Anda di halaman 1dari 16

LAP.

REKAP MUTASI KAS PROYEK TITIK NOL


BULAN : APRIL 2023
MNGG 01. Period. Tgl. ... April s/d ..., 2024
NO TANGGAL KETERANGAN MASUK KELUAR

Saldo minggu lalu


Droping ke

1, 26-Oct-15 saldo pindahan minggu-9 39,425,110


2, 26-Oct-15 6 biaya konsumsi pekerja relokasi pagar pengaman 250,000
3, 26-Oct-15 5 biaya reinstalisasi listrik tahap 2 a/n Munir 100,000
4, 26-Oct-15 13 ban angkong luar-dalam 75,000
2 parkir mobil 2,000
5, 26-Oct-15 13 mur dan baut roda troli 6,000
6, 26-Oct-15 4 konsumsi lapangan (2 galon AQUA) 32,900
7, 26-Oct-15 5 peralatan listrik 15,500
8, 26-Oct-15 12 besi ulir 19 mm = 42 btg 9,000,000
12 besi 12 mm = 36 btg 3,060,000
12 Besi 10 mm = 30 btg 1,680,000
12 bendrat = 1 roll 300,000
12 pipa paralon 3/4' = 40 btg 1,040,000
6 paku beton 10 cm = 10 dus 165,000
6 paku kayu 7 cm = 3 kg 39,000
9, 26-Oct-15 12 resibon potong besi = 20 pc 180,000
10, 26-Oct-15 6 kayu kasau glugu 2,5 m = 30 btg 900,000
11, 26-Oct-15 6 paku kayu 5 cm = 3 kg 390,000
13 Sekop Tanah = 2 set 110,000
13 senggrong tangan = 3 set 75,000
6 Gegep Bendrat = 4 pc 90,000
6 Paku payung = 2 kg 46,000
5 Kloset jongkok = 1 set 160,000
5 Angkong sorong = 2 unit 900,000
12, 26-Oct-15 5 Multipleks 8 mm = 5 lbr 500,000
5 Terpal 5x7 m = 1 lbr 343,000
13, 26-Oct-15 12 Besi Begel 12x12 cm = 100 kg 1,200,000
14, 26-Oct-15 2 BBM kend. Operasional a/n Wintawan 42,500
15, 26-Oct-15 4 Penggaris Siku =2 pc 20,000
4 Cat PYLOX =1 klg 18,500
4 Meteran 5 m = 2 set 30,000
16, 26-Oct-15 4 Meteran 3 m = 2 set 20,000
4 Pensil Tukang = 1 set 2,000
17, 26-Oct-15 4 Cat PYLOX = 2 klg 44,000
18, 26-Oct-15 5 Biaya Sewa dan Mob-Demob Excavator tahap 1 15,160,000
19, 27-Oct-15 Terima Kas 10,000,000
20, 27-Oct-15 3 konsumsi karyawan 108,000
21, 27-Oct-15 5 BBM Excavator, DEX 60 ltr 624,000
22, 27-Oct-15 5 BBM Excavator, DEX 60 ltr 624,000
23, 27-Oct-15 4 masker hijau, 1 pak 49,940
24, 27-Oct-15 4 konsumsi lapangan (2 galon AQUA) 32,000
25, 27-Oct-15 4 konsumsi lapangan (3 galon AQUA) 48,000
26, 27-Oct-15 11 Resibon 14" x 3 120,000
27, 27-Oct-15 11 Benang Nylon 10, 1 pak 25,000
28, 27-Oct-15 11 Paku, Resibon, Bendrat 935,000
29, 28-Oct-15 4 Partisipasi Acara Peringatan Sumpah Pemuda 500,000
30, 4-Jan-00 5 BBM Excavator & BBM kend. Operasional 2,596,000
31, 28-Oct-15 4 konsumsi lapangan (2 galon AQUA) 32,000
32, 28-Oct-15 2 BBM kend. Operasional AB 1606 LN 200,000
33, 29-Oct-15 11 Besi, pipa paralon, dll (Dowel & Tie Bar) 11,802,000
34, 29-Oct-15 11 Besi, pipa paralon, dll (Dowel & Tie Bar) 93,000
35, 30-Oct-15 Terima Kas 90,000,000
36, 30-Oct-15 9 v-belt u/ Asphalt Cutter 150,000
37, 30-Oct-15 4 alat tulis kantor 66,300
38, 30-Oct-15 4 konsumsi lapangan (2 galon AQUA) 32,000
39, 30-Oct-15 2 Biaya Sewa 1 unit pick up bulan-2 3,000,000
40, 31-Oct-15 11 upah dan lembur pekerja periode 25-31/10 15,218,000
41, 31-Oct-15 3 biaya catering periode 29/10 - 07/11 2,750,000
42, 31-Oct-15 6 upah dan lembur pekerja periode 25-31/10 2,490,000
43, 31-Oct-15 6 upah dan lembur 1 org pekerja periode 25-31/10 400,000
44, 31-Oct-15 * Kas Bon Flagman a/n Anggit AM 200,000
45, 31-Oct-15 12 Besi Begel 12x12 cm, 20 kg 240,000
46, 31-Oct-15 4 konsumsi lapangan (1 galon AQUA) 15,500
47, 31-Oct-15 4 konsumsi lapangan (1 galon AQUA) 15,500
48, 31-Oct-15 5 BBM Excavator, DEX 60 ltr 624,000
49, 31-Oct-15 5 BBM Excavator, DEX 60 ltr 624,000
50, 31-Oct-15 4 Rekening Listrik KONI 1,800,000
51, 31-Oct-15 5 gaji karyawan :
1 Wintawan Alka Putranto 4,000,000
1 Benyamin Sumedi 3,000,000
1 Septian Tri Nugroho 2,500,000
6 Tim pengamanan 5,000,000
52, 31-Oct-15 taktis polisi :
6 Kasatlantas Polresta 1,000,000
6 wakasatlantas polresta 800,000
6 2 org Danru lantas polresta @ Rp. 500.000,00 1,000,000
6 Ka-SRD ditalntas 1,000,000
6 kapolsek Danurejan 500,000
53, 31-Oct-15 tunjangan direksi :
4 koordinator 1,000,000
4 anggota 1 800,000
4 anggota 2 700,000
54, 31-Oct-15 3 UM staf pelaksana 840,000
55, 31-Oct-15 3 konsumsi lapangan (logistik warung) s/d 06/10 735,000
56, 1-Nov-15 12 Besi Begel 12x12 cm 372,000
57, 1-Nov-15 5 BBM Excavator, DEX 110 ltr 1,122,000
58, 1-Nov-15 12 100 pc batubata 100,000
59, 1-Nov-15 4 Selang air 3/4" , 1 roll 430,000
60, 1-Nov-15 2 BBM kend. Operasional AB 1606 LN 300,000
61, 1-Nov-15 4 konsumsi lapangan (INDOMART) 50,200
62, 1-Nov-15 4 konsumsi lapangan (INDOMART) 65,400
63, 1-Nov-15 3 konsumsi karyawan 288,750

JUMLAH 139,425,110 107,013,990


SALDO 32,411,120

TOTAL 139,425,110 139,425,110


KET SALDO :
VB : 0
NOTA : 0 Jogja, 1 nopember, 2015
TUNAI : 32,411,120
32,411,120 MENGETAHUI DILAPORKAN OLEH

1
SALDO

16,985,400

2,565,940

3,328,000
15,143,300

47,252,000

2,728,350

88,002,990
PROYEK JALAN KALIURANG
BULAN : tgl.26 okt s/d 1 nop, 2015
MNGG : 10

Acc Keterangan Minggu Lalu MG 1 Jumlah KETERANGAN


Biaya Tidak Langsung
10 Sisa Minggu lalu
20 Droping Dana Mingguan
100 MOBILISASI KONTRAKTOR
101 Mobilisasi untuk kontraktor
102 Sewa untuk Gudang Kontraktor
103 Sewa Kantor Lapangan & Mess staf
104 Akomodasi Keet
105 Perlengkapan Keet
106 Rekening Listrik
107 Akomodasi Telepon GS
108 Akomodasi Telep, Koord. Pelaksana,Pelaksana
109 Penerangan dan keamanan proyek
110 Dokumentasi Proyek
111 ADMINISTRASI TEKNIK
112 Pengukuran dan olah data
113 Sewa Theodolyth + Kelengkapan
114 Rool meter 100 meter
115 Meteran 5 meter
116 Patok cross, cat dll
117 Tenaga Harian Survey
118 Laborat Proyek + Lapangan
119 Mix design ( 9 Jenis Job-Mix dan test ke Kanwil )
120 Pembuatan sampel, pengujian
121 Tenaga Harian Laborat + Uang Makan
122 Administrasi Teknik + Lapangan
123 Cartridge dan tinta refill
124 Kertas (HVS & Buram)
125 Laporan mingguan,bulanan & harian
126 Request mingguan & harian
127 Alat - alat tulis dll
128 Foto copy, jilid
129 Biaya MC 0, CCO
130 Biaya pembuatan Dokumen Kontrak
131 Gambar shop drawing
132 Gambar asbuild drawing
133 Light durk / rekalkir shoop drawing
134 Light durk / rekalkir asbuild drawing
135 SEWA KENDARAAN, BBM DAN PEMELIHARAAN
136 Sewa kendaraan
137 Sewa kendaraan DGS ; 1 unit
138 Sewa kendaraan Adtek & Umum 1 Unit
139 Sewa kendaraan roda dua (motor) 8 unit
140 Sewa komputer 3 unit + printer 2 unit
141 Sewa Kendaraan Pick Up ( 2 unit )
142 BBM dan Pemeliharaan
143 BBM Kendaraan GS & DGS
144 BBM Kendaraan Pikup 2 unit
145 BBM Kendaraan lapangan 1 unit
146 BBM motor operasional lapangan
147 Servis ringan mobil GS & DGS
148 Servis ringan pick up
149 Servis ringan spd motor
150 DANA TAKTIS LAPANGAN
151 Overtime Direksi, Konsultan Pengawas
152 Overtime PPK
153 Overtime Korlap
154 Overtime Pengawas Lapangan ( 5 org )
155 Overtime Site Engineer ( 1 org )
156 Overtime Engineer dan Chief Inspector ( 2 org )
157 Overtime Inspector ( 4 org )
158 Uang makan Direksi Pengawas, Konsultan ( 12 org )
159 Jamuan rapat mingguan
160 Sosialisasi
161 Bulanan Bina Lingkungan
162 Taktis Keamanan Lingkungan
163 Taktis Aparat dan Kepolisian
164 Taktis Lapangan tak Langsung
165 Penagihan, PHO, FHO
166 Taktis pencairan Uang Muka
167 Taktis pencairan Termyn
168 Biaya PHO
169 Biaya FHO
170 GAJI STAF dan OVERHEAD KORWIL
171 Gaji ,tunjangan ,U.makan ,Lembur rutin Staf
172 Gaji staf Lapangan
173 THR
174 Uang makan GS & DGS
175 Uang makan staf lapangan
176 Lemburan rutin staf lapangan
177 Lemburan rutin GS dan DGS
178 Akomodasi pelaksana pemeliharaan
179 Gaji Personel Kantor Pusat ( overbooking )
180 Gaji bulanan GS & DGS
181 Gaji bulanan Personil kp (3 org/ dalijo,puguh,rio)
182 Opersional Cabang / Korwil DIY
183 Gaji Staf Ktr Korwil DIY
184 Operasional Korwil DIY
KONTROL RAP Minggu ke : 10
TITIK NOL MALIOBORO Tanggal : 26 okt, 2 s/d

No Jenis Anggaran Stn Qty Hrg. Satuan Anggaran Minggu Lalu Minggu Ini Jumlah Sisa Anggaran Keterangan
A. B Biaya Tidak Langsung
1 Sisa Minggu lalu 86,300,000 18,000,000 9,500,000 27,500,000.00 58,800,000.00
2 Droping Dana Mingguan 33,840,000 12,021,328 3,544,500 15,565,828.00 18,274,172.00
3 MOBILISASI KONTRAKTOR 25,500,000 25,434,068 4,721,750 30,155,818.00 (4,655,818.00)
4 Mobilisasi untuk kontraktor 89,800,000 21,147,001 5,804,240 26,951,241.00 62,848,759.00
Sewa untuk Gudang Kontraktor Jumlah A 235,440,000 76,602,397 23,570,490 100,172,887.00 135,267,113.00
B. B Sewa Kantor Lapangan & Mess staf
1 Akomodasi Keet
1.1 Perlengkapan Keet Ls 1.00 38,500,000 38,500,000 29,881,975 23,392,500 53,274,475.00 (14,774,475.00)
1.2 Rekening Listrik Ls 1.00 156,115,263 156,115,263 88,686,610 14,070,000 102,756,610.00 53,358,653.00
1.3 Akomodasi Telepon GS Ls 1.00 9,000,000 9,000,000 - 9,000,000.00
1.4 Akomodasi Telep, Koord. Pelaksana,Pelaksana Ls 1.00 25,000,000 25,000,000 - 25,000,000.00
Penerangan dan keamanan proyek
2 Dokumentasi Proyek
2.1 ADMINISTRASI TEKNIK m3 229.49 141,392 32,448,000 24,477,000 150,000 24,627,000.00 7,821,000.00
2.2 Pengukuran dan olah data m3 299.13 72,316 21,632,000 20,283,200.00 20,283,200.00 1,348,800.00
Sewa Theodolyth + Kelengkapan
3. D Rool meter 100 meter
3.1 Meteran 5 meter m3 507.76 961,333 488,126,613 42,952,388.00 28,193,000 71,145,388.00 416,981,225.00
3.2 Patok cross, cat dll m3 78.50 705,333 55,368,667 13,240,500.00 17,172,000 30,412,500.00 24,956,167.00
3.3 Tenaga Harian Survey m3 1,570.00 1,094,033 1,717,631,810 815,411,990 266,000 815,677,990.00 901,953,820.00
Laborat Proyek + Lapangan
4. D Mix design ( 9 Jenis Job-Mix dan test ke Kanwil )
4.1 Pembuatan sampel, pengujian Ton 31.20 1,000,000 31,204,250 620,000.00 620,000.00 30,584,250.00
4.2 Tenaga Harian Laborat + Uang Makan Ton 45.71 1,000,000 45,712,200 6,400,000.00 6,400,000.00 39,312,200.00
Administrasi Teknik + Lapangan 76.92 140,433
Cartridge dan tinta refill
5. D Kertas (HVS & Buram)
5.1 Laporan mingguan,bulanan & harian m2 76.07 65,000 4,944,550 - 4,944,550.00
5.2 Request mingguan & harian Bh 4.00 400,000 1,600,000 - 1,600,000.00
5.3 Alat - alat tulis dll m' 50.00 325,000 16,250,000 1,149,500 1,149,500.00 15,100,500.00
Foto copy, jilid
6. D Biaya MC 0, CCO
6.1 Biaya pembuatan Dokumen Kontrak Jam 35.00 6,250 218,750 - 218,750.00
6.2 Gambar shop drawing Jam 175.00 5,000 875,000 - 875,000.00
6.3 Gambar asbuild drawing Jam 35.00 5,714 200,000 100,000.00 100,000.00 100,000.00
6.4 Light durk / rekalkir shoop drawing Jam 35.00 72,600 2,541,000 - 2,541,000.00 Kas
Light durk / rekalkir asbuild drawing
SEWA KENDARAAN, BBM DAN PEMELIHARAAN
Sewa kendaraan
Sewa kendaraan DGS ; 1 unit
Sewa kendaraan Adtek & Umum 1 Unit
Sewa kendaraan roda dua (motor) 8 unit
Sewa komputer 3 unit + printer 2 unit
Sewa Kendaraan Pick Up ( 2 unit )
BBM dan Pemeliharaan
BBM Kendaraan GS & DGS
BBM Kendaraan Pikup 2 unit
BBM Kendaraan lapangan 1 unit
BBM motor operasional lapangan
Servis ringan mobil GS & DGS
Servis ringan pick up
Servis ringan spd motor
DANA TAKTIS LAPANGAN
Overtime Direksi, Konsultan Pengawas
Overtime PPK
Overtime Korlap
Overtime Pengawas Lapangan ( 5 org )
Overtime Site Engineer ( 1 org )
Overtime Engineer dan Chief Inspector ( 2 org )
Overtime Inspector ( 4 org )
Uang makan Direksi Pengawas, Konsultan ( 12 org )
Jamuan rapat mingguan
Sosialisasi
Bulanan Bina Lingkungan
Taktis Keamanan Lingkungan
Taktis Aparat dan Kepolisian
Taktis Lapangan tak Langsung
Penagihan, PHO, FHO
Taktis pencairan Uang Muka
Taktis pencairan Termyn
Biaya PHO
Biaya FHO
GAJI STAF dan OVERHEAD KORWIL
Gaji ,tunjangan ,U.makan ,Lembur rutin Staf
Gaji staf Lapangan
THR
Uang makan GS & DGS
Uang makan staf lapangan
Lemburan rutin staf lapangan
Lemburan rutin GS dan DGS
Akomodasi pelaksana pemeliharaan
Gaji Personel Kantor Pusat ( overbooking )
Gaji bulanan GS & DGS
Gaji bulanan Personil kp (3 org/ dalijo,puguh,rio)
Opersional Cabang / Korwil DIY
Gaji Staf Ktr Korwil DIY
Operasional Korwil DIY

DIVISI I : UMUM
Mobilisasi
-
-

Penyiapan Dokumen Penerapan SMKK


Pembuatan Dokumen RKK, RMPK, RKPPL dan RMLPP
Pembuatan Prosedur dan Instruksi Kerja
Penyusunan pelaporan penerapan SMKK

Sosialisasi, promosi dan pelatihan


Induksi Keselamatan Konstruksi (Safety Induktion)
Pengarahan keselamatan Konstruksi (Safety Brieffing)
Pertemuan Keselamatan (Safety talk dan/atau toolbox meeting)
Simulasi Keselamatan Konstruksi
Spanduk (Banner)
Poster/Pamflet
Papan Informasi Keselamatan Konstruksi

Alat Pelindung Kerja dan Alat Pelindung Diri


APK
Pembatas Area (Restrick Area)
APD
Topi Pelindung (safety helmet)
Pelindung pernafasan dan mulut (masker, masker respirator)
Sarung Tangan (safety gloves)
Sepatu Keselamatan (safety shoes, rubber safety soes and toe cap)
Rompi Keselamatan (Saety Vest)

Asuransi dan Perizinan terkait Keselamatan Konstruksi


Asuransi (Construction All Risk)

Personal Keselamatan Konstruksi


Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi
Petugas Pengatur Lalu Lintas
Koordinator Manajemen dan Keselamatan Lalu Lintas

Rambu dan Perlengkapan Lalu Lintas yg diperrlukan atau manajemen lalu lintas
Rambu Petunjuk
Rambu Larangan
Rambu Peringatan
Rambu Informasi
Kerucut Lalu Lintas ( Trafic Cone)
Tongkat Pengatur Lalu Lintas (Warning Lights Stick)
Lampu Putar (rotary lamp)
Pembatas jalan (Water Tank Barrier)
Lampu/alat penetangan sementara
Lampu darurat (Emerrgency Lamp)

Kegiatan dan peralatan terkait pengendalian resiko keselamatan konstruksi


Alat Pemadam Api Ringan (APAR)
Bender K3
Pengujian Baku Mutu Ambein Lengkap
Pengujian Vibrasi Lingkungan utk kenyamanan dan keselamatan
Pengujian tingkat getaran kendaraan bermotor

JUMLAH DIVISI 1

PEJKERJAAN PERKERASAN LENTUR


Perbaikan Lapis Pondasi Agregat Kelas A Terpasang
Lapis Resap Pengikat-aspal emulsi medium setting terpasang
Lapis Perekat aspal emulsi rapid setting terpasang
Pekerjaan Galian Perkerasan Beraspal dengan Cold Milling Machine
Laston lapis Aus (AC- WC) Terpasang
Laston lapis Antara (AC- BC) Terpasang
Laston Lapis Pondasi (AC-Base)
Aditif Anti Pengelupasan

JUMLAH DIVISI PERKERASAN LENTUR

PEKERJAAN PEMELIHARAAN BANGUNAN PELENGKAP


Pembersian Drainase dan saluran samping
Marka jalan thermoplastis terpasang
Rambu Jalan Tunggal dg Permukaan Pemantul Engineering Grade
Perbaikan Rel Pengaman Terpasang
Perkerasan Blok Beton pada trotoar dan median terpasang
Pasangan batu terpasang
Bongkaran pasangan batu
Kerb Pracetak Jenis 1 (Peninggi/Mountable)
Kerb Pracetak Jenis 6 (Kerb dengan Bukaan)
Pembongkaran Ubin Bekisting atau perkerasan blok beton eksisting pd trotoar

JUMLAH DIVISI PEMELIHARAAN BANGUNAN PELENGKAP

PEKERJAAN DRAINASE JALAN


Pekerjaan Galian Drainase utk Selokan dan Saluran Air

JUMLAH DIVISI PEKERJAAN DRAINASE JALAN

PEKERJAAN TANAH
Pekerjaan Galian Biasa
Penyiapan badan jalan

JUMLAH DIVISI PEKERJAAN TANAH

PEKERJAAN PERBAIKAN PERKERASAN KAKU


Pekerjaan Beton Struktur fc'10MPa
Pekerjaan Beton Struktur fc'20MPa
Pekerjaan Beton Struktur fc'20MPa untuk bahu jalan
Bongkaran beton
JUMLAH DIVISI PEKERJAAN PERKERASAN KAKU

PERBAIKAN LERENG (LONGSORAN)


Pondasi Cerucuk Penyediaan dan Pemancangan
Baja Tulangan Polos BJTP 280

Sisa Mg lalu :
Jumlah B 2,647,368,103 1,043,203,163 83,243,500 1,126,446,663.00 1,520,921,440.00 Kas Mg Ini :
Jumlah :
Jumlah A + B 2,882,808,103 1,119,805,560 106,813,990 1,226,619,550.00 1,656,188,553.00 Seton Mg ini :
Sisa Mg ini :
1 nop ,2015

Keterangan
39,425,110
100,000,000
139,425,110
106,813,990
32,611,120
DIVISI I : UMUM
Mobilisasi
-
-

Penyiapan Dokumen Penerapan SMKK


Pembuatan Dokumen RKK, RMPK, RKPPL dan RMLPP
Pembuatan Prosedur dan Instruksi Kerja
Penyusunan pelaporan peneraoan SMKK

Sosialisasi, promosi dan pelatihan


Induksi Keselamatan Konstruksi (Safety Induktion)
Pengarahan keselamatan Konstruksi (Safety Brieffing)
Pertemuan Keselamatan (Safety talk dan/atau toolbox meeting)
Simulasi Keselamatan Konstruksi
Spanduk (Banner)
Poster/Pamflet
Papan Informasi Keselamatan Konstruksi

Alat Pelindung Kerja dan Alat Pelindung Diri


APK
Pembatas Area (Restrick Area)
APD
Topi Pelindung (safety helmet)
Pelindung pernafasan dan mulut (masker, masker respirator)
Sarung Tangan (safety gloves)
Sepatu Keselamatan (safety shoes, rubber safety soes and toe cap)
Rompi Keselamatan (Saety Vest)

Asuransi dan Perizinan terkait Keselamatan Konstruksi


Asuransi (Construction All Risk)

Personal Keselamatan Konstruksi


Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi
Petugas Pengatur Lalu Lintas
Koordinator Manajemen dan Keselamatan Lalu Lintas

Rambu dan Perlengkapan Lalu Lintas yg diperrlukan atau manajemen lalu lintas
Rambu Petunjuk
Rambu Larangan
Rambu Peringatan
Rambu Informasi
Kerucut Lalu Lintas ( Trafic Cone)
Tongkat Pengatur Lalu Lintas (Warning Lights Stick)
Lampu Putar (rotary lamp)
Pembatas jalan (Water Tank Barrier)
Lampu/alat penetangan sementara
Lampu darurat (Emerrgency Lamp)

Kegiatan dan peralatan terkait pengendalian resiko keselamatan konstruksi


Alat Pemadam Api Ringan (APAR)
Bender K3
Pengujian Baku Mutu Ambein Lengkap
Pengujian Vibrasi Lingkungan utk kenyamanan dan keselamatan
Pengujian tingkat getaran kendaraan bermotor

JUMLAH DIVISI 1

PEJKERJAAN PERKERASAN LENTUR


Perbaikan Lapis Pondasi Agregat Kelas A Terpasang
Lapis Resap Pengikat-aspal emulsi medium setting terpasang
Lapis Perekat aspal emulsi rapid setting terpasang
Pekerjaan Galian Perkerasan Beraspal dengan Cold Milling Machine
Laston lapis Aus (AC- WC) Terpasang
Laston lapis Antara (AC- BC) Terpasang
Laston Lapis Pondasi (AC-Base)
Aditif Anti Pengelupasan

JUMLAH DIVISI PERKERASAN LENTUR

PEKERJAAN PEMELIHARAAN BANGUNAN PELENGKAP


Pembersian Drainase dan saluran samping
Marka jalan thermoplastis terpasang
Rambu Jalan Tunggal dg Permukaan Pemantul Engineering Grade
Perbaikan Rel Pengaman Terpasang
Perkerasan Blok Beton pada trotoar dan median terpasang
Pasangan batu terpasang
Bongkaran pasangan batu
Kerb Pracetak Jenis 1 (Peninggi/Mountable)
Kerb Pracetak Jenis 6 (Kerb dengan Bukaan)
Pembongkaran Ubin Bekisting atau perkerasan blok beton eksisting pd trotoar

JUMLAH DIVISI PEMELIHARAAN BANGUNAN PELENGKAP


PEKERJAAN DRAINASE JALAN
Pekerjaan Galian Drainase utk Selokan dan Saluran Air

JUMLAH DIVISI PEKERJAAN DRAINASE JALAN

PEKERJAAN TANAH
Pekerjaan Galian Biasa
Penyiapan badan jalan

JUMLAH DIVISI PEKERJAAN TANAH

PEKERJAAN PERBAIKAN PERKERASAN KAKU


Pekerjaan Beton Struktur fc'10MPa
Pekerjaan Beton Struktur fc'20MPa
Pekerjaan Beton Struktur fc'20MPa untuk bahu jalan
Bongkaran beton

JUMLAH DIVISI PEKERJAAN PERKERASAN KAKU

PERBAIKAN LERENG (LONGSORAN)


Pondasi Cerucuk Penyediaan dan Pemancangan
Baja Tulangan Polos BJTP 280

JUMLAH DIVISI PERBAIKAN LERENG (LONGSORAN)

Anda mungkin juga menyukai