TERMINASI KABEL BUSDUCT AREA 31A
GAMBARAN UMUM
GAMBARAN UMUM
METODE INI MENJELASKAN TENTANG LANGKAH-LANGKAH TERMINASI KABEL
BUSDUCT DI AREA 31A MENGGUNAKAN SCAFFOLDING
AREA KERJA
TERMINASI KABEL BUSDUCT AREA 31A
PROSES TAHAP PERTAMA
LANGKAH – 1
PROSES PEMASANGAN SCAFFOLDING
PERSIAPAN
- LANGKAH PERTAMA LAKUKAN TOOLBOX MEETING ATAU BREAFING PAGI SEBELUM BEKERJA
- MOBILISASI MATERIAL DAN ALAT
- PASTIKAN MATERIAL DAN ALAT KERJA DIBERSIHKAN SEBELUM MASUK KE AREA PRODUKSI
- PASTIKAN ALAT KERJA ATAU TOOLS DALAM TAGING HIJAU
- LIFTING MATERIAL SCAFFOLDING SECARA MANUAL
- INSTAL SCAFFOLDING UNTUK AKSES PEKERJAAN KETINGGIAN
- PASANG BRACING, JOIN PINT, TANGGA, CATWALK DENGAN BENAR & PASTIKAN DALAM
KONDISI PROPER/TERKUNCI
- PASANG BARICADE & SIGN BOARD UNTUK MEMBATASI AREA
- SETELAH SCAFFOLDINGQ SELESAI DI INSTAL, LAKUKAN TAGGING SCAFFOLDING
- PASTIKAN SCAFFOLDING DI TAGGING HIJAU
- SPV DAN HSE WAJIB MENGECEK DAN MENGAWASI
- PASTIKAN PEKERJA SUDAH TENSI DARAH
- PASTIKAN GAMBAR KERJA/SLD (SINGLE LINE DIAGRAM) PANEL SESUAI.
TERMINASI KABEL BUSDUCT AREA 31A
PROSES TAHAP KEDUA
LANGKAH – 2
PROSSES MEMATIKAN ALIRAN LISTRIK DI PANEL SDP
• MATIKAN POWER BUSDUCT DARI PANEL SDP
1. PASTIKAN SEBELUM MEMATIKAN POWER TIM YANG MENGERJAKAN SUDAH MENGETAHUI
SCOPE PEKERJAANNYA
2. PASTIKAN TAGING LOTOTO DIPERSIAPKAN TERLEBIH DAHULU
3. SETELAH PERSIAPAN SUDAH SELESAI SELANJUTNYA LAKUKAN SHUTTING OFF PANEL SDP
4. LAKUKAN PENGECEKAN MENGGUNAKAN AVO METER UNTUK MEMASTIKAN POWER
SUDAH OFF
5. SETELAH ITU LAKUKAN TAGGING LOTOTO
HSE DAN SPV HARUS MENGAWASI
TERMINASI KABEL BUSDUCT AREA 31A
PROSES TAHAP KETIGA
LANGKAH – 3
PROSES MEMBUKA COVER BUSDUCT
TRAY TRAY
BUSDUCT • LANGKAH SELANJUTNYA BUKA COVER BUSDUCT
1. PERSIAPKAN ALAT UNTUK MEMBUKA BUSDUCT SEPERTI OBENG ATAU KUNCI
2. PASTIKAN ALAT MASIH LAYAK UNTUK DIGUNAKAN DAN KUNCI UNTUK MEMBUKA COVER
SESUAI
3. SETELAH KEBEL TERBUKA LEPAS KABEL ATAU DISCONNECT KABEL
• PASTIKAN SAAT BEKERJA DIKETINGGIAN MENGGUNAKAN BODYHARNESS DOUBLE HOOK
SCAFFOLDING BUSDUCT
• GUNAKAN VOLTMETER UNTUK MEMASTIKAN ALIRAN LISTRIK SUDAH MATI
• GUNAKAN SARUNG TANGAN LISTRIK SAAT MELEPAS KABEL DR BUSDUCT
• PASTIKAN SPV DAN HSE MENGAWASI
PROSES MEMBUKA COVER BUSDUCT
TERMINASI KABEL BUSDUCT AREA 31A
PROSES TAHAP KEEMPAT
LANGKAH – 4
PROSES LEPAS KABEL EXISTING DARI TERMINAL BUSDUCT
- LEPASKAN KABEL EXISTING DARI TERMINAL BUSDUCT
1. PASTIKAN ALIRAN LISTRIK SUDAH DALAM KEADAAN OFF
2. GUNAKAN SARUNG TANGAN LISTRIK SAAT PENARIKAN KABEL
KABEL TRAY - PASTIKAN SAAT PEKERJAAN KETINGGIAN MENGGUNAKAN BODY HARNESS DOUBLE HOOK
- KONEKSI KABEL BARU KE BUSDUCT SESUAI MARKING KABEL.
1. PASTIKAN PEKERJA MENGGUNAKAN SARUNG TANGAN LISTRIK
2. PASTIKAN PEKERJA MENGGUNAKAN BODYHARNESS
3. PASTIKAN ALAT YANG DIGUNAKAN MASIH LAYAK PAKAI
SCAFFOLDING - HSE DAN SPV WAJIB MENGAWASI