KONTRAK AWAL PEK. TAMBAH PEK.

KURANG

PEK PERSIAPAN 35,000,000.00 10,000,000.00 -

PEKERJAAN SIPIL & ARSITEKTUR 4,590,000,000.00 1,575,236,675.45 885,416,883.07

PEKERJAAN ME 4,560,000,000.00 333,260,100.00 214,342,300.00

TOTAL 9,185,000,000.00 1,918,496,775.45 ###


TOTAL

45,000,000.00

5,279,819,792.38 1

4,793,917,800.00 0

### 0
Lampiran surat Permohonan Perubahan Pekerjaan

REKAPITULASI PEKERJAAN TAMBAH KURANG ( CC 0 )


Pekerjaan : Renovasi Gedung Biokimia Sekolah Vokasi IPB University
Kegiatan : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128
Tahun Anggaran : 2020

SESUAI KONTRAK PEKERJAAN TAMBAH PEKERJAAN KURANG SESUAI PELAKSANAAN


NO URAIAN PEKERJAAN KETERANGAN
JUMLAH HARGA (Rp.) BOBOT JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) BOBOT

REKAPITULASI BOBOT PRESTASI PEKERJAAN

I PEKERJAAN PERSIAPAN 35,000,000.00 0.3811% 10,000,000.00 - 45,000,000.00 0.4899%


II PEKERJAAN ARSITEKTUR GEDUNG UTAMA
1 LANTAI.1
A BONGKARAN 106,666,775.60 1.1613% 58,799,742.70 15,790,855.60 149,675,662.70 1.6296%
B DINDING 329,818,198.50 3.5908% 296,577,560.05 - 626,395,758.55 6.8198%
C LANTAI 723,501,548.80 7.8770% 203,367,407.56 144,248,848.80 782,620,107.56 8.5206%
D KUSEN PINTU & JENDELA 351,661,313.70 3.8286% 31,744,664.00 9,929,900.00 373,476,077.70 4.0662%
E PLAFOND 245,732,500.00 2.6754% 94,683,089.50 - 340,415,589.50 3.7062%
F SANITAIR 187,794,528.40 2.0446% 20,944,000.00 5,044,700.00 203,693,828.40 2.2177%
G PENGECATAN 172,153,514.00 1.8743% 93,115,472.09 1,804,669.00 263,464,317.09 2.8684%
H PENUTUP ATAP 249,339,630.72 2.7146% 23,406,043.60 220,156,710.72 52,588,963.60 0.5726%
I PEK. PERLENGKAPAN LABORATORIUM 187,960,203.83 2.0464% 119,860,999.83 7,000,000.00 300,821,203.66 3.2751%
2 LANTAI.2
A BONGKARAN 81,321,849.25 0.8854% 52,088,270.50 5,341,789.25 128,068,330.50 1.3943%
B DINDING 90,208,693.30 0.9821% 163,183,016.85 - 253,391,710.15 2.7588%
C LANTAI 422,324,400.00 4.5980% 31,677,678.60 18,492,000.00 435,510,078.60 4.7415%
D KUSEN PINTU & JENDELA 294,090,398.00 3.2019% 25,069,552.00 - 319,159,950.00 3.4748%
E PLAFOND 161,786,500.00 1.7614% 63,341,770.80 - 225,128,270.80 2.4510%
F PENGECATAN 117,939,050.20 1.2840% 92,625,597.60 1,893,888.00 208,670,759.80 2.2719%
G PENUTUP ATAP 310,741,395.70 3.3831% 146,801,832.00 63,510,441.70 394,032,786.00 4.2900%
H PEK. PERLENGKAPAN LABORATORIUM 66,959,500.00 0.7290% - 3,500,000.00 63,459,500.00 0.6909%
III PEKERJAAN KORIDOR TERAS LANTAI.1
1 PEKERJAAN SIPIL 31,599,437.70 0.3440% - 31,599,437.70 - 0.0000%
2 PEKERJAAN ARSITEKTUR 138,400,562.30 1.5068% - 134,337,202.30 4,063,360.00 0.0442%
IV PEKERJAAN KORIDOR PENGHUBUNG
1 PEKERJAAN SIPIL 45,176,501.51 0.4919% - 45,176,501.51 - 0.0000%
2 PEKERJAAN ARSITEKTUR 224,823,498.49 2.4477% 56,196,655.00 177,589,938.49 103,430,215.00 1.1261%
V PEKERJAAN GWT 10m3 DAN RUMAH POMPA 50,000,000.00 0.5444% 1,753,322.76 - 51,753,322.76 0.5635%
VI PEKERJAAN MEKANIKAL
1 LANTAI 1
A PERALATAN UTAMA INSTALASI PLUMBING 115,141,200.00 1.2536% 39,435,500.00 - 154,576,700.00 1.6829%
B INST. PEMIPAAN AIR BERSIH (PVC AW SETARA RUCIKA) 11,286,100.00 0.1229% 2,943,800.00 1,128,000.00 13,101,900.00 0.1426%
C INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN) 25,312,500.00 0.2756% 10,168,000.00 - 35,480,500.00 0.3863%
D AIR CONDITIONING (UNIT AC VRV) 1,421,735,400.00 15.4789% 65,304,800.00 17,120,400.00 1,469,919,800.00 16.0035%
E INSTALASI GAS.(PIPA GIV MEDIUM SETARA SPINDO) 21,514,600.00 0.2342% 1,453,000.00 2,826,000.00 20,141,600.00 0.2193%
2 LANTAI 2
A INST. PEMIPAAN AIR BERSIH (PVC AW SETARA WAVIN) 1,320,700.00 0.0144% - - 1,320,700.00 0.0144%
B INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN) 3,627,900.00 0.0395% 9,120,600.00 - 12,748,500.00 0.1388%
C INST. PEMIPAAN AIR HUJAN (PVC AW SETARA WAVIN) 23,575,600.00 0.2567% 1,505,400.00 14,850,000.00 10,231,000.00 0.1114%
D AIR CONDITIONING (UNIT AC VRV) 1,173,172,100.00 12.7727% 50,055,700.00 21,269,800.00 1,201,958,000.00 13.0861%
E INSTALASI GAS ( PIPA GIV MEDIUM SETARA SPINDO ) 3,313,900.00 0.0361% 1,250,000.00 1,130,400.00 3,433,500.00 0.0374%
VII PEKERJAAN ELEKTRIKAL
1 LANTAI 1
REKAP Tamkur
SESUAI KONTRAK PEKERJAAN TAMBAH PEKERJAAN KURANG SESUAI PELAKSANAAN
NO URAIAN PEKERJAAN KETERANGAN
JUMLAH HARGA (Rp.) BOBOT JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) JUMLAH HARGA (Rp.) BOBOT

A PANEL LISTRIK SETARA TERAMETRIK 100,470,800.00 1.0939% - - 100,470,800.00 1.0939%


B KABEL FEEDER & KABEL BC SETARA SUPREME 78,687,600.00 0.8567% 118,398,000.00 74,252,500.00 122,833,100.00 1.3373%
C INSTALASI DAN ARMATUR 282,380,600.00 3.0744% 6,270,900.00 4,505,200.00 284,146,300.00 3.0936%
D KABEL TRAY SETARA ONI TRAY 153,960,800.00 1.6762% - - 153,960,800.00 1.6762%
E TATA SUARA SETARA TOA 111,503,083.74 1.2140% - - 111,503,083.74 1.2140%
F TELEPON 63,767,200.00 0.6943% 480,000.00 8,868,200.00 55,379,000.00 0.6029%
G SYSTEM DATA / WIFI 41,086,267.60 0.4473% 4,537,900.00 - 45,624,167.60 0.4967%
H CCTV SETARA PANASONIC 80,260,160.40 0.8738% - - 80,260,160.40 0.8738%
I LCD/PROJECTOR 39,874,560.00 0.4341% - - 39,874,560.00 0.4341%
J INSTALASI TELEVISI KABEL SETARA BELDEN 109,383,032.76 1.1909% - - 109,383,032.76 1.1909%
K FIRE ALARM SETARA DEMCO 66,307,600.00 0.7219% - - 66,307,600.00 0.7219%
L GROUNDING ARUS LEMAH 4,435,100.00 0.0483% - - 4,435,100.00 0.0483%
2 LANTAI 2
A PANEL SETARA TERAMETRIK 33,481,900.00 0.3645% - - 33,481,900.00 0.3645%
B INSTALASI DAN ARMATUR 195,750,800.00 2.1312% 4,496,800.00 8,391,800.00 191,855,800.00 2.0888%
C KABEL TRAY SETARA ONI TRAY 128,300,500.00 1.3968% - - 128,300,500.00 1.3968%
D TATA SUARA SETARA TOA 44,051,100.00 0.4796% 12,706,400.00 - 56,757,500.00 0.6179%
E TELEPON 18,875,200.00 0.2055% 1,800,000.00 - 20,675,200.00 0.2251%
F SYSTEM DATA 17,901,300.00 0.1949% 3,333,300.00 - 21,234,600.00 0.2312%
G CCTV SETARA PANASONIC 9,219,000.00 0.1004% - - 9,219,000.00 0.1004%
H LCD/PROJECTOR 39,874,560.00 0.4341% - - 39,874,560.00 0.4341%
I INSTALASI TV ,KABEL SETARA BELDEN 8,730,800.00 0.0951% - - 8,730,800.00 0.0951%
J FIRE ALARM SETARA DEMCO 34,853,900.00 0.3795% - - 34,853,900.00 0.3795%
K PENANGKAL PETIR 36,844,135.49 0.4011% - - 36,844,135.49 0.4011%
VIII PENAMBAHAN DAYA 48.500 VA 60,000,000.00 0.6532% - 60,000,000.00 115,000,000.00 1.2520%

SUB TOTAL 9,185,000,000.00 100.0000% 1,918,496,775.45 1,099,759,183.07 10,118,737,592.37 110.1659%


PPN 10 % 918,500,000.00 1,011,873,759.24
JUMLAH TOTAL 10,103,500,000.00 11,130,611,351.61
DIBULATKAN 10,103,500,000.00 11,130,611,000.00
SELISIH 1,027,111,000.00

Mengetahui Mengetahui Mengetahui Diperiksa oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT PERSETUJUAN TIM TEKNIS SEKOLAH VOKASI Konsultan Perencana: Konsultan Pengawas: Kontraktor Pelaksana :
IPB UNIVESITY IPB UNIVESITY IPB UNIVESITY CV RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA

SETIAWAN, SE, MM AMIN SUROSO, S.T DEKAN RIRIK DP, ST, M.SI NAJI AL ABDAT, ST IR. MULYONO
NIP:197012301994031001 NIP:19711108 199103 1 001 NIP:--------------- TEAM LEADER TEAM LEADER DIREKTUR

REKAP Tamkur
SESUAI KONTRAK PERKERJAAN TAMBAH
HARGA SATUAN HARGA SATUAN
NO. URAIAN PEKERJAAN SAT (Rp) JUMLAH HARGA (Rp) JUMLAH HARGA
VOLUME VOLUME
(Rp) (Rp)
9 Genteng metal berpasir 41x110 cm Setara Rainbow M2 189.20 138,700.00 26,242,040.00
10 Rangka Baja Ringan M2 19.00 183,100.00 3,478,900.00
11 Nok metal M' 30.00 167,700.00 5,031,000.00

Rincian Tamkur 5 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :

INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA

Kegiatan : Renovasi Gedung Biokimia Sekolah Vokasi IPB University Minggu : 30 (TIGA PULUH)
Lokasi : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128 Periode : 7 - 13 Oktober 2020
Tahun Anggaran : 2020 Tanggal : Jakarta, 9 Oktober 2020

PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
BOBOT
NO URAIAN PEKERJAAN (%) PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

REKAPITULASI BOBOT PRESTASI PEKERJAAN

I PEKERJAAN PERSIAPAN 0.4434% 23.5093% 0.1042% 42.9896% 0.1906% 88.7211% 0.3934%


II PEKERJAAN ARSITEKTUR GEDUNG UTAMA
1 LANTAI.1
A BONGKARAN 1.4747% 75.2707% 1.1100% 16.1784% 0.2386% 100.0000% 1.4747%
B DINDING 6.1718% 58.2798% 3.5969% 11.9534% 0.7377% 84.5135% 5.2160%
C LANTAI 7.7110% 56.4656% 4.3541% 24.8182% 1.9137% 86.8187% 6.6946%
D KUSEN PINTU & JENDELA 3.6798% 13.9702% 0.5141% 4.6567% 0.1714% 23.9605% 0.8817%
E PLAFOND 3.3540% 57.1661% 1.9174% 26.1047% 0.8756% 85.1910% 2.8573%
F SANITAIR 2.0070% 27.8029% 0.5580% 247.0522% 4.9582% 28.6382% 0.5748%
G PENGECATAN 2.5959% 22.5979% 0.5866% 8.5958% 0.2231% 31.1937% 0.8097%
H PENUTUP ATAP 0.6226% 12.7799% 0.0796% 45.8059% 0.2852% 58.5859% 0.3647%
I PEK. PERLENGKAPAN LABORATORIUM 2.9639% 60.0000% 1.7784% 35.0000% 1.0374% 95.0000% 2.8157%
2 LANTAI.2
A BONGKARAN 1.2699% 76.6875% 0.9739% 23.3125% 0.2961% 100.0000% 1.2699%
B DINDING 2.4966% 68.1926% 1.7025% 30.1982% 0.7539% 98.3908% 2.4564%
C LANTAI 4.2910% 50.0215% 2.1464% 31.3041% 1.3433% 81.3256% 3.4897%
D KUSEN PINTU & JENDELA 3.1446% 18.2236% 0.5731% 6.0745% 0.1910% 24.2981% 0.7641%
E PLAFOND 2.2181% 50.1088% 1.1115% 39.7482% 0.8817% 89.8570% 1.9932%
F PENGECATAN 2.0560% 20.0496% 0.4122% 19.2243% 0.3953% 39.2739% 0.8075%
G PENUTUP ATAP 3.8823% 17.6655% 0.6858% 78.6181% 3.0522% 96.2836% 3.7380%
H PEK. PERLENGKAPAN LABORATORIUM 0.8053% 36.6794% 0.2954% 37.0795% 0.2986% 73.7590% 0.5940%

III PEKERJAAN KORIDOR TERAS LANTAI.1


1 PEKERJAAN SIPIL 0.0000% #DIV/0! 0.0000% #DIV/0! 0.0000% #DIV/0! 0.0400%
2 PEKERJAAN ARSITEKTUR 0.0400% 0.0000% 0.0000% 100.0000% 0.0400% 100.0000% 0.0400%
IV PEKERJAAN KORIDOR PENGHUBUNG
1 PEKERJAAN SIPIL 0.0000% #DIV/0! 0.1352% #DIV/0! 0.0000% #DIV/0! 0.6060%
2 PEKERJAAN ARSITEKTUR 1.0191% 13.2625% 0.1352% 46.2065% 0.4709% 59.4690% 0.6060%
V PEKERJAAN GWT 10m3 DAN RUMAH POMPA 0.5099% 82.1336% 0.4188% 11.8123% 0.0602% 93.9459% 0.4790%
VI PEKERJAAN MEKANIKAL
1 LANTAI 1
A PERALATAN UTAMA INSTALASI PLUMBING 1.5230% 0.0000% 0.0000% 44.7382% 0.6814% 44.7382% 0.6814%
B INST. PEMIPAAN AIR BERSIH (PVC AW SETARA RUCIKA) 0.1291% 0.0000% 0.0000% 95.0000% 0.1226% 95.0000% 0.1226%
C INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN) 0.3496% 0.0000% 0.0000% 95.0000% 0.3321% 95.0000% 0.3321%
D AIR CONDITIONING (UNIT AC VRV) 14.4828% 0.0000% 0.0000% 94.4189% 13.6745% 94.4189% 13.6745%
E INSTALASI GAS.(PIPA GIV MEDIUM SETARA SPINDO) 0.1985% 0.0000% 0.0000% 83.2515% 0.1652% 83.2515% 0.1652%
2 LANTAI 2
A INST. PEMIPAAN AIR BERSIH (PVC AW SETARA WAVIN) 0.0130% 0.0000% 0.0000% 76.7778% 0.0100% 76.7778% 0.0100%
B INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN) 0.1256% 0.0000% 0.0000% 26.9052% 0.0338% 26.9052% 0.0338%
C INST. PEMIPAAN AIR HUJAN (PVC AW SETARA WAVIN) 0.1008% 0.0000% 0.0000% 83.6785% 0.0844% 83.6785% 0.0844%
D AIR CONDITIONING (UNIT AC VRV) 11.8427% 0.0000% 0.0000% 91.7119% 10.8611% 91.7119% 10.8611%
E INSTALASI GAS ( PIPA GIV MEDIUM SETARA SPINDO ) 0.0338% 0.0000% 0.0000% 76.2573% 0.0258% 76.2573% 0.0258%
VII PEKERJAAN ELEKTRIKAL
1 LANTAI 1
A PANEL LISTRIK SETARA TERAMETRIK 0.9899% 0.0000% 0.0000% 70.0000% 0.6929% 70.0000% 0.6929%
B KABEL FEEDER & KABEL BC SETARA SUPREME 1.2103% 0.0000% 0.0000% 43.3694% 0.5249% 43.3694% 0.5249%
C INSTALASI DAN ARMATUR 2.8091% 0.0000% 0.0000% 27.8876% 0.7834% 27.8876% 0.7834%
D KABEL TRAY SETARA ONI TRAY 1.5169% 0.0000% 0.0000% 95.0000% 1.4411% 95.0000% 1.4411%
E TATA SUARA SETARA TOA 1.0986% 0.0000% 0.0000% 41.1293% 0.4519% 41.1293% 0.4519%
F TELEPON 0.5456% 0.0000% 0.0000% 13.3943% 0.0731% 13.3943% 0.0731%
G SYSTEM DATA / WIFI 0.4495% 0.0000% 0.0000% 16.3129% 0.0733% 16.3129% 0.0733%
H CCTV SETARA PANASONIC 0.7908% 0.0000% 0.0000% 9.1253% 0.0722% 9.1253% 0.0722%
I LCD/PROJECTOR 0.3929% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%
J INSTALASI TELEVISI KABEL SETARA BELDEN 1.0777% 0.0000% 0.0000% 3.8079% 0.0410% 3.8079% 0.0410%
K FIRE ALARM SETARA DEMCO 0.6533% 0.0000% 0.0000% 36.0969% 0.2358% 36.0969% 0.2358%
L GROUNDING ARUS LEMAH 0.0437% 0.0000% 0.0000% 50.0000% 0.0218% 50.0000% 0.0218%
2 LANTAI 2
A PANEL SETARA TERAMETRIK 0.3299% 0.0000% 0.0000% 70.0000% 0.2309% 70.0000% 0.2309%
B INSTALASI DAN ARMATUR 1.8903% 0.0000% 0.0000% 23.1135% 0.4369% 23.1135% 0.4369%
C KABEL TRAY SETARA ONI TRAY 1.2641% 0.0000% 0.0000% 80.0000% 1.0113% 80.0000% 1.0113%
D TATA SUARA SETARA TOA 0.5592% 0.0000% 0.0000% 62.8087% 0.3512% 62.8087% 0.3512%
E TELEPON 0.2037% 0.0000% 0.0000% 24.2137% 0.0493% 24.2137% 0.0493%
F SYSTEM DATA 0.2092% 0.0000% 0.0000% 44.0880% 0.0922% 44.0880% 0.0922%
G CCTV SETARA PANASONIC 0.0908% 0.0000% 0.0000% 32.0989% 0.0292% 32.0989% 0.0292%
H LCD/PROJECTOR 0.3929% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%
I INSTALASI TV ,KABEL SETARA BELDEN 0.0860% 0.0000% 0.0000% 42.4062% 0.0365% 42.4062% 0.0365%
J FIRE ALARM SETARA DEMCO 0.3434% 0.0000% 0.0000% 38.1513% 0.1310% 38.1513% 0.1310%
K PENANGKAL PETIR 0.3630% 0.0000% 0.0000% 2.5972% 0.0094% 2.5972% 0.0094%
VIII PENAMBAHAN DAYA 48.500 VA 1.1331% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000% 0.0000%

TOTAL 100.0% 23.1891% 51.1951% 71.7471%

AKTUAL 71.7471%
RENCANA 0.1068%
CEPAT / LAMBAT 71.6403%
KEMAJUAN FISIK LAPANGAN
WAKTU PELAKSANAAN 240 Hari Kalender

Page 6 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :

INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA

Kegiatan : Renovasi Gedung Biokimia Sekolah Vokasi IPB University Minggu : 30 (TIGA PULUH)
Lokasi : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128 Periode : 7 - 13 Oktober 2020
Tahun Anggaran : 2020 Tanggal : Jakarta, 9 Oktober 2020

PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
BOBOT
NO URAIAN PEKERJAAN (%) PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)
KEMAJUAN FISIK LAPANGAN

WAKTU SUDAH BERJALAN 28 Hari Kalender


SISA WAKTU PELAKSANAAN 212 Hari Kalender

Menyetui : Diperiksa oleh : Dibuat oleh :


INSTITUTE PERTANIAN BOGOR Konsultan Pengawas : Kontraktor Pelaksana :
PEJABAT PEMBUAT KOMITMEN PT. BUMI MADANI PT. BAYU SUKSES PRATAMA

Setiawan, SE, MM Naji Al Abdat, ST Wendara Bayu Sumapraja, ST. M.Sc


NIP : 197012301994031001 Team Leader Project Manager

Page 7 of 55
PEMBERI TUGAS : KONSULTAN PERENCANA : KONSULTAN PENGAWAS : KONTRAKTOR PELAKSANA :

INSTITUTE PERTANIAN BOGOR CV. RENCANA JASA PT. BUMI MADANI PT. BAYU SUKSES PRATAMA

KEGIATAN : Renovasi Gedung Biokimia Sekolah Vokasi IPB University


LOKASI : Komplek SB IPB Jalan Lodaya No.11, RT.04/RW.2, Babakan, Kecamatan Bogor Tengah, Kota Bogor, Jawa Barat 16128
TAHUN ANGGARAN : 2020

PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

I. PEKERJAAN PERSIAPAN
1 Dokumentasi dan pelaporan 5.00 Ls 1,500,000.00 7,500,000.00 0.0739% 50.00 0.0369% 40.00 0.0296% 90.00 0.0665%
Pembuatan laporan harian,mingguan dan bulanan,foto-foto berwarna kemajuan pekerjaan dan gambar
sesuai pelaksanaan (as build drawing) diserahkan kepada pihak-pihak terkait diserahkan setiap bulan
hingga masa penyerahan pertama. Laporan-laporan tersebut dibuat sebanyak 6 eksemplar
2 Papan nama Kegiatan, ukuran 1.20 x 1.00 m lengkap 1.20 m2 165,000.00 198,000.00 0.0020% 50.00 0.0010% 50.00 0.0010% 100.00 0.0020%
Pembuatan dan pemasangan papan nama proyek di lokasi pekerjaan
3 Mobilisasi dan Demobilisasi 1.00 Ls 10,000,000.00 10,000,000.00 0.0985% 50.00 0.0493% 50.00 0.0493% 100.00 0.0985%
4 Pembersihan 1.00 Ls 17,302,000.00 17,302,000.00 0.1705% 10.00 0.0170% 65.00 0.1108% 75.00 0.1279%
Pembersihan hasil pekerjaan dan lingkungan akibat dari pelaksanaan pekerjaan.
5 Pemindahan kursi, meja kuliah dan perabot dalam ruangan 1.00 Ls 10,000,000.00 10,000,000.00 0.0985% - 0.0000% 100.00 0.0985% 100.00 0.0985%

SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI.1 45,000,000.00 0.1042% 0.2891% 0.3934%

II. PEKERJAAN ARSITEKTUR GEDUNG UTAMA


A.1 LANTAI.1
A.1.1 BONGKARAN
1 Pengikisan/pengerokan permukaan cat lama (dgn soda api sampai dasar) 2,888.85 M2 21,500.00 62,110,378.20 0.6120% 75.00 0.4590% 25.00 0.1530% 100.00 0.6120%
2 Bongkar Dinding 1 Bata 403.62 M2 30,000.00 12,108,630.00 0.1193% 80.00 0.0954% 20.00 0.0239% 100.00 0.1193%
3 Bongkar Dinding 1/2 Bata 82.43 M2 25,000.00 2,060,637.50 0.0203% 90.00 0.0183% 10.00 0.0020% 100.00 0.0203%
4 Bongkar penutup atap & rangka atap 122.64 M2 35,000.00 4,292,400.00 0.0423% 90.00 0.0381% 10.00 0.0042% 100.00 0.0423%
5 Bongkar Listplank 272.10 M' 15,000.00 4,081,500.00 0.0402% 90.00 0.0362% 10.00 0.0040% 100.00 0.0402%
6 Bongkar Rangka Plafond & penutup plafond 887.14 M2 25,000.00 22,178,500.00 0.2185% 90.00 0.1967% 10.00 0.0219% 100.00 0.2185%
7 Bongkar Kusen Pintu Single 44.00 Un 50,000.00 2,200,000.00 0.0217% 90.00 0.0195% 10.00 0.0022% 100.00 0.0217%
8 Bongkar Kusen Pintu Dobel 13.00 Un 100,000.00 1,300,000.00 0.0128% 90.00 0.0115% 10.00 0.0013% 100.00 0.0128%
9 Bongkar plint lantai & perapihan 751.74 M' 25,000.00 18,793,500.00 0.1852% 90.00 0.1667% 10.00 0.0185% 100.00 0.1852%
10 Bongkar Meja lab 9.00 Un 100,000.00 900,000.00 0.0089% 90.00 0.0080% 10.00 0.0009% 100.00 0.0089%
11 Bongkar Koridor penghubung 140.30 M2 30,000.00 4,209,000.00 0.0415% 90.00 0.0373% 10.00 0.0041% 100.00 0.0415%
12 Bongkar Lantai 105.70 M2 25,000.00 2,642,500.00 0.0260% 90.00 0.0234% 10.00 0.0026% 100.00 0.0260%
13 Bongkaran sloof Ruang Rapat 34.30 M' 25,000.00 857,500.00 0.0084% - 0.0000% 100.00 0.0084% 100.00 0.0084%
14 Galian tanah Ruang Rapat 3.76 M3 106,700.00 401,192.00 0.0040% - 0.0000% 100.00 0.0040% 100.00 0.0040%
15 Bongkar Meja Beton Lab Kimia 4.00 Bh 100,000.00 400,000.00 0.0039% - 0.0000% 100.00 0.0039% 100.00 0.0039%
16 Bongkar Kolom Eksisting 12.90 M' 25,000.00 322,500.00 0.0032% - 0.0000% 100.00 0.0032% 100.00 0.0032%
17 Bongkar Beton Retening Wall rapat 33.73 M2 165,000.00 5,564,625.00 0.0548% - 0.0000% 100.00 0.0548% 100.00 0.0548%
18 Bongkar Relling Kayu Ruang Rapat 6.00 M' 25,000.00 150,000.00 0.0015% - 0.0000% 100.00 0.0015% 100.00 0.0015%
19 Bongkar Pintu Pagar Besi Dan Pagar Besi Jendela 5.00 Unit 100,000.00 500,000.00 0.0049% - 0.0000% 100.00 0.0049% 100.00 0.0049%
20 Bongkar Kipas Besi dia 1,2 1.00 Unit 100,000.00 100,000.00 0.0010% - 0.0000% 100.00 0.0010% 100.00 0.0010%
21 Bongkar Meja Beton R Persediaan Alat 1.00 Bh 100,000.00 100,000.00 0.0010% - 0.0000% 100.00 0.0010% 100.00 0.0010%
22 Bongkar Lemari Asam 3.00 Bh 150,000.00 450,000.00 0.0044% - 0.0000% 100.00 0.0044% 100.00 0.0044%
23 Pembongkaran Talang Air 294.50 M' 12,000.00 3,534,000.00 0.0348% - 0.0000% 100.00 0.0348% 100.00 0.0348%
24 Bongkar Kusen Jendela 6.00 bh 50,000.00 300,000.00 0.0030% - 0.0000% 100.00 0.0030% 100.00 0.0030%
25 Bongkar Pondasi 40/60 ruang rapat 0.36 m3 330,000.00 118,800.00 0.0012% - 0.0000% 100.00 0.0012% 100.00 0.0012%

A.1.2 DINDING
1 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) 99.34 M2 133,800.00 13,291,577.31 0.1310% 90.00 0.1179% 10.00 0.0131% 100.00 0.1310%

Page 8 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

2 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) 122.16 M2 263,200.00 32,152,812.80 0.3168% 90.00 0.2851% 10.00 0.0317% 100.00 0.3168%
3 Plesteran semen instant Setara MM-201 497.22 M2 90,700.00 45,098,061.31 0.4443% 90.00 0.3999% 10.00 0.0444% 100.00 0.4443%
4 Acian Dinding setara MM-301 t. 3 mm 497.22 M2 52,800.00 26,253,336.69 0.2587% 90.00 0.2328% 10.00 0.0259% 100.00 0.2587%
5 Plesteran bukaan kusen Setara MM-201 t. 10 mm 395.34 M2 90,700.00 35,857,338.00 0.3533% 50.00 0.1766% 50.00 0.1766% 100.00 0.3533%
6 Acian bukaan kusen Setara MM-301 t. 10 mm 395.34 M2 52,800.00 20,873,952.00 0.2057% 50.00 0.1028% 50.00 0.1028% 100.00 0.2057%
7 Kolom Praktis 10x10 66.30 M' 89,600.00 5,940,480.00 0.0585% 75.00 0.0439% 25.00 0.0146% 100.00 0.0585%
8 Balok lintel 8x10 15.10 M' 125,000.00 1,887,500.00 0.0186% 75.00 0.0139% 25.00 0.0046% 100.00 0.0186%
9 Dinding granit 60x60 (MU-450 & MU-408) 252.17 M2 339,600.00 85,636,932.00 0.8438% 75.00 0.6328% 25.00 0.2109% 100.00 0.8438%
10 Listplank lapis Almunium Composit Panel (ACP) setara Seven 6.60 M2 798,900.00 5,272,740.00 0.0520% - 0.0000% - 0.0000% - 0.0000%
11 Batu alam andesit bintik bakar cipanca 403.02 M2 362,800.00 146,215,039.24 1.4406% 90.00 1.2966% 2.00 0.0288% 92.00 1.3254%
12 Plint keramik 10 x 80 Polish setara Sandimas 866.08 M' 49,300.00 42,697,744.00 0.4207% 70.00 0.2945% 20.00 0.0841% 90.00 0.3786%
13 Dinding lapis alumunium composit panel (ACP) setara seven 75.88 M2 798,900.00 60,620,532.00 0.5973% - 0.0000% - 0.0000% - 0.0000%
14 Logo Stainless Mirror, ketebalan 0.8 1.00 unit 3,000,000.00 3,000,000.00 0.0296% - 0.0000% - 0.0000% - 0.0000%
15 Tulisan Stainless Mirror, ketebalan 0.8 1.00 unit 2,600,000.00 2,600,000.00 0.0256% - 0.0000% - 0.0000% - 0.0000%
16 Tulisan Stainless Mirror, ketebalan 0.8 1.00 unit 6,200,000.00 6,200,000.00 0.0611% - 0.0000% - 0.0000% - 0.0000%
17 Pasang Kolom 15/25 ( Openingan Kusen ) 48.00 M' 330,000.00 15,840,000.00 0.1561% 75.00 0.1171% 25.00 0.0390% 100.00 0.1561%
18 Ban - ban an batu alam 186.00 M' 95,000.00 17,670,000.00 0.1741% 90.00 0.1567% 10.00 0.0174% 100.00 0.1741%
19 Penambahan Plesteran Dinding batu alam 46.18 M2 90,700.00 4,188,163.20 0.0413% 90.00 0.0371% 10.00 0.0041% 100.00 0.0413%
20 Pekerjaan ring balk atas kusen 15/25 47.90 M' 330,000.00 15,807,000.00 0.1557% 75.00 0.1168% 25.00 0.0389% 100.00 0.1557%
21 Perapihan Bekas Bobokan 116.17 M' 95,000.00 11,036,150.00 0.1087% 80.00 0.0870% 20.00 0.0217% 100.00 0.1087%
22 Plint Parquet 41.83 M' 80,000.00 3,346,400.00 0.0330% - 0.0000% - 0.0000% - 0.0000%
23 Pasang Kolom 30/40 ruang rapat 9.40 M' 1,050,000.00 9,870,000.00 0.0972% 90.00 0.0875% 10.00 0.0097% 100.00 0.0972%
24 Pasang Balok 30/60 ruang rapat 9.40 M' 1,600,000.00 15,040,000.00 0.1482% 90.00 0.1334% 10.00 0.0148% 100.00 0.1482%

A.1.3 LANTAI
1 Granitile 80x80 Motif Setara Sandimas 914.87 M2 378,000.00 345,818,970.00 3.4073% 75.00 2.5555% 25.00 0.8518% 100.00 3.4073%
2 Granitile 80x80 Motif Setara Sandimas - M2 378,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Granitile 80x80 Unpolish Setara Sandimas 593.23 M2 532,000.00 315,596,285.20 3.1095% 50.00 1.5548% 30.00 0.9329% 80.00 2.4876%
4 Granitile 60x60 unpolish Setara Sandimas 69.58 M2 418,500.00 29,119,230.00 0.2869% 75.00 0.2152% 25.00 0.0717% 100.00 0.2869%
5 Parquet jati 1.5cmx9cmx30cm-120cm 60.74 M2 611,300.00 37,130,362.00 0.3658% - 0.0000% - 0.0000% - 0.0000%
6 Stepnosing tangga (custom pabrikan) 170.90 M' 68,100.00 11,638,290.00 0.1147% 25.00 0.0287% 50.00 0.0573% 75.00 0.0860%
7 Cat Epoxy 1000 Micron - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
8 Curving Lantai - M' 60,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
9 Cat Epoxy 1000 Micron - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
10 Lantai panggung rangka baja fin.Kalsifloor 20mm (Rise floor) - M2 885,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
11 Finis Lantai cinema mini - M' 236,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
12 Screed Lantai T = 6 cm 130.96 M2 68,232.00 8,935,662.72 0.0880% 75.00 0.0660% 25.00 0.0220% 100.00 0.0880%
13 Pemadatan tanah 52.20 M2 14,100.00 736,020.00 0.0073% 75.00 0.0054% 25.00 0.0018% 100.00 0.0073%
14 Rabat Beton T = 6 cm 314.60 M2 68,232.00 21,465,787.20 0.2115% 75.00 0.1586% 25.00 0.0529% 100.00 0.2115%
15 Pekerjaan Sloof 8x12 11.80 M' 330,000.00 3,894,000.00 0.0384% 75.00 0.0288% 25.00 0.0096% 100.00 0.0384%
16 Pengurugan Lantai R.Toilet Pria Mushola 96.91 M2 37,500.00 3,634,125.00 0.0358% 75.00 0.0269% 25.00 0.0090% 100.00 0.0358%
17 Screed Lantai Toilet Pria 68.17 M2 68,232.00 4,651,375.44 0.0458% 65.00 0.0298% 35.00 0.0160% 100.00 0.0458%

A.1.4 KUSEN PINTU & JENDELA


Kusen baru Setara Alexindo 4" warna Tebal.1mm + Acesories setara Dekson
1 P1.2 (PINTU KACA) 1.00 Unit 28,920,200.00 28,920,200.00 0.2849% 15.00 0.0427% 5.00 0.0142% 20.00 0.0570%
2 P1.2A 20.00 Unit 9,258,300.00 185,166,000.00 1.8244% 15.00 0.2737% 5.00 0.0912% 20.00 0.3649%
3 P1.1B (AL) 8.00 Unit 5,044,000.00 40,352,000.00 0.3976% 15.00 0.0596% 5.00 0.0199% 20.00 0.0795%
4 J1.1 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 299,100.00 299,100.00 0.0029% 15.00 0.0004% 5.00 0.0001% 20.00 0.0006%
5 J1.1' (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 306,200.00 306,200.00 0.0030% 15.00 0.0005% 5.00 0.0002% 20.00 0.0006%
6 J1.1A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 6.00 Unit 324,400.00 1,946,400.00 0.0192% 15.00 0.0029% 5.00 0.0010% 20.00 0.0038%
7 J1.1B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 342,300.00 342,300.00 0.0034% 15.00 0.0005% 5.00 0.0002% 20.00 0.0007%
8 J1.2 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 10.00 Unit 411,400.00 4,114,000.00 0.0405% 15.00 0.0061% 5.00 0.0020% 20.00 0.0081%
9 J1.2A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 62.00 Unit 792,600.00 49,141,200.00 0.4842% 15.00 0.0726% 5.00 0.0242% 20.00 0.0968%
10 J1.2B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 4.00 Unit 715,100.00 2,860,400.00 0.0282% 15.00 0.0042% 5.00 0.0014% 20.00 0.0056%
11 J1.2C (kerok cat lama & dicat ulang setara Dulux & aksesoris) 4.00 Unit 671,600.00 2,686,400.00 0.0265% 15.00 0.0040% 5.00 0.0013% 20.00 0.0053%
12 J1.3 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 930,300.00 930,300.00 0.0092% 15.00 0.0014% 5.00 0.0005% 20.00 0.0018%
13 J1.3A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 892,500.00 892,500.00 0.0088% 15.00 0.0013% 5.00 0.0004% 20.00 0.0018%

Page 9 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

14 BV1.1 (AL) 5.00 Unit 573,600.00 2,868,000.00 0.0283% 15.00 0.0042% 5.00 0.0014% 20.00 0.0057%
15 BV1.A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 232,000.00 232,000.00 0.0023% 15.00 0.0003% 5.00 0.0001% 20.00 0.0005%
16 JLO (AL) 1.00 Unit 2,050,100.00 2,050,100.00 0.0202% 15.00 0.0030% 5.00 0.0010% 20.00 0.0040%
17 Sekat Partisi Kaca t.140cm 37.52 M2 659,000.00 24,728,513.70 0.2436% 15.00 0.0365% 5.00 0.0122% 20.00 0.0487%
18 Pintu Lebar 135 cm R.Laboratorium 1.00 Unit 7,151,150.00 7,151,150.00 0.0705% 15.00 0.0106% 5.00 0.0035% 20.00 0.0141%
19 Penutupan Kaca Jendela Menggunakan Gysum 75.59 M2 244,600.00 18,489,314.00 0.1822% 80.00 0.1457% 20.00 0.0364% 100.00 0.1822%

A.1.5 PLAFOND
1 Plafond Gypsum 9mm Setara Jayaboard 926.97 M2 122,300.00 113,367,819.50 1.1170% 60.00 0.6702% 30.00 0.3351% 90.00 1.0053%
2 Plafond Gypsum 9mm Setara Jayaboard (drop ceiling) 34.00 M2 141,200.00 4,800,800.00 0.0473% - 0.0000% 100.00 0.0473% 100.00 0.0473%
3 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi 1,169.68 M2 147,600.00 172,644,030.00 1.7010% 60.00 1.0206% 25.00 0.4253% 85.00 1.4459%
4 Plafond Grc 4mm Setara Grc 102.35 M2 83,500.00 8,546,225.00 0.0842% 75.00 0.0632% 10.00 0.0084% 85.00 0.0716%
5 Plafond Grc 4mm Setara Grc 70.68 M2 83,500.00 5,901,696.50 0.0581% 60.00 0.0349% 15.00 0.0087% 75.00 0.0436%
6 Plafond Grc 4mm Setara Grc 131.26 M2 83,500.00 10,960,293.50 0.1080% 75.00 0.0810% 25.00 0.0270% 100.00 0.1080%
7 Plafond metal Linear Ceiling 85C 24.00 M2 379,500.00 9,108,000.00 0.0897% - 0.0000% - 0.0000% - 0.0000%
8 List plafond Almunium U 2cm (shadow line) 392.23 M' 20,500.00 8,040,715.00 0.0792% 60.00 0.0475% 30.00 0.0238% 90.00 0.0713%
9 Sekat Partisi Gysum Tinggi 350 cm 41.65 M2 122,300.00 5,093,795.00 0.0502% 60.00 0.0301% 30.00 0.0151% 90.00 0.0452%
10 List Kornice 95.23 M' 20,500.00 1,952,215.00 0.0192% 75.00 0.0144% 25.00 0.0048% 100.00 0.0192%

A.1.6 SANITAIR
1 Closet duduk TOTO CW914J 6.00 BH 7,418,800.00 44,512,800.00 0.4386% 50.00 0.2193% - 0.0000% 50.00 0.2193%
2 Closet jongkok setara TOTO CE9/TV150NWV12J 3.00 BH 4,219,700.00 12,659,100.00 0.1247% 50.00 0.0624% - 0.0000% 50.00 0.0624%
3 Shower Spray setara TOTO THX 20 NBN 5 + TL 340 CSN 9.00 BH 361,600.00 3,254,400.00 0.0321% 50.00 0.0160% - 0.0000% 50.00 0.0160%
4 Washtafel setara TOTO LW 540 J 14.00 BH 1,543,000.00 21,602,000.00 0.2128% 50.00 0.1064% - 0.0000% 50.00 0.1064%
5 Cermin dibevel 6cm 8.46 M2 224,000.00 1,895,040.00 0.0187% - 0.0000% - 0.0000% - 0.0000%
6 Urinoar TOTO UW930J 4.00 BH 6,107,800.00 24,431,200.00 0.2407% 50.00 0.1204% - 0.0000% 50.00 0.1204%
7 Sekat Urinoar setara TOTO A100 4.00 BH 1,488,000.00 5,952,000.00 0.0586% - 0.0000% - 0.0000% - 0.0000%
8 Floor drain setara TOTO TX1BN 11.00 BH 463,400.00 5,097,400.00 0.0502% - 0.0000% - 0.0000% - 0.0000%
9 Kran air setara TOTO TX470SEN 3.00 BH 1,267,200.00 3,801,600.00 0.0375% - 0.0000% - 0.0000% - 0.0000%
10 Meja Beton lapis granite tile 60x60 7.05 M' 965,400.00 6,806,070.00 0.0671% 50.00 0.0335% 25.00 0.0168% 75.00 0.0503%
11 Pintu Tempered Toilet 12mm (lengkap aksesoris) 10.00 UNIT 3,095,700.00 30,957,000.00 0.3050% - 0.0000% - 0.0000% - 0.0000%
12 Sekat kaca Tempered Toilet 12mm (lengkap aksesoris) 26.94 M2 1,266,900.00 34,125,218.40 0.3362% - 0.0000% - 0.0000% - 0.0000%
13 Sink Laboratorium type ms 808 4.00 Unit 1,200,000.00 4,800,000.00 0.0473% - 0.0000% - 0.0000% - 0.0000%
14 Kran Air Laboratorium Leher Angsa 4.00 Unit 950,000.00 3,800,000.00 0.0374% - 0.0000% - 0.0000% - 0.0000%

A.1.7 PENGECATAN
1 Cat Dinding Interior Setara Dulux Easy Clean (standart) 1,748.62 M2 58,800.00 102,818,756.04 1.0131% 15.00 0.1520% 5.00 0.0507% 20.00 0.2026%
2 Cat Dinding Exterior Setara Dulux wheatershield (standart) 1,048.27 M2 72,500.00 75,999,575.00 0.7488% 10.00 0.0749% - 0.0000% 10.00 0.0749%
3 Cat bukaan kusen Setara Dulux Easy Clean 32.92 M2 58,800.00 1,935,696.00 0.0191% 10.00 0.0019% - 0.0000% 10.00 0.0019%
4 Cat Plafond Setara Vinilex 1,265.26 M2 38,700.00 48,965,368.50 0.4824% 60.00 0.2895% 20.00 0.0965% 80.00 0.3860%
5 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 78.60 M2 72,500.00 5,698,500.00 0.0561% - 0.0000% - 0.0000% - 0.0000%
6 Coating batu alam Setara Propan 403.02 M2 58,500.00 23,576,570.55 0.2323% 25.00 0.0581% 30.00 0.0697% 55.00 0.1278%
7 Finishing Lantai Parquet setara Ultran (3 lapis) 29.00 M2 80,900.00 2,346,100.00 0.0231% - 0.0000% - 0.0000% - 0.0000%
8 Cat listplank 30.29 M2 36,000.00 1,090,476.00 0.0107% 25.00 0.0027% 35.00 0.0038% 60.00 0.0064%
9 Kerok cat railing 17.97 M2 21,500.00 386,355.00 0.0038% 75.00 0.0029% 25.00 0.0010% 100.00 0.0038%
10 Cat Railing 17.97 M' 36,000.00 646,920.00 0.0064% 75.00 0.0048% 25.00 0.0016% 100.00 0.0064%

A.1.8 PENUTUP ATAP


1 Rangka Baja Ringan coating ZAM Setara J-STEEL - M2 183,100.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Genteng metal berpasir 41x110 cm Setara Rainbow - M2 138,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Nok metal - M' 167,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Flashing metal 10.00 M' 184,470.00 1,844,700.00 0.0182% 50.00 0.0091% 50.00 0.0091% 100.00 0.0182%
5 Almunium sheet t.0.2mm (dibawah genteng) - M2 33,600.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
6 Listplank GRC 2 susun 51.00 M2 179,200.00 9,139,200.00 0.0900% - 0.0000% 100.00 0.0900% 100.00 0.0900%
7 Listplank GRC 2 susun - M2 179,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
8 Plat Beton t. 15 cm (Tipe S1) 3.00 M3 3,713,900.00 11,141,700.00 0.1098% 25.00 0.0274% 75.00 0.0823% 100.00 0.1098%
9 Plat Beton t. 15 cm (Tipe S1) 3.30 M3 3,211,800.00 10,598,940.00 0.1044% 25.00 0.0261% 75.00 0.0783% 100.00 0.1044%
10 Water profing membrane 117.86 M2 185,600.00 21,874,073.60 0.2155% - 0.0000% - 0.0000% - 0.0000%
11 Screed untuk leveling atap dak 94.70 M2 90,700.00 8,589,290.00 0.0846% 20.00 0.0169% 30.00 0.0254% 50.00 0.0423%

A.1.9 PEK. PERLENGKAPAN LABORATORIUM


1 Island Bench/Meja Lab. 1,5X3.2 (M1) (lengkap dengan furniture > lihat gambar) 3.00 UNIT 11,650,500.00 34,951,500.00 0.3444% 60.00 0.2066% 35.00 0.1205% 95.00 0.3272%
2 Island Bench/Meja Lab. 1,5X5 (M2) (lengkap dengan furniture > lihat gambar) 6.00 UNIT 19,986,500.00 119,919,000.00 1.1815% 60.00 0.7089% 35.00 0.4135% 95.00 1.1225%
3 Wall Bench/Meja Lab, 0,8X3,85 (M3) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 5,089,703.83 5,089,703.83 0.0501% 60.00 0.0301% 35.00 0.0176% 95.00 0.0476%
4 Centrifugal fan Ex China 6.00 UNIT 3,500,000.00 21,000,000.00 0.2069% 60.00 0.1241% 35.00 0.0724% 95.00 0.1966%
- chemical resistant fan PP casing, electromotor ex Polandia,
- 1 hp speed 1400-2800 Rpm, 3phase, warranty motor 4 month

Page 10 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

5 UNIT Island Bench/Meja Lab. (0,9x0,9) (lengkap dengan furniture > lihat gambar) 4.00 UNIT 1,357,627.98 5,430,511.90 0.0535% 60.00 0.0321% 35.00 0.0187% 95.00 0.0508%
6 UNIT Island Bench/Meja Lab. (R. INSTRUMEN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 10,534,929.66 10,534,929.66 0.1038% 60.00 0.0623% 35.00 0.0363% 95.00 0.0986%
7 UNIT Island Bench/Meja Lab. (R.LAB GG 01) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 12,437,479.28 12,437,479.28 0.1225% 60.00 0.0735% 35.00 0.0429% 95.00 0.1164%
8 UNIT Island Bench/Meja Lab. (R.PENYIMPANAN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 7,509,085.87 7,509,085.87 0.0740% 60.00 0.0444% 35.00 0.0259% 95.00 0.0703%
9 UNIT Island Bench/Meja Lab. (LAB KIMIA 3) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 7,413,043.95 7,413,043.95 0.0730% 60.00 0.0438% 35.00 0.0256% 95.00 0.0694%
10 UNIT Island Bench/Meja Lab. (R.KIMIA 2) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 19,594,233.44 19,594,233.44 0.1931% 60.00 0.1158% 35.00 0.0676% 95.00 0.1834%
11 UNIT Island Bench/Meja Lab. (R.PVT) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 6,760,168.50 6,760,168.50 0.0666% 60.00 0.0400% 35.00 0.0233% 95.00 0.0633%
12 UNIT Island Bench/Meja Lab. (R.PERALATAN) (lengkap dengan furniture > lihat gambar) 1.00 UNIT 4,189,665.06 4,189,665.06 0.0413% 60.00 0.0248% 35.00 0.0144% 95.00 0.0392%
13 UNIT Island Bench/Meja Lab. (LAB KIMIA ATAS BAWAH 1) (lengkap dengan furniture > lihat g 2.00 UNIT 7,945,212.50 15,890,425.01 0.1566% 60.00 0.0939% 35.00 0.0548% 95.00 0.1487%
14 UNIT Island Bench/Meja Lab. (RUANG STUDIO MULTIMEDIA) (lengkap dengan furniture > liha 1.00 UNIT 30,101,457.16 30,101,457.16 0.2966% 60.00 0.1780% 35.00 0.1038% 95.00 0.2818%

SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI. 1 3,103,750,448.77 15.7469% 5.9424% 21.6893%

A.2 LANTAI.2
A.2.1 BONGKARAN
1 Pengikisan/pengerokan permukaan cat lama (dgn soda api sampai dasar) 2,055.40 M2 21,500.00 44,191,035.50 0.4354% 75.00 0.3266% 25.00 0.1089% 100.00 0.4354%
2 Bongkar Dinding 1 Bata 328.96 M2 30,000.00 9,868,695.00 0.0972% 75.00 0.0729% 25.00 0.0243% 100.00 0.0972%
3 Bongkar penutup atap & rangka atap 456.80 M2 35,000.00 15,988,000.00 0.1575% 80.00 0.1260% 20.00 0.0315% 100.00 0.1575%
4 Bongkar Listplank 272.10 M' 15,000.00 4,081,500.00 0.0402% 80.00 0.0322% 20.00 0.0080% 100.00 0.0402%
5 Bongkar Rangka Plafond & penutup plafond 937.19 M2 25,000.00 23,429,750.00 0.2308% 80.00 0.1847% 20.00 0.0462% 100.00 0.2308%
6 Bongkar Kusen Pintu Single 15.00 Un 50,000.00 750,000.00 0.0074% 75.00 0.0055% 25.00 0.0018% 100.00 0.0074%
7 Bongkar Kusen Pintu Dobel 9.00 Un 100,000.00 900,000.00 0.0089% 75.00 0.0067% 25.00 0.0022% 100.00 0.0089%
8 Bongkar plint lantai & perapihan 840.40 M' 25,000.00 21,010,000.00 0.2070% 75.00 0.1553% 25.00 0.0518% 100.00 0.2070%
9 Bongkar Meja beton 32.20 M' 50,000.00 1,610,000.00 0.0159% 75.00 0.0119% 25.00 0.0040% 100.00 0.0159%
10 Bongkar dinding 1/2 bata 99.77 m2 25,000.00 2,494,350.00 0.0246% 75.00 0.0184% 25.00 0.0061% 100.00 0.0246%
11 Bongkar Partisi Kaca R.MCR+R.Studio Fotografi 6.70 M2 25,000.00 167,500.00 0.0017% 75.00 0.0012% 25.00 0.0004% 100.00 0.0017%
12 Bongkar Partisi Kayu Dan Glaswool 32.40 M2 25,000.00 810,000.00 0.0080% 75.00 0.0060% 25.00 0.0020% 100.00 0.0080%
13 Bongkar Ring Balk 15/25 42.00 M' 50,000.00 2,100,000.00 0.0207% 75.00 0.0155% 25.00 0.0052% 100.00 0.0207%
14 Bongkar Jendela 1.00 Bh 50,000.00 50,000.00 0.0005% 75.00 0.0004% 25.00 0.0001% 100.00 0.0005%
15 Bongkar Lantai 24.70 M2 25,000.00 617,500.00 0.0061% 75.00 0.0046% 25.00 0.0015% 100.00 0.0061%
16 Bongkar Dinding Pelapis GRC 12.83 M2 25,000.00 320,750.00 0.0032% 75.00 0.0024% 25.00 0.0008% 100.00 0.0032%
17 Pembuangan Bongkaran Atap 1.00 Ls 500,000.00 500,000.00 0.0049% 75.00 0.0037% 25.00 0.0012% 100.00 0.0049%

A.2.2 DINDING
1 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 104.63 M2 138,200.00 14,459,175.00 0.1425% 85.00 0.1211% 15.00 0.0214% 100.00 0.1425%
2 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 56.69 M2 272,100.00 15,424,124.55 0.1520% 80.00 0.1216% 20.00 0.0304% 100.00 0.1520%
3 Dinding 2 Lapis bata (leveling atap) 52.20 M2 272,100.00 14,203,620.00 0.1399% 75.00 0.1050% 25.00 0.0350% 100.00 0.1399%
4 Plesteran semen instant Setara MM-201 Lt. 2 269.36 M2 97,400.00 26,235,761.40 0.2585% 50.00 0.1292% 50.00 0.1292% 100.00 0.2585%
5 Acian Dinding setara MM-301 t. 3 mm 269.36 M2 57,200.00 15,407,449.20 0.1518% 50.00 0.0759% 50.00 0.0759% 100.00 0.1518%
6 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2 97,400.00 2,337,600.00 0.0230% 50.00 0.0115% 50.00 0.0115% 100.00 0.0230%
7 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2 57,200.00 1,372,800.00 0.0135% 50.00 0.0068% 50.00 0.0068% 100.00 0.0135%
8 Kolom Praktis 10x10 17.20 M' 92,800.00 1,596,160.00 0.0157% 75.00 0.0118% 25.00 0.0039% 100.00 0.0157%
9 Balok lintel 8x10 (keliling bukaan kusen) 7.40 M' 130,300.00 964,220.00 0.0095% 75.00 0.0071% 25.00 0.0024% 100.00 0.0095%
10 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2 805.84 M' 50,600.00 40,775,504.00 0.4018% 50.00 0.2009% 40.00 0.1607% 90.00 0.3616%
11 Pekerjaan ring balk atas kusen 15/25 32.00 m' 330,000.00 10,560,000.00 0.1040% 75.00 0.0780% 25.00 0.0260% 100.00 0.1040%
12 Pasang Kolom 15/25 ( Opening Kusen ) 42.00 M' 330,000.00 13,860,000.00 0.1366% 75.00 0.1024% 25.00 0.0341% 100.00 0.1366%
13 Granitile 60 x 60 Setara Sincere 67.16 M2 307,600.00 20,658,416.00 0.2035% 85.00 0.1730% 15.00 0.0305% 100.00 0.2035%
14 Pasang Kolom 15/15 Ruang Kuliah 21.50 M' 208,800.00 4,489,200.00 0.0442% 75.00 0.0332% 25.00 0.0111% 100.00 0.0442%
15 Pasang Ring Balk 25/30 Ruang Kuliah 16.00 M' 696,000.00 11,136,000.00 0.1097% 75.00 0.0823% 25.00 0.0274% 100.00 0.1097%
16 Pasang Ring Balk 15/20 Ruang Kuliah 9.70 M' 556,800.00 5,400,960.00 0.0532% 75.00 0.0399% 25.00 0.0133% 100.00 0.0532%
17 Pasang Ring Balk 20/30 Ruang Kuliah 91.45 M' 556,800.00 50,919,360.00 0.5017% 75.00 0.3763% 25.00 0.1254% 100.00 0.5017%
18 Pasang Kolom 30/30 Ruang Kuliah 4.30 M' 835,200.00 3,591,360.00 0.0354% 75.00 0.0265% 25.00 0.0088% 100.00 0.0354%

A.2.3 LANTAI
1 Granitile 80x80 Motif Setara Sandimas Lt. 2 695.29 M2 386,700.00 268,868,643.00 2.6491% 50.00 1.3246% 35.00 0.9272% 85.00 2.2517%
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2 303.30 M2 540,700.00 163,994,310.00 1.6158% 50.00 0.8079% 25.00 0.4040% 75.00 1.2119%
3 Cat Epoxy 1000 Micr (R.Laboratorium) - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Curving Lantai (R.Laboratorium) - M' 60,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
5 Cat Epoxy 1000 Micr (plint t.20cm) - M2 180,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
6 Rabat Beton T:6cm Lantai R kuliah 33.30 M2 68,232.00 2,272,125.60 0.0224% 50.00 0.0112% 50.00 0.0112% 100.00 0.0224%
7 Pengupasan Lantai Dapur Existing 15.00 M2 25,000.00 375,000.00 0.0037% 75.00 0.0028% 25.00 0.0009% 100.00 0.0037%

A.2.4 KUSEN PINTU & JENDELA


Kusen baru Setara Alexindo 4" warna Tebal.1mm + Acesories setara Dekson
1 P2.1 1.00 Unit 8,367,700.00 8,367,700.00 0.0824% 15.00 0.0124% 5.00 0.0041% 20.00 0.0165%
2 P2.2 1.00 Unit 16,472,000.00 16,472,000.00 0.1623% 15.00 0.0243% 5.00 0.0081% 20.00 0.0325%
3 P2.1B (AL) 6.00 Unit 5,044,000.00 30,264,000.00 0.2982% 15.00 0.0447% 5.00 0.0149% 20.00 0.0596%

Page 11 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

4 P2.2A 16.00 Unit 9,258,300.00 148,132,800.00 1.4595% 15.00 0.2189% 5.00 0.0730% 20.00 0.2919%
5 J2.1 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 1.00 Unit 314,600.00 314,600.00 0.0031% 15.00 0.0005% 5.00 0.0002% 20.00 0.0006%
6 J2.1A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 2.00 Unit 321,100.00 642,200.00 0.0063% 15.00 0.0009% 5.00 0.0003% 20.00 0.0013%
7 J2.1B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 6.00 Unit 381,700.00 2,290,200.00 0.0226% 15.00 0.0034% 5.00 0.0011% 20.00 0.0045%
8 J2.1C (kerok cat lama & dicat ulang setara Dulux & aksesoris) 6.00 Unit 129,700.00 778,200.00 0.0077% 15.00 0.0012% 5.00 0.0004% 20.00 0.0015%
9 J2.1D (kerok cat lama & dicat ulang setara Dulux & aksesoris) 3.00 Unit 371,900.00 1,115,700.00 0.0110% 15.00 0.0016% 5.00 0.0005% 20.00 0.0022%
10 J2.2 (kerok cat lama & dicat ulang setara Dulux & aksesoris) 3.00 Unit 592,900.00 1,778,700.00 0.0175% 15.00 0.0026% 5.00 0.0009% 20.00 0.0035%
11 J2.2A (kerok cat lama & dicat ulang setara Dulux & aksesoris) 32.00 Unit 647,500.00 20,720,000.00 0.2042% 15.00 0.0306% 5.00 0.0102% 20.00 0.0408%
12 J2.2B (kerok cat lama & dicat ulang setara Dulux & aksesoris) 10.00 Unit 937,500.00 9,375,000.00 0.0924% 15.00 0.0139% 5.00 0.0046% 20.00 0.0185%
13 J2.2C (kerok cat lama & dicat ulang setara Dulux & aksesoris) 4.00 Unit 1,287,400.00 5,149,600.00 0.0507% 15.00 0.0076% 5.00 0.0025% 20.00 0.0101%
14 J2.2D (kerok cat lama & dicat ulang setara Dulux & aksesoris) 5.00 Unit 585,800.00 2,929,000.00 0.0289% 15.00 0.0043% 5.00 0.0014% 20.00 0.0058%
15 J2.LO (AL) 1.00 Unit 4,332,900.00 4,332,900.00 0.0427% 15.00 0.0064% 5.00 0.0021% 20.00 0.0085%
16 J2.5 (kerok cat lama & dicat ulang setara Dulux & aksesoris & kaca,frame) 1.00 Unit 3,602,700.00 3,602,700.00 0.0355% 15.00 0.0053% 5.00 0.0018% 20.00 0.0071%
17 J2.12 (kerok cat lama & dicat ulang setara Dulux & aksesoris & kaca,frame) 1.00 Unit 15,550,500.00 15,550,500.00 0.1532% 15.00 0.0230% 5.00 0.0077% 20.00 0.0306%
18 Sekat Partisi Kaca t.140cm 45.82 M2 659,000.00 30,196,698.00 0.2975% 15.00 0.0446% 5.00 0.0149% 20.00 0.0595%
19 Penutupan Kaca Jendela Menggunakan Gysum 68.81 M2 249,200.00 17,147,452.00 0.1690% 75.00 0.1267% 25.00 0.0422% 100.00 0.1690%

A.2.5 PLAFOND
1 Plafond Gypsum 9mm Setara Jayaboard 431.36 M2 124,600.00 53,747,082.20 0.5296% 60.00 0.3177% 35.00 0.1853% 95.00 0.5031%
2 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2 867.68 M2 154,800.00 134,316,477.00 1.3234% 50.00 0.6617% 35.00 0.4632% 85.00 1.1249%
3 Plafond GRC 4mm Set(plafon penutup samping di Teras) 121.73 M2 84,700.00 10,310,785.10 0.1016% 25.00 0.0254% 75.00 0.0762% 100.00 0.1016%
4 Plafond GRC 4mm Set(Overstek) 246.87 M2 84,700.00 20,909,889.00 0.2060% 35.00 0.0721% 65.00 0.1339% 100.00 0.2060%
5 List plafond Almunium U 2cm (shadow line) 285.08 M' 20,500.00 5,844,037.50 0.0576% 60.00 0.0345% 40.00 0.0230% 100.00 0.0576%

A.2.6 PENGECATAN
1 Cat Dinding Interior Setara Dulux Easy Clean (standart) Lt. 2 1,447.14 M2 60,400.00 87,407,256.00 0.8612% 15.00 0.1292% 20.00 0.1722% 35.00 0.3014%
2 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2 1,111.91 M2 74,100.00 82,392,234.60 0.8118% 15.00 0.1218% 20.00 0.1624% 35.00 0.2841%
3 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2 60,400.00 283,880.00 0.0028% 50.00 0.0014% 50.00 0.0014% 100.00 0.0028%
4 Cat Plafond gypsum Setara Vinilex 679.03 M2 41,200.00 27,976,077.20 0.2756% 45.00 0.1240% 15.00 0.0413% 60.00 0.1654%
5 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2 74,100.00 4,742,400.00 0.0467% - 0.0000% - 0.0000% - 0.0000%
6 Cat lisplank 38.44 M2 36,000.00 1,383,912.00 0.0136% 50.00 0.0068% 20.00 0.0027% 70.00 0.0095%
7 Kerok cat railing 78.00 M2 21,500.00 1,677,000.00 0.0165% 50.00 0.0083% 50.00 0.0083% 100.00 0.0165%
8 Cat Railing 78.00 M' 36,000.00 2,808,000.00 0.0277% 75.00 0.0208% 25.00 0.0069% 100.00 0.0277%

A.2.7 PENUTUP ATAP


1 Rangka Baja Ringan (Garansi minimal 25 Tahun) 434.05 M2 183,100.00 79,474,555.00 0.7830% - 0.0000% 100.00 0.7830% 100.00 0.7830%
2 Genteng metal berpasir 41x110 cm Setara Rainbow 456.80 M2 138,700.00 63,358,160.00 0.6243% - 0.0000% 100.00 0.6243% 100.00 0.6243%
3 Nok metal 52.75 M' 167,700.00 8,846,175.00 0.0872% - 0.0000% 100.00 0.0872% 100.00 0.0872%
4 Almunium sheet t.0.2mm (dibawah genteng) - M2 33,600.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
5 Listplank GRC 2 susu (Atap Baru) 48.97 M' 179,200.00 8,775,424.00 0.0865% - 0.0000% 100.00 0.0865% 100.00 0.0865%
6 Listplank GRC 2 susu (Atap lama) 219.00 M' 179,200.00 39,244,800.00 0.3867% - 0.0000% 100.00 0.3867% 100.00 0.3867%
7 Plat Beton t. 15 cm ( (bangunan tangga samping) 9.60 m3 3,713,900.00 35,653,440.00 0.3513% - 0.0000% 100.00 0.3513% 100.00 0.3513%
8 Water profing membrane 78.90 M2 185,600.00 14,643,840.00 0.1443% - 0.0000% - 0.0000% - 0.0000%
9 Balok baja untuk dudukan Rangka atap baja ringan 1.00 Unit 5,000,000.00 5,000,000.00 0.0493% - 0.0000% 100.00 0.0493% 100.00 0.0493%

Perbaikan Atap Gedung Tengah


1 Perbaikan atap yg bolong 139.00 ttk 30,000.00 4,170,000.00 0.0411% - 0.0000% 100.00 0.0411% 100.00 0.0411%
2 Perbaikan cerobong Asap (incl. Bongkar pasang atap, flashing, lisplank, sealant) 7.00 ttk 650,000.00 4,550,000.00 0.0448% 75.00 0.0336% 25.00 0.0112% 100.00 0.0448%
4 Pas. Jurai dalam (galvalum 90cm) 88.00 m1 368,940.00 32,466,720.00 0.3199% 25.00 0.0800% 75.00 0.2399% 100.00 0.3199%
5 Bongkar pasang atap yg rusak (Atap menggunakan atap eksisting) 236.20 m2 55,000.00 12,991,000.00 0.1280% 75.00 0.0960% 25.00 0.0320% 100.00 0.1280%
6 Penggantian atap konsol (Atap menggunakan atap eksisting) 112.70 m2 55,000.00 6,198,500.00 0.0611% 25.00 0.0153% 75.00 0.0458% 100.00 0.0611%
7 Penambahan atap teras (Atap menggunakan atap eksisting) 44.80 m2 55,000.00 2,464,000.00 0.0243% 75.00 0.0182% 25.00 0.0061% 100.00 0.0243%
8 Tutup kisi2 atap limas terpotong 6.00 ttk 3,250,000.00 19,500,000.00 0.1921% 75.00 0.1441% 25.00 0.0480% 100.00 0.1921%
9 Tutup dinding sopi2 12.30 m2 292,500.00 3,597,750.00 0.0354% 50.00 0.0177% 50.00 0.0177% 100.00 0.0354%
10 Pas. Lisplank + dudukan 348.00 m1 130,000.00 45,240,000.00 0.4457% 50.00 0.2229% 50.00 0.2229% 100.00 0.4457%
11 Flashing dinding 42.60 m1 184,470.00 7,858,422.00 0.0774% 75.00 0.0581% 25.00 0.0194% 100.00 0.0774%

A.2.8 PEK. PERLENGKAPAN LABORATORIUM


1 Island Bench/Meja Lab. 1,5X5 (M2) (lengkap dengan furniture > lihat gambar) 3.00 UNIT 19,986,500.00 59,959,500.00 0.5908% 50.00 0.2954% 45.00 0.2658% 95.00 0.5612%
2 Centrifugal fan Ex China 1.00 UNIT 3,500,000.00 3,500,000.00 0.0345% - 0.0000% 95.00 0.0328% 95.00 0.0328%
- chemical resistant fan PP casing, electromotor ex Polandia,
- 1 hp speed 1400-2800 Rpm, 3phase, warranty motor 4 month

A.2.9 Pekerjaan Penebangan Pohon


Pohon Pangsor 1.00 bh 1,275,000.00 1,275,000.00 0.0126% - 0.0000% - 0.0000% - 0.0000%
Pohon Karet 1.00 bh 1,700,000.00 1,700,000.00 0.0167% - 0.0000% - 0.0000% - 0.0000%
Pohon Buni 1.00 bh 425,000.00 425,000.00 0.0042% - 0.0000% - 0.0000% - 0.0000%

Page 12 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

Pohon Mangga 1.00 bh 1,275,000.00 1,275,000.00 0.0126% - 0.0000% - 0.0000% - 0.0000%


Pohon Salam 1.00 bh 2,550,000.00 2,550,000.00 0.0251% - 0.0000% - 0.0000% - 0.0000%
Pohon Angsana 1.00 bh 2,550,000.00 2,550,000.00 0.0251% - 0.0000% - 0.0000% - 0.0000%
Pohon Randu 1.00 bh 8,500,000.00 8,500,000.00 0.0837% - 0.0000% - 0.0000% - 0.0000%

SUB TOTAL PEKERJAAN ARSITEKTUR LANTAI. 2 2,046,517,135.85 7.9008% 7.2120% 15.1128%

III. PEKERJAAN KORIDOR TERAS LANTAI.1


1 PEKERJAAN SIPIL
A. PEK. TANAH
1 Galian tanah pondasi setempat - M3 106,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Urugan tanah kembali pondasi setempat - M3 30,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Urug pasir bawah pondasi setempat t= 5 cm - M3 405,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Urug pasir bawah sloof t= 5 cm - M3 405,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

B. PEK. PONDASI
1 Pondasi Plat setempat P1(60x60x30) ; K-175 - M3 6,687,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Sloof S1 (15x25) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

C. PEK. KONSTRUKSI BETON


1 Kolom K-2 (30x30) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

2 PEKERJAAN ARSITEKTUR
A. PEK. DINDING
1 Batu alam andesit bintik bakar cipanca 11.20 M2 362,800.00 4,063,360.00 0.0400% - 0.0000% 100.00 0.0400% 100.00 0.0400%

B. PEK. PENUTUP ATAP


1 Atap Polycarbonate Solid SOLARFLAT T=6mm Rangka Holow Almunium - M2 943,118.57 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Kolom pipa 5" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Kolom pipa 4" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Balok pipa 5" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
5 Plat baja 300x300x10 - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
6 Besi Plat strip 5mmx50mm - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
7 Angker mur baut dia.19/panjang 60cm - BH 85,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
8 Dinabolt S10 P=12cm - BH 16,500.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

C. PEK. PENGECATAN
1 Cat Pipa - M2 50,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

SUB TOTAL PEKERJAAN KORIDOR TERAS LANTAI.1 4,063,360.00 0.0000% 0.0400% 0.0400%

IV. PEKERJAAN KORIDOR PENGHUBUNG


1 PEKERJAAN SIPIL
A. PEK. TANAH
1 Galian tanah pondasi setempat - M3 106,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Urugan tanah kembali pondasi setempat - M3 30,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Urug pasir bawah pondasi setempat t= 5 cm - M3 405,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Urug pasir bawah sloof t= 5 cm - M3 405,700.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

B. PEK. PONDASI
1 Pondasi Plat setempat P1(60x60x30) ; K-175 - M3 5,228,886.59 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Sloof S1 (15x25) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

C. PEK. KONSTRUKSI BETON


1 Kolom K-2 (30x30) ; K-175 - M3 7,669,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

2 PEKERJAAN ARSITEKTUR
A. PEK. DINDING
1 Batu alam andesit bintik bakar cipanca - M2 362,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

B. PEK. PENUTUP ATAP


1 Atap Polycarbonate Solid SOLARFLAT T=6mm Rangka Holow Almunium - M2 943,118.57 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
2 Kolom pipa 5" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
3 Kolom pipa 4" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
4 Balok pipa 5" - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

Page 13 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

5 Plat baja 300x300x10 - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%


6 Besi Plat strip 5mmx50mm - KG 25,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
7 Angker mur baut dia.19/panjang 60cm - BH 85,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
8 Dinabolt S10 P=12cm - BH 16,500.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
9 Genteng metal berpasir 41x110 cm Setara Rainbow 189.20 M2 138,700.00 26,242,040.00 0.2586% 25.00 0.0646% 75.00 0.1939% 100.00 0.2586%
10 Rangka Baja Ringan 19.00 M2 183,100.00 3,478,900.00 0.0343% 25.00 0.0086% 75.00 0.0257% 100.00 0.0343%
11 Nok metal 30.00 M' 167,700.00 5,031,000.00 0.0496% 25.00 0.0124% 75.00 0.0372% 100.00 0.0496%
12 Pas. Lisplank + dudukan 56.80 M' 130,000.00 7,384,000.00 0.0728% 50.00 0.0364% 50.00 0.0364% 100.00 0.0728%
13 Pas. Jurai dalam (galvalum 90cm) 3.90 M' 368,940.00 1,438,866.00 0.0142% 50.00 0.0071% 50.00 0.0071% 100.00 0.0142%
14 Flashing dinding 6.70 M' 184,470.00 1,235,949.00 0.0122% 50.00 0.0061% 50.00 0.0061% 100.00 0.0122%

D. PEK. LANTAI
1 Granitile 60x60 Unpolish Setara Sandimas 133.00 M2 418,500.00 55,660,500.00 0.5484% - 0.0000% 30.00 0.1645% 30.00 0.1645%
2 Stepnosing tangga (custom pabrikan) 17.60 M' 68,100.00 1,198,560.00 0.0118% - 0.0000% - 0.0000% - 0.0000%
3 Bius Beton Bulat Diameter 20 10.00 M' 176,040.00 1,760,400.00 0.0173% - 0.0000% - 0.0000% - 0.0000%

G. PEK. PENGECATAN
1 Cat Pipa - M2 50,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

SUB TOTAL PEKERJAAN KORIDOR PENGHUBUNG 103,430,215.00 0.1352% 0.4709% 0.6060%

V. PEKERJAAN GWT 10m3 DAN RUMAH POMPA


A PEKERJAAN GWT
1 Galian tanah max kedalam 2 m' 31.50 M3 113,500.00 3,575,250.00 0.0352% 75.00 0.0264% 25.00 0.0088% 100.00 0.0352%
2 Pemadatan tanah 7.50 M3 14,100.00 105,750.00 0.0010% 75.00 0.0008% 25.00 0.0003% 100.00 0.0010%
3 Urugan pasir t. 10 cm 1.20 M3 335,800.00 402,960.00 0.0040% 75.00 0.0030% 25.00 0.0010% 100.00 0.0040%
4 Pas. Batako Press 26.00 M3 115,500.00 3,003,000.00 0.0296% 80.00 0.0237% 20.00 0.0059% 100.00 0.0296%
5 Bekisting dengan Multipleks 12mm 27.44 M3 149,500.00 4,102,280.00 0.0404% 90.00 0.0364% 10.00 0.0040% 100.00 0.0404%
6 Lantai kerja/beton tumbuk 1pc : 3ps : 5kr 0.60 M3 1,137,200.00 682,320.00 0.0067% 90.00 0.0061% 10.00 0.0007% 100.00 0.0067%
7 Pekerjaan beton bertulang
- Dinding t. 15 cm; K-300; M7 2 lapis 4.12 M3 1,934,173.14 7,961,056.65 0.0784% 90.00 0.0706% 10.00 0.0078% 100.00 0.0784%
- Dinding man hole 60x60x15; K-250; M6 1 lapis 0.19 M3 3,270,600.00 627,955.20 0.0062% 90.00 0.0056% 10.00 0.0006% 100.00 0.0062%
- Plat dasar t. 15 cm; K-250; M6 2 lapis 1.58 M3 3,221,368.29 5,073,655.05 0.0500% 90.00 0.0450% 10.00 0.0050% 100.00 0.0500%
- Plat atas (keraton t. 12 + beton. t. 5 cm) 10.50 M2 186,210.00 1,955,205.00 0.0193% 90.00 0.0173% 10.00 0.0019% 100.00 0.0193%
- Screeding t. 3 cm 27.00 M2 90,700.00 2,448,900.00 0.0241% 90.00 0.0217% 10.00 0.0024% 100.00 0.0241%
- Balok 20x30; K-250; besi beton 0.25 M3 6,957,630.00 1,753,322.76 0.0173% 90.00 0.0155% 10.00 0.0017% 100.00 0.0173%
'- MM-503 - pelapis kedap air/1,5 m2 (3 kg) 48.44 M2 110,000.00 5,328,400.00 0.0525% 90.00 0.0472% 10.00 0.0052% 100.00 0.0525%
8 Plesteran semen instant Setara MM-201 0.72 M2 90,700.00 65,304.00 0.0006% 90.00 0.0006% 10.00 0.0001% 100.00 0.0006%
9 Acian semen instant Setara MM-301 0.72 M2 52,800.00 38,016.00 0.0004% 90.00 0.0003% 10.00 0.0000% 100.00 0.0004%
10 Plesteran semen instant Setara MM-201 27.44 M2 90,700.00 2,488,808.00 0.0245% 90.00 0.0221% 10.00 0.0025% 100.00 0.0245%
11 Acian semen instant Setara MM-301 27.44 M2 52,800.00 1,448,832.00 0.0143% 90.00 0.0128% 10.00 0.0014% 100.00 0.0143%
12 Tutup man hole 60X60 0.36 UNIT 5,000,000.00 1,800,000.00 0.0177% 90.00 0.0160% 10.00 0.0018% 100.00 0.0177%
13 Tangga monyet stainles 2" 1.00 UNIT 1,250,000.00 1,250,000.00 0.0123% - 0.0000% - 0.0000% - 0.0000%
14 Pipa ventilasi GIP medium A d. 4" H 1 m 5.00 UNIT 350,000.00 1,750,000.00 0.0172% 90.00 0.0155% 10.00 0.0017% 100.00 0.0172%
- Balok Sloof 20x30; K-250; besi beton 0.25 M3 6,957,630.00 1,753,322.76 0.0173% 90.00 0.0155% 10.00 0.0017% 100.00 0.0173%

B PEK. RUMAH POMPA 3x2 m2


1 Pekerjaan beton bertulang :
- Kolom 15x15; K-175; besi beton 3.20 M' 84,100.00 269,120.00 0.0027% 75.00 0.0020% 25.00 0.0007% 100.00 0.0027%
- Ring balok 15x20 3.20 M' 168,200.00 538,240.00 0.0053% 75.00 0.0040% 25.00 0.0013% 100.00 0.0053%
2 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) 2.56 M2 133,800.00 342,528.00 0.0034% 75.00 0.0025% 25.00 0.0008% 100.00 0.0034%
3 Plesteran semen instant Setara MM-201 5.12 M2 90,700.00 464,384.00 0.0046% 75.00 0.0034% 25.00 0.0011% 100.00 0.0046%
4 Acian semen instant Setara MM-301 5.12 M2 52,800.00 270,336.00 0.0027% 75.00 0.0020% 25.00 0.0007% 100.00 0.0027%
5 Cat Dinding Exterior Setara Dulux wheatershield (standart) 5.12 M2 72,500.00 371,200.00 0.0037% 75.00 0.0027% 25.00 0.0009% 100.00 0.0037%
6 Instalasi stop kontak 500W 1.00 titik 486,400.00 486,400.00 0.0048% - 0.0000% - 0.0000% - 0.0000%
7 Tutup Rumah pompa 1.00 bh 500,000.00 500,000.00 0.0049% - 0.0000% - 0.0000% - 0.0000%
8 Stop kontak 500 W, 1P setara phillips / clipsal 1.00 bh 46,800.00 46,800.00 0.0005% - 0.0000% - 0.0000% - 0.0000%
9 MCCB setara phillips / clipsal 1.00 bh 849,977.34 849,977.34 0.0084% - 0.0000% - 0.0000% - 0.0000%
- 10 A : 1
-4A : 2
- Box panel plat : 1

SUB TOTAL PEKERJAAN GWT 10 M3 DAN RUMAH POMPA 51,753,322.76 0.4188% 0.0602% 0.4790%

VI. PEKERJAAN MEKANIKAL


M.1 LANTAI 1

Page 14 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

M.1.1 PERALATAN UTAMA INSTALASI PLUMBING


1 Pasang Septick tank Biotech RC-08 termasuk galian dan acc/Terpasang 1.00 Unit 17,702,200.00 17,702,200.00 0.1744% - 0.0000% 85.00 0.1483% 85.00 0.1483%
2 Pasang Septick tank Biotech RC-03 termasuk galian dan acc/Terpasang 1.00 Unit 12,267,800.00 12,267,800.00 0.1209% - 0.0000% 85.00 0.1027% 85.00 0.1027%
2 Pasang Septick tank Biotech RC-03 untuk limbah kimia/Terpasang 3.00 unit 12,267,800.00 36,803,400.00 0.3626% - 0.0000% 50.00 0.1813% 50.00 0.1813%
3 Sumur resapan kapasitas 1m3 2.00 Unit 3,083,200.00 6,166,400.00 0.0608% - 0.0000% 50.00 0.0304% 50.00 0.0304%
4 Pompa booster setara Walrus Kap. 70 Lpm Head 27 M 1.00 unit 6,476,300.00 6,476,300.00 0.0638% - 0.0000% 30.00 0.0191% 30.00 0.0191%
Instalasi pompa booster lengkap dengan pemipaan dan acc.
( pompa ex Walrus ,Radar,watter mur,bal valve dll sesuai systeem )
5 Pompa transfer setara DAB Kap. 100 Lpm Head 30-60 M 2.00 unit 5,730,300.00 11,460,600.00 0.1129% - 0.0000% 50.00 0.0565% 50.00 0.0565%
6 Emergency Shower setara Shaka 1.00 set 8,128,700.00 8,128,700.00 0.0801% - 0.0000% - 0.0000% - 0.0000%
7 Roof tank stenlis setara Excel kapasitas 1,1M3 2.00 unit 8,067,900.00 16,135,800.00 0.1590% - 0.0000% 90.00 0.1431% 90.00 0.1431%

INSTALASI PEMIPAAN GWT


1 Watermeter 2" (flange") 1.00 unit 2,750,000.00 2,750,000.00 0.0271% - 0.0000% - 0.0000% - 0.0000%

INSTALASI PENGGANTIAN PIPA MAIN LINE AIR BERSIH EXISTING


1 Pipa PPR PN 10 dia.2 (Rucika Green) 170.00 M' 204,900.00 34,833,000.00 0.3432% - 0.0000% 85.00 0.2917% 85.00 0.2917%
2 Get valve 2'' 1.00 buah 675,000.00 675,000.00 0.0067% - 0.0000% - 0.0000% - 0.0000%
3 Fitting 1.00 ls 1,177,500.00 1,177,500.00 0.0116% - 0.0000% 85.00 0.0099% 85.00 0.0099%

M.1.2 INST. PEMIPAAN AIR BERSIH (PVC AW SETARA RUCIKA)


1 Pipa dari pompa transfer ke RT dia. 1,5" 50.00 M' 36,200.00 1,810,000.00 0.0178% - 0.0000% 95.00 0.0169% 95.00 0.0169%
2 dia2" 79.00 M' 42,400.00 3,349,600.00 0.0330% - 0.0000% 95.00 0.0314% 95.00 0.0314%
2 dia 1 1/2" 15.00 M' 36,200.00 543,000.00 0.0054% - 0.0000% 95.00 0.0051% 95.00 0.0051%
2 dia 1" 102.00 M' 26,800.00 2,733,600.00 0.0269% - 0.0000% 95.00 0.0256% 95.00 0.0256%
3 dia. 3/4" - M' 23,500.00 - 0.0000% - 0.0000% 0.0000% - 0.0000%
4 dia. 1/2" 52.00 M' 20,800.00 1,081,600.00 0.0107% - 0.0000% 95.00 0.0101% 95.00 0.0101%
5 Fitting 1.00 Lot 1,177,500.00 1,177,500.00 0.0116% - 0.0000% 95.00 0.0110% 95.00 0.0110%
6 Gate Valve dia. 1 " 9.00 Bh 267,400.00 2,406,600.00 0.0237% - 0.0000% 95.00 0.0225% 95.00 0.0225%

M.1.3 INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN)
1 dia. 6" 15.00 M' 143,200.00 2,148,000.00 0.0212% - 0.0000% 95.00 0.0201% 95.00 0.0201%
1 dia. 4" 48.00 M' 118,800.00 5,702,400.00 0.0562% - 0.0000% 95.00 0.0534% 95.00 0.0534%
2 dia. 3" 9.00 M' 80,800.00 727,200.00 0.0072% - 0.0000% 95.00 0.0068% 95.00 0.0068%
3 dia. 2" 118.00 M' 49,500.00 5,841,000.00 0.0576% - 0.0000% 95.00 0.0547% 95.00 0.0547%
4 dia 3" PPR dari limbah kimia 27.00 M' 293,800.00 7,932,600.00 0.0782% - 0.0000% 95.00 0.0743% 95.00 0.0743%
dia 2" PPR 20.00 M' 196,400.00 3,928,000.00 0.0387% - 0.0000% 95.00 0.0368% 95.00 0.0368%
dia 4" PPR 16.00 M' 390,000.00 6,240,000.00 0.0615% - 0.0000% 95.00 0.0584% 95.00 0.0584%
5 Fitting 1.00 Lot 2,020,900.00 2,020,900.00 0.0199% - 0.0000% 95.00 0.0189% 95.00 0.0189%
6 dia. 4" 2.00 Bh 338,800.00 677,600.00 0.0067% - 0.0000% 95.00 0.0063% 95.00 0.0063%
7 dia. 3" 1.00 Bh 153,800.00 153,800.00 0.0015% - 0.0000% 95.00 0.0014% 95.00 0.0014%
8 dia. 2" 1.00 Bh 109,000.00 109,000.00 0.0011% - 0.0000% 95.00 0.0010% 95.00 0.0010%

M.1.4 AIR CONDITIONING (UNIT AC VRV)


Pengadaan dan pemasangan instalasi dan unit ac lengkap
dengan material bantu dan acc dan pipa drain Ac Pvc dia
1/2"-3/4" termasuk bobokan dinding sesuai gambar
dan spesifikasi teknis
1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 7.200 BTUH 1.00 unit 11,913,900.00 11,913,900.00 0.1174% - 0.0000% 95.00 0.1115% 95.00 0.1115%
2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 9.600 BTUH 1.00 Unit 12,540,200.00 12,540,200.00 0.1236% - 0.0000% 95.00 0.1174% 95.00 0.1174%
3 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 15.400 BTUH 1.00 Unit 14,104,700.00 14,104,700.00 0.1390% - 0.0000% 95.00 0.1320% 95.00 0.1320%
4 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 19.100 BTUH 4.00 Unit 16,657,100.00 66,628,400.00 0.6565% - 0.0000% 95.00 0.6237% 95.00 0.6237%
5 Pengadaan dan Pemasangan IU VRV Split Cassette Type 19.100 BTUH 2.00 Unit 22,886,100.00 45,772,200.00 0.4510% - 0.0000% 95.00 0.4284% 95.00 0.4284%
5 Pengadaan dan Pemasangan IU VRV Split Cassette Type 24.200 BTUH 3.00 Unit 24,107,400.00 72,322,200.00 0.7126% - 0.0000% 95.00 0.6769% 95.00 0.6769%
6 Pengadaan dan Pemasangan IU VRV Split Cassette Type 30.700 BTUH 2.00 Unit 25,162,400.00 50,324,800.00 0.4958% - 0.0000% 95.00 0.4710% 95.00 0.4710%
7 Pengadaan dan Pemasangan IU VRV Split Cassette Type 38.200 BTUH 2.00 Unit 25,868,400.00 51,736,800.00 0.5098% - 0.0000% 95.00 0.4843% 95.00 0.4843%
8 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 19.100 BTUH LT. Basement 3.00 Unit 16,657,100.00 49,971,300.00 0.4924% - 0.0000% 95.00 0.4677% 95.00 0.4677%
9 Pengadaan dan Pemasangan OU VRV Lt 1
Kap. 131.000 BTUH (4.300 cfm) (Cadangan 1 unit) 2.00 unit 247,140,900.00 494,281,800.00 4.8701% - 0.0000% 95.00 4.6266% 95.00 4.6266%
Kap. 186.000 BTUH (6.200 cfm) (Cadangan 1 unit) 1.00 unit 329,018,700.00 329,018,700.00 3.2418% - 0.0000% 95.00 3.0797% 95.00 3.0797%
10 REFNET Joint 14.00 bh 2,402,400.00 33,633,600.00 0.3314% - 0.0000% 95.00 0.3148% 95.00 0.3148%
11 Navigator Controller 16.00 bh 1,515,800.00 24,252,800.00 0.2390% - 0.0000% 95.00 0.2270% 95.00 0.2270%
12 OU Connection Kit 16.00 bh 1,301,300.00 20,820,800.00 0.2051% - 0.0000% 95.00 0.1949% 95.00 0.1949%
13 Pipa Refrigerant c/w Insulation
Copper Refrigerant Pipe 1/4" (0,71 mm) 78.00 m' 95,900.00 7,480,200.00 0.0737% - 0.0000% 95.00 0.0700% 95.00 0.0700%
Copper Refrigerant Pipe 3/8" (0,71 mm) 120.00 m' 107,400.00 12,888,000.00 0.1270% - 0.0000% 95.00 0.1206% 95.00 0.1206%
Copper Refrigerant Pipe 1/2" (0,71 mm) 111.00 m' 124,500.00 13,819,500.00 0.1362% - 0.0000% 95.00 0.1294% 95.00 0.1294%

Page 15 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

Copper Refrigerant Pipe 5/8" (0,71 mm) 82.00 m' 143,800.00 11,791,600.00 0.1162% - 0.0000% 95.00 0.1104% 95.00 0.1104%
Copper Refrigerant Pipe 3/4" (0,89 mm) 12.00 m' 204,600.00 2,455,200.00 0.0242% - 0.0000% 95.00 0.0230% 95.00 0.0230%
Copper Refrigerant Pipe 7/8" (1,14 mm) 47.00 m' 232,000.00 10,904,000.00 0.1074% - 0.0000% 95.00 0.1021% 95.00 0.1021%
Copper Refrigerant Pipe 1 1/8" (1,27 mm) 52.00 m' 303,000.00 15,756,000.00 0.1552% - 0.0000% 95.00 0.1475% 95.00 0.1475%
Copper Refrigerant Pipe 1 3/8" (1,40 mm) - m' 363,300.00 - 0.0000% - 0.0000% 0.0000% - 0.0000%
Copper Refrigerant Pipe 1 5/8" (1,52 mm) - m' 453,000.00 - 0.0000% - 0.0000% 0.0000% - 0.0000%
Fitting Copper Refrigerant Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 95.00 0.0388% 95.00 0.0388%
Hanger Refrigerant Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 95.00 0.0049% 95.00 0.0049%
Supporting Material Refrigerant Pipe 1.00 lot 8,300,000.00 8,300,000.00 0.0818% - 0.0000% 95.00 0.0777% 95.00 0.0777%
14 Pemipaan Drain AC VRV c/w Insulation
PVC Drain Pipe 3/4", class AW 74.00 m' 20,700.00 1,531,800.00 0.0151% - 0.0000% 95.00 0.0143% 95.00 0.0143%
PVC Drain Pipe 1", class AW 34.00 m' 23,700.00 805,800.00 0.0079% - 0.0000% 95.00 0.0075% 95.00 0.0075%
PVC Drain Pipe 1 1/4", class AW 9.00 m' 29,300.00 263,700.00 0.0026% - 0.0000% 95.00 0.0025% 95.00 0.0025%
PVC Drain Pipe 1 1/2", class AW 6.00 m' 31,900.00 191,400.00 0.0019% - 0.0000% 95.00 0.0018% 95.00 0.0018%
PVC Drain Pipe 2", class AW - m' 147,900.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Fitting Drain Pipe 1.00 lot 4,980,000.00 4,980,000.00 0.0491% - 0.0000% 95.00 0.0466% 95.00 0.0466%
Hanger Drain Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 95.00 0.0049% 95.00 0.0049%
Supporting Material Drain Pipe 1.00 lot 8,300,000.00 8,300,000.00 0.0818% - 0.0000% 95.00 0.0777% 95.00 0.0777%
15 Pengkabelan AC VRV c/w Conduit
Power Cable NYM 3 x 2,5 mm2 186.00 m' 26,100.00 4,854,600.00 0.0478% - 0.0000% 95.00 0.0454% 95.00 0.0454%
Power Cable NYY 3 x 4 mm2 240.00 m' 39,800.00 9,552,000.00 0.0941% - 0.0000% 95.00 0.0894% 95.00 0.0894%
Power Cable NYY 4 x 16 mm2 24.00 m' 129,300.00 3,103,200.00 0.0306% - 0.0000% - 0.0000% - 0.0000%
Grounding Cable NYA 6 mm2 130.00 m' 21,200.00 2,756,000.00 0.0272% - 0.0000% - 0.0000% - 0.0000%
Control Cable AWG 18 370.00 m' 27,400.00 10,138,000.00 0.0999% - 0.0000% 90.00 0.0899% 90.00 0.0899%
Thermostat Cable NYYHY 2 x 0,75 mm2 - m' 17,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Supporting Material Electrical 1.00 lot 9,960,000.00 9,960,000.00 0.0981% - 0.0000% 90.00 0.0883% 90.00 0.0883%
16 Hanger Indoor Unit 16.00 unit 186,800.00 2,988,800.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
17 Dudukan Condensing Unit 6.00 unit 498,000.00 2,988,000.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
18 Consumables & waste item 1.00 lott 9,130,000.00 9,130,000.00 0.0900% - 0.0000% 95.00 0.0855% 95.00 0.0855%
19 Exhaust Fan High Pressure Industrial KDK 40GSC 2.125 cfm 5.00 unit 6,079,600.00 30,398,000.00 0.2995% - 0.0000% 95.00 0.2845% 95.00 0.2845%
20 Testing & Commissioning 1.00 ls 2,075,000.00 2,075,000.00 0.0204% - 0.0000% - 0.0000% - 0.0000%

M.1.5 INSTALASI GAS.(PIPA GIV MEDIUM SETARA SPINDO)


Pengadaan dan pemasangan pipa gas bahan galvanis medium
sesuai spesifikasi teknis dan gambar, terpasang lengkap
(Pipa Galvanis medium setara Spindo)
Instalasi exposes di atas permukaan tanah dan diberi support concrete
setiap 2.5m
1 dia. 3/4" ,dari jaringan luar ( gas PGN) ke gedung 112.00 M' 62,500.00 7,000,000.00 0.0690% - 0.0000% 90.00 0.0621% 90.00 0.0621%
2 dia. 3/4" 49.00 M' 62,500.00 3,062,500.00 0.0302% - 0.0000% 95.00 0.0287% 95.00 0.0287%
3 dia. 1/2" 8.00 M' 47,100.00 376,800.00 0.0037% - 0.0000% 95.00 0.0035% 95.00 0.0035%
4 Gate valve dia 3/4 12.00 bh 276,000.00 3,312,000.00 0.0326% - 0.0000% 95.00 0.0310% 95.00 0.0310%
5 Kran Gas 18.00 bh 112,900.00 2,032,200.00 0.0200% - 0.0000% - 0.0000% - 0.0000%
6 Pekerjaan Galian tanah dan pengurugan u/pipa 3/4" 112.00 m' 23,600.00 2,643,200.00 0.0260% - 0.0000% 95.00 0.0247% 95.00 0.0247%
7 Fitting 1.00 lot 1,714,900.00 1,714,900.00 0.0169% - 0.0000% 90.00 0.0152% 90.00 0.0152%

SUB TOTAL PEKERJAAN MEKANIKAL LANTAI 1 1,693,220,500.00 0.0000% 15.2774% 15.2774%

M.2 LANTAI 2
M.2.1 INST. PEMIPAAN AIR BERSIH (PVC AW SETARA WAVIN)
1 Pipa dari pompa booster tiap shaft dia. 1" 8.00 M' 26,800.00 214,400.00 0.0021% - 0.0000% 95.00 0.0020% 95.00 0.0020%
2 dia. 3/4" 8.00 M' 23,500.00 188,000.00 0.0019% - 0.0000% 95.00 0.0018% 95.00 0.0018%
3 dia. 1/2" 15.00 M' 20,800.00 312,000.00 0.0031% - 0.0000% 95.00 0.0029% 95.00 0.0029%
4 Fitting 1.00 Lot 71,500.00 71,500.00 0.0007% - 0.0000% 95.00 0.0007% 95.00 0.0007%
5 Gate Valve dia. 1 " 2.00 Bh 267,400.00 534,800.00 0.0053% - 0.0000% 50.00 0.0026% 50.00 0.0026%

M.2.2 INST. PEMIPAAN AIR KOTOR, BEKAS & VENT (PVC AW SETARA WAVIN)
1 dia. 4" 18.00 M' 118,800.00 2,138,400.00 0.0211% - 0.0000% 95.00 0.0200% 95.00 0.0200%
2 dia. 3" 7.00 M' 80,800.00 565,600.00 0.0056% - 0.0000% 95.00 0.0053% 95.00 0.0053%
3 dia. 2" 12.00 M' 49,500.00 594,000.00 0.0059% - 0.0000% 95.00 0.0056% 95.00 0.0056%
4 Fitting 1.00 Lot 329,900.00 329,900.00 0.0033% - 0.0000% 90.00 0.0029% 90.00 0.0029%
dia 3" PPR dari limbah kimia 15.00 M' 293,800.00 4,407,000.00 0.0434% - 0.0000% 95.00 0.0413% 95.00 0.0413%
dia 2" PPR 24.00 M' 196,400.00 4,713,600.00 0.0464% - 0.0000% 95.00 0.0441% 95.00 0.0441%

M.2.3 INST. PEMIPAAN AIR HUJAN (PVC AW SETARA WAVIN)


1 dia 4" 65.00 m 118,800.00 7,722,000.00 0.0761% - 0.0000% 80.00 0.0609% 80.00 0.0609%
2 Roof Drain dia 4" 10.00 bh 250,900.00 2,509,000.00 0.0247% - 0.0000% 95.00 0.0235% 95.00 0.0235%

Page 16 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

M.2.4 AIR CONDITIONING (UNIT AC VRV)


Pengadaan dan pemasangan instalasi dan unit ac lengkap
dengan material bantu dan acc dan pipa drain Ac Pvc dia
1/2"-3/4" termasuk bobokan dinding sesuai gambar
dan spesifikasi teknis
1 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 7.200 BTUH 1.00 unit 11,913,900.00 11,913,900.00 0.1174% - 0.0000% 95.00 0.1115% 95.00 0.1115%
2 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 9.600 BTUH 2.00 Unit 12,540,200.00 25,080,400.00 0.2471% - 0.0000% 95.00 0.2348% 95.00 0.2348%
3 Pengadaan dan Pemasangan IU VRV Wall Mounted Type 19.100 BTUH 3.00 Unit 16,657,100.00 49,971,300.00 0.4924% - 0.0000% 95.00 0.4677% 95.00 0.4677%
4 Pengadaan dan Pemasangan IU VRV Split Cassette Type 19.100 BTUH 5.00 Unit 22,886,100.00 114,430,500.00 1.1275% - 0.0000% 95.00 1.0711% 95.00 1.0711%
5 Pengadaan dan Pemasangan IU VRV Split Cassette Type 24.200 BTUH 2.00 Unit 24,107,400.00 48,214,800.00 0.4751% - 0.0000% 80.00 0.3800% 80.00 0.3800%
6 Pengadaan dan Pemasangan IU VRV Split Cassette Type 30.700 BTUH 2.00 Unit 25,162,400.00 50,324,800.00 0.4958% - 0.0000% 90.00 0.4463% 90.00 0.4463%
7 Pengadaan dan Pemasangan IU VRV Split Cassette Type 47.800 BTUH 1.00 Unit 26,970,700.00 26,970,700.00 0.2657% - 0.0000% 50.00 0.1329% 50.00 0.1329%
8 Pengadaan dan Pemasangan OU VRV Lt 1
Kap. 207.000 BTUH (6.900 cfm) (Cadangan 1 unit) 1.00 unit 384,354,000.00 384,354,000.00 3.7870% - 0.0000% 95.00 3.5976% 95.00 3.5976%
Kap. 153.000 BTUH (5.100 cfm) (Cadangan 1 unit) 1.00 unit 279,763,200.00 279,763,200.00 2.7565% - 0.0000% 95.00 2.6186% 95.00 2.6186%
9 REFNET Joint 14.00 bh 2,402,400.00 33,633,600.00 0.3314% - 0.0000% 95.00 0.3148% 95.00 0.3148%
10 Navigator Controller 16.00 bh 1,515,800.00 24,252,800.00 0.2390% - 0.0000% 95.00 0.2270% 95.00 0.2270%
11 OU Connection Kit 16.00 bh 1,301,300.00 20,820,800.00 0.2051% - 0.0000% 95.00 0.1949% 95.00 0.1949%
12 Pipa Refrigerant c/w Insulation

Copper Refrigerant Pipe 1/4" (0,71 mm) 40.00 m' 95,900.00 3,836,000.00 0.0378% - 0.0000% 95.00 0.0359% 95.00 0.0359%
Copper Refrigerant Pipe 3/8" (0,71 mm) 99.00 m' 107,400.00 10,632,600.00 0.1048% - 0.0000% 80.00 0.0838% 80.00 0.0838%
Copper Refrigerant Pipe 1/2" (0,71 mm) 60.00 m' 124,500.00 7,470,000.00 0.0736% - 0.0000% 95.00 0.0699% 95.00 0.0699%
Copper Refrigerant Pipe 5/8" (0,71 mm) 103.00 m' 143,800.00 14,811,400.00 0.1459% - 0.0000% 80.00 0.1167% 80.00 0.1167%
Copper Refrigerant Pipe 3/4" (0,89 mm) 9.00 m' 204,600.00 1,841,400.00 0.0181% - 0.0000% 95.00 0.0172% 95.00 0.0172%
Copper Refrigerant Pipe 7/8" (1,14 mm) 21.00 m' 232,000.00 4,872,000.00 0.0480% - 0.0000% 95.00 0.0456% 95.00 0.0456%
Copper Refrigerant Pipe 1 1/8" (1,27 mm) 78.00 m' 303,000.00 23,634,000.00 0.2329% - 0.0000% 95.00 0.2212% 95.00 0.2212%
Copper Refrigerant Pipe 1 3/8" (1,40 mm) - m' 363,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Copper Refrigerant Pipe 1 5/8" (1,52 mm) - m' 453,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Fitting Copper Refrigerant Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 90.00 0.0368% 90.00 0.0368%
Hanger Refrigerant Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 80.00 0.0041% 80.00 0.0041%
Supporting Material Refrigerant Pipe 1.00 lot 6,225,000.00 6,225,000.00 0.0613% - 0.0000% 85.00 0.0521% 85.00 0.0521%
10 Pemipaan Drain AC VRV c/w Insulation
PVC Drain Pipe 3/4", class AW 74.00 m' 20,700.00 1,531,800.00 0.0151% - 0.0000% 85.00 0.0128% 85.00 0.0128%
PVC Drain Pipe 1", class AW 40.00 m' 23,700.00 948,000.00 0.0093% - 0.0000% 85.00 0.0079% 85.00 0.0079%
PVC Drain Pipe 1 1/4", class AW 19.00 m' 29,300.00 556,700.00 0.0055% - 0.0000% 90.00 0.0049% 90.00 0.0049%
PVC Drain Pipe 1 1/2", class AW 16.00 m' 31,900.00 510,400.00 0.0050% - 0.0000% 90.00 0.0045% 90.00 0.0045%
PVC Drain Pipe 2", class AW - m' 37,400.00 - 0.0000% - 0.0000% 90.00 0.0000% 90.00 0.0000%
Fitting Drain Pipe 1.00 lot 4,980,000.00 4,980,000.00 0.0491% - 0.0000% 85.00 0.0417% 85.00 0.0417%
Hanger Drain Pipe 16.00 ttk 32,400.00 518,400.00 0.0051% - 0.0000% 85.00 0.0043% 85.00 0.0043%

Page 17 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

Supporting Material Drain Pipe 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 85.00 0.0348% 85.00 0.0348%
11 Pengkabelan AC VRV c/w Conduit
Power Cable NYM 3 x 2,5 mm2 196.00 m' 26,100.00 5,115,600.00 0.0504% - 0.0000% 85.00 0.0428% 85.00 0.0428%
Power Cable NYY 3 x 4 mm2 128.00 m' 39,800.00 5,094,400.00 0.0502% - 0.0000% 85.00 0.0427% 85.00 0.0427%
Power Cable NYY 4 x 16 mm2 24.00 m' 129,300.00 3,103,200.00 0.0306% - 0.0000% - 0.0000% - 0.0000%
Grounding Cable NYA 6 mm2 130.00 m' 21,200.00 2,756,000.00 0.0272% - 0.0000% - 0.0000% - 0.0000%
Control Cable AWG 18 310.00 m' 27,400.00 8,494,000.00 0.0837% - 0.0000% 80.00 0.0670% 80.00 0.0670%
Thermostat Cable NYYHY 2 x 0,75 mm2 - m' 17,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Supporting Material Electrical 1.00 lot 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 80.00 0.0327% 80.00 0.0327%
12 Hanger Indoor Unit 16.00 unit 186,800.00 2,988,800.00 0.0294% - 0.0000% 80.00 0.0236% 80.00 0.0236%
13 Dudukan Condensing Unit 6.00 unit 498,000.00 2,988,000.00 0.0294% - 0.0000% 95.00 0.0280% 95.00 0.0280%
14 Consumables & waste item 1.00 lott 4,150,000.00 4,150,000.00 0.0409% - 0.0000% 80.00 0.0327% 80.00 0.0327%
15 Testing & Commissioning 1.00 ls 2,084,600.00 2,084,600.00 0.0205% - 0.0000% - 0.0000% - 0.0000%
16 Exhaust Fan High Pressure Industrial KDK 40GSC 2.125 cfm 1.00 unit 116,500.00 116,500.00 0.0011% - 0.0000% - 0.0000% - 0.0000%

M.2.5 INSTALASI GAS ( PIPA GIV MEDIUM SETARA SPINDO )


Pengadaan dan pemasangan pipa gas bahan galvanis medium
sesuai spesifikasi teknis dan gambar,
terpasang lengkap
1 dia. 3/4" 24.00 M' 62,500.00 1,500,000.00 0.0148% - 0.0000% 95.00 0.0140% 95.00 0.0140%
2 dia. 1/2" 4.00 M' 47,100.00 188,400.00 0.0019% - 0.0000% 95.00 0.0018% 95.00 0.0018%
3 Gate valve dia 3/4 3.00 bh 276,000.00 828,000.00 0.0082% - 0.0000% 95.00 0.0078% 95.00 0.0078%
4 Kran gas 1/2" 6.00 bh 112,900.00 677,400.00 0.0067% - 0.0000% 0.0000% - 0.0000%
2 Fitting 1.00 Lot 239,700.00 239,700.00 0.0024% - 0.0000% 95.00 0.0022% 95.00 0.0022%

SUB TOTAL PEKERJAAN MEKANIKAL LANTAI 2 1,229,691,700.00 0.0000% 11.1004% 11.1004%

VII. PEKERJAAN ELEKTRIKAL

E.1 LANTAI 1
E.1.1 PANEL LISTRIK SETARA TERAMETRIK
1 Panel SDP 1.00 Unit 30,082,000.00 30,082,000.00 0.2964% - 0.0000% 70.00 0.2075% 70.00 0.2075%
2 P.LP/PP.1 LT 1 1.00 Unit 17,274,600.00 17,274,600.00 0.1702% - 0.0000% 70.00 0.1191% 70.00 0.1191%
3 P.LP/PP.1A LT 1 1.00 Unit 19,409,200.00 19,409,200.00 0.1912% - 0.0000% 70.00 0.1339% 70.00 0.1339%
4 P.PP.AC LT.1 1.00 Unit 7,842,300.00 7,842,300.00 0.0773% - 0.0000% 70.00 0.0541% 70.00 0.0541%
4 P.PP.AC LT.1A 1.00 Unit 16,230,400.00 16,230,400.00 0.1599% - 0.0000% 70.00 0.1119% 70.00 0.1119%
4 Panel Kontrol Pompa Transfer 1.00 Unit 9,632,300.00 9,632,300.00 0.0949% - 0.0000% 70.00 0.0664% 70.00 0.0664%

E.1.2 KABEL FEEDER & KABEL BC SETARA SUPREME


1 Kabel power dari KWH ke Panel Utama ( PU )
NYY 4 x 70 mm2 - m 547,400.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYFGBY 4 x 120 mm 50.00 m 1,073,100.00 53,655,000.00 0.5287% - 0.0000% - 0.0000% - 0.0000%
2 Kabel power dari Panel Utama ( PU ) ke P.PP AC LT.1
NYY 4 x 10 mm2 + BC 10 mm2 - m 97,500.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 16 mm + BC 6mm 38.00 m 160,000.00 6,080,000.00 0.0599% - 0.0000% 80.00 0.0479% 80.00 0.0479%
3 Kabel power dari Panel Utama ( PU ) ke P.PP AC LT.1A
NYY 4 x 35 mm2 + BC 25 mm2 - m 300,200.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 50 mm2 + BC 25 mm2 72.00 m 415,000.00 29,880,000.00 0.2944% - 0.0000% 80.00 0.2355% 80.00 0.2355%
4 Kabel power dari Panel SDP ke P.LP/PP.1 LT.1
NYY 4 x 6 mm2 + BC 4 mm2 - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 16 mm + BC 6mm 8.00 m 160,000.00 1,280,000.00 0.0126% - 0.0000% 80.00 0.0101% 80.00 0.0101%
5 Kabel power dari Panel SDP ke P.LP/PP.1A LT.1
NYY 4 x 6 mm2 + BC 4 mm2 - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 16 mm + BC 6mm 57.00 m 160,000.00 9,120,000.00 0.0899% - 0.0000% 80.00 0.0719% 80.00 0.0719%
6 Kabel power dari Panel SDP ke P.LP/PP.1 LT.2
NYY 4 x 6 mm2 + BC 4 mm2 - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 10 mm + BC 6mm 28.00 m 97,500.00 2,730,000.00 0.0269% - 0.0000% 80.00 0.0215% 80.00 0.0215%
7 Kabel power dari Panel SDP ke P.LP/PP.1A LT.2A
NYY 4 x 6 mm2 + BC 4 mm2 - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 16 mm + BC 6mm 70.00 m 160,000.00 11,200,000.00 0.1104% - 0.0000% 80.00 0.0883% 80.00 0.0883%
8 Kabel Fedeer ke P.Kontrol Pompa Transfer NYY 4 x 6 mm2 - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 4 mm2 84.00 m 42,000.00 3,528,000.00 0.0348% - 0.0000% 80.00 0.0278% 80.00 0.0278%
9 Kabel Fedeer ke P.Kontrol Pompa Boster 4 x 6 mm - m 89,300.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
NYY 4 x 2,5 mm2 25.00 37,000.00 925,000.00 0.0091% - 0.0000% - 0.0000% - 0.0000%
10 Pengadaan dan pemasangan Grounding instalasi listrik lengkap 1.00 titik 4,435,100.00 4,435,100.00 0.0437% - 0.0000% 50.00 0.0218% 50.00 0.0218%
dengan material dan alat kerja bantu dan acc,dengan Resistance 2 Ohm

Page 18 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

E.1.3 INSTALASI DAN ARMATUR


Armature setara Artolite,komponen setara Philips
Kabel Instalasi stop kontak,lampu, NYM setara Eterna
1 RM 300 2x16W ess Led m1 Savy setara Artolite 133.00 Unit 1,152,000.00 153,216,000.00 1.5096% - 0.0000% - 0.0000% - 0.0000%
2 Lampu Down Light LED 5 W c/w battery, setara Phillips 5.00 Unit 179,000.00 895,000.00 0.0088% - 0.0000% - 0.0000% - 0.0000%
3 Lampu Down Light LED 9 W c/w battery, setara Phillips 69.00 Unit 194,500.00 13,420,500.00 0.1322% - 0.0000% - 0.0000% - 0.0000%
4 Lampu Down Light LED 12 W c/w battery, setara Phillips 8.00 Unit 252,500.00 2,020,000.00 0.0199% - 0.0000% - 0.0000% - 0.0000%
5 Lampu Baret LED 6 W c/w setara Phillips 41.00 Unit 252,500.00 10,352,500.00 0.1020% - 0.0000% - 0.0000% - 0.0000%
6 Lampu LED strip 7w / m Setara Philips (lampu up ceiling) 18.00 m 73,400.00 1,321,200.00 0.0130% - 0.0000% - 0.0000% - 0.0000%
7 Exhaust Fan Ceilling type Setara KDK 12.00 Bh 459,300.00 5,511,600.00 0.0543% - 0.0000% - 0.0000% - 0.0000%
8 Stop kontak setara Clipsal 111.00 Bh 44,100.00 4,895,100.00 0.0482% - 0.0000% 50.00 0.0241% 50.00 0.0241%
9 Stop kontak Exhaust fan industrial 10.00 Bh 145,000.00 1,450,000.00 0.0143% - 0.0000% - 0.0000% - 0.0000%
Stop Kontak 3 Phase Legrand 6.00 Unit 650,000.00 3,900,000.00 0.0384% - 0.0000% - 0.0000% - 0.0000%
Stop Kontak AC Clipsal 3.00 Unit 111,000.00 333,000.00 0.0033% - 0.0000% - 0.0000% - 0.0000%
10 Saklar Tunggal setara Phillips/Clipsal 5.00 Bh 53,900.00 269,500.00 0.0027% - 0.0000% 50.00 0.0013% 50.00 0.0013%
11 Saklar Ganda setara Clipsal 50.00 Bh 45,200.00 2,260,000.00 0.0223% - 0.0000% 50.00 0.0111% 50.00 0.0111%
12 Saklar hotel setara Clipsal 2.00 Bh 41,700.00 83,400.00 0.0008% - 0.0000% - 0.0000% - 0.0000%
13 Instalasi Penerangan 252.00 Titik 203,900.00 51,382,800.00 0.5063% - 0.0000% 90.00 0.4556% 90.00 0.4556%
14 Instalasi exhaust Fan industrial type 10.00 Titik 319,600.00 3,196,000.00 0.0315% - 0.0000% 90.00 0.0283% 90.00 0.0283%
15 Instalasi Stop kontak 111.00 Titik 203,900.00 22,632,900.00 0.2230% - 0.0000% 90.00 0.2007% 90.00 0.2007%
16 Instalasi Stop kontak Lantai 3 fasa 6.00 Titik 1,167,800.00 7,006,800.00 0.0690% - 0.0000% 90.00 0.0621% 90.00 0.0621%
17 Instalasi Stop Kontak AC 3.00 Titik 319,600.00 958,800.00 0.0094% - 0.0000% 90.00 0.0085% 90.00 0.0085%

E.1.4 KABEL TRAY SETARA ONI TRAY


Pemasangan tray kabel beserta peralatan bantu lainnya,
sesuai specifikasi teknis dan gambar, terpasang lengkap
1 Kabel Tray ukuran 300 X 100 mm terpasang menggantung 138.00 m' 655,600.00 90,472,800.00 0.8914% - 0.0000% 95.00 0.8468% 95.00 0.8468%
pada langit langit
2 Kabel Tray ukuran 200 X 100 mm terpasang menggantung 138.00 m' 394,500.00 54,441,000.00 0.5364% - 0.0000% 95.00 0.5096% 95.00 0.5096%
pada langit langit
3 Fitting & alat bantu 1.00 lot 9,047,000.00 9,047,000.00 0.0891% - 0.0000% 95.00 0.0847% 95.00 0.0847%

E.1.5 TATA SUARA SETARA TOA


1 Pengadaan dan pemasangan peralatan Sistem Tata Suara 1.00 unit 46,345,483.74 46,345,483.74 0.4566% - 0.0000% - 0.0000% - 0.0000%
ditempatkan di Ruang Kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan
dalam Gambar dan Spesifikasi Teknis, terpasang lengkap.
Radio Tuner AM /FM,Compact Disc,Mic Emergency,
Aux Pre Amplifier,Power Amplifier 120W,Speaker Selector
JBX- TB
2 Pengadaan dan pemasangan Speaker berikut alat/material
bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis
Ceilling Speaker 3 Watt Setara TOA 57.00 bh 156,100.00 8,897,700.00 0.0877% - 0.0000% - 0.0000% - 0.0000%
Kolom speaker Setara TOA 2.00 bh 731,700.00 1,463,400.00 0.0144% - 0.0000% - 0.0000% - 0.0000%
Volume Control Setara TOA 24.00 bh 194,400.00 4,665,600.00 0.0460% - 0.0000% - 0.0000% - 0.0000%
3 Pemasangan Instalasi sistem Tata Suara termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari JBX-SS LT.1 ke Speaker, NYMHY 2 x 2,5 mm2 in HIC 20mm2 57.00 ttk 618,900.00 35,277,300.00 0.3476% - 0.0000% 90.00 0.3128% 90.00 0.3128%
Instalasi volume control, NYMHY 2 x 2,5 mm2 in HIC 20mm2 24.00 ttk 618,900.00 14,853,600.00 0.1463% - 0.0000% 95.00 0.1390% 95.00 0.1390%

E.1.6 TELEPON
1 Pengadaan dan pemasangan peralatan Sistem Telepon 1.00 unit 30,125,300.00 30,125,300.00 0.2968% - 0.0000% - 0.0000% - 0.0000%
ditempatkan di Ruang Kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan
dalam Gambar dan Spesifikasi Teknis, terpasang lengkap.
Ups, MDF,Power Surge Arrester
Telephone 4-6 Line PTT 50-60Ext
JBX- TB
2 Outlet telepon
Pengadaan dan pemasangan Outlet Telepon, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Handset telepon analog setara Panasonic 21.00 bh 776,400.00 16,304,400.00 0.1606% - 0.0000% - 0.0000% - 0.0000%
Outlet telepon setara Clipsal 21.00 bh 97,500.00 2,047,500.00 0.0202% - 0.0000% 80.00 0.0161% 80.00 0.0161%
3 Instalasi Outlet telepon
Pemasangan Instalasi sistem Outlet Telepon termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai

Page 19 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

Gambar dan Spesifikasi Teknis


Kabel dari KTB TELKOM ke ke outlet telepon 21.00 ttk 305,800.00 6,421,800.00 0.0633% - 0.0000% 90.00 0.0569% 90.00 0.0569%
ITC 2 x 2 x 0.6 mm + PVC Ø 20
Kabel ITC Multi 20 pair Dari TB telepon lt 1 ke box MDF 8.00 m 60,000.00 480,000.00 0.0047% - 0.0000% - 0.0000% - 0.0000%

E.1.7 SYSTEM DATA / WIFI


1 Peralatan utama 1.00 unit 33,457,767.60 33,457,767.60 0.3297% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Peralatan Distribusi untuk Sistem
Data berikut alat / material bantu pemasangan lainnya
sesuai Gambar dan Spesifikasi Teknis.
Server setara LG,Core Switch setara Dlink,Switch Hub 8 dan 16 port
setara Dlink, Access point/Wifi/Hotspot ex Dlink AP
Access point/Wifi/Hotspot ex Dlink AP 5.00 Unit 602,300.00 3,011,500.00 0.0297% - 0.0000% - 0.0000% - 0.0000%
2 Instalasi kabel feeder
Kabel UTP Cat 6 dari Main Switch Hub ke Switch Hub lt,1 10.00 m 74,200.00 742,000.00 0.0073% - 0.0000% - 0.0000% - 0.0000%
3 Outlet data
Pengadaan dan pemasangan Outlet Data, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Outlet data 9.00 bh 143,300.00 1,289,700.00 0.0127% - 0.0000% 80.00 0.0102% 80.00 0.0102%
4 Instalasi outlet data
Pemasangan Instalasi sistem Outlet Data termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari Switch Hub Lantai 1 ke Outlet Data, UTP CAT-6 9.00 titik 508,800.00 4,579,200.00 0.0451% - 0.0000% 90.00 0.0406% 90.00 0.0406%
Kabel dari Switch Hub Lantai 1 ke Hot spot UTP CAT-6 5.00 titik 508,800.00 2,544,000.00 0.0251% - 0.0000% 90.00 0.0226% 90.00 0.0226%

E.1.8 CCTV SETARA PANASONIC


1 Peralatan utama
Pengadaan dan pemasangan peralatan utama CCTV lengkap berikut 1.00 unit 62,987,960.40 62,987,960.40 0.6206% - 0.0000% - 0.0000% - 0.0000%
material bantu dan peralatan bantu sesuai gambar dan spesifikasi teknis
Monitor color 21" LCD setara LG,Spot monitor color 24" setara LG,
PC setara Accer,UPS 3KVA Backup min 30 menit setara Siemens,
DVR setara Panasonic , System controller "PANASONIC" WV-CU360CJ
2 Equipment / Acc
CCD dome colour camera setara Hikvision 7.00 set 1,104,000.00 7,728,000.00 0.0761% - 0.0000% - 0.0000% - 0.0000%
Out door camera s/w housing setara Hikvision 3.00 set 468,800.00 1,406,400.00 0.0139% - 0.0000% - 0.0000% - 0.0000%
3 Instalasi CCTV Coaxial RG-11 + NYA 3x1,5mm2 11.00 titik 739,800.00 8,137,800.00 0.0802% - 0.0000% 90.00 0.0722% 90.00 0.0722%

E.1.9 LCD/PROJECTOR
1 Peralatan utama 3.00 unit 5,426,900.00 16,280,700.00 0.1604% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Peralatan Proyektor LCD setara
Epson EB-S300 lengkap dengan acc sesuai gambar & spesifikasi
2 Instalasi screen 3.00 Unit 5,673,600.00 17,020,800.00 0.1677% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Motorized Screen KEYSTONE
lengkap dengan acc sesuai gambar dan spesifikasi
3 Instalasi kabel LCD
Instalasi kabel LCD dengan connector VGA dari out let ke 60.00 m 14,601.00 876,060.00 0.0086% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
Instalasi kabel LCD dengan connector HDMI dari out let ke 3.00 unit 847,800.00 2,543,400.00 0.0251% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
4 Instalasi bracket LCD.L 75 -120 cm stara BRITE 3.00 set 1,051,200.00 3,153,600.00 0.0311% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Bracket LCD lengkap dengan
pemasangan stop kontak dan pengkabelanya

E.1.10 INSTALASI TELEVISI KABEL SETARA BELDEN


I PERALATAN UTAMA
Pengadaan dan pemasangan Peralatan Distribusi untuk Sistem
MATV berikut alat / material bantu pemasangan lainnya
sesuai Gambar dan Spesifikasi Teknis.
1 UHF Antenna 1.00 bh 1,096,900.00 1,096,900.00 0.0108% - 0.0000% - 0.0000% - 0.0000%
2 VHF Antenna 1.00 bh 860,400.00 860,400.00 0.0085% - 0.0000% - 0.0000% - 0.0000%
3 Parabola 1.00 bh 8,726,100.00 8,726,100.00 0.0860% - 0.0000% - 0.0000% - 0.0000%
4 Indovision 1.00 bh 7,219,200.00 7,219,200.00 0.0711% - 0.0000% - 0.0000% - 0.0000%
5 Masthead Amplifier 1.00 bh 6,024,400.00 6,024,400.00 0.0594% - 0.0000% - 0.0000% - 0.0000%
6 Power Supply 1.00 bh 1,838,000.00 1,838,000.00 0.0181% - 0.0000% - 0.0000% - 0.0000%
7 Agiles Modulator 7.00 bh 4,014,800.00 28,103,600.00 0.2769% - 0.0000% - 0.0000% - 0.0000%
8 Headed Amplifier 1.00 bh 5,662,300.00 5,662,300.00 0.0558% - 0.0000% - 0.0000% - 0.0000%

Page 20 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

9 Receiver Digital 7.00 bh 4,394,900.00 30,764,300.00 0.3031% - 0.0000% - 0.0000% - 0.0000%


10 Power Devider 2.00 bh 2,672,200.00 5,344,400.00 0.0527% - 0.0000% - 0.0000% - 0.0000%
11 Single Channel Amplifier 1.00 bh 1,757,400.00 1,757,400.00 0.0173% - 0.0000% - 0.0000% - 0.0000%
12 Combiner 1.00 bh 3,211,200.00 3,211,200.00 0.0316% - 0.0000% - 0.0000% - 0.0000%
13 Main Splitter MATV 1.00 bh 1,762,832.76 1,762,832.76 0.0174% - 0.0000% - 0.0000% - 0.0000%
14 Splitter-TV LT 1, LT 2 2.00 bh 450,400.00 900,800.00 0.0089% - 0.0000% - 0.0000% - 0.0000%
II OUTLET MATV
Pengadaan dan pemasangan Outlet MATV, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Outlet MATV 8.00 bh 132,300.00 1,058,400.00 0.0104% - 0.0000% - 0.0000% - 0.0000%

III INSTALASI KABEL MATV


Instalasi Kabel Feeder Sistem MATV menggunakan kabel Coaxial
7C-2V termasuk semua aksesoris, material / alat bantu pemasangan
lainnya sesuai Gambar dan Spesifikasi Teknis
Kabel dari MAIN SPLITTER ke SPLITTER-TV LT Satu, Coaxial 7C-2V 6.00 m' 70,800.00 424,800.00 0.0042% - 0.0000% - 0.0000% - 0.0000%
IV INSTALASI OUTLET MATV
Pemasangan Instalasi Outlet MATV termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
a Coaxial Cable 7C, dari SPLITTER-TV LT 2 ke Outlet MATV 8.00 ttk 578,500.00 4,628,000.00 0.0456% - 0.0000% 90.00 0.0410% 90.00 0.0410%

E.1.11 FIRE ALARM SETARA DEMCO


1 Peralatan Utama
Pengadaan dan pemasangan termasuk setting MCFA 1.00 unit 17,104,600.00 17,104,600.00 0.1685% - 0.0000% - 0.0000% - 0.0000%
2 Pengadaan dan pemasangan :
Tabung pemadam kebakaran setara Yamato 4.00 bh 1,770,300.00 7,081,200.00 0.0698% - 0.0000% - 0.0000% - 0.0000%
Smoke Detector setara DEMCO 1.00 bh 472,300.00 472,300.00 0.0047% - 0.0000% - 0.0000% - 0.0000%
Heat Detector setara DEMCO 43.00 bh 254,100.00 10,926,300.00 0.1077% - 0.0000% - 0.0000% - 0.0000%
Bell setara DEMCO 4.00 bh 341,200.00 1,364,800.00 0.0134% - 0.0000% - 0.0000% - 0.0000%
Lampu setara DEMCO 4.00 bh 283,100.00 1,132,400.00 0.0112% - 0.0000% - 0.0000% - 0.0000%
Push button setara DEMCO 4.00 bh 331,300.00 1,325,200.00 0.0131% - 0.0000% - 0.0000% - 0.0000%
End Off Line 4.00 bh 76,600.00 306,400.00 0.0030% - 0.0000% - 0.0000% - 0.0000%
3 Instalasi Fire Alarm
Instalasi Smoke Detector / Heat Decector 44.00 titik 474,900.00 20,895,600.00 0.2059% - 0.0000% 90.00 0.1853% 90.00 0.1853%
Instalasi Bell Alarm 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 90.00 0.0168% 90.00 0.0168%
Instlasi Lampu Alarm 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 90.00 0.0168% 90.00 0.0168%
Instalasi Push Button 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 90.00 0.0168% 90.00 0.0168%

E.1.12 GROUNDING ARUS LEMAH


Pengadaan dan pemasangan Grounding Arus Lemah lengkap 1.00 lot 4,435,100.00 4,435,100.00 0.0437% - 0.0000% 50.00 0.0218% 50.00 0.0218%
dengan material dan alat kerja bantu dan acc,dengan Resistance 2 Ohm

SUB TOTAL PEKERJAAN ELEKTRIKAL LANTAI 1 1,175,136,504.51 0.0000% 4.4200% 4.4200%

E.2 LANTAI 2
E.2.1 PANEL SETARA TERAMETRIK
1 P.LP/PP 2.LT 2 1.00 UNIT 16,207,300.00 16,207,300.00 0.1597% - 0.0000% 70.00 0.1118% 70.00 0.1118%
2 P.LP/PP 2A.LT 2 1.00 UNIT 17,274,600.00 17,274,600.00 0.1702% - 0.0000% 70.00 0.1191% 70.00 0.1191%

E.2.2 INSTALASI DAN ARMATUR


Armature setara Artolite,komponen setara Philips
Kabel Instalasi stop kontak,lampu, NYM setara Eterna
1 RM 300 2x16W ess Led m1 Savy setara Artolite 96.00 Bh 1,152,000.00 110,592,000.00 1.0896% - 0.0000% - 0.0000% - 0.0000%
2 Lampu Down Light LED 9 W c/w battery, setara Phillips 44.00 Bh 194,500.00 8,558,000.00 0.0843% - 0.0000% - 0.0000% - 0.0000%
3 Lampu Baret LED 6 W c/w setara Phillips 37.00 Unit 252,500.00 9,342,500.00 0.0920% - 0.0000% - 0.0000% - 0.0000%
4 Exhaust Fan Ceilling type 3.00 Bh 459,300.00 1,377,900.00 0.0136% - 0.0000% - 0.0000% - 0.0000%
5 Stop kontak setara Clipsal 72.00 Bh 44,100.00 3,175,200.00 0.0313% - 0.0000% 50.00 0.0156% 50.00 0.0156%
6 Stop kontak lantai 1 fasa setara Panasonic - Bh 791,800.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%
Stop kontak lantai 3 fasa legrand 2.00 Bh 650,000.00 1,300,000.00 0.0128% - 0.0000% - 0.0000% - 0.0000%
Stop kontak AC Clipsal 2.00 Bh 111,000.00 222,000.00 0.0022% - 0.0000% - 0.0000% - 0.0000%
7 Exhaust Fan Ceilling type Setara KDK 3.00 Bh 145,000.00 435,000.00 0.0043% - 0.0000% - 0.0000% - 0.0000%
8 Saklar Tunggal setara Phillips/Clipsal 6.00 Bh 53,900.00 323,400.00 0.0032% - 0.0000% 50.00 0.0016% 50.00 0.0016%
9 Saklar Ganda setara Clipsal 25.00 Bh 45,200.00 1,130,000.00 0.0111% - 0.0000% 50.00 0.0056% 50.00 0.0056%
10 Saklar hotel setara Clipsal 2.00 Bh 41,700.00 83,400.00 0.0008% - 0.0000% - 0.0000% - 0.0000%
11 Instalasi Penerangan 177.00 Titik 203,900.00 36,090,300.00 0.3556% - 0.0000% 80.00 0.2845% 80.00 0.2845%
12 Instalasi Exhaust Fan Ceilling type 3.00 Bh 203,900.00 611,700.00 0.0060% - 0.0000% 90.00 0.0054% 90.00 0.0054%

Page 21 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

14 Instalasi Exhaust Fan 3.00 Titik 319,600.00 958,800.00 0.0094% - 0.0000% 90.00 0.0085% 90.00 0.0085%
15 Instalasi Stop Kontak 72.00 Titik 203,900.00 14,680,800.00 0.1446% - 0.0000% 80.00 0.1157% 80.00 0.1157%
Instalasi Stop Kontak 3 fasa 2.00 Titik 1,167,800.00 2,335,600.00 0.0230% - 0.0000% 80.00 0.0184% 80.00 0.0184%
Instalasi Stop Kontak AC 2.00 Titik 319,600.00 639,200.00 0.0063% - 0.0000% 90.00 0.0057% 90.00 0.0057%

E.2.3 KABEL TRAY SETARA ONI TRAY


Pemasangan tray kabel beserta peralatan bantu lainnya,
sesuai specifikasi teknis dan gambar, terpasang lengkap
1 Kabel Tray ukuran 300 X 100 mm terpasang menggantung 115.00 m' 655,600.00 75,394,000.00 0.7428% - 0.0000% 80.00 0.5943% 80.00 0.5943%
pada langit langit
2 Kabel Tray ukuran 200 X 100 mm terpasang menggantung 115.00 m' 394,500.00 45,367,500.00 0.4470% - 0.0000% 80.00 0.3576% 80.00 0.3576%
pada langit langit
3 Fitting dan material bantu 1.00 lot 7,539,000.00 7,539,000.00 0.0743% - 0.0000% 80.00 0.0594% 80.00 0.0594%

E.2.4 TATA SUARA SETARA TOA


1 Pengadaan dan pemasangan Speaker berikut alat/material
bantu pemasangan lainnya sesuai gambar dan spesifikasi teknis
Ceilling Speaker 3 Watt 47.00 bh 156,100.00 7,336,700.00 0.0723% - 0.0000% - 0.0000% - 0.0000%
Volume Control 25.00 bh 194,400.00 4,860,000.00 0.0479% - 0.0000% - 0.0000% - 0.0000%
2 Pemasangan Instalasi sistem Tata Suara termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari JBX-SS LT.1 ke Speaker, NYMHY 2 x 2,5 mm2 in HIC 20mm2 47.00 ttk 618,900.00 29,088,300.00 0.2866% - 0.0000% 80.00 0.2293% 80.00 0.2293%
Instalasi volume control, NYMHY 2 x 2,5 mm2 in HIC 20mm2 25.00 ttk 618,900.00 15,472,500.00 0.1524% - 0.0000% 80.00 0.1220% 80.00 0.1220%

E.2.5 TELEPON
2 Outlet telepon
Pengadaan dan pemasangan Outlet Telepon, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Handset telepon analog setara Panasonic 16.00 bh 776,400.00 12,422,400.00 0.1224% - 0.0000% - 0.0000% - 0.0000%
Outlet telepon setara Clipsal 16.00 bh 97,500.00 1,560,000.00 0.0154% - 0.0000% 70.00 0.0108% 70.00 0.0108%
3 Instalasi Outlet telepon
Pemasangan Instalasi sistem Outlet Telepon termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari KTB TELKOM ke ke outlet telepon 16.00 ttk 305,800.00 4,892,800.00 0.0482% - 0.0000% 80.00 0.0386% 80.00 0.0386%
ITC 2 x 2 x 0.6 mm + PVC Ø 20
Kabel ITC Multi 20 pair Dari TB telepon lt 2 ke box MDF 30.00 M' 60,000.00 1,800,000.00 0.0177% - 0.0000% 80.00 0.0142% 80.00 0.0142%

E.2.6 SYSTEM DATA


1 Peralatan utama
Pengadaan dan pemasangan Peralatan Distribusi untuk Sistem
Data berikut alat / material bantu pemasangan lainnya
sesuai Gambar dan Spesifikasi Teknis.
switch Hub 12 port Lt 2 setara DLINK 1.00 bh 602,300.00 602,300.00 0.0059% - 0.0000% - 0.0000% - 0.0000%
Access point/Wifi/Hotspot ex Dlink AP 5.00 bh 602,300.00 3,011,500.00 0.0297% - 0.0000% - 0.0000% - 0.0000%
2 Instalasi kabel feeder
Kabel UTP Cat 6 dari Main Switch Hub ke Switch Hub lt. 2 45.00 m 74,200.00 3,339,000.00 0.0329% - 0.0000% - 0.0000% - 0.0000%
3 Outlet data
Pengadaan dan pemasangan Outlet Data, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
Outlet data 18.00 bh 143,300.00 2,579,400.00 0.0254% - 0.0000% - 0.0000% - 0.0000%
4 Instalasi outlet data
Pemasangan Instalasi sistem Outlet Data termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
Kabel dari Switch Hub Lantai 1 ke Outlet Data, UTP CAT-6 18.00 titik 508,800.00 9,158,400.00 0.0902% - 0.0000% 80.00 0.0722% 80.00 0.0722%
Kabel dari Switch Hub Lantai 1 ke Hot spot UTP CAT-6 5.00 titik 508,800.00 2,544,000.00 0.0251% - 0.0000% 80.00 0.0201% 80.00 0.0201%

E.2.7 CCTV SETARA PANASONIC


1 Equipment
CCD dome colour camera setara Hikvision 5.00 set 1,104,000.00 5,520,000.00 0.0544% - 0.0000% - 0.0000% - 0.0000%
Out door camera s/w housing setara Hikvision
2 Instalasi CCTV Coaxial RG-11 + NYA 3x1,5mm2 5.00 titik 739,800.00 3,699,000.00 0.0364% - 0.0000% 80.00 0.0292% 80.00 0.0292%

E.2.8 LCD/PROJECTOR
1 Peralatan utama 3.00 unit 5,426,900.00 16,280,700.00 0.1604% - 0.0000% - 0.0000% - 0.0000%

Page 22 of 55
PROGRES MINGGU LALU PROGRES MINGGU INI KUMULATIF s/d MINGGU INI
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA BOBOT PROGRES BOBOT PROGRES BOBOT PROGRES BOBOT
(%) PRESTASI (%) (%) PRESTASI (%) (%) PRESTASI (%)

Pengadaan dan pemasangan Peralatan Proyektor LCD setara


Epson EB-S300 lengkap dengan acc sesuai gambar & spesifikasi
2 Instalasi screen 3.00 Unit 5,673,600.00 17,020,800.00 0.1677% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Motorized Screen KEYSTONE
lengkap dengan acc sesuai gambar dan spesifikasi
3 Instalasi kabel LCD
Instalasi kabel LCD dengan connector VGA dari out let ke 60.00 m 14,601.00 876,060.00 0.0086% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
Instalasi kabel LCD dengan connector HDMI dari out let ke 3.00 unit 847,800.00 2,543,400.00 0.0251% - 0.0000% - 0.0000% - 0.0000%
bracket di plafond lengkap dengan acc dan material bantu
4 Instalasi bracket LCD.L 75 -120 cm stara BRITE 3.00 set 1,051,200.00 3,153,600.00 0.0311% - 0.0000% - 0.0000% - 0.0000%
Pengadaan dan pemasangan Bracket LCD lengkap dengan
pemasangan stop kontak dan pengkabelanya

E.2.9 INSTALASI TV ,KABEL SETARA BELDEN


INSTALASI OUTLET MATV
Pemasangan Instalasi Outlet MATV termasuk semua
aksesoris, material / alat bantu pemasangan lainnya sesuai
Gambar dan Spesifikasi Teknis
a Coaxial Cable 7C, dari SPLITTER-TV LT 2 ke Outlet MATV 8.00 ttk 578,500.00 4,628,000.00 0.0456% - 0.0000% 80.00 0.0365% 80.00 0.0365%

OUTLET MATV
Pengadaan dan pemasangan Outlet MATV, berikut alat/material
bantu pemasangan lainnya sesuai Gambar dan Spesifikasi Teknis
b Outlet MATV 8.00 bh 132,300.00 1,058,400.00 0.0104% - 0.0000% - 0.0000% - 0.0000%

INSTALASI KABEL MATV


Instalasi Kabel Feeder Sistem MATV menggunakan kabel Coaxial
7C-2V termasuk semua aksesoris, material / alat bantu pemasangan
lainnya sesuai Gambar dan Spesifikasi Teknis
c Kabel dari MAIN SPLITTER ke SPLITTER-TV LT 2, Coaxial 7C-2V 43.00 m' 70,800.00 3,044,400.00 0.0300% - 0.0000% - 0.0000% - 0.0000%

E.2.10 FIRE ALARM SETARA DEMCO


1 Pengadaan dan pemasangan :
Tabung pemadam kebakaran setara Yamato 4.00 bh 1,770,300.00 7,081,200.00 0.0698% - 0.0000% - 0.0000% - 0.0000%
Smoke Detector setara DEMCO 1.00 bh 472,300.00 472,300.00 0.0047% - 0.0000% - 0.0000% - 0.0000%
Heat Detector setara DEMCO 23.00 bh 254,100.00 5,844,300.00 0.0576% - 0.0000% - 0.0000% - 0.0000%
Bell 4.00 bh 341,200.00 1,364,800.00 0.0134% - 0.0000% - 0.0000% - 0.0000%
Lampu 4.00 bh 283,100.00 1,132,400.00 0.0112% - 0.0000% - 0.0000% - 0.0000%
Push button 4.00 bh 526,900.00 2,107,600.00 0.0208% - 0.0000% - 0.0000% - 0.0000%
End off Line 3.00 bh 76,600.00 229,800.00 0.0023% - 0.0000% - 0.0000% - 0.0000%
2 Instalasi Fire Alarm
Instalasi Smoke Detector / Heat Decector 23.00 titik 474,900.00 10,922,700.00 0.1076% - 0.0000% 80.00 0.0861% 80.00 0.0861%
Instalasi Bell Alarm 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 80.00 0.0150% 80.00 0.0150%
Instlasi Lampu Alarm 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 80.00 0.0150% 80.00 0.0150%
Instalasi Push Button 4.00 titik 474,900.00 1,899,600.00 0.0187% - 0.0000% 80.00 0.0150% 80.00 0.0150%

E.2.11 PENANGKAL PETIR


- Electrostatic System dengan proteksi radius 110 meter, termasuk 1.00 Unit 18,133,500.00 18,133,500.00 0.1787% - 0.0000% - 0.0000% - 0.0000%
pipa galv. Dia. 5",4",3*,2,5" dengan tinggi 25 Meter dan support, klem
dan alat bantu lainnya sesuai gambar dan spesifikasi
- Obstruction Lamp 100 W 1.00 bh 6,476,250.00 6,476,250.00 0.0638% - 0.0000% - 0.0000% - 0.0000%
- Instalasi Obstruction light 100 W 1.00 ttk 492,195.00 492,195.00 0.0048% - 0.0000% - 0.0000% - 0.0000%
- NYY 70 mm2 , termasuk klem, pipa PVC dan alat bantu lainnya 43.00 m 150,249.00 6,460,707.00 0.0637% - 0.0000% - 0.0000% - 0.0000%
- Bak Kontrol 400 x 300, termasuk pentanahan (Spitz tembaga) 1.00 unit 2,590,500.00 2,590,500.00 0.0255% - 0.0000% - 0.0000% - 0.0000%
maks. 3 ohm
- Pentanahan 1.00 Ls 1,913,833.49 1,913,833.49 0.0189% - 0.0000% 50.00 0.0094% 50.00 0.0094%
- Box Test 1.00 Ls 777,150.00 777,150.00 0.0077% - 0.0000% - 0.0000% - 0.0000%

SUB TOTAL PEKERJAAN ELEKTRIKAL LANTAI 2 581,827,895.49 0.0000% 2.4163% 2.4163%

VIII PENAMBAHAN DAYA 48.500 VA


PENAMBAHAN DAYA 48.500 VA - Ls 60,000,000.00 - 0.0000% - 0.0000% - 0.0000% - 0.0000%

PENAMBAHAN DAYA DARI 105 KVA KE 197 KVA 1.00 Ls 115,000,000.00 115,000,000.00 1.1331% - 0.0000% - 0.0000% - 0.0000%

SUB TOTAL PEKERJAAN PENAMBAHAN DAYA 48.500 VA 115,000,000.00 0.0000% 0.0000% 0.0000%

Page 23 of 55
REKAPITULASI HITUNGAN VOLUME

NO URAIAN VOLUME SATUAN

A BACK UP HITUNGAN LANTAI 1


1 Granitile 80x80 Motif Setara Sandimas Polish (R.Dosen, R.Kuliah, R.Dubbing) 914.87 m2
2 Granitile 80x80 Motif Setara Sandimas Unpolish (Teras, Koridor dan Tangga) 593.23 m2
3 Parquet jati 1.5cmx9cmx30cm-120cm 60.74 m2
4 Lantai panggung rangka baja fin.Kalsifloor 20mm (Rise floor) - m2
5 Granitile 60x60 unpolish Setara Sandimas (Lantai Toilet) 69.58 m2
6 Granitile 60x60 unpolish Setara Sandimas (Dinding Toilet) 252.17 m2
7 Plint keramik 10 x 80 Polish setara Sandimas (R.Dosen, R.Kuliah, R.Dubbing) 641.32 m'
8 Plint keramik 10 x 80 Unpolish setara Sandimas (Teras, Koridor dan Tangga) 224.76 m'
9 Plint Parket 20.83 m'
10 Stepnosing tangga (custom pabrikan) 170.90 m'
11 Batu alam andesit 403.02 m2
12 List Ban Batu Andesit 167.09 m'
13 Penebalan Bagian Bawah Dinding Andesit 46.18 m2
14 Plafond Gyptile 1,169.68 m2
15 Plafond Gypsum 9mm Setara Jayaboard 926.97 m2
16 Plafond GRC 4mm Setara Grc 304.29 m2
17 List plafond Almunium U 2cm (shadow line) 392.23 m'
18 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) 99.34 m2
19 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) 122.16 m2
20 Plesteran semen instant Setara MM-201 497.22 m2
21 Plesteran bukaan kusen Setara MM-201 t. 10 mm 395.34 m2
22 Acian bukaan kusen Setara MM-301 t. 10 mm 395.34 m2
23 Kolom Praktis 10x10 66.30 m'
24 Balok lintel 8x10 15.10 m'
25 Listplank lapis Almunium Composit Panel (ACP) setara Seven 6.60 m2
26 Dinding lapis alumunium composit panel (ACP) setara seven 75.88 m2
27 Logo Stainless Mirror, Tulisan Stainles Mirror (Inspring Inovation with Integrity, IPB 1.00 un
28 Logo Stainless Mirror, Tulisan Stainles Mirror (Inspring Inovation with Integrity, IPB 1.00 un
29 Pekerjaan ring balk atas kusen 15/25 47.90 m'
30 Perapihan Bekas Bobokan 116.17 m'
31 Screed Lantai 130.96 m2
32 Pemadatan tanah 52.20 m2
33 Rabat Beton T = 6 cm 314.60 m2
34 Err:509 360.80 m'
33 Pengurugan Mushola 28.74 M2
35 Pengurugan Dan Screet Lantai 68.17 m2
36 Pekerjaan Sloof 8x12 11.80 m'
37 Err:509 4.00 bh
38 Err:509 9.00 bh
39 Cat Dinding Interior Setara Dulux Easy Clean (standart) 1,748.62 m2
40 Cat Dinding Exterior Setara Dulux wheatershield (standart) 1,048.27 m2
41 Bongkar Dinding 1 Bata 403.62 m2
42 Bongkar Dinding 1/2 Bata 82.43 m2
43 Bongkar Listplank 272.10 m'
44 Bongkar Rangka Plafond & penutup plafond 887.14 m2
45 Bongkar Kusen Pintu Single 44.00 bh
46 Bongkar Kusen Pintu Dobel 13.00 bh
47 Bongkar plint lantai & perapihan 751.74 m'
48 Bongkar Meja lab 9.00 un
49 Bongkar Koridor penghubung 140.30 m2
50 Bongkar Lantai 105.70 m2
51 Bongkaran sloof Ruang Rapat 34.30 m'
52 Galian tanah Ruang Rapat 3.76 m3
53 Bongkar Isi Ruangan 1.00 ls
54 Bongkar Meja Beton Lab Kimia 4.00 bh
55 Bongkar Beton Retening Wall rapat 33.73 m2
56 Bongkar Relling Kayu Ruang Rapat 6.00 m'
57 Bongkar Pintu Pagar Besi Km/Wc 1.00 bh
58 Bongkar Kipas Besi dia 1,2 13.00 bh
59 Bongkar Meja Beton R Persediaan Alat 1.00 bh
60 Bongkar Lemari Asam 2.00 bh
61 Pembongkaran Talang Air 294.50 m'
64 Bongkar Kusen Jendela 6.00 Bh
65 Bongkar Bouven Light 3.00 Bh
66 Pasang Kolom 15/25 ( Openingan Kusen ) 48.00 M'
68 Pasang Kolom 30/40 ruang rapat 9.40 M'
69 Pasang Balok 30/60 ruang rapat 9.40 M'
70 Bongkar Pondasi 40/60 ruang rapat 0.36 M3

B LANTAI 2
1 Granitile 80x80 Motif Setara Sandimas Polish 695.29 M2
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2 303.30 M2
3 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2 695.29 M'
4 Plint keramik 10 x 80 Unpolish setara Sandimas (Teras, Koridor dan Tangga) 110.55 M'
5 Rabat Beton T: 6 cm 33.30 M2
6 Plafond Gypsum 9mm Setara Jayaboard 431.36 M2
7 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2 867.68 M2
8 Plafond GRC 4mm Setara Grc 121.73 M2
9 Plafond GRC 4mm Setara Grc 246.87 M2
10 List plafond Almunium U 2cm (shadow line) 285.08 M'
11 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 83.40 M2
12 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2 56.69 M2
13 Plesteran semen instant Setara MM-201 Lt. 2 269.36 M2
14 Acian Dinding setara MM-301 t. 3 mm 269.36 M2
15 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2
16 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2
17 Kolom Praktis 10x10 17.20 M'
18 Pekerjaan ring balk atas kusen 15/25 32.00 M'
19 Cat Dinding Interior Setara Dulux Easy Clean (standart) Lt. 2 1,447.14 M2
20 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2 1,111.91 M2
21 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2
22 Cat Plafond gypsum Setara Vinilex 679.03 M2
23 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2
24 Cat lisplank 38.44 M2
25 Kerok cat railing 78.00
26 Cat Railing 78.00
27 Pengikisan/pengerokan permukaan cat lama 2,055.40 M2
28 Bongkar Dinding 1 Bata 328.96 M2
29 Bongkar Listplank 272.10 M2
30 Bongkar Rangka Plafond & penutup plafond 937.19 M2
31 Bongkar Kusen Pintu Single 15.00 BH
32 Bongkar Kusen Pintu Dobel 9.00 BH
33 Bongkar plint lantai & perapihan 840.40 M'
34 Bongkar Meja beton 32.20
35 Bongkar dinding 1/2 bata 91.37 M2
36 Bongkar Partisi Kaca R.MCR+R.Studio Fotografi 6.70 M2
37 Err:509 14.50
38 Bongkar Partisi Kayu Dan Glaswool 32.40 M2
39 Bongkar Ring Balk 15/25 42.00 M'
Volume
NO ITEM PEKERJAAN LOKASI
M2 Dus
1 Granitile 60x60 Selasar Penghubung 133 98
NO URAIAN M' BTG
1 RENG 107.89474 19
2 BAJA RINGAN 113.15789 20
HITUNGAN CAT

NO URAIAN SPESIFIKASI MATERIAL LANTAI LUAS LANTAI SATUAN

(M')

A BACK UP HITUNGAN LANTAI 1

1 Granitile 80x80 Motif Setara Sandimas Polish (R.Dosen, R.Kuliah, R.Dubbing)

1 RUANG ISTIRAHAT POLISH 80X80 12.80 M2


2 RUANG PERS. ALAT POLISH 80X80 50.60 M2
3 LAB KIMIA 2 POLISH 80X80 38.98 M2
4 LAB ANATOMI BASAH POLISH 80X80 35.15 M2
5 RUANG PVT POLISH 80X80 22.37 M2
6 LAB. GG 14 POLISH 80X80 41.60 M2
7 RUANG KULIAH 1 POLISH 80X80 36.45 M2
8 RUANG KULIAH 2 POLISH 80X80 74.33 M2
9 RUANG RAPAT POLISH 80X80 123.36 M2
10 RUANG PRODI 1 POLISH 80X80 39.86 M2
11 RUANG DOSEN 1 POLISH 80X80 27.00 M2
12 RUANG PRODI 2 POLISH 80X80 31.00 M2
13 RUANG PENYIMPANAN POLISH 80X80 26.52 M2
14 LAB. PERSIAPAN POLISH 80X80 26.00 M2
15 RUANG LABORAN POLISH 80X80 13.76 M2
16 RUANG PANEL POLISH 80X80 6.59 M2
17 RUANG DUBBING POLISH 80X80 M2
18 LAB KIMIA 1 POLISH 80X80 85.80 M2
19 LAB. GG 01 POLISH 80X80 89.44 M2
20 LAB KIMIA 3 POLISH 80X80 89.24 M2
21 LAB BASAH POLISH 80X80 23.00 M2
22 RUANG INSTRUMENT POLISH 80X80 21.04 M2

914.87 M2
JUMLAH

2 Granitile 80x80 Motif Setara Sandimas Unpolish (Teras, Koridor dan Tangga)
547.26 M2
1 KORIDOR UNPOLISH 80X80

1 TANGGA 2 4.44 M2
Trap unpolish UNPOLISH 80X80 0.36 M2
Bordes unpolish UNPOLISH 80X80
2 TANGGA 1 4.46 M2
Trap Unpolish UNPOLISH 80X80 8.40 M2
Bordes unpolish UNPOLISH 80X80
3 TANGGA 3 8.36 M2
Trap Unpolish UNPOLISH 80X80 7.16 M2
Bordes unpolish UNPOLISH 80X80
4 TANGGA Lab Basah 2.02 M2
Trap Unpolish UNPOLISH 80X80 2.88 M2
Bordes unpolish UNPOLISH 80X80
5 TANGGA Lab Basah 2 0.91 M2
Trap Unpolish UNPOLISH 80X80 1.48 M2
Bordes unpolish UNPOLISH 80X80
6 TANGGA R Pers Alat 1.28 M2
Trap Unpolish UNPOLISH 80X80
7 TANGGA Mushola 1.28 M2
Trap Unpolish UNPOLISH 80X80 0.46 M2
Bordes unpolish UNPOLISH 80X80
8 TANGGA Toilet lk/prm 1.28 M2
Trap Unpolish UNPOLISH 80X80 0.46 M2
Bordes unpolish UNPOLISH 80X80
9 TANGGA KM1 + KM2 0.74 M2
Trap Unpolish UNPOLISH 80X80

JUMLAH 593.23 M2

3 Parquet jati 1.5cmx9cmx30cm-120cm

1 MUSHOLLAH 28.74 M2
2 R penyimpanan 32.00

JUMLAH 60.74 M2

4 Lantai panggung rangka baja fin.Kalsifloor 20mm (Rise floor)

1 RUANG CINEMA Rise Floor M2


JUMLAH - M2

5 Granitile 60x60 unpolish Setara Sandimas (Lantai Toilet)

1 Kamar Mandi Pria UNPOLISH 60X60 21.30 M2


2 Kamar Mandi Wanita UNPOLISH 60X60 17.15 M2
3 Toilet Pria & Wanita UNPOLISH 60X60 16.30 M2
4 Toilet Staff Lantai 2 UNPOLISH 60X60 4.15 M2
5 Toilet Wanita Lantai 2 UNPOLISH 60X60 10.68 M2

JUMLAH 69.58 M2

6 Granitile 60x60 unpolish Setara Sandimas (Dinding Toilet)

1 Dinding Toilet Wanita UNPOLISH 60x60 48.12 M2


2 Dinding Toilet Pria dan Wanita UNPOLISH 60x60 74.00 M2
3 DINDING TOILET PRIA UNPOLISH 60x60 48.45 M2
4 Dinding Toilet Staff Lantai 2 UNPOLISH 60x60 28.60 M2
5 Dinding Toilet Wanita Lantai 2 UNPOLISH 60x60 53.00 M2

JUMLAH 252.17 M2
6A KORNIS

1 Toilet Wanita KORNIS 16.44


2 Toilet Pria dan Wanita KORNIS 30.00
3 TOILET PRIA KORNIS 21.05

JUMLAH 67.49 M2

7 Plint keramik 10 x 80 Polish setara Sandimas (R.Dosen, R.Kuliah, R.Dubbing)

1 RUANG ISTIRAHAT POLISH 10X80 13.00 M'


2 RUANG PERS. ALAT POLISH 10X80 31.60 M'
3 LAB KIMIA 2 POLISH 10X80 24.40 M'
4 LAB ANATOMI BASAH POLISH 10X80 22.80 M'
5 RUANG PVT POLISH 10X80 18.00 M'
6 LAB. GG 14 POLISH 10X80 24.70 M'
7 RUANG KULIAH 1 POLISH 10X80 22.80 M'
8 RUANG KULIAH 2 POLISH 10X80 34.70 M'
9 RUANG RAPAT POLISH 10X80 44.85 M'
10 RUANG PRODI 1 POLISH 10X80 26.00 M'
11 RUANG DOSEN 1 POLISH 10X80 19.45 M'
12 RUANG PRODI 2 POLISH 10X80 20.88 M'
13 RUANG PENYIMPANAN POLISH 10X80 18.88 M'
14 LAB. PERSIAPAN POLISH 10X80 17.30 M'
15 RUANG LABORAN POLISH 10X80 12.26 M'
16 RUANG PANEL POLISH 10X80 9.82 M'
17 RUANG DUBBING POLISH 10X80 M'
18 LAB KIMIA 1 POLISH 10X80 45.30 M'
19 LAB. GG 01 POLISH 10X80 38.68 M'
20 LAB KIMIA 3 POLISH 10X80 41.20 M'
21 LAB BASAH POLISH 10X80 20.27 M'
22 RUANG INSTRUMENT POLISH 10X80 18.04 M'
Island Bench/Meja Lab. 1,5X3.2 (M1) (lengkap dengan furniture > lihat
23 POLISH 10X80 28.20 M'
gambar)
Island Bench/Meja Lab. 1,5X5 (M2) (lengkap dengan furniture > lihat
24 POLISH 10X80 78.00 M'
gambar)

25 Wall Bench/Meja Lab, 0,8X3,85 (M3) (lengkap dengan furniture > lihat POLISH 10X80 10.19 M'
gambar)

JUMLAH 641.32 M'

8 Plint keramik 10 x 80 Unpolish setara Sandimas (Teras, Koridor dan Tangga)

Plint Area Koridor


Kolom UNPOLISH 10X80 28.80 M'
DEPAN LAB KIMIA UNPOLISH 10X80 6.70 M'
D. R ISTIRAHAT UNPOLISH 10X80 1.70 M'
R. PERS ALAT UNPOLISH 10X80 2.62 M'
LAB KIMIA UNPOLISH 10X80 6.70 M'
ATANOMI BASAH UNPOLISH 10X80 6.50 M'
R PVT UNPOLISH 10X80 9.88 M'
LAB GG 014 UNPOLISH 10X80 8.43 M'
R.KULIAH 1 UNPOLISH 10X80 5.40 M'
R.KULIAH 2 UNPOLISH 10X80 8.00 M'
R.RAPAT UNPOLISH 10X80 5.48 M'
R DOSEN UNPOLISH 10X80 8.80 M'
LAB KIMIA 3 UNPOLISH 10X80 10.50 M'
R DOSEN 2 UNPOLISH 10X80 8.32 M'
MUSHOLA UNPOLISH 10X80 6.85 M'
TOILET UNPOLISH 10X80 23.20 M'
VOID s/d R.Penyimpanan UNPOLISH 10X80 17.97 M'
R.Laboran s/d Lab GG 01 UNPOLISH 10X80 15.95 M'
R.Instrumen UNPOLISH 10X80 3.20 M'

Plint Area Tangga


TANGGA 1 UNPOLISH 10X80 13.79 M'
TANGGA 2 UNPOLISH 10X80 8.04 M'
TANGGA 3 UNPOLISH 10X80 17.93 M'

JUMLAH 224.76 M'

9 Plint Parket

R. Musholla Plint Parket 20.83 M'


Meja Tambahan L 2

JUMLAH 20.83 M'

10 Stepnosing tangga (custom pabrikan)

TANGGA 1
Stepnosing tangga 50.70 M'
TANGGA 2
Stepnosing tangga 14.40 M'
TANGGA 3
Stepnosing tangga 52.60 M'
TANGGA Lab Basah
Stepnosing tangga 9.60 M'
TANGGA Lab Basah 2
Stepnosing tangga 12.60 M'
TANGGA R Pers Alat
Stepnosing tangga 3.80 M'
TANGGA Mushola
Stepnosing tangga 9.20 M'
TANGGA Toilet lk/prm
Stepnosing tangga 9.20 M'
TANGGA KM1 + KM2
Stepnosing tangga 8.80 M'

JUMLAH 170.90 M'

11 Batu alam andesit

Keliling Andesit Tampak Depan 54.35 M2


T Depan Bawah 84.96 M2
depan klm 12.60 M2
Kolom Depan 21.00 M2
Dinding Depan Mushola 9.27 M2
Keliling Andesit Tampak Samping Kiri 88.41 M2
kolom 6.18 M2
RR AN R Rapat 12.96 M2
Keliling Andesit Tampak Samping Kanan 60.11 M2
Samping Kiri Full 53.18 M2

JUMLAH 403.02 M2

12 List Ban Batu Andesit


KELILING ANDESIT TAMPAK DEPAN 43.15 M'
KELILING ANDESIT TAMPAK SAMPING KIRI 69.3 M'
KELILING ANDESIT TAMPAK SAMPING KANAN 54.64 M'

JUMLAH 167.09 M'

13 Penebalan Bagian Bawah Dinding Andesit


KELILING ANDESIT TAMPAK DEPAN 10.19 M2
Kolom Depan 1.80 M2
Dinding Depan Mushola 1.85 M2
KELILING ANDESIT TAMPAK SAMPING KIRI 17.68 M2
RR AN R Rapat 2.63 M2
KELILING ANDESIT TAMPAK SAMPING KANAN 12.02 M2

JUMLAH 46.18 M2
14 Plafond Gyptile
RUANG ISTIRAHAT 26.43 M2
RUANG PERS. ALAT 109.52 M2
LAB KIMIA 2 80.94 M2
LAB ANATOMI BASAH 35.96 M2
RUANG PVT 22.23 M2
LAB. GG 14 41.33 M2
RUANG KULIAH 1 35.91 M2
RUANG KULIAH 2 73.25 M2
RUANG RAPAT 155.42 M2
RUANG PRODI 1 39.32 M2
RUANG DOSEN 1 26.46 M2
RUANG PRODI 2 30.46 M2
RUANG PENYIMPANAN 25.98 M2
LAB. PERSIAPAN 24.92 M2
RUANG LABORAN 12.68 M2
RUANG PANEL 6.59 M2
RUANG DUBBING M2
LAB KIMIA 1 188.92 M2
LAB. GG 01 98.46 M2
LAB KIMIA 3 90.72 M2
LAB BASAH 22.80 M2
RUANG INSTRUMENT 21.38 M2
RUANG CINEMA M2

JUMLAH 1,169.68 M2

15 Plafond Gypsum 9mm Setara Jayaboard


MUSHOLLAH 28.74 M2
PLAFOND KORIDOR 547.26 M2
AUDOTRIUM 33.85 M2
Gypsum koridor (dulu solarflate) 114.38 M2
Gypsum Koridor Penghubung 186.60 M2
Partisi 2.60 M2
Bawah tangga 13.54 M2

JUMLAH 926.97 M2

16 Plafond GRC 4mm Setara Grc


PLAFOND KORIDOR DROP 70.68 M2
PLAFOND KORIDOR REC 131.26 M2
Kamar Mandi Pria 42.60 M2
Kamar Mandi Wanita 42.60 M2
Toilet Pria & Wanita 17.15 M2

JUMLAH 304.29 M2

17 List plafond Almunium U 2cm (shadow line)


Area Koridor, Mushollah 392.23 M1

JUMLAH 392.23 M1

18 Dinding bata ringan Setara Hebel 10x20x60 (MM-101)

LAB KIMIA 1 5.31 M2


LAB BASAH 0.90 M2
R.PRODI 24.08 M2
MUSHOLA 6.24 M2
TOILET PRIA 25.71 M2
TOILET PRIA&WANITA 17.10 M2
Kipas Besi Diameter 1.2 12.26 M2
Ruang Panel 7.74

JUMLAH 99.34 M2

19 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101)


LAB KIMIA 1 2.93 M2
PERS ALAT 3.30 M2
LAB KIMIA 2 2.28 M2
LAB ATANOMI BASAH 4.80 M2
LAB GG. 14 2.09 M2
R.KULIAH 1 2.09 M2
R.RAPAT 5.70 M2
R.DOSEN 2.09 M2
LAB KIMIA 3 4.18 M2
TOILET WANITA 13.89 M2
VOID 27.52 M2
R PENYIMPANAN 2.70 M2
R LABORAN+R. LAP PERSI 7.74 M2
LAB GG.01 23.54 M2
Ruang Panel 4.50 M2
Kipas Besi 12.26 M2
exhousfant 40x40 0.48 M2
exhousfant 20x40 0.08 M2

JUMLAH 122.16 M2

20 Plesteran semen instant Setara MM-201


LAB KIMIA 1 16.48 M2
LAB BASAH 1.80 M2
R PERSEDIAAN ALAT 6.60 M2
LAB KIMIA 2 4.56 M2
LAB ATANOMI BASAH 9.60 M2
R.PVT 4.18 M2
R.KULIAH 1 4.18 M2
R.KULIAH 2 11.40 M2
R.PRODI 48.16 M2
R.DOSEN 4.18 M2
LAB KIMIA 3 8.36 M2
R.PRODI 2 12.47 M2
TOILET WANITA 27.78 M2
TOILET PRIA 51.43 M2
TOILET PRIA&WANITA 34.20 M2
VOID 55.04 M2
R PENYIMPANAN 5.40 M2
R LABORAN+R. LAP PERSI 15.48 M2
LAB GG.01 47.08 M2
GWT 24.75 M2
exhousfant 40x40 0.32 M2
exhousfant 20x40 0.16 M2
R Panel 24.48 M2
Kipas Besi Dia 1,2 24.51 M2
Finish Bibir Keramik Koridor 54.63

JUMLAH 497.22 M2

21 Acian Dinding setara MM-301 t. 3 mm


LAB KIMIA 1 16.48 M2
LAB BASAH 1.80 M2
R PERSEDIAAN ALAT 6.60 M2
LAB KIMIA 2 4.56 M2
LAB ATANOMI BASAH 9.60 M2
R.PVT 4.18 M2
R.KULIAH 1 4.18 M2
R.KULIAH 2 11.40 M2
R.PRODI 48.16 M2
R.DOSEN 4.18 M2
LAB KIMIA 3 8.36 M2
R.PRODI 2 12.47 M2
TOILET WANITA 27.78 M2
TOILET PRIA 51.43 M2
TOILET PRIA&WANITA 34.20 M2
VOID 55.04 M2
R PENYIMPANAN 5.40 M2
R LABORAN+R. LAP PERSI 15.48 M2
LAB GG.01 47.08 M2
xhousfant 40x40 0.32 M2
exhousfant 20x40 0.16 M2
R Panel 24.48 M2
Kipas Besi Dia 1,2 48.96 M2
Finish Bibir Keramik Koridor 54.63 M2

JUMLAH 496.92 M2

22 Plesteran bukaan kusen Setara MM-201 t. 10 mm


Kusen Single 295.24 M2
Kusen Double 100.10 M2

JUMLAH 395.34 M2

23 Acian bukaan kusen Setara MM-301 t. 10 mm


Kusen Single 295.24 M2
Kusen Double 100.10 M2
JUMLAH 395.34 M2

24 Kolom Praktis 10x10


Lantai 1 52.3 M'
Pintu Loket 2 M'
Koridor penghubung 12

JUMLAH 66.30 M'

25 Balok lintel 8x10


Lantai 1 7.40 M'
Pintu Loket 7.70 M'

JUMLAH 15.10 M'

26 Listplank lapis Almunium Composit Panel (ACP) setara Seven


Tampak Depan (Depan Ruang Rapat) 6.60 M2

JUMLAH 6.60 M2

27 Dinding lapis alumunium composit panel (ACP) setara seven


Tampak Depan (Depan Ruang Rapat) 44.72 M2
DEPAN PERMINTAAN USER 19.26 M2
ATAS RUANG RESEPSIONIS 11.90 M2

JUMLAH 75.88 M2

28 Logo Stainless Mirror, Tulisan Stainles Mirror (Inspring Inovation with Integrity, IPB UNIVERSITY)
Tampak Depan (Depan Ruang Rapat) 1.00 UNIT

JUMLAH 1.00 UNIT

29 Pekerjaan ring balk atas kusen 15/25


LAB KIMIA 1 2.95 M'
PERS ALAT 5.20 M'
LAB ATANOMI BASAH 2.00 M'
R.PVT 1.00 M'
LAB GG. 14 2.00 M'
R.KULIAH 1 2.95 M'
R.KULIAH 2 4.00 M'
R.RAPAT 2.00 M'
R.PRODI 2.00 M'
R.DOSEN 2.00 M'
LAB KIMIA 3 4.00 M'
R.PRODI 2 2.00 M'
TOILET WANITA 2.00 M'
TOILET PRIA 1.00 M'
TOILET PRIA&WANITA 2.00 M'
R LABORAN+R. LAP PERSI 4.00 M'
LAB GG.01 2.00 M'
R INSTRUMEN 1.80 M'
Ruang Panel 3.00 M'

JUMLAH 47.90 M'

30 Perapihan Bekas Bobokan


LAB KIMIA 1 3.10 M'
PERS ALAT 36.10 M'
LAB KIMIA 2 1.00 M'
LAB ATANOMI BASAH 31.70 M'
LAB GG. 14 20.00 M'
R.KULIAH 1 0.95 M'
R.KULIAH 2 5.70 M'
R.RAPAT 11.32 M'
LAB KIMIA 3 1.90 M'
LAB GG. 01 1.80 M'
TOILET WANITA 2.60 M'

JUMLAH 116.17 M'

31 Screed Lantai
R.Pers Alat, Koridor dpn Pers Alat,R.kuliah 114.47 M2
R.Instrumen 16.49 M2

JUMLAH 130.96 M2

32 Pemadatan tanah
Ruang Rapat 52.20 M2
JUMLAH 52.20 M2

33 Rabat Beton T = 6 cm
Koridor Luar 252.56 M2
R kuliah L 2 33.30
Mushola 28.74

JUMLAH 314.60 M2

34 ###
Koridor Luar 360.80 M'

JUMLAH 360.80 M'

35 Pengurugan Dan Screet Lantai


R.Toilet Wanita 16.90 M2
Selasar Tambahan 51.27

JUMLAH 68.17 M2

36 Pekerjaan Sloof 8x12


Selasar Tambahan 6.20
Ruang Prodi 5.60 M'

JUMLAH 11.80 M'

37 ### 4.00 UNIT

JUMLAH 4.00 UNIT

38 ### 9.00 UNIT

JUMLAH 9.00 UNIT

39 Cat Dinding Interior Setara Dulux Easy Clean (standart)


RUANG ISTIRAHAT 44.52 M2
RUANG PERS. ALAT 98.29 M2
LAB KIMIA 2 72.14 M2
LAB ANATOMI BASAH 69.16 M2
RUANG PVT 59.48 M2
LAB. GG 14 77.20 M2
RUANG KULIAH 1 69.73 M2
RUANG KULIAH 2 105.18 M2
RUANG RAPAT 158.48 M2
RUANG PRODI 1 89.16 M2
RUANG DOSEN 1 60.50 M2
RUANG PRODI 2 62.44 M2
RUANG PENYIMPANAN 62.03 M2
LAB. PERSIAPAN 60.01 M2
RUANG LABORAN 43.21 M2
RUANG PANEL 35.18 M2
RUANG DUBBING M2
LAB KIMIA 1 124.82 M2
LAB. GG 01 155.73 M2
LAB KIMIA 3 117.24 M2
LAB BASAH 46.66 M2
RUANG INSTRUMENT 56.72 M2
MUSHOLLAH 80.73 M2
RUANG CINEMA M2

JUMLAH 1,748.62 M2

40 Cat Dinding Exterior Setara Dulux wheatershield (standart)


Selasar 233.36 M2
Dinding Depan 132.27 M2
Kanopi Depan 33.00 M2
Plat Lantai D 21.20 M2
Lis Ban D 29.52 M2
Dinding Belakang 95.05 M2
Plat Lantai B 5.08 M2
Kanopi B 19.72 M2
Dinding Sisi Kiri 143.20 M2
Lisban K 3.50 M2
Kanopi K 37.00 M2
Dinding Sisi Kanan 133.28 M2
Lisban Kn 22.80 M2
Plat Kn 21.20 M2
Kanopi Kn 59.40 M2
Dinding Belakang Kiri 39.62 M2
Kanopi Belakang Kiri 19.08 M2

JUMLAH 1,048.27 M2

40 Pengikisan/pengerokan permukaan cat lama

RUANG ISTIRAHAT 44.33


RUANG PERS. ALAT 87.55
LAB KIMIA 2 63.64
LAB ANATOMI BASAH 61.18
RUANG PVT 56.36
LAB. GG 14 71.94
RUANG KULIAH 1 63.25
RUANG KULIAH 2 99.06
RUANG RAPAT 158.25
RUANG PRODI 1 46.80
RUANG DOSEN 1 30.59
RUANG PRODI 2 58.26
RUANG PENYIMPANAN 54.85
LAB. PERSIAPAN 53.20
RUANG LABORAN 39.24
RUANG PANEL 35.50
RUANG DUBBING
LAB KIMIA 1 117.44
LAB. GG 01 137.48
LAB KIMIA 3 108.55
LAB BASAH 46.66
RUANG INSTRUMENT 56.90
MUSHOLLAH 80.73
RUANG CINEMA
Selasar 502.20
Dinding Depan 132.27
Kanopi Depan 33.00
Plat Lantai D 21.20
Lis Ban D 29.52
Dinding Belakang 95.05
Plat Lantai B 5.08
Kanopi B 19.72
Dinding Sisi Kiri 143.20
Lisban K 3.50
Kanopi K 37.00
Dinding Sisi Kanan 133.28
Lisban Kn 22.80
Plat Kn 21.20
Kanopi Kn 59.40
Dinding Belakang Kiri 39.62
Kanopi Belakang Kiri 19.08

JUMLAH 2,888.85 M2

41 Bongkar Dinding 1 Bata


LAB KIMIA 1 11.34 M2
LAB BASAH 4.00 M2
PERS ALAT 33.99 M2
LAB KIMIA 2 2.20 M2
LAB ATANOMI BASAH 42.53 M2
R.PVT 2.20 M2
LAB GG. 14 24.51 M2
R.KULIAH 2 24.51 M2
R.RAPAT 48.98 M2
R.PRODI 25.74 M2
LAB KIMIA 3 43.00 M2
NO NAME 2 34.53 M2
MUSHOLA 2.58 M2
TOILET WANITA 20.21 M2
TOILET PRIA&WANITA 73.10 M2
R LABORAN+R. LAP PERSI 10.20 M2

JUMLAH 403.62 M2

42 Bongkar Dinding 1/2 Bata


LAB KIMIA 1 8.98 M2
LAB ATANOMI BASAH 15.05 M2
TOILET PRIA 58.39 M2

JUMLAH 82.43 M2

43 Bongkar Listplank 272.10 M'

JUMLAH 272.10 M'

44 Bongkar Rangka Plafond & penutup plafond 669.11 M2


Kamar Mandi Wanita 16.89 M2
Kamar Mandi Pria 23.90 M2
Ruang Rapat 33.00 M2
Ruang Lab Kimia 1 74.39 M2
PERS ALAT 36.60 M2
Lab Kimia 2 33.25 M2

JUMLAH 887.14 M2

45 Bongkar Kusen Pintu Single


LAB KIMIA 1 2.00 UNIT
LAB BASAH 1.00 UNIT
R ISTIRAHAT 1.00 UNIT
PERS ALAT 2.00 UNIT
LAB KIMIA 2 2.00 UNIT
LAB ATANOMI BASAH 4.00 UNIT
R.PVT 1.00 UNIT
LAB GG. 14 2.00 UNIT
R.KULIAH 1 2.00 UNIT
R.KULIAH 2 2.00 UNIT
R.RAPAT 3.00 UNIT
R.PRODI 1.00 UNIT
R.DOSEN 1.00 UNIT
LAB KIMIA 3 2.00 UNIT
NO NAME 2 2.00 UNIT
TOILET WANITA 2.00 UNIT
TOILET PRIA 5.00 UNIT
TOILET PRIA&WANITA 5.00 UNIT
R LABORAN+R. LAP PERSI 3.00 UNIT
R INSTRUMEN 1.00 UNIT

JUMLAH 44.00 UNIT

46 Bongkar Kusen Pintu Dobel


LAB KIMIA 1 2.00 UNIT
PERS ALAT 1.00 UNIT
R.KULIAH 1 1.00 UNIT
R.KULIAH 2 1.00 UNIT
R.RAPAT 1.00 UNIT
R.PRODI 1.00 UNIT
R.DOSEN 1.00 UNIT
LAB KIMIA 3 2.00 UNIT
R.PRODI 2 1.00 UNIT
MUSHOLA 1.00 UNIT
R PENYIMPANAN 1.00 UNIT

JUMLAH 13.00 UNIT

47 Bongkar plint lantai & perapihan


Ruangan
RUANG ISTIRAHAT POLISH 10X80 15.05 M'
RUANG PERS. ALAT POLISH 10X80 31.60 M'
LAB KIMIA 2 POLISH 10X80 24.40 M'
LAB ANATOMI BASAH POLISH 10X80 22.80 M'
RUANG PVT POLISH 10X80 18.00 M'
LAB. GG 14 POLISH 10X80 24.70 M'
RUANG KULIAH 1 POLISH 10X80 22.80 M'
RUANG KULIAH 2 POLISH 10X80 34.70 M'
RUANG RAPAT POLISH 10X80 44.85 M'
RUANG PRODI 1 POLISH 10X80 26.00 M'
RUANG DOSEN 1 POLISH 10X80 19.45 M'
RUANG PRODI 2 POLISH 10X80 20.88 M'
RUANG PENYIMPANAN POLISH 10X80 18.88 M'
LAB. PERSIAPAN POLISH 10X80 17.30 M'
RUANG LABORAN POLISH 10X80 12.26 M'
RUANG PANEL POLISH 10X80 9.82 M'
RUANG DUBBING POLISH 10X80 M'
LAB KIMIA 1 POLISH 10X80 45.30 M'
LAB. GG 01 POLISH 10X80 38.68 M'
LAB KIMIA 3 POLISH 10X80 41.20 M'
LAB BASAH POLISH 10X80 20.27 M'
RUANG INSTRUMENT POLISH 10X80 18.04 M'

JUMLAH 526.98 M'

Plint Area Koridor


Kolom UNPOLISH 10X80 28.80 M'
DEPAN LAB KIMIA UNPOLISH 10X80 6.70 M'
D. R ISTIRAHAT UNPOLISH 10X80 1.70 M'
R. PERS ALAT UNPOLISH 10X80 2.62 M'
LAB KIMIA UNPOLISH 10X80 6.70 M'
ATANOMI BASAH UNPOLISH 10X80 6.50 M'
R PVT UNPOLISH 10X80 9.88 M'
LAB GG 014 UNPOLISH 10X80 8.43 M'
R.KULIAH 1 UNPOLISH 10X80 5.40 M'
R.KULIAH 2 UNPOLISH 10X80 8.00 M'
R.RAPAT UNPOLISH 10X80 5.48 M'
R DOSEN UNPOLISH 10X80 8.80 M'
LAB KIMIA 3 UNPOLISH 10X80 10.50 M'
R DOSEN 2 UNPOLISH 10X80 8.32 M'
MUSHOLA UNPOLISH 10X80 6.85 M'
TOILET UNPOLISH 10X80 23.20 M'
VOID s/d R.Penyimpanan UNPOLISH 10X80 17.97 M'
R.Laboran s/d Lab GG 01 UNPOLISH 10X80 15.95 M'
R.Instrumen UNPOLISH 10X80 3.20 M'

JUMLAH 185.00 M'

Plint Area Tangga


TANGGA 1 UNPOLISH 10X80 13.79 M'
TANGGA 2 UNPOLISH 10X80 8.04 M'
TANGGA 3 UNPOLISH 10X80 17.93 M'

JUMLAH 39.76 M'

JUMLAH 751.74 M'

48 Bongkar Meja lab


R Lab Kimia 1 3.00 UNIT
R Lab Kimia 3 4.00 UNIT
R Lab Klinik Bisnis 1.00 UNIT
R Lab Persiapan 1.00 UNIT

JUMLAH 9.00 UNIT

49 Bongkar Koridor penghubung


Luasan Atap 140.30 M2

JUMLAH 140.30 M2

50 Bongkar Lantai
Ruang Rapat 105.70 M2

JUMLAH 105.70 M2

51 Bongkaran sloof Ruang Rapat


Ruang Rapat 34.30 M'

JUMLAH 34.30 M'

52 Galian tanah Ruang Rapat 3.76 M3

JUMLAH 3.76 M3

53 Bongkar Isi Ruangan


### 1.00 UNIT
### 1.00 UNIT
### 1.00 UNIT

54 Bongkar Meja Beton Lab Kimia 4.00 UNIT

JUMLAH 4.00 UNIT

55 Bongkar Beton Retening Wall rapat


Ruang Rapat 33.44 M2
Kamar Mandi Toilet 0.29 M2
JUMLAH 33.73 M2

56 Bongkar Relling Kayu Ruang Rapat 6.00 M'


57 Bongkar Pintu Pagar Besi Dan Pagar Besi Jendela 1.00 UNIT
58 Bongkar Kipas Besi dia 1,2 13.00 UNIT
59 Bongkar Meja Beton R Persediaan Alat 1.00 UNIT
60 Bongkar Lemari Asam 2.00 UNIT
61 Pembongkaran Talang Air 294.50 M'
64 Bongkar Kusen Jendela 6.00 UNIT
65 Bongkar Bouven Light 3.00 UNIT
66 Pasang Kolom 15/25 ( Openingan Kusen ) 48.00 M'
67 Pasang Kolom 30/40 ruang rapat 9.40 M'
68 Pasang Balok 30/60 ruang rapat 9.40 M'
69 Bongkar Pondasi 40/60 ruang rapat 0.36 M3

B BACK UP HITUNGAN LANTAI 2

1 Granitile 80x80 Motif Setara Sandimas Polish


NO NAME POLISH 80X80 83.74 M2
RUANG KULIAH 1 POLISH 80X80 71.07 M2
RUANG DOSEN 1 POLISH 80X80 36.04 M2
RUANG ANATOMI KERING POLISH 80X80 39.54 M2
RUANG KULIAH 2 POLISH 80X80 30.22 M2
RUANG PERALATAN 1 POLISH 80X80 41.87 M2
RUANG PERALATAN 2 POLISH 80X80 31.32 M2
RUANG KULIAH 2 POLISH 80X80 52.83 M2
RUANG BACA POLISH 80X80 17.78 M2
RUANG PENYIMPANAN POLISH 80X80 26.50 M2
RUANG STUDIO FOTOGRAPHI POLISH 80X80 31.74 M2
MCR POLISH 80X80 12.29 M2
RUANG STUDIO AUDIO VISUAL POLISH 80X80 44.50 M2
RUANG STUDIO MULTIMEDIA POLISH 80X80 54.34 M2
RUANG TAX CENTER POLISH 80X80 31.00 M2
RUANG DOSEN 2 POLISH 80X80 29.16 M2
RUANG DOSEN 3 POLISH 80X80 46.06 M2
RUANG SIARAN POLISH 80X80 9.96 M2
RUANG STUDIO SIARAN RADIO POLISH 80X80 M2
RUANG PANEL POLISH 80X80 5.33 M2

JUMLAH 695.29 M2
2 Granitile 80x80 Unpolish Setara Sandimas Lt. 2
KORIDOR UNPOLISH 80X80 303.30 M2

JUMLAH 303.30 M2
3 Plint keramik 10 x 80 Polish setara Sandimas Lt. 2
NO NAME POLISH 10X80 83.74 M'
RUANG KULIAH 1 POLISH 10X80 71.07 M'
RUANG DOSEN 1 POLISH 10X80 36.04 M'
RUANG ANATOMI KERING POLISH 10X80 39.54 M'
RUANG KULIAH 2 POLISH 10X80 30.22 M'
RUANG PERALATAN 1 POLISH 10X80 41.87 M'
RUANG PERALATAN 2 POLISH 10X80 31.32 M'
RUANG KULIAH 2 POLISH 10X80 52.83 M'
RUANG BACA POLISH 10X80 17.78 M'
RUANG PENYIMPANAN POLISH 10X80 26.50 M'
RUANG STUDIO FOTOGRAPHI POLISH 10X80 31.74 M'
MCR POLISH 10X80 12.29 M'
RUANG STUDIO AUDIO VISUAL POLISH 10X80 44.50 M'
RUANG STUDIO MULTIMEDIA POLISH 10X80 54.34 M'
RUANG TAX CENTER POLISH 10X80 31.00 M'
RUANG DOSEN 2 POLISH 10X80 29.16 M'
RUANG DOSEN 3 POLISH 10X80 46.06 M'
RUANG SIARAN POLISH 10X80 9.96 M'
RUANG STUDIO SIARAN RADIO POLISH 10X80 M'
RUANG PANEL POLISH 10X80 5.33 M'

JUMLAH 695.29 M'


3 Plint keramik 10 x 80 Unpolish setara Sandimas (Teras, Koridor dan Tangga)
Koridor
Kolom UNPOLISH 10X80 28.8 M'
R.Kuliah UNPOLISH 10X80 4 M'
R.Dosen UNPOLISH 10X80 6 M'
Antonomi kering UNPOLISH 10X80 4.9 M'
R kuliah UNPOLISH 10X80 6.7 M'
R, Peralatan UNPOLISH 10X80 8.8 M'
R. Kuliah UNPOLISH 10X80 6 M'
R,Baca UNPOLISH 10X80 8.35 M'
R. Peny Alat UNPOLISH 10X80 37 M'

JUMLAH 110.55 M'


4 Plafond Gypsum 9mm Setara Jayaboard
MCR Gypsum 11.75 M2
KORIDOR Gypsum 343.30 M2
PENYIMPANAN ALAT Gypsum 60.27 M2
R Studio Audio Visual Gypsum 16.04 M2

JUMLAH 431.36 M2
5 Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2
RUANG KULIAH 1 Plafond Gyptile 70.53 M2
RUANG DOSEN 1 Plafond Gyptile 71.00 M2
RUANG ANATOMI KERING Plafond Gyptile 78.00 M2
RUANG KULIAH 2 Plafond Gyptile 29.68 M2
RUANG PERALATAN 1 Plafond Gyptile 41.33 M2
RUANG PERALATAN 2 Plafond Gyptile 30.78 M2
RUANG KULIAH 2 Plafond Gyptile 52.29 M2
RUANG BACA Plafond Gyptile 17.24 M2
RUANG PENYIMPANAN Plafond Gyptile 27.02 M2
RUANG STUDIO FOTOGRAPHI Plafond Gyptile 31.20 M2
RUANG STUDIO AUDIO VISUAL Plafond Gyptile 43.96 M2
RUANG STUDIO MULTIMEDIA Plafond Gyptile 53.80 M2
RUANG TAX CENTER Plafond Gyptile 30.46 M2
RUANG DOSEN 2 Plafond Gyptile 28.62 M2
RUANG DOSEN 3 Plafond Gyptile 45.52 M2
RUANG SIARAN Plafond Gyptile 9.96 M2
RUANG STUDIO SIARAN RADIO Plafond Gyptile 34.56 M2
RUANG PANEL Plafond Gyptile 5.33 M2
NO NAME Plafond Gyptile 166.40 M2

JUMLAH 867.68 M2
6 Plafond GRC 4mm Setara Grc
PLAFOND GRC DROP CEILING 121.733 M2

JUMLAH 121.73 M2
7 Plafond GRC 4mm Setara Grc
PLAFOND GRC Mendatar 217.21 M2
KAMAR MANDI STAFF 21.36 M2
KAMAR MANDI SISWA 8.30 M2
JUMLAH 246.87 M2
8 List plafond Almunium U 2cm (shadow line)
KORIDOR 285.08 M'
N
JUMLAH 285.08 M'
9 Dinding bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2
RUANG KULIAH 33.23 M2
R BACA 22.52 M2
R.PANEL 27.65 M2

JUMLAH 83.40 M2
10 Dinding 2 Lapis bata ringan Setara Hebel 10x20x60 (MM-101) Lt. 2
RUANG KULIAH 5.40 M2
RUANG DOSEN 8.40 M2
R KULIAH 4.18 M2
R PERALATAN 7.11 M2
R KULIAH 5.33 M2
R BACA 4.50 M2
RUANG AUDI VIDI 3.80 M2
STUDIO MM 1.98 M2
R.TAX CEN 1.98 M2
R.DOSEN 2 14.00 M2

JUMLAH 56.69 M2
11 Plesteran semen instant Setara MM-201 Lt. 2
RUANG KULIAH 66.46 M2
RUANG DOSEN 16.80 M2
R KULIAH 8.36 M2
R PERALATAN 14.22 M2
R KULIAH 10.67 M2
R BACA 54.04 M2
RUANG AUDI VIDI 7.60 M2
STUDIO MM 3.96 M2
R.TAX CEN 3.96 M2
R.PANEL 55.30 M2
R.DOSEN 2 28.00 M2
R. SIARAN+RUANG STD

JUMLAH 269.36 M2
12 Acian Dinding setara MM-301 t. 3 mm
RUANG KULIAH 66.46 M2
RUANG DOSEN 16.8 M2
R KULIAH 8.36 M2
R PERALATAN 14.22 M2
R KULIAH 10.665 M2
R BACA 54.036 M2
RUANG AUDI VIDI 7.6 M2
STUDIO MM 3.96 M2
R.TAX CEN 3.96 M2
R.PANEL 55.3 M2
R.DOSEN 2 28 M2

JUMLAH 269.36 M2
13 Plesteran bukaan kusen setara MM-201 t. 10 mm 24.00 M2

JUMLAH 24.00 M2
14 Acian bukaan kusen setara MM-301 t. 10 mm 24.00 M2

JUMLAH 24.00 M2
15 Kolom Praktis 10x10 17.20 M'

JUMLAH 17.20 M'


16 Pekerjaan ring balk atas kusen 15/25 32.00 M'

JUMLAH 32.00 M'


17 Cat Dinding Interior Setara Dulux Easy Clean (standart) Lt. 2
NO NAME 104.07 M2
RUANG KULIAH 1 89.14 M2
RUANG DOSEN 1 72.40 M2
RUANG ANATOMI KERING 75.41 M2
RUANG KULIAH 2 66.87 M2
RUANG PERALATAN 1 78.35 M2
RUANG PERALATAN 2 65.40 M2
RUANG KULIAH 2 91.83 M2
RUANG BACA 56.07 M2
RUANG PENYIMPANAN 69.82 M2
RUANG STUDIO FOTOGRAPHI 79.04 M2
MCR 53.03 M2
RUANG STUDIO AUDIO VISUAL 85.11 M2
RUANG STUDIO MULTIMEDIA 89.24 M2
RUANG TAX CENTER 79.38 M2
RUANG DOSEN 2 67.61 M2
RUANG DOSEN 3 86.81 M2
RUANG SIARAN 44.42 M2
RUANG STUDIO SIARAN RADIO 61.70 M2
RUANG PANEL 31.46 M2

JUMLAH 1,447.14 M2
18 Cat Dinding Exterior Setara Dulux wheatershield (standart) Lt. 2
SELASAR 548.29 M2
Dinding Belakang 78.14 M2
Belakang Sisi Kiri 81.24 M2
Sisi Kiri 33.98 M2
Depan 150.00 M2
Sisi Kanan 220.26 M2

JUMLAH 1,111.91 M2
19 Cat bukaan kusen Setara Dulux Easy Clean 4.70 M2

JUMLAH 4.70 M2
20 Cat Plafond gypsum Setara Vinilex
MCR Gypsum 11.75 M2
KORIDOR Gypsum 310.30 M2
PENYIMPANAN ALAT Gypsum 27.02 M2
R Studio Audio Visual Gypsum 16.04 M2
PLAFOND GRC DROP CEILING GRC 76.884 M2
PLAFOND GRC Mendatar GRC 222.21 M2
KAMAR MANDI STAFF GRC 10.68 M2
KAMAR MANDI SISWA GRC 4.15 M2

JUMLAH 679.03 M2
21 Cat Pet beton Exterior Setara Dulux wheatershield (standart) 64.00 M2

JUMLAH 64.00 M2
22 Cat lisplank 38.44 M2

JUMLAH 38.44 M2
23 Kerok cat railing 78.00 M'

JUMLAH 78.00 M'


24 Cat Railing 78.00 M'

JUMLAH 78.00 M'


25 Pengikisan/pengerokan permukaan cat lama
NO NAME 98.73
RUANG KULIAH 1 83.80
RUANG DOSEN 1 65.66
RUANG ANATOMI KERING 71.15
RUANG KULIAH 2 60.45
RUANG PERALATAN 1 71.93
RUANG PERALATAN 2 61.14
RUANG KULIAH 2 86.49
RUANG BACA 30.17
RUANG PENYIMPANAN 67.72
RUANG STUDIO FOTOGRAPHI 76.94
MCR 30.28
RUANG STUDIO AUDIO VISUAL 60.20
RUANG STUDIO MULTIMEDIA 84.98
RUANG TAX CENTER 60.72
RUANG DOSEN 2 63.35
RUANG DOSEN 3 75.61
RUANG SIARAN 22.02
RUANG STUDIO SIARAN RADIO 41.68
RUANG PANEL -

KORIDOR Selasar 176.06


Kolom Selasar Koridor 75.60
Samping Kanan 183.98
Tampak Depan 116.83
Samping Kiri 60.51
Sisi Belakang 159.38
Tangga Kamar Mandi Pria Wanita 37.83
Sisi Samping Tangga R Mushola 32.21

JUMLAH 2,055.40 M2
26 Bongkar Dinding 1 Bata
RUANG KULIAH 76.12 M2
RUANG DOSEN 50.80 M2
DAPUR (EXISTING 55.54 M2
RUANG AUDI VIDI 53.64 M2
R.DOSEN 2 92.86 M2

JUMLAH 328.96 M2
27 Bongkar Listplank 272.10 M'

JUMLAH 272.10 M'


28 Bongkar Rangka Plafond & penutup plafond 911.68 M2
Kamar Mandi Lantai 2 25.51 M2
Noname 78.50 M2
R. Anatomi Kering 32.08 M2

JUMLAH 937.19 M2
29 Bongkar Kusen Pintu Single
LAB KIMIA 1.00 UNIT
R ATANOMI KERING 2.00 UNIT
R KULIAH 2.00 UNIT
RUANG AUDI VIDI 1.00 UNIT
STUDIO MM 1.00 UNIT
R.TAX CEN 1.00 UNIT
R.PANEL 4.00 UNIT
R.DOSEN 2 3.00 UNIT

30 JUMLAH 15.00 UNIT


Bongkar Kusen Pintu Dobel
RUANG KULIAH 1.00 UNIT
LAB KIMIA 2.00 UNIT
RUANG DOSEN 1.00 UNIT
R PERALATAN 1.00 UNIT
DAPUR (EXISTING 2.00 UNIT
R.DOSEN 2 1.00 UNIT
R. SIARAN+RUANG STD 1.00 UNIT

JUMLAH 9.00 UNIT


31 Bongkar plint lantai & perapihan
NO NAME 83.74 M'
RUANG KULIAH 1 71.07 M'
RUANG DOSEN 1 36.04 M'
RUANG ANATOMI KERING 39.54 M'
RUANG KULIAH 2 30.22 M'
RUANG PERALATAN 1 41.87 M'
RUANG PERALATAN 2 31.32 M'
RUANG KULIAH 2 52.83 M'
RUANG BACA 17.78 M'
RUANG PENYIMPANAN 26.50 M'
RUANG STUDIO FOTOGRAPHI 31.74 M'
MCR 12.29 M'
RUANG STUDIO AUDIO VISUAL 44.50 M'
RUANG STUDIO MULTIMEDIA 54.34 M'
RUANG TAX CENTER 31.00 M'
RUANG DOSEN 2 29.16 M'
RUANG DOSEN 3 46.06 M'
RUANG SIARAN 9.96 M'
RUANG STUDIO SIARAN RADIO 34.56 M'
RUANG PANEL 5.33 M'

JUMLAH 729.85 M'


31 Bongkar plint lantai & perapihan
Kolom 28.8 M'
R.Kuliah 4 M'
R.Dosen 6 M'
Antonomi kering 4.9 M'
R kuliah 6.7 M'
R, Peralatan 8.8 M'
R. Kuliah 6 M'
R,Baca 8.35 M'
R. Peny Alat 37 M'

JUMLAH 110.55 M'


33 Bongkar Meja beton 32.20 M'

JUMLAH 32.20 M'


34 Bongkar dinding 1/2 bata
R PERALATAN 22.80 M2
R.DOSEN 2 15.96 M2
R. SIARAN+RUANG STD 52.61 M2
JUMLAH 91.37 M2
35 Bongkar Partisi Kaca R.MCR+R.Studio Fotografi 6.70 M'

JUMLAH 6.70 M'


36 ### 14.50 M'

JUMLAH 14.50 M'


37 Bongkar Partisi Kayu Dan Glaswool
Ruang Radio 32.40 M'

JUMLAH 32.40 M'


38 Bongkar Ring Balk 15/25 42.00 M'

JUMLAH 42.00 M'


39 Pasang Kolom 15/25 ( Opening Kusen ) 42.00 M'

JUMLAH 42.00 M'


40 Pasang Kolom 15/15 Ruang Kuliah 21.50 M'

JUMLAH 21.50 M'


41 Pasang Ring Balk 25/30 Ruang Kuliah 16.00 M'

JUMLAH 16.00 M'


42 Pasang Ring Balk 15/20 Ruang Kuliah 9.70 M'

JUMLAH 9.70 M'


43 Pasang Ring Balk 20/30 Ruang Kuliah 91.45 M'

JUMLAH 91.45 M'


44 Pasang Kolom 30/30 Ruang Kuliah 4.30 M'

JUMLAH 4.30 M'


45 Bongkar Dinding Pelapis GRC M2
R Kuliah 12.83

JUMLAH 12.83 M2

45 Bongkar Dinding 1/2 Bata Ruang Kuliah 8.40 M2

JUMLAH 8.40 M2
46 Kolom Praktis Meja Lab
M2 10 x 10 6.30 M'
M1 10 x 10 1.65 M'
M3 10 x 10 0.30 M'

JUMLAH 8.25 M'


47 Plat t. 10 cm (M4 1 Lapis) - Beton site mix K-175
M2 6.75 M2
M1 1.44 M2
M3 0.31 M2

JUMLAH 8.50 M2
48 Granitile 60 x 60 Setara Sincere
M2 54.54 M2
M1 12.48 M2
M3 0.14 M2

49 Dinding bata ringan Setara Hebel 10x20x60 (MM-101)


M2 0.69 M2
50 Plesteran, Acian, Cat Dinding
M2 1.37 M2
51 Penembangan Pohon
Pohon Pangsor 1.00 Unit
Pohon Karet 1.00 Unit
Pohon Buni 1.00 Unit
Pohon Mangga 1.00 Unit
Pohon Salam 1.00 Unit
Pohon Angsana 1.00 Unit
Pohon Randu 1.00 Unit
49 List Kornice
Kamar Mandi Staff 11.00 M'
Kamar Mandi Siswa 12.34 M'
Kamar Mandi Pria 28.60 M'
Kamar Mandi Wanita 17.00 M'
Toilet Pria & Wanita 26.29 M'
49 Penutupan Kaca Jendela Menggunakan Gysum

Kaca Jendela 1,35 x 0,18 m Lantai 1 15.80 M2


Kaca Jendela 1,35 x 0,18 m Lantai 2 8.51 M2
Kaca Jendela 0,5x0,3 M Lantai 1 22.00 M2
Kaca Jendela 0,5x0,3 M Lantai 2 22.75 M2
Kaca Jendela 0,7x0,25 Lantai 2 3.15 M2

50 Pembuangan Bongkaran Atap


Pembuangan Bongkaran Atap 1.00 LS
NO URAIAN SPESIFIKASI MATERIAL LANTAI LUAS LANTAI SATUAN

A BACK UP HITUNGAN LANTAI


1A Bongkar pasang atap yg rusak (Atap menggunakan atap eksisting) 11.70
9.00
115.32

TOTAL

1 Perbaikan atap yg bolong


Lantai 1 90.00
Lantai 2 49.00

2 Penggantian atap konsol (Atap menggunakan atap eksisting)


A 439.20
B
3 Penambahan atap teras (Atap menggunakan atap eksisting)
A 40.58
4 Pas. Jurai dalam (galvalum 90cm)
A 6.70
7.10
4.50
3.70
2.20
7.00
7.00
7.00
6.50
7.00
6.00
4.50
5.50
5.70
8.50
4.60
2.20
2.20
2.00

99.90
5 Tutup kisi2 atap limas terpotong
titik 7.00
6 Tutup dinding sopi2
M2 7.00
7 Pas. Lisplank + dudukan
6.20 Cat
1.95 Cat
1.95 Cat
1.95 Cat
1.95 Cat
2.70 Cat
1.80 Cat
3.50 Cat
6.25 Cat
2.00 Cat
2.80 Cat
4.05 Cat
7.00 Cat
1.50 Cat
4.50 Cat
6.20 Cat
6.30 Cat
5.80 Cat
2.40 Cat
7.20 Cat
6.50 Cat
2.30 Cat
8.50
20.70
20.50
8.70
3.70
24.20
18.50
3.70
6.20
6.80
7.20
32.00
6.90
26.20
23.80
11.20
9.00
8.20
13.80
11.00
207.00
9.25
573.85 M'
8 Flashing dinding
7.30
13.30
4.60
10.60
2.60
5.30
2.50
3.50
4.50
3.50
3.00
2.00
1.00
1.00
4.20
68.90
CONTOH CAT EXTERIOR

CONTOH CAT EXTERIOR


BONGKAR PINTU BONGKAR PINTU BONGKAR DINDING 1/2 BONGKAR DINDING 1 BONGKAR MEJA PERAPIHAN BEKAS BOBOKAN PASANG 1 BATA PASANG 1/2 BATA PASANG RING BALK
No RUANGAN BONGKAR MEJA WASHTAFEL PLESTERAN+ACIAN BONGKAR LAIN LAIN
SINGLE DOUBLE BATA M2 BATA M2 LAB (M') M2 M2 15/25 M'
MEJA BETON 13 M', Bongkaran
1 LAB KIMIA 1 2 2 8.9815 11.338 7 3 3.1 2.925 5.313 16.476 2.95
Atap= 2,6*2,5
2 LAB BASAH 1 4 0.9 1.8 Pasang kolom 15x15 cm 1 bh
3 R ISTIRAHAT 1
3 PERS ALAT 2 1 33.99 2 36.1 3.3 6.6 5.2 bongkar bak cuci
4 LAB KIMIA 2 2 2.2 2 1 2.28 4.56 MEJA BETON 1 BH
Kolom 30x30 cm Balok
5 LAB ATANOMI BASAH 4 15.05 42.53 4 31.7 4.8 9.6 2
Utama,Meja Beton 2 bh
6 R.PVT 1 2.2 1 1
7 LAB GG. 14 2 24.51 20 2.09 4.18 2 bongkar kolom 1 bh
8 R.KULIAH 1 2 1 1 0.95 2.09 4.18 2.95
9 R.KULIAH 2 2 1 24.51 6 5.7 4 bongkar kolom 1 bh

SLOOF 1,28 m3, cor rabat beton


21,25 m3, bongkar dinding
shape wall 5,2 m3,
10 R.RAPAT 3 1 48.984 11.32 5.7 11.4 2
pembongkaran lantai PC
existing 20,16 m3, galian tanah
1 lsm.

11 R.PRODI 1 1 25.74 1 24.08 48.16 2 bongkar kolom 1 bh


MEJA COR PANJANG 5 M 2
12 R.DOSEN 1 1 2.09 4.18 2
BUAH

KURSI 50 BH, MEJA LAB COR 1 BH,


13 LAB KIMIA 3 2 2 43 6 4 1.9 4.18 8.36 4 MEJA BETON 7 M', PERALATAN
KIMA.DLL, kolom 1 bh

14 R.PRODI 2 1 2
15 NO NAME 2 2 34.529 0
16 MUSHOLA 1 2.58 1 6.235 12.47
17 TOILET WANITA 2 20.21 13.889 27.778 2
BONGKAR FURNITURE TOILET: 1
18 TOILET PRIA 5 58.394 1 25.714 51.428 1
LSM
19 TOILET PRIA&WANITA 5 73.1 17.1 34.2 2
20 VOID 27.52 55.04 4 UNIT JENDELA
21 R PENYIMPANAN 1 2.7 5.4
22 R LABORAN+R. LAP PERSI 3 10.2 7.74 15.48 4
1 BUAH JENDELA, PERALATAN
23 LAB GG.01 23.54 47.08 2
LABORATORIUM
24 R INSTRUMEN 1

TOTAL BONGKAR 1 BATA 403.621


TOTAL BONGKAR 1/2 BATA 82.4255
BONGKAR PINTU SINGLE 44
BONGKAR PINTU DOUBLE 20
MEJA WASTAFEL 31
BONGKAR MEJA LAB 9
PERAPIHAN BEKAS BOBOKAN 111.77
PASANGAN 1 BATA 104.844
PASANGAN 1/2 BATA 74.029
PASANGAN RING BALK 15/25 52.8 40 135.9
Bongkar Dak Lab Basah 6.5
Bongkar Kolom 12.9
Bongkar Furniture Toilet 1
Bongkar Peralatan Lab 1
Bongkar Meja Cor R dosen 4
Galian Tanah Ruang rapat 3.76
7.52
11.28
22.56
sloof 32.8
Bongkar Koridor Penghubung 216.2
Bongkar Lantai 105.7
Bongkar Beton Retaining Wall 33.44
Bongkar Relling Kayu 6 M' 6
Plesteran Dan Acian 368.372
Plester aci Bukaan Kusen 18.92 14
Kolom Praktis 10x10 cm M' 104.55
Bongkar Plafon 669.11
Bongkar Listplank 272.1
Bongkar Talang 294.50
Plat Beton 4.575
BONGKAR PINTU BONGKAR PINTU BONGKAR DINDING 1/2 BONGKAR DINDING 1 BONGKAR MEJA PERAPIHAN BEKAS BOBOKAN PASANG 1 BATA PASANG 1/2 BATA PLESTERAN DAN PASANG RING BALK
No RUANGAN BONGKAR MEJA WASHTAFEL
SINGLE DOUBLE BATA M2 BATA M2 LAB (M') M2 M2 ACIAN 15/25 M'

1 RUANG KULIAH 1 1 52.2 5.4 12 34.8 2

2 LAB KIMIA 2 7 3 0 2
3 RUANG DOSEN 1 1 50.8 2.66 8.4 16.8 2

4 R ATANOMI KERING 0 2

5 R KULIAH 2 2 4.18 8.36 2


6 R PERALATAN 2 1 22.8 1 19.4 7.11 14.22 2
7 R KULIAH 5.3325 10.665 2

8 R BACA 4.503 22.515 54.036 2

9 DAPUR (EXISTING 2 55.537

10 R.Penyimpanan Alat
11 R. Studio Fotografi
12 RUANG AUDI VIDI 53.64 1 1 1.9 3.8 7.6 4
13 STUDIO MM 1 1.98 3.96 2
14 R.TAX CEN 1 1.98 3.96 2
15 R. DOSEN 1 2
16 R.PANEL 27.65 55.3 1
17 R.DOSEN 2 4 1 15.96 92.8645 14 28 2

18 R. SIARAN+RUANG STD 3 1 52.614 5 1 3

19 Bongkaran Panggung Atas Tangga


20 Penurunan Pintu Bekas Gudang
19

TOTAL BONGKAR 1 BATA 252.8415


TOTAL BONGKAR 1/2 BATA 91.374
BONGKAR PINTU SINGLE 16
BONGKAR PINTU DOUBLE 9
MEJA WASTAFEL 16
BONGKAR MEJA LAB 5
PERAPIHAN BEKAS BOBOKAN 23.96
PASANGAN 1 BATA 56.6855
PASANGAN 1/2 BATA 50.165
PASANGAN RING BALK 15/25 32
BONGKAR RING BALK 15/25 EXISTING 24 18
Bongkar Beton Screet
Ganti Lemari Tanam, Ganti Tempat
Cuci Piring
Bongkar Parabot Ruangan
Pengupasan Lantai
Bongkaran Panggung Atas Tangga
CAT BUKAAN KUSEN 6.88 6.3
Bongkar Kolom 15x15 cm
Meja Beton
PLESTER DAN ACIAN 237.701
Plafond Gypsum 9mm Setara Jayaboard
Plafond Gyptile/akustik ex lokal, rk alumunium & list tepi Lt. 2
Plafond GRC 4mm Setara Grc
Plafond GRC 4mm Setara Grc
List plafond Almunium U 2cm (shadow line)
Partisi Kaca R.MCR dan R.Studio
Potografi
Pengupasan Lantai Dapur Existing
Bongkar Partisi Dinding Dan Glaswool
BONGKAR LAIN LAIN

BETON SCREET 8,85 x 2,1 m,


PENGURUGAN 8,85 x 2,1 m',3
KOLOM 15x15
MEJA BETON 13 M'
,PENGUPASAN LANTAI 88 m2
1 kolom 15x15
MEJA 1,2x0,9, ganti lemari
tanam 12,45 m, pergantian
tempat cuci piring 2 m, kolom 1
15x15 cm
MEJA BETON 1 BH
BONGKAR PARTISI, bongkar
kolom 1

Bongkar Lemari Ruang


Baca+Beserta isinya (peralatan
dapur)
BONGKAR KELENGKAPAN DAPUR, kolom
15x15 cm, ring balk 4,3 m, pengupasan
lantai meja dapur= 5+3+5+3, pengupasan
lantai level koridor 22,8 keliling

Partisi Kaca
Partisi Kaca

PARABOT RUANGAN , Meja


Beton 4,6=2 buah, Partisi Kayu
dan Glaswoll
keliling 14,5
1 lsm

42
18.585
1
1
38.8
14.5

17.2
32.2

6.7
15
32.4
PARAF :
OPSI 1

PARAF :
OPSI 2
LANTAI 2
NO NAME 83.74 36.9 3.5 30.42 98.73

RUANG KULIAH 1 71.07 33.4 3.5 33.1 83.8


RUANG DOSEN 1 36.04 24.2 3.5 19.04 65.66
RUANG ANATOMI KERING 39.54 25.6 3.5 18.45 71.15
RUANG KULIAH 2 30.22 21.84 3.5 16 60
RUANG PERALATAN 1 41.87 25.9 3.5 18.72 71.93
RUANG PERALATAN 2 31.32 22.2 3.5 16.56 61.14
RUANG KULIAH 2 52.83 29.75 3.5 17.64 86.485
RUANG BACA 17.78 17.45 3.5 30.91 30.165
RUANG PENYIMPANAN 26.5 20 3.5 2.28 67.72
RUANG STUDIO FOTOGRAPHI 31.74 23.43 3.5 5.07 76.935
MCR 12.29 16 3.5 25.72 30.28
RUANG STUDIO AUDIO VISUAL 44.5 27.28 3.5 35 60.20
RUANG STUDIO MULTIMEDIA 54.34 30.4 3.5 21.42 84.98
RUANG TAX CENTER 31 22.08 3.5 16.56 60.72
RUANG DOSEN 2 29.16 22 3.5 14 63.354
RUANG DOSEN 3 46.06 27.44 3.5 20.43 75.61
RUANG SIARAN 9.96 12.69 3.5 22.4 22.015
RUANG STUDIO SIARAN RADIO 34.56 23.54 3.5 40.707 41.683
RUANG PANEL 5.33 9.04 3.5 31.64 0

KORIDOR Selasar 303.3 130.9 3.5 364.165 176.06

Kolom Selasar Koridor 75.6


Samping Kanan 183.98
Tampak Depan 116.83
Samping Kiri 60.51
Sisi Belakang 159.38
Tangga Kamar Mandi Pria Wanita 37.83
Sisi Samping Tangga R Mushola 32.207
Total exterior 842.397

Lantai 2
JUMLAH
JUMLAH
JUMLAH
JUMLAH LUAS CAT LANTAI 1 1861.9636
JUMLAH LUAS CAT EXTERIOR L 1 316.2498
Cat Bukaan Kusen 4.7
Cat Railing 77.32
JUMLAH CAT EXTERIOR LANTAI 2 842.397
JUMLAH LUAS CAT LANTAI 2 1213
LANTAI 2
NO NAME 83.74 37.5 3.5 27.18 104.07

RUANG KULIAH 1 71.07 34 3.5 29.86 89.14


RUANG DOSEN 1 36.04 24.8 3.5 14.4 72.4
RUANG ANATOMI KERING 39.54 26.2 3.5 16.29 75.41
RUANG KULIAH 2 30.22 22.44 3.5 12 67
RUANG PERALATAN 1 41.87 26.5 3.5 14.4 78.35
RUANG PERALATAN 2 31.32 22.8 3.5 14.4 65.4
RUANG KULIAH 2 52.83 30.35 3.5 14.4 91.825
RUANG BACA 17.78 18.05 3.5 7.11 56.065
RUANG PENYIMPANAN 26.5 20.6 3.5 2.28 69.82
RUANG STUDIO FOTOGRAPHI 31.74 24.03 3.5 5.07 79.035
MCR 12.29 16.6 3.5 5.07 53.03
RUANG STUDIO AUDIO VISUAL 44.5 27.88 3.5 12 85.11
RUANG STUDIO MULTIMEDIA 54.34 31 3.5 19.26 89.24
RUANG TAX CENTER 31 22.68 3.5 79.38
RUANG DOSEN 2 29.16 22.6 3.5 11 67.614
RUANG DOSEN 3 46.06 28.04 3.5 11.33 86.81
RUANG SIARAN 9.96 12.69 3.5 44.415
RUANG STUDIO SIARAN RADIO 34.56 23.54 3.5 20.687 61.703
RUANG PANEL 5.33 9.64 3.5 2.28 31.46

KORIDOR Selasar 303.3 130.9 3.5 306.87 233.355

Kolom Selasar Koridor 75.6


Samping Kanan 183.98
Tampak Depan 116.83
Samping Kiri 60.51
Sisi Belakang 159.38
Tangga Kamar Mandi Pria Wanita 37.83
Sisi Samping Tangga R Mushola 32.207
Total exterior 899.692

Lantai 2
JUMLAH
JUMLAH
JUMLAH
JUMLAH LUAS CAT LANTAI 1 2037.8951
JUMLAH LUAS CAT EXTERIOR L 1 486.2593
Cat Bukaan Kusen 4.7
Cat Railing 77.32
JUMLAH CAT EXTERIOR LANTAI 2 899.692
JUMLAH LUAS CAT LANTAI 2 1447.14
DATA DARI AUTO CAD HITUNGAN CAT

NO URAIAN LUAS LANTAI KELILING LANTAI TINGGI PENGURANGAN LUAS CAT

(M2) (M')

LANTAI 1
1 RUANG ISTIRAHAT 13.5 16 3.4 4.7925 49.6075
2 RUANG PERS. ALAT 55.3 33.4 3.5 19.5496 97.3504
3 LAB KIMIA 2 41.01 26.2 3.4 17.874 71.206
4 LAB ANATOMI BASAH 36.5 24.6 3.5 17.874 68.226
5 RUANG PVT 22.77 19.8 3.55 10.962 59.328
6 LAB. GG 14 41.87 26.5 3.5 16.0936 76.6564
7 RUANG KULIAH 1 36.45 24.6 3.6 19.764 68.796
8 RUANG KULIAH 2 74.33 38.3 3.6 34.182 103.698
9 RUANG RAPAT 123.36 48 3.9 27.46 159.74
10 RUANG PRODI 1 39.86 27.8 3.5 7.506 89.794
11 RUANG DOSEN 1 27 21.25 3.5 14.418 59.957
12 RUANG PRODI 2 31 22.68 3.5 17.874 61.506
13 RUANG PENYIMPANAN 26.52 20.68 3.5 9.72 62.66
14 LAB. PERSIAPAN 26 20.9 3.5 11.88 61.27
15 RUANG LABORAN 13.76 15.86 3.5 11.04 44.47
16 RUANG PANEL 6.59 10.72 3.5 2.025 35.495
17 RUANG DUBBING 54.21 40.62 2.04 4.05 78.8148

1 LAB KIMIA 1 95 47.1 3.4 38.61 121.53


2 LAB. GG 01 99 40.48 4.5 27.756 154.404
3 LAB KIMIA 3 91.8 44.8 3.51 42.66 114.588
4 LAB BASAH 23 21.17 2.4 4.15 46.658
5 RUANG INSTRUMENT 21.58 18.94 3.6 11.145 57.039

1 MUSHOLLAH 28.74 22.78 3.6 1.2765 80.7315

1 RUANG CINEMA 33.72 61.82 3.6 11.145 211.407

1 KORIDOR Teras 547.26 220.21 3.5 11.145 841.73


PLAFOND KORIDOR ###
Cat Koridor Ruang Cinema 56.634
Samping Kanan Koridor 79.86
DindingTampak Depan 99.649
Kanopi Tampak Depan 33
Dak tampak depan 4.739
List Plank Tampak Depan 11.2
List Ban Tampak Depan 40.775
R.Koridor R rapat 44.31
Tangga Tampak Depan 1.08
Dak 2 Tampak Depan(pintu masuk) 17.875
Kanopi Ruang Rapat 23.52