ENGINEERING
Laporan Bulanan Engineering
2. Income Statement
3. Action Plant
4. Realisasi Plant
DATE ELECTRICITY COST PPJ OCCUPANCY COST / DAILY HOTEL DAILY ELECTRICITY COST PEMAKAIAN AIR PEMAKAIAN GAS FUEL
TOTAL ELECTRICITY TOTAL EVENT
WBP LWBP AMOUNT 0.10 ROOM % OCCP ROOMS NETT REVENUE (IDR) TO REVENUE COMPARISON M3 Rp Tbng Rp
1 119
10 385,440 1,175,680 1,561,120 156,112.00 1,717,232.00 34 41.46 50,506.82 30,632,631.00 5.61 % 0 - 4 Rp 2,620,000.00 1
12 559,680 1,073,600 1,633,280 163,328.00 1,796,608.00 30 36.59 59,886.93 39,874,431.00 4.51 % 0 - 1 Rp 655,000.00 5 1
19 485,760 1,397,440 1,883,200 188,320.00 2,071,520.00 63 76.83 32,881.27 35,880,322.00 5.77 % 0 - 4 Rp 2,620,000.00 60 1
26 528,000 1,436,160 1,964,160 196,416.00 2,160,576.00 52 63.41 41,549.54 35,809,144.00 6.03 % 0 - 3 Rp 1,965,000.00 200
28 31,680 542,080 573,760 57,376.00 631,136.00 33 40.24 19,125.33 20,219,223.00 3.12 % 0 - 101
30 681,120 1,745,920 2,427,040 242,704.00 2,669,744.00 70 85.37 38,139.20 59,081,450.00 4.52 % 0 - 132 2
En e rg y Co st :
En e rg y Co st 6 2 6 ,4 0 5 ,5 7 0 6 4 .3 5 5 9 ,2 3 0 ,0 0 0 5 9 .8 6 7 ,1 7 5 ,5 7 0 1 2 .0 1
Fu e l O il 6 ,3 3 6 ,3 1 0 0 .6 5 4 ,1 6 6 ,6 0 0 0 .4 5 2 ,1 6 9 ,7 1 0 5 2 .0 7
Wa te r 9 5 ,9 9 2 ,2 7 2 9 .8 5 1 3 3 ,0 9 3 ,4 0 0 1 4 .2 3 -3 7 ,1 0 1 ,1 2 8 -2 7 .8 8
----------------- -------- --- -------------- ----------- -------------- --------
To ta l En e rg y Co st 7 2 8 ,7 3 4 ,1 5 2 7 4 .8 6 9 6 ,4 9 0 ,0 0 0 7 4 .4 8 3 2 ,2 4 4 ,1 5 2 4 .6 3
To ta l O th e r Exp e n se s 8 7 2 ,9 5 0 ,7 0 6 8 9 .6 8 4 0 ,9 0 0 ,4 0 0 8 9 .9 2 3 2 ,0 5 0 ,3 0 6 3 .8 1
P O M
NET COST TO TTL AVAILABLE 17,609 0.00 17,064 0.00 545 0.00 14,577 172.25
NET COST TO TTL OCCP 19,255 0.00 18,658 0.00 597 0.00 16,995 234.12
TOTAL POM 144,216,554 1.83 144,410,400 1.91 (193,846) -0.07 123,366,109 1.86
ENERGY COST
NET COST TO TTL AVAILABLE 88,979 0.00 82,298 0.00 6,680 0.00 75,344 947.32
NET COST TO TTL OCCP 97,294 0.00 89,986 0.00 7,308 0.00 87,841 1.16
NET COST TO TTL AVAILABLE 118,953 0.00 110,496 0.00 8,457 0.00 98,569 0.00
NET COST TO TTL OCCP 130,070 1,588 120,818 2.62 9,252 114,918 1.51
TOTAL POMEC 974,226,390 12.39 935,130,400 12.34 39,095,990 13.67 834,188,963 19.55
P O M
NET COST TO TTL AVAILABLE 20,212 0.00 17,527 0.00 2,685 0.00 72,364 0.00
NET COST TO TTL OCCP 24,285 0.00 19,564 0.00 4,721 0.00 84,528 0.00
TOTAL POM 827,695,310 2.33 722,510,600 2.02 105,184,710 -54.69 599,740,117 1.83
ENERGY COST
NET COST TO TTL AVAILABLE 81,023 0.00 84,007 0.00 (2,984) 0.00 370,646 0.00
NET COST TO TTL OCCP 97,347 0.00 93,770 0.00 3,577 (0.00) 434,750 0.00
NET COST TO TTL AVAILABLE 113,018 0.00 112,963 0.00 55 0.00 3 8 8 ,4 2 0 0.00
NET COST TO TTL OCCP 135,789 332 126,092 2.62 9,697 4 5 4 ,1 8 4 0.00
TOTAL POMEC 4,628,091,684 13.04 4,656,692,400 13.05 (28,600,716) 14.87 4 ,0 3 3 ,0 5 0 ,9 7 3 12.29
HOTEL SANTIKA PERIODE : APRIL
ACTION PLAN
UNIT : BENGKULU TAHUN : 2013
DEPT : ENGINEERING
PROGRAM MAINTENANCE
MINGGU KE -
NO URAIAN KERJA KETERANGAN
I II III IV
1 AIR CONDETIONER
AC Splite Kamar Lantai 3
AC Splite Kamar Lantai 5
2 EXCHAUST
Exchaust STP
Exchaust Traffo
Exchaust LVMDP
Exchaust Pump Room
Exchaust Hood
3 FIRE SERVICE & ALARM
Diesel Fire Pump
Electric Main Pump
Jockey Fire Pump
Fire Extinguisher
MCFA
Hydrant Box & Accessories
Hydrant Pillar
Seamess Conection
4 ELECTRONIC EQUPMENT
Sound System
MATV
5 SWAGE TREATMENT PLANT
Rotor Disk
6 GENERAL EQUIPMENT
Tools
Gym Equipment
7 KITCHEN EQUIPMENT
Walk In Freezer
Walk In Chiller
Ice Cube Machine
Under Counter Chiller
Main Kitchen Equipment
Pastry Equipment
HOTEL SANTIKA PERIODE : MARET
REALIZATION ACTION PLAN
UNIT : BENGKULU TAHUN : 2013
DEPT : ENGINEERING
PROGRAM MAINTENANCE
MINGGU KE -
NO URAIAN KERJA KETERANGAN
I II III IV
A AC CONDITIONER
1 AC Split ruang GM done
2 AC Split ruang S & M done
3 AC Split ruang HRD done
4 AC Split ruang Accounting -
5 AC Split ruang BOH -
6 AC Split ruang Server done
7 AC Split ruang FOM done
8 AC Split ruang Engineering done
9 AC Split ruang HK done
10 AC Split ruang Kitchen + Pestry done
11 AC Split ruang Privat done
12 AC Split ruang Restaurant done
13 AC Split kamar lantai 6 done 10 kamar
14 AC Split standing done 2 unit
15 AC Split Duct Lobby done 1 unit
16 AC Split Duct Ballroom done
17 AC Split depan lift tamu done
18 AC Split ruang kontrol lift -
19 AC Split kamar lantai 2 done 15 kamar
20 AC Split ruang Cempaka -
21 AC Split ruang Gading done
B ELECTRICAL PANEL
1 Panel SDP hydrant done
2 Panel Diesel pump done
3 Panel Hidrant done
4 Panel Pompa filter done
5 Panel Pompa transfer done
6 Panel SDP Function Room done
7 Panel Function room 1 done
8 Panel Function room 2 done
9 Panel Function room 3 done
10 Panel Pree Function done
11 Panel STP done
12 Panel Travo -
13 Panel LVMDP/PPU control -
14 Panel Power utility done
15 Panel Listrik BOH done
16 Panel Listrik lantai 2 done
17 Panel Listrik lantai 3 done
18 Panel Listrik lantai 4 done
19 Panel Listrik lantai 5 done
20 Panel Listrik lantai 6 done
21 Panel Lobby done
22 Panel restorant & kitchen done
23 Panel atap done
24 Panel lift barang done
25 Panel sirkuasi air panas done
26 Panel booster done
27 Panel lift passanger done
28 Panel kolam renang done
F ELECKTRONIC EQUIPMENT
1 Sound sistem done
2 MATV done
3 PABX Control done
4 CCTV done
G GENSET PLAIN
1 Genset done
2 Fuel daily tank done
3 Storage solar tank done