LAPORAN DUMPTRUCK
HM AWAL Rittase OB
HM AKHIR Rittase CG
06.00 / 18.00 07.00 / 19.00 08.00 / 20.00 09.00 / 21.00 10.00 / 22.00 11.00 / 23.00 12.00 / 24.00 13.00 / 01.00 14.00 / 02.00 15.00 / 03.00 16.00 / 04.00 17.00 / 05.00 18.00 / 06.00
BEKERJA
III. MOTOR III. MOTOR Prepared by, Checked by, Approved by.
1 FUNGSI PEDAL / STEERING 1 CHECK SUARA TIDAK NORMAL
2 KELENGKAPAN UNDERCARRIAGE 2 CHECK FUNGSI PEDAL / STEERING
3 MAIN CONTOL VALVE 3 CHECK GETARAN PADA KAKI-KAKI
4 4 KELENGKAPAN UNDERCARRIAGE
5 5
Driver Checker Foreman Supervisor
Name : Name : Name : Name :