION METHOD : Visual Inspection NDT
UNIT :
WORK SUBJECT : Cleaning internal Single Stage Ejector & Penggantian semua baut tanam.

PENEMUAN / DESKRIPSI GEJALA MASALAH

DESKRIPSI TINDAKAN TANGGUNG JAWAB / TINDAKAN KOREKTIF

DRAWING PART PEMERIKSAAN AWAL INSPEKSI AKHIR


Head
Shell
Nozzle
Demister
Partition Plate
Gasket Face
Sight Glass
Bolt
Structure Support

METODE CLEANING
Sandblasting Manual Scrap Brushing
PENGGANTIAN SPAREPART
Vessel / Drum Set Demister
Sight Glass Bolt & Nut

FINISHING WORK
1. Dilakukan Final Inspect bersama untuk memastikan part terpasang dengan benar dan baik dan memastikan kebersihan di unit
sebelum menutup cover.
2. Memastikan facing gasket telah bersih sebelum pemasangan dan memastikan gasket telah terpasang dengan baik dan benar.
3. Pengikatan bolt cover dilakukan dengan menggunakan kunci ring pass kemudian dilakukan test bolting (memastikan) disetiap baut telah
terikat dengan baik dan kuat.
4. Finishing pekerjaan dilakukan cleaning disekitar area unit.
Setelah
Check Point Setelah dibuka Sebelum Penutupan Man-Way Setelah Man-hole ditutup
Pembersihan
Pemeriksaan ulang Pemeriksaan
Pemasangan Plug Pemeriksaan
Pemeriksaan Pemeriksaan hasil benda asing bagian Permukaan Flange
Detail Check do Bottom Nozzle kotoran / Pemeriksaan
Internal Parts Pemasangan dalam & Gasket dan
Item untuk pencegahan penyumbatan di Kekencangan Baut
(Tray / Cab) Internal Parts Pemeriksaan ulang Pemeriksaan Approval
Benda Asing setiap line nozzle
Sumbatan Nozzle Gasket

W/P No. Final Check Final Check Final Check Final Check Final Check Final Check Final Check

Date Date Date Date Date Date Date Date

… … … … … … … …

Sign Sign Sign Sign Sign Sign Sign Sign

PT. BRIKASA PT. PERTAMINA


Disiapkan & Diperiksa oleh, Mengetahui, Disetujui,
INSPECTION RECORD
PROJECT NAME :
COMPANY NAME : PT. PERTAMINA RU-III CONTRACTOR NAME : PT. SRIJASA BRIKA PERKASA
LOCATION : PALEMBANG DISCIPLINE : STATIONERY WORK
INSPECTION METHOD : Visual Inspection Pneumatic Test ECT Hydrotest
UNIT :
WORK SUBJECT :

PENEMUAN / DESKRIPSI GEJALA MASALAH

DESKRIPSI TINDAKAN TANGGUNG JAWAB / TINDAKAN KOREKTIF

DRAWING PART PEMERIKSAAN AWAL INSPEKSI AKHIR


Channel Cover
Gasket Cover Sheet
Channel Tube
Gasket Channel Sheet
Floating Head Cover
Tube Bundle
Shell

HYDROTASTIC TEST
POSISI PRESSURE HASIL PEMERIKSAAN
Shell side test ... Kg/cm²
Tube side test ... Kg/cm²
Final test ... Kg/cm²

METODE CLEANING PENGGANTIAN SPAREPART


Water Jet Unit set (Bundle & Shell) Sacrificial Anode Zinc Wiremesh
Brushing / Sandblasting Tube Bundle Three Way Valve Intercooler
COATING Floating Head Cover Gasket Plug Tube Shell Cover
Polyurethane Bolt & Nut Bank Fin Fan Cover Fan

FINISHING WORK
1. Dilakukan Final Inspect bersama untuk memastikan part terpasang dengan benar dan baik dan memastikan kebersihan di unit
sebelum menutup cover.
2. Memastikan facing gasket telah bersih sebelum pemasangan dan memastikan gasket telah terpasang dengan baik dan benar.
3. Pengikatan bolt cover dilakukan dengan menggunakan kunci ring pass dan kunci torque kemudian dilakukan test bolting (memastikan)
disetiap baut manhole telah terikat dengan baik dan kuat.
4. Finishing pekerjaan dilakukan cleaning disekitar area unit.
Check Point After Open After Cleaning Before Assembling Bundle & Channel Assembling Bundle

Setelah pelepasan
Pencegahan benda After Demolition
Cleaning inspection Pencegahan benda blind test, periksa Hydro Test
Detail Check asing masuk Periksa Permukaan Test Blind check of Approval
(Cover, Shell, Tube asing tertinggal permukaan flange Coupling Screw
Item (Shell side Blind & Face Gasket The Flange Face &
Bundle) (Inside Shell) gasket lalu Install Check
B/Nozzle) Install Gasket
Gasket

Unit Final Check Final Check Final Check Final Check Final Check Final Check Final Check
Date Date Date Date Date Date Date Date

Date & Sign … … … … … … … …

Sign Sign Sign Sign Sign Sign Sign Sign

PT. BRIKASA PT. PERTAMINA


Disiapkan & Diperiksa oleh, Mengetahui, Disetujui,
INSPECTION RECORD
PROJECT NAME :
COMPANY NAME : PT. PERTAMINA RU-III CONTRACTOR NAME : PT. SRIJASA BRIKA PERKASA
LOCATION : PALEMBANG DISCIPLINE : STATIONERY WORK
INSPECTION METHOD : Visual Inspection NDT
UNIT :
WORK SUBJECT : Cleaning internal Single Stage Ejector & Penggantian semua baut tanam.

PENEMUAN / DESKRIPSI GEJALA MASALAH

DESKRIPSI TINDAKAN TANGGUNG JAWAB / TINDAKAN KOREKTIF

DRAWING PART PEMERIKSAAN AWAL INSPEKSI AKHIR


Ejector Body
Motive Fluid Nozzle
Gasket Sheet Ejector
Shell
Diffuser
Bolt & Nut

METODE CLEANING
Sandblasting Manual Scrap Brushing
PENGGANTIAN SPAREPART
Ejector Body Gasket Sheet Ejector Diffuser
Motive Fluid Nozzle Shell Bolt & Nut

FINISHING WORK
1. Dilakukan Final Inspect bersama untuk memastikan part terpasang dengan benar dan baik dan memastikan kebersihan di unit
sebelum menutup cover.
2. Memastikan facing gasket telah bersih sebelum pemasangan dan memastikan gasket telah terpasang dengan baik dan benar.
3. Pengikatan bolt cover dilakukan dengan menggunakan kunci ring pass kemudian dilakukan test bolting (memastikan) disetiap baut telah
terikat dengan baik dan kuat.
4. Finishing pekerjaan dilakukan cleaning disekitar area unit.
Check Point After Open After Cleaning Before Assembling Bundle & Channel
Ejector Assembling Bundle Ejector

Setelah pelepasan
Pencegahan benda After Demolition
Cleaning inspection Pencegahan benda blind test, periksa Hydro Test
Detail Check asing masuk Periksa Permukaan Test Blind check of Approval
(Cover, Shell, Tube asing tertinggal permukaan flange Coupling Screw
Item (Shell side Blind & Face Gasket The Flange Face &
Bundle) (Inside Shell) gasket lalu Install Check
B/Nozzle) Install Gasket
Gasket

Unit Final Check Final Check Final Check Final Check Final Check Final Check Final Check
Date Date Date Date Date Date Date Date

Date & Sign … … … … … … … …

Sign Sign Sign Sign Sign Sign Sign Sign

PT. BRIKASA PT. PERTAMINA


Disiapkan & Diperiksa oleh, Mengetahui, Disetujui,
INSPECTION RECORD
PROJECT NAME :
COMPANY NAME : PT. PERTAMINA RU-III CONTRACTOR NAME : PT. SRIJASA BRIKA PERKASA
LOCATION : PALEMBANG DISCIPLINE : STATIONERY WORK
INSPECTION METHOD : Visual Inspection NDT Hydrotest
UNIT :
WORK SUBJECT : Cleaning, Coating & Repaire Box Cooler

PENEMUAN / DESKRIPSI GEJALA MASALAH

DESKRIPSI TINDAKAN TANGGUNG JAWAB / TINDAKAN KOREKTIF

NOTE PART PEMERIKSAAN AWAL INSPEKSI AKHIR


Dinding internal
Lantai internal
Coil
Support coil
Baut
Ladder box cooler

METODE CLEANING
Sandblasting Manual Scrap Brushing
PENGGANTIAN SPAREPART
Coil Ladder Box Cooler Box Cooler
Support Coil Baut

FINISHING WORK
1. Dilakukan Final Inspect bersama untuk memastikan part terpasang dengan benar dan baik dan memastikan kebersihan di unit
2. Memastikan facing gasket telah bersih sebelum pemasangan dan memastikan gasket telah terpasang dengan baik dan benar.
3. Pengikatan bolt cover dilakukan dengan menggunakan kunci ring pass kemudian dilakukan test bolting (memastikan) disetiap baut telah
terikat dengan baik dan kuat.
4. Finishing pekerjaan dilakukan cleaning disekitar area unit.
Check Point After Open After Cleaning Before Assembling Bundle & Channel
Ejector Assembling Bundle Ejector

Setelah pelepasan
Pencegahan benda After Demolition
Cleaning inspection Pencegahan benda blind test, periksa Hydro Test
Detail Check asing masuk Periksa Permukaan Test Blind check of Approval
(Cover, Shell, Tube asing tertinggal permukaan flange Coupling Screw
Item (Shell side Blind & Face Gasket The Flange Face &
Bundle) (Inside Shell) gasket lalu Install Check
B/Nozzle) Install Gasket
Gasket

Unit Final Check Final Check Final Check Final Check Final Check Final Check Final Check
Date Date Date Date Date Date Date Date

Date & Sign … … … … … … … …

Sign Sign Sign Sign Sign Sign Sign Sign