Anda di halaman 1dari 44

DUTCH CONE PENETROMETER

PROJECT PRAKTIKUM LABORATORIUM MEKANIKA TANAH


LOCATION LABORATORIUM MEKANIKA TANAH
DATE
TESTING METHOD SONDIR
DIAMETER KONUS (DC)=DS 3.57 Cm
PANJANG SELIMUT GESER (Ls) 13.35 Cm
DIAMETER PISTON (Dpi) 5.05 cm
LUAS PENAMPANG PISTON (Api) 20 Cm2
LUAS PENAMPANG KONUS (Ac) 10 Cm2
LUAS SELIMUT GESER (As) 149.65 cm2
Kw qc fs Lf Rf
Depth Cw Tw Tf
(Tw-Cw) (Cw.Api)/Ac Kw.Api/As fs*20 (fs/qc)*100
No.
(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm) (kg/cm) (%)
1 2 3 4 5 6 7 8 9
1 0 0 0 0 0 0.00 0.00 0 0.00
2 0.2 3 6 3 6 0.40 8.03 8.03 6.69
3 0.4 7 12 5 14 0.67 13.38 21.40 4.78
4 0.6 15 20 5 30 0.67 13.38 34.78 2.23
5 0.8 25 31 6 50 0.80 16.05 50.83 1.60
6 1 35 42 7 70 0.94 18.73 69.56 1.34
7 1.2 46 52 6 92 0.80 16.05 85.62 0.87
8 1.4 55 63 8 110 1.07 21.40 107.02 0.97
9 1.6 75 81 6 150 0.80 16.05 123.07 0.53
10 1.8 89 94 5 178 0.67 13.38 136.45 0.38
11 2 98 103 5 196 0.67 13.38 149.83 0.34
12 2.2 110 117 7 220 0.94 18.73 168.56 0.43
13 2.4 125 128 3 250 0.40 8.03 176.58 0.16
14 2.6 135 142 7 270 0.94 18.73 195.31 0.35
15 2.8 150 156 6 300 0.80 16.05 211.36 0.27
16 3 160 167 7 320 0.94 18.73 230.09 0.29
17 3.2 167 173 6 334 0.80 16.05 246.15 0.24
18 3.4 180 186 6 360 0.80 16.05 262.20 0.22
19 3.6 186 191 5 372 0.67 13.38 275.58 0.18
20 3.8 195 200 5 390 0.67 13.38 288.95 0.17
21 4 200 210 10 400 1.34 26.75 315.71 0.33
22 4.2 215 220 5 430 0.67 13.38 329.09 0.16
23 4.4 225 230 5 450 0.67 13.38 342.46 0.15
24 4.6 235 240 5 470 0.67 13.38 355.84 0.14
25 4.8 245 250 5 490 0.67 13.38 369.22 0.14

369.22 6.69

Tabel 1. Penafsiran Hasil Penyelidikan Tanah dengan Memakai Alat Sondir


Hasil Sondir (kg/cm2)
Klasifikasi
qc Fs
6 0,15 - 0,40 Humus, lempung sangat lunak
0.2 Pasir kelanauan lepas, pasir sangat lepas
6 - 10'
0,20 - 0,60 Lempung lembek, lempung kelanauan lembek
0.10 kerikil lepas
0,10 - 0,40 Pasir lepas
10 - 30'
0,40 - 0,80 Lempung atau lempung kelanauan
0,80 - 2,00 Lempung agak kenyal
1.50 Pasir kelanauan, pasir agak padat
30 - 60
1,50 - 3,00 Lempung atau lempung kelanauan kenyal
1.00 Kerikil kepasiran lepas
pasir padat, pasir kelanauan atau lempung padat dan
60 - 150 1,00 - 3,00
kerikil kelempungan
3.00 Lempung kerikil kenyal
150 - 300 1,00 - 2,00 Pasir padat, pasir kerikil padat , pasir kasar padat, pasir
kelanauan sangat padat
Ket :
qc= Tekanan Konus
fs= Hambatan Pelekat
(Sumber : Ir. Sunggono kh (1995), Buku Teknik Sipil, Penerbit NOVA, Bandung )
Hubungan Antara Rf dengan kedalaman hubugan antara perlawanankonus
angka banding geser (rf) kedalaman(m)
0 100
gesekan
200
total
300
(tf))
0
-0.50 0.50 1.50 2.50 3.50 4.50 5.50 6.50 7.50
0 0.2
0.2 0.4
0.6
0.4
0.8
0.6
1
0.8
1.2
1
1.4
1.2
1.6
1.4 1.8
1.6 2
1.8 2.2

kedalaman
2 2.4
2.2 2.6
Kedalaman

2.4 2.8
2.6 3
3.2
2.8
3.4
3
3.6
3.2
3.8
3.4
4
3.6
4.2
3.8 4.4
4 4.6
4.2 4.8
4.4 5
4.6
4.8
4.2 4.8
4.4 5
4.6
4.8
5
hubugan antara total hambatan pelekat degan kedalaman(m)
a perlawanankonus(qc) degan
kedalaman(m) 0 100 200 300 400 500 600
0
gesekan
00
total
300
(tf)) 400 500 600 0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
kedalaman 2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
4
4.2
4.4
4.6
4.8
5

perlawanan konus (qc)


4.8
5

perlawanan konus (qc)


GRAFIK HUBUNGAN KEDALAMAN DENGAN GESERAN TOTAL
Hasil Sondir (kg/cm2)
Klasifikasi
qc Fs
6 0,15 - 0,40 Humus, lempung sangat lunak
0.2 Pasir kelanauan lepas, pasir sangat lepas
6 - 10'
0,20 - 0,60 Lempung lembek, lempung kelanauan lembek
0.10 kerikil lepas
0,10 - 0,40 Pasir lepas
10 - 30'
0,40 - 0,80 Lempung atau lempung kelanauan
0,80 - 2,00 Lempung agak kenyal
1.50 Pasir kelanauan, pasir agak padat
30 - 60
1,50 - 3,00 Lempung atau lempung kelanauan kenyal
1.00 Kerikil kepasiran lepas
60 - 150 1,00 - 3,00 pasir padat, pasir kelanauan atau lempung padat dan
kerikil kelempungan
3.00 Lempung kerikil kenyal
Pasir padat, pasir kerikil padat , pasir kasar padat, pasir
150 - 300 1,00 - 2,00 kelanauan sangat padat
Tabel Pemeriksaan Berat Jenis

No. Percobaan Satuan I II


Berat Piknometer, W1 (gram) gram 29.1 39.3
Berat Piknometer + air, W2 (gram) gram 68 66
Berat Piknometer + air, + tanah W3 (gram) gram 98 97
Berat tanah kering, Ws (gram) gram 50 50
Temperatur, ℃ ℃ 25 25
Faktor koreksi, a = yT/y20 - 0.99757 0.99757
Berat Jenis, Gs - 2.50 2.63
Berat Jenis Rata-rata - 2.57
Tabel Pemeriksaan Kadar Air dan Berat Isi

Sampel - I II
Ring/Container Number - 1 2
Weight Ring (1) gram 39 39.6
Weight of Container (2) gram 105 100
Weight Ring + Container + Wet Soil (3) gram 217 216
Weight of Wet Soil (4) = (3)-(2)-(1) gram 73 76.4
Volume of Soil (5) cm3 58.20 57.3
Weight of Ring + Container + DrySoil (6) gram 192 159.5
Weight of Dry Soil (7) = (6)-(1)-(2) gram 48 19.9
Weight of Water (8) = (4)-(7) gram 25 56.5
Spesific Gravity, Gs - 2.57 2.68
Volume of Dry Soil (9) = (7)/Gs cm3 18.7 7.4
Volume of Pore (10) = (5)-(9) cm3 39.5 49.9
Wet Density, ywet = (4)/(5) gr/cm3 1.25 1.3
Water Content, w = (8)/(7)*100% % 52.1 283.9
Dry Density, gdry =ywet/(1+w) gr/cm3 0.02 0.00
Porosity, n = (10)/(5)*100% % 67.86 87.04
Degree of Saturation, Sr = (8)/(10)*100% % 63.30 113.28

88.29376
*
Tabel Pemeriksaan Batas Cair

No Test Satuan 1 2 3
Jumlah Pukulan - 45 30 24
No. Container - I II III
Berat Tanah Basah + Container, W1 gram 43 50 51
Berat Tanah Kering + Container, W2 gram 33 43 40
Berat Container, W3 gram 11 13 18
Berat Air (Ww=W1-W2) gram 10 7 11
Berat Tanah Kering, (Wd=W2-W3) gram 22 30 22
Kadar Air, Ww/Wd x 100% % 45.45 23.33 50.00
Kadar air rata-rata % 44.97

GRAFIK BATAS CAIR


60.00
f(x) = − 15.40100581 ln(x) + 93.8286583893722
50.00

40.00
KADAR AIR

30.00

20.00

10.00

0.00
1 10 100
JUMLAH PUKULAN
Tabel Pemeriksaan Batas Plastis

4 No Test Satuan 1 2
10 109 No. Container - I II
IV Berat Tanah Basah + Container, W1 gram 37 37
42 Berat Tanah Kering + Container, W2 gram 33 33
31 Berat Container, W3 gram 15.2 15.3
13 Berat Air (Ww=W1-W2) gram 4 4
11 Berat Tanah Kering, (Wd=W2-W3) gram 17.8 17.7
18 Kadar Air , Ww/Wd x 100% % 22.47 22.60
61.11 179.90 Kadar Air Rata-rata % 22.54
7 Index Plastisitas (PI=LL-PL) 22.44

Persamaan Regresi Grafik Batas Cair


Y = -15.4LN(X)+93.829 = 44.26
93.8286583893722

100
Tabel Pemeriksaan Batas Susut

No Test Satuan 1 2
Berat Mould, W1 gram 4 3.9
Berat Mould + Tanah Basah, W2 gram 24.2 20.6
Berat Mould + Tanah Kering, W3 gram 14.9 13.1
Berat Air Raksa yang dipakai untuk mengisi
gram 335.2 334.1
mangkok shringkage, W4
Berat Air Raksa yang dipindahkan oleh tanah yang
gram 115.1 92.6
ditest, W5
Berat tanah basah, Ww=W2-W1 gram 20.2 16.7
Berat tanah kering, Wd=W3-W1 gram 10.9 9.2
Berat Air, Wa=W2-W3 gram 9.3 7.5
Berat Cawan petri, Wp gram 20 20
Berat jenis air raksa, r 13.6 13.6
Volume tanah basah, Vw=(W4-Wp)/r Cm3 23.18 23.10
Volume tanah kering, Vd=(W5-Wp)/r Cm3 6.99 5.34
Kadar air, = Wa/Wd x 100% % 85.32 81.52
Batas susut,
% 83.84 79.59
SL= Kadar air - ((Vw-Vd)/Wd)x100%)
SL rata-rata % 81.71
No x y ln(x)
1 45 45.45 3.81
2 30 23.33 3.40
3 24 50.00 3.18
4 10 61.11 2.30
Jumlah 109 179.90 12.69
161.00

b = n. (Σln(x).y)-(Σln(x)).Σy)
n. (Σ(ln(x))^2)-(Σln(x))^2

= 4.(520,01)-(11,64)(188,92
4.(36,44)-(135,58)

= -74.62
4.84
= -15.40

a = y'-bx
y' = Σy 188.92
=
n 4

x' = Σln(x) 11.64


=
n 4

a = y'-bx
= 47,23-(-11,78 . 2,91)
= 93.83

y = b.ln(x)+a
= 44.25
ln(x)^2 ln(x)*y
14.49 173.03
11.57 79.36
10.10 158.90
5.30 140.71
41.46 552.01

44.97

3.17
Tabel Pemeriksaan Analisa Saringan

Diameter Berat Berat Saringan + Berat Tertahan


No.
(mm) Saringan Berat Tertahan (gram)
4 4.75 442 442 0
10 2 427 542 115
16 0.84 389 477 88
40 0.43 332 496 164
60 0.25 394 442 48
100 0.15 333 339 6
200 0.08 389 456 67
Pan - 288 300 12
A B C
500
ANALISA SARINGAN
lisa Saringan
100 100
90
77
80
Berat Kumulatif Persen (%) 70

Persen Lolos (%)


59.4
(gram) Tertahan Lolos 60
0 0 100 50
115 23 77 40
26.6
203 40.6 59.4 30
367 73.4 26.6 17 15.8
20
415 83 17 10 2.40000
421 84.2 15.8
0
488 97.6 2.4 10 1 0.1
500 100 0 Diameter Saringan (mm)
D E F
ISA SARINGAN

D10
4

26.6

17 15.8

2.40000000000001

0.1 0.01
meter Saringan (mm)
Tabel Pengujian Sand Cone Test
Kelompok 2

Perhitungan Kepadatan Tanah


Berat Botol + Corong W1
Berat Botol + Corong + Air W2 (gr)
Berat Botol + Pasir Penuh + Corong W3 (gr)
Berat Pasir Dalam Corong W4 (gr)
Berat Tanah Basah + Kaleng Lapangan W5 (gr)
Berat Kosong Kaleng Lapangan W6 (gr)
Berat Botol + Corong + Pasir secukupnya +-3/4 W7 (gr)
Berat Sisa Pasir + Botol + Corong Dilapangan W8(gr)
Berat Sisa Pasir Di Lubang W9 (gr)
Berat Tanah Basah (Wwet) (gr)
Volume Sisa Pasir Di Lubang (V) (Cm3)

Kadar Air (w) (%)


Berat Isi Tanah Kering Pengujian Lapangan (Ydry fiel)(gram/cm3)

Berat Isi Tanah Kering Pengujian Laboratorium (Kompaksi)


(Ydry fiel)(gram/cm3)

Derajat kepadatan = Ydry fiel (lapangan)/Ydry fiel (kompaksi)*100%


nd Cone Test
k2

Satuan I
Gram 684

Gram 7489

gram 8410 Ysand = W3-W1

gram 2550 W2-W1

gram 2746 = 7493-682,9

gram 292 7489-682,9

gram 5920 Ysand = 1.14

gram 3269

gram 101

gram 2454

Cm3 89.0

% 41

gram/cm3 1.4

gram/cm3 1.47

% 98.7
Ywet = Wwet/V

= 27.6

B.TK.+B.T.BOX = 65 GRAM

B.TB + B.T.Box = 87 gram

B.T.Box = 11.8 gram

B.Tk = 53.2 gram B.Tk = (B.Tk. +B.T.Box) - B.Tbox

B.TB = 75.2 gram = 65-11,8 gram

= 75.2 gram = 53.2 gram

B.TB + B.T.Box = 87 gram

B.Tk + B.T.Box = 65 gram

Berat Air = 22 gram

Kadar Air = Berat Air x 100 %

B.Tk

= 41 %
Tabel Pengujian Kompaksi
Kelompok 2

Berat tanah gram 2000 2000 2000


Kadar air mula-mula % 0 0 0
Penambahan Air ml 500 560 620
Kadar air Akhir % 25 28 31

Berat Isi Basah (Wet Density)

No. Mould - 1 2 3
Berat Mould gram 1614 1614 1614
Berat Tanah basah + Mould gram 3166 3163 3150
Berat tanah basah, Wwet gram 1552 1549 1536
Volume Mould cm3 928 928 928
Berat Volume Basah
gr/cm3 1.67 1.67 1.66
ywet = Wwet/Vmould
Kadar Air (Wat
Kel

2000 2000 No. Container - 1A


0 0 Berat tanah basah + Container gram 52
680 740 Berat tanah kering + Container gram 40
34 37 Berat air gram 12
Berat Container gram 11.1
Berat tanah kering gram 28.9
Kadar air % 41.52
Kadar air rata-rata % 40.98
4 5
1614 1614
3133.0 3124 Berat Isi Kering
1519 1510 Berat Tanah Basah, Wwet
928 928 Kadar Air Rata-rata
Berat Kering Wdry=𝑊𝑤𝑒𝑡/(1+(𝑊/100))
1.64 1.63
Volume Mould
Berat Isi Kering Ydry
=𝑊𝑑𝑟𝑦/𝑉𝑚𝑜𝑢𝑙
Yw=Gs/(1+W).Gs 𝑑
Berat Jenis (Gs)

Berat Jenis (Gs) = 2.57


Kadar Air Optimum (Wopt) = 27.12
1.49

GRAFIK KOMPAKSI
2.0

1.8

1.6

1.4 f(x) = − 4.97227890126365E-05 x² + 0.003


Kering (gr/cm3)

1.2

1.0
1.8

1.6

1.4 f(x) = − 4.97227890126365E-05 x² + 0.003

Kepadatan Kering (gr/cm3)


1.2

1.0

0.8

f(x) = − 0.0039
0.6

0.4

0.2

0.0
20 25 30 35 40

Kadar Air (w) (%)


Kadar Air (Water Content)
Kelompok 2

1B 2A 2B 3A 3B 4A 4B 5A 5B
51 54 58 46.0 45 48 49 44 46
40 41 44 34 34 37 36 28 34
11 13 14 12 11 11 13 16 12
12.8 11.1 11.3 11 12.8 12.8 11.1 11.1 12.8
27.2 29.9 32.7 23 21.2 24.2 24.9 16.9 21.2
40.44 43.48 42.81 52.17 51.89 45.45 52.21 94.67 56.60
40.98 43.15 52.03 48.83 75.64

gram 1552 1549 1536 1519


% 40.98 43.15 52.03 48.83
gram 1385.71 1370.80 1371.43 1368.47
cm3 928 928 928 928
gr/cm3 1.49 1.48 1.48 1.47
gr/cm3 0.71 0.70 0.66 0.67
2.57 2.57 2.57 2.57

n x y
1 40.98 1.49
2 43.15 1.48
3 52.03 1.48
4 48.83 1.47
5 75.64 1.40
D= 100.9 mm Σn 5 260.63 7.33
t= 116.1 mm
r= 50.45
V= 927864 mm3 x
= 928 cm3 5 260.63 14354.05
260.63 14354.05 839196.53
14354.05 14354.05 52033967.66

1.96 1.96
RAFIK KOMPAKSI

Persamaan garis regresi (dari grafik)


y= 0.0013 x2 - 0.07050
y' = 0.0026 x - 0.0705
0= 0.0026 x - 0.0705
x) = − 4.97227890126365E-05 x² + 0.00338610190227465 x + 1.43157126013537 x= 27.12 %
x) = − 4.97227890126365E-05 x² + 0.00338610190227465 x + 1.43157126013537
Jadi, kadar air optimum dicapai pada27,12% dan%berat
saat 25,96 dan isi kering
berat 0,00263,11
isi kering gr/

f(x) = − 0.00398994514932966 x + 0.869361361659196

35 40 45 50 55

Kadar Air (w) (%)


1510
75.64
1301.72
928
1.40
0.57
2.57

x2 y2 x3 x.y x4 x2.y
1679.51 2.23 68829.43 61.20 2820756.23 2508.26
1861.57 2.18 80318.82 63.74 3465424.57 2750.22
2707.16 2.18 140854.37 76.90 7328702.31 4001.31
2384.53 2.18 116440.83 72.02 5686002.34 3516.85
5721.28 1.97 432753.09 106.12 32733082.22 8026.54
14354.05 10.74 839196.53 379.99 52033967.66 20803.18

y
7.33
379.99
20803.18

7.33
379.99
20803.18

x + 2.3794

y= 1.42 gr/cm3
% dan berat isi kering 0,0026 gr/cm³
( 10 x Tumbukan)
Densitas
Berat tanah basah + mold gram 7674
Berat mold gram 4157.6
Berat tanah basah gram 3516.4
Isi cetakan (V) cm3 2186.54
Berat volume basah (𝛾wet) gram/cm3 1.61
Berat volume kering (𝛾dry) gram/cm3 1.28

Kadar air
No. cawan - 1A 1B
Berat tanah basah + cawan gram 59.30 60.50
Berat tanah kering + cawan gram 49.60 50.60
Berat air gram 9.70 9.90
Berat cawan gram 12.50 12.20
Berat tanah kering gram 37.10 38.40
Kadar air (w) % 26.15 25.78
Kadar air rata-rata % 25.96

Penetrasi, kalibrasi proving ring, lbs/Dev = 32.1314

Pembacaan arloji ukur


Waktu penetrasi Beban penetrasi
beban
(menit)
mm devisi lb
0 0 0 0.00
1/4 0.330 1.9 61.05
1/2 0.635 4.0 128.53
1 1.27 8.0 257.05
1 1/2 1.905 10.0 321.31
2 2.54 10.4 334.17
3 3.81 10.6 340.59
4 5.08 10.8 345.41
6 7.62 20.9 671.55
8 10.16 20.3 652.27
10 12.7 20.5 658.69

10 Tumbukan
750.00
650.00
550.00
an (lbs)

450.00
350.00
10 Tumbukan
750.00
650.00
550.00
Beban (lbs)

450.00
350.00
250.00
150.00
50.00
0 2 4 6 8 10 12 14
Penurunan (mm)

No. x y ln(x) (ln(x))^2 ln(x).y


1 0.33 61.0 -1.11 1.23 -67.68
2 0.64 128.5 -0.45 0.21 -58.37
3 1.27 257.1 0.24 0.06 61.44
4 1.91 321.3 0.64 0.42 207.08
5 2.54 334.2 0.93 0.87 311.50
6 3.81 340.6 1.34 1.79 455.59
7 5.08 345.4 1.63 2.64 561.40
8 7.62 671.5 2.03 4.12 1363.76
9 10.16 652.3 2.32 5.38 1512.25
10 12.70 658.7 2.54 6.46 1674.14
46.05 3770.6 10.11 23.17 6021.11

Penurunan (x)
Beban (lbs) CBR (%)
(mm)
2.54 363.67 12.12
5.08 481.95 10.71
Nilai CBR rata-rata: 11.42

n (ΣLn(x)y) - (ΣLn(x).Σy)
b=
n (Σ (Ln(x))² - (Σ Ln (x))²
10 6021.11 - 10.11 3770.62
b=
10 23.17 - 102.14
22102.78
b=
129.52
b= 170.65
a = y' - bx'
y' = Σy a= 377.06 - 170.65 1.01
n a= 377.06 - 172.47
y' = 3770.62 a= 204.59
10
y' = 377.06
y= b Ln(x) + a
x' = Σ ln(x) y= 170.65 Ln(x) + 204.59
n
x' = 10.11
10
x' = 1.01
( 25 x Tumbukan)
Densitas
Berat tanah basah + mold gram 8027
Berat mold gram 4329
Berat tanah basah gram 3698
Isi cetakan (V) cm3 2186.54
Berat volume basah (𝛾wet) gram/cm3 1.69
Berat volume kering (𝛾dry) gram/cm3 1.25

Kadar air
No. cawan - 2A
Berat tanah basah + cawan gram 51.80
Berat tanah kering + cawan gram 42.30
Berat air gram 9.50
Berat cawan gram 15.70
Berat tanah kering gram 26.60
Kadar air (w) % 35.71
Kadar air rata-rata % 35.71

Penetrasi, kalibrasi proving ring, lbs/Dev = 32.1314

Pembacaan arloji ukur


Waktu penetrasi Beban penetrasi
beban
(menit)
in devisi lb
0 0 0 0.00
1/4 0.330 0.5 16.07
1/2 0.635 0.8 25.71
1 1.27 1.0 32.13
1 1/2 1.905 1.3 41.77
2 2.54 1.9 61.05
3 3.81 2.7 86.75
4 5.08 3.8 122.10
6 7.62 5.1 163.87
8 10.16 6.3 202.43
10 12.7 7.2 231.35

25 Tumbukan
290.00
250.00
210.00
eban (lbs)

170.00
130.00
25 Tumbukan
290.00
250.00
210.00

Beban (lbs)
170.00
130.00
90.00
50.00
10.00
0 2 4 6 8 10 12
Penurunan (mm)

No. x y ln(x) (ln(x))^2


1 0.33 16.1 -1.11 1.23
2 0.64 25.7 -0.45 0.21
3 1.27 32.1 0.24 0.06
4 1.91 41.8 0.64 0.42
5 2.54 61.0 0.93 0.87
6 3.81 86.8 1.34 1.79
7 5.08 122.1 1.63 2.64
8 7.62 163.9 2.03 4.12
9 10.16 202.4 2.32 5.38
10 12.70 231.3 2.54 6.46
46.05 983.2 10.11 23.17

Penurunan (x) Beban CBR (%)


(mm) (lbs)
2.54 93.64 3.12
5.08 135.00 3.00
Nilai CBR rata-rata: 3.06

n (ΣLn(x)y) - (ΣLn(x).Σy)
b=
n (Σ (Ln(x))² - (Σ Ln (x))²
10 1766.61 - 10.11
b=
10 23.17 - 102.14
7729.06
b=
129.52
b= 59.67
a = y' - bx'
y' = Σy a= 98.32 -
n a= 98.32 -
y' = 983.22 a= 38.01
10
y' = 98.32
y= b Ln(x) + a
x' = Σ ln(x) y= 59.67 Ln(x)
n
x' = 10.11
10
x' = 1.01
( 60 x Tumbukan)
Densitas
Berat tanah basah + mold
Berat mold
Berat tanah basah
Isi cetakan (V)
Berat volume basah (𝛾wet)
Berat volume kering (𝛾dry)

Kadar air
2B No. cawan
58.60 Berat tanah basah + cawan
46.60 Berat tanah kering + cawan
12.00 Berat air
13.00 Berat cawan
33.60 Berat tanah kering
35.71 Kadar air (w)
35.71 Kadar air rata-rata

Penetrasi, kalibrasi proving ring, lbs/Dev =

Pembacaan arloji ukur


Waktu penetrasi
beban
(menit)
in devisi
0 0 0
1/4 0.330 1.2
1/2 0.635 3
1 1.27 8.1
1 1/2 1.905 13.2
2 2.54 18.9
3 3.81 24
4 5.08 28.1
6 7.62 32
8 10.16 35
10 12.7 37.2

60 Tumbukan
1230.00
1030.00
830.00
an (lbs)

630.00
60 Tumbukan
1230.00
1030.00
830.00

Beban (lbs)
630.00
430.00
230.00

10 12 14 30.00
0 2 4 6
Penurunan (mm

ln(x).y No. x y
-17.81 1 0.33 38.6
-11.67 2 0.64 96.4
7.68 3 1.27 260.3
26.92 4 1.91 424.1
56.91 5 2.54 607.3
116.05 6 3.81 771.2
198.45 7 5.08 902.9
332.78 8 7.62 1028.2
469.32 9 10.16 1124.6
587.99 10 12.70 1195.3
1766.61 46.05 6448.8

Penurunan (x) Beban (lbs) CBR (%)


(mm)
2.54 617.42 20.58
5.08 859.84 19.11
Nilai CBR rata-rata: 19.84

n (ΣLn(x)y) - (ΣLn(x).Σy)
b=
n (Σ (Ln(x))² - (Σ Ln (x))²
983.22 10 11047.45
b=
10 23.17
45299.08
b=
129.52
b= 349.74
a = y' - bx'
59.67 1.01 y' = Σy a=
60.31 n a=
y' = 6448.77 a=
10
y' = 644.88
y=
+ 38.01 x' = Σ ln(x) y=
n
x' = 10.11
10
x' = 1.01
( 60 x Tumbukan)

gram 6683
gram 4343
gram 2340
cm3 2186.54
gram/cm3 1.07
gram/cm3 0.79

- 3A 3B
gram 70.00 73.40
gram 54.70 57.30
gram 15.30 16.10
gram 12.40 12.90
gram 42.30 44.40
% 36.17 36.26
% 36.22

32.1314

Pembacaan arloji ukur


Beban penetrasi
beban

devisi lb
0 0.00
1.2 38.56
3 96.39
8.1 260.26
13.2 424.13
18.9 607.28
24 771.15
28.1 902.89
32 1028.20
35 1124.60
37.2 1195.29

60 Tumbukan
60 Tumbukan

4 6 8 10 12 14
Penurunan (mm)

ln(x) (ln(x))^2 ln(x).y


-1.11 1.23 -42.75
-0.45 0.21 -43.78
0.24 0.06 62.21
0.64 0.42 273.35
0.93 0.87 566.09
1.34 1.79 1031.52
1.63 2.64 1467.48
2.03 4.12 2088.05
2.32 5.38 2607.34
2.54 6.46 3037.95
10.11 23.17 11047.45

y) - (ΣLn(x).Σy)
x))² - (Σ Ln (x))²
- 10.11 6448.77
- 102.14

644.88 - 349.74 1.01


644.88 - 353.47
291.41

b Ln(x) + a
349.74 Ln(x) + 291.41
Tabel Pemeriksa
Kelompok
Penetrasi (D) Penetrasi (D) Kumulatif
Tumbukan
(cm) (mm) Tumbukan Penetrasi (cm)
0 0 0 0 5 2
1 5 2 20 10 4
2 5 2 20 15 6
3 5 6 60 20 12
4 5 9 90 25 21
5 5 11 110 30 32
6 5 14 140 35 46
7 5 15 150 40 61
8 5 13 130 45 74
9 5 11 110 50 85
10 5 9 90 55 94
11 5 6 60 60 100
980

120 100
105.44
105 90
80
90

Kumulatif Penetrasi (cm)


70
75
CBR Konus 60

60
60 50

45 40
30
30 24.92
14.63 20
11.24 9.03 8.19 7.48
15 7.48 10
0 2
0 0
0 0.5 1 1.5 2 2.5 3 3.5 0 1
DCP (cm/tumbukan)
Tabel Pemeriksaan DCP
Kelompok 2
DCP DCP CBR
(cm/Tumbukan) (mm/Tumbukan) Konus 60° D*CBR*1/3 CBR DESAIN
0 0 0
0.4 4 105.44 18.90
0.4 4 105.44 18.90
1.2 12 24.92 35.05
1.8 18 14.63 44.03
2.2 22 11.24 49.29
14.63
2.8 28 8.19 56.44
3 30 7.48 58.68
2.6 26 9.03 54.14
2.2 22 11.24 49.29
1.8 18 14.63 44.03
1.2 12 7.48 428.73

7.48
100 94
90 85
80 74
Kumulatif Penetrasi (cm)

70 61
60
50 46

40 32
30 21
20 12
10 4 6
2
0
0 10 20 30 40 50 60
Kumulatif Tumbukan

Anda mungkin juga menyukai