PROJECT AREA 3 AREA 5A
Project Area 3
• Water level: +528 m at RL 744 and Q = 0 m^3/s
• ACSC water surface: ≈543 m^2
Vertical Shaft
• Vertical Shaft Top Excavation Level: RL. +532.00
• Vertical Shaft Bottom Excavation Level: RL. +369.350
• Vertical Shaft Height: 162.65 m
3
PERIODE SD 09 JANUARI
2022 WOKSHOP PENSTOCK
Working Progress
Stock Yard Plat Besi Penstock Access Depan WS. Penstock Drainase WS. Penstock
Working Progress
Lay Out Drainase GALIAN CAPING BEAM GALIAN CAPING BEAM
5