Anda di halaman 1dari 2

FORM KELENGKAPAN SIM UPLOAD RAB/DED SAAT PERENCANAAN

Nomor Format Kelengkapan


1 Format 3.2.5.1 PENYEDIAAN MATERIAL LOKAL
2 Format 3.2.5.2 SURVEI PENYEDIAAN TENAGA KERJA UPAH KERJA PER ORANG PER HARI
3 Format 3.2.5.3 DAFTAR SURVEI HARGA SATUAN BAHAN/ALAT
4 Format 3.2.5.4 SURVEI HARGA SATUAN BAHAN/ALAT
5 Format 3.2.5.5 DAFTAR HASIL KONFIRMASI HARGA SATUAN BAHAN/ALAT
6 Format 3.2.5.6 DAFTAR HASIL KONFIRMASI UPAH PEKERJA PER ORANG PER HARI
7 Format 3.2.5.7 LEMBAR VERIFIKASI SURVEI HARGA SATUAN
8 Format 3.2.5.8 RENCANA PENGGUNAAN ALAT BERAT
9 Format 3.2.5.9 DAFTAR RENCANA TENAGA KERJA LOKAL
10 Format 3.2.5.10 PENYEDIAAN MATERIAL LOKAL
11 Format 3.2.5.11 SURAT KESANGGUPAN PENYEDIAAN TENAGA TEKNIS DAN LOKAL
12 Format 3.2.6.1 PENJELASAN PENYUSUNAN RANCANGAN TEKNIS (DED) DAN RAB
13 Format 3.2.6.2 BINGKAI GAMBAR RENCANA
14 Format 3.2.6.3 RENCANA ANGGARAN BIAYA (RAB) BIAYA ADMINISTRASI DAN OPERASIONAL
15 Format 3.2.6.4 RENCANA ANGGARAN BIAYA UNTUK PAKET PEKERJAAN
16 Format 3.2.6.5 RENCANA ANGGARAN BIAYA ANALISA HARGA SATUAN PEKERJAAN
17 Format 3.2.6.6 RENCANA ANGGARAN BIAYA DAFTAR HARGA SATUAN PEKERJAAN
18 Format 3.2.6.7 REKAPITULASI ANGGARAN BIAYA
19 Format 3.2.6.8 REKAPITULASI ANGGARAN BIAYA
20 Format 3.2.6.9 RENCANA JADWAL PELAKSANAAN PEKERJAAN (KURVA S)
21 Format 3.2.7.1 PEMERIKSAAN DESAIN DAN RAB
22 Format 3.2.7.2 LEMBAR ASISTENSI ASISTEN
23 Format 3.2.7.3 LEMBAR ASISTENSI PPK
NO. KAB. DESA KELENGKAPAN FORM YANG BELUM ADA

15 Bireuen Meunasah Tunong Tidak ada F.3.2.5.(1-11), F.3.2.6.(1,7), F.3.2.7.(1-3)

Anda mungkin juga menyukai