KURANG
45,000,000.00
5,279,819,792.38 1
4,793,917,800.00 0
### 0
Lampiran surat Permohonan Perubahan Pekerjaan
SETIAWAN, SE, MM AMIN SUROSO, S.T DEKAN RIRIK DP, ST, M.SI NAJI AL ABDAT, ST IR. MULYONO
NIP:197012301994031001 NIP:19711108 199103 1 001 NIP:--------------- TEAM LEADER TEAM LEADER DIREKTUR
REKAP Tamkur
SESUAI KONTRAK PERKERJAAN TAMBAH
HARGA SATUAN HARGA SATUAN
NO. URAIAN PEKERJAAN SAT (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA
VOLUME VOLUME
(Rp) (Rp)
9 Genteng metal berpasir 41x110 cm Setara Rainbow M2 189.20 138,700.00 26,242,040.00
10 Rangka Baja Ringan M2 19.00 183,100.00 3,478,900.00
11 Nok metal M' 30.00 167,700.00 5,031,000.00
Rincian Tamkur 5 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :
INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA
Kegiatan : Renovasi Gedung Biokimia Sekolah Vokasi IPB University Minggu : 30 (TIGA PULUH)
Lokasi : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128 Periode : 7 - 13 Oktober 2020
Tahun Anggaran : 2020 Tanggal : Jakarta, 9 Oktober 2020
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
BOBOT
NO URAIAN PEKERJAAN (%) PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
AKTUAL 71.7471%
RENCANA 0.1068%
CEPAT / LAMBAT 71.6403%
KEMAJUAN FISIK LAPANGAN
WAKTU PELAKSANAAN 240 Hari Kalender
Page 6 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :
INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA
Kegiatan : Renovasi Gedung Biokimia Sekolah Vokasi IPB University Minggu : 30 (TIGA PULUH)
Lokasi : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128 Periode : 7 - 13 Oktober 2020
Tahun Anggaran : 2020 Tanggal : Jakarta, 9 Oktober 2020
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
BOBOT
NO URAIAN PEKERJAAN (%) PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
KEMAJUAN FISIK LAPANGAN
Page 7 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :
INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
I. PEKERJAAN PERSIAPAN
1 Dokumentasi dan pelaporan 5.00 Ls 1,500,000.00 7,500,000.00 0.0739% 50.00 0.0369% 40.00 0.0296% 90.00 0.0665%
Pembuatan laporan harian,mingguan dan bulanan,foto-foto berwarna kemajuan pekerjaan dan gambar
sesuai pelaksanaan (as build drawing) diserahkan kepada pihak-pihak terkait diserahkan setiap bulan
hingga masa penyerahan pertama. Laporan-laporan tersebut dibuat sebanyak 6 eksemplar
2 Papan nama Kegiatan, ukuran 1.20 x 1.00 m lengkap 1.20 m2 165,000.00 198,000.00 0.0020% 50.00 0.0010% 50.00 0.0010% 100.00 0.0020%
Pembuatan dan pemasangan papan nama proyek di lokasi pekerjaan
3 Mobilisasi dan Demobilisasi 1.00 Ls 10,000,000.00 10,000,000.00 0.0985% 50.00 0.0493% 50.00 0.0493% 100.00 0.0985%
4 Pembersihan 1.00 Ls 17,302,000.00 17,302,000.00 0.1705% 10.00 0.0170% 65.00 0.1108% 75.00 0.1279%
Pembersihan hasil pekerjaan dan lingkungan akibat dari pelaksanaan pekerjaan.
5 Pemindahan kursi, meja kuliah dan perabot dalam ruangan 1.00 Ls 10,000,000.00 10,000,000.00 0.0985% - 0.0000% 100.00 0.0985% 100.00 0.0985%
A.1.2 DINDING
1 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) 99.34 M2 133,800.00 13,291,577.31 0.1310% 90.00 0.1179% 10.00 0.0131% 100.00 0.1310%
Page 8 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
2 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) 122.16 M2 263,200.00 32,152,812.80 0.3168% 90.00 0.2851% 10.00 0.0317% 100.00 0.3168%
3 Plesteran semen instant Setara MM-201 497.22 M2 90,700.00 45,098,061.31 0.4443% 90.00 0.3999% 10.00 0.0444% 100.00 0.4443%
4 Acian Dinding setara MM-301 t. 3 mm 497.22 M2 52,800.00 26,253,336.69 0.2587% 90.00 0.2328% 10.00 0.0259% 100.00 0.2587%
5 Plesteran bukaan kusen Setara MM-201 t. 10 mm 395.34 M2 90,700.00 35,857,338.00 0.3533% 50.00 0.1766% 50.00 0.1766% 100.00 0.3533%
6 Acian bukaan kusen Setara MM-301 t. 10 mm 395.34 M2 52,800.00 20,873,952.00 0.2057% 50.00 0.1028% 50.00 0.1028% 100.00 0.2057%
7 Kolom Praktis 10x10 66.30 M' 89,600.00 5,940,480.00 0.0585% 75.00 0.0439% 25.00 0.0146% 100.00 0.0585%
8 Balok lintel 8x10 15.10 M' 125,000.00 1,887,500.00 0.0186% 75.00 0.0139% 25.00 0.0046% 100.00 0.0186%
9 Dinding granit 60x60 (MU-450 & MU-408) 252.17 M2 339,600.00 85,636,932.00 0.8438% 75.00 0.6328% 25.00 0.2109% 100.00 0.8438%
10 Listplank lapis Almunium Composit Panel (ACP) setara Seven 6.60 M2 798,900.00 5,272,740.00 0.0520% - 0.0000% - 0.0000% - 0.0000%
11 Batu alam andesit bintik bakar cipanca 403.02 M2 362,800.00 146,215,039.24 1.4406% 90.00 1.2966% 2.00 0.0288% 92.00 1.3254%
12 Plint keramik 10 x 80 Polish setara Sandimas 866.08 M' 49,300.00 42,697,744.00 0.4207% 70.00 0.2945% 20.00 0.0841% 90.00 0.3786%
13 Dinding lapis alumunium composit panel (ACP) setara seven 75.88 M2 798,900.00 60,620,532.00 0.5973% - 0.0000% - 0.0000% - 0.0000%
14 Logo Stainless Mirror, ketebalan 0.8 1.00 unit 3,000,000.00 3,000,000.00 0.0296% - 0.0000% - 0.0000% - 0.0000%
15 Tulisan Stainless Mirror, ketebalan 0.8 1.00 unit 2,600,000.00 2,600,000.00 0.0256% - 0.0000% - 0.0000% - 0.0000%
16 Tulisan Stainless Mirror, ketebalan 0.8 1.00 unit 6,200,000.00 6,200,000.00 0.0611% - 0.0000% - 0.0000% - 0.0000%
17 Pasang Kolom 15/25 ( Openingan Kusen ) 48.00 M' 330,000.00 15,840,000.00 0.1561% 75.00 0.1171% 25.00 0.0390% 100.00 0.1561%
18 Ban - ban an batu alam 186.00 M' 95,000.00 17,670,000.00 0.1741% 90.00 0.1567% 10.00 0.0174% 100.00 0.1741%
19 Penambahan Plesteran Dinding batu alam 46.18 M2 90,700.00 4,188,163.20 0.0413% 90.00 0.0371% 10.00 0.0041% 100.00 0.0413%
20 Pekerjaan ring balk atas kusen 15/25 47.90 M' 330,000.00 15,807,000.00 0.1557% 75.00 0.1168% 25.00 0.0389% 100.00 0.1557%
21 Perapihan Bekas Bobokan 116.17 M' 95,000.00 11,036,150.00 0.1087% 80.00 0.0870% 20.00 0.0217% 100.00 0.1087%
22 Plint Parquet 41.83 M' 80,000.00 3,346,400.00 0.0330% - 0.0000% - 0.0000% - 0.0000%
23 Pasang Kolom 30/40 ruang rapat 9.40 M' 1,050,000.00 9,870,000.00 0.0972% 90.00 0.0875% 10.00 0.0097% 100.00 0.0972%
24 Pasang Balok 30/60 ruang rapat 9.40 M' 1,600,000.00 15,040,000.00 0.1482% 90.00 0.1334% 10.00 0.0148% 100.00 0.1482%
A.1.3 LANTAI
1 Granitile 80x80 Motif Setara Sandimas 914.87 M2 378,000.00 345,818,970.00 3.4073% 75.00 2.5555% 25.00 0.8518% 100.00 3.4073%
2 Granitile 80x80 Motif Setara Sandimas - M2 378,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Granitile 80x80 Unpolish Setara Sandimas 593.23 M2 532,000.00 315,596,285.20 3.1095% 50.00 1.5548% 30.00 0.9329% 80.00 2.4876%
4 Granitile 60x60 unpolish Setara Sandimas 69.58 M2 418,500.00 29,119,230.00 0.2869% 75.00 0.2152% 25.00 0.0717% 100.00 0.2869%
5 Parquet jati 1.5cmx9cmx30cm-120cm 60.74 M2 611,300.00 37,130,362.00 0.3658% - 0.0000% - 0.0000% - 0.0000%
6 Stepnosing tangga (custom pabrikan) 170.90 M' 68,100.00 11,638,290.00 0.1147% 25.00 0.0287% 50.00 0.0573% 75.00 0.0860%
7 Cat Epoxy 1000 Micron - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
8 Curving Lantai - M' 60,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
9 Cat Epoxy 1000 Micron - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
10 Lantai panggung rangka baja fin.Kalsifloor 20mm (Rise floor) - M2 885,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
11 Finis Lantai cinema mini - M' 236,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
12 Screed Lantai T = 6 cm 130.96 M2 68,232.00 8,935,662.72 0.0880% 75.00 0.0660% 25.00 0.0220% 100.00 0.0880%
13 Pemadatan tanah 52.20 M2 14,100.00 736,020.00 0.0073% 75.00 0.0054% 25.00 0.0018% 100.00 0.0073%
14 Rabat Beton T = 6 cm 314.60 M2 68,232.00 21,465,787.20 0.2115% 75.00 0.1586% 25.00 0.0529% 100.00 0.2115%
15 Pekerjaan Sloof 8x12 11.80 M' 330,000.00 3,894,000.00 0.0384% 75.00 0.0288% 25.00 0.0096% 100.00 0.0384%
16 Pengurugan Lantai R.Toilet Pria Mushola 96.91 M2 37,500.00 3,634,125.00 0.0358% 75.00 0.0269% 25.00 0.0090% 100.00 0.0358%
17 Screed Lantai Toilet Pria 68.17 M2 68,232.00 4,651,375.44 0.0458% 65.00 0.0298% 35.00 0.0160% 100.00 0.0458%
Page 9 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
14 BV1.1 (AL) 5.00 Unit 573,600.00 2,868,000.00 0.0283% 15.00 0.0042% 5.00 0.0014% 20.00 0.0057%
15 BV1.A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 232,000.00 232,000.00 0.0023% 15.00 0.0003% 5.00 0.0001% 20.00 0.0005%
16 JLO (AL) 1.00 Unit 2,050,100.00 2,050,100.00 0.0202% 15.00 0.0030% 5.00 0.0010% 20.00 0.0040%
17 Sekat Partisi Kaca t.140cm 37.52 M2 659,000.00 24,728,513.70 0.2436% 15.00 0.0365% 5.00 0.0122% 20.00 0.0487%
18 Pintu Lebar 135 cm R.Laboratorium 1.00 Unit 7,151,150.00 7,151,150.00 0.0705% 15.00 0.0106% 5.00 0.0035% 20.00 0.0141%
19 Penutupan Kaca Jendela Menggunakan Gysum 75.59 M2 244,600.00 18,489,314.00 0.1822% 80.00 0.1457% 20.00 0.0364% 100.00 0.1822%
A.1.5 PLAFOND
1 Plafond Gypsum 9mm Setara Jayaboard 926.97 M2 122,300.00 113,367,819.50 1.1170% 60.00 0.6702% 30.00 0.3351% 90.00 1.0053%
2 Plafond Gypsum 9mm Setara Jayaboard (drop ceiling) 34.00 M2 141,200.00 4,800,800.00 0.0473% - 0.0000% 100.00 0.0473% 100.00 0.0473%
3 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi 1,169.68 M2 147,600.00 172,644,030.00 1.7010% 60.00 1.0206% 25.00 0.4253% 85.00 1.4459%
4 Plafond Grc 4mm Setara Grc 102.35 M2 83,500.00 8,546,225.00 0.0842% 75.00 0.0632% 10.00 0.0084% 85.00 0.0716%
5 Plafond Grc 4mm Setara Grc 70.68 M2 83,500.00 5,901,696.50 0.0581% 60.00 0.0349% 15.00 0.0087% 75.00 0.0436%
6 Plafond Grc 4mm Setara Grc 131.26 M2 83,500.00 10,960,293.50 0.1080% 75.00 0.0810% 25.00 0.0270% 100.00 0.1080%
7 Plafond metal Linear Ceiling 85C 24.00 M2 379,500.00 9,108,000.00 0.0897% - 0.0000% - 0.0000% - 0.0000%
8 List plafond Almunium U 2cm (shadow line) 392.23 M' 20,500.00 8,040,715.00 0.0792% 60.00 0.0475% 30.00 0.0238% 90.00 0.0713%
9 Sekat Partisi Gysum Tinggi 350 cm 41.65 M2 122,300.00 5,093,795.00 0.0502% 60.00 0.0301% 30.00 0.0151% 90.00 0.0452%
10 List Kornice 95.23 M' 20,500.00 1,952,215.00 0.0192% 75.00 0.0144% 25.00 0.0048% 100.00 0.0192%
A.1.6 SANITAIR
1 Closet duduk TOTO CW914J 6.00 BH 7,418,800.00 44,512,800.00 0.4386% 50.00 0.2193% - 0.0000% 50.00 0.2193%
2 Closet jongkok setara TOTO CE9/TV150NWV12J 3.00 BH 4,219,700.00 12,659,100.00 0.1247% 50.00 0.0624% - 0.0000% 50.00 0.0624%
3 Shower Spray setara TOTO THX 20 NBN 5 + TL 340 CSN 9.00 BH 361,600.00 3,254,400.00 0.0321% 50.00 0.0160% - 0.0000% 50.00 0.0160%
4 Washtafel setara TOTO LW 540 J 14.00 BH 1,543,000.00 21,602,000.00 0.2128% 50.00 0.1064% - 0.0000% 50.00 0.1064%
5 Cermin dibevel 6cm 8.46 M2 224,000.00 1,895,040.00 0.0187% - 0.0000% - 0.0000% - 0.0000%
6 Urinoar TOTO UW930J 4.00 BH 6,107,800.00 24,431,200.00 0.2407% 50.00 0.1204% - 0.0000% 50.00 0.1204%
7 Sekat Urinoar setara TOTO A100 4.00 BH 1,488,000.00 5,952,000.00 0.0586% - 0.0000% - 0.0000% - 0.0000%
8 Floor drain setara TOTO TX1BN 11.00 BH 463,400.00 5,097,400.00 0.0502% - 0.0000% - 0.0000% - 0.0000%
9 Kran air setara TOTO TX470SEN 3.00 BH 1,267,200.00 3,801,600.00 0.0375% - 0.0000% - 0.0000% - 0.0000%
10 Meja Beton lapis granite tile 60x60 7.05 M' 965,400.00 6,806,070.00 0.0671% 50.00 0.0335% 25.00 0.0168% 75.00 0.0503%
11 Pintu Tempered Toilet 12mm (lengkap aksesoris) 10.00 UNIT 3,095,700.00 30,957,000.00 0.3050% - 0.0000% - 0.0000% - 0.0000%
12 Sekat kaca Tempered Toilet 12mm (lengkap aksesoris) 26.94 M2 1,266,900.00 34,125,218.40 0.3362% - 0.0000% - 0.0000% - 0.0000%
13 Sink Laboratorium type ms 808 4.00 Unit 1,200,000.00 4,800,000.00 0.0473% - 0.0000% - 0.0000% - 0.0000%
14 Kran Air Laboratorium Leher Angsa 4.00 Unit 950,000.00 3,800,000.00 0.0374% - 0.0000% - 0.0000% - 0.0000%
A.1.7 PENGECATAN
1 Cat Dinding Interior Setara Dulux Easy Clean (standart) 1,748.62 M2 58,800.00 102,818,756.04 1.0131% 15.00 0.1520% 5.00 0.0507% 20.00 0.2026%
2 Cat Dinding Exterior Setara Dulux wheatershield (standart) 1,048.27 M2 72,500.00 75,999,575.00 0.7488% 10.00 0.0749% - 0.0000% 10.00 0.0749%
3 Cat bukaan kusen Setara Dulux Easy Clean 32.92 M2 58,800.00 1,935,696.00 0.0191% 10.00 0.0019% - 0.0000% 10.00 0.0019%
4 Cat Plafond Setara Vinilex 1,265.26 M2 38,700.00 48,965,368.50 0.4824% 60.00 0.2895% 20.00 0.0965% 80.00 0.3860%
5 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 78.60 M2 72,500.00 5,698,500.00 0.0561% - 0.0000% - 0.0000% - 0.0000%
6 Coating batu alam Setara Propan 403.02 M2 58,500.00 23,576,570.55 0.2323% 25.00 0.0581% 30.00 0.0697% 55.00 0.1278%
7 Finishing Lantai Parquet setara Ultran (3 lapis) 29.00 M2 80,900.00 2,346,100.00 0.0231% - 0.0000% - 0.0000% - 0.0000%
8 Cat listplank 30.29 M2 36,000.00 1,090,476.00 0.0107% 25.00 0.0027% 35.00 0.0038% 60.00 0.0064%
9 Kerok cat railing 17.97 M2 21,500.00 386,355.00 0.0038% 75.00 0.0029% 25.00 0.0010% 100.00 0.0038%
10 Cat Railing 17.97 M' 36,000.00 646,920.00 0.0064% 75.00 0.0048% 25.00 0.0016% 100.00 0.0064%
Page 10 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
5 UNIT Island Bench/Meja Lab. (0,9x0,9) (lengkap dengan furniture > lihat gambar) 4.00 UNIT 1,357,627.98 5,430,511.90 0.0535% 60.00 0.0321% 35.00 0.0187% 95.00 0.0508%
6 UNIT Island Bench/Meja Lab. (R. INSTRUMEN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 10,534,929.66 10,534,929.66 0.1038% 60.00 0.0623% 35.00 0.0363% 95.00 0.0986%
7 UNIT Island Bench/Meja Lab. (R.LAB GG 01) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 12,437,479.28 12,437,479.28 0.1225% 60.00 0.0735% 35.00 0.0429% 95.00 0.1164%
8 UNIT Island Bench/Meja Lab. (R.PENYIMPANAN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 7,509,085.87 7,509,085.87 0.0740% 60.00 0.0444% 35.00 0.0259% 95.00 0.0703%
9 UNIT Island Bench/Meja Lab. (LAB KIMIA 3) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 7,413,043.95 7,413,043.95 0.0730% 60.00 0.0438% 35.00 0.0256% 95.00 0.0694%
10 UNIT Island Bench/Meja Lab. (R.KIMIA 2) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 19,594,233.44 19,594,233.44 0.1931% 60.00 0.1158% 35.00 0.0676% 95.00 0.1834%
11 UNIT Island Bench/Meja Lab. (R.PVT) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 6,760,168.50 6,760,168.50 0.0666% 60.00 0.0400% 35.00 0.0233% 95.00 0.0633%
12 UNIT Island Bench/Meja Lab. (R.PERALATAN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 4,189,665.06 4,189,665.06 0.0413% 60.00 0.0248% 35.00 0.0144% 95.00 0.0392%
13 UNIT Island Bench/Meja Lab. (LAB KIMIA ATAS BAWAH 1) (lengkap dengan furniture > lihat g 2.00 UNIT 7,945,212.50 15,890,425.01 0.1566% 60.00 0.0939% 35.00 0.0548% 95.00 0.1487%
14 UNIT Island Bench/Meja Lab. (RUANG STUDIO MULTIMEDIA) (lengkap dengan furniture > liha 1.00 UNIT 30,101,457.16 30,101,457.16 0.2966% 60.00 0.1780% 35.00 0.1038% 95.00 0.2818%
A.2 LANTAI.2
A.2.1 BONGKARAN
1 Pengikisan/pengerokan permukaan cat lama (dgn soda api sampai dasar) 2,055.40 M2 21,500.00 44,191,035.50 0.4354% 75.00 0.3266% 25.00 0.1089% 100.00 0.4354%
2 Bongkar Dinding 1 Bata 328.96 M2 30,000.00 9,868,695.00 0.0972% 75.00 0.0729% 25.00 0.0243% 100.00 0.0972%
3 Bongkar penutup atap & rangka atap 456.80 M2 35,000.00 15,988,000.00 0.1575% 80.00 0.1260% 20.00 0.0315% 100.00 0.1575%
4 Bongkar Listplank 272.10 M' 15,000.00 4,081,500.00 0.0402% 80.00 0.0322% 20.00 0.0080% 100.00 0.0402%
5 Bongkar Rangka Plafond & penutup plafond 937.19 M2 25,000.00 23,429,750.00 0.2308% 80.00 0.1847% 20.00 0.0462% 100.00 0.2308%
6 Bongkar Kusen Pintu Single 15.00 Un 50,000.00 750,000.00 0.0074% 75.00 0.0055% 25.00 0.0018% 100.00 0.0074%
7 Bongkar Kusen Pintu Dobel 9.00 Un 100,000.00 900,000.00 0.0089% 75.00 0.0067% 25.00 0.0022% 100.00 0.0089%
8 Bongkar plint lantai & perapihan 840.40 M' 25,000.00 21,010,000.00 0.2070% 75.00 0.1553% 25.00 0.0518% 100.00 0.2070%
9 Bongkar Meja beton 32.20 M' 50,000.00 1,610,000.00 0.0159% 75.00 0.0119% 25.00 0.0040% 100.00 0.0159%
10 Bongkar dinding 1/2 bata 99.77 m2 25,000.00 2,494,350.00 0.0246% 75.00 0.0184% 25.00 0.0061% 100.00 0.0246%
11 Bongkar Partisi Kaca R.MCR+R.Studio Fotografi 6.70 M2 25,000.00 167,500.00 0.0017% 75.00 0.0012% 25.00 0.0004% 100.00 0.0017%
12 Bongkar Partisi Kayu Dan Glaswool 32.40 M2 25,000.00 810,000.00 0.0080% 75.00 0.0060% 25.00 0.0020% 100.00 0.0080%
13 Bongkar Ring Balk 15/25 42.00 M' 50,000.00 2,100,000.00 0.0207% 75.00 0.0155% 25.00 0.0052% 100.00 0.0207%
14 Bongkar Jendela 1.00 Bh 50,000.00 50,000.00 0.0005% 75.00 0.0004% 25.00 0.0001% 100.00 0.0005%
15 Bongkar Lantai 24.70 M2 25,000.00 617,500.00 0.0061% 75.00 0.0046% 25.00 0.0015% 100.00 0.0061%
16 Bongkar Dinding Pelapis GRC 12.83 M2 25,000.00 320,750.00 0.0032% 75.00 0.0024% 25.00 0.0008% 100.00 0.0032%
17 Pembuangan Bongkaran Atap 1.00 Ls 500,000.00 500,000.00 0.0049% 75.00 0.0037% 25.00 0.0012% 100.00 0.0049%
A.2.2 DINDING
1 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 104.63 M2 138,200.00 14,459,175.00 0.1425% 85.00 0.1211% 15.00 0.0214% 100.00 0.1425%
2 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 56.69 M2 272,100.00 15,424,124.55 0.1520% 80.00 0.1216% 20.00 0.0304% 100.00 0.1520%
3 Dinding 2 Lapis bata (leveling atap) 52.20 M2 272,100.00 14,203,620.00 0.1399% 75.00 0.1050% 25.00 0.0350% 100.00 0.1399%
4 Plesteran semen instant Setara MM-201 Lt. 2 269.36 M2 97,400.00 26,235,761.40 0.2585% 50.00 0.1292% 50.00 0.1292% 100.00 0.2585%
5 Acian Dinding setara MM-301 t. 3 mm 269.36 M2 57,200.00 15,407,449.20 0.1518% 50.00 0.0759% 50.00 0.0759% 100.00 0.1518%
6 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2 97,400.00 2,337,600.00 0.0230% 50.00 0.0115% 50.00 0.0115% 100.00 0.0230%
7 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2 57,200.00 1,372,800.00 0.0135% 50.00 0.0068% 50.00 0.0068% 100.00 0.0135%
8 Kolom Praktis 10x10 17.20 M' 92,800.00 1,596,160.00 0.0157% 75.00 0.0118% 25.00 0.0039% 100.00 0.0157%
9 Balok lintel 8x10 (keliling bukaan kusen) 7.40 M' 130,300.00 964,220.00 0.0095% 75.00 0.0071% 25.00 0.0024% 100.00 0.0095%
10 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2 805.84 M' 50,600.00 40,775,504.00 0.4018% 50.00 0.2009% 40.00 0.1607% 90.00 0.3616%
11 Pekerjaan ring balk atas kusen 15/25 32.00 m' 330,000.00 10,560,000.00 0.1040% 75.00 0.0780% 25.00 0.0260% 100.00 0.1040%
12 Pasang Kolom 15/25 ( Opening Kusen ) 42.00 M' 330,000.00 13,860,000.00 0.1366% 75.00 0.1024% 25.00 0.0341% 100.00 0.1366%
13 Granitile 60 x 60 Setara Sincere 67.16 M2 307,600.00 20,658,416.00 0.2035% 85.00 0.1730% 15.00 0.0305% 100.00 0.2035%
14 Pasang Kolom 15/15 Ruang Kuliah 21.50 M' 208,800.00 4,489,200.00 0.0442% 75.00 0.0332% 25.00 0.0111% 100.00 0.0442%
15 Pasang Ring Balk 25/30 Ruang Kuliah 16.00 M' 696,000.00 11,136,000.00 0.1097% 75.00 0.0823% 25.00 0.0274% 100.00 0.1097%
16 Pasang Ring Balk 15/20 Ruang Kuliah 9.70 M' 556,800.00 5,400,960.00 0.0532% 75.00 0.0399% 25.00 0.0133% 100.00 0.0532%
17 Pasang Ring Balk 20/30 Ruang Kuliah 91.45 M' 556,800.00 50,919,360.00 0.5017% 75.00 0.3763% 25.00 0.1254% 100.00 0.5017%
18 Pasang Kolom 30/30 Ruang Kuliah 4.30 M' 835,200.00 3,591,360.00 0.0354% 75.00 0.0265% 25.00 0.0088% 100.00 0.0354%
A.2.3 LANTAI
1 Granitile 80x80 Motif Setara Sandimas Lt. 2 695.29 M2 386,700.00 268,868,643.00 2.6491% 50.00 1.3246% 35.00 0.9272% 85.00 2.2517%
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2 303.30 M2 540,700.00 163,994,310.00 1.6158% 50.00 0.8079% 25.00 0.4040% 75.00 1.2119%
3 Cat Epoxy 1000 Micr (R.Laboratorium) - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Curving Lantai (R.Laboratorium) - M' 60,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
5 Cat Epoxy 1000 Micr (plint t.20cm) - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
6 Rabat Beton T:6cm Lantai R kuliah 33.30 M2 68,232.00 2,272,125.60 0.0224% 50.00 0.0112% 50.00 0.0112% 100.00 0.0224%
7 Pengupasan Lantai Dapur Existing 15.00 M2 25,000.00 375,000.00 0.0037% 75.00 0.0028% 25.00 0.0009% 100.00 0.0037%
Page 11 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
4 P2.2A 16.00 Unit 9,258,300.00 148,132,800.00 1.4595% 15.00 0.2189% 5.00 0.0730% 20.00 0.2919%
5 J2.1 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 314,600.00 314,600.00 0.0031% 15.00 0.0005% 5.00 0.0002% 20.00 0.0006%
6 J2.1A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 2.00 Unit 321,100.00 642,200.00 0.0063% 15.00 0.0009% 5.00 0.0003% 20.00 0.0013%
7 J2.1B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 6.00 Unit 381,700.00 2,290,200.00 0.0226% 15.00 0.0034% 5.00 0.0011% 20.00 0.0045%
8 J2.1C (kerok cat lama & dicat ulang setara Dulux & aksesoris) 6.00 Unit 129,700.00 778,200.00 0.0077% 15.00 0.0012% 5.00 0.0004% 20.00 0.0015%
9 J2.1D (kerok cat lama & dicat ulang setara Dulux & aksesoris) 3.00 Unit 371,900.00 1,115,700.00 0.0110% 15.00 0.0016% 5.00 0.0005% 20.00 0.0022%
10 J2.2 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 3.00 Unit 592,900.00 1,778,700.00 0.0175% 15.00 0.0026% 5.00 0.0009% 20.00 0.0035%
11 J2.2A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 32.00 Unit 647,500.00 20,720,000.00 0.2042% 15.00 0.0306% 5.00 0.0102% 20.00 0.0408%
12 J2.2B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 10.00 Unit 937,500.00 9,375,000.00 0.0924% 15.00 0.0139% 5.00 0.0046% 20.00 0.0185%
13 J2.2C (kerok cat lama & dicat ulang setara Dulux & aksesoris) 4.00 Unit 1,287,400.00 5,149,600.00 0.0507% 15.00 0.0076% 5.00 0.0025% 20.00 0.0101%
14 J2.2D (kerok cat lama & dicat ulang setara Dulux & aksesoris) 5.00 Unit 585,800.00 2,929,000.00 0.0289% 15.00 0.0043% 5.00 0.0014% 20.00 0.0058%
15 J2.LO (AL) 1.00 Unit 4,332,900.00 4,332,900.00 0.0427% 15.00 0.0064% 5.00 0.0021% 20.00 0.0085%
16 J2.5 (kerok cat lama & dicat ulang setara Dulux & aksesoris & kaca,frame) 1.00 Unit 3,602,700.00 3,602,700.00 0.0355% 15.00 0.0053% 5.00 0.0018% 20.00 0.0071%
17 J2.12 (kerok cat lama & dicat ulang setara Dulux & aksesoris & kaca,frame) 1.00 Unit 15,550,500.00 15,550,500.00 0.1532% 15.00 0.0230% 5.00 0.0077% 20.00 0.0306%
18 Sekat Partisi Kaca t.140cm 45.82 M2 659,000.00 30,196,698.00 0.2975% 15.00 0.0446% 5.00 0.0149% 20.00 0.0595%
19 Penutupan Kaca Jendela Menggunakan Gysum 68.81 M2 249,200.00 17,147,452.00 0.1690% 75.00 0.1267% 25.00 0.0422% 100.00 0.1690%
A.2.5 PLAFOND
1 Plafond Gypsum 9mm Setara Jayaboard 431.36 M2 124,600.00 53,747,082.20 0.5296% 60.00 0.3177% 35.00 0.1853% 95.00 0.5031%
2 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2 867.68 M2 154,800.00 134,316,477.00 1.3234% 50.00 0.6617% 35.00 0.4632% 85.00 1.1249%
3 Plafond GRC 4mm Set(plafon penutup samping di Teras) 121.73 M2 84,700.00 10,310,785.10 0.1016% 25.00 0.0254% 75.00 0.0762% 100.00 0.1016%
4 Plafond GRC 4mm Set(Overstek) 246.87 M2 84,700.00 20,909,889.00 0.2060% 35.00 0.0721% 65.00 0.1339% 100.00 0.2060%
5 List plafond Almunium U 2cm (shadow line) 285.08 M' 20,500.00 5,844,037.50 0.0576% 60.00 0.0345% 40.00 0.0230% 100.00 0.0576%
A.2.6 PENGECATAN
1 Cat Dinding Interior Setara Dulux Easy Clean (standart) Lt. 2 1,447.14 M2 60,400.00 87,407,256.00 0.8612% 15.00 0.1292% 20.00 0.1722% 35.00 0.3014%
2 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2 1,111.91 M2 74,100.00 82,392,234.60 0.8118% 15.00 0.1218% 20.00 0.1624% 35.00 0.2841%
3 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2 60,400.00 283,880.00 0.0028% 50.00 0.0014% 50.00 0.0014% 100.00 0.0028%
4 Cat Plafond gypsum Setara Vinilex 679.03 M2 41,200.00 27,976,077.20 0.2756% 45.00 0.1240% 15.00 0.0413% 60.00 0.1654%
5 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2 74,100.00 4,742,400.00 0.0467% - 0.0000% - 0.0000% - 0.0000%
6 Cat lisplank 38.44 M2 36,000.00 1,383,912.00 0.0136% 50.00 0.0068% 20.00 0.0027% 70.00 0.0095%
7 Kerok cat railing 78.00 M2 21,500.00 1,677,000.00 0.0165% 50.00 0.0083% 50.00 0.0083% 100.00 0.0165%
8 Cat Railing 78.00 M' 36,000.00 2,808,000.00 0.0277% 75.00 0.0208% 25.00 0.0069% 100.00 0.0277%
Page 12 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
B. PEK. PONDASI
1 Pondasi Plat setempat P1(60x60x30) ; K-175 - M3 6,687,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Sloof S1 (15x25) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 PEKERJAAN ARSITEKTUR
A. PEK. DINDING
1 Batu alam andesit bintik bakar cipanca 11.20 M2 362,800.00 4,063,360.00 0.0400% - 0.0000% 100.00 0.0400% 100.00 0.0400%
C. PEK. PENGECATAN
1 Cat Pipa - M2 50,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
SUB TOTAL PEKERJAAN KORIDOR TERAS LANTAI.1 4,063,360.00 0.0000% 0.0400% 0.0400%
B. PEK. PONDASI
1 Pondasi Plat setempat P1(60x60x30) ; K-175 - M3 5,228,886.59 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Sloof S1 (15x25) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 PEKERJAAN ARSITEKTUR
A. PEK. DINDING
1 Batu alam andesit bintik bakar cipanca - M2 362,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Page 13 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
D. PEK. LANTAI
1 Granitile 60x60 Unpolish Setara Sandimas 133.00 M2 418,500.00 55,660,500.00 0.5484% - 0.0000% 30.00 0.1645% 30.00 0.1645%
2 Stepnosing tangga (custom pabrikan) 17.60 M' 68,100.00 1,198,560.00 0.0118% - 0.0000% - 0.0000% - 0.0000%
3 Bius Beton Bulat Diameter 20 10.00 M' 176,040.00 1,760,400.00 0.0173% - 0.0000% - 0.0000% - 0.0000%
G. PEK. PENGECATAN
1 Cat Pipa - M2 50,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
SUB TOTAL PEKERJAAN GWT 10 M3 DAN RUMAH POMPA 51,753,322.76 0.4188% 0.0602% 0.4790%
Page 14 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
M.1.3 INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN)
1 dia. 6" 15.00 M' 143,200.00 2,148,000.00 0.0212% - 0.0000% 95.00 0.0201% 95.00 0.0201%
1 dia. 4" 48.00 M' 118,800.00 5,702,400.00 0.0562% - 0.0000% 95.00 0.0534% 95.00 0.0534%
2 dia. 3" 9.00 M' 80,800.00 727,200.00 0.0072% - 0.0000% 95.00 0.0068% 95.00 0.0068%
3 dia. 2" 118.00 M' 49,500.00 5,841,000.00 0.0576% - 0.0000% 95.00 0.0547% 95.00 0.0547%
4 dia 3" PPR dari limbah kimia 27.00 M' 293,800.00 7,932,600.00 0.0782% - 0.0000% 95.00 0.0743% 95.00 0.0743%
dia 2" PPR 20.00 M' 196,400.00 3,928,000.00 0.0387% - 0.0000% 95.00 0.0368% 95.00 0.0368%
dia 4" PPR 16.00 M' 390,000.00 6,240,000.00 0.0615% - 0.0000% 95.00 0.0584% 95.00 0.0584%
5 Fitting 1.00 Lot 2,020,900.00 2,020,900.00 0.0199% - 0.0000% 95.00 0.0189% 95.00 0.0189%
6 dia. 4" 2.00 Bh 338,800.00 677,600.00 0.0067% - 0.0000% 95.00 0.0063% 95.00 0.0063%
7 dia. 3" 1.00 Bh 153,800.00 153,800.00 0.0015% - 0.0000% 95.00 0.0014% 95.00 0.0014%
8 dia. 2" 1.00 Bh 109,000.00 109,000.00 0.0011% - 0.0000% 95.00 0.0010% 95.00 0.0010%
Page 15 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
Copper Refrigerant Pipe 5/8" (0,71 mm) 82.00 m' 143,800.00 11,791,600.00 0.1162% - 0.0000% 95.00 0.1104% 95.00 0.1104%
Copper Refrigerant Pipe 3/4" (0,89 mm) 12.00 m' 204,600.00 2,455,200.00 0.0242% - 0.0000% 95.00 0.0230% 95.00 0.0230%
Copper Refrigerant Pipe 7/8" (1,14 mm) 47.00 m' 232,000.00 10,904,000.00 0.1074% - 0.0000% 95.00 0.1021% 95.00 0.1021%
Copper Refrigerant Pipe 1 1/8" (1,27 mm) 52.00 m' 303,000.00 15,756,000.00 0.1552% - 0.0000% 95.00 0.1475% 95.00 0.1475%
Copper Refrigerant Pipe 1 3/8" (1,40 mm) - m' 363,300.00 - 0.0000% - 0.0000% 0.0000% - 0.0000%
Copper Refrigerant Pipe 1 5/8" (1,52 mm) - m' 453,000.00 - 0.0000% - 0.0000% 0.0000% - 0.0000%
Fitting Copper Refrigerant Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 95.00 0.0388% 95.00 0.0388%
Hanger Refrigerant Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 95.00 0.0049% 95.00 0.0049%
Supporting Material Refrigerant Pipe 1.00 lot 8,300,000.00 8,300,000.00 0.0818% - 0.0000% 95.00 0.0777% 95.00 0.0777%
14 Pemipaan Drain AC VRV c/w Insulation
PVC Drain Pipe 3/4", class AW 74.00 m' 20,700.00 1,531,800.00 0.0151% - 0.0000% 95.00 0.0143% 95.00 0.0143%
PVC Drain Pipe 1", class AW 34.00 m' 23,700.00 805,800.00 0.0079% - 0.0000% 95.00 0.0075% 95.00 0.0075%
PVC Drain Pipe 1 1/4", class AW 9.00 m' 29,300.00 263,700.00 0.0026% - 0.0000% 95.00 0.0025% 95.00 0.0025%
PVC Drain Pipe 1 1/2", class AW 6.00 m' 31,900.00 191,400.00 0.0019% - 0.0000% 95.00 0.0018% 95.00 0.0018%
PVC Drain Pipe 2", class AW - m' 147,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Fitting Drain Pipe 1.00 lot 4,980,000.00 4,980,000.00 0.0491% - 0.0000% 95.00 0.0466% 95.00 0.0466%
Hanger Drain Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 95.00 0.0049% 95.00 0.0049%
Supporting Material Drain Pipe 1.00 lot 8,300,000.00 8,300,000.00 0.0818% - 0.0000% 95.00 0.0777% 95.00 0.0777%
15 Pengkabelan AC VRV c/w Conduit
Power Cable NYM 3 x 2,5 mm2 186.00 m' 26,100.00 4,854,600.00 0.0478% - 0.0000% 95.00 0.0454% 95.00 0.0454%
Power Cable NYY 3 x 4 mm2 240.00 m' 39,800.00 9,552,000.00 0.0941% - 0.0000% 95.00 0.0894% 95.00 0.0894%
Power Cable NYY 4 x 16 mm2 24.00 m' 129,300.00 3,103,200.00 0.0306% - 0.0000% - 0.0000% - 0.0000%
Grounding Cable NYA 6 mm2 130.00 m' 21,200.00 2,756,000.00 0.0272% - 0.0000% - 0.0000% - 0.0000%
Control Cable AWG 18 370.00 m' 27,400.00 10,138,000.00 0.0999% - 0.0000% 90.00 0.0899% 90.00 0.0899%
Thermostat Cable NYYHY 2 x 0,75 mm2 - m' 17,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Supporting Material Electrical 1.00 lot 9,960,000.00 9,960,000.00 0.0981% - 0.0000% 90.00 0.0883% 90.00 0.0883%
16 Hanger Indoor Unit 16.00 unit 186,800.00 2,988,800.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
17 Dudukan Condensing Unit 6.00 unit 498,000.00 2,988,000.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
18 Consumables & waste item 1.00 lott 9,130,000.00 9,130,000.00 0.0900% - 0.0000% 95.00 0.0855% 95.00 0.0855%
19 Exhaust Fan High Pressure Industrial KDK 40GSC 2.125 cfm 5.00 unit 6,079,600.00 30,398,000.00 0.2995% - 0.0000% 95.00 0.2845% 95.00 0.2845%
20 Testing & Commissioning 1.00 ls 2,075,000.00 2,075,000.00 0.0204% - 0.0000% - 0.0000% - 0.0000%
M.2 LANTAI 2
M.2.1 INST. PEMIPAAN AIR BERSIH (PVC AW SETARA WAVIN)
1 Pipa dari pompa booster tiap shaft dia. 1" 8.00 M' 26,800.00 214,400.00 0.0021% - 0.0000% 95.00 0.0020% 95.00 0.0020%
2 dia. 3/4" 8.00 M' 23,500.00 188,000.00 0.0019% - 0.0000% 95.00 0.0018% 95.00 0.0018%
3 dia. 1/2" 15.00 M' 20,800.00 312,000.00 0.0031% - 0.0000% 95.00 0.0029% 95.00 0.0029%
4 Fitting 1.00 Lot 71,500.00 71,500.00 0.0007% - 0.0000% 95.00 0.0007% 95.00 0.0007%
5 Gate Valve dia. 1 " 2.00 Bh 267,400.00 534,800.00 0.0053% - 0.0000% 50.00 0.0026% 50.00 0.0026%
M.2.2 INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN)
1 dia. 4" 18.00 M' 118,800.00 2,138,400.00 0.0211% - 0.0000% 95.00 0.0200% 95.00 0.0200%
2 dia. 3" 7.00 M' 80,800.00 565,600.00 0.0056% - 0.0000% 95.00 0.0053% 95.00 0.0053%
3 dia. 2" 12.00 M' 49,500.00 594,000.00 0.0059% - 0.0000% 95.00 0.0056% 95.00 0.0056%
4 Fitting 1.00 Lot 329,900.00 329,900.00 0.0033% - 0.0000% 90.00 0.0029% 90.00 0.0029%
dia 3" PPR dari limbah kimia 15.00 M' 293,800.00 4,407,000.00 0.0434% - 0.0000% 95.00 0.0413% 95.00 0.0413%
dia 2" PPR 24.00 M' 196,400.00 4,713,600.00 0.0464% - 0.0000% 95.00 0.0441% 95.00 0.0441%
Page 16 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
Copper Refrigerant Pipe 1/4" (0,71 mm) 40.00 m' 95,900.00 3,836,000.00 0.0378% - 0.0000% 95.00 0.0359% 95.00 0.0359%
Copper Refrigerant Pipe 3/8" (0,71 mm) 99.00 m' 107,400.00 10,632,600.00 0.1048% - 0.0000% 80.00 0.0838% 80.00 0.0838%
Copper Refrigerant Pipe 1/2" (0,71 mm) 60.00 m' 124,500.00 7,470,000.00 0.0736% - 0.0000% 95.00 0.0699% 95.00 0.0699%
Copper Refrigerant Pipe 5/8" (0,71 mm) 103.00 m' 143,800.00 14,811,400.00 0.1459% - 0.0000% 80.00 0.1167% 80.00 0.1167%
Copper Refrigerant Pipe 3/4" (0,89 mm) 9.00 m' 204,600.00 1,841,400.00 0.0181% - 0.0000% 95.00 0.0172% 95.00 0.0172%
Copper Refrigerant Pipe 7/8" (1,14 mm) 21.00 m' 232,000.00 4,872,000.00 0.0480% - 0.0000% 95.00 0.0456% 95.00 0.0456%
Copper Refrigerant Pipe 1 1/8" (1,27 mm) 78.00 m' 303,000.00 23,634,000.00 0.2329% - 0.0000% 95.00 0.2212% 95.00 0.2212%
Copper Refrigerant Pipe 1 3/8" (1,40 mm) - m' 363,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Copper Refrigerant Pipe 1 5/8" (1,52 mm) - m' 453,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Fitting Copper Refrigerant Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 90.00 0.0368% 90.00 0.0368%
Hanger Refrigerant Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 80.00 0.0041% 80.00 0.0041%
Supporting Material Refrigerant Pipe 1.00 lot 6,225,000.00 6,225,000.00 0.0613% - 0.0000% 85.00 0.0521% 85.00 0.0521%
10 Pemipaan Drain AC VRV c/w Insulation
PVC Drain Pipe 3/4", class AW 74.00 m' 20,700.00 1,531,800.00 0.0151% - 0.0000% 85.00 0.0128% 85.00 0.0128%
PVC Drain Pipe 1", class AW 40.00 m' 23,700.00 948,000.00 0.0093% - 0.0000% 85.00 0.0079% 85.00 0.0079%
PVC Drain Pipe 1 1/4", class AW 19.00 m' 29,300.00 556,700.00 0.0055% - 0.0000% 90.00 0.0049% 90.00 0.0049%
PVC Drain Pipe 1 1/2", class AW 16.00 m' 31,900.00 510,400.00 0.0050% - 0.0000% 90.00 0.0045% 90.00 0.0045%
PVC Drain Pipe 2", class AW - m' 37,400.00 - 0.0000% - 0.0000% 90.00 0.0000% 90.00 0.0000%
Fitting Drain Pipe 1.00 lot 4,980,000.00 4,980,000.00 0.0491% - 0.0000% 85.00 0.0417% 85.00 0.0417%
Hanger Drain Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 85.00 0.0043% 85.00 0.0043%
Page 17 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
Supporting Material Drain Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 85.00 0.0348% 85.00 0.0348%
11 Pengkabelan AC VRV c/w Conduit
Power Cable NYM 3 x 2,5 mm2 196.00 m' 26,100.00 5,115,600.00 0.0504% - 0.0000% 85.00 0.0428% 85.00 0.0428%
Power Cable NYY 3 x 4 mm2 128.00 m' 39,800.00 5,094,400.00 0.0502% - 0.0000% 85.00 0.0427% 85.00 0.0427%
Power Cable NYY 4 x 16 mm2 24.00 m' 129,300.00 3,103,200.00 0.0306% - 0.0000% - 0.0000% - 0.0000%
Grounding Cable NYA 6 mm2 130.00 m' 21,200.00 2,756,000.00 0.0272% - 0.0000% - 0.0000% - 0.0000%
Control Cable AWG 18 310.00 m' 27,400.00 8,494,000.00 0.0837% - 0.0000% 80.00 0.0670% 80.00 0.0670%
Thermostat Cable NYYHY 2 x 0,75 mm2 - m' 17,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Supporting Material Electrical 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 80.00 0.0327% 80.00 0.0327%
12 Hanger Indoor Unit 16.00 unit 186,800.00 2,988,800.00 0.0294% - 0.0000% 80.00 0.0236% 80.00 0.0236%
13 Dudukan Condensing Unit 6.00 unit 498,000.00 2,988,000.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
14 Consumables & waste item 1.00 lott 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 80.00 0.0327% 80.00 0.0327%
15 Testing & Commissioning 1.00 ls 2,084,600.00 2,084,600.00 0.0205% - 0.0000% - 0.0000% - 0.0000%
16 Exhaust Fan High Pressure Industrial KDK 40GSC 2.125 cfm 1.00 unit 116,500.00 116,500.00 0.0011% - 0.0000% - 0.0000% - 0.0000%
E.1 LANTAI 1
E.1.1 PANEL LISTRIK SETARA TERAMETRIK
1 Panel SDP 1.00 Unit 30,082,000.00 30,082,000.00 0.2964% - 0.0000% 70.00 0.2075% 70.00 0.2075%
2 P.LP/PP.1 LT 1 1.00 Unit 17,274,600.00 17,274,600.00 0.1702% - 0.0000% 70.00 0.1191% 70.00 0.1191%
3 P.LP/PP.1A LT 1 1.00 Unit 19,409,200.00 19,409,200.00 0.1912% - 0.0000% 70.00 0.1339% 70.00 0.1339%
4 P.PP.AC LT.1 1.00 Unit 7,842,300.00 7,842,300.00 0.0773% - 0.0000% 70.00 0.0541% 70.00 0.0541%
4 P.PP.AC LT.1A 1.00 Unit 16,230,400.00 16,230,400.00 0.1599% - 0.0000% 70.00 0.1119% 70.00 0.1119%
4 Panel Kontrol Pompa Transfer 1.00 Unit 9,632,300.00 9,632,300.00 0.0949% - 0.0000% 70.00 0.0664% 70.00 0.0664%
Page 18 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
E.1.6 TELEPON
1 Pengadaan dan pemasangan peralatan Sistem Telepon 1.00 unit 30,125,300.00 30,125,300.00 0.2968% - 0.0000% - 0.0000% - 0.0000%
ditempatkan di Ruang Kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan
dalam Gambar dan Spesifikasi Teknis, terpasang lengkap.
Ups, MDF,Power Surge Arrester
Telephone 4-6 Line PTT 50-60Ext
JBX- TB
2 Outlet telepon
Pengadaan dan pemasangan Outlet Telepon, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Handset telepon analog setara Panasonic 21.00 bh 776,400.00 16,304,400.00 0.1606% - 0.0000% - 0.0000% - 0.0000%
Outlet telepon setara Clipsal 21.00 bh 97,500.00 2,047,500.00 0.0202% - 0.0000% 80.00 0.0161% 80.00 0.0161%
3 Instalasi Outlet telepon
Pemasangan Instalasi sistem Outlet Telepon termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Page 19 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
E.1.9 LCD/PROJECTOR
1 Peralatan utama 3.00 unit 5,426,900.00 16,280,700.00 0.1604% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Peralatan Proyektor LCD setara
Epson EB-S300 lengkap dengan acc sesuai gambar & spesifikasi
2 Instalasi screen 3.00 Unit 5,673,600.00 17,020,800.00 0.1677% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Motorized Screen KEYSTONE
lengkap dengan acc sesuai gambar dan spesifikasi
3 Instalasi kabel LCD
Instalasi kabel LCD dengan connector VGA dari out let ke 60.00 m 14,601.00 876,060.00 0.0086% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
Instalasi kabel LCD dengan connector HDMI dari out let ke 3.00 unit 847,800.00 2,543,400.00 0.0251% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
4 Instalasi bracket LCD.L 75 -120 cm stara BRITE 3.00 set 1,051,200.00 3,153,600.00 0.0311% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Bracket LCD lengkap dengan
pemasangan stop kontak dan pengkabelanya
Page 20 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
E.2 LANTAI 2
E.2.1 PANEL SETARA TERAMETRIK
1 P.LP/PP 2.LT 2 1.00 UNIT 16,207,300.00 16,207,300.00 0.1597% - 0.0000% 70.00 0.1118% 70.00 0.1118%
2 P.LP/PP 2A.LT 2 1.00 UNIT 17,274,600.00 17,274,600.00 0.1702% - 0.0000% 70.00 0.1191% 70.00 0.1191%
Page 21 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
14 Instalasi Exhaust Fan 3.00 Titik 319,600.00 958,800.00 0.0094% - 0.0000% 90.00 0.0085% 90.00 0.0085%
15 Instalasi Stop Kontak 72.00 Titik 203,900.00 14,680,800.00 0.1446% - 0.0000% 80.00 0.1157% 80.00 0.1157%
Instalasi Stop Kontak 3 fasa 2.00 Titik 1,167,800.00 2,335,600.00 0.0230% - 0.0000% 80.00 0.0184% 80.00 0.0184%
Instalasi Stop Kontak AC 2.00 Titik 319,600.00 639,200.00 0.0063% - 0.0000% 90.00 0.0057% 90.00 0.0057%
E.2.5 TELEPON
2 Outlet telepon
Pengadaan dan pemasangan Outlet Telepon, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Handset telepon analog setara Panasonic 16.00 bh 776,400.00 12,422,400.00 0.1224% - 0.0000% - 0.0000% - 0.0000%
Outlet telepon setara Clipsal 16.00 bh 97,500.00 1,560,000.00 0.0154% - 0.0000% 70.00 0.0108% 70.00 0.0108%
3 Instalasi Outlet telepon
Pemasangan Instalasi sistem Outlet Telepon termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari KTB TELKOM ke ke outlet telepon 16.00 ttk 305,800.00 4,892,800.00 0.0482% - 0.0000% 80.00 0.0386% 80.00 0.0386%
ITC 2 x 2 x 0.6 mm + PVC Ø 20
Kabel ITC Multi 20 pair Dari TB telepon lt 2 ke box MDF 30.00 M' 60,000.00 1,800,000.00 0.0177% - 0.0000% 80.00 0.0142% 80.00 0.0142%
E.2.8 LCD/PROJECTOR
1 Peralatan utama 3.00 unit 5,426,900.00 16,280,700.00 0.1604% - 0.0000% - 0.0000% - 0.0000%
Page 22 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
OUTLET MATV
Pengadaan dan pemasangan Outlet MATV, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
b Outlet MATV 8.00 bh 132,300.00 1,058,400.00 0.0104% - 0.0000% - 0.0000% - 0.0000%
PENAMBAHAN DAYA DARI 105 KVA KE 197 KVA 1.00 Ls 115,000,000.00 115,000,000.00 1.1331% - 0.0000% - 0.0000% - 0.0000%
SUB TOTAL PEKERJAAN PENAMBAHAN DAYA 48.500 VA 115,000,000.00 0.0000% 0.0000% 0.0000%
Page 23 of 55
REKAPITULASI HITUNGAN VOLUME
B LANTAI 2
1 Granitile 80x80 Motif Setara Sandimas Polish 695.29 M2
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2 303.30 M2
3 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2 695.29 M'
4 Plint keramik 10 x 80 Unpolish setara Sandimas (Teras, Koridor dan Tangga) 110.55 M'
5 Rabat Beton T: 6 cm 33.30 M2
6 Plafond Gypsum 9mm Setara Jayaboard 431.36 M2
7 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2 867.68 M2
8 Plafond GRC 4mm Setara Grc 121.73 M2
9 Plafond GRC 4mm Setara Grc 246.87 M2
10 List plafond Almunium U 2cm (shadow line) 285.08 M'
11 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 83.40 M2
12 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 56.69 M2
13 Plesteran semen instant Setara MM-201 Lt. 2 269.36 M2
14 Acian Dinding setara MM-301 t. 3 mm 269.36 M2
15 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2
16 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2
17 Kolom Praktis 10x10 17.20 M'
18 Pekerjaan ring balk atas kusen 15/25 32.00 M'
19 Cat Dinding Interior Setara Dulux Easy Clean (standart) Lt. 2 1,447.14 M2
20 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2 1,111.91 M2
21 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2
22 Cat Plafond gypsum Setara Vinilex 679.03 M2
23 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2
24 Cat lisplank 38.44 M2
25 Kerok cat railing 78.00
26 Cat Railing 78.00
27 Pengikisan/pengerokan permukaan cat lama 2,055.40 M2
28 Bongkar Dinding 1 Bata 328.96 M2
29 Bongkar Listplank 272.10 M2
30 Bongkar Rangka Plafond & penutup plafond 937.19 M2
31 Bongkar Kusen Pintu Single 15.00 BH
32 Bongkar Kusen Pintu Dobel 9.00 BH
33 Bongkar plint lantai & perapihan 840.40 M'
34 Bongkar Meja beton 32.20
35 Bongkar dinding 1/2 bata 91.37 M2
36 Bongkar Partisi Kaca R.MCR+R.Studio Fotografi 6.70 M2
37 Err:509 14.50
38 Bongkar Partisi Kayu Dan Glaswool 32.40 M2
39 Bongkar Ring Balk 15/25 42.00 M'
Volume
NO ITEM PEKERJAAN LOKASI
M2 Dus
1 Granitile 60x60 Selasar Penghubung 133 98
NO URAIAN M' BTG
1 RENG 107.89474 19
2 BAJA RINGAN 113.15789 20
HITUNGAN CAT
(M')
914.87 M2
JUMLAH
2 Granitile 80x80 Motif Setara Sandimas Unpolish (Teras, Koridor dan Tangga)
547.26 M2
1 KORIDOR UNPOLISH 80X80
1 TANGGA 2 4.44 M2
Trap unpolish UNPOLISH 80X80 0.36 M2
Bordes unpolish UNPOLISH 80X80
2 TANGGA 1 4.46 M2
Trap Unpolish UNPOLISH 80X80 8.40 M2
Bordes unpolish UNPOLISH 80X80
3 TANGGA 3 8.36 M2
Trap Unpolish UNPOLISH 80X80 7.16 M2
Bordes unpolish UNPOLISH 80X80
4 TANGGA Lab Basah 2.02 M2
Trap Unpolish UNPOLISH 80X80 2.88 M2
Bordes unpolish UNPOLISH 80X80
5 TANGGA Lab Basah 2 0.91 M2
Trap Unpolish UNPOLISH 80X80 1.48 M2
Bordes unpolish UNPOLISH 80X80
6 TANGGA R Pers Alat 1.28 M2
Trap Unpolish UNPOLISH 80X80
7 TANGGA Mushola 1.28 M2
Trap Unpolish UNPOLISH 80X80 0.46 M2
Bordes unpolish UNPOLISH 80X80
8 TANGGA Toilet lk/prm 1.28 M2
Trap Unpolish UNPOLISH 80X80 0.46 M2
Bordes unpolish UNPOLISH 80X80
9 TANGGA KM1 + KM2 0.74 M2
Trap Unpolish UNPOLISH 80X80
JUMLAH 593.23 M2
1 MUSHOLLAH 28.74 M2
2 R penyimpanan 32.00
JUMLAH 60.74 M2
JUMLAH 69.58 M2
JUMLAH 252.17 M2
6A KORNIS
JUMLAH 67.49 M2
25 Wall Bench/Meja Lab, 0,8X3,85 (M3) (lengkap dengan furniture > lihat POLISH 10X80 10.19 M'
gambar)
9 Plint Parket
TANGGA 1
Stepnosing tangga 50.70 M'
TANGGA 2
Stepnosing tangga 14.40 M'
TANGGA 3
Stepnosing tangga 52.60 M'
TANGGA Lab Basah
Stepnosing tangga 9.60 M'
TANGGA Lab Basah 2
Stepnosing tangga 12.60 M'
TANGGA R Pers Alat
Stepnosing tangga 3.80 M'
TANGGA Mushola
Stepnosing tangga 9.20 M'
TANGGA Toilet lk/prm
Stepnosing tangga 9.20 M'
TANGGA KM1 + KM2
Stepnosing tangga 8.80 M'
JUMLAH 403.02 M2
JUMLAH 46.18 M2
14 Plafond Gyptile
RUANG ISTIRAHAT 26.43 M2
RUANG PERS. ALAT 109.52 M2
LAB KIMIA 2 80.94 M2
LAB ANATOMI BASAH 35.96 M2
RUANG PVT 22.23 M2
LAB. GG 14 41.33 M2
RUANG KULIAH 1 35.91 M2
RUANG KULIAH 2 73.25 M2
RUANG RAPAT 155.42 M2
RUANG PRODI 1 39.32 M2
RUANG DOSEN 1 26.46 M2
RUANG PRODI 2 30.46 M2
RUANG PENYIMPANAN 25.98 M2
LAB. PERSIAPAN 24.92 M2
RUANG LABORAN 12.68 M2
RUANG PANEL 6.59 M2
RUANG DUBBING M2
LAB KIMIA 1 188.92 M2
LAB. GG 01 98.46 M2
LAB KIMIA 3 90.72 M2
LAB BASAH 22.80 M2
RUANG INSTRUMENT 21.38 M2
RUANG CINEMA M2
JUMLAH 1,169.68 M2
JUMLAH 926.97 M2
JUMLAH 304.29 M2
JUMLAH 392.23 M1
JUMLAH 99.34 M2
JUMLAH 122.16 M2
JUMLAH 497.22 M2
JUMLAH 496.92 M2
JUMLAH 395.34 M2
JUMLAH 6.60 M2
JUMLAH 75.88 M2
28 Logo Stainless Mirror, Tulisan Stainles Mirror (Inspring Inovation with Integrity, IPB UNIVERSITY)
Tampak Depan (Depan Ruang Rapat) 1.00 UNIT
31 Screed Lantai
R.Pers Alat, Koridor dpn Pers Alat,R.kuliah 114.47 M2
R.Instrumen 16.49 M2
JUMLAH 130.96 M2
32 Pemadatan tanah
Ruang Rapat 52.20 M2
JUMLAH 52.20 M2
33 Rabat Beton T = 6 cm
Koridor Luar 252.56 M2
R kuliah L 2 33.30
Mushola 28.74
JUMLAH 314.60 M2
34 ###
Koridor Luar 360.80 M'
JUMLAH 68.17 M2
JUMLAH 1,748.62 M2
JUMLAH 1,048.27 M2
JUMLAH 2,888.85 M2
JUMLAH 403.62 M2
JUMLAH 82.43 M2
JUMLAH 887.14 M2
JUMLAH 140.30 M2
50 Bongkar Lantai
Ruang Rapat 105.70 M2
JUMLAH 105.70 M2
JUMLAH 3.76 M3
JUMLAH 695.29 M2
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2
KORIDOR UNPOLISH 80X80 303.30 M2
JUMLAH 303.30 M2
3 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2
NO NAME POLISH 10X80 83.74 M'
RUANG KULIAH 1 POLISH 10X80 71.07 M'
RUANG DOSEN 1 POLISH 10X80 36.04 M'
RUANG ANATOMI KERING POLISH 10X80 39.54 M'
RUANG KULIAH 2 POLISH 10X80 30.22 M'
RUANG PERALATAN 1 POLISH 10X80 41.87 M'
RUANG PERALATAN 2 POLISH 10X80 31.32 M'
RUANG KULIAH 2 POLISH 10X80 52.83 M'
RUANG BACA POLISH 10X80 17.78 M'
RUANG PENYIMPANAN POLISH 10X80 26.50 M'
RUANG STUDIO FOTOGRAPHI POLISH 10X80 31.74 M'
MCR POLISH 10X80 12.29 M'
RUANG STUDIO AUDIO VISUAL POLISH 10X80 44.50 M'
RUANG STUDIO MULTIMEDIA POLISH 10X80 54.34 M'
RUANG TAX CENTER POLISH 10X80 31.00 M'
RUANG DOSEN 2 POLISH 10X80 29.16 M'
RUANG DOSEN 3 POLISH 10X80 46.06 M'
RUANG SIARAN POLISH 10X80 9.96 M'
RUANG STUDIO SIARAN RADIO POLISH 10X80 M'
RUANG PANEL POLISH 10X80 5.33 M'
JUMLAH 431.36 M2
5 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2
RUANG KULIAH 1 Plafond Gyptile 70.53 M2
RUANG DOSEN 1 Plafond Gyptile 71.00 M2
RUANG ANATOMI KERING Plafond Gyptile 78.00 M2
RUANG KULIAH 2 Plafond Gyptile 29.68 M2
RUANG PERALATAN 1 Plafond Gyptile 41.33 M2
RUANG PERALATAN 2 Plafond Gyptile 30.78 M2
RUANG KULIAH 2 Plafond Gyptile 52.29 M2
RUANG BACA Plafond Gyptile 17.24 M2
RUANG PENYIMPANAN Plafond Gyptile 27.02 M2
RUANG STUDIO FOTOGRAPHI Plafond Gyptile 31.20 M2
RUANG STUDIO AUDIO VISUAL Plafond Gyptile 43.96 M2
RUANG STUDIO MULTIMEDIA Plafond Gyptile 53.80 M2
RUANG TAX CENTER Plafond Gyptile 30.46 M2
RUANG DOSEN 2 Plafond Gyptile 28.62 M2
RUANG DOSEN 3 Plafond Gyptile 45.52 M2
RUANG SIARAN Plafond Gyptile 9.96 M2
RUANG STUDIO SIARAN RADIO Plafond Gyptile 34.56 M2
RUANG PANEL Plafond Gyptile 5.33 M2
NO NAME Plafond Gyptile 166.40 M2
JUMLAH 867.68 M2
6 Plafond GRC 4mm Setara Grc
PLAFOND GRC DROP CEILING 121.733 M2
JUMLAH 121.73 M2
7 Plafond GRC 4mm Setara Grc
PLAFOND GRC Mendatar 217.21 M2
KAMAR MANDI STAFF 21.36 M2
KAMAR MANDI SISWA 8.30 M2
JUMLAH 246.87 M2
8 List plafond Almunium U 2cm (shadow line)
KORIDOR 285.08 M'
N
JUMLAH 285.08 M'
9 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2
RUANG KULIAH 33.23 M2
R BACA 22.52 M2
R.PANEL 27.65 M2
JUMLAH 83.40 M2
10 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2
RUANG KULIAH 5.40 M2
RUANG DOSEN 8.40 M2
R KULIAH 4.18 M2
R PERALATAN 7.11 M2
R KULIAH 5.33 M2
R BACA 4.50 M2
RUANG AUDI VIDI 3.80 M2
STUDIO MM 1.98 M2
R.TAX CEN 1.98 M2
R.DOSEN 2 14.00 M2
JUMLAH 56.69 M2
11 Plesteran semen instant Setara MM-201 Lt. 2
RUANG KULIAH 66.46 M2
RUANG DOSEN 16.80 M2
R KULIAH 8.36 M2
R PERALATAN 14.22 M2
R KULIAH 10.67 M2
R BACA 54.04 M2
RUANG AUDI VIDI 7.60 M2
STUDIO MM 3.96 M2
R.TAX CEN 3.96 M2
R.PANEL 55.30 M2
R.DOSEN 2 28.00 M2
R. SIARAN+RUANG STD
JUMLAH 269.36 M2
12 Acian Dinding setara MM-301 t. 3 mm
RUANG KULIAH 66.46 M2
RUANG DOSEN 16.8 M2
R KULIAH 8.36 M2
R PERALATAN 14.22 M2
R KULIAH 10.665 M2
R BACA 54.036 M2
RUANG AUDI VIDI 7.6 M2
STUDIO MM 3.96 M2
R.TAX CEN 3.96 M2
R.PANEL 55.3 M2
R.DOSEN 2 28 M2
JUMLAH 269.36 M2
13 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2
JUMLAH 24.00 M2
14 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2
JUMLAH 24.00 M2
15 Kolom Praktis 10x10 17.20 M'
JUMLAH 1,447.14 M2
18 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2
SELASAR 548.29 M2
Dinding Belakang 78.14 M2
Belakang Sisi Kiri 81.24 M2
Sisi Kiri 33.98 M2
Depan 150.00 M2
Sisi Kanan 220.26 M2
JUMLAH 1,111.91 M2
19 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2
JUMLAH 4.70 M2
20 Cat Plafond gypsum Setara Vinilex
MCR Gypsum 11.75 M2
KORIDOR Gypsum 310.30 M2
PENYIMPANAN ALAT Gypsum 27.02 M2
R Studio Audio Visual Gypsum 16.04 M2
PLAFOND GRC DROP CEILING GRC 76.884 M2
PLAFOND GRC Mendatar GRC 222.21 M2
KAMAR MANDI STAFF GRC 10.68 M2
KAMAR MANDI SISWA GRC 4.15 M2
JUMLAH 679.03 M2
21 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2
JUMLAH 64.00 M2
22 Cat lisplank 38.44 M2
JUMLAH 38.44 M2
23 Kerok cat railing 78.00 M'
JUMLAH 2,055.40 M2
26 Bongkar Dinding 1 Bata
RUANG KULIAH 76.12 M2
RUANG DOSEN 50.80 M2
DAPUR (EXISTING 55.54 M2
RUANG AUDI VIDI 53.64 M2
R.DOSEN 2 92.86 M2
JUMLAH 328.96 M2
27 Bongkar Listplank 272.10 M'
JUMLAH 937.19 M2
29 Bongkar Kusen Pintu Single
LAB KIMIA 1.00 UNIT
R ATANOMI KERING 2.00 UNIT
R KULIAH 2.00 UNIT
RUANG AUDI VIDI 1.00 UNIT
STUDIO MM 1.00 UNIT
R.TAX CEN 1.00 UNIT
R.PANEL 4.00 UNIT
R.DOSEN 2 3.00 UNIT
JUMLAH 12.83 M2
JUMLAH 8.40 M2
46 Kolom Praktis Meja Lab
M2 10 x 10 6.30 M'
M1 10 x 10 1.65 M'
M3 10 x 10 0.30 M'
JUMLAH 8.50 M2
48 Granitile 60 x 60 Setara Sincere
M2 54.54 M2
M1 12.48 M2
M3 0.14 M2
TOTAL
99.90
5 Tutup kisi2 atap limas terpotong
titik 7.00
6 Tutup dinding sopi2
M2 7.00
7 Pas. Lisplank + dudukan
6.20 Cat
1.95 Cat
1.95 Cat
1.95 Cat
1.95 Cat
2.70 Cat
1.80 Cat
3.50 Cat
6.25 Cat
2.00 Cat
2.80 Cat
4.05 Cat
7.00 Cat
1.50 Cat
4.50 Cat
6.20 Cat
6.30 Cat
5.80 Cat
2.40 Cat
7.20 Cat
6.50 Cat
2.30 Cat
8.50
20.70
20.50
8.70
3.70
24.20
18.50
3.70
6.20
6.80
7.20
32.00
6.90
26.20
23.80
11.20
9.00
8.20
13.80
11.00
207.00
9.25
573.85 M'
8 Flashing dinding
7.30
13.30
4.60
10.60
2.60
5.30
2.50
3.50
4.50
3.50
3.00
2.00
1.00
1.00
4.20
68.90
CONTOH CAT EXTERIOR
14 R.PRODI 2 1 2
15 NO NAME 2 2 34.529 0
16 MUSHOLA 1 2.58 1 6.235 12.47
17 TOILET WANITA 2 20.21 13.889 27.778 2
BONGKAR FURNITURE TOILET: 1
18 TOILET PRIA 5 58.394 1 25.714 51.428 1
LSM
19 TOILET PRIA&WANITA 5 73.1 17.1 34.2 2
20 VOID 27.52 55.04 4 UNIT JENDELA
21 R PENYIMPANAN 1 2.7 5.4
22 R LABORAN+R. LAP PERSI 3 10.2 7.74 15.48 4
1 BUAH JENDELA, PERALATAN
23 LAB GG.01 23.54 47.08 2
LABORATORIUM
24 R INSTRUMEN 1
2 LAB KIMIA 2 7 3 0 2
3 RUANG DOSEN 1 1 50.8 2.66 8.4 16.8 2
4 R ATANOMI KERING 0 2
10 R.Penyimpanan Alat
11 R. Studio Fotografi
12 RUANG AUDI VIDI 53.64 1 1 1.9 3.8 7.6 4
13 STUDIO MM 1 1.98 3.96 2
14 R.TAX CEN 1 1.98 3.96 2
15 R. DOSEN 1 2
16 R.PANEL 27.65 55.3 1
17 R.DOSEN 2 4 1 15.96 92.8645 14 28 2
Partisi Kaca
Partisi Kaca
42
18.585
1
1
38.8
14.5
17.2
32.2
6.7
15
32.4
PARAF :
OPSI 1
PARAF :
OPSI 2
LANTAI 2
NO NAME 83.74 36.9 3.5 30.42 98.73
Lantai 2
JUMLAH
JUMLAH
JUMLAH
JUMLAH LUAS CAT LANTAI 1 1861.9636
JUMLAH LUAS CAT EXTERIOR L 1 316.2498
Cat Bukaan Kusen 4.7
Cat Railing 77.32
JUMLAH CAT EXTERIOR LANTAI 2 842.397
JUMLAH LUAS CAT LANTAI 2 1213
LANTAI 2
NO NAME 83.74 37.5 3.5 27.18 104.07
Lantai 2
JUMLAH
JUMLAH
JUMLAH
JUMLAH LUAS CAT LANTAI 1 2037.8951
JUMLAH LUAS CAT EXTERIOR L 1 486.2593
Cat Bukaan Kusen 4.7
Cat Railing 77.32
JUMLAH CAT EXTERIOR LANTAI 2 899.692
JUMLAH LUAS CAT LANTAI 2 1447.14
DATA DARI AUTO CAD HITUNGAN CAT
(M2) (M')
LANTAI 1
1 RUANG ISTIRAHAT 13.5 16 3.4 4.7925 49.6075
2 RUANG PERS. ALAT 55.3 33.4 3.5 19.5496 97.3504
3 LAB KIMIA 2 41.01 26.2 3.4 17.874 71.206
4 LAB ANATOMI BASAH 36.5 24.6 3.5 17.874 68.226
5 RUANG PVT 22.77 19.8 3.55 10.962 59.328
6 LAB. GG 14 41.87 26.5 3.5 16.0936 76.6564
7 RUANG KULIAH 1 36.45 24.6 3.6 19.764 68.796
8 RUANG KULIAH 2 74.33 38.3 3.6 34.182 103.698
9 RUANG RAPAT 123.36 48 3.9 27.46 159.74
10 RUANG PRODI 1 39.86 27.8 3.5 7.506 89.794
11 RUANG DOSEN 1 27 21.25 3.5 14.418 59.957
12 RUANG PRODI 2 31 22.68 3.5 17.874 61.506
13 RUANG PENYIMPANAN 26.52 20.68 3.5 9.72 62.66
14 LAB. PERSIAPAN 26 20.9 3.5 11.88 61.27
15 RUANG LABORAN 13.76 15.86 3.5 11.04 44.47
16 RUANG PANEL 6.59 10.72 3.5 2.025 35.495
17 RUANG DUBBING 54.21 40.62 2.04 4.05 78.8148