Document Title

INSULATION RESISTANCE TEST METHOD


FOR MOTOR
Document Number : PAGE OF
1 9
TVP-P-

Rev Date Description Prepared Checked Approved


by by by

0 Issued for use


DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 2 of 9

REVISION DESCRIPTION

REVISION REVISION DATE DESCRIPTION


PAGE
0 - Issued for use

Page 2
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 3 of 9

TABLE OF CONTENT

1. GOAL 4
2. SAFETY CONSIDERATION 4
3. EQUIPMENT REQUIRED 5
4. METODS TAN DELTA 5
5. CONSIDERED THINGS 5
6. PREPARING FOR TESTING 6
7. START TESTING 7

Page 3
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 4 of 9

1. TUJUAN 1. GOAL

Pengujian ketahanan isolasi sangat penting untuk Insulation resistance testing is essential to prevent
mencegah guncangan, korsleting, dan akibat shocks, short circuits, and other dangerous
berbahaya lainnya yang membahayakan outcomes that risk workers’ safety and equipment
keselamatan pekerja dan umur peralatan. longevity. Insulation resistance testing provides
Pengujian ketahanan isolasi memberikan information and data that can be used to
informasi dan data yang dapat digunakan untuk determine the health of the motor.
menentukan kesehatan motor.

.
2. PERTIMBANGAN KESELAMATAN 2. SAFETY CONSIDERATION

Bahaya yang aka nada saat melakukan pekerjaan, The Hazards that will be existing while conduct
adalah ; these jobs ;
a) Mekanik : Kabel terlilit pada bagian yang a) Mechanical : Cable twisted on the
berputar rotating part
b) Listrik : Sengatan Listrik b) Electrical : Electrical shock
c) Suhu : Paparan suhu c) Temperature : Temperature exposure
d) Suara : Kebisingan dengan intensitas d) Sound : High intensity noise
tinggi

Page 4
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 5 of 9

3. PERALATAN YANG DIGUNAKAN 3. EQUIPMENT REQUIRED

 Kyoritsu Insulation Tester KEW 3128  Kyoritsu Insulation Tester KEW 3128
 Kabel prob HV (merah)  HV Line Probe (red)
 Klip Buaya (merah)  Alligator Clip (red)
 Kabel Bumi (hitam) dan Pelindung (hijau)  Earth (black) and Guard Cords (green)
 Prod Ekstensi  Extension Prod
 Kabel Utama  Main Cord

4. FUNGSI DASAR 4. BASIC FUNCTION


 Resitansi Isolasi  Insulation resistance

5. HAL-HAL YANG PERLU 5. CONSIDERED THINGS


DIPERHATIKAN

1. Pastikan Motor yang akan di uji sudah 1. Make sure the Motor to be tested is
terhubung atau terkoneksi dengan connected to the grounding system
pentanahan system (Grounding System)
2. Make sure the Motor to be tested in a
2. Pastikan Motor yang akan di uji dalam separate state of the circuit system
keadaan terpisah dari rangkaian sistem (Disconnect system) or there is no cable
(Disconnect system) atau sudah tidak ada connection conductor or bar on the terminal
koneksi kabel penghantar atau bar pada side of the Motor at the phase and neutral.
terminal Motor sisi Fasa Dan Netralnya.

Page 5
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 6 of 9

3. Sebelum memulai pengujian, pastikan 3. Before starting the test, make sure the
Pentanahan (Grounding) dari Alat Uji sudah Earthing (Grounding) of Test Equipment has
terpasang dengan baik. been installed properly.

4. Buatlah kabel jumper untuk Terminal Motor 4. Make a jumper cable to Terminal Motor and
dan jumper sebaik mungkin jumper as good as possible

5. Jangan membuka koneksi kabel atau 5. Do not open the cable connection or change
merubah nilai parameter pada saat proses the parameter values during the testing
pengujian berlangsung. process.

6. MEMPERSIAPKAN PENGUJIAN 6. PREPARING FOR TESTING

1. Rangkaian pengujian 1. Test series

2. Jumperlah (Short Circuit) semua terminal 2. Connect (Short Circuit) all phase of the
Fasa dari MOTOR yang akan diuji terminal of tested motor

Page 6
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 7 of 9

3. Nyalakan Kyoritsu KEW 3128 3. Turn on the Kyoritsu Kew 3128 based on
berdasarkan nilai rating pengujiannya the test rating value

7. MEMULAI PENGUJIAN 7. START TESTING

1. Periksa tegangan yang dapat diterapkan 1. Check the voltage which can be applied to
ke rangkaian yang diuji, dan atur Rentang the circuit under test, and set the Range
ke Rentang Tegangan yang diinginkan Switch to any desired Voltage Range

2. Pilih “IR” (Resistensi Insulasi) pada 2. Select the “IR” (Insulation Resistance) on
Layar Pemilihan Mode, dan tekan Tombol the Mode Selection Screen, and press the
ENTER ENTER Key

Page 7
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 8 of 9

3. Tetapkan nilai tegangan, dan 3. Set a voltage value, and confirm it with
konfirmasikan dengan Tombol ENTER the ENTER Key

4. Layar Konfirmasi ditampilkan. Tekan 4. Confrimation Screen is displayed. Press


Tombol ENTER dan konfirmasi nilainya the ENTER Key and confirm the value

5. Instrumen masuk ke mode siaga ketika 5. The instrument enters into stand-by mode
pengaturan dibuat when settings are made

6. Hubungkan Kabel Bumi (hitam) ke 6. Connect the Earth Cord (black) to the
Terminal Bumi pada rangkaian yang diuji Earth Terminal of the circuit under test

7. Pasang ujung Line Probe (merah) ke 7. Put the tip of the Line Probe (red) to the

Page 8
DOCUMENT TITLE
INSULATION RESISTANCE TEST METHOD FOR MOTOR
Document No. Revision No. Revision Date Page No.:
TVP-P-ENG- 0 9 of 9

rangkaian yang diuji. Kemudian tekan circuit under test. Then press the Test
Tombol Tes. Buzzer berbunyi sebentar- Button. The Buzzer sounds intermittently
sebentar selama pengukuran during a measurement

8. Nilai terukur akan ditampilkan pada LCD 8. The measured value will be displayed on
the LCD

9. Lepaskan Tombol untuk menghentikan


pengukuran. Kemudian hasil pengukuran 9. Release the Button to stop the
akan ditampilkan pada LCD measurement. Then the measured results
will be displayed on the LCD
10. Instrumen ini memiliki fungsi pelepasan
otomatis. Dengan kabel uji terhubung ke 10. This instrument has an auto-discharge
sirkuit yang sedang diuji, lepaskan function. With the test leads connected to
Tombol Tes untuk melepaskan kapasitansi the circuit under test, release the Test
di sirkuit setelah pengujian. Button to discharge capacitance in the
circuit after test.
11. Pastikan pembacaan pada monitor
Tegangan menjadi “0V”. Atur Sakelar 11. Confirm that the readings on the Voltage
Jangkauan ke posisi “OFF”, dan lepaskan monitor becomes “0V”. Set the Range
kabel uji dari perangkat yang sedang diuji. Switch to “OFF” position, and remove the
test leads from the device under test.