Komponen Tugas
Quiz (1 tgs) /Tugas Rumah (4 Tgs) 10%
Soal mandiri untuk ujian, tugas rumah atau quiz akan diberikan nilai dengan bobot seperti tabel di atas.
Sumber:
“Unit Pengembangan Materi dan Proses Pembelajaran di Perguruan Tinggi” Direktorat Pembinaan
Akademik dan Kemahasiswaan dan Direktorat Jenderal Pendidikan Tinggi Departemen Pendidikan
Nasional 2005
TUGAS
Tidak boleh melakukan kecurangan tugas dan quiz, tugas
dikumpulkan satu minggu kemudian.
Keterampilan adalah nilai Praktek sistem manufaktur terpadu
Machines
Raw “Finished”
Material Products
Interested in:
Lead time for products
Cost of processing
Decisions include:
System configuration
Scheduling methods
MANUFACTURING SYSTEM CONFIGURATIONS
T T D
T T D T T
M G G M M M
M M G G G D
Flow Line
Job Shop Configuration Configurations
MANUFACTURING SYSTEM CONFIGURATIONS
Job Shop
Process layout that groups functionally similar machines
Flow Line
Product layout that groups machines based on a product’s flow
Cellular Manufacturing System
Hybrid layout that groups similar parts and the corresponding processing
machines
Flexible Manufacturing System is an automated application
Project Shop
Product is fixed and people and equipment brought to it
Continuous Process
MANUFACTURING SYSTEM DESIGN
Little’s Law
WIP = Production Rate × Throughput Time (L=λW)
Matter is conserved
Larger scope implies reduced reliability
Objects decay
Exponential growth in complexity
M components, N states ==> NM possible system
states
PRINSIP-PRINSIP SYSTEM MANUFAKTUR
Technology termaju
Komponen sistem muncul untuk
berperilaku secara acak
Batas (Manusia) rasionalitas
Menggabungkan, menyederhanakan, dan
menghilangkan untuk menghemat waktu,
uang, dan energi
IKTISAR MANUFACTURING SYSTEM
Desain Produk
Perencanaan Proses
Desain system Produksi
Perencanaan Produksi
Perencanaan Operasional
Shop Floor Control
Execution
PRODUCT DESIGN
Idea Idea Generation
Memahami dan mengidentifikasi (Product Design)
kebutuhan pelanggan
• Desain awal
Studi kelayakan untuk menentukan Feasibility Study
fungsi awal (Performance
Specification)
Prototype
Market Research Preleminary Design
Market potential, economic analysis, (Prototype)
strategic assessment
Design Refinement Final Design
Functional specifications (Final Design Specification)
Detailed Specifications
Detailed design considering functions, Process Planning
quality/reliability, manufacturing, etc. (Manufacturing
Specication)
PRODUCT DESIGN (CONT.)
Functional analysis
Customer specifications
Product reliability
Design for X
Manufacture or Assembly
Simplification, standardization, modularization
Testing
Repair
Robustness to variations
Concurrent engineering
Consider how product will be manufactured (process and
production planning) during design phase
Reduce cost and time to market
PRODUCT DESIGN (CONT.)
Computer-Aided Design
Use of computer graphics to assist in the creation,
modification, and analysis of a design
Common uses
Geometric modeling
Automated drafting and documentation
Engineering analysis
Design analysis
CAD/CAM
Generation of manufacturing instructions directly from CAD
design data
PRODUCT LIFE CYCLE
Product (Consumer) Perspective Production System
(Manufacturer)
Inception Perspective
Design Design
Production Ramp-up
Use
Maturity
Maintenance and repair
Decline
Disposal
Reuse, recycle, scrap
Sale
Time
PRODUCTION SYSTEM LIFE CYCLE
Lifecycle
Inception
Design
Construction
Startup
Use
Closure
Relationship to product lifecycle
Typically production system lifecycle is longer than an
individual product’s lifecycle
Production system will revert to earlier stages in its lifecycle
when new products are introduced
Extent and cost depends on system flexibility