Anda di halaman 1dari 83

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
BAB III
ANALISA DAN PERENCANAAN

3.1. Perencanaan Dimensi Perkuatan Lereng


3.1.1. Perhitungan Panjang Busur, Beda Tinggi ( ΔH ), Kehilangan Energi Pada Tikungan

Dari hasil analisa gambar Lampiran 1, sketsa perencanaan sungai dan gambar potongan I-IV
di dapat nilai-nilai sebagai berikut :

Diketahui :
B = 101
h= 21
m= 1
b = B - 2(m.h) B = b + 2(m.h)
b = 101 - 2(1.21) B = 59 + 2(1.21)
b = 101 - 42 B = 59 + 42
b = 59 B = 101

Ϡ Lebar dasar sungai ( bB) = 101.00 m


Ϡ Tinggi Sungai Rata-rata ( h ) = 21.00 m
Ϡ Bahan dasar sungai = Kerikil Sedang
Ϡ Kecepatan yang diizinkan = 1.50 m/dtk ( buku pps hal 126)

Penyelesaian :

1. Potongan 1-1
0
Di Ketahui : Ө1 = 35
R1 = 111.70 m
Maka:
Ro = R1 + B Rc = Ro - 1/2 B
= 111.7 + 101.00 = 212.70 - 1/2 . 101
= 212.70 m = 162.2 m

☞ Panjang Busur
L1 = Ө1 L2 = Ө1
. 2π . R1 . 2π . Ro
360 360
= 35 = 35
. 2 . 111.70 . 2 . 212.70
360 360
= 21.72 m = 41.4 m

☞ Beda tinggi (menggunakan persamaan Euler)


2
V Ro
H1 = Ln
g R1
1.50 212.7
= Ln
9.81 111.70
= 0.229 . 0.644
= 0.148 m

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
2
☞ Koreksi h V
H2 = K .
2g
+ 1.50
K = < 0.7 H2 = 0.62 .
Rc 19.62
101 H2 = 0.071
K = < 0.7
162.2
K = 0.62 < 0.7 MEMENUHI Syarat H2 < H1 = 0.071 < 0.148 AMAN

☞ Kehilangan energi pada tikungan

h . Ө1 2 2
C1 = 24 x + 2.5 x 2
Rc c c

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy


87
C =
ϒ
1 +
Rc

87
=
0.16
1 +
162

87
=
1.01

= 85.92

Maka :
h . Ө1 2 2
C1 = 24 x + 2.5 x 2
Rc c c

21.00 . 35 2 2
= 24 x + 2.5 x 2
162.2 85.92 85.92

= 24 x 4.53 x 0.024

= 2.61

2. Potongan II-II
0
Di Ketahui : Ө2 = 44
R2 = 171.00 m
Maka:
Ro = R2 + b Rc = Ro - 1/2 b
= 171 + 101.00 = 272 - 1/2 . 101
= 272 m = 221.5

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
☞ Panjang Busur
L1 = Ө2 L2 = Ө2
. 2π . R2 . 2π . Ro
360 360
= 44 = 44
. 2 . 3.14 . 171 . 2 . 3.14 . 272.0
360 360
= 131.25 m = 208.78 m

☞ Beda tinggi (menggunakan persamaan Euler)


2
V Ro
H1 = Ln
g R2
1.50 272
= Ln
9.81 171
= 0.229 . 0.464
= 0.106 m

2
☞ Koreksi h V
H2 = K .
2g
b 1.50
K = < 0.7 H2 = 0.46 .
Rc 19.62
101 H2 = 0.052
K = < 0.7
221.5
K = 0.46 < 0.7 MEMENUHI Syarat H2 < H1 = 0.052 < 0.106 AMAN

☞ Kehilangan energi pada tikungan


h . Ө2 2 2
C1 = 24 x + 2.5 x 2
Rc c c

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy


87
C =
ϒ
1 +
Rc
87
=
0.16
1 +
222

87
=
1.01
= 86.07

Maka :
h . Ө2 2 2
C1 = 24 x + 2.5 x 2
Rc c c

21 . 44 2 2
= 24 x + 2.5 x 2
222 86.07 86.07

= 24 x 4.17 x 0.02

= 2.39
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
3. Potongan III-III

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
0
Di Ketahui : Ө3 = 21
R3 = 143.20 m
Maka:
Ro = R4 + b Rc = Ro - 1/2 b
= 143.2 + 101 = 244.2 - 1/2 . 101
= 244.2 m = 193.70

☞ Panjang Busur

L1 = Ө4 L2 = Ө4
. 2π . R4 . 2π . Ro
360 360
= 21 = 21
. 2 . 3.14 . 143.2 . 2 . 3.14 . 244.20
360 360
= 52.46 m = 89.46 m

☞ Beda tinggi (menggunakan persamaan Euler)

2
V Ro
H1 = Ln
g R3
1.50 244.2
= Ln
9.81 143.20
= 0.229 . 0.534
= 0.1224 m

☞ Koreksi h

2
b V
K= < 0.7 H2 = K .
Rc 2g
101 1.50
K= < 0.7 H2 = 0.52 .
193.70 19.62
K= 0.52 < 0.7 AMAN H2 = 0.03986

Syarat H2 < H1 = 0.0399 < 0.12241865 AMAN


MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
☞ Kehilangan energi pada tikungan

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy

87
C =
ϒ
1 +
Rc

87
=
0.022
1 +
193.70

87
=
1.002
= 86.86

Maka :

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

21 . 25 2 2
= 24 x + 2.5 x 2
193.70 86.86 86.86

= 24 x 2.71 x 0.02

= 1.54

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
4. Potongan IV-IV

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
0
Di Ketahui : Ө4 = 29
R4 = 160.90 m
Maka:
Ro = R4 + b Rc = Ro - 1/2 b
= 160.9 + 101 = 261.9 - 1/2 . 101
= 261.9 m = 211.40

☞ Panjang Busur

L1 = Ө4 L2 = Ө4
. 2π . R4 . 2π . Ro
360 360
= 29 = 29
. 2 . 3.14 . 160.9 . 2 . 3.14 . 261.90
360 360
= 81.40 m = 132.49 m

☞ Beda tinggi (menggunakan persamaan Euler)

2
V Ro
H1 = Ln
g R4
1.50 261.9
= Ln
9.81 160.90
= 0.229 . 0.487
= 0.1117 m

☞ Koreksi h

2
b V
K = < 0.7 H2 = K .
Rc 2g
101 1.50
K = < 0.7 H2 = 0.48 .
211.40 19.62
K = 0.48 < 0.7 AMAN H2 = 0.03653

Syarat H2 < H1 = 0.0365 < 0.1117 AMAN

☞ Kehilangan energi pada tikungan

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy

87
C =
ϒ
1 +
Rc

87
=
0.022
1 +
211.40

87
=
1.002
= 86.87

Maka :

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

21 . 25 2 2
= 24 x + 2.5 x 2
211.40 86.87 86.87

= 24 x 2.48 x 0.02

= 1.41
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
0
Di Ketahui : Ө4 = 29
R4 = 160.90 m
Maka:
Ro = R4 + b Rc = Ro - 1/2 b
= 160.9 + 101 = 261.9 - 1/2 . 101
= 261.9 m = 211.40

☞ Panjang Busur

L1 = Ө4 L2 = Ө4
. 2π . R4 . 2π . Ro
360 360
= 29 = 29
. 2 . 3.14 . 160.9 . 2 . 3.14 . 261.90
360 360
= 81.40 m = 132.49 m

☞ Beda tinggi (menggunakan persamaan Euler)

2
V Ro
H1 = Ln
g R4
1.50 261.9
= Ln
9.81 160.90
= 0.229 . 0.487
= 0.1117 m

☞ Koreksi h

2
b V
K = < 0.7 H2 = K .
Rc 2g
101 1.50
K = < 0.7 H2 = 0.48 .
211.40 19.62
K = 0.48 < 0.7 AMAN H2 = 0.03653

Syarat H2 < H1 = 0.0365 < 0.1117 AMAN

☞ Kehilangan energi pada tikungan

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy

87
C =
ϒ
1 +
Rc

87
=
0.022
1 +
211.40

87
=
1.002
= 86.87

Maka :

h . b 2 2
C1 = 24 x + 2.5 x 2
Rc c c

21 . 25 2 2
= 24 x + 2.5 x 2
211.40 86.87 86.87

= 24 x 2.48 x 0.02

MAHDIYYIN
= 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Di Ketahui : Ө4 = 29 0
R4 = 199,00 m
Maka:
Ro = R4 + B Rc = Ro - 1/2 B
= 199 + 125 = 324 - 1/2 . 125
= 324 m = 262

☞ Panjang Busur

L1 = Ө4 L2 = Ө4
. 2π . R4 . 2π . Ro
360 360
= 29 = 29
. 2 . 3,14 . 199 . 2 . 3,14 . 324,00
360 360
= 100,67 m = 163,91 m

☞ Beda tinggi (menggunakan persamaan Euler)

V2 Ro
H1 = Ln
g R4
0,80 324
= Ln
9,81 199,00
= 0,065 . 0,487
= 0,0318 m

☞ Koreksi h

B V2
K = < 0,7 H2 = K .
Rc 2g
125 0,80
K = < 0,7 H2 = 0,48 .
261,50 19,62
K = 0,48 < 0,7 AMAN H2 = 0,019491

Syarat H2 < H1 = 0,0195 < 0,0318 AMAN

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
☞ Kehilangan energi pada tikungan

h . B 2 2
C1 = 24 x + 2,5 x
Rc c c2

Dimana c adalah faktor tahanan aliran yang disebut koefesien chezy

87
C =
ϒ
1 +
Rc

87
=
0,022
1 +
261,50

87
=
1,001
= 86,88

Maka :

h . B 2 2
C1 = 24 x + 2,5 x
Rc c c2

21 . 125,00 2 2
= 24 x + 2,5 x 2
261,50 86,88 86,88

= 24 x 10,04 x 0,02

= 5,71

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
3.1.2. Perhitungan Curah Hujan (Re) Untuk Daerah Pengairan Sungai

Dalam menganilis masing-masing stasiun yang di tinjau dalam perencanaan yaitu diantaranya
stasiun Malino, Stasiun Senre, Stasiun Telebatu, Stasiun Maccini Baji, Stasiun Barembeng
dan Stasiun Kampili dengan menggunakan 3 metode diantaranya yaitu Metode Log Person type III,
Metode Gumbel untuk perhitugan Curah hujan. Sedangkan metode Melchior
untuk perhitungan debit rencana.

Perhitungan metode Iwai dapat dilihat pada tabel 3.1 sampai 3.6 untuk perhitungan
Metode Log Person Type 3 dapat dlihat pada tbel 3.7 sampai 3.10 dan untuk perhituungan
metode melchior dapat dilihat pada tabel

Tabel 3.1 Data Curah Hujan setiap stasiun

Nama Stasiun
No
Malino Senre Telebatu Maccini Baji Barembeng Kampili
1 217 231 100 116 110 311
2 221 111 14 27 13 211
3 118 251 114 111 41 131
4 112 115 221 301 311 116
5 18 101 111 111 101 111
6 13 15 111 176 100 71
7 16 211 11 67 14 111
8 111 113 12 101 12 211
9 123 13 13 21 111 41
10 115 41 151 101 129 211
11 112 12 17 221 241 112
12 11 214 18 231 117 110
Sumber : Soal Tugas Besar Rekayasa Sungai

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

3.1.3. Analiasa Metode Iwai

Diketahui data-data sebagai berikut :


2
☞ Luas DAS = 121 km

perhitungan Curah Hujan ( Re ) dengan Metode Iwai :


Luas DAS / Luas Pengaruh: Koefisien Thiessen :
2
☞ HDR-1 = 16 km ☞ HDR-1 = 0.1322 km2
2
☞ HDR-2 = 24 km ☞ HDR-2 = 0.1983 km2
2
☞ HDR-3 = 19 km ☞ HDR-3 = 0.157 km2
2
☞ HDR-4 = 15 km ☞ HDR-4 = 0.124 km2
2
☞ HDR-5 = 25 km ☞ HDR-5 = 0.2066 km2
2
☞ HDR-6 = 22 km + ☞ HDR-6 = 0.1818 km2+
2 2
121 km 1 km
Tabel 3.2. Perhitungan Maksimum Rerata Setiap Stasiun

Nama Stasiun
No Max Rerata ( X )
Malino Senre Telebatu Maccini Baji Barembeng Kampili
1 217 231 100 116 110 311 180.83
2 221 111 14 27 13 211 99.50
3 118 251 114 111 41 131 127.67
4 112 115 221 301 311 116 196.00
5 18 101 111 111 101 111 92.17
6 13 15 111 176 100 71 81.00
7 16 211 11 67 14 111 71.67
8 111 113 12 101 12 211 93.33
9 123 13 13 21 111 41 53.67
10 115 41 151 101 129 211 124.67
11 112 12 17 221 241 112 119.17
12 11 214 18 231 117 110 116.83
1356.50
Sumber : Hasil Perhitungan 113.042

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

Kala Ulang P 2 3
No Xi Log Xi (Log Xi - Log X) (Log Xi - Log X)
(Tahun) (%)
1 13.00 7.7 180.83 2.26 0.0531 0.0123
2 6.50 15.4 99.50 2.00 0.0008 0.0000
3 4.33 23.1 127.67 2.11 0.0063 0.0005
4 3.25 30.8 196.00 2.29 0.0705 0.0187
5 2.60 38.5 92.17 1.96 0.0039 -0.0002
6 2.17 46.2 81.00 1.91 0.0140 -0.0017
7 1.86 53.8 71.67 1.86 0.0294 -0.0050
8 1.63 61.5 93.33 1.97 0.0032 -0.0002
9 1.44 69.2 53.67 1.73 0.0882 -0.0262
10 1.30 76.9 124.67 2.10 0.0048 0.0003
11 1.18 84.6 119.17 2.08 0.0024 0.0001
12 1.08 92.3 116.83 2.07 0.0017 0.0001
Σ 40.3 24.32 0.2783 -0.0014

24.32
Log X =
12
= 2.026752

X= 106.35

2
X = 11311.08
Tabel 3.4. Perhitungan Nila b
2
No Xs Xt Xs x Xt Xs +Xt (Xs x Xt)-Xr 2Xr-(Xs +Xt) bi
(1) (2) (3) (4) (5) (6) (7) (8)
1 180.83 71.67 12959.72 252.50 1648.64 -39.79 -41.43
2 124.67 99.50 12404.33 224.17 -1093.25 -11.46 118.97
Sumber : Hasil Perhitungan Σ bi 77.54
b 38.77

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

Tabel 3.5. Perhitungan Nilai Xo dan Xa

2
No Xi Log Xi Xi + b Log (Xi + b) Log (Xi + b)
1 180.83 2.26 219.60 2.34 5.48
2 99.50 2.10 138.27 2.14 4.58
3 127.67 2.29 166.44 2.22 4.93
4 196.00 2.11 234.77 2.37 5.62
5 92.17 1.73 130.94 2.12 4.48
6 81.00 2.08 119.77 2.08 4.32
7 71.67 2.07 110.44 2.04 4.17
8 93.33 1.97 132.10 2.12 4.50
9 53.67 1.96 92.44 1.97 3.86
10 124.67 1.91 163.44 2.21 4.90
11 119.17 2.00 157.94 2.20 4.83
12 116.83 1.86 155.60 2.19 4.80
Σ 1356.50 24.32 1395.27 26.00 56.50
Rata -rata 2.17 4.71
Sumber : Hasil Perhitungan Xo Xa

Menghitung Nilai c

1 2n 2
= x Xa-Xo
C n- 1

2 . 12 2
= x 4.71 - 2.17
12 - 1

= 1.48 x 0.111
= 0.16

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel 3.6. Perhitungan Curah Hujan Rencana

T ξ (1/C) x ξ (1/C) x ξ + X0 -1 Xt = 5- b
Log (4)
(1) (2) (3) (4) (5) (6)
5 0.595 0.097 2.264 183.839 145.070
10 0.906 0.148 2.315 206.742 167.972
25 1.238 0.203 2.370 234.30 195.533
50 1.452 0.238 2.405 254.033 215.264
100 1.645 0.270 2.436 273.200 234.430
200 1.821 0.298 2.465 292.001 253.231

Langkah – langkah Kerja Perhitungan Metode Iwai :


 Perhitungan Log X, X, dan X2
Diketahui :
∑ ( log Xi ) =24 , 32
n=12

log X =
∑ (log xi)=2,026752
n
X = 106,35
X2 = 11311.08
 Perhitungan nilai b
Diketahui :
Xs 1=180 ,83
Xs 2=124 , 67
Xt 1=71, 67
Xt 2=99 , 50
X =106 , 35
2
X =11311, 08
b 1= ( Xs 1. Xt 1 )−X ¿
2 ¿
2 X −(Xs 1+ Xt 1)
( 180 , 83 .71 , 67 )−11311 , 08
b 1=
2 .106 ,35−(180 ,83+71 , 67)
b 1=−41 , 43

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

b 2=( Xs 2 . Xt 2 )−X 2 ¿ ¿
2 X −( Xs 2+ Xt 2)
( 124 , 67 . 99 , 50 )−11311 , 08
b 2=
2 . 106 ,35−(124 , 67+99 , 50)
b 2=118, 97

b 1+ b 2
b=
2
−41 , 43+118 ,97
b=
2
b=38 , 77

 Perhitungan harga Xo
Diketahui :
∑ ( log Xi ) =24 , 32
n=12

log X =
∑ (log xi)=2,026752
n

 Perhitungan harga a
Diketahui :
Xo = 2,17
Xa = 4,71
1
a
=

2n
n−1
. ( Xa−Xo2 )

1
a
=

2 . 12
12−1
. ( 4 ,71−2 ,17 2)

1
=0 , 16
a

 Perhitungan Probabilitas Curah hujan harian Maksimum Tahunan


Untuk t = 5 tahun

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Diketahui :
ξ=0,595
1
=0 , 16
a
Xo=2 ,17
( 1a )
Xt =10 . ξ+ Xo
0
Xt =10 , 16 . 0,595+2 ,17
Xt =145,070

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
3.1.3 Analisa Metode Gumbel

Diketahui data-data sebagai berikut :


2
☞ Luas DAS = 121 km

perhitungan Curah Hujan ( Re ) dengan Metode Iwai :


Luas DAS / Luas Pengaruh: Koefisien Thiessen :
2
☞ HDR-1 = 16 km ☞ HDR-1 = 0.1322314
2
☞ HDR-2 = 24 km ☞ HDR-2 = 0.1983471
2
☞ HDR-3 = 19 km ☞ HDR-3 = 0.1570248
2
☞ HDR-4 = 15 km ☞ HDR-4 = 0.1239669
2
☞ HDR-5 = 25 km ☞ HDR-5 = 0.2066116
2
☞ HDR-6 = 22 km + ☞ HDR-6 = 0.1818182
2
121 km 1.00
Tabel 3.2. Perhitungan Maksimum Rerata Setiap Stasiun

Nama Stasiun
No Max Rerata ( Xi ) Log Xi
Malino Senre Telebatu Maccini Baji Barembeng Kampili
1 217 231 100 116 110 311 180.83 2.26
2 221 111 14 27 13 211 99.50 2.00
3 118 251 114 111 41 131 127.67 2.11
4 112 115 221 301 311 116 196.00 2.29
5 18 101 111 111 101 111 92.17 1.96
6 13 15 111 176 100 71 81.00 1.91
7 16 211 11 67 14 111 71.67 1.86
8 111 113 12 101 12 211 93.33 1.97
9 123 13 13 21 111 41 53.67 1.73
10 115 41 151 101 129 211 124.67 2.10
11 112 12 17 221 241 112 119.17 2.08
12 11 214 18 231 117 110 116.83 2.07
1356.50 24.32
Sumber : Hasil Perhitungan

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Curah
Kala Ulang
No Hujan (X) X² (X-Xr)² (X-Xr)³
(mm) (Tahun)
1 180.83 13.00 32700.69 4595.71 311550.85
2 99.50 6.50 9900.25 183.38 -2483.23
3 127.67 4.33 16298.78 213.89 3128.15
4 196.00 3.25 38416.00 6882.09 570926.31
5 92.17 2.60 8494.69 435.77 -9096.61
6 81.00 2.17 6561.00 1026.67 -32896.17
7 71.67 1.86 5136.11 1711.89 -70829.47
8 93.33 1.63 8711.11 388.42 -7655.08
9 53.67 1.44 2880.11 3525.39 -209320.07
10 124.67 1.30 15541.78 135.14 1571.01
11 119.17 1.18 14200.69 37.52 229.78
12 116.83 1.08 13650.03 14.38 54.51
Σ 1356.50 19150.23 555179.98

Jumlah Data (n) = 12


Rata-rata X (Xr) = 113.04
Rata-rata X Pangkat Dua (Xr) ² = 12778.42
Standar Deviasi (Sx) = 41.724

Tabel Perhitungan Curah Hujan Rencana Metode Gumbel


Kala Ulang
No Xr Sx K K.Sx Kt= Xr + (K.Sx)
(Tahun)
1 5 113.042 41.72 0.97 40.411 153.453
2 10 113.042 41.72 1.70 71.103 184.145
3 25 113.042 41.72 2.63 109.895 222.937
4 50 113.042 41.72 3.32 138.668 251.710
5 100 113.042 41.72 4.01 167.229 280.271
6 200 113.042 41.72 4.69 195.696 308.738

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Langkah Kerja Perhitungan Metode Gumbel

« Perhitungan rata - rata curah hujan ( Xr )


Untuk t = 51,25Tahun
tahun
Diketahui : ΣX = 1356.50
n = 12

ΣX 1356.50
Xr = = = 113.042
n 12
Untuk t selanjutnya dihitung dengan cara yang sama

« Perhitungan simpangan baku ( Sx )


Untuk t = 5 Tahun
Diketahui : Σ( Xi - Xr )² = 19150.23
n = 12

Sx = Σ(Xi-Xr)² = 19150.23 = 41.724


n- 1 11

Untuk t selanjutnya dihitung dengan cara yang sama

« Perhitungan faktor frekuensi ( K )


Untuk t = 5 Tahun
Diketahui : Yt = 1.4999
Yn = 0.5120
Sn = 1.0200
Yt - Yn 1.500 - 0.512
K = = = 0.97
Sn 1.02

Untuk t selanjutnya dihitung dengan cara yang sama

« Perhitungan besarnya curah hujan rencana untuk periode ulang t ( Xt )


Untuk t = 5 Tahun Xr = 113.04
Sx = 41.72
K = 0.97

Xt = Xr + ( Sx . K )
= 153.453

MAHDIYYIN
Untuk t selanjutnya dihitung dengan cara yang sama 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel Rekapitulasi Hasil Perhitungan Curah Hujan Rencana (Xt)

Periode Metode
No
Ulang Iwai Gumbel
1 5 145.070 153.453
2 10 167.972 184.145
3 25 195.533 222.937
4 50 215.264 251.710
5 100 234.430 280.271
6 200 253.231 308.738

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

PERHITUNGAN BANJIR RANCANGAN DENGAN METODE NON HIDROGRAF

A. PERHITUNGAN BANJIR RANCANGAN DENGAN METODE RASIONAL JEPANG

Diketahui data - data sebagai berikut :


☛ Luas DAS (A) = 121 km²
☛ Panjang sungai (L) = 13 km
☛ Kemiringan rerata (s) = 0.1

☞ Menghitung Koefisien Limpasan (α)


0.7
1 + 0.012 x A
α = 0.7
1 + 0.75 x A
0.7
1 + 0.012 x 121
= 0.7
1 + 0.75 x 121
1.0120
=
1.7500
= 0.578

☞ Menghitung Waktu Konsentrasi ( tc )


tc = 0.76 x A 0.38
0.38
= 0.76 x ( 121 )
= 4.70

☞ Menghitung Intensitas Curah Hujan ( I )

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
2/3
I5 R24 24
= x ( )
24 tc
2/3
153.453 24
= x ( )
24 4.70
= 18.95 mm/jam

2/3
I 10 R24 24
= x ( )
24 tc
2/3
184.145 24
= x ( )
24 4.70
= 22.75 mm/jam

2/3
I 25 R24 24
= x ( )
24 tc
2/3
222.937 24
= x ( )
24 4.70
= 27.54 mm/jam

2/3
I 50 R24 24
= x ( )
24 tc
251.710 24 2/3
= x ( )
24 4.70
= 31.09 mm/jam

2/3
I 100 R24 24
= x ( )
24 tc
2/3
280.271 24
= x ( )
24 4.70
= 34.62 mm/jam
2/3
I 200 R24 24
= x ( )
24 tc
2/3
308.738 24
= x ( )
24 4.70
= 38.14 mm/jam

☞ Menghitung Debit Puncak ( Q )

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
α x I5 x A
Q5 =
3.6
0.578 x 18.95 x 121
=
3.6
= 368.42 m³/dtk

α x I 10 x A
Q 10 =
3.6
0.578 x 22.75 x 121
=
3.6
= 442.11 m³/dtk

α x I 25 x A
Q 25 =
3.6
0.578 x 27.54 x 121
=
3.6
= 535.25 m³/dtk

α x I 100 x A
Q 50 =
3.6
0.578 x 31.09 x 121
=
3.6
= 604.33 m³/dtk

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
α x I 200 x A
Q 100 =
3.6
0.578 x 34.62 x 121
=
3.6
= 672.90 m³/dtk

α x I 200 x A
Q 200 =
3.6
0.578 x 38.14 x 121
=
3.6
= 741.25 m³/dtk

Tabel Hasil Perhitungan Dengan Metode Rasional Jepang


Kala R t I A Q
α
Ulang (mm) (jam) (mm/jam) (km²) (m³/dtk)
5 153.453 18.95 368.42
10 184.145 22.75 442.11
25 222.937 27.54 535.25
0.578

4.70

121

50 251.710 31.09 604.33


100 280.271 34.62 672.90
200 308.738 38.14 741.25

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
B. Cara Perhitungan Hidrograf Satuan Sintetik Nakayasu

Data - data diketahui sebagai berikut :


☛ Luas DAS ( A ) = 121 km²
☛ Panjang sungai ( L ) = 13 km
☛ Ro = 1.00 mm
☛ C = 0.75
☛ α = 0.52

Penyelesaian :
✏ Waktu antara hujan sampai debit puncak banjir Tg ( L > 15 km )
Tg = 0.4 + 0.058 x L
= 0.4 + 0.058 x 13
= 1.15 Jam

✏ Waktu hujan Tr
Tr = 0.5 x Tg
= 0.5 x 1.15
= 0.58 Jam

✏ Waktu mencapai puncak Tp

Tp = Tg + 0.8 Tr
= 1.15 + 0.8 x 0.58
= 1.6 Jam

T0,3 = α x Tg
= 0.52 x 1.15
= 5.6 jam

Tp + T0,3 = 1.6 + 5.6 0,5T0,3 = 0.5 x 5.6


= 7.2 Jam = 2.80 Jam

1,5T0,3 = 1.5 x 5.6 2T0,3 = 2 x 5.6


= 8.40 Jam = 11.20 Jam

Tp + 1.5T0,3 = 1.6 + 8.40


= 10.0 Jam

Tp + T0,3 +1,5T0,3 = 1.6156 + 5.6 + 8.40


= 15.6 Jam

C x Ro x A
Qp =
3,6 ( 0,3 x Tp + T0,3 )
0.75 x 1 x 121
=
3.6 0.3 x 1.6156 + 5.6
90.75
=
21.90
MAHDIYYIN = m³/dtk 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
✏ Persamaan Hidrograf Satuannya adalah sebagai berikut :
1. Waktu naik (0 ≤ t < Tp)
t 2.4
Qt = Qp x ( )
Tp

2. Waktu turun :
a. Tp < t < (Tp + Tp0,3)
t - Tp
( )
Qt = Qmax x 0.3 T0,3

b. (Tp + T0,3) < t < (Tp + 1.5T0,3)


t - Tp + 0,5T0,3
( )
Qt = Qmax x 0.3 1,5T0,3

c. t > (Tp + 1.5T0,3)


t - Tp + 1,5T0,3
( )
Qt = Qmax x 0.3 2T0,3

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabe l : Pe rhitungan HSS Nakayas u

t Q
Ke te rangan
(jam) m³/dtk
0 0.0000
Qnaik
1 1.3101
1.6 4.0476 Qp
2 3.8143
3 3.0764
4 2.4813
5 2.0012 Qturun1
6 1.6141
7 1.3018
7.2 0.9810
8 0.7435
9 0.6443
10 0.5582
11 0.4837
12 0.4191
QTurun2
13 0.3631
14 0.3146
15 0.2726
16 0.2362
16.3 0.2263
17 0.2047
18 0.1774
19 0.1537
20 0.1331
21 0.1154
22 0.1000
23 0.0866
24 0.0750
25 0.0650
26 0.0563
27 0.0488
28 0.0423
29 0.0367
30 0.0318
31 0.0275
32 0.0238
33 0.0207
Qturun3
34 0.0179
35 0.0155
36 0.0134
37 0.0116
38 0.0101
39 0.0087
40 0.0076
41 0.0066
42 0.0057
43 0.0049
44 0.0043
45 0.0037
46 0.0032
47 0.0028
48 0.0024
49 0.0021
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 5 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
70.3558 18.2870 12.8279 10.2123 8.6239 7.5382
0 0.0000 0.0000 0.0000
1 1.3101 92.1733 0.0000 92.1733
1.6 4.0476 284.7693 23.9578 0.0000 308.7271
2 3.8143 268.3580 74.0175 16.8058 0.0000 359.1813
3 3.0764 216.4429 69.7519 51.9216 13.3791 0.0000 351.4954
4 2.4813 174.5710 56.2581 48.9293 41.3347 11.2981 0.0000 332.3912
5 2.0012 140.7994 45.3747 39.4637 38.9526 34.9056 9.8759 309.3718
6 1.6141 113.5611 36.5967 31.8293 31.4170 32.8939 30.5115 276.8096
7 1.3018 91.5922 29.5169 25.6718 25.3392 26.5305 28.7531 227.4037
7.2 0.9810 69.0191 23.8067 20.7054 20.4372 21.3980 23.1907 178.5572
8 0.7435 52.3128 17.9395 16.6999 16.4836 17.2585 18.7043 139.3985
9 0.6443 45.3274 13.5972 12.5841 13.2947 13.9197 15.0859 113.8091
10 0.5582 39.2747 11.7815 9.5381 10.0182 11.2269 12.1675 94.0069
11 0.4837 34.0303 10.2083 8.2645 7.5933 8.4600 9.8136 78.3700
12 0.4191 29.4861 8.8452 7.1609 6.5793 6.4122 7.3950 65.8788
13 0.3631 25.5488 7.6641 6.2047 5.7008 5.5560 5.6050 56.2794
14 0.3146 22.1372 6.6407 5.3762 4.9395 4.8141 4.8566 48.7643
15 0.2726 19.1812 5.7539 4.6583 4.2800 4.1713 4.2081 42.2527
16 0.2362 16.6199 4.9856 4.0362 3.7084 3.6143 3.6462 36.6106
16.3 0.2263 15.9204 4.3199 3.4973 3.2132 3.1316 3.1593 33.2417
17 0.2047 14.4006 4.1380 3.0303 2.7842 2.7135 2.7374 29.8040
18 0.1774 12.4777 3.7430 2.9027 2.4124 2.3511 2.3719 26.2588
19 0.1537 10.8115 3.2432 2.6256 2.3109 2.0372 2.0552 23.0835
20 0.1331 9.3678 2.8101 2.2750 2.0903 1.9514 1.7807 20.2754
21 0.1154 8.1169 2.4349 1.9712 1.8112 1.7652 1.7058 17.8051
22 0.1000 7.0330 2.1098 1.7080 1.5693 1.5294 1.5429 15.4925
23 0.0866 6.0939 1.8280 1.4799 1.3598 1.3252 1.3369 13.4238
24 0.0750 5.2802 1.5839 1.2823 1.1782 1.1483 1.1584 11.6313
25 0.0650 4.5751 1.3724 1.1111 1.0209 0.9949 1.0037 10.0781
26 0.0563 3.9642 1.1892 0.9627 0.8845 0.8621 0.8697 8.7324
27 0.0488 3.4348 1.0304 0.8342 0.7664 0.7470 0.7536 7.5663
28 0.0423 2.9762 0.8928 0.7228 0.6641 0.6472 0.6529 6.5560
29 0.0367 2.5788 0.7736 0.6263 0.5754 0.5608 0.5657 5.6805
30 0.0318 2.2344 0.6703 0.5426 0.4986 0.4859 0.4902 4.9220
31 0.0275 1.9360 0.5808 0.4702 0.4320 0.4210 0.4247 4.2648
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
32 0.0238 1.6775 0.5032 0.4074 0.3743 0.3648 0.3680 3.6953
33 0.0207 1.4535 0.4360 0.3530 0.3243 0.3161 0.3189 3.2018
34 0.0179 1.2594 0.3778 0.3059 0.2810 0.2739 0.2763 2.7743
35 0.0155 1.0913 0.3274 0.2650 0.2435 0.2373 0.2394 2.4038
36 0.0134 0.9455 0.2836 0.2296 0.2110 0.2056 0.2074 2.0828
37 0.0116 0.8193 0.2458 0.1990 0.1828 0.1782 0.1797 1.8047
38 0.0101 0.7099 0.2129 0.1724 0.1584 0.1544 0.1557 1.5637
39 0.0087 0.6151 0.1845 0.1494 0.1372 0.1338 0.1349 1.3549
40 0.0076 0.5330 0.1599 0.1294 0.1189 0.1159 0.1169 1.1740
41 0.0066 0.4618 0.1385 0.1121 0.1030 0.1004 0.1013 1.0172
42 0.0057 0.4001 0.1200 0.0972 0.0893 0.0870 0.0878 0.8814
43 0.0049 0.3467 0.1040 0.0842 0.0774 0.0754 0.0761 0.7637
44 0.0043 0.3004 0.0901 0.0730 0.0670 0.0653 0.0659 0.6617
45 0.0037 0.2603 0.0781 0.0632 0.0581 0.0566 0.0571 0.5734
46 0.0032 0.2255 0.0677 0.0548 0.0503 0.0490 0.0495 0.4968
47 0.0028 0.1954 0.0586 0.0475 0.0436 0.0425 0.0429 0.4305
48 0.0024 0.1693 0.0508 0.0411 0.0378 0.0368 0.0371 0.3730
49 0.0021 0.1467 0.0440 0.0356 0.0327 0.0319 0.0322 0.3232
50 0.0018 0.1271 0.0381 0.0309 0.0284 0.0276 0.0279 0.2800

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 10 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
82.9650 21.5644 15.1269 12.0425 10.1694 8.8893
0 0.0000 0.0000 0.0000
1 1.3101 108.6927 0.0000 108.6927
1.6 4.0476 335.8059 28.2515 0.0000 364.0574
2 3.8143 316.4533 87.2830 19.8178 0.0000 423.5541
3 3.0764 255.2340 82.2529 61.2270 15.7769 0.0000 414.4907
4 2.4813 205.8578 66.3407 57.6985 48.7427 13.3230 0.0000 391.9626
5 2.0012 166.0336 53.5068 46.5364 45.9337 41.1614 11.6458 364.8177
6 1.6141 133.9137 43.1556 37.5337 37.0476 38.7892 35.9798 326.4197
7 1.3018 108.0074 34.8070 30.2727 29.8806 31.2853 33.9063 268.1592
7.2 0.9810 81.3887 28.0734 24.4163 24.1000 25.2330 27.3470 210.5584
8 0.7435 61.6883 21.1546 19.6928 19.4378 20.3516 22.0566 164.3817
9 0.6443 53.4510 16.0341 14.8395 15.6774 16.4145 17.7896 134.2060
10 0.5582 46.3135 13.8930 11.2475 11.8137 13.2390 14.3481 110.8549
11 0.4837 40.1292 12.0379 9.7456 8.9542 9.9762 11.5724 92.4155
12 0.4191 34.7707 10.4304 8.4443 7.7585 7.5614 8.7204 77.6857
13 0.3631 30.1277 9.0376 7.3167 6.7225 6.5517 6.6096 66.3658
14 0.3146 26.1047 7.8308 6.3397 5.8248 5.6769 5.7270 57.5038
15 0.2726 22.6189 6.7852 5.4931 5.0470 4.9188 4.9622 49.8252
16 0.2362 19.5985 5.8791 4.7596 4.3731 4.2620 4.2996 43.1720
16.3 0.2263 18.7737 5.0941 4.1241 3.7891 3.6929 3.7255 39.1993
17 0.2047 16.9815 4.8797 3.5734 3.2832 3.1998 3.2280 35.1455
18 0.1774 14.7139 4.4138 3.4230 2.8448 2.7725 2.7970 30.9650
19 0.1537 12.7491 3.8245 3.0962 2.7250 2.4023 2.4235 27.2206
20 0.1331 11.0467 3.3138 2.6828 2.4649 2.3012 2.0999 23.9092
21 0.1154 9.5716 2.8713 2.3245 2.1357 2.0815 2.0115 20.9962
22 0.1000 8.2935 2.4879 2.0141 1.8506 1.8036 1.8195 18.2691
23 0.0866 7.1861 2.1557 1.7452 1.6034 1.5627 1.5765 15.8296
24 0.0750 6.2265 1.8678 1.5121 1.3893 1.3541 1.3660 13.7158
25 0.0650 5.3951 1.6184 1.3102 1.2038 1.1732 1.1836 11.8843
26 0.0563 4.6746 1.4023 1.1353 1.0431 1.0166 1.0255 10.2974
27 0.0488 4.0504 1.2150 0.9837 0.9038 0.8808 0.8886 8.9224
28 0.0423 3.5096 1.0528 0.8523 0.7831 0.7632 0.7699 7.7309
29 0.0367 3.0409 0.9122 0.7385 0.6785 0.6613 0.6671 6.6986
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
31 0.0275 2.2830 0.6849 0.5544 0.5094 0.4965 0.5009 5.0291
32 0.0238 1.9782 0.5934 0.4804 0.4414 0.4302 0.4340 4.3576
33 0.0207 1.7140 0.5142 0.4163 0.3825 0.3727 0.3760 3.7757
34 0.0179 1.4851 0.4455 0.3607 0.3314 0.3230 0.3258 3.2715
35 0.0155 1.2868 0.3860 0.3125 0.2871 0.2798 0.2823 2.8347
36 0.0134 1.1150 0.3345 0.2708 0.2488 0.2425 0.2446 2.4561
37 0.0116 0.9661 0.2898 0.2346 0.2156 0.2101 0.2120 2.1282
38 0.0101 0.8371 0.2511 0.2033 0.1868 0.1820 0.1836 1.8440
39 0.0087 0.7253 0.2176 0.1761 0.1618 0.1577 0.1591 1.5978
40 0.0076 0.6285 0.1885 0.1526 0.1402 0.1367 0.1379 1.3844
41 0.0066 0.5445 0.1634 0.1322 0.1215 0.1184 0.1195 1.1995
42 0.0057 0.4718 0.1415 0.1146 0.1053 0.1026 0.1035 1.0394
43 0.0049 0.4088 0.1226 0.0993 0.0912 0.0889 0.0897 0.9006
44 0.0043 0.3542 0.1063 0.0860 0.0790 0.0770 0.0777 0.7803
45 0.0037 0.3069 0.0921 0.0745 0.0685 0.0667 0.0673 0.6761
46 0.0032 0.2659 0.0798 0.0646 0.0593 0.0578 0.0583 0.5858
47 0.0028 0.2304 0.0691 0.0560 0.0514 0.0501 0.0506 0.5076
48 0.0024 0.1997 0.0599 0.0485 0.0446 0.0434 0.0438 0.4398
49 0.0021 0.1730 0.0519 0.0420 0.0386 0.0376 0.0380 0.3811
50 0.0018 0.1499 0.0450 0.0364 0.0334 0.0326 0.0329 0.3302

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 25 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
99.6522 25.9017 18.1694 14.4647 12.2149 10.6772
0 0.0000 0.0000 0.0000
1 1.3101 130.5545 0.0000 130.5545
1.6 4.0476 403.3480 33.9339 0.0000 437.2818
2 3.8143 380.1029 104.8386 23.8038 0.0000 508.7454
3 3.0764 306.5703 98.7968 73.5418 18.9502 0.0000 497.8590
4 2.4813 247.2628 79.6841 69.3036 58.5466 16.0027 0.0000 470.7998
5 2.0012 199.4287 64.2688 55.8965 55.1725 49.4403 13.9882 438.1951
6 1.6141 160.8483 51.8357 45.0831 44.4991 46.5911 43.2166 392.0738
7 1.3018 129.7314 41.8079 36.3615 35.8906 37.5778 40.7260 322.0952
7.2 0.9810 97.7588 33.7199 29.3272 28.9474 30.3082 32.8474 252.9089
8 0.7435 74.0960 25.4096 23.6537 23.3474 24.4449 26.4929 197.4445
9 0.6443 64.2018 19.2591 17.8242 18.8307 19.7160 21.3677 161.1995
10 0.5582 55.6288 16.6874 13.5098 14.1898 15.9018 17.2340 133.1517
11 0.4837 48.2006 14.4591 11.7058 10.7551 11.9828 13.9000 111.0034
12 0.4191 41.7642 12.5283 10.1427 9.3190 9.0823 10.4743 93.3109
13 0.3631 36.1874 10.8554 8.7883 8.0746 7.8695 7.9390 79.7142
14 0.3146 31.3552 9.4059 7.6148 6.9964 6.8187 6.8789 69.0698
15 0.2726 27.1683 8.1499 6.5980 6.0621 5.9082 5.9603 59.8468
16 0.2362 23.5405 7.0616 5.7169 5.2527 5.1192 5.1644 51.8553
16.3 0.2263 22.5497 6.1187 4.9536 4.5513 4.4357 4.4748 47.0836
17 0.2047 20.3970 5.8611 4.2921 3.9435 3.8434 3.8773 42.2144
18 0.1774 17.6734 5.3016 4.1115 3.4169 3.3301 3.3595 37.1931
19 0.1537 15.3134 4.5937 3.7190 3.2731 2.8855 2.9109 32.6956
20 0.1331 13.2686 3.9803 3.2224 2.9607 2.7640 2.5222 28.7182
21 0.1154 11.4968 3.4488 2.7921 2.5653 2.5002 2.4161 25.2192
22 0.1000 9.9616 2.9883 2.4192 2.2228 2.1663 2.1854 21.9436
23 0.0866 8.6314 2.5892 2.0962 1.9260 1.8770 1.8936 19.0135
24 0.0750 7.4789 2.2435 1.8163 1.6688 1.6264 1.6408 16.4746
25 0.0650 6.4802 1.9439 1.5738 1.4459 1.4092 1.4217 14.2747
26 0.0563 5.6149 1.6843 1.3636 1.2529 1.2210 1.2318 12.3686
27 0.0488 4.8651 1.4594 1.1815 1.0856 1.0580 1.0673 10.7170
28 0.0423 4.2155 1.2645 1.0238 0.9406 0.9167 0.9248 9.2859
29 0.0367 3.6526 1.0957 0.8870 0.8150 0.7943 0.8013 8.0459
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
31 0.0275 2.7422 0.8226 0.6660 0.6119 0.5963 0.6016 6.0406
32 0.0238 2.3760 0.7128 0.5770 0.5302 0.5167 0.5213 5.2340
33 0.0207 2.0588 0.6176 0.5000 0.4594 0.4477 0.4517 4.5351
34 0.0179 1.7839 0.5351 0.4332 0.3980 0.3879 0.3914 3.9295
35 0.0155 1.5457 0.4637 0.3754 0.3449 0.3361 0.3391 3.4048
36 0.0134 1.3393 0.4017 0.3252 0.2988 0.2912 0.2938 2.9502
37 0.0116 1.1604 0.3481 0.2818 0.2589 0.2524 0.2546 2.5562
38 0.0101 1.0055 0.3016 0.2442 0.2244 0.2187 0.2206 2.2149
39 0.0087 0.8712 0.2613 0.2116 0.1944 0.1895 0.1911 1.9191
40 0.0076 0.7549 0.2264 0.1833 0.1684 0.1642 0.1656 1.6629
41 0.0066 0.6541 0.1962 0.1588 0.1459 0.1422 0.1435 1.4408
42 0.0057 0.5667 0.1700 0.1376 0.1265 0.1232 0.1243 1.2484
43 0.0049 0.4911 0.1473 0.1193 0.1096 0.1068 0.1077 1.0817
44 0.0043 0.4255 0.1276 0.1033 0.0949 0.0925 0.0933 0.9373
45 0.0037 0.3687 0.1106 0.0895 0.0823 0.0802 0.0809 0.8121
46 0.0032 0.3194 0.0958 0.0776 0.0713 0.0695 0.0701 0.7037
47 0.0028 0.2768 0.0830 0.0672 0.0618 0.0602 0.0607 0.6097
48 0.0024 0.2398 0.0719 0.0582 0.0535 0.0522 0.0526 0.5283
49 0.0021 0.2078 0.0623 0.0505 0.0464 0.0452 0.0456 0.4577
50 0.0018 0.1801 0.0540 0.0437 0.0402 0.0392 0.0395 0.3966

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 50 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
112.6618 29.2832 20.5415 16.3530 13.8095 12.0711
0 0.0000 0.0000 0.0000
1 1.3101 147.5984 0.0000 147.5984
1.6 4.0476 456.0050 38.3639 0.0000 494.3690
2 3.8143 429.7254 118.5253 26.9114 0.0000 575.1621
3 3.0764 346.5930 111.6947 83.1427 21.4241 0.0000 562.8546
4 2.4813 279.5430 90.0868 78.3512 66.1898 18.0919 0.0000 532.2627
5 2.0012 225.4641 72.6591 63.1938 62.3753 55.8948 15.8144 495.4014
6 1.6141 181.8470 58.6029 50.9687 50.3085 52.6735 48.8585 443.2591
7 1.3018 146.6679 47.2659 41.1085 40.5761 42.4836 46.0428 364.1447
7.2 0.9810 110.5212 38.1221 33.1559 32.7264 34.2650 37.1356 285.9261
8 0.7435 83.7692 28.7268 26.7417 26.3954 27.6362 29.9515 223.2209
9 0.6443 72.5833 21.7734 20.1512 21.2891 22.2899 24.1573 182.2441
10 0.5582 62.8911 18.8659 15.2735 16.0423 17.9778 19.4839 150.5346
11 0.4837 54.4932 16.3467 13.2340 12.1592 13.5471 15.7147 125.4949
12 0.4191 47.2166 14.1639 11.4668 10.5356 10.2680 11.8418 105.4927
13 0.3631 40.9116 12.2726 9.9357 9.1287 8.8969 8.9754 90.1209
14 0.3146 35.4486 10.6338 8.6089 7.9098 7.7089 7.7769 78.0869
15 0.2726 30.7151 9.2138 7.4594 6.8536 6.6795 6.7384 67.6598
16 0.2362 26.6137 7.9835 6.4633 5.9384 5.7876 5.8386 58.6251
16.3 0.2263 25.4936 6.9175 5.6002 5.1454 5.0147 5.0590 53.2304
17 0.2047 23.0599 6.6263 4.8524 4.4583 4.3451 4.3835 47.7255
18 0.1774 19.9807 5.9937 4.6482 3.8630 3.7649 3.7981 42.0486
19 0.1537 17.3126 5.1934 4.2045 3.7004 3.2622 3.2910 36.9640
20 0.1331 15.0008 4.4999 3.6430 3.3472 3.1249 2.8515 32.4673
21 0.1154 12.9977 3.8990 3.1566 2.9002 2.8266 2.7315 28.5116
22 0.1000 11.2621 3.3784 2.7351 2.5129 2.4491 2.4707 24.8084
23 0.0866 9.7583 2.9273 2.3699 2.1774 2.1221 2.1408 21.4957
24 0.0750 8.4552 2.5364 2.0534 1.8866 1.8387 1.8550 18.6253
25 0.0650 7.3262 2.1977 1.7792 1.6347 1.5932 1.6073 16.1382
26 0.0563 6.3479 1.9042 1.5416 1.4164 1.3805 1.3926 13.9833
27 0.0488 5.5002 1.6500 1.3358 1.2273 1.1961 1.2067 12.1161
28 0.0423 4.7658 1.4296 1.1574 1.0634 1.0364 1.0455 10.4982
29 0.0367 4.1294 1.2387 1.0029 0.9214 0.8980 0.9059 9.0963
30 0.0318 3.5780 1.0733 0.8689 0.7984 0.7781 0.7850 7.8817
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
31 0.0275 3.1002 0.9300 0.7529 0.6918 0.6742 0.6801 6.8292
32 0.0238 2.6862 0.8058 0.6524 0.5994 0.5842 0.5893 5.9173
33 0.0207 2.3275 0.6982 0.5653 0.5194 0.5062 0.5106 5.1272
34 0.0179 2.0167 0.6050 0.4898 0.4500 0.4386 0.4424 4.4425
35 0.0155 1.7474 0.5242 0.4244 0.3899 0.3800 0.3834 3.8493
36 0.0134 1.5141 0.4542 0.3677 0.3378 0.3293 0.3322 3.3353
37 0.0116 1.3119 0.3935 0.3186 0.2927 0.2853 0.2878 2.8899
38 0.0101 1.1367 0.3410 0.2761 0.2536 0.2472 0.2494 2.5040
39 0.0087 0.9849 0.2955 0.2392 0.2198 0.2142 0.2161 2.1697
40 0.0076 0.8534 0.2560 0.2073 0.1904 0.1856 0.1872 1.8799
41 0.0066 0.7395 0.2218 0.1796 0.1650 0.1608 0.1622 1.6289
42 0.0057 0.6407 0.1922 0.1556 0.1430 0.1393 0.1406 1.4114
43 0.0049 0.5552 0.1665 0.1348 0.1239 0.1207 0.1218 1.2229
44 0.0043 0.4810 0.1443 0.1168 0.1073 0.1046 0.1055 1.0596
45 0.0037 0.4168 0.1250 0.1012 0.0930 0.0906 0.0914 0.9181
46 0.0032 0.3611 0.1083 0.0877 0.0806 0.0785 0.0792 0.7955
47 0.0028 0.3129 0.0939 0.0760 0.0698 0.0680 0.0687 0.6893
48 0.0024 0.2711 0.0813 0.0658 0.0605 0.0590 0.0595 0.5973
49 0.0021 0.2349 0.0705 0.0571 0.0524 0.0511 0.0515 0.5175
50 0.0018 0.2036 0.0611 0.0494 0.0454 0.0443 0.0447 0.4484

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 100 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
126.1089 32.7783 22.9932 18.3049 15.4578 13.5119
0 0.0000 0.0000 0.0000
1 1.3101 165.2155 0.0000 165.2155
1.6 4.0476 510.4330 42.9430 0.0000 553.3759
2 3.8143 481.0166 132.6723 30.1235 0.0000 643.8124
3 3.0764 387.9617 125.0263 93.0665 23.9813 0.0000 630.0358
4 2.4813 312.9087 100.8394 87.7030 74.0901 20.2513 0.0000 595.7926
5 2.0012 252.3751 81.3316 70.7365 69.8203 62.5663 17.7020 554.5316
6 1.6141 203.5520 65.5976 57.0522 56.3132 58.9606 54.6902 496.1657
7 1.3018 164.1739 52.9074 46.0152 45.4192 47.5544 51.5384 407.6084
7.2 0.9810 123.7128 42.6722 37.1133 36.6326 38.3548 41.5680 320.0538
8 0.7435 93.7677 32.1556 29.9336 29.5459 30.9348 33.5265 249.8641
9 0.6443 81.2467 24.3722 22.5564 23.8301 24.9504 27.0406 203.9964
10 0.5582 70.3977 21.1177 17.0965 17.9571 20.1236 21.8095 168.5022
11 0.4837 60.9974 18.2978 14.8136 13.6105 15.1641 17.5904 140.4738
12 0.4191 52.8523 15.8545 12.8355 11.7931 11.4936 13.2552 118.0841
13 0.3631 45.7948 13.7374 11.1216 10.2183 9.9588 10.0467 100.8776
14 0.3146 39.6797 11.9030 9.6365 8.8539 8.6290 8.7052 87.4072
15 0.2726 34.3812 10.3136 8.3497 7.6716 7.4767 7.5427 75.7356
16 0.2362 29.7902 8.9364 7.2347 6.6472 6.4784 6.5355 65.6224
16.3 0.2263 28.5364 7.7431 6.2687 5.7596 5.6133 5.6628 59.5839
17 0.2047 25.8123 7.4172 5.4316 4.9905 4.8637 4.9067 53.4220
18 0.1774 22.3655 6.7092 5.2030 4.3241 4.2143 4.2515 47.0675
19 0.1537 19.3790 5.8133 4.7063 4.1421 3.6515 3.6838 41.3760
20 0.1331 16.7913 5.0370 4.0779 3.7467 3.4978 3.1919 36.3426
21 0.1154 14.5491 4.3644 3.5333 3.2464 3.1639 3.0575 31.9147
22 0.1000 12.6063 3.7816 3.0615 2.8129 2.7414 2.7656 27.7695
23 0.0866 10.9230 3.2767 2.6527 2.4373 2.3754 2.3963 24.0614
24 0.0750 9.4644 2.8391 2.2985 2.1118 2.0582 2.0764 20.8484
25 0.0650 8.2006 2.4600 1.9916 1.8298 1.7834 1.7991 18.0645
26 0.0563 7.1056 2.1315 1.7256 1.5855 1.5452 1.5589 15.6523
27 0.0488 6.1567 1.8469 1.4952 1.3738 1.3389 1.3507 13.5622
28 0.0423 5.3346 1.6003 1.2955 1.1903 1.1601 1.1703 11.7512
29 0.0367 4.6223 1.3866 1.1226 1.0314 1.0052 1.0141 10.1821
30 0.0318 4.0051 1.2014 0.9727 0.8937 0.8710 0.8787 8.8224
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
31 0.0275 3.4703 1.0410 0.8428 0.7743 0.7547 0.7613 7.6443
32 0.0238 3.0069 0.9020 0.7302 0.6709 0.6539 0.6597 6.6236
33 0.0207 2.6054 0.7815 0.6327 0.5813 0.5666 0.5716 5.7391
34 0.0179 2.2575 0.6772 0.5482 0.5037 0.4909 0.4953 4.9728
35 0.0155 1.9560 0.5868 0.4750 0.4365 0.4254 0.4291 4.3087
36 0.0134 1.6948 0.5084 0.4116 0.3782 0.3686 0.3718 3.7334
37 0.0116 1.4685 0.4405 0.3566 0.3277 0.3194 0.3222 3.2349
38 0.0101 1.2724 0.3817 0.3090 0.2839 0.2767 0.2791 2.8029
39 0.0087 1.1025 0.3307 0.2678 0.2460 0.2398 0.2419 2.4286
40 0.0076 0.9553 0.2866 0.2320 0.2132 0.2077 0.2096 2.1043
41 0.0066 0.8277 0.2483 0.2010 0.1847 0.1800 0.1816 1.8233
42 0.0057 0.7172 0.2151 0.1742 0.1600 0.1560 0.1573 1.5799
43 0.0049 0.6214 0.1864 0.1509 0.1387 0.1351 0.1363 1.3689
44 0.0043 0.5384 0.1615 0.1308 0.1201 0.1171 0.1181 1.1861
45 0.0037 0.4665 0.1400 0.1133 0.1041 0.1015 0.1024 1.0277
46 0.0032 0.4042 0.1213 0.0982 0.0902 0.0879 0.0887 0.8905
47 0.0028 0.3503 0.1051 0.0851 0.0782 0.0762 0.0768 0.7716
48 0.0024 0.3035 0.0910 0.0737 0.0677 0.0660 0.0666 0.6685
49 0.0021 0.2630 0.0789 0.0639 0.0587 0.0572 0.0577 0.5793
50 0.0018 0.2279 0.0684 0.0553 0.0508 0.0496 0.0500 0.5019

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hidrograf Banjir Rancangan Metode Nakayasu Dengan Kala Ulang 200 Tahun

t Qt Distribusi Hujan Efektif Jam-jaman Q total


R1 R2 R3 R4 R5 R6
(Jam) (m³/dtk) (m³/dtk)
140.1544 36.4291 25.5541 20.3436 17.1794 15.0168
0 0.0000 0.0000 0.0000
1 1.3101 183.6166 0.0000 183.6166
1.6 4.0476 567.2832 47.7258 0.0000 615.0091
2 3.8143 534.5906 147.4489 33.4785 0.0000 715.5180
3 3.0764 431.1716 138.9514 103.4319 26.6522 0.0000 700.2071
4 2.4813 347.7594 112.0706 97.4711 82.3420 22.5068 0.0000 662.1499
5 2.0012 280.4838 90.3900 78.6149 77.5966 69.5347 19.6735 616.2935
6 1.6141 226.2229 72.9036 63.4065 62.5852 65.5274 60.7814 551.4269
7 1.3018 182.4590 58.8001 51.1402 50.4778 52.8508 57.2785 453.0064
7.2 0.9810 137.4915 47.4249 41.2469 40.7126 42.6266 46.1977 355.7002
8 0.7435 104.2113 35.7369 33.2675 32.8366 34.3803 37.2606 277.6931
9 0.6443 90.2957 27.0867 25.0686 26.4842 27.7292 30.0523 226.7168
10 0.5582 78.2384 23.4698 19.0007 19.9571 22.3649 24.2386 187.2694
11 0.4837 67.7910 20.3358 16.4635 15.1264 16.8530 19.5495 156.1192
12 0.4191 58.7388 17.6203 14.2651 13.1066 12.7737 14.7315 131.2359
13 0.3631 50.8953 15.2674 12.3602 11.3564 11.0680 11.1657 112.1130
14 0.3146 44.0991 13.2287 10.7098 9.8400 9.5901 9.6747 97.1423
15 0.2726 38.2105 11.4623 9.2797 8.5260 8.3095 8.3828 84.1707
16 0.2362 33.1081 9.9317 8.0405 7.3875 7.1999 7.2634 72.9312
16.3 0.2263 31.7147 8.6055 6.9669 6.4011 6.2385 6.2935 66.2201
17 0.2047 28.6872 8.2433 6.0366 5.5463 5.4054 5.4532 59.3719
18 0.1774 24.8565 7.4564 5.7825 4.8057 4.6836 4.7250 52.3097
19 0.1537 21.5374 6.4607 5.2305 4.6034 4.0582 4.0940 45.9843
20 0.1331 18.6614 5.5980 4.5320 4.1640 3.8874 3.5474 40.3903
21 0.1154 16.1695 4.8505 3.9269 3.6080 3.5163 3.3981 35.4693
22 0.1000 14.0104 4.2028 3.4025 3.1262 3.0468 3.0737 30.8623
23 0.0866 12.1396 3.6416 2.9482 2.7087 2.6399 2.6632 26.7412
24 0.0750 10.5185 3.1553 2.5545 2.3470 2.2874 2.3076 23.1704
25 0.0650 9.1140 2.7340 2.2134 2.0336 1.9820 1.9995 20.0764
26 0.0563 7.8970 2.3689 1.9178 1.7621 1.7173 1.7325 17.3956
27 0.0488 6.8425 2.0526 1.6617 1.5268 1.4880 1.5011 15.0727
28 0.0423 5.9288 1.7785 1.4398 1.3229 1.2893 1.3007 13.0600
29 0.0367 5.1371 1.5410 1.2476 1.1463 1.1171 1.1270 11.3161
30 0.0318 4.4511 1.3352 1.0810 0.9932 0.9680 0.9765 9.8050
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
31 0.0275 3.8568 1.1569 0.9366 0.8606 0.8387 0.8461 8.4957
32 0.0238 3.3418 1.0025 0.8116 0.7457 0.7267 0.7331 7.3613
33 0.0207 2.8955 0.8686 0.7032 0.6461 0.6297 0.6352 6.3783
34 0.0179 2.5089 0.7526 0.6093 0.5598 0.5456 0.5504 5.5266
35 0.0155 2.1739 0.6521 0.5279 0.4851 0.4727 0.4769 4.7886
36 0.0134 1.8836 0.5650 0.4574 0.4203 0.4096 0.4132 4.1492
37 0.0116 1.6321 0.4896 0.3964 0.3642 0.3549 0.3581 3.5951
38 0.0101 1.4141 0.4242 0.3434 0.3155 0.3075 0.3102 3.1151
39 0.0087 1.2253 0.3676 0.2976 0.2734 0.2665 0.2688 2.6991
40 0.0076 1.0617 0.3185 0.2578 0.2369 0.2309 0.2329 2.3387
41 0.0066 0.9199 0.2760 0.2234 0.2053 0.2001 0.2018 2.0264
42 0.0057 0.7971 0.2391 0.1936 0.1779 0.1733 0.1749 1.7558
43 0.0049 0.6906 0.2072 0.1677 0.1541 0.1502 0.1515 1.5214
44 0.0043 0.5984 0.1795 0.1453 0.1335 0.1301 0.1313 1.3182
45 0.0037 0.5185 0.1555 0.1259 0.1157 0.1128 0.1138 1.1422
46 0.0032 0.4493 0.1348 0.1091 0.1002 0.0977 0.0986 0.9897
47 0.0028 0.3893 0.1168 0.0945 0.0869 0.0847 0.0854 0.8575
48 0.0024 0.3373 0.1012 0.0819 0.0753 0.0734 0.0740 0.7430
49 0.0021 0.2923 0.0877 0.0710 0.0652 0.0636 0.0641 0.6438
50 0.0018 0.2532 0.0760 0.0615 0.0565 0.0551 0.0556 0.5578

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Tabel : Hasil Perhitungan Hidrograf Satuan Sintetik Nakayasu

t Q total
(jam) 5 tahun 10 tahun 25 tahun 50 tahun 100 tahun 200 tahun
0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
1 92.1733 108.6927 130.5545 147.5984 165.2155 183.6166
1.6 308.7271 364.0574 437.2818 494.3690 553.3759 615.0091
2 359.1813 423.5541 508.7454 575.1621 643.8124 715.5180
3 351.4954 414.4907 497.8590 562.8546 630.0358 700.2071
4 332.3912 391.9626 470.7998 532.2627 595.7926 662.1499
5 309.3718 364.8177 438.1951 495.4014 554.5316 616.2935
6 276.8096 326.4197 392.0738 443.2591 496.1657 551.4269
7 227.4037 268.1592 322.0952 364.1447 407.6084 453.0064
7.2 178.5572 210.5584 252.9089 285.9261 320.0538 355.7002
8 139.3985 164.3817 197.4445 223.2209 249.8641 277.6931
9 113.8091 134.2060 161.1995 182.2441 203.9964 226.7168
10 94.0069 110.8549 133.1517 150.5346 168.5022 187.2694
11 78.3700 92.4155 111.0034 125.4949 140.4738 156.1192
12 65.8788 77.6857 93.3109 105.4927 118.0841 131.2359
13 56.2794 66.3658 79.7142 90.1209 100.8776 112.1130
14 48.7643 57.5038 69.0698 78.0869 87.4072 97.1423
15 42.2527 49.8252 59.8468 67.6598 75.7356 84.1707
16 36.6106 43.1720 51.8553 58.6251 65.6224 72.9312
16.3 33.2417 39.1993 47.0836 53.2304 59.5839 66.2201
17 29.8040 35.1455 42.2144 47.7255 53.4220 59.3719
18 26.2588 30.9650 37.1931 42.0486 47.0675 52.3097
19 23.0835 27.2206 32.6956 36.9640 41.3760 45.9843
20 20.2754 23.9092 28.7182 32.4673 36.3426 40.3903
21 17.8051 20.9962 25.2192 28.5116 31.9147 35.4693
22 15.4925 18.2691 21.9436 24.8084 27.7695 30.8623
23 13.4238 15.8296 19.0135 21.4957 24.0614 26.7412
24 11.6313 13.7158 16.4746 18.6253 20.8484 23.1704
25 10.0781 11.8843 14.2747 16.1382 18.0645 20.0764
26 8.7324 10.2974 12.3686 13.9833 15.6523 17.3956
27 7.5663 8.9224 10.7170 12.1161 13.5622 15.0727
28 6.5560 7.7309 9.2859 10.4982 11.7512 13.0600
29 5.6805 6.6986 8.0459 9.0963 10.1821 11.3161
30 4.9220 5.8041 6.9715 7.8817 8.8224 9.8050
31 4.2648 5.0291 6.0406 6.8292 7.6443 8.4957
32 3.6953 4.3576 5.2340 5.9173 6.6236 7.3613
33 3.2018 3.7757 4.5351 5.1272 5.7391 6.3783
34 2.7743 3.2715 3.9295 4.4425 4.9728 5.5266
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
36 2.0828 2.4561 2.9502 3.3353 3.7334 4.1492
37 1.8047 2.1282 2.5562 2.8899 3.2349 3.5951
38 1.5637 1.8440 2.2149 2.5040 2.8029 3.1151
39 1.3549 1.5978 1.9191 2.1697 2.4286 2.6991
40 1.1740 1.3844 1.6629 1.8799 2.1043 2.3387
41 1.0172 1.1995 1.4408 1.6289 1.8233 2.0264
42 0.8814 1.0394 1.2484 1.4114 1.5799 1.7558
43 0.7637 0.9006 1.0817 1.2229 1.3689 1.5214
44 0.6617 0.7803 0.9373 1.0596 1.1861 1.3182
45 0.5734 0.6761 0.8121 0.9181 1.0277 1.1422
46 0.4968 0.5858 0.7037 0.7955 0.8905 0.9897
47 0.4305 0.5076 0.6097 0.6893 0.7716 0.8575
48 0.3730 0.4398 0.5283 0.5973 0.6685 0.7430
49 0.3232 0.3811 0.4577 0.5175 0.5793 0.6438
50 0.2800 0.3302 0.3966 0.4484 0.5019 0.5578

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
B. PERHITUNGAN DEBIT BANJIR UNTUK DIMENSI SALURAN

Diketahui :
- Luas DAS (A) = 121 km2
- Panjang Sungai dari sumbernya sampai
Ke lokasi bangunan perkuatan lereng (L) = 13 km
- Elevasi pada Sumbernya = 101 m
- Elevasi pada perkuatan lereng = 1 m
- Koefisien pengaliran (f) = 1.50
- Nilai n dari rumus Manning = 0.022
- Kemiringan sungai (I) = 0.00769
- Debit Rencana ( R ) = 741.25

Penyelesaian :
~ Menghitung Interval Kedalaman Debit Puncak ( T )
L Dimana : L = Panjang sungai dari sumber sampai ke lokasi perambatan banjir
T =
V V = Kecepatan perambatan banjir (m/det)
∆H = Perbedaan elevasi sumber dengan lokasi perkuatan lereng

∆H 0.6
Dimana :
V = 72 ( )
L ∆H = 101.00 - 1.00
100 0.6
= 100.00 m
= 72 ( )
13000 L = 13 km
= 3.881 m/det = 13000 m
jadi :
L 13
T = = = 3.349 dtk = 0.001 Jam
V 3.881
~ Menghitung Debit Banjir Rencana
f = 1.50
2/3
Rmax 24 741.25 24 2/3
R = ( ) = ( ) = 114.79 mm/det
24 t 24 3.349
A = 121 km2
f . R . A
Qrencana =
3.6
1.50 x 114.79 x 121
=
3.6
= 5787.405 3
m /det

sedimen yang terdapat pada aliran debit sebesar 10 %, sehingga diperoleh hasil sebagai berikut :
Qp = 1.1 x Q0
= 1.1 x 5787.405
= 6366.145 3
m /det
~ Menentukan Lebar Rencana Sungai ( B )
b= B - 2(m.h)
= 100 - 2(1.20)
= 100 - 40
= 60
Kontrol
B= b + 2(m.h)
= 60 + 2(1.20)
= 60 + 40
MAHDIYYIN
= 100
105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
D. PERHITUNGAN TINGGI MUKA AIR DAN TINGGI JAGAAN

Perhitungan Tinggi Muka Air Maksimum


Diketahui data-data sebagai berikut :
Debit banjir rencana (Qp) = 6366.145 m3/dtk
Lebar Dasar sungai (b) rencana = 60 m
Nilai n dari rumus Manning = 0.022 (Buku Drainase Perkotaan)
Kemiringan sungai (I) = 0.00769
Kemiringan talud (m) = 1 (KP 03 hal.97)
Penyelesaian :
A = ( b + m h ) h
= ( 60 + 1 h ) h
= 60 h + h2
P = b + 2.h 1 + m2
= 60 + 2 x h 1 + 1.00 .
2

= 60 + 2.828 h
A 60 h + h
2
R = =
P 60 + 2.828 h
1
V = R2/3 I1/2
n
1 60 h + 2
h
2/3 0.5
= x ( ) 0.008
0.022 60 + 2.828 .h
60 h + 2
h
2/3
= 3.987 x ( )
60 + 2.828 .h
Q = A x V
2
60 h + h
2 2/3
6366.145 = ( 60 h+h ) x 3.987 ( )
60 + 2.828 h
Untuk memperoleh nilai h digunakan sistem coba-coba
h kiri kanan
2.346 6366.145 5188.898
2.765 6366.145 7219.768
2.597 6366.145 6366.145
Dicoba,
~ Nilai h = 2.346
2
60 h + h
2 2/3
6366.145 = ( 60 h+h ) ( 3.987 ( ))
60 + 2.83 .h
6366.145 = 5188.898
~ Nilai h = 2.765
2
60 h + h2 2/3
6366.145 = ( 60 h+h ) ( 3.987 ( ))
60 + 2.83 .h
6366.145 = 7219.768
~ Nilai h = 2.597
60 h + h2 2/3
6366.145 = ( 60 h + h2 ) ( 3.987 ( ))
60 + 2.83 .h
MAHDIYYIN = 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Dengan sistem coba-coba didapat harga max untuk :
Q = 6366.145 , yaitu : h = 2.597
Dengan tinggi jagaan :
W = 0.25 x h + 0.30 A 162.58
R = = = 2.414 m
= 0.25 x 2.597 + 0.30 P 67.35
= 0.949 m
A = 60 x h + h2 60 h + h2 2/3
V = 3.99 x ( )
= 60 x 2.597 + 2.597 2
60 + 2.83 .h
= 162.582 m 60 2.597 + 2.597 2 2/3
= 3.99 x ( )
P = 60 + 2.83 x h 60 + 2.83 2.597
= 60 + 2.83 x 2.597 = 39.156 m2/dtk
= 67.346 m
Sehingga :
Q = A x V Jadi, Q = 6366.145 m3/dtk
= 162.582 x 39.156 6366.145 = 6366.145
= 6366.145 3
m /dtk
Perhitungan Tinggi Muka Air Minimum
Diketahui data-data sebagai berikut :
Lebar sungai (B) rencana = 60 m
Nilai n dari rumus Manning = 0.022 (Buku Drainase Perkotaan)
Kemiringan sungai (I) = 0.00769
Kemiringan talud (m) = 1.0 (KP 03 hal.97)
α = 1.50
Penyelesaian :

B2 60 .2 m3/dtk
Qp = Qmin = = = 2400
α 1.50
A = ( b + m h ) h
= ( 60 + 1 h) h
= 60 h + h2
P = b + 2.h 1 + m2
= 60 + 2 x h 1 + 1.00 .2
= 60 + 2.828 h
A 60 h + h2
R = =
P 60 + 2.828 h
1
V = R2/3 I1/2
n
1 60 h + h2 2/3 0.5
= x ( ) 0.008
0.02 60 + 2.828 .h
60 h + h2 2/3
= 3.987 x ( )
60 + 2.828 .h
Q = A x V
60 h + h2 2/3
2400 = ( 60 h + h2 ) x 3.987 ( )
MAHDIYYIN + h 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Untuk memperoleh nilai h digunakan sistem coba-coba
h kiri kanan
1.524 2400 2183
1.417 2400 1887
1.598 2400 2400
Dicoba,
~ Nilai h = 1.524000
2
60 h + h2 2/3
2400.000 = ( 60.000 h+h ) ( 3.987 ( ))
60 + 2.828 .h
2400.000 = 2183.450
~ Nilai h = 1.417000
60 h + h2 2/3
2400.000 = ( 60.00 h + h2 ) ( 3.99 ( ))
60 + 2.828 .h
2400.000 = 1886.978
~ Nilai h = 1.597598
60 h + h2 2/3
2400.000 = ( 60.00 h + h2 ) ( 3.99 ( ))
60 + 2.828 .h
2400.000 = 2400.000
Dengan sistem coba-coba didapat harga max untuk :
Q = 2400.000 , yaitu : h = 1.598
Dengan tinggi jagaan :
W = 0.25 x h + 0.30 A 98.41
R = = = 1.53 m
= 0.25 x 1.598 + 0.30 P 64.52
= 0.699 m
A = 60 x h + h2 60 h + h2
2/3
V = 3.99 x ( )
= 60 x 1.598 + 1.598 2
60 + 2.83 .h
= 98.408 m 60 1.598 + 1.598 2 2/3
= 3.99 x ( )
P = 60 + 2.83 x h 60 + 2.828 1.598
= 60 + 2.83 x 1.598 = 24.39 2
m /dtk

= 64.519 m
Sehingga :
Q = A x V Jadi, Q = 2400 m3/dtk
= 98.408 x 24.388 2400 = 2400
= 2400 m3/dtk

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
E. PERHITUNGAN KECEPATAN ANTARA QMAX & QMIN

Diketahui :
3
Qmax = 6366.145 m /dtk
B = 60 m
h = 2.597 m
m = 1.00 (KP 03 hal 97)
Penyelesaian :
A = (b + m.h) . h
= ( 60 + 1.00 2.597 )x 2.597
2
= 162.582 m
Q = A x V
Q 6366.145
V = = = 39.156 m/dtk
A 162.582

Diketahui :
Q mi n = 2400 3
m /dtk
B = 60 m
h = 1.598 m
m = 1.00 (KP 03 hal 97)
Penyelesaian :
A = (b + m.h) . h
= ( 60 + 1.00 1.598 )x 1.598
= 98.408 m
2

Q = A x V
Q 2400.000
V = = = 24.388 m/dtk
A 98.408

Persamaan Bernoulli tanpa sistem coba/banding :


2 2
V1 V2
Z 1 + h1 + = Z 2 + h2 + + h'
2.g 2.g

Dimana : Z1 = elevasi lokasi bangunan - elevasi bangunan


Z2 = elevasi air dari sumber
h1 = h2 = tinggi muka air
V1 = V2 = kecepatan aliran
L = panjang sungai

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
G. Perhitungan Kehilangan Tinggi Energi Pada Setiap Potongan
● Kehilangan Tinggi Energi Pada Keadaan Maksimum
☞ Potongan I - I
Diketahui : Z1 = 1 m
V1 = V2 = 39.156 m/dtk
h1 = 0.163 m
h2 = 0.078 m
L2 = 164.70 m
i = 0.00769
DZ1 = L2 x i Z2 = Z1 - DZI
= 164.70 x 0.008 = 1.00 - 1.267
= 1.267 m = -0.267 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
2g 2g
1 + 0.163 + 39.156 ² = -0.267 + 0.078 + 39.156 ² + hf
2 9.81 2 9.81
79.309 = 77.957 + hf
hf = 1.352 m

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
☞ Potongan II - II
Diketahui : Z1 = 1 m
V1 = V2 = 39.156 m/dtk
h1 = 0.1590 m
h2 = 0.076 m
L2 = 169.56 m
i = 0.00769
DZ2 = DZ1 + L2 x i Z2 = Z1 - DZ2
= 1.267 + 170 x 0.008 = 1 - 2.571
= 2.571 m = -1.571 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
g g
1 + 0.159 + 39.156 ² = -1.571 + 0.076 + 39.156 ² + hf
2 9.81 2 9.81
79.305 = 76.651 + hf
hf = 2.654 m
☞ Potongan III - III
Diketahui : Z1 = 1 m
V1 = V2 = 39.156 m/dtk
h1 = 0.155 m
h2 = 0.075 m
L2 = 19.18 m
i = 0.00769
DZ3 = DZ2 + L2 x i Z2 = Z1 - DZ3
= 2.571 + 19.18 x 0.008 = 1 - 2.719
= 2.719 m = -1.719 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
g g
1 + 0.155 + 39.156 ² = -1.72 + 0.075 + 39.156 ² + hf
2 9.81 2 9.81
79.301 = 76.502 + hf
hf = 2.799 m
☞ Potongan IV - IV
Diketahui : Z1 = 1 m
V1 = V2 = 39.156 m/dtk
h1 = 0.152 m
h2 = 0.073 m
L2 = 99.50 m
i = 0.00769
DZ4 = DZ3 + L2 x i Z2 = Z1 - DZ4
= 2.719 + 100 x 0.00769 = 1 - 3.484
MAHDIYYIN = m = m 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Z1 + h1 + V1² = Z2 + h2 + V2² + hf
2g 2g
1 + 0.152 + 39.156 ² = -2.484 + 0.073 + 39.156 ² + hf
2 9.81 2 9.81
79.298 = 75.735 + hf
hf = 3.563 m
● Kehilangan Tinggi Energi Pada Keadaan Minimum
☞ Potongan I - I
Diketahui : Z1 = 1 m
V1 = V2 = 24.388 m/dtk
h1 = 0.163 m
h2 = 0.0780 m
L2 = 164.70 m
i = 0.00769
DZI = L2 x i Z2 = Z1 - DZI
= 164.70 x 0.008 = 1 - 1.267
= 1.267 m = -0.267 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
2g 2g
1 + 0.163 + 24.388 ² = -0.267 + 0.078 + 24.388 ² + hf
2 9.81 2 9.81
31.478 = 30.126 + hf
hf = 1.352 m
☞ Potongan II - II
Diketahui : Z1 = 1 m
V1 = V2 = 24.388 m/dtk
h1 = 0.1590 m
h2 = 0.0760 m
L2 = 169.560 m
i = 0.00769
DZ2 = DZI + L2 x i Z2 = Z1 - DZ2
= 1.267 + 169.56 x 0.00769 2 = 1 - 2.571
= 2.571 m = -1.571 m

Z1 + h1 +
V1² = Z2 + h2 + V2² + hf
2g 2g
1 + 0.159 + 24.388 ² = -1.571 + 0.076 + 24.388 ² + hf
2 9.81 2 9.81
31.474 = 28.820 + hf
MAHDIYYIN hf = m 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
☞ Potongan III - III
Diketahui : Z1 = 1 m
V1 = V2 = 24.388 m/dtk
h1 = 0.155 m
h2 = 0.0750 m
L2 = 19.18 m
i = 0.00769
DZ3 = DZ2 + L2 x i Z2 = Z1 - DZ3
= 2.571 + 19.18 x 0.00769 = 1.000 - 2.719
= 2.719 m = -1.719 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
g g
1 + 0.155 + 24.388 ² = -1.719 + 0.075 + 24.388 ² + hf
2 9.81 2 9.81
31.470 = 28.671 + hf
hf = 2.799 m
☞ Potongan IV - IV
Diketahui : Z1 = 1 m
V1 = V2 = 24.388 m/dtk
h1 = 0.152 m
h2 = 0.0730 m
L2 = 99.50 m
i = 0.00769
DZ4 = DZ3 + L2 x i Z2 = Z1 - DZ4
= 2.719 + 99.50 x 0.0077 = 1 - 3.484
= 3.484 m = -2.484 m

Z1 + h1 + V1² = Z2 + h2 + V2² + hf
2g 2g
1 + 0.152 + 24.388 ² = -2.484 + 0.073 + 24.388 ² + hf
2 9.81 2 9.81
31.467 = 27.904 + hf
hf = 3.563 m

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
H. PERHITUNGAN GALIAN DAN TIMBUNAN

POT SKETSA GALIAN TIMBUNAN

26 36.2
I-I 1 1
VG1 = x a x b x L1 VT1 = x a x b x L2
2 2
1 1
= x 26 x 60 x 80.94 = x 36.2 x 60 x 164.7
2 2
60
= 63133 m³ = 178864 m³

19.6 23.5
II - II 1 1
VG2 = x a x b x L1 VT2 = x a x b x L2
2 2
1 1
= x 19.6 x 60 x 84.78 = x 23.5 x 60 x 169.56
2 2
60
= 49851 m³ = 119540 m³

22.5 18.1
III - III 1 1
VG3 = x a x b x L1 VT3 = x a x b x L2
2 2
1 1
= x 22.5 x 60 x 60.57 = x 18.1 x 60 x 119.18
2 2
60
= 40885 m³ = 64715 m³

7.7 15.3
IV - IV 1 1
VG4 = x a x b x L1 VT4 = x a x b x L2
2 2
1 1
= x 7.7 x 60 x 51.36 = x 15.3 x 60 x 99.50
2 2
60
= 11864 m³ = 45671 m³

3
Σ VOLUME V Galian : 165733 m V Timbunan : 408789 m3
Sumber Hasil Perhitungan

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
G. ANALISA TEKNIK PEKERJAAN GALIAN DAN TIMBUNAN TANAH MENGGUNAKAN ALAT BERAT

1 . EXCAVATOR PC 200
Kapasitas Bucket : 0.900 3
m
Kedalaman Galian Rata - Rata (D) : 1.000 m
Sudut Swing : 120 ⁰
Kondisi Kerja : Baik
kondisi Tata Laksana : Sedang
Swell (faktor kembang) (SW) : 0.630
Ukuran Bucket (q) : 1.000 3
m
q 1.000
Kapasitas Bucket (padat) (Q) : = = 1.587 m3
SW 0.630
Siklus Waktu
Pengisian Bucket : 8.000 detik
mengangkat beban dan Swing : 10.000 detik
Dumping (pembuangan) : 5.000 detik
Swing kembali : 5.000 detik
Waktu tetap percepatan : 10.000 detik
Total 38.000 detik
Waktu Siklus (WS) : 0.633 menit
60.000 60.000
Banyaknya Trip (T) : = = 94.737 Trip/jam
WS 0.633
Produksi Teoritis (PT) : Q x T = 1.587 x 94.737 = 150.376 m3
Efisiensi Kerja = 50 menit/jam (EK) : 20.000
Kondisi kerja baik, tata laksana sedang (KK) : 5.000
Faktor Swing : 2.070
D 1.000
Kedalaman optimum : 100 % = 100 % = 48.309 %
2.070 2.070
Sudut Swing 120 derajat (SD) : 0.770
Faktor pengisian material (PS) : 0.850
faktor koreksi (FK) : EK x KK x SD x PS = 65.450
Produksi Excavator : PT x FK = 150.376 x 65.450 = 9842.11 m3/jam
Produksi Excavator per hari : 8.000 x 9842.105 = 78736.842 m3/Hari 165733
volume galian 165733 408789
Durasi pekerjaan galian : = = 2 hari
Produksi Excavator per hari 78736.842
Durasi pekerjaan timbunan : Volume Timbunan 408789
= = 5 hari
MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
2 . BULDOZER
Kecepatan rata-rata maju (F) : 2.770 km/jam
Kecepatan rata-rata mundur (R) : 7.140 km/jam
Waktu tukar perseneling (Z) : 0.1 km/jam
Dozing rata - rata : 60.000 m
Perkiraan produksi (VT) : 200.000 m3
SDM operator (OP) : 1.000
Material (MT) : Gembur/material lepas : 1.000
Gusuran ; metode celah (GS) : 1.200
Efisiensi kerja (EK) ; 50 menit/jam : 5.000
Kemiringan medan rata - rata (kM) : 8.000
Berat Material (BM) : 0.950
Produksi Aktual : VT x OP x MT x GS x EK x KM x BM = 9120 m3
Produksi buldozer per hari : = 8.000 x produksi aktual
= 8.000 x 9120
3
= 72960 m /Hari

volume galian 165733


Durasi pekerjaan galian : = = 2 hari
72960 72960
Durasi pekerjaan timbunan : Volume Timbunan 408789
= = 6 hari
72960 72960

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
3 . DUMP TRUCK
3
Kapasitas rata - rata (q) : 5.000 m /Hari
Waktu siklus tiap operasional
Waktu pemuatan : 3.000 menit
Waktu pengangkutan : 5.000 menit
Waktu kembali : 3.000 menit
Waktu tetap : 2.000 menit
Waktu pembuangan/manuver : 1.000 menit
Total 14.000 menit
Waktu siklus : 0.233 jam
1.000 1.000
Banyaknya Trip (T) : = = 4.292 Trip/jam
WS 0.233
3
Produksi toritis (Q) : q x T = 5.000 x 4.292 = 21.459 m /jam
Efisiensi Kerja 50 menit/jam (WK) : 20.000
Kondisi kerja ; Baik (KP) : 20.000
Total Produksi : = Q x WK x KP
= 21.459 x 20.000 x 20.000
= 8583.69 m3
Produksi Dump Truck per hari : 8.000 x 8583.691 = 68669.53 m3/Hari

volume galian 165733


Durasi pekerjaan galian : = = 2 hari
68669.53 68669.53
Durasi pekerjaan timbunan : Volume Timbunan 408789
= = 6 hari
68669.53 68669.53

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Jumlah Alat yang digunakan
~ PEKERJAAN GALIAN
1 . EXCAVATOR PC 200
Volume : 165733 3
m
Kapasitas produksi : 9842.11 3
m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 2 hari
165733
Jumlah Alat yang digunakan =
9842.11. x 8 x 2
= 1.00 = 1.00 unit
2 . BULDOZER
Volume : 165733 3
m
Kapasitas produksi : 9120 3
m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 2 hari
165733
Jumlah Alat yang digunakan =
9120 x 8 x 2
= 1.00 = 1.00 unit
3 . DUMP TRCK
Volume : 165733 3
m
Kapasitas produksi : 8583.69 3
m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 2 hari
165733
Jumlah Alat yang digunakan =
8583.69 x 8 x 2
= 1.00 = 1.00 unit

~ PEKERJAAN TIMBUNAN
1 . EXCAVATOR PC 200
Volume : 408789 3
m
Kapasitas produksi : 9842.11 3
m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 5 hari
408789
Jumlah Alat yang digunakan =
9842.11. x 8 x 5
= 1.00 = 1.00 unit
2 . BULDOZER
Volume : 408789 3
m
Kapasitas produksi : 9120 3
m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 6 hari
408789
Jumlah Alat yang digunakan =
9120 x 8 x 6
= 1.00 = 1.00 unit
3 . DUMP TRCK
Volume : 408789 3
m
8583.69 3
Kapasitas produksi : m /jam
Jam kerja efektif : 8 jam/hari
waktu pelaksanaan : 6 hari
408789
Jumlah Alat yang digunakan =
8583.69 x 8 x 6
MAHDIYYIN = =
105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
RENCANA ANGGARAN BIAYA
JENIS PEKERJAAN : MOBILISASI

DURASI HARGA JUMLAH


No. JENIS ALAT SATUAN V0L. PEKERJAAN SATUAN HARGA
(Jam) (Rp.) (Rp.)

A. PEEKERJAAN GALIAN

1 EXCAVATOR PC 200 Unit 1 16 7.500.000 120.000.000


2 BULLDOZER 100-150 HP Unit 1 16 7.500.000 120.000.000
3 DUMP TRUCK Unit 1 16 400.000 6.400.000

B. PEKERJAAN TIMBUNAN
1 EXCAVATOR PC 200 Unit 1 40 7.500.000 300.000.000
2 BULLDOZER 100-150 HP Unit 1 48 7.500.000 360.000.000
3 DUMP TRUCK Unit 1 48 400.000 19.200.000

Total anggaran 925.600.000

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Harga Satuan Jumlah Harga
NO Satuan Koefisien (M3) Volume (M3)
( Rp ) ( Rp )
1 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Ls 1.00 3.000.000 3.000.000
2 Pengukuran MC.0 dan MC.100 Ls 1.00 2.000.000 2.000.000
5.000.000
II PEKERJAAN FISIK
Potongan I - I
Pekerjaan Galian Tanah
1 Excavator
Sewa Excavator ha 0.0015 63133 2.880.000 272.734.560
Sollar ltr 0.3421 63133 7.800 168.462.835
Pelumas ltr 0.0177 63133 40.800 45.592.127
Grease kg 0.0004 63133 78.000 1.969.750
Operator ho 0.0015 63133 175.000 16.572.413
505.331.684
2 Bulldozer
Sewa Bulldozer ha 0.0016 63133 4.096.000 413.748.429
Sollar ltr 0.3365 63133 7.800 165.705.185
Pelumas ltr 0.0187 63133 48.800 57.612.650
Grease kg 0.0004 63133 78.000 1.969.750
Operator ho 0.0016 63133 175.000 17.677.240
656.713.254
3 D rum Truck
Sewa D rump Truck ha 0.0187 63133 3.704.400 4.373.366.853
Sollar ltr 3.9626 63133 7.800 1.951.332.441
Pelumas ltr 0.2196 63133 48.800 676.563.532
Grease kg 0.0047 63133 78.000 23.144.558
Operator ho 0.0187 63133 175.000 206.602.743
7.231.010.127
Potongan II - II
Pekerjaan Galian Tanah
1 Excavator
Sewa Excavator ha 0.0015 49851 2.880.000 215.356.320
Sollar ltr 0.3421 49851 7.800 133.021.411
Pelumas ltr 0.0177 49851 40.800 36.000.398
Grease kg 0.0004 49851 78.000 1.555.351
Operator ho 0.0015 49851 175.000 13.085.888
399.019.368
2 Bulldozer
Sewa Bulldozer ha 0.0016 49851 4.096.000 326.703.514
Sollar ltr 0.3365 49851 7.800 130.843.920
Pelumas ltr 0.0187 49851 48.800 45.492.029
Grease kg 0.0004 49851 78.000 1.555.351
Operator ho 0.0016 49851 175.000 13.958.280
518.553.093
3 D rum Truck
Sewa D rump Truck ha 0.0187 49851 3.704.400 3.453.292.430
Sollar ltr 3.9626 49851 7.800 1.540.808.666
Pelumas ltr 0.2196 49851 48.800 534.227.244
Grease kg 0.0047 49851 78.000 18.275.377
Operator ho 0.0187 49851 175.000 163.137.398
5.709.741.115

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Potongan III - III
Pekerjaan Galian Tanah
1 Excavator
Sewa Excavator ha 0.0015 40885 2.880.000 176.623.200
Sollar ltr 0.3421 40885 7.800 109.096.716
Pelumas ltr 0.0177 40885 40.800 29.525.512
Grease kg 0.0004 40885 78.000 1.275.612
Operator ho 0.0015 40885 175.000 10.732.313
327.253.352
2 Bulldozer
Sewa Bulldozer ha 0.0016 40885 4.096.000 267.943.936
Sollar ltr 0.3365 40885 7.800 107.310.860
Pelumas ltr 0.0187 40885 48.800 37.310.016
Grease kg 0.0004 40885 78.000 1.275.612
Operator ho 0.0016 40885 175.000 11.447.800
425.288.223
3 D rum Truck
Sewa D rump Truck ha 0.0187 40885 3.704.400 2.832.197.168
Sollar ltr 3.9626 40885 7.800 1.263.685.028
Pelumas ltr 0.2196 40885 48.800 438.143.285
Grease kg 0.0047 40885 78.000 14.988.441
Operator ho 0.0187 40885 175.000 133.796.163
4.682.810.084
Potongan IV - IV
Pekerjaan Galian Tanah
1 Excavator
Sewa Excavator ha 0.0015 11864 2.880.000 51.252.480
Sollar ltr 0.3421 11864 7.800 31.657.660
Pelumas ltr 0.0177 11864 40.800 8.567.706
Grease kg 0.0004 11864 78.000 370.157
Operator ho 0.0015 11864 175.000 3.114.300
94.962.303
2 Bulldozer
Sewa Bulldozer ha 0.0016 11864 4.096.000 77.751.910
Sollar ltr 0.3365 11864 7.800 31.139.441
Pelumas ltr 0.0187 11864 48.800 10.826.612
Grease kg 0.0004 11864 78.000 370.157
Operator ho 0.0016 11864 175.000 3.321.920
123.410.040
3 D rum Truck
Sewa D rump Truck ha 0.0187 11864 3.704.400 821.846.330
Sollar ltr 3.9626 11864 7.800 366.695.834
Pelumas ltr 0.2196 11864 48.800 127.140.319
Grease kg 0.0047 11864 78.000 4.349.342
Operator ho 0.0187 11864 175.000 38.824.940
1.358.856.765

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Potongan I - I
Pekerjaan Timbunan Tanah
1 Excavator
Sewa Excavator ha 0.0015 178864 2.880.000 772.692.480
Sollar ltr 0.3421 178864 7.800 477.277.120
Pelumas ltr 0.0177 178864 40.800 129.168.426
Grease kg 0.0004 178864 78.000 5.580.557
Operator ho 0.0015 178864 175.000 46.951.800
1.431.670.383
2 Bulldozer
Sewa Bulldozer ha 0.0016 178864 4.096.000 1.172.203.110
Sollar ltr 0.3365 178864 7.800 469.464.341
Pelumas ltr 0.0187 178864 48.800 163.224.132
Grease kg 0.0004 178864 78.000 5.580.557
Operator ho 0.0016 178864 175.000 50.081.920
1.860.554.060
3 D rum Truck
Sewa D rump Truck ha 0.0187 178864 3.704.400 12.390.317.090
Sollar ltr 3.9626 178864 7.800 5.528.378.594
Pelumas ltr 0.2196 178864 48.800 1.916.792.479
Grease kg 0.0047 178864 78.000 65.571.542
Operator ho 0.0187 178864 175.000 585.332.440
20.486.392.145
Potongan II - II
Pekerjaan Timbunan Tanah
1 Excavator
Sewa Excavator ha 0.0015 119540 2.880.000 516.412.800
Sollar ltr 0.3421 119540 7.800 318.978.145
Pelumas ltr 0.0177 119540 40.800 86.327.006
Grease kg 0.0004 119540 78.000 3.729.648
Operator ho 0.0015 119540 175.000 31.379.250
956.826.850
2 Bulldozer
Sewa Bulldozer ha 0.0016 119540 4.096.000 783.417.344
Sollar ltr 0.3365 119540 7.800 313.756.638
Pelumas ltr 0.0187 119540 48.800 109.087.422
Grease kg 0.0004 119540 78.000 3.729.648
Operator ho 0.0016 119540 175.000 33.471.200
1.243.462.252
3 D rum Truck
Sewa D rump Truck ha 0.0187 119540 3.704.400 8.280.808.351
Sollar ltr 3.9626 119540 7.800 3.694.775.791
Pelumas ltr 0.2196 119540 48.800 1.281.048.019
Grease kg 0.0047 119540 78.000 43.823.364
Operator ho 0.0187 119540 175.000 391.194.650
13.691.650.176

MAHDIYYIN 105
811 1059 21
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH
MAKASSAR
TEKNIK SUNGAI
Potongan III - III
Pekerjaan Timbunan Tanah
1 Excavator
Sewa Excavator ha 0.0015 64715 2.880.000 279.568.800
Sollar ltr 0.3421 64715 7.800 172.684.212
Pelumas ltr 0.0177 64715 40.800 46.734.584
Grease kg 0.0004 64715 78.000 2.019.108
Operator ho 0.0015 64715 175.000 16.987.688
517.994.392
2 Bulldozer
Sewa Bulldozer ha 0.0016 64715 4.096.000 424.116.224
Sollar ltr 0.3365 64715 7.800 169.857.461
Pelumas ltr 0.0187 64715 48.800 59.056.320
Grease kg 0.0004 64715 78.000 2.019.108
Operator ho 0.0016 64715 175.000 18.120.200
673.169.313
3 D rum Truck
Sewa D rump Truck ha 0.0187 64715 3.704.400 4.482.955.600
Sollar ltr 3.9626 64715 7.800 2.000.229.340
Pelumas ltr 0.2196 64715 48.800 693.517.003
Grease kg 0.0047 64715 78.000 23.724.519
Operator ho 0.0187 64715 175.000 211.779.838
7.412.206.300
Potongan IV - IV
Pekerjaan Timbunan Tanah
1 Excavator
Sewa Excavator ha 0.0015 45671 2.880.000 197.298.720
Sollar ltr 0.3421 45671 7.800 121.867.583
Pelumas ltr 0.0177 45671 40.800 32.981.769
Grease kg 0.0004 45671 78.000 1.424.935
Operator ho 0.0015 45671 175.000 11.988.638
365.561.645
2 Bulldozer
Sewa Bulldozer ha 0.0016 45671 4.096.000 299.309.466
Sollar ltr 0.3365 45671 7.800 119.872.674
Pelumas ltr 0.0187 45671 48.800 41.677.528
Grease kg 0.0004 45671 78.000 1.424.935
Operator ho 0.0016 45671 175.000 12.787.880
475.072.482
3 D rum Truck
Sewa D rump Truck ha 0.0187 45671 3.704.400 3.163.734.300
Sollar ltr 3.9626 45671 7.800 1.411.612.056
Pelumas ltr 0.2196 45671 48.800 489.432.358
Grease kg 0.0047 45671 78.000 16.742.989
Operator ho 0.0187 45671 175.000 149.458.348
5.230.980.050
Jumlah 76.383.489.456
PPN 10 % 7.638.348.946
Total 68.745.140.511
Dibulatkan 68745200000

MAHDIYYIN 105