Anda di halaman 1dari 47

Aplikasi DataPro Premium v23.0 (Full).

xlsx 3/22/2023-7:44 PM

PERKIRAAN HARGA SATUAN DASAR KOTA BESAR DI INDONESIA


JURNAL DATABASE HARGA SATUAN (BIDANG III BINA MARGA)
20/03/2023 13:32:31

Provinsi : Ibukota : UMP:


8 Sumatera Selatan Palembang Rp 3,282,000

DATABASE BIDANG BINA MARGA (STD III )

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
DAFTAR HARGA DASAR UPAH KERJA
1 Pekerja L.3.001 Jam 20,900
2 Tukang L.3.002 Jam 24,900
3 Mandor L.3.003 Jam 38,200
4 Operator L.3.004 Jam 19,200
5 Pembantu Operator L.3.005 Jam 19,200
6 Sopir / Driver L.3.006 Jam 20,900
7 Pembantu Sopir / Driver L.3.007 Jam 19,200
8 Mekanik L.3.008 Jam 22,800
9 Pembantu Mekanik L.3.009 Jam 19,200
10 Kepala Tukang L.3.010 Jam 24,900
11 Pekerja Biasa L.3.011 Jam 20,900

DAFTAR HARGA DASAR PERALATAN


12 Asphalt Mixing Plant T.3.001 jam 4,561,900
13 Asphalt Finisher T.3.002 jam 1,058,900
14 Asphalt Sprayer T.3.003 jam 54,200
15 Bulldozer 100-150 Hp T.3.004 jam 460,300
16 Compressor T.3.005 jam 119,300
17 Concrete Mixer T.3.006 jam 169,400
18 Crane T.3.007 jam 649,600
19 Dump Truck Sedang T.3.008 jam 229,200
20 Dump Truck Besar T.3.009 jam 273,000
21 Excavator T.3.010 jam 453,700
22 Flat Bed Truck T.3.011 jam 587,700
23 Generator Set T.3.012 jam 458,200
24 Motor Grader T.3.013 jam 753,300
25 Track Loader 75-100 Hp T.3.014 jam 254,100
26 Wheel Loader T.3.015 jam 294,900
27 Three Wheel Roller 6-8 T T.3.016 jam 181,500
28 Tandem Roller T.3.017 jam 496,900
29 Pneumatic Tire Roller T.3.018 jam 440,500
30 Vibratory Roller 5-8 T. T.3.019 jam 420,600
31 Concrete Vibrator T.3.020 jam 60,300
32 Stone Crusher T.3.021 jam 579,900
33 Water Pump 70-100 Mm T.3.022 jam 157,300
34 Water Tank Truck T.3.023 jam 400,600
35 Pedestrian Roller T.3.024 jam 92,200
36 Vibratory Compactor T.3.025 jam 61,300
37 Jack Hammer T.3.026 jam 33,200
38 Fulvi Mixer T.3.027 jam 1,820,800
39 Concrete Pump T.3.028 jam 220,200
40 Trailer 20 Ton T.3.029 jam 446,500
41 Pile Driver + Hammer T.3.030 jam 67,800
42 Crane On Track 35 Ton T.3.031 jam 362,200
43 Welding Set T.3.032 jam 128,200

www.mitra-arsitek.com Price BM 1/52


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:44 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
44 Bore Pile Machine (Besar) T.3.033 jam 777,300
45 Asphalt Liquid Mixer T.3.034 jam 37,400
46 Tronton T.3.035 jam 482,400
47 Cold Milling T.3.036 jam 941,500
48 Rock Drill Breaker T.3.037 jam 259,700
49 Cold Recycler T.3.038 jam 3,406,200
50 Hot Recycler T.3.039 jam 3,016,000
51 Aggregat (Chip) Spreader T.3.040 jam 570,700
52 Asphalt Distributor T.3.041 jam 295,100
53 Slip Form Paver/Conc. Paver T.3.042 jam 526,500
54 Concrete Pan Mixer/Batching Plant T.3.043 jam 656,200
55 Concrete Breaker T.3.044 jam 845,000
56 Aspahlt Tanker T.3.045 jam 404,700
57 Cement Tanker T.3.046 jam 396,600
58 Condrete Mixer (350) T.3.047 jam 82,800
59 Vibrating Rammer T.3.048 jam 58,000
60 Truck Mixer T.3.049 jam 524,600
61 Bore Pile Machine T.3.050 jam 649,200
62 Crane On Track 75-100 Ton T.3.051 jam 578,400
63 Blending Equipment T.3.052 jam 230,900
64 Asphalt Liquid Mixer (Besar) T.3.053 jam 91,700
65 Bar Bender T.3.054 jam 26,900
66 Bar Cutter T.3.055 jam 23,900
67 Breaker T.3.056 jam 127,000
68 Grouting Pump T.3.057 jam 157,400
69 Jack Hidraulik T.3.058 jam 25,600
70 Mesin Las T.3.059 jam 28,300
71 Pile Driver Leader, 75 Kw T.3.060 jam 114,900
72 Pile Hammer T.3.061 jam 48,500
73 Pile Hammer, 2,5 Ton T.3.062 jam 25,100
74 Stressing Jack T.3.063 jam 141,400
75 Welding Machine, 300 A T.3.064 jam 29,400
76 Chainsaw T.3.065 jam 132,800
77 Angkutan Kapal Laut T.3.066 mill-laut 600
78 Ponton + Tug Boat T.3.067 jam 346,500
79 Screed Paver T.3.068 jam 210,000

DAFTAR HARGA DASAR MATERIAL


80 Additive M.3.001 Ltr 43,600
81 Aggregat S M.3.002 m3 184,800
82 Agr.Base Kelas A M.3.003 M3 179,500
83 Agr.Base Kelas B M.3.004 M3 186,300
84 Agr.Base Kelas C M.3.005 M3 192,000
85 Agregat Halus M.3.006 M3 164,500
86 Agregat Pecah Kasar M.3.007 M3 150,700
87 Agregat Pecah Mesin 0-5 mm M.3.008 M3 73,500
88 Agregat Pecah Mesin 5-10 & 10-20 mm M.3.009 M3 91,800
89 Air M.3.010 Ltr 600
90 Alat Bantu M.3.011 Ls 26,000
91 Ampelas M.3.012 bh 79,500
92 Anchorage M.3.013 buah 646,800
93 Asbuton M.3.014 m3 817,500
94 Aspal M.3.015 KG 8,600
95 Aspal Emulsi M.3.016 Kg 6,300
96 Aspal Modifikasi M.3.017 kg 8,400
97 Aspal Pengisian Retak M.3.018 Liter 10,600
98 Bahan Curing M.3.019 M2 68,700
99 Bahan Grouting M.3.020 Kg 37,800

www.mitra-arsitek.com Price BM 2/52


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:44 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
100 Bahan Modifikasi M.3.021 Kg 1,100
101 Bahan pengaman tebing galian (kayu) M.3.022 M3 1,145,000
102 Bahan pengawet (kreosot) M.3.023 liter 10,000
103 Bahan Penunjang Lainnya M.3.024 Ls 52,500
104 Bahan Pilihan M.3.025 M3 73,500
105 Bahan Tanah Timbunan M.3.026 M3 49,500
106 Bahan tiang pancang kayu M.3.027 m1 70,900
107 Baja Struktur M.3.028 Kg 11,600
108 Baja Struktur BJ 34 M.3.029 Kg 25,300
109 Baja Struktur BJ 37 M.3.030 Kg 30,300
110 Baja Tulangan (Polos) U24 M.3.031 Kg 8,300
111 Baja Tulangan (Polos) U32 M.3.032 Kg 13,200
112 Baja Tulangan (Ulir) D32 M.3.033 Kg 9,900
113 Baja Tulangan (Ulir) D39 M.3.034 Kg 11,500
114 Baja Tulangan (Ulir) D48 M.3.035 Kg 11,400
115 Batu Belah M.3.036 M3 239,600
116 Batu Kali M.3.037 M3 278,400
117 Baut Angkur M.3.038 Kg 46,000
118 Besi Beton M.3.039 Kg 12,100
119 Beton K-175 M.3.040 M3 1,376,800
120 Beton K-250 M.3.041 M3 1,755,700
121 Beton K-300 M.3.042 M3 2,046,300
122 Beton K-350 M.3.043 M3 2,521,500
123 Beton K-400 M.3.044 M3 2,436,500
124 Beton K-500 M.3.045 M3 2,938,900
125 Biaya Umum M.3.046 Ls 16,431,800
126 Camp. Aspal Dingin M.3.047 M3 1,488,200
127 Camp. Aspal Panas M.3.048 M3 739,500
128 Casing M.3.049 M2 10,000
129 Cat M.3.050 Kg 30,600
130 Cat Anti Karat M.3.051 Kg 36,200
131 Cat Marka (Non Thermoplas) M.3.052 Kg 36,800
132 Cat Marka (Thermoplastic) M.3.053 Kg 36,400
133 Cat, dan material lainnya M.3.054 Ls 56,000
134 Cerucuk M.3.055 M 18,600
135 Chipping M.3.056 M3 248,100
136 Curing Compound M.3.057 Ltr 41,600
137 Ducting (Strand prestress) M.3.058 M' 49,000
138 Filler Added M.3.059 Kg 1,200
139 Formwork Plate M.3.060 m2 750,000
140 Formworks M.3.061 ls 2,570,500
141 Gebalan Rumput M.3.062 M2 14,100
142 Geotextile M.3.063 M2 28,600
143 Glass Bead M.3.064 Kg 39,000
144 Joint Sealent M.3.065 Kg 35,200
145 Joint Sealent & Cat Anti Karat M.3.066 kg 76,500
146 Kabel Baja Prategang M.3.067 Kg 12,000
147 Kabel prategang M.3.068 Kg 10,900
148 Kabel Prategang Selongsong M.3.069 M' 20,900
149 Kawat Beton M.3.070 Kg 25,300
150 Kawat Bronjong M.3.071 Kg 10,400
151 Kawat Las M.3.072 Dos 133,300
152 Kayu Acuan M.3.073 M3 2,205,000
153 Kayu Klas I M.3.074 m3 3,637,500
154 Kayu Perancah M.3.075 M3 2,295,000
155 Kerosene/Minyak Tanah M.3.076 LITER 17,200
156 Lapis Pondasi Aggregat M.3.077 m3 180,000
157 Lolos screen2 ukuran ( 0 - 5) M.3.078 M3 177,600

www.mitra-arsitek.com Price BM 3/52


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:44 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
158 Lolos screen2 ukuran ( 5 - 9,5) M.3.079 M3 167,700
159 Lolos screen2 ukuran ( 9.5 - 19,0) M.3.080 M3 152,700
160 Marmer M.3.081 Buah 404,000
161 Mata Kucing M.3.082 buah 390,000
162 Mortar M.3.083 M3 83,300
163 Multiplex 12 mm M.3.084 Lbr 193,500
164 Paku M.3.085 Kg 27,300
165 Paku Jalan M.3.086 bh 72,800
166 Pasir Halus M.3.087 M3 196,000
167 Pasir Kasar M.3.088 M3 213,700
168 Pasir Pasang M.3.089 M3 231,000
169 Paving Block M.3.090 Buah 4,000
170 Pelat Baja M.3.091 Kg 14,300
171 Pelat Rambu (Eng. Grade) M.3.092 BH 186,600
172 Pelat Rambu (High I. Grade) M.3.093 BH 218,700
173 Pemantul Cahaya (Reflector) M.3.094 Bh. 14,000
174 Pipa Baja M.3.095 Kg 14,600
175 Pipa Galvanis Dia 3" M.3.096 M 21,800
176 Pipa Galvanis Dia. 1.6" M.3.097 Batang 157,100
177 Pipa Porus M.3.098 M' 60,600
178 Plastik Filter M.3.099 M2 25,800
179 Pohon M.3.100 bh 56,000
180 Polytene 125 mikron M.3.101 Kg 20,800
181 Pracetak Gelagar Tipe I bentang M.3.102 bh 15,900,000
182 Pracetak Gelagar Tipe U bentang M.3.103 bh 19,400,000
183 Pupuk M.3.104 kg 3,500
184 Rel Pengaman M.3.105 M' 437,300
185 Retribusi M.3.106 Rp 15,800
186 Semen M.3.107 Kg 2,000
187 Tanah Liat M.3.108 m3 194,300
188 Thinner M.3.109 LITER 19,300
189 Urugan Porus M.3.110 m3 305,400
190 Acuan/multipleks M.3.111 M3 2,376,500
191 Aditif anti pengelupasan M.3.112 Kg 30,300
192 Agg. Halus LP A M.3.113 M3 138,100
193 Agr.Base Kelas C2 M.3.114 M3 186,500
194 Agregat Pecah Mesin 20-30 mm M.3.115 M3 94,100
195 Alat Penyuntik Anti Gravitasi M.3.116 Kg 13,400
196 Anchorage (mati) M.3.117 bh 424,000
197 Anti Korosif Baja M.3.118 Kg 144,500
198 Anti strpping agent M.3.119 Kg 36,000
199 Arbocell M.3.120 Kg. 31,100
200 Asbuton Halus M.3.121 Ton 325,000
201 Asbuton yang diproses M.3.122 Kg 33,300
202 Assetilline M.3.123 Botol 225,000
203 Bensin M.3.124 LITER 7,100
204 Bahan anti rayap M.3.125 Kg 207,200
205 Bahan Baja Profil M.3.126 Kg 18,200
206 Bahan Baja Profil, Mutu BJ 32 M.3.127 Kg 22,600
207 Bahan Baja Profil, Mutu BJ 41 M.3.128 Kg 33,000
208 Bahan Baja Profil, Mutu BJ 52 M.3.129 Kg 43,300
209 Bahan Geosynthetic M.3.130 M2 97,200
210 Bahan Pengisi (Filler) Tambahan M.3.131 Kg 1,600
211 Baja Bergelombang M.3.132 Kg 12,800
212 Baja Profil M.3.133 Kg 17,600
213 Baja Struktur Lantai Ortotropik M.3.134 Kg 55,100
214 Baja Struktur Titik leleh 3500 kg/cm2 M.3.135 Kg 38,500
215 Baja Tulangan BJTP 24 (epoxy coated) M.3.136 Kg 19,700

www.mitra-arsitek.com Price BM 4/52


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:44 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
216 Batu Bara M.3.137 Kg 700
217 Batubara M.3.138 kg 600
218 Baut Mutu Tinggi M.3.139 Buah 50,900
219 Beton K-125 M.3.140 M3 1,180,300
220 Bunker Oil M.3.141 Liter 3,200
221 Cairan Perekat (Epoxy Resin) M.3.142 Kg 149,900
222 Cat Galvanis M.3.143 Kg 46,400
223 Chipping (kg) M.3.144 Kg 200
224 Concrete Grouting M.3.145 Kg 36,100
225 Ducting (Kabel prestress) M.3.146 M' 154,500
226 Elastomer M.3.147 buah 377,400
227 Elastomer Alam M.3.148 Kg 32,700
228 Elastomer jenis 1 M.3.149 buah 408,700
229 Elastomer jenis 2 M.3.150 buah 708,500
230 Elastomer jenis 3 M.3.151 buah 838,000
231 Elastomer Sintesis M.3.152 Kg 32,700
232 Epoxy Bahan Penutup (sealant) M.3.153 Kg 37,900
233 Epoxy coated M.3.154 Kg 19,100
234 Expansion Cap M.3.155 M2 6,500
235 Expansion Join Baja Siku M.3.156 M 283,300
236 Expansion Join Tipe Rubber M.3.157 M 1,164,000
237 Expansion Joint Tipe Torma M.3.158 M1 1,272,000
238 Expansion Tipe Joint Asphaltic Plug M.3.159 M 1,110,000
239 Fibre jenis e-glass M.3.160 M2 77,900
240 Gravel M.3.161 M3 268,100
241 Gelagar baja M.3.162 Kg 45,200
242 Joint Socket Pile 16x16x16 M.3.163 Set 70,900
243 Joint Socket Pile 35x35 M.3.164 Set 656,100
244 Kabel Prategang Grouting M.3.165 M2 42,400
245 Kapur M.3.166 M3 41,200
246 Kayu Kelas 1 M.3.167 M3 7,548,000
247 Kerb jenis 1 M.3.168 Buah 45,500
248 Kerb jenis 2 M.3.169 Buah 54,500
249 Kerb jenis 3 M.3.170 Buah 60,500
250 Kerb Type A M.3.171 Buah 50,000
251 Lolos screen1 ukuran ( 0 - 5) M.3.172 M3 132,700
252 Matras Concrete M.3.173 Buah 413,100
253 Mikro Pile 16x16x16 M.3.174 M1 66,300
254 Mini Timber Pile M.3.175 Buah 30,300
255 Minyak Fluks M.3.176 Liter 6,500
256 Minyak Pelumas / Olie M.3.177 LITER 27,300
257 Oxygen M.3.178 Botol 117,100
258 Pasir Tailing M.3.179 M3 261,600
259 Pasir Urug M.3.180 M3 185,000
260 Pasir Urug (ada unsur lempung) M.3.181 M3 203,800
261 PCI Girder L=17m M.3.182 Buah 105,600,000
262 PCI Girder L=21m M.3.183 Buah 119,840,000
263 PCI Girder L=26m M.3.184 Buah 135,340,000
264 PCI Girder L=32m M.3.185 Buah 188,710,000
265 PCI Girder L=36m M.3.186 Buah 194,020,000
266 PCI Girder L=41m M.3.187 Buah 231,080,000
267 Pelat Baja (Klem) M.3.188 Kg 26,800
268 Pelat Baja Galvanis M.3.189 Kg 24,500
269 Petrolium jelly M.3.190 Kg 610,200
270 Pipa Aluminium M.3.191 M' 63,100
271 Pipa Galvanis Dia 1,5" M.3.192 M 15,000
272 Polimer M.3.193 kg 43,700
273 Polymer Mortar M.3.194 Kg 18,800

www.mitra-arsitek.com Price BM 5/52


Aplikasi DataPro Premium v23.0 (Full).xlsx 3/22/2023-7:44 PM

No Nama Item & Spesifikasi Kode Item Satuan Harga Perkiraan Dasar
274 Sirtu M.3.195 M3 126,300
275 Solar M.3.196 LITER 5,400
276 Semen / PC (50kg) M.3.197 Zak 96,100
277 Strip Bearing M.3.198 Buah 238,700
278 Tiang Pancang Baja M.3.199 M' 28,300
279 Tiang Pancang Beton Pratekan M.3.200 M3 479,100
280 Timbunan Porous M.3.201 M3 262,200

www.mitra-arsitek.com Price BM 6/52


Analisa Harga Satuan Pekerjaan BINA MARGA
Bidang Pekerjaan Bina Marga PUPERA

STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan

Analisa EI- 2.1.(1)


B-001 1.00 M3 Galian untuk Selokan Drainase dan Saluran Air 60,626 0.01 . 920 33,705 26,000
0.03 jam Pekerja 632 L.3.001 . . .
0.01 jam Mandor 289 L.3.003 . . .
0.01 jam Excavator 3,429 T.3.010 . . .
0.13 jam Dump Truck Sedang 30,276 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.2.(1)
B-002 1.00 M3 Pasangan Batu dengan Mortar 957,525 0.80 . 129,277 68,032 760,216
4.02 jam Pekerja 83,936 L.3.001 . . .
1.20 jam Tukang 30,000 L.3.002 . . .
0.40 jam Mandor 15,341 L.3.003 . . .
1.08 M3 Batu Kali 300,672 M.3.037 . . .
161.00 kg Semen 322,000 M.3.107 . . .
0.48 M3 Pasir Pasang 111,544 M.3.089 . . .
0.40 jam Concrete Mixer 68,032 T.3.006 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(1)
B-003 M1 Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm 632,609 0.53 . 89,833 107,982 434,793
2.33 jam Pekerja 48,767 L.3.001 . . .
0.93 jam Tukang 23,240 L.3.002 . . .
0.47 jam Mandor 17,827 L.3.003 . . .
0.11 M3 Beton K-300 215,199 M.3.042 . . .
11.57 Kg Baja Tulangan (Polos) U24 96,015 M.3.031 . . .
0.12 M3 Urugan Porus 37,839 M.3.110 . . .
0.81 M3 Bahan Pilihan 59,740 M.3.025 . . .
1.01 jam Vibratory Compactor 61,859 T.3.025 . . .
0.08 jam Flat Bed Truck 46,123 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(2)
B-004 M1 Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm 894,299 1.00 . 164,010 149,832 580,456
4.90 jam Pekerja 102,410 L.3.001 . . .
1.40 jam Tukang 34,860 L.3.002 . . .
0.70 jam Mandor 26,740 L.3.003 . . .
0.15 M3 Beton K-300 298,771 M.3.042 . . .
16.06 Kg Baja Tulangan (Polos) U24 133,303 M.3.031 . . .
0.14 M3 Urugan Porus 44,252 M.3.110 . . .
1.06 M3 Bahan Pilihan 78,130 M.3.025 . . .
1.32 Jam Vibratory Compactor 80,648 T.3.025 . . .
0.12 Jam Flat Bed Truck 69,185 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(3)
B-005 M1 Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm 1,840,384 2.50 . 403,025 318,708 1,118,650
14.00 Jam Pekerja 292,600 L.3.001 . . .
1.75 Jam Tukang 43,575 L.3.002 . . .
1.75 Jam Mandor 66,850 L.3.003 . . .

www.mitra-arsitek.com AHSP BM 7/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.29 M3 Beton K-300 592,881 M.3.042 . . .
31.87 Kg Baja Tulangan (Polos) U24 264,527 M.3.031 . . .
0.31 M3 Urugan Porus 94,758 M.3.110 . . .
1.91 M3 Bahan Pilihan 140,484 M.3.025 . . .
2.38 Jam Vibratory Compactor 145,747 T.3.025 . . .
0.29 Jam Flat Bed Truck 172,961 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(4)
B-006 M1 Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm 2,284,104 2.50 . 403,025 349,709 1,531,369
14.00 Jam Pekerja 292,600 L.3.001 . . .
1.75 Jam Tukang 43,575 L.3.002 . . .
1.75 Jam Mandor 66,850 L.3.003 . . .
0.41 M3 Beton K-300 835,723 M.3.042 . . .
44.92 Kg Baja Tulangan (Polos) U24 372,876 M.3.031 . . .
0.42 M3 Urugan Porus 126,985 M.3.110 . . .
2.31 M3 Bahan Pilihan 169,785 M.3.025 . . .
2.88 Jam Vibratory Compactor 176,748 T.3.025 . . .
0.29 Jam Flat Bed Truck 172,961 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(5)
B-007 Ton Gorong2 Pipa Baja Bergelombang 19,832,428 10.77 . 1,690,231 145,780 17,996,417
64.62 Jam Pekerja 1,350,462 L.3.001 . . .
5.38 Jam Tukang 134,077 L.3.002 . . .
5.38 Jam Mandor 205,692 L.3.003 . . .
####### Kg Pipa Baja 15,330,000 M.3.095 . . .
8.04 M3 Urugan Porus 2,453,920 M.3.110 . . .
2.54 M3 Bahan Pilihan 186,498 M.3.025 . . .
2.38 Jam Vibratory Compactor 145,780 T.3.025 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(6)
B-008 M1 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm 241,966 0.30 . 49,945 54,580 137,441
1.75 jam Pekerja 36,575 L.3.001 . . .
0.35 jam Mandor 13,370 L.3.003 . . .
0.05 M3 Beton K-175 74,504 M.3.040 . . .
0.07 M3 Urugan Porus 20,202 M.3.110 . . .
0.23 M3 Bahan Pilihan 16,734 M.3.025 . . .
0.00 jam Vibratory Compactor 222 T.3.025 . . .
0.27 jam Vibratory Compactor 16,815 T.3.025 . . .
0.06 jam Flat Bed Truck 37,543 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(7)
B-009 M1 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm 262,336 0.30 . 49,945 56,966 155,425
1.75 jam Pekerja 36,575 L.3.001 . . .
0.35 jam Mandor 13,370 L.3.003 . . .
0.06 M3 Beton K-175 88,561 M.3.040 . . .
0.07 M3 Urugan Porus 21,806 M.3.110 . . .
0.26 M3 Bahan Pilihan 19,058 M.3.025 . . .
0.00 jam Vibratory Compactor 273 T.3.025 . . .
0.31 jam Vibratory Compactor 19,150 T.3.025 . . .
0.06 jam Flat Bed Truck 37,543 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(8)
B-010 M1 Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm 282,878 0.30 . 49,945 59,441 173,492
1.75 jam Pekerja 36,575 L.3.001 . . .
0.35 jam Mandor 13,370 L.3.003 . . .

www.mitra-arsitek.com AHSP BM 8/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.07 M3 Beton K-175 102,619 M.3.040 . . .
0.08 M3 Urugan Porus 23,409 M.3.110 . . .
0.29 M3 Bahan Pilihan 21,464 M.3.025 . . .
0.01 jam Vibratory Compactor 331 T.3.025 . . .
0.35 jam Vibratory Compactor 21,568 T.3.025 . . .
0.06 jam Flat Bed Truck 37,543 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(9)
B-011 M1 Saluran berbentuk U Tipe DS 1 2,306,619 0.70 . 108,319 114,620 2,083,680
4.02 Jam Pekerja 83,936 L.3.001 . . .
0.80 Jam Tukang 20,000 L.3.002 . . .
0.11 Jam Mandor 4,383 L.3.003 . . .
370.80 Kg Semen 741,600 M.3.107 . . .
0.53 M3 Pasir Kasar 112,193 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 111,895 M.3.007 . . .
0.20 Ls Formworks 514,100 M.3.061 . . .
1.20 Kg Paku 32,760 M.3.085 . . .
45.00 Kg Besi Beton 544,500 M.3.039 . . .
0.03 Kg Kawat beton 633 M.3.070 . . .
0.40 Jam Concrete Mixer 68,032 T.3.006 . . .
0.06 Jam Water Tank Truck 22,371 T.3.023 . . .
0.40 Jam Concrete Vibrator 24,217 T.3.020 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(10)
B-012 M1 Saluran berbentuk U Tipe DS 2 2,306,619 0.70 . 108,319 114,620 2,083,680
4.02 Jam Pekerja 83,936 L.3.001 . . .
0.80 Jam Tukang 20,000 L.3.002 . . .
0.11 Jam Mandor 4,383 L.3.003 . . .
370.80 Kg Semen 741,600 M.3.107 . . .
0.53 M3 Pasir Kasar 112,193 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 111,895 M.3.007 . . .
0.20 Ls Formworks 514,100 M.3.061 . . .
1.20 Kg Paku 32,760 M.3.085 . . .
45.00 Kg Besi Beton 544,500 M.3.039 . . .
0.03 Kg Kawat beton 633 M.3.070 . . .
0.40 Jam Concrete Mixer 68,032 T.3.006 . . .
0.06 Jam Water Tank Truck 22,371 T.3.023 . . .
0.40 Jam Concrete Vibrator 24,217 T.3.020 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(11)
B-013 M1 Saluran berbentuk U Tipe DS 3 2,306,619 0.70 . 108,319 114,620 2,083,680
4.02 Jam Pekerja 83,936 L.3.001 . . .
0.80 Jam Tukang 20,000 L.3.002 . . .
0.11 Jam Mandor 4,383 L.3.003 . . .
370.80 Kg Semen 741,600 M.3.107 . . .
0.53 M3 Pasir Kasar 112,193 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 111,895 M.3.007 . . .
0.20 Ls Formworks 514,100 M.3.061 . . .
1.20 Kg Paku 32,760 M.3.085 . . .
45.00 Kg Besi Beton 544,500 M.3.039 . . .
0.03 Kg Kawat beton 633 M.3.070 . . .
0.40 Jam Concrete Mixer 68,032 T.3.006 . . .
0.06 Jam Water Tank Truck 22,371 T.3.023 . . .

www.mitra-arsitek.com AHSP BM 9/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.40 Jam Concrete Vibrator 24,217 T.3.020 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(12)
B-014 M3 Beton K250 (fc’ 20) untuk struktur drainase beton minor 2,305,986 0.70 . 108,319 114,620 2,083,047
4.02 Jam Pekerja 83,936 L.3.001 . . .
0.80 Jam Tukang 20,000 L.3.002 . . .
0.11 Jam Mandor 4,383 L.3.003 . . .
370.80 Kg Semen 741,600 M.3.107 . . .
0.53 M3 Pasir Kasar 112,193 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 111,895 M.3.007 . . .
0.20 Ls Formworks 514,100 M.3.061 . . .
1.20 Kg Paku 32,760 M.3.085 . . .
45.00 Kg Besi Beton 544,500 M.3.039 . . .
0.40 Jam Concrete Mixer 68,032 T.3.006 . . .
0.06 Jam Water Tank Truck 22,371 T.3.023 . . .
0.40 Jam Concrete Vibrator 24,217 T.3.020 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(13)
B-015 Kg Baja Tulangan untuk struktur drainase beton minor 44,769 0.03 . 4,403 - 40,366
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.05 Kg Baja Tulangan (Polos) U32 13,860 M.3.032 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.3.(14)
B-016 M3 Pasangan Batu tanpa Adukan (Aanstamping) 476,285 1.13 . 186,725 - 289,560
5.25 jam Pekerja Biasa 109,725 L.3.011 . . .
1.75 jam Tukang 43,575 L.3.002 . . .
0.88 jam Mandor 33,425 L.3.003 . . .
1.10 M3 Batu Belah 263,560 M.3.036 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.4.(1)
B-017 M3 Bahan Porous untuk Bahan Penyaring (Filter) 321,527 0.50 . 85,260 9,847 226,420
2.80 Jam Pekerja 58,520 L.3.001 . . .
0.70 Jam Mandor 26,740 L.3.003 . . .
0.55 M3 Agregat Pecah Kasar 82,885 M.3.007 . . .
0.55 M3 Pasir Kasar 117,535 M.3.088 . . .
0.16 Jam Vibratory Compactor 9,847 T.3.025 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.4.(2)
B-018 M2 Anyaman Filter Plastik 82,462 0.16 . 29,372 - 53,090
0.56 Jam Pekerja 11,704 L.3.001 . . .
0.28 Jam Tukang 6,972 L.3.002 . . .
0.28 Jam Mandor 10,696 L.3.003 . . .
1.05 M2 Plastik Filter 27,090 M.3.099 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 2.4.(3)
B-019 M1 Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase176,869
Bawah Permukaan
0.33 . 61,192 - 115,677
1.17 Jam Pekerja 24,383 L.3.001 . . .
0.58 Jam Tukang 14,525 L.3.002 . . .
0.58 Jam Mandor 22,283 L.3.003 . . .
1.05 M' Pipa Porus 63,630 M.3.098 . . .
0.09 Kg Semen 180 M.3.107 . . .
0.00 M3 Mortar 21 M.3.083 . . .
0.00 M3 Pasir Pasang 46 M.3.089 . . .

www.mitra-arsitek.com AHSP BM 10/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Ls Plastik Filter 25,800 M.3.099 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(1a)
B-020 M3 Galian Biasa 116,271 0.01 . 2,044 88,227 26,000
0.05 Jam Pekerja 1,068 L.3.001 . . .
0.03 Jam Mandor 976 L.3.003 . . .
0.03 Jam Excavator 11,592 T.3.010 . . .
0.33 Jam Dump Truck Sedang 76,635 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(1b)
B-021 M3 Galian batu lunak 141,030 0.07 . 11,457 129,573 -
0.45 Jam Pekerja 9,326 L.3.001 . . .
0.06 Jam Mandor 2,131 L.3.003 . . .
0.06 Jam Compressor 6,654 T.3.005 . . .
0.06 Jam Jack Hammer 1,852 T.3.026 . . .
0.06 Jam Wheel Loader 16,449 T.3.015 . . .
0.06 Jam Excavator 25,307 T.3.010 . . .
0.35 Jam Dump Truck Sedang 79,311 T.3.008 . . .
Analisa EI- 3.1.(2)
B-022 M3 Galian Batu 165,908 0.09 . 15,153 150,755 -
0.59 Jam Pekerja 12,335 L.3.001 . . .
0.07 Jam Mandor 2,818 L.3.003 . . .
0.07 Jam Compressor 8,801 T.3.005 . . .
0.07 Jam Jack Hammer 2,449 T.3.026 . . .
0.07 Jam Wheel Loader 21,755 T.3.015 . . .
0.07 Jam Excavator 33,470 T.3.010 . . .
0.37 Jam Dump Truck Sedang 84,279 T.3.008 . . .
Analisa EI- 3.1.(3)
B-023 M3 Galian Struktur dengan kedalaman 0 - 2 meter 60,408 0.00 . 631 9,027 50,750
0.02 Jam Pekerja 433 L.3.001 . . .
0.01 Jam Mandor 198 L.3.003 . . .
0.50 M3 Bahan Tanah Timbunan 24,750 M.3.026 . . .
0.01 Jam Excavator 2,351 T.3.010 . . .
0.01 Jam Bulldozer 100-150 Hp 6,675 T.3.004 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(4)
B-024 M3 Galian Struktur dengan kedalaman 2 - 4 meter 1,231,211 0.01 . 1,423 9,288 1,220,500
0.06 Jam Pekerja 1,203 L.3.001 . . .
0.01 Jam Mandor 220 L.3.003 . . .
1.00 M3 Bahan Tanah Timbunan 49,500 M.3.026 . . .
1.00 Ls Bahan pengaman tebing galian (kayu) 1,145,000 M.3.022 . . .
0.01 Jam Excavator 2,612 T.3.010 . . .
0.01 Jam Bulldozer 100-150 Hp 6,675 T.3.004 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(5)
B-025 M3 Galian Struktur dengan kedalaman 4 - 6 meter 1,213,790 0.02 . 2,496 10,594 1,200,700
0.10 Jam Pekerja 2,166 L.3.001 . . .
0.01 Jam Mandor 330 L.3.003 . . .
0.60 M3 Bahan Tanah Timbunan 29,700 M.3.026 . . .
1.00 Ls Bahan pengaman tebing galian (kayu) 1,145,000 M.3.022 . . .
0.01 Jam Excavator 3,918 T.3.010 . . .
0.01 Jam Bulldozer 100-150 Hp 6,675 T.3.004 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(6)
B-026 M3 Galian Perkerasan Beraspal dengan Cold Milling Machine 170,917 0.02 . 2,963 141,954 26,000
0.07 Jam Pekerja 1,548 L.3.001 . . .
0.04 Jam Mandor 1,415 L.3.003 . . .

www.mitra-arsitek.com AHSP BM 11/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 Jam Cold Milling 34,870 T.3.036 . . .
0.47 Jam Dump Truck Sedang 107,083 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(7)
B-027 M3 Galian Perkerasan Beraspal tanpa Cold Milling Machine 635,818 0.07 . 13,333 622,485 -
0.33 Jam Pekerja 6,967 L.3.001 . . .
0.17 Jam Mandor 6,367 L.3.003 . . .
2.41 Jam Jack Hammer 80,000 T.3.026 . . .
2.41 Jam Compressor 287,470 T.3.005 . . .
1.11 Jam Dump Truck Sedang 255,015 T.3.008 . . .
Analisa EI- 3.2.(1a)
B-028 M3 Timbunan Biasa Dari Sumber Galian 234,026 0.01 . 1,227 151,854 80,945
0.04 Jam Pekerja 842 L.3.001 . . .
0.01 Jam Mandor 385 L.3.003 . . .
1.11 M3 Bahan Tanah Timbunan 54,945 M.3.026 . . .
0.01 Jam Excavator 4,572 T.3.010 . . .
0.61 Jam Dump Truck Sedang 139,891 T.3.008 . . .
0.00 Jam Motor Grader 2,817 T.3.013 . . .
0.00 Jam Vibratory Roller 5-8 T. 1,760 T.3.019 . . .
0.01 Jam Water tank truck 2,815 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.2.(1b)
B-029 M3 Timbunan Biasa Dari Galian 176,448 0.02 . 3,214 147,234 26,000
0.11 Jam Pekerja 2,206 L.3.001 . . .
0.03 Jam Mandor 1,008 L.3.003 . . .
0.03 Jam Excavator 11,973 T.3.010 . . .
0.56 Jam Dump Truck Sedang 127,869 T.3.008 . . .
0.00 Jam Motor Grader 2,817 T.3.013 . . .
0.00 Jam Vibratory Roller 5-8 T. 1,760 T.3.019 . . .
0.01 Jam Water tank truck 2,815 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.2.(2a)
B-030 M3 Timbunan Pilihan Dari Sumber Gaian 337,078 0.43 . 73,975 155,519 107,585
2.43 Jam Pekerja 50,774 L.3.001 . . .
0.61 Jam Mandor 23,201 L.3.003 . . .
1.11 M3 Bahan Pilihan 81,585 M.3.025 . . .
0.01 Jam Wheel Loader 2,508 T.3.015 . . .
0.61 Jam Dump Truck Sedang 139,204 T.3.008 . . .
0.00 Jam Motor Grader 2,989 T.3.013 . . .
0.02 Jam Tandem Roller 8,002 T.3.017 . . .
0.01 Jam Water Tank Truck 2,815 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.2.(2)
B-031 M3 Timbunan Pilihan dari galian 245,114 0.38 . 64,890 138,424 41,800
2.13 Jam Pekerja 44,539 L.3.001 . . .
0.53 Jam Mandor 20,352 L.3.003 . . .
1.00 Rp Retribusi 15,800 M.3.106 . . .
0.01 Jam Wheel Loader 2,508 T.3.015 . . .
0.53 Jam Dump Truck Sedang 122,109 T.3.008 . . .
0.00 Jam Motor Grader 2,989 T.3.013 . . .
0.02 Jam Tandem Roller 8,002 T.3.017 . . .
0.01 Jam Water Tank Truck 2,815 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.2.(3a)
B-032 M3 Timbunan Pilihan (diukur diatas bak truk) 245,453 0.00 . 567 145,386 99,500
0.01 Jam Pekerja 296 L.3.001 . . .

www.mitra-arsitek.com AHSP BM 12/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 Jam Mandor 271 L.3.003 . . .
1.00 M3 Bahan Pilihan 73,500 M.3.025 . . .
0.63 Jam Dump Truck Sedang 143,296 T.3.008 . . .
0.01 Jam Wheel Loader 2,090 T.3.015 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.2.(3b)
B-033 M3 Timbunan Pilihan (diukur dengan rod dan plate) 245,453 0.00 . 567 145,386 99,500
0.01 Jam Pekerja 296 L.3.001 . . .
0.01 Jam Mandor 271 L.3.003 . . .
1.00 M3 Bahan Pilihan 73,500 M.3.025 . . .
0.63 Jam Dump Truck Sedang 143,296 T.3.008 . . .
0.01 Jam Wheel Loader 2,090 T.3.015 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.3.(1)
B-034 M2 Penyiapan Badan Jalan 26,719 0.00 . 73 646 26,000
0.00 jam Pekerja 50 L.3.001 . . .
0.00 jam Mandor 23 L.3.003 . . .
0.00 jam Motor Grader 448 T.3.013 . . .
0.00 jam Vibratory Roller 5-8 T. 198 T.3.019 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.4.(1)
B-035 M2 Pembersihan dan Pengupasan Lahan 87,858 0.01 . 1,998 460 85,400
0.07 jam Pekerja 1,463 L.3.001 . . .
0.01 jam Mandor 535 L.3.003 . . .
1.20 M3 Bahan Tanah Timbunan 59,400 M.3.026 . . .
0.00 jam Dump Truck Sedang 460 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.4.(2)
B-036 buah Pemotongan Pohon Pilihan diameter 15 – 30 cm 290,884 0.55 . 86,520 178,364 26,000
3.50 Jam Pekerja Biasa 73,150 L.3.011 . . .
0.35 Jam Mandor 13,370 L.3.003 . . .
0.20 Jam Dump Truck Sedang 45,564 T.3.008 . . .
1.00 Jam Chainsaw 132,800 T.3.065 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.4.(3)
B-037 buah Pemotongan Pohon Pilihan diameter 30 – 50 cm 313,666 0.55 . 86,520 201,146 26,000
3.50 Jam Pekerja Biasa 73,150 L.3.011 . . .
0.35 Jam Mandor 13,370 L.3.003 . . .
0.30 Jam Dump Truck Sedang 68,346 T.3.008 . . .
1.00 Jam Chainsaw 132,800 T.3.065 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.4.(4)
B-038 buah Pemotongan Pohon Pilihan diameter 50 – 75 cm 359,230 0.55 . 86,520 246,710 26,000
3.50 Jam Pekerja Biasa 73,150 L.3.011 . . .
0.35 Jam Mandor 13,370 L.3.003 . . .
0.50 Jam Dump Truck Sedang 113,910 T.3.008 . . .
1.00 Jam Chainsaw 132,800 T.3.065 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.4.(5)
B-039 buah Pemotongan Pohon Pilihan diameter > 75 cm 533,890 0.73 . 115,360 392,530 26,000
4.67 Jam Pekerja Biasa 97,533 L.3.011 . . .
0.47 Jam Mandor 17,827 L.3.003 . . .
1.08 Jam Dump Truck Sedang 248,530 T.3.008 . . .
1.08 Jam Chainsaw 144,000 T.3.065 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 3.1.(8)
B-040 M3 Galian Perkerasan berbutir 133,522 0.25 . 40,900 92,622 -
1.50 Jam Pekerja 31,350 L.3.001 . . .

www.mitra-arsitek.com AHSP BM 13/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.25 Jam Mandor 9,550 L.3.003 . . .
0.27 Jam Jack Hammer 8,889 T.3.026 . . .
0.27 Jam Compressor 31,941 T.3.005 . . .
0.23 Jam Dump Truck Sedang 51,792 T.3.008 . . .
Analisa EI- 3.1.(9).
B-041 M3 Galian Perkerasan Beton 144,771 0.17 . 27,267 117,505 -
1.00 Jam Pekerja 20,900 L.3.001 . . .
0.17 Jam Mandor 6,367 L.3.003 . . .
0.40 Jam Jack Hammer 13,333 T.3.026 . . .
0.40 Jam Compressor 47,912 T.3.005 . . .
0.25 Jam Dump Truck Sedang 56,260 T.3.008 . . .
Analisa EI- 3.5.(1)
B-042 M2 Geotekstil Filler untuk Drainase Bawah Permukaan (Kelas 2) 42,617 0.02 . 3,630 10,387 28,600
0.02 jam Mandor 675 L.3.003 . . .
0.14 jam Pekerja 2,955 L.3.001 . . .
1.00 M2 Geotextile 28,600 M.3.063 . . .
0.02 jam Flat Bed Truck 10,387 T.3.011 . . .
Analisa EI- 3.5.(2a)
B-043 M2 Geotekstile Separator Kelas 1 42,617 0.02 . 3,630 10,387 28,600
0.02 jam Mandor 675 L.3.003 . . .
0.14 jam Pekerja 2,955 L.3.001 . . .
1.00 M2 Geotextile 28,600 M.3.063 . . .
0.02 jam Flat Bed Truck 10,387 T.3.011 . . .
Analisa EI- 3.5.(2b)
B-044 M2 Geotekstile Separator Kelas 2 42,617 0.02 . 3,630 10,387 28,600
0.02 jam Mandor 675 L.3.003 . . .
0.14 jam Pekerja 2,955 L.3.001 . . .
1.00 M2 Geotextile 28,600 M.3.063 . . .
0.02 jam Flat Bed Truck 10,387 T.3.011 . . .
Analisa EI- 3.5.(2c)
B-045 M2 Geotekstile Separator Kelas 3 42,617 0.02 . 3,630 10,387 28,600
0.02 jam Mandor 675 L.3.003 . . .
0.14 jam Pekerja 2,955 L.3.001 . . .
1.00 M2 Geotextile 28,600 M.3.063 . . .
0.02 jam Flat Bed Truck 10,387 T.3.011 . . .
Analisa EI- 3.5.(3)
B-046 M2 Geotekstile Stabilisator (Kelas 1) 42,617 0.02 . 3,630 10,387 28,600
0.02 jam Mandor 675 L.3.003 . . .
0.14 jam Pekerja 2,955 L.3.001 . . .
1.00 M2 Geotextile 28,600 M.3.063 . . .
0.02 jam Flat Bed Truck 10,387 T.3.011 . . .
Analisa EI- 4.2.(1)
B-047 M3 Lapis Pondasi Agregat Kelas A 390,154 0.01 . 1,567 136,666 251,920
0.06 Jam Pekerja 1,243 L.3.001 . . .
0.01 Jam Mandor 325 L.3.003 . . .
1.26 M3 Agr.Base Kelas A 225,920 M.3.003 . . .
0.01 Jam Wheel Loader 2,505 T.3.015 . . .
0.50 Jam Dump Truck Sedang 115,582 T.3.008 . . .
0.01 Jam Motor Grader 7,059 T.3.013 . . .
0.01 Jam Tandem Roller 5,889 T.3.017 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 4.2.(2a)
B-048 M3 Lapis Pondasi Agregat Kelas B 398,145 0.01 . 1,567 136,099 260,479
0.06 Jam Pekerja 1,243 L.3.001 . . .
0.01 Jam Mandor 325 L.3.003 . . .
1.26 M3 Agr.Base Kelas B 234,479 M.3.004 . . .
0.01 Jam Wheel Loader 2,505 T.3.015 . . .

www.mitra-arsitek.com AHSP BM 14/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 Jam Dump Truck Sedang 115,582 T.3.008 . . .
0.01 Jam Motor Grader 7,059 T.3.013 . . .
0.01 Jam Tandem Roller 5,322 T.3.017 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 4.2.(3)
B-049 Ton Semen untuk Lapis Pondasi Semen Tanah 2,269,619 0.37 . 56,988 112,630 2,100,000
2.43 Jam Pekerja 50,799 L.3.001 . . .
0.16 Jam Mandor 6,190 L.3.003 . . .
####### Kg Semen 2,100,000 M.3.107 . . .
0.49 Jam Dump Truck Sedang 112,630 T.3.008 . . .
Analisa EI- 4.2.(4)
B-050 M3 Lapis Pondasi Semen Tanah 253,607 0.01 . 1,480 166,727 85,400
0.06 Jam Pekerja 1,174 L.3.001 . . .
0.01 Jam Mandor 306 L.3.003 . . .
1.20 M3 Bahan Tanah Timbunan 59,400 M.3.026 . . .
0.01 Jam Wheel Loader 2,366 T.3.015 . . .
0.53 Jam Dump Truck Sedang 121,810 T.3.008 . . .
0.01 Jam Motor Grader 7,059 T.3.013 . . .
0.03 Jam Vibratory Roller 5-8 T. 11,261 T.3.019 . . .
0.01 Jam Pneumatic Tire Roller 2,845 T.3.018 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
0.02 Jam Cold Milling 15,755 T.3.036 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 4.2.(5)
B-051 M2 Agregat Penutup BURTU 8,215,751 0.00 . 56 2,396 8,213,300
0.00 Jam Pekerja 51 L.3.001 . . .
0.00 Jam Mandor 5 L.3.003 . . .
33.00 Kg Chipping 8,187,300 M.3.056 . . .
0.00 Jam Wheel Loader 36 T.3.015 . . .
0.01 Jam Dump Truck Sedang 2,075 T.3.008 . . .
0.00 Jam Pneumatic Tire Roller 284 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 4.2.(6)
B-052 Liter Bahan Aspal untuk Pekerjaan Pelaburan 10,327 0.00 . 59 86 10,181
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
1.08 Kg Aspal 9,280 M.3.015 . . .
0.05 Liter Kerosene/Minyak Tanah 901 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 4.2.(7)
B-053 Liter Lapis Resap Pengikat 13,927 0.00 . 59 86 13,781
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.63 Kg Aspal 5,457 M.3.015 . . .
0.48 liter Kerosene/Minyak Tanah 8,325 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 4.2.(2b)
B-054 M3 Lapis Pondasi Agregat Kelas S 385,568 0.01 . 1,567 125,410 258,591
0.06 jam Pekerja 1,243 L.3.001 . . .
0.01 jam Mandor 325 L.3.003 . . .
1.26 M3 Aggregat S 232,591 M.3.002 . . .
0.01 jam Wheel Loader 2,505 T.3.015 . . .
0.49 jam Dump Truck Sedang 111,404 T.3.008 . . .

www.mitra-arsitek.com AHSP BM 15/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.00 jam Motor Grader 3,209 T.3.013 . . .
0.01 jam Tandem Roller 2,661 T.3.017 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.1.(1)
B-055 M3 Lapis Pondasi Agregat Kelas A 387,066 0.01 . 1,567 133,579 251,920
0.06 jam Pekerja 1,243 L.3.001 . . .
0.01 jam Mandor 325 L.3.003 . . .
1.26 M3 Agr.Base Kelas A 225,920 M.3.003 . . .
0.01 jam Wheel Loader 2,505 T.3.015 . . .
0.50 jam Dump Truck Sedang 115,582 T.3.008 . . .
0.00 jam Motor Grader 3,209 T.3.013 . . .
0.01 jam Tandem Roller 6,652 T.3.017 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.1.(2)
B-056 M3 Lapis Pondasi Agregat Kelas B 387,456 0.01 . 1,567 125,410 260,479
0.06 jam Pekerja 1,243 L.3.001 . . .
0.01 jam Mandor 325 L.3.003 . . .
1.26 M3 Agr.Base Kelas B 234,479 M.3.004 . . .
0.01 jam Wheel Loader 2,505 T.3.015 . . .
0.49 jam Dump Truck Sedang 111,404 T.3.008 . . .
0.00 jam Motor Grader 3,209 T.3.013 . . .
0.01 jam Tandem Roller 2,661 T.3.017 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.2,(1)
B-057 M3 Lapis Permukaan Agregat Tanpa Penutup Aspal 354,042 0.01 . 1,567 84,821 267,653
0.06 Jam Pekerja 1,243 L.3.001 . . .
0.01 Jam Mandor 325 L.3.003 . . .
1.26 M3 Agr.Base Kelas C 241,653 M.3.005 . . .
0.01 Jam Wheel Loader 2,505 T.3.015 . . .
0.30 Jam Dump Truck Sedang 68,155 T.3.008 . . .
0.00 Jam Motor Grader 3,209 T.3.013 . . .
0.01 Jam Tandem Roller 5,322 T.3.017 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.4.(2)
B-058 M3 Lapis Pondasi Semen Tanah 218,608 0.03 . 4,053 129,155 85,400
0.18 Jam Pekerja 3,729 L.3.001 . . .
0.01 Jam Mandor 325 L.3.003 . . .
1.20 M3 Bahan Tanah Timbunan 59,400 M.3.026 . . .
0.01 Jam Wheel Loader 2,505 T.3.015 . . .
0.43 Jam Dump Truck Sedang 99,537 T.3.008 . . .
0.00 Jam Motor Grader 3,209 T.3.013 . . .
0.01 Jam Vibratory Roller 5-8 T. 4,504 T.3.019 . . .
0.00 Jam Pneumatic Tire Roller 1,581 T.3.018 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
0.01 Jam Fulvi Mixer 12,187 T.3.027 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.4.(1)
B-059 Ton Semen untuk Lapis Pondasi Semen Tanah 2,312,594 0.37 . 56,988 155,605 2,100,000
2.43 Jam Pekerja 50,799 L.3.001 . . .
0.16 Jam Mandor 6,190 L.3.003 . . .
####### Kg Semen 2,100,000 M.3.107 . . .

www.mitra-arsitek.com AHSP BM 16/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.68 Jam Dump Truck Sedang 155,605 T.3.008 . . .
Analisa EI- 5.3.(2)
B-060 M3 Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal 2,240,693 0.32 . 52,631 166,363 2,021,699
1.41 jam Pekerja 29,378 L.3.001 . . .
0.70 jam Tukang 17,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
410.00 Kg Semen 820,000 M.3.107 . . .
0.62 M3 Pasir Kasar 133,279 M.3.088 . . .
0.79 M3 Agregat Pecah Kasar 118,830 M.3.007 . . .
45.00 Kg Baja Tulangan (Polos) U24 373,500 M.3.031 . . .
1.01 Kg Joint Sealent & Cat Anti Karat 77,265 M.3.066 . . .
0.33 Kg Polytene 125 mikron 6,825 M.3.101 . . .
0.65 Ltr Curing Compound 27,144 M.3.057 . . .
0.57 M2 Formwork Plate 427,500 M.3.060 . . .
0.86 Ltr Additive 37,356 M.3.001 . . .
0.02 jam Wheel Loader 7,199 T.3.015 . . .
0.05 jam Concrete Pan Mixer/Batching Plant 32,942 T.3.043 . . .
0.20 jam Truck Mixer 102,387 T.3.049 . . .
0.05 jam Concrete Vibrator 3,027 T.3.020 . . .
0.04 jam Water Tank Truck 16,893 T.3.023 . . .
0.01 jam Slip Form Paver/Conc. Paver 3,916 T.3.042 . . .
Analisa EI- 5.3.(3)
B-061 M3 Lapis Pondasi bawah Beton Kurus 1,344,112 0.29 . 45,311 164,405 1,134,395
1.51 jam Pekerja 31,476 L.3.001 . . .
0.40 jam Tukang 10,000 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
309.55 Kg Semen 619,100 M.3.107 . . .
0.50 M3 Pasir Kasar 106,657 M.3.088 . . .
0.88 M3 Agregat Pecah Kasar 133,173 M.3.007 . . .
0.16 Lbr Multiplex 12 mm 30,960 M.3.084 . . .
0.10 M3 Kayu Acuan 211,680 M.3.073 . . .
0.25 Kg Paku 6,825 M.3.085 . . .
0.02 jam Wheel Loader 7,199 T.3.015 . . .
0.05 jam Concrete Pan Mixer/Batching Plant 32,942 T.3.043 . . .
0.20 jam Truck Mixer 102,387 T.3.049 . . .
0.05 jam Concrete Vibrator 3,027 T.3.020 . . .
0.04 jam Water Tank Truck 16,893 T.3.023 . . .
0.00 jam Slip Form Paver/Conc. Paver 1,958 T.3.042 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.5.(1)
B-062 M3 Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB) 567,899 0.22 . 35,286 142,690 389,922
1.05 jam Pekerja 22,033 L.3.001 . . .
0.30 jam Tukang 7,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
87.13 Kg Semen 174,250 M.3.107 . . .
1.26 M3 Agregat Pecah Kasar 189,672 M.3.007 . . .
0.02 jam Wheel Loader 7,199 T.3.015 . . .
0.08 jam Concrete Pan Mixer/Batching Plant 49,413 T.3.043 . . .
0.28 jam Dump Truck Sedang 64,895 T.3.008 . . .
0.01 jam Vibratory Roller 5-8 T. 2,283 T.3.019 . . .
0.04 jam Water Tank Truck 16,893 T.3.023 . . .
0.01 jam Screed Paver 2,008 T.3.068 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .

www.mitra-arsitek.com AHSP BM 17/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
Analisa EI- 5.5.(2)
B-063 M3 Lapis Pondasi Bawah (Cement Treated Sub Base) (CTSB) 619,818 0.22 . 35,286 143,359 441,172
1.05 jam Pekerja 22,033 L.3.001 . . .
0.30 jam Tukang 7,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
112.75 Kg Semen 225,500 M.3.107 . . .
1.26 M3 Agregat Pecah Kasar 189,672 M.3.007 . . .
0.02 jam Wheel Loader 7,199 T.3.015 . . .
0.08 jam Concrete Pan Mixer/Batching Plant 49,413 T.3.043 . . .
0.28 jam Dump Truck Sedang 64,895 T.3.008 . . .
0.01 jam Vibratory Roller 5-8 T. 2,283 T.3.019 . . .
0.04 jam Water Tank Truck 16,893 T.3.023 . . .
0.01 jam Screed Paver 2,677 T.3.068 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.2,(2)
B-064 M3 Lapis Pondasi Agregat Tanpa Penutup Aspal 377,620 0.01 . 1,567 123,503 252,550
0.06 jam Pekerja 1,243 L.3.001 . . .
0.01 jam Mandor 325 L.3.003 . . .
1.26 M3 Lapis Pondasi Aggregat 226,550 M.3.077 . . .
0.01 jam Wheel Loader 2,505 T.3.015 . . .
0.49 jam Dump Truck Sedang 111,464 T.3.008 . . .
0.00 jam Motor Grader 2,406 T.3.013 . . .
0.00 jam Tandem Roller 1,497 T.3.017 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 5.3.(1)
B-065 M3 Perkerasan Jalan Beton 1,931,163 0.32 . 52,631 191,830 1,686,702
1.41 jam Pekerja 29,378 L.3.001 . . .
0.70 jam Tukang 17,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
410.00 Kg Semen 820,000 M.3.107 . . .
0.62 M3 Pasir Kasar 133,279 M.3.088 . . .
0.79 M3 Agregat Pecah Kasar 118,830 M.3.007 . . .
15.88 Kg Baja Tulangan (Polos) U32 209,550 M.3.032 . . .
1.01 Kg Joint Sealent & Cat Anti Karat 77,265 M.3.066 . . .
0.44 Kg Polytene 125 mikron 9,100 M.3.101 . . .
0.87 Ltr Curing Compound 36,192 M.3.057 . . .
0.16 Lbr Multiplex 12 mm 30,960 M.3.084 . . .
0.10 M3 Kayu Acuan 211,680 M.3.073 . . .
0.91 Ltr Additive 39,847 M.3.001 . . .
0.02 jam Wheel Loader 7,199 T.3.015 . . .
0.05 jam Concrete Pan Mixer/Batching Plant 32,942 T.3.043 . . .
0.24 jam Truck Mixer 127,853 T.3.049 . . .
0.05 jam Concrete Vibrator 3,027 T.3.020 . . .
0.04 jam Water Tank Truck 16,893 T.3.023 . . .
0.01 jam Slip Form Paver/Conc. Paver 3,916 T.3.042 . . .
Analisa EI- 6.1 (1)(a)
B-066 Liter Lapis Resap Pengikat - Aspal Cair 12,363 0.00 . 59 86 12,217
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.68 Kg Aspal 5,839 M.3.015 . . .
0.37 liter Kerosene/Minyak Tanah 6,378 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .

www.mitra-arsitek.com AHSP BM 18/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
Analisa EI- 6.1 (2)(a)
B-067 Liter Lapis Perekat - Aspal Cair 10,988 0.00 . 59 86 10,842
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.85 Kg Aspal 7,299 M.3.015 . . .
0.21 liter Kerosene/Minyak Tanah 3,543 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 6.2 (1)
B-068 M2 Agregat Penutup BURTU 5,745,420 0.03 . 4,850 8,270 5,732,300
0.21 Jam Pekerja 4,444 L.3.001 . . .
0.01 Jam Mandor 406 L.3.003 . . .
23.00 Kg Chipping 5,706,300 M.3.056 . . .
0.01 Jam Wheel Loader 3,135 T.3.015 . . .
0.02 Jam Dump Truck Sedang 4,898 T.3.008 . . .
0.00 Jam Pneumatic Tire Roller 237 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.2 (2)
B-069 M2 Agregat Penutup BURDA 8,730,646 0.05 . 8,083 13,063 8,709,500
0.35 Jam Pekerja 7,406 L.3.001 . . .
0.02 Jam Mandor 677 L.3.003 . . .
35.00 Kg Chipping 8,683,500 M.3.056 . . .
0.02 Jam Wheel Loader 5,225 T.3.015 . . .
0.03 Jam Dump Truck Sedang 7,364 T.3.008 . . .
0.00 Jam Pneumatic Tire Roller 474 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3 (1)
B-070 Ton Latasir Kelas A (SS-A) 1,272,720 0.02 . 3,705 167,889 1,101,126
0.14 Jam Pekerja 2,938 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.21 M3 Pasir Kasar 44,570 M.3.088 . . .
0.42 M3 Pasir Halus 81,756 M.3.087 . . .
31.50 Kg Semen 63,000 M.3.107 . . .
103.00 Kg Aspal 885,800 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.01 Jam Dump Truck Sedang 2,797 T.3.008 . . .
0.04 Jam Asphalt Finisher 40,910 T.3.002 . . .
0.03 Jam Tandem Roller 15,765 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 4,789 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3 (2)
B-071 Ton Latasir Kelas B (SS-B) 1,049,087 0.02 . 3,705 153,458 891,924
0.14 Jam Pekerja 2,938 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.01 M3 Pasir Kasar 2,975 M.3.088 . . .
0.01 M3 Pasir Halus 2,729 M.3.087 . . .
31.50 Kg Semen 63,000 M.3.107 . . .
92.70 Kg Aspal 797,220 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.02 Jam Dump Truck Sedang 3,729 T.3.008 . . .
0.03 Jam Asphalt Finisher 30,683 T.3.002 . . .

www.mitra-arsitek.com AHSP BM 19/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 Jam Tandem Roller 11,824 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 3,594 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(3a)
B-072 Ton Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) 1,038,939 0.02 . 3,516 218,238 817,184
0.13 Jam Pekerja 2,788 L.3.001 . . .
0.02 Jam Mandor 728 L.3.003 . . .
0.24 M3 Agregat Pecah Mesin 5-10 & 10-20 mm 22,400 M.3.009 . . .
0.15 M3 Lolos screen2 ukuran ( 0 - 5) 27,319 M.3.078 . . .
0.25 M3 Pasir Halus 48,631 M.3.087 . . .
23.10 Kg Semen 46,200 M.3.107 . . .
75.19 Kg Aspal 646,634 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.02 Jam Asphalt Finisher 20,180 T.3.002 . . .
0.02 Jam Tandem Roller 7,777 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 1,898 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(3b)
B-073 Ton Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang)
1,038,939 0.02 . 3,516 218,238 817,184
0.13 Jam Pekerja 2,788 L.3.001 . . .
0.02 Jam Mandor 728 L.3.003 . . .
0.24 M3 Agregat Pecah Mesin 5-10 & 10-20 mm 22,400 M.3.009 . . .
0.15 M3 Lolos screen2 ukuran ( 0 - 5) 27,319 M.3.078 . . .
0.25 M3 Pasir Halus 48,631 M.3.087 . . .
23.10 Kg Semen 46,200 M.3.107 . . .
75.19 Kg Aspal 646,634 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.02 Jam Asphalt Finisher 20,180 T.3.002 . . .
0.02 Jam Tandem Roller 7,777 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 1,898 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3.(4a)
B-074 Ton Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) 888,935 0.00 . 753 202,704 685,477
0.03 Jam Pekerja 597 L.3.001 . . .
0.00 Jam Mandor 156 L.3.003 . . .
0.30 M3 Agregat Pecah Mesin 5-10 & 10-20 mm 27,152 M.3.009 . . .
0.14 M3 Lolos screen2 ukuran ( 0 - 5) 24,943 M.3.078 . . .
0.23 M3 Pasir Halus 44,402 M.3.087 . . .
15.75 Kg Semen 31,500 M.3.107 . . .
61.80 Kg Aspal 531,480 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.00 Jam Asphalt Finisher 4,324 T.3.002 . . .
0.02 Jam Tandem Roller 7,827 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,169 T.3.018 . . .

www.mitra-arsitek.com AHSP BM 20/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3.(4b)
B-075 Ton Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi 888,935
senjang) 0.00 . 753 202,704 685,477
0.03 Jam Pekerja 597 L.3.001 . . .
0.00 Jam Mandor 156 L.3.003 . . .
0.30 M3 Agregat Pecah Mesin 5-10 & 10-20 mm 27,152 M.3.009 . . .
0.14 M3 Lolos screen2 ukuran ( 0 - 5) 24,943 M.3.078 . . .
0.23 M3 Pasir Halus 44,402 M.3.087 . . .
15.75 Kg Semen 31,500 M.3.107 . . .
61.80 Kg Aspal 531,480 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.00 Jam Asphalt Finisher 4,324 T.3.002 . . .
0.02 Jam Tandem Roller 7,827 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,169 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(5a)
B-076 Ton Laston Lapis Aus (AC-WC) 911,302 0.03 . 4,964 212,208 694,131
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.30 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 45,481 M.3.080 . . .
0.35 M3 Lolos screen2 ukuran ( 0 - 5) 62,572 M.3.078 . . .
9.87 Kg Semen 19,740 M.3.107 . . .
62.83 Kg Aspal 540,338 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 14,548 T.3.002 . . .
0.01 Jam Tandem Roller 6,720 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,556 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(5b)
B-077 Ton Laston Lapis Aus Modifikasi (AC-WC Mod) 907,272 0.03 . 4,964 212,208 690,100
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.30 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 45,436 M.3.080 . . .
0.35 M3 Lolos screen2 ukuran ( 0 - 5) 62,500 M.3.078 . . .
9.87 Kg Semen 19,740 M.3.107 . . .
63.86 Kg Aspal Modifikasi 536,424 M.3.017 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 14,548 T.3.002 . . .
0.01 Jam Tandem Roller 6,720 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,556 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(5c)
B-078 Ton Laston Lapis Aus Perata (AC-WC(L)) 911,302 0.03 . 4,964 212,208 694,131
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .

www.mitra-arsitek.com AHSP BM 21/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 45,481 M.3.080 . . .
0.35 M3 Lolos screen2 ukuran ( 0 - 5) 62,572 M.3.078 . . .
9.87 Kg Semen 19,740 M.3.107 . . .
62.83 Kg Aspal 540,338 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 14,548 T.3.002 . . .
0.01 Jam Tandem Roller 6,720 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,556 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(5d)
B-079 Ton Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) 985,473 0.03 . 4,964 212,208 768,302
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.29 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 44,939 M.3.080 . . .
0.35 M3 Lolos screen2 ukuran ( 0 - 5) 61,835 M.3.078 . . .
9.77 Kg Filler Added 11,718 M.3.059 . . .
74.26 Kg Aspal modifikasi 623,809 M.3.017 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 14,548 T.3.002 . . .
0.01 Jam Tandem Roller 6,720 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,556 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(6a)
B-080 Ton Laston Lapis Antara (AC-BC) 862,044 0.03 . 4,964 207,443 649,637
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.35 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 53,161 M.3.080 . . .
0.31 M3 Lolos screen2 ukuran ( 0 - 5) 55,528 M.3.078 . . .
9.45 Kg Semen 18,900 M.3.107 . . .
57.68 Kg Aspal 496,048 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 11,638 T.3.002 . . .
0.01 Jam Tandem Roller 5,376 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,045 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(6b)
B-081 Ton Laston Lapis Antara Modifikasi (AC-BC Mod) 930,752 0.03 . 4,964 207,443 718,345
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.34 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 52,581 M.3.080 . . .
0.31 M3 Lolos screen2 ukuran ( 0 - 5) 54,923 M.3.078 . . .
9.35 Kg Filler Added 11,214 M.3.059 . . .
68.29 Kg Aspal modifikasi 573,628 M.3.017 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .

www.mitra-arsitek.com AHSP BM 22/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 11,638 T.3.002 . . .
0.01 Jam Tandem Roller 5,376 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,045 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(6c)
B-082 Ton Laston Lapis Antara Perata (AC-BC(L)) 862,044 0.03 . 4,964 207,443 649,637
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.35 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 53,161 M.3.080 . . .
0.31 M3 Lolos screen2 ukuran ( 0 - 5) 55,528 M.3.078 . . .
9.45 Kg Semen 18,900 M.3.107 . . .
57.68 Kg Aspal 496,048 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 11,638 T.3.002 . . .
0.01 Jam Tandem Roller 5,376 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,045 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(6d)
B-083 Ton Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling 930,752 0.03 . 4,964 207,443 718,345
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.34 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 52,581 M.3.080 . . .
0.31 M3 Lolos screen2 ukuran ( 0 - 5) 54,923 M.3.078 . . .
9.35 Kg Filler Added 11,214 M.3.059 . . .
68.29 Kg Aspal Modifikasi 573,628 M.3.017 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 11,638 T.3.002 . . .
0.01 Jam Tandem Roller 5,376 T.3.017 . . .
0.00 Jam Pneumatic Tire Roller 2,045 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(7a)
B-084 Ton Laston Lapis Pondasi (AC-Base) 793,943 0.03 . 4,964 204,835 584,145
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.13 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 20,098 M.3.080 . . .
0.30 M3 Lolos screen2 ukuran ( 5 - 9,5) 49,998 M.3.079 . . .
0.24 M3 Lolos screen2 ukuran ( 0 - 5) 42,914 M.3.078 . . .
9.98 Kg Semen 19,950 M.3.107 . . .
49.44 Kg Aspal 425,184 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 9,699 T.3.002 . . .

www.mitra-arsitek.com AHSP BM 23/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 Jam Tandem Roller 4,480 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,272 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(7b)
B-085 Ton Laston Lapis Pondasi Modifikasi (AC-Base Mod) 855,036 0.03 . 4,964 207,121 642,952
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.13 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 19,906 M.3.080 . . .
0.30 M3 Lolos screen2 ukuran ( 5 - 9,5) 49,527 M.3.079 . . .
0.24 M3 Lolos screen2 ukuran ( 0 - 5) 42,510 M.3.078 . . .
9.87 Kg Filler Added 11,844 M.3.059 . . .
58.71 Kg Aspal Modifikasi 493,164 M.3.017 . . .
0.02 Jam Wheel Loader 5,109 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 9,699 T.3.002 . . .
0.01 Jam Tandem Roller 4,480 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,272 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(7c)
B-086 Ton Laston Lapis Pondasi Perata (AC-Base(L)) 793,943 0.03 . 4,964 204,835 584,145
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.13 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 20,098 M.3.080 . . .
0.30 M3 Lolos screen2 ukuran ( 5 - 9,5) 49,998 M.3.079 . . .
0.24 M3 Lolos screen2 ukuran ( 0 - 5) 42,914 M.3.078 . . .
9.98 Kg Semen 19,950 M.3.107 . . .
49.44 Kg Aspal 425,184 M.3.015 . . .
0.01 Jam Wheel Loader 2,823 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 9,699 T.3.002 . . .
0.01 Jam Tandem Roller 4,480 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,272 T.3.018 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.3(7d)
B-087 Ton Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) 855,036 0.03 . 4,964 207,121 642,952
0.20 Jam Pekerja 4,197 L.3.001 . . .
0.02 Jam Mandor 767 L.3.003 . . .
0.13 M3 Lolos screen2 ukuran ( 9.5 - 19,0) 19,906 M.3.080 . . .
0.30 M3 Lolos screen2 ukuran ( 5 - 9,5) 49,527 M.3.079 . . .
0.24 M3 Lolos screen2 ukuran ( 0 - 5) 42,510 M.3.078 . . .
9.87 Kg Filler Added 11,844 M.3.059 . . .
58.71 Kg Aspal Modifikasi 493,164 M.3.017 . . .
0.02 Jam Wheel Loader 5,109 T.3.015 . . .
0.02 Jam Asphalt Mixing Plant 91,604 T.3.001 . . .
0.02 Jam Generator Set 9,201 T.3.012 . . .
0.37 Jam Dump Truck Sedang 84,756 T.3.008 . . .
0.01 Jam Asphalt Finisher 9,699 T.3.002 . . .
0.01 Jam Tandem Roller 4,480 T.3.017 . . .
0.01 Jam Pneumatic Tire Roller 2,272 T.3.018 . . .

www.mitra-arsitek.com AHSP BM 24/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.5.(1)
B-088 M3 Campuran Aspal Dingin untuk Pelapisan 1,361,464 0.15 . 24,083 106,042 1,231,338
1.00 jam Pekerja 20,900 L.3.001 . . .
0.08 jam Mandor 3,183 L.3.003 . . .
1.35 M3 Lolos screen2 ukuran ( 0 - 5) 239,548 M.3.078 . . .
153.30 Kg Aspal Emulsi 965,790 M.3.016 . . .
0.08 jam Concrete Mixer 14,117 T.3.006 . . .
0.02 jam Tandem Roller 11,973 T.3.017 . . .
0.35 jam Dump Truck Sedang 79,952 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 6.6.(1)
B-089 M3 Lapis Permukaan Penetrasi Macadam 1,225,482 0.02 . 3,504 72,293 1,149,685
0.14 Jam Pekerja 2,962 L.3.001 . . .
0.01 Jam Mandor 541 L.3.003 . . .
1.67 M3 Agregat Pecah Kasar 251,520 M.3.007 . . .
0.15 M3 Agregat Halus 24,327 M.3.006 . . .
98.59 Kg Aspal 847,837 M.3.015 . . .
0.01 Jam Wheel Loader 2,090 T.3.015 . . .
0.18 Jam Dump Truck Sedang 41,781 T.3.008 . . .
0.04 Jam Three Wheel Roller 6-8 T 7,892 T.3.016 . . .
0.38 Jam Asphalt Sprayer 20,530 T.3.003 . . .
1.00 Ls Alat bantu 26,000 M.3.011 . . .
Analisa EI- 6.6.(2)
B-090 M3 Lapis Pondasi/Perata Penetrasi Macadam 1,295,056 0.02 . 3,504 71,767 1,219,785
0.14 Jam Pekerja 2,962 L.3.001 . . .
0.01 Jam Mandor 541 L.3.003 . . .
1.77 M3 Agregat Pecah Kasar 267,439 M.3.007 . . .
0.25 M3 Agregat Halus 40,546 M.3.006 . . .
103.00 Kg Aspal 885,800 M.3.015 . . .
0.01 Jam Wheel Loader 2,090 T.3.015 . . .
0.18 Jam Dump Truck Sedang 41,781 T.3.008 . . .
0.04 Jam Three Wheel Roller 6-8 T 7,366 T.3.016 . . .
0.38 Jam Asphalt Sprayer 20,530 T.3.003 . . .
1.00 Ls Alat bantu 26,000 M.3.011 . . .
Analisa EI- 6.1 (1)(b)
B-091 Liter Lapis Resap Pengikat - Aspal Emulsi 6,700 0.00 . 59 86 6,554
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
1.04 Kg Aspal Emulsi 6,554 M.3.016 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 6.1 (2)(b)
B-092 Liter Lapis Perekat - Aspal Emulsi 4,958 0.00 . 59 1,021 3,877
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.52 Kg Aspal Emulsi 3,277 M.3.016 . . .
1.00 Liter Air 600 M.3.010 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
0.03 Jam Asphalt Liquid Mixer 935 T.3.034 . . .
Analisa EI- 6.1 (2)(c)
B-093 Liter Lapis Perekat - Aspal Emulsi Modifikasi 6,602 0.00 . 59 86 6,456
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
1.02 Kg Aspal Emulsi 6,436 M.3.016 . . .

www.mitra-arsitek.com AHSP BM 25/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.02 Kg Bahan Modifikasi 20 M.3.021 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 6.2 (3a)
B-094 Liter Bahan Aspal untuk Pekerjaan Pelaburan 9,673 0.00 . 59 86 9,528
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.98 Kg Aspal 8,394 M.3.015 . . .
0.07 Ltr Kerosene/Minyak Tanah 1,134 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 6.2 (3b)
B-095 Liter Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan 9,292 0.00 . 59 86 9,146
0.00 Jam Pekerja 44 L.3.001 . . .
0.00 Jam Mandor 16 L.3.003 . . .
0.99 Kg Aspal Modifikasi 8,296 M.3.017 . . .
0.05 Ltr Kerosene/Minyak Tanah 850 M.3.076 . . .
0.00 Jam Asphalt Distributor 61 T.3.041 . . .
0.00 Jam Compressor 25 T.3.005 . . .
Analisa EI- 6.2 (4a)
B-096 Liter Aspal Cair Emulsi untuk Precoated 38,706 0.17 . 28,540 638 9,528
1.00 Jam Pekerja 20,900 L.3.001 . . .
0.20 Jam Mandor 7,640 L.3.003 . . .
0.98 Kg Aspal 8,394 M.3.015 . . .
0.07 liter Kerosene/Minyak Tanah 1,134 M.3.076 . . .
0.00 Jam Concrete Pan Mixer/Batching Plant 638 T.3.043 . . .
Analisa EI- 6.2 (4b)
B-097 Liter Aspal Emulsi untuk Precoated 64,729 0.34 . 57,080 638 7,011
2.00 Jam Pekerja 41,800 L.3.001 . . .
0.40 Jam Mandor 15,280 L.3.003 . . .
0.98 Kg Aspal Emulsi 6,161 M.3.016 . . .
0.05 Liter Kerosene/Minyak Tanah 850 M.3.076 . . .
0.00 Jam Concrete Pan Mixer/Batching Plant 638 T.3.043 . . .
Analisa EI- 6.2 (4c)
B-098 Liter Aspal Emulsi Modifikasi untuk Precoated 64,842 0.34 . 57,080 638 7,124
2.00 Jam Pekerja 41,800 L.3.001 . . .
0.40 Jam Mandor 15,280 L.3.003 . . .
0.96 Kg Aspal Emulsi 6,030 M.3.016 . . .
0.06 Liter Kerosene/Minyak Tanah 1,074 M.3.076 . . .
0.02 Kg Bahan Modifikasi 21 M.3.021 . . .
0.00 Jam Concrete Pan Mixer/Batching Plant 638 T.3.043 . . .
Analisa EI-7.1 (2)
B-099 :M3 :Beton mutu tinggi fc’=45 Mpa 2,783,395 0.39 . 65,622 247,071 2,470,702
0.80 jam Pekerja 16,787 L.3.001 . . .
1.81 jam Tukang 45,000 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
595.34 Kg Semen 1,190,680 M.3.107 . . .
0.43 M3 Pasir Kasar 92,861 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 112,121 M.3.007 . . .
0.40 M3 Kayu Perancah 918,000 M.3.075 . . .
4.80 Kg Paku 131,040 M.3.085 . . .
0.10 jam Concrete Pan Mixer/Batching Plant 65,884 T.3.043 . . .
0.32 jam Truck Mixer 165,903 T.3.049 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.1 (4)
B-100 :M3 :Beton mutu tinggi fc’=35 Mpa 2,591,893 0.39 . 65,622 247,071 2,279,200

www.mitra-arsitek.com AHSP BM 26/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.80 jam Pekerja 16,787 L.3.001 . . .
1.81 jam Tukang 45,000 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
492.34 Kg Semen 984,680 M.3.107 . . .
0.50 M3 Pasir Kasar 107,360 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 112,121 M.3.007 . . .
0.40 M3 Kayu Perancah 918,000 M.3.075 . . .
4.80 Kg Paku 131,040 M.3.085 . . .
0.10 jam Concrete Pan Mixer/Batching Plant 65,884 T.3.043 . . .
0.32 jam Truck Mixer 165,903 T.3.049 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (5)
B-101
a :M3 :Beton mutu sedang fc’=30 MPa lantai jembatan 2,505,483 0.39 . 65,622 247,071 2,192,789
0.80 jam Pekerja 16,787 L.3.001 . . .
1.81 jam Tukang 45,000 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
469.68 Kg Semen 939,360 M.3.107 . . .
0.51 M3 Pasir Kasar 109,949 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 112,121 M.3.007 . . .
0.40 M3 Kayu Perancah 918,000 M.3.075 . . .
3.20 Kg Paku 87,360 M.3.085 . . .
0.10 jam Concrete Pan Mixer/Batching Plant 65,884 T.3.043 . . .
0.32 jam Truck Mixer 165,903 T.3.049 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (6)
B-102 :M3 :Beton mutu sedang fc’= 25 Mpa 1,984,267 0.29 . 48,122 247,071 1,689,074
0.80 jam Pekerja 16,787 L.3.001 . . .
1.10 jam Tukang 27,500 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
469.68 Kg Semen 939,360 M.3.107 . . .
0.51 M3 Pasir Kasar 108,913 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 112,121 M.3.007 . . .
0.20 M3 Kayu Perancah 459,000 M.3.075 . . .
1.60 Kg Paku 43,680 M.3.085 . . .
0.10 jam Concrete Pan Mixer/Batching Plant 65,884 T.3.043 . . .
0.32 jam Truck Mixer 165,903 T.3.049 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (7)
B-103
a :M3 :Beton mutu sedang fc’= 20 MPa 1,896,238 0.29 . 48,122 247,071 1,601,045
0.80 jam Pekerja Biasa 16,787 L.3.011 . . .
1.10 jam Tukang 27,500 L.3.002 . . .
0.10 jam Mandor 3,835 L.3.003 . . .
422.30 Kg Semen 844,600 M.3.107 . . .
0.54 M3 Pasir Kasar 115,645 M.3.088 . . .
0.74 M3 Agregat Pecah Kasar 112,121 M.3.007 . . .
0.20 M3 Kayu Perancah 459,000 M.3.075 . . .
1.60 Kg Paku 43,680 M.3.085 . . .
0.10 jam Concrete Pan Mixer/Batching Plant 65,884 T.3.043 . . .
0.32 jam Truck Mixer 165,903 T.3.049 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .

www.mitra-arsitek.com AHSP BM 27/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (8)
B-104 :M3 :Beton mutu rendah fc’= 15 MPa 1,395,758 0.49 . 88,618 130,939 1,176,201
1.37 jam Pekerja 28,538 L.3.001 . . .
1.37 jam Tukang 34,000 L.3.002 . . .
0.68 jam Mandor 26,080 L.3.003 . . .
327.54 Kg Semen 655,080 M.3.107 . . .
0.50 M3 Pasir Kasar 107,360 M.3.088 . . .
0.91 M3 Agregat Pecah Kasar 136,421 M.3.007 . . .
0.10 M3 Kayu Perancah 229,500 M.3.075 . . .
0.80 Kg Paku 21,840 M.3.085 . . .
0.68 jam Concrete Mixer 115,655 T.3.006 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (9)
B-105 :M3 :Beton Siklop fc’=15 Mpa 1,197,785 1.37 . 214,309 172,107 811,369
8.19 jam Pekerja 171,229 L.3.001 . . .
0.68 jam Tukang 17,000 L.3.002 . . .
0.68 jam Mandor 26,080 L.3.003 . . .
229.28 Kg Semen 458,556 M.3.107 . . .
0.35 M3 Pasir Kasar 75,152 M.3.088 . . .
0.63 M3 Agregat Pecah Kasar 95,495 M.3.007 . . .
0.65 M3 Batu Belah 156,166 M.3.036 . . .
0.68 jam Concrete Mixer 115,655 T.3.006 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
0.68 jam Concrete Vibrator 41,169 T.3.020 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI-7.1 (10)
B-106 :M3 :Beton mutu rendah fc’= 10 Mpa 1,239,026 0.49 . 88,618 130,939 1,019,469
1.37 jam Pekerja 28,538 L.3.001 . . .
1.37 jam Tukang 34,000 L.3.002 . . .
0.68 jam Mandor 26,080 L.3.003 . . .
311.06 Kg Semen 622,120 M.3.107 . . .
0.51 M3 Pasir Kasar 109,258 M.3.088 . . .
0.91 M3 Agregat Pecah Kasar 136,421 M.3.007 . . .
0.05 M3 Kayu Perancah 114,750 M.3.075 . . .
0.40 Kg Paku 10,920 M.3.085 . . .
0.68 jam Concrete Mixer 115,655 T.3.006 . . .
0.04 jam Water Tank Truck 15,284 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2 (1a)
B-107 Buah Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter 15,900,000 - . - - 15,900,000
1.00 buah Pracetak Gelagar Tipe I bentang 15,900,000 M.3.102 . . .
Analisa EI- 7.2 (1b)
B-108 Buah Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter 15,900,000 - . - - 15,900,000
1.00 buah Pracetak Gelagar Tipe I bentang 15,900,000 M.3.102 . . .
Analisa EI- 7.2 (1c)
B-109 Buah Unit Pracetak Gelagar I Penyediaan Unit Pracetak Gelagar Tipe 115,900,000
Bentang … meter
- . - - 15,900,000
1.00 buah Pracetak Gelagar Tipe I bentang 15,900,000 M.3.102 . . .
Analisa EI- 7.2 (1a)
B-110 Buah Unit Pracetak Gelagar I Penyediaan Unit Pracetak Gelagar Tipe 131,188,192
Bentang 16 meter
3.43 . 538,900 849,940 29,799,352
18.00 jam Pekerja 376,200 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
4.25 M3 Beton K-500 12,490,325 M.3.045 . . .
283.92 kg Kabel prategang 3,094,728 M.3.068 . . .
566.01 kg Baja Tulangan (Ulir) D32 5,603,499 M.3.033 . . .

www.mitra-arsitek.com AHSP BM 28/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
6.00 kg Anchorage 3,880,800 M.3.013 . . .
96.00 M Ducting (Strand prestress) 4,704,000 M.3.058 . . .
0.90 jam Crane On Track 35 Ton 327,289 T.3.031 . . .
0.90 jam Crane On Track 75-100 Ton 522,651 T.3.051 . . .
1.00 LS Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2 (1b)
B-111 Buah Unit Pracetak Gelagar I Penyediaan Unit Pracetak Gelagar Tipe 151,368,152
Bentang 25 meter
3.43 . 538,900 849,940 49,979,313
18.00 jam Pekerja 376,200 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
6.64 M3 Beton K-500 19,516,133 M.3.045 . . .
443.63 kg Kabel prategang 4,835,513 M.3.068 . . .
884.39 kg Baja Tulangan (Ulir) D32 8,755,467 M.3.033 . . .
9.00 kg Anchorage 5,821,200 M.3.013 . . .
225.00 M Ducting (Strand prestress) 11,025,000 M.3.058 . . .
0.90 jam Crane On Track 35 Ton 327,289 T.3.031 . . .
0.90 jam Crane On Track 75-100 Ton 522,651 T.3.051 . . .
1.00 LS Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2 (1c)
B-112 Buah Unit Pracetak Gelagar I Penyediaan Unit Pracetak Gelagar Tipe 155,526,397
Bentang … meter
3.43 . 538,900 849,940 54,137,558
18.00 jam Pekerja 376,200 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
9.30 M3 Beton K-500 27,322,586 M.3.045 . . .
621.08 kg Kabel prategang 6,769,718 M.3.068 . . .
####### kg Baja Tulangan (Ulir) D32 12,257,654 M.3.033 . . .
12.00 kg Anchorage 7,761,600 M.3.013 . . .
0.90 (E31) Crane On Track 35 Ton 327,289 T.3.031 . . .
0.90 (E31) Crane On Track 75-100 Ton 522,651 T.3.051 . . .
1.00 LS Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2 (3)a
B-113 Buah Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter 19,400,000 - . - - 19,400,000
1.00 buah Pracetak Gelagar Tipe U bentang 19,400,000 M.3.103 . . .
Analisa EI- 7.2 (3)b
B-114 Buah Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter 19,400,000 - . - - 19,400,000
1.00 buah Pracetak Gelagar Tipe U bentang 19,400,000 M.3.103 . . .
Analisa EI- 7.2 (4)a
B-115 Buah Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter 1,440,440 3.43 . 538,900 875,540 26,000
18.00 jam Pekerja 376,200 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
0.90 jam Crane On Track 35 Ton 327,289 T.3.031 . . .
0.90 jam Crane On Track 75-100 Ton 522,651 T.3.051 . . .
1.00 jam Jack Hidraulik 25,600 T.3.058 . . .
1.00 LS Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2 (4)b
B-116 Buah Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter 1,440,440 3.43 . 538,900 875,540 26,000
18.00 jam Pekerja 376,200 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
0.90 jam Crane On Track 35 Ton 327,289 T.3.031 . . .
0.90 jam Crane On Track 75-100 Ton 522,651 T.3.051 . . .
1.00 jam Jack Hidraulik 25,600 T.3.058 . . .
1.00 LS Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2.(7)
B-117 Kg Baja Prategang 355,309 0.52 . 81,958 236,452 36,900
3.01 jam Pekerja 62,952 L.3.001 . . .

www.mitra-arsitek.com AHSP BM 29/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.30 jam Tukang 7,500 L.3.002 . . .
0.30 jam Mandor 11,506 L.3.003 . . .
1.00 Kg Kabel Prategang 10,900 M.3.068 . . .
0.18 jam Dump Truck Sedang 40,789 T.3.008 . . .
0.30 jam Crane 195,663 T.3.007 . . .
1.00 jam Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2.(8)
B-118 Buah Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter
18,970,149 2.57 . 413,500 2,791,875 15,764,774
12.00 jam Pekerja 250,800 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
1.37 M3 Beton K-400 3,335,485 M.3.044 . . .
289.00 kg Baja Tulangan (Polos) U24 2,398,700 M.3.031 . . .
5.92 m' Kabel Prategang Selongsong 123,644 M.3.069 . . .
6.38 kg Kabel Baja Prategang 76,560 M.3.067 . . .
3.91 m3 Kayu Perancah 8,971,483 M.3.075 . . .
3.00 kg Baut Angkur 138,000 M.3.038 . . .
11.28 Kg Bahan Grouting 426,344 M.3.020 . . .
3.91 m2 Bahan Curing 268,558 M.3.019 . . .
0.90 jam Crane 586,988 T.3.007 . . .
7.80 Jam Concrete Pump 1,716,514 T.3.028 . . .
2.41 jam Jack Hidraulik 61,687 T.3.058 . . .
2.71 jam Grouting Pump 426,687 T.3.057 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2.(9)
B-119 Buah Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter
21,155,306 2.57 . 413,500 2,109,954 18,631,852
12.00 jam Pekerja 250,800 L.3.001 . . .
5.00 jam Tukang 124,500 L.3.002 . . .
1.00 jam Mandor 38,200 L.3.003 . . .
2.27 M3 Beton K-400 5,533,974 M.3.044 . . .
289.00 kg Baja Tulangan (Polos) U24 2,398,700 M.3.031 . . .
5.92 m' Kabel Prategang Selongsong 123,644 M.3.069 . . .
6.38 kg Kabel Baja Prategang 76,560 M.3.067 . . .
4.19 m3 Kayu Perancah 9,620,640 M.3.075 . . .
3.00 buah Baut Angkur 138,000 M.3.038 . . .
11.28 Kg Bahan Grouting 426,344 M.3.020 . . .
4.19 m2 Bahan Curing 287,990 M.3.019 . . .
0.90 jam Crane 586,988 T.3.007 . . .
4.70 Jam Concrete Pump 1,034,592 T.3.028 . . .
2.41 jam Jack Hidraulik 61,687 T.3.058 . . .
2.71 jam Grouting Pump 426,687 T.3.057 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.2.(10)
B-120 m3 Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran 1.55
1,623,576 (post tension)
. 245,873 586,988 790,715
9.04 jam Pekerja 188,855 L.3.001 . . .
0.90 jam Tukang 22,500 L.3.002 . . .
0.90 jam Mandor 34,518 L.3.003 . . .
0.16 m3 Beton K-350 398,271 M.3.043 . . .
31.59 kg Baja Struktur 366,444 M.3.028 . . .
0.90 jam Crane 586,988 T.3.007 . . .
1.00 jam Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (1)
B-121 Kg :Baja Tulangan U 24 Polos 39,596 0.03 . 4,403 - 35,193
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .

www.mitra-arsitek.com AHSP BM 30/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.10 Kg Baja Tulangan (Polos) U24 9,130 M.3.031 . . .
0.00 Kg Kawat Beton 63 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (2)
B-122 Kg :Baja Tulangan U 32 Polos 45,429 0.03 . 4,403 - 41,026
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.10 Kg Baja Tulangan (Polos) U32 14,520 M.3.032 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (3)
B-123 Kg :Baja Tulangan U 32 Ulir 41,799 0.03 . 4,403 - 37,396
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.10 Kg Baja Tulangan (Ulir) D32 10,890 M.3.033 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (4)
B-124 Kg :Baja Tulangan U 39 Ulir 42,984 0.03 . 4,403 - 38,581
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.05 Kg Baja Tulangan (Ulir) D39 12,075 M.3.034 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (5)
B-125 Kg :Baja Tulangan U 48 Ulir 43,449 0.03 . 4,403 - 39,046
0.11 jam Pekerja Biasa 2,195 L.3.011 . . .
0.04 jam Tukang 872 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.10 Kg Baja Tulangan (Ulir) D48 12,540 M.3.035 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.3 (6)
B-126 Kg :Anyaman Kawat Yang Dilas (Welded Wire Mesh) 43,105 0.05 . 7,469 - 35,636
0.21 jam Pekerja Biasa 4,389 L.3.011 . . .
0.07 jam Tukang 1,743 L.3.002 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
1.10 Kg Baja Tulangan (Polos) U24 9,130 M.3.031 . . .
0.02 Kg Kawat Beton 506 M.3.070 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (1)
B-127
a Kg :Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) 51,606 0.00 . 27 278 51,300
0.00 jam Pekerja 21 L.3.001 . . .
0.00 jam Tukang 3 L.3.002 . . .
0.00 jam Mandor 4 L.3.003 . . .
1.00 kg Baja Struktur BJ 34 25,300 M.3.029 . . .
0.00 jam Tronton 213 T.3.035 . . .
0.00 jam Crane 65 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (2)
B-128
a Kg :Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) 27,565 0.00 . 913 652 26,000
0.00 jam Pekerja 21 L.3.001 . . .

www.mitra-arsitek.com AHSP BM 31/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.01 jam Tukang 125 L.3.002 . . .
0.02 jam Mandor 767 L.3.003 . . .
0.00 jam Crane 652 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (1)
B-129
b Kg :Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) 56,606 0.00 . 27 278 56,300
0.00 jam Pekerja 21 L.3.001 . . .
0.00 jam Tukang 3 L.3.002 . . .
0.00 jam Mandor 4 L.3.003 . . .
1.00 Buah Baja Struktur BJ 37 30,300 M.3.030 . . .
0.00 jam Tronton 213 T.3.035 . . .
0.00 jam Crane 65 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (2)
B-130
b Kg :Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) 27,565 0.00 . 913 652 26,000
0.00 jam Pekerja 21 L.3.001 . . .
0.01 jam Tukang 125 L.3.002 . . .
0.02 jam Mandor 767 L.3.003 . . .
0.00 jam Crane 652 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (1)
B-131
c Kg :Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) 37,906 0.00 . 27 278 37,600
0.00 jam Pekerja 21 L.3.001 . . .
0.00 jam Tukang 3 L.3.002 . . .
0.00 jam Mandor 4 L.3.003 . . .
1.00 kg Baja Struktur 11,600 M.3.028 . . .
0.00 jam Tronton 213 T.3.035 . . .
0.00 jam Crane 65 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.4 (2)
B-132
c Kg :Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) 27,565 0.00 . 913 652 26,000
0.00 jam Pekerja 21 L.3.001 . . .
0.01 jam Tukang 125 L.3.002 . . .
0.02 jam Mandor 767 L.3.003 . . .
0.00 jam Crane 652 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.5 (1)
B-133 Kg :Pemasangan jembatan Rangka Baja 26,931 0.00 . 466 465 26,000
0.02 jam Pekerja 336 L.3.001 . . .
0.00 jam Tukang 100 L.3.002 . . .
0.00 jam Mandor 31 L.3.003 . . .
0.00 jam Crane On Track 75-100 Ton 465 T.3.051 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.5 (2)
B-134 buah Pengangkutan Bahan Jembatan 86,469 0.00 . 4 60,465 26,000
0.00 jam Pekerja 4 L.3.001 . . .
0.00 jam Mandor 1 L.3.003 . . .
0.00 jam Trailer 20 Ton 137 T.3.029 . . .
0.00 jam Trailer 20 Ton 137 T.3.029 . . .
0.00 jam Crane On Track 35 Ton 44 T.3.031 . . .
0.00 jam Crane On Track 75-100 Ton 70 T.3.051 . . .
0.00 jam Crane 78 T.3.007 . . .
100.00 millaut Angkutan Kapal Laut 60,000 T.3.066 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (1)
B-135 M1 Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk 118,850 0.46 . 74,250 - 44,600
2.50 jam Pekerja 52,250 L.3.001 . . .

www.mitra-arsitek.com AHSP BM 32/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.50 jam Tukang 12,450 L.3.002 . . .
0.25 jam Mandor 9,550 L.3.003 . . .
1.00 M1 Cerucuk 18,600 M.3.055 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (2)
B-136 M1 :Dinding Turap Kayu Tanpa Pengawetan 143,600 0.62 . 99,000 - 44,600
3.33 jam Pekerja 69,667 L.3.001 . . .
0.67 jam Tukang 16,600 L.3.002 . . .
0.33 jam Mandor 12,733 L.3.003 . . .
1.00 M1 Cerucuk 18,600 M.3.055 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (3)
B-137 M1 Dinding Turap Kayu Dengan Pengawetan 212,333 0.71 . 112,933 - 99,400
4.00 jam Pekerja 83,600 L.3.001 . . .
0.67 jam Tukang 16,600 L.3.002 . . .
0.33 jam Mandor 12,733 L.3.003 . . .
1.00 M1 Bahan tiang pancang kayu 70,900 M.3.027 . . .
0.25 liter Bahan pengawet (kreosot) 2,500 M.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (4)
B-138 M1 Dinding Turap Baja 51,310 0.00 . 121 191 50,998
0.00 jam Pekerja 78 L.3.001 . . .
0.00 jam Tukang 31 L.3.002 . . .
0.00 jam Mandor 12 L.3.003 . . .
1.05 Kg Pipa Baja 15,330 M.3.095 . . .
0.21 Kg Pelat Baja 3,003 M.3.091 . . .
0.05 Dos Kawat Las 6,665 M.3.072 . . .
0.00 jam Trailer 20 Ton 49 T.3.029 . . .
0.00 jam Crane On Track 35 Ton 32 T.3.031 . . .
0.00 jam Crane On Track 75-100 Ton 52 T.3.051 . . .
0.00 jam Welding Set 57 T.3.032 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (8)
B-139
a M1 :Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm
271,187 1.42 . 226,683 154 44,349
7.00 jam Pekerja 146,300 L.3.001 . . .
2.33 jam Tukang 58,100 L.3.002 . . .
0.58 jam Mandor 22,283 L.3.003 . . .
1.05 Kg Pipa Baja 15,330 M.3.095 . . .
0.21 Kg Pelat Baja 3,019 M.3.091 . . .
0.00 jam Trailer 20 Ton 50 T.3.029 . . .
0.00 jam Crane 70 T.3.007 . . .
0.00 jam Welding Set 34 T.3.032 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (8)
B-140
b :M1 Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm 271,187 1.42 . 226,683 154 44,349
7.00 jam Pekerja 146,300 L.3.001 . . .
2.33 jam Tukang 58,100 L.3.002 . . .
0.58 jam Mandor 22,283 L.3.003 . . .
1.05 Kg Pipa Baja 15,330 M.3.095 . . .
0.21 Kg Pelat Baja 3,019 M.3.091 . . .
0.00 jam Trailer 20 Ton 50 T.3.029 . . .
0.00 jam Crane 70 T.3.007 . . .
0.00 jam Welding Set 34 T.3.032 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (8)
B-141
c M1 Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm
316,489 1.70 . 272,020 136 44,333

www.mitra-arsitek.com AHSP BM 33/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
8.40 jam Pekerja 175,560 L.3.001 . . .
2.80 jam Tukang 69,720 L.3.002 . . .
0.70 jam Mandor 26,740 L.3.003 . . .
1.05 Kg Pipa Baja 15,330 M.3.095 . . .
0.21 Kg Pelat Baja 3,003 M.3.091 . . .
0.00 jam Trailer 20 Ton 49 T.3.029 . . .
0.00 jam Crane 58 T.3.007 . . .
0.00 jam Welding Set 29 T.3.032 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (13)
B-142 :M1 Pemancangan Tiang Pancang Kayu Ukuran …. mm 171,934 0.71 . 115,301 30,633 26,000
3.61 jam Pekerja 75,542 L.3.001 . . .
0.90 jam Tukang 22,500 L.3.002 . . .
0.45 jam Mandor 17,259 L.3.003 . . .
0.45 jam Pile Driver + Hammer 30,633 T.3.030 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (14)
B-143a :M1 Pemancangan Tiang Pancang Baja Diameter 500 mm 74,645 0.24 . 38,434 10,211 26,000
1.20 jam Pekerja 25,181 L.3.001 . . .
0.30 jam Tukang 7,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
0.15 jam Pile Driver + Hammer 10,211 T.3.030 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (14)
B-144b :M1 Pemancangan Tiang Pancang Baja Diameter ..… mm 74,645 0.24 . 38,434 10,211 26,000
1.20 jam Pekerja 25,181 L.3.001 . . .
0.30 jam Tukang 7,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
0.15 jam Pile Driver + Hammer 10,211 T.3.030 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (6)
B-145 M1 Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm143,600 0.62 . 99,000 - 44,600
3.33 jam Pekerja 69,667 L.3.001 . . .
0.67 jam Tukang 16,600 L.3.002 . . .
0.33 jam Mandor 12,733 L.3.003 . . .
1.00 M1 Cerucuk 18,600 M.3.055 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (7)
B-146 M1 Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm212,333 0.71 . 112,933 - 99,400
4.00 jam Pekerja 83,600 L.3.001 . . .
0.67 jam Tukang 16,600 L.3.002 . . .
0.33 jam Mandor 12,733 L.3.003 . . .
1.00 M1 Bahan tiang pancang kayu 70,900 M.3.027 . . .
0.25 liter Bahan pengawet (kreosot) 2,500 M.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.9.(1)
B-147 M3 Pasangan Batu 1,111,722 1.07 . 174,233 116,218 821,271
5.46 jam Pekerja Biasa 114,153 L.3.011 . . .
1.37 jam Tukang 34,000 L.3.002 . . .
0.68 jam Mandor 26,080 L.3.003 . . .
1.17 M3 Batu Kali 325,728 M.3.037 . . .
176.00 Kg Semen 352,000 M.3.107 . . .
0.51 M3 Pasir Pasang 117,543 M.3.089 . . .
0.68 jam Concrete Mixer 115,655 T.3.006 . . .
0.00 jam Water Tank Truck 563 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .

www.mitra-arsitek.com AHSP BM 34/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
Analisa EI- 7.10B-148
(1) M3 Pasangan Batu Kosong Yang Diisi Adukan 996,263 1.37 . 219,771 116,218 660,274
6.83 jam Pekerja Biasa 142,691 L.3.011 . . .
2.05 jam Tukang 51,000 L.3.002 . . .
0.68 jam Mandor 26,080 L.3.003 . . .
112.50 kg Semen 225,000 M.3.107 . . .
0.22 M3 Pasir Pasang 50,376 M.3.089 . . .
0.28 M3 Agregat Pecah Kasar 42,627 M.3.007 . . .
1.32 M3 Batu Belah 316,272 M.3.036 . . .
0.68 jam Concrete Mixer 115,655 T.3.006 . . .
0.00 jam Water Tank Truck 563 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.10B-149
(2) M3 Pasangan Batu Kosong 476,285 1.13 . 186,725 - 289,560
5.25 jam Pekerja Biasa 109,725 L.3.011 . . .
1.75 jam Tukang 43,575 L.3.002 . . .
0.88 jam Mandor 33,425 L.3.003 . . .
1.10 M3 Batu Belah 263,560 M.3.036 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.10.(3)
B-150a. M3 Bronjong dengan kawat yang dilapisi galvanis 696,753 1.25 . 208,513 - 488,240
5.25 jam Pekerja Biasa 109,725 L.3.011 . . .
2.63 jam Tukang 65,363 L.3.002 . . .
0.88 jam Mandor 33,425 L.3.003 . . .
15.00 Kg Kawat Bronjong 156,000 M.3.071 . . .
1.10 M3 Batu Kali 306,240 M.3.037 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.13.(1)
B-151 M1 Sandaran (Railing) 146,927 0.36 . 59,752 - 87,175
1.68 jam Pekerja 35,112 L.3.001 . . .
0.56 jam Tukang 13,944 L.3.002 . . .
0.28 jam Mandor 10,696 L.3.003 . . .
1.00 M Pipa Galvanis Dia 3" 21,800 M.3.096 . . .
0.75 Ls Bahan Penunjang Lainnya 39,375 M.3.024 . . .
1.00 LS Alat bantu 26,000 M.3.011 . . .
Analisa EI- 7.14.(1)
B-152 buah Papan Nama Jembatan 893,100 3.00 . 560,000 - 333,100
14.00 jam Pekerja 292,600 L.3.001 . . .
7.00 jam Mandor 267,400 L.3.003 . . .
0.75 m2 Marmer 303,000 M.3.081 . . .
2.05 kg Semen 4,100 M.3.107 . . .
1.00 LS Alat bantu 26,000 M.3.011 . . .
Analisa EI- 7.15.(2)
B-153 M3 Pembongkaran Beton 628,649 1.93 . 301,042 301,607 26,000
12.50 Jam Pekerja 261,250 L.3.001 . . .
1.04 Jam Mandor 39,792 L.3.003 . . .
1.04 Jam Compressor 124,271 T.3.005 . . .
1.04 Jam Jack Hammer 34,583 T.3.026 . . .
0.01 Jam Wheel Loader 2,988 T.3.015 . . .
0.61 Jam Dump Truck Sedang 139,765 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15.(5)
B-154 M2 Pembongkaran Rangka Baja 349,346 0.86 . 136,933 186,413 26,000
5.33 Jam Pekerja 111,467 L.3.001 . . .
0.67 Jam Mandor 25,467 L.3.003 . . .
0.33 Jam Compressor 39,767 T.3.005 . . .
0.33 Jam Jack Hammer 11,067 T.3.026 . . .

www.mitra-arsitek.com AHSP BM 35/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.33 Jam Wheel Loader 98,300 T.3.015 . . .
0.16 Jam Dump Truck Sedang 37,280 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15.(6)
B-155 M' Pembongkaran Balok Baja (Steel Stringers) 294,660 0.31 . 49,440 219,220 26,000
2.00 Jam Pekerja 41,800 L.3.001 . . .
0.20 Jam Mandor 7,640 L.3.003 . . .
0.20 Jam Crane 129,920 T.3.007 . . .
0.20 Jam Trailer 20 ton 89,300 T.3.029 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (16)
B-156 M1 Pemancangan Tiang Pancang Beton . ukuran .... 80,940 0.28 . 44,729 10,211 26,000
1.51 jam Pekerja 31,476 L.3.001 . . .
0.30 jam Tukang 7,500 L.3.002 . . .
0.15 jam Mandor 5,753 L.3.003 . . .
0.15 jam Pile Driver + Hammer 10,211 T.3.030 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (19)
B-157a M1 :Tiang Bor Beton, diameter 800 mm 1,947,252 0.00 . 395 17,957 1,928,900
0.01 jam Pekerja 208 L.3.001 . . .
0.00 jam Tukang 124 L.3.002 . . .
0.00 jam Mandor 63 L.3.003 . . .
0.50 M3 Beton K-250 882,511 M.3.041 . . .
75.40 Kg Baja Tulangan (Polos) U32 995,257 M.3.032 . . .
2.51 M2 Casing 25,133 M.3.049 . . .
0.00 jam Bore Pile Machine (Besar) 1,288 T.3.033 . . .
0.08 jam Concrete Pump 16,669 T.3.028 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (19)
B-158b M1 :Tiang Bor Beton, diameter ….. mm 3,019,156 0.00 . 395 27,334 2,991,428
0.01 jam Pekerja 208 L.3.001 . . .
0.00 jam Tukang 124 L.3.002 . . .
0.00 jam Mandor 63 L.3.003 . . .
0.79 M3 Beton K-250 1,378,924 M.3.041 . . .
117.81 Kg Baja Tulangan (Polos) U32 1,555,088 M.3.032 . . .
3.14 M2 Casing 31,416 M.3.049 . . .
0.00 jam Bore Pile Machine (Besar) 1,288 T.3.033 . . .
0.12 jam Concrete Pump 26,046 T.3.028 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (5)
B-159 M1 :Dinding Turap Beton 790,205 1.23 . 291,848 65,198 433,159
1.23 jam Pekerja 25,759 L.3.001 . . .
1.23 jam Tukang 30,688 L.3.002 . . .
6.16 jam Mandor 235,401 L.3.003 . . .
0.07 M3 Beton K-350 176,505 M.3.043 . . .
0.35 Kg Joint Sealent 12,320 M.3.065 . . .
15.27 Kg Pelat Baja 218,334 M.3.091 . . .
0.12 jam Trailer 20 Ton 52,828 T.3.029 . . .
0.01 jam Crane On Track 35 Ton 5,431 T.3.031 . . .
0.01 jam Crane On Track 75-100 Ton 6,938 T.3.051 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (20)
B-160 M1 Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18)89,756
bila Tiang Pancang
0.02 . dikerjakan 2,845 60,911 26,000
0.08 jam Pekerja 1,672 L.3.001 . . .
0.03 jam Tukang 664 L.3.002 . . .
0.01 jam Mandor 509 L.3.003 . . .

www.mitra-arsitek.com AHSP BM 36/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.16 jam Ponton + Tug Boat 55,239 T.3.067 . . .
0.01 jam Crane 5,671 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.6 (21)
B-161 M1 Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang119,650
Bor Beton dikerjakan
0.21 . 34,273 59,377 26,000
0.96 jam Pekerja 20,140 L.3.001 . . .
0.32 jam Tukang 7,998 L.3.002 . . .
0.16 jam Mandor 6,135 L.3.003 . . .
0.16 jam Ponton + Tug Boat 55,650 T.3.067 . . .
0.01 jam Crane 3,727 T.3.007 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15.(1)
B-162 M3 :Pembongkaran Pasangan Batu 426,872 1.55 . 247,470 153,403 26,000
9.64 Jam Pekerja 201,446 L.3.001 . . .
1.20 Jam Mandor 46,024 L.3.003 . . .
1.20 Jam Jack Hammer 40,000 T.3.026 . . .
0.01 Jam Wheel Loader 2,988 T.3.015 . . .
0.48 Jam Dump Truck Sedang 110,415 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15.(3)
B-163 M3 :Pembongkaran Beton Pratekan 259,230 0.37 . 57,800 175,430 26,000
2.40 Jam Pekerja 50,160 L.3.001 . . .
0.20 Jam Mandor 7,640 L.3.003 . . .
0.20 Jam Compressor 23,860 T.3.005 . . .
0.20 Jam Jack Hammer 6,640 T.3.026 . . .
0.20 Jam Wheel Loader 58,980 T.3.015 . . .
0.38 Jam Dump Truck Sedang 85,950 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15B-164
(4) M2 Pembongkaran Bangunan Gedung 112,241 0.09 . 14,450 71,791 26,000
0.60 Jam Pekerja 12,540 L.3.001 . . .
0.05 Jam Mandor 1,910 L.3.003 . . .
0.05 Jam Compressor 5,965 T.3.005 . . .
0.05 Jam Jack Hammer 1,660 T.3.026 . . .
0.05 Jam Wheel Loader 14,745 T.3.015 . . .
0.22 Jam Dump Truck Sedang 49,421 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15B-165
(7) M2 Pembongkaran Lantai Jembatan Kayu 151,019 0.37 . 59,086 65,933 26,000
2.30 Jam Pekerja 48,097 L.3.001 . . .
0.29 Jam Mandor 10,989 L.3.003 . . .
0.29 Jam Dump Truck Sedang 65,933 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 7.15B-166
(8) M2 Pembongkaran Jembatan Kayu 362,523 0.34 . 53,982 282,541 26,000
2.10 Jam Pekerja 43,943 L.3.001 . . .
0.26 Jam Mandor 10,040 L.3.003 . . .
0.50 Jam ChainSaw 66,400 T.3.065 . . .
0.24 Jam Crane 155,904 T.3.007 . . .
0.26 Jam Dump Truck Sedang 60,237 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-167
(1) M3 Pondasi Agregat Kls. A Untuk - 343,161 0.03 . 3,974 123,515 215,672
0.18 jam Pekerja Biasa 3,703 L.3.011 . . .
0.01 jam Mandor 271 L.3.003 . . .
1.26 M3 Agregat Pecah Kasar 189,672 M.3.007 . . .
0.01 jam Wheel Loader 2,090 T.3.015 . . .

www.mitra-arsitek.com AHSP BM 37/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.48 jam Dump Truck Sedang 110,938 T.3.008 . . .
0.05 jam Pedestrian Roller 4,856 T.3.024 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-168
(2) M3 Pondasi Agregat Kls. B Untuk - 341,680 0.02 . 2,493 123,515 215,672
0.11 jam Pekerja Biasa 2,222 L.3.011 . . .
0.01 jam Mandor 271 L.3.003 . . .
1.26 M3 Agregat Pecah Kasar 189,672 M.3.007 . . .
0.01 jam Wheel Loader 2,090 T.3.015 . . .
0.48 jam Dump Truck Sedang 110,938 T.3.008 . . .
0.05 jam Pedestrian Roller 4,856 T.3.024 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-169
(3) M3 Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor
303,826 0.02 . 2,988 44,438 256,400
0.13 Jam Pekerja Biasa 2,663 L.3.011 . . .
0.01 Jam Mandor 325 L.3.003 . . .
1.20 M3 Agr.Base Kelas C 230,400 M.3.005 . . .
0.01 Jam Wheel Loader 2,505 T.3.015 . . .
0.14 Jam Dump Truck Sedang 31,446 T.3.008 . . .
0.05 Jam Pedestrian Roller 4,856 T.3.024 . . .
0.01 Jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-170
(4) M3 Waterbound Macadam Utk. Pek. - 226,272 0.02 . 3,798 28,427 194,047
0.16 Jam Pekerja Biasa 3,409 L.3.011 . . .
0.01 Jam Mandor 389 L.3.003 . . .
0.94 M3 Agregat Pecah Kasar 140,905 M.3.007 . . .
0.17 M3 Agregat Halus 27,143 M.3.006 . . .
0.01 Jam Wheel Loader 3,006 T.3.015 . . .
0.09 Jam Dump Truck Sedang 20,561 T.3.008 . . .
0.03 Jam Three Wheel Roller 6-8 T 4,859 T.3.016 . . .
1.00 Ls Alat BAntu 26,000 M.3.011 . . .
Analisa EI- 8.1.(4)
B-171 M3 Lapis Pondasi Agregat Kelas S untuk pekerjaan minor 385,568 0.01 . 1,567 125,410 258,591
0.06 jam Pekerja 1,243 L.3.001 . . .
0.01 jam Mandor 325 L.3.003 . . .
1.26 M3 Aggregat S 232,591 M.3.002 . . .
0.01 jam Wheel Loader 2,505 T.3.015 . . .
0.49 jam Dump Truck Sedang 111,404 T.3.008 . . .
0.00 jam Motor Grader 3,209 T.3.013 . . .
0.01 jam Tandem Roller 2,661 T.3.017 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-172
(5) M3 Camp. Aspal Panas Utk.Pek.Minor 2,042,147 0.17 . 27,400 405,197 1,609,550
1.11 Jam Pekerja Biasa 23,166 L.3.011 . . .
0.11 Jam Mandor 4,234 L.3.003 . . .
0.77 M3 Agregat Pecah Kasar 116,499 M.3.007 . . .
0.53 M3 Agregat Halus 86,705 M.3.006 . . .
25.30 Kg Filler Added 30,360 M.3.059 . . .
156.98 Kg Aspal 1,349,985 M.3.015 . . .
0.03 Jam Wheel Loader 8,889 T.3.015 . . .
0.06 Jam Asphalt Mixing Plant 252,828 T.3.001 . . .

www.mitra-arsitek.com AHSP BM 38/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.06 Jam Generator Set 25,394 T.3.012 . . .
0.44 Jam Dump Truck Sedang 99,875 T.3.008 . . .
0.20 Jam Pedestrian Roller 18,211 T.3.024 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-173
(7) M3 Penetrasi Macadam Utk.Pek.Minor 1,202,808 0.03 . 4,205 54,296 1,144,308
0.17 Jam Pekerja Biasa 3,555 L.3.011 . . .
0.02 Jam Mandor 650 L.3.003 . . .
1.76 M3 Agregat Pecah Kasar 264,562 M.3.007 . . .
99.27 Kg Aspal 853,745 M.3.015 . . .
0.01 Jam Wheel Loader 2,508 T.3.015 . . .
0.21 Jam Dump Truck Sedang 47,705 T.3.008 . . .
0.01 Jam Three Wheel Roller 6-8 T 2,138 T.3.016 . . .
0.04 Jam Asphalt Sprayer 1,945 T.3.003 . . .
1.00 Ls Alat bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-174
(8) M3 Camp. Aspal Dingin Utk.Pek.Minor 1,256,819 0.19 . 31,537 120,684 1,104,597
1.16 jam Pekerja Biasa 24,173 L.3.011 . . .
0.19 jam Mandor 7,364 L.3.003 . . .
1.17 M3 Agregat Halus 192,187 M.3.006 . . .
140.70 Kg Aspal Emulsi 886,410 M.3.016 . . .
0.10 jam Concrete Mixer 16,328 T.3.006 . . .
0.20 jam Pedestrian Roller 18,211 T.3.024 . . .
0.38 jam Dump Truck Sedang 86,146 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1B-175
(9) LITER Residu Bitumen Untuk Pek.Minor 11,152 0.00 . 82 134 10,937
0.00 Jam Pekerja Biasa 69 L.3.011 . . .
0.00 Jam Mandor 13 L.3.003 . . .
0.99 Kg Aspal 8,477 M.3.015 . . .
0.14 Liter Kerosene/Minyak Tanah 2,460 M.3.076 . . .
0.00 Jam Asphalt Sprayer 18 T.3.003 . . .
0.00 Jam Compressor 40 T.3.005 . . .
0.00 Jam Dump Truck Sedang 76 T.3.008 . . .
Analisa EI- 8.3.(1)
B-176 M2 Stabilisasi Dengan Tanaman 53,522 0.07 . 12,012 - 41,510
0.28 jam Pekerja Biasa 5,852 L.3.011 . . .
0.14 jam Tukang 3,486 L.3.002 . . .
0.07 jam Mandor 2,674 L.3.003 . . .
1.10 M2 Gebalan Rumput 15,510 M.3.062 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.3.(1b)
B-177 M2 Stabilisasi dengan Tanaman VS 97,457 0.04 . 5,726 12,352 79,379
0.21 jam Pekerja 4,389 L.3.001 . . .
0.04 jam Mandor 1,337 L.3.003 . . .
3.30 M2 Gebalan Rumput 46,530 M.3.062 . . .
0.03 m3 Tanah Liat 6,412 M.3.108 . . .
0.13 kg Pupuk 438 M.3.104 . . .
0.03 jam Water Tank Truck 12,352 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.3.(2)
B-178 M2 Semak/perdu 52,962 0.07 . 11,452 - 41,510
0.42 jam Pekerja Biasa 8,778 L.3.011 . . .
0.07 jam Mandor 2,674 L.3.003 . . .
1.10 M2 Gebalan Rumput 15,510 M.3.062 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .

www.mitra-arsitek.com AHSP BM 39/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
Analisa EI- 8.3.(3)
B-179 Buah Pohon 93,452 0.07 . 11,452 - 82,000
0.42 jam Pekerja Biasa 8,778 L.3.011 . . .
0.07 jam Mandor 2,674 L.3.003 . . .
1.00 bh Pohon 56,000 M.3.100 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.5.(1)
B-180 M2 Pengembalian kondisi lantai jembatan beton 124,187 0.25 . 38,533 59,653 26,000
1.60 Jam Pekerja 33,440 L.3.001 . . .
0.13 Jam Mandor 5,093 L.3.003 . . .
0.13 Jam Compressor 15,907 T.3.005 . . .
0.13 Jam Jack Hammer 4,427 T.3.026 . . .
0.13 Jam Wheel Loader 39,320 T.3.015 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.5.(2)
B-181 M2 Pengembalian kondisi lantai jembatan kayu 517,010 0.71 . 121,800 - 395,210
4.00 Jam Pekerja 83,600 L.3.001 . . .
1.00 Jam Mandor 38,200 L.3.003 . . .
0.10 M3 Kayu Klas I 363,750 M.3.074 . . .
0.20 Kg Paku 5,460 M.3.085 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.5.(3)
B-182 M2 Pengembalian kondisi pelapisan permukaan baja struktur 287,920 0.48 . 81,200 - 206,720
2.67 Jam Pekerja 55,733 L.3.001 . . .
0.67 Jam Mandor 25,467 L.3.003 . . .
0.60 M2 Cat anti karat 21,720 M.3.051 . . .
2.00 lbr Ampelas 159,000 M.3.012 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.1 (6)
B-183 M3 Lasbutag untuk pekerjaan minor 1,665,063 0.00 . 142 1,158,125 506,796
0.01 Jam Pekerja 130 L.3.001 . . .
0.00 Jam Mandor 12 L.3.003 . . .
0.38 M3 Agregat Pecah Kasar 56,638 M.3.007 . . .
0.62 M3 Pasir Pasang 143,249 M.3.089 . . .
0.34 M3 Asbuton 280,909 M.3.014 . . .
0.03 Jam Wheel Loader 10,089 T.3.015 . . .
2.02 Jam Dump Truck Sedang 463,392 T.3.008 . . .
0.54 Jam Pneumatic Tire Roller 237,195 T.3.018 . . .
0.82 Jam Tandem Roller 407,262 T.3.017 . . .
0.00 Jam Asphalt Finisher 330 T.3.002 . . .
0.24 Jam Concrete Mixer 39,859 T.3.006 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(1)
B-184 M2 Marka Jalan Termoplastik 181,940 0.13 . 21,008 26,138 134,795
0.60 jam Pekerja Biasa 12,540 L.3.011 . . .
0.23 jam Tukang 5,603 L.3.002 . . .
0.08 jam Mandor 2,865 L.3.003 . . .
1.95 Kg Cat Marka (Thermoplastic) 70,980 M.3.053 . . .
1.05 Liter Thinner 20,265 M.3.109 . . .
0.45 Kg Glass Bead 17,550 M.3.064 . . .
0.08 Jam Compressor 8,948 T.3.005 . . .
0.08 Jam Dump Truck Sedang 17,190 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(2)
B-185 M2 Marka Jalan Bukan Termoplastic 182,720 0.13 . 21,008 26,138 135,575
0.60 jam Pekerja Biasa 12,540 L.3.011 . . .
0.23 jam Tukang 5,603 L.3.002 . . .

www.mitra-arsitek.com AHSP BM 40/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.08 jam Mandor 2,865 L.3.003 . . .
1.95 Kg Cat Marka (Non Thermoplas) 71,760 M.3.052 . . .
1.05 Liter Thinner 20,265 M.3.109 . . .
0.45 Kg Glass Bead 17,550 M.3.064 . . .
0.08 Jam Compressor 8,948 T.3.005 . . .
0.08 Jam Dump Truck Sedang 17,190 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(3)
B-186
.(a) BH Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
516,892 0.20 . 33,668 35,495 447,729
0.77 jam Pekerja Biasa 16,184 L.3.011 . . .
0.46 jam Tukang 11,569 L.3.002 . . .
0.15 jam Mandor 5,916 L.3.003 . . .
1.00 BH Pelat Rambu (Eng. Grade) 186,600 M.3.092 . . .
1.00 Batang Pipa Galvanis Dia. 1.6" 157,100 M.3.097 . . .
0.02 M3 Beton K-175 22,029 M.3.040 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.15 Jam Dump Truck Sedang 35,495 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(3)
B-187
.(b) BH Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade706,729 0.22 . 36,905 35,495 634,329
0.93 jam Pekerja Biasa 19,420 L.3.011 . . .
0.46 jam Tukang 11,569 L.3.002 . . .
0.15 jam Mandor 5,916 L.3.003 . . .
2.00 BH Pelat Rambu (Eng. Grade) 373,200 M.3.092 . . .
1.00 Batang Pipa Galvanis Dia. 1.6" 157,100 M.3.097 . . .
0.02 M3 Beton K-175 22,029 M.3.040 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.15 Jam Dump Truck Sedang 35,495 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(4)
B-188.(a) BH Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
548,992 0.20 . 33,668 35,495 479,829
0.77 jam Pekerja Biasa 16,184 L.3.011 . . .
0.46 jam Tukang 11,569 L.3.002 . . .
0.15 jam Mandor 5,916 L.3.003 . . .
1.00 BH Pelat Rambu (High I. Grade) 218,700 M.3.093 . . .
1.00 Batang Pipa Galvanis Dia. 1.6" 157,100 M.3.097 . . .
0.02 M3 Beton K-175 22,029 M.3.040 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.15 Jam Dump Truck Sedang 35,495 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(4)
B-189.(b) BH Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade
767,692 0.20 . 33,668 35,495 698,529
0.77 jam Pekerja Biasa 16,184 L.3.011 . . .
0.46 jam Tukang 11,569 L.3.002 . . .
0.15 jam Mandor 5,916 L.3.003 . . .
2.00 BH Pelat Rambu (High I. Grade) 437,400 M.3.093 . . .
1.00 Batang Pipa Galvanis Dia. 1.6" 157,100 M.3.097 . . .
0.02 M3 Beton K-175 22,029 M.3.040 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.15 Jam Dump Truck Sedang 35,495 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(5)
B-190 BH Patok Pengarah 226,116 0.17 . 28,136 21,143 176,837
0.74 jam Pekerja Biasa 15,424 L.3.011 . . .
0.37 jam Tukang 9,188 L.3.002 . . .

www.mitra-arsitek.com AHSP BM 41/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.09 jam Mandor 3,524 L.3.003 . . .
0.04 M3 Beton K-175 48,790 M.3.040 . . .
4.65 Kg Baja Tulangan (Ulir) D32 46,047 M.3.033 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.09 Jam Dump Truck Sedang 21,143 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(6)
B-191.(a) BH Patok Kilometer 521,504 0.12 . 20,187 24,035 477,282
0.52 jam Pekerja Biasa 10,959 L.3.011 . . .
0.21 jam Tukang 5,222 L.3.002 . . .
0.10 jam Mandor 4,006 L.3.003 . . .
0.15 M3 Beton K-175 208,172 M.3.040 . . .
18.90 Kg Baja Tulangan (Ulir) D32 187,110 M.3.033 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.10 Jam Dump Truck Sedang 24,035 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(6)
B-192.(b) BH Patok Hektometer 290,923 0.12 . 20,187 24,035 246,701
0.52 jam Pekerja Biasa 10,959 L.3.011 . . .
0.21 jam Tukang 5,222 L.3.002 . . .
0.10 jam Mandor 4,006 L.3.003 . . .
0.06 M3 Beton K-175 86,738 M.3.040 . . .
7.88 Kg Baja Tulangan (Ulir) D32 77,963 M.3.033 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
0.10 Jam Dump Truck Sedang 24,035 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(7)
B-193 M' Rel Pengaman 787,588 0.32 . 51,573 46,319 689,696
1.62 jam Pekerja Biasa 33,789 L.3.011 . . .
0.40 jam Tukang 10,064 L.3.002 . . .
0.20 jam Mandor 7,720 L.3.003 . . .
1.00 M' Rel Pengaman 437,300 M.3.105 . . .
0.09 buah Beton K-175 127,909 M.3.040 . . .
4.65 buah Baja Tulangan (Ulir) D32 45,987 M.3.033 . . .
1.00 buah Bahan Penunjang Lainnya 52,500 M.3.024 . . .
0.20 Jam Dump Truck Sedang 46,319 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(8)
B-194 BH Paku Jalan 308,913 0.40 . 67,375 - 241,538
1.75 jam Pekerja Biasa 36,575 L.3.011 . . .
0.70 jam Tukang 17,430 L.3.002 . . .
0.35 jam Mandor 13,370 L.3.003 . . .
0.06 M3 Beton K-175 86,738 M.3.040 . . .
1.00 bh Paku Jalan 72,800 M.3.086 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(9)
B-195 BH Mata Kucing 626,113 0.40 . 67,375 - 558,738
1.75 jam Pekerja Biasa 36,575 L.3.011 . . .
0.70 jam Tukang 17,430 L.3.002 . . .
0.35 jam Mandor 13,370 L.3.003 . . .
0.06 M3 Beton K-175 86,738 M.3.040 . . .
1.00 bh Mata kucing 390,000 M.3.082 . . .
1.00 Ls Cat, dan material lainnya 56,000 M.3.054 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .

www.mitra-arsitek.com AHSP BM 42/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
Analisa EI- 8.4.(12)
B-196 M2 Perkerasan Blok Beton pada Trotoar dan Median 435,432 0.63 . 140,442 14,771 280,219
0.40 jam Pekerja Biasa 8,394 L.3.011 . . .
1.61 jam Tukang 40,000 L.3.002 . . .
2.41 jam Mandor 92,048 L.3.003 . . .
55.00 bh Paving Block 220,000 M.3.090 . . .
0.05 M3 Pasir Kasar 11,219 M.3.088 . . .
0.50 Kg Baut Angkur 23,000 M.3.038 . . .
0.24 Jam Vibratory Compactor 14,771 T.3.025 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(11)
B-197 M Kerb Pracetak yang digunakan kembali 135,908 0.26 . 42,851 13,182 79,874
1.20 jam Pekerja Biasa 25,181 L.3.011 . . .
0.40 jam Tukang 10,000 L.3.002 . . .
0.20 jam Mandor 7,671 L.3.003 . . .
0.02 M3 Mortar 1,374 M.3.083 . . .
1.00 Ls Bahan Penunjang Lainnya 52,500 M.3.024 . . .
0.08 Jam Concrete Mixer 13,182 T.3.006 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(a)
B-198 M' Kerb Pracetak Jenis 1 (Peninggi/Mountable) 179,014 0.09 . 14,679 24,876 139,458
0.42 jam Pekerja Biasa 8,847 L.3.011 . . .
0.17 jam Tukang 4,216 L.3.002 . . .
0.04 jam Mandor 1,617 L.3.003 . . .
0.06 M3 Beton K-300 112,802 M.3.042 . . .
0.01 M3 Mortar 656 M.3.083 . . .
0.04 Jam Flat Bed Truck 24,876 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(b)
B-199 M' Kerb Pracetak Jenis 2 (Penghalang/Barrier) 197,295 0.09 . 15,240 25,826 156,229
0.44 jam Pekerja Biasa 9,184 L.3.011 . . .
0.18 jam Tukang 4,377 L.3.002 . . .
0.04 jam Mandor 1,679 L.3.003 . . .
0.06 M3 Beton K-300 128,917 M.3.042 . . .
0.02 M3 Mortar 1,312 M.3.083 . . .
0.04 Jam Flat Bed Truck 25,826 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(c)
B-200 M' Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter) 204,059 0.09 . 15,240 25,826 162,993
0.44 jam Pekerja Biasa 9,184 L.3.011 . . .
0.18 jam Tukang 4,377 L.3.002 . . .
0.04 jam Mandor 1,679 L.3.003 . . .
0.07 M3 Beton K-300 135,900 M.3.042 . . .
0.01 M3 Mortar 1,093 M.3.083 . . .
0.04 Jam Flat Bed Truck 25,826 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(d)
B-201 M' Kerb Pracetak Jenis 4 (Penghalang Berparit) t=20 cm 233,124 0.10 . 15,941 27,014 190,169
0.46 jam Pekerja Biasa 9,607 L.3.011 . . .
0.18 jam Tukang 4,578 L.3.002 . . .
0.05 jam Mandor 1,756 L.3.003 . . .
0.08 M3 Beton K-300 163,295 M.3.042 . . .
0.01 M3 Mortar 875 M.3.083 . . .
0.05 Jam Flat Bed Truck 27,014 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(e)
B-202 M' Kerb Pracetak Jenis 5 (Penghalang Berparit) t=30 cm 270,088 0.10 . 15,941 27,014 227,133

www.mitra-arsitek.com AHSP BM 43/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.46 jam Pekerja Biasa 9,607 L.3.011 . . .
0.18 jam Tukang 4,578 L.3.002 . . .
0.05 jam Mandor 1,756 L.3.003 . . .
0.10 M3 Beton K-300 199,821 M.3.042 . . .
0.02 M3 Mortar 1,312 M.3.083 . . .
0.05 Jam Flat Bed Truck 27,014 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(f)
B-203 Buah Kerb Pracetak Jenis 6 (Kerb dengan bukaan) 120,107 0.10 . 15,941 27,014 77,152
0.46 jam Pekerja Biasa 9,607 L.3.011 . . .
0.18 jam Tukang 4,578 L.3.002 . . .
0.05 jam Mandor 1,756 L.3.003 . . .
0.02 M3 Beton K-300 50,278 M.3.042 . . .
0.01 M3 Mortar 875 M.3.083 . . .
0.05 Jam Flat Bed Truck 27,014 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 8.4.(10).(g)
B-204 Buah Kerb Pracetak Jenis 7a (Kerb pd pelandaian trotoar) 767,018 0.14 . 22,248 37,703 707,068
0.64 jam Pekerja Biasa 13,408 L.3.011 . . .
0.26 jam Tukang 6,390 L.3.002 . . .
0.06 jam Mandor 2,451 L.3.003 . . .
0.33 M3 Beton K-300 678,619 M.3.042 . . .
0.03 M3 Mortar 2,449 M.3.083 . . .
0.06 Jam Flat Bed Truck 37,703 T.3.011 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 9.4B-205 JAM PEKERJAAN HARIAN (DUMP TRUCK 3-4 M3) 229,200 - . - 229,200 -
1.00 jam Dump Truck Sedang 229,200 T.3.008 . . .
Analisa EI- 9.5B-206 JAM PEKERJAAN HARIAN (FLAT BED TRUCK 3-4 M3) 587,700 - . - 587,700 -
1.00 jam Flat Bed Truck 587,700 T.3.011 . . .
Analisa EI- 9.6B-207 JAM PEKERJAAN HARIAN (WATER TANKER 3000-4500 L.) 400,600 - . - 400,600 -
1.00 jam Water Tank Truck 400,600 T.3.023 . . .
Analisa EI- 9.7B-208 JAM PEKERJAAN HARIAN (BULLDOZER 100-150 HP) 460,300 - . - 460,300 -
1.00 jam Bulldozer 100-150 Hp 460,300 T.3.004 . . .
Analisa EI- 9.8B-209 JAM PEKERJAAN HARIAN (MOTOR GRADER >100 HP) 753,300 - . - 753,300 -
1.00 jam Motor Grader 753,300 T.3.013 . . .
Analisa EI- 9.9B-210 JAM PEKERJAAN HARIAN (WHEEL LOADER 1.0-1.6 M3) 294,900 - . - 294,900 -
1.00 jam Wheel Loader 294,900 T.3.015 . . .
Analisa EI- 9.10B-211 JAM PEKERJAAN HARIAN (TRACK LOADER 75-100 HP) 254,100 - . - 254,100 -
1.00 jam TRACK LOADER 75-100 HP 254,100 T.3.014 . . .
Analisa EI- 9.11B-212 JAM PEKERJAAN HARIAN (EXCAVATOR 80-140 HP) 453,700 - . - 453,700 -
1.00 jam Excavator 453,700 T.3.010 . . .
Analisa EI- 9.12B-213 JAM PEKERJAAN HARIAN (CRANE 10-15 TON) 649,600 - . - 649,600 -
1.00 jam Crane 649,600 T.3.007 . . .
Analisa EI- 9.13B-214 JAM PEKERJAAN HARIAN (STEEL WHEEL ROLLER 6-9 T.) 181,500 - . - 181,500 -
1.00 jam Three Wheel Roller 6-8 T 181,500 T.3.016 . . .
Analisa EI- 9.14B-215 JAM PEKERJAAN HARIAN (VIBRATORY ROLLER 5-8 T.) 420,600 - . - 420,600 -
1.00 jam VIBRATORY ROLLER 5-8 T. 420,600 T.3.019 . . .
Analisa EI- 9.15B-216 JAM PEKERJAAN HARIAN (VIBRATORY COMPACTOR) 61,300 - . - 61,300 -
1.00 jam VIBRATORY COMPACTOR 61,300 T.3.025 . . .
Analisa EI- 9.16B-217 JAM PEKERJAAN HARIAN (TIRE ROLLER 8-10 T.) 440,500 - . - 440,500 -
1.00 jam Pneumatic Tire Roller 440,500 T.3.018 . . .
Analisa EI- 9.17B-218 JAM PEKERJAAN HARIAN (COMPRESSOR 4000-6500 L\M) 119,300 - . - 119,300 -

www.mitra-arsitek.com AHSP BM 44/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 jam Compressor 119,300 T.3.005 . . .
Analisa EI- 9.18B-219 JAM PEKERJAAN HARIAN (CONCRETE MIXER 0.3-0.6 M3) 169,400 - . - 169,400 -
1.00 jam Concrete Mixer 169,400 T.3.006 . . .
Analisa EI- 9.19B-220 JAM PEKERJAAN HARIAN (WATER PUMP 70-100 mm) 157,300 - . - 157,300 -
1.00 jam WATER PUMP 70-100 mm 157,300 T.3.022 . . .
Analisa EI- 9.20B-221 JAM PEKERJAAN HARIAN (JACK HAMMER) 33,200 - . - 33,200 -
1.00 jam JACK HAMMER 33,200 T.3.026 . . .
Analisa EI- 10.A
B-222 M3 Pondasi Agregat Kls. B Untuk Pek. Rutin 410,017 0.03 . 4,579 193,138 212,300
0.20 jam Pekerja Biasa 4,082 L.3.011 . . .
0.01 jam Mandor 497 L.3.003 . . .
1.00 M3 Agr.Base Kelas B 186,300 M.3.004 . . .
0.01 jam Wheel Loader 3,839 T.3.015 . . .
0.78 jam Dump Truck Sedang 178,812 T.3.008 . . .
0.05 jam Pedestrian Roller 4,856 T.3.024 . . .
0.01 jam Water Tank Truck 5,631 T.3.023 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.B
B-223 M3 Camp. Aspal Panas Utk.Pek.Rutin 12,545,551 1.83 . 303,968 502,620 11,738,963
10.65 Jam Pekerja Biasa 222,597 L.3.011 . . .
2.13 Jam Mandor 81,371 L.3.003 . . .
0.03 M3 Agregat Pecah Mesin 5-10 & 10-20 mm 2,816 M.3.009 . . .
0.03 M3 Agregat Pecah Mesin 0-5 mm 2,190 M.3.008 . . .
####### kg Semen 11,663,568 M.3.107 . . .
5.16 Kg Aspal 44,389 M.3.015 . . .
0.02 Jam Wheel Loader 6,430 T.3.015 . . .
0.05 Jam Asphalt Mixing Plant 212,522 T.3.001 . . .
0.05 Jam Generator Set 21,346 T.3.012 . . .
1.07 Jam Dump Truck Sedang 244,112 T.3.008 . . .
0.20 Jam Pedestrian Roller 18,211 T.3.024 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.C
B-224 M3 Penetrasi Macadam Utk.Pek.Rutin 1,295,754 0.03 . 4,205 143,408 1,148,141
0.17 Jam Pekerja Biasa 3,555 L.3.011 . . .
0.02 Jam Mandor 650 L.3.003 . . .
1.48 M3 Agregat Pecah Kasar 222,701 M.3.007 . . .
0.28 M3 Agregat Halus 45,694 M.3.006 . . .
99.27 Kg Aspal 853,745 M.3.015 . . .
0.01 Jam Wheel Loader 2,508 T.3.015 . . .
0.58 Jam Dump Truck Sedang 131,939 T.3.008 . . .
0.04 Jam Three Wheel Roller 6-8 T 7,016 T.3.016 . . .
0.04 Jam Asphalt Sprayer 1,945 T.3.003 . . .
1.00 Ls Alat bantu 26,000 M.3.011 . . .
Analisa EI- 10.D
B-225 M3 Camp. Aspal Dingin Utk.Pek.Rutin 1,414,897 1.01 . 156,687 465,021 793,189
6.51 jam Pekerja Biasa 135,976 L.3.011 . . .
0.54 jam Mandor 20,711 L.3.003 . . .
1.20 M3 Agregat Halus 197,354 M.3.006 . . .
90.45 Kg Aspal Emulsi 569,835 M.3.016 . . .
0.54 jam Concrete Mixer 91,843 T.3.006 . . .
0.22 jam Pedestrian Roller 20,508 T.3.024 . . .
1.54 jam Dump Truck Sedang 352,670 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.E
B-226 LITER Aspal Pengisian Retak 12,814 0.00 . 701 1,176 10,937

www.mitra-arsitek.com AHSP BM 45/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
0.03 Jam Pekerja Biasa 592 L.3.011 . . .
0.00 Jam Mandor 108 L.3.003 . . .
0.99 Kg Aspal 8,477 M.3.015 . . .
0.14 Liter Kerosene/Minyak Tanah 2,460 M.3.076 . . .
0.00 Jam Asphalt Sprayer 154 T.3.003 . . .
0.00 Jam Compressor 373 T.3.005 . . .
0.00 Jam Dump Truck Sedang 650 T.3.008 . . .
Analisa EI- 10.FB-227 M2 Pemeliharaan Rutin Untuk Pemotongan Rumput 34,526 0.05 . 8,526 - 26,000
0.28 Jam Pekerja 5,852 L.3.001 . . .
0.07 Jam Mandor 2,674 L.3.003 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-228
(1) b M2 Pembersihan Rumija 255 0.00 . 255 - -
0.01 jam Pekerja 244 L.3.001 . . .
0.00 jam Mandor 12 L.3.003 . . .
Analisa EI- 10.1B-229
(4) b. Bh. Perawatan Patok Hektometer 978,457 0.07 . 9,976 - 968,481
0.47 jam Pekerja 9,753 L.3.001 . . .
0.01 jam Mandor 223 L.3.003 . . .
346.15 kg Semen 692,308 M.3.107 . . .
0.41 M3 Pasir Kasar 88,591 M.3.088 . . .
0.67 M3 Agregat Pecah Kasar 101,433 M.3.007 . . .
0.25 kg Cat 7,650 M.3.050 . . .
1.00 Ls Bahan Penunjang Lainnya 52,500 M.3.024 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-230
(4) c. Bh. Perawatan Patok Pengarah 99,151 0.05 . 6,651 - 92,500
0.31 jam Pekerja 6,502 L.3.001 . . .
0.00 jam Mandor 149 L.3.003 . . .
1.00 Ls Bahan Penunjang Lainnya 52,500 M.3.024 . . .
1.00 Bh Pemantul Cahaya (Reflector) 14,000 M.3.094 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-231
(4) d. BH Perawatan Rambu lalu lintas 92,537 0.04 . 6,387 - 86,150
0.28 jam Pekerja 5,852 L.3.001 . . .
0.01 jam Mandor 535 L.3.003 . . .
0.25 kg Cat 7,650 M.3.050 . . .
1.00 Ls Bahan Penunjang Lainnya 52,500 M.3.024 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-232
(4) e. M2 Perawatan Marka Jalan 90,600 0.03 . 4,790 - 85,810
0.21 jam Pekerja 4,389 L.3.001 . . .
0.01 jam Mandor 401 L.3.003 . . .
0.20 Kg Cat Marka (Thermoplastic) 7,310 M.3.053 . . .
1.00 Ls Bahan Penunjang Lainnya 52,500 M.3.024 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-233
(3) a. M Pemeliharan Selokan Samping Diperkeras 165,112 0.74 . 112,250 26,862 26,000
4.92 jam Pekerja 102,851 L.3.001 . . .
0.25 jam Mandor 9,399 L.3.003 . . .
0.12 Jam Dump Truck Sedang 26,862 T.3.008 . . .
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-234
(3)b M' Pembersihan Selokan Samping Diperkeras 28,694 0.01 . 812 1,882 26,000
0.03 jam Pekerja 687 L.3.001 . . .
0.00 jam Mandor 125 L.3.003 . . .
0.01 Jam Dump Truck Sedang 1,882 T.3.008 . . .

www.mitra-arsitek.com AHSP BM 46/47


STANDAR ID Koef. Unit Uraian Harga OH Kode Item Biaya Upah Biaya Alat Biaya Bahan
1.00 Ls Alat Bantu 26,000 M.3.011 . . .
Analisa EI- 10.1B-235
(1) Ls/ Bulan Pemeliharaan Rutin Perkerasan 82,202,546 64.80 . 10,788,120 36,799,560 34,614,866
378.00 Jam Pekerja 7,900,200 L.3.001 . . .
75.60 Jam Mandor 2,887,920 L.3.003 . . .
10.73 M3 Camp. Aspal Panas 7,933,356 M.3.048 . . .
10.73 M3 Camp. Aspal Dingin 15,965,410 M.3.047 . . .
####### Liter Aspal Pengisian Retak 10,663,600 M.3.018 . . .
1.00 LS Bahan Penunjang Lainnya 52,500 M.3.024 . . .
25.20 Jam Motor Grader 18,983,160 T.3.013 . . .
25.20 Jam Flat Bed Truck 14,810,040 T.3.011 . . .
25.20 Jam Compressor 3,006,360 T.3.005 . . .
Analisa EI- 10.1B-236
(2) Ls/ Bulan Pemeliharaan Rutin Bahu Jalan 31,159,650 21.60 . 3,596,040 19,183,500 8,380,110
126.00 Jam Pekerja 2,633,400 L.3.001 . . .
25.20 Jam Mandor 962,640 L.3.003 . . .
44.70 M3 Agr.Base Kelas B 8,327,610 M.3.004 . . .
1.00 LS Bahan Penunjang Lainnya 52,500 M.3.024 . . .
12.60 Jam Motor Grader 9,491,580 T.3.013 . . .
12.60 Jam Flat Bed Truck 7,405,020 T.3.011 . . .
12.60 Jam Three Wheel Roller 6-8 T 2,286,900 T.3.016 . . .
Analisa EI- 10.1B-237
(3) Ls/ Bulan Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan 73,141,880 43.20 . 7,192,080 49,518,000 16,431,800
252.00 Jam Pekerja 5,266,800 L.3.001 . . .
50.40 Jam Mandor 1,925,280 L.3.003 . . .
1.00 LS Biaya Umum 16,431,800 M.3.046 . . .
50.40 Jam Motor Grader 37,966,320 T.3.013 . . .
50.40 Jam Dump Truck Sedang 11,551,680 T.3.008 . . .
Analisa EI- 10.1B-238
(4) Ls/ Bulan Pemeliharaan Rutin Perlengkapan Jalan 25,394,180 9.90 . 1,557,360 7,405,020 16,431,800
63.00 Jam Pekerja 1,316,700 L.3.001 . . .
6.30 Jam Mandor 240,660 L.3.003 . . .
1.00 LS Biaya Umum 16,431,800 M.3.046 . . .
12.60 Jam Flat Bed Truck 7,405,020 T.3.011 . . .
Analisa EI- 10.1B-239
(5) Ls/ Bulan Pemeliharaan Rutin Jembatan 112,058,240 129.60 . 21,576,240 74,050,200 16,431,800
756.00 Jam Pekerja 15,800,400 L.3.001 . . .
151.20 Jam Mandor 5,775,840 L.3.003 . . .
1.00 LS Biaya Umum 16,431,800 M.3.046 . . .
126.00 Jam Flat Bed Truck 74,050,200 T.3.011 . . .

www.mitra-arsitek.com AHSP BM 47/47

Anda mungkin juga menyukai