Anda di halaman 1dari 231

REKAPITULASI

RENCANA ANGGARAN BIAYA


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
SUMBER BIAYA
TAHUN ANGGARAN

:
:
:
:
:
:

PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN


PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDE
DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEK
DAK/DAU
2012

NO

URAIAN JENIS PEKERJAAN

2
A
I

PEKERJAAN KONSTRUKSI SIPIL


PEKERJAAN PERSIAPAN

II

PEKERJAAN BENDUNG/INTEK

III

PEKERJAAN BAK PENENANG

IV

PEKERJAAN PIPA PESAT

V
VI

RUMAH PEMBANGKIT&DUDUKAN TURBIN


TANGGA INSPEKS
JUMLAH ( A )

B
I
II

PEKERJAAN MEKANIKAL ELEKTRIKAL


PERALATAN MEKANIKAL ELEKTRIKAL
TRANSMISI DAN DISTRIBUSI
JUMLAH ( B )
JUMLAH ( A ) + ( B )
PPN 10 %
TOTAL JUMLAH (A) + (B) + PPN 10%
DIBULATKAN

Terbilang :

Delapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Mengetahui / Menyetujui :

REKAPITULASI
RENCANA ANGGARAN BIAYA

PENGEMBANGAN BIDANG KETENAGALISTRIKAN


EMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
EMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN
DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU

JUMLAH HARGA
(Rp.)
3

946,342.52
120,509,145.94
25,325,667.29
165,368,520.88
61,933,395.54
38,320,501.34
412,403,573.51

203,000,000.00
180,050,000.00
383,050,000.00
795,453,573.51
79,545,357.35
874,998,930.86
874,998,000.00

t Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Sekadau, Mei 2012


Dibuat Oleh :

R E N CANA AN G GARAN B IAYA


PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
SUMBER BIAYA
TAHUN ANGGARAN

NO

:
:
:
:
:
:

PEMBINAAN DAN PENGEMBANGAN BIDANG KETENAGALISTRIKAN


PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH)
PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) DI PEDESAAN
DUSUN SANGKE DESA MERAGUN KECAMATAN NANGA TAMAN KABUPATEN SEKADAU
DAK/DAU
2012

URAIAN JENIS PEKERJAAN

1
A

2
PEKERJAAN KONSTRUKSI SIPIL
I.
PEKERJAAN PERSIAPAN
1
Mobilisasi/Demobilisasi
2
Pembersihan Lapangan dan Perataan

1,120.00

40.00

PEKERJAAN BENDUNG/INTEK
1
Galian Tanah Cadas

M3

72.00

Pondasi Cor Beton K-225

31.50

Bendung Cor Beton K-225

28.99

Pasangan Batu 1 : 2

6.75

Plesteran 1:2 dan Acian

113.25

6
7

Urugan Tanah Kembali


Pintu Kuras Air

M
Bh

14.40
1.00

M3

9.18

Plesteran 1:2 dan Acian


Pintu Air
Saringan
Pipa Penguras 4 inc
Elbow 4 inc
Stop Kran 4 inc

M
Set
Set
M1
bh
bh

45.90
1.00
1.00
6.00
1.00
1.00

PEKERJAAN PIPA PESAT


1
Galian Tanah Cadas

M3

37.50

Pasangan Batu 1 : 2

9.12

Plesteran 1:2 dan Acian

76.00

4
5
6
7
8

Pipa Pesat dia 12 inc


Pipe Conduit 12 inct
Clamp Pipa Pesat
Lem PVC
Pembungkus Pipa PVC

M
bh
Set
Klg
M2

150.00
1.00
38.00
3.00
225.00

M3

20.00

1
2
3
4
5
6
7

VI.

IV.

V.

SATUAN VOLUME

M2

3
II.

KODE
ANALISA

Pengukuran dan Pemasangan Bowplank

PEKERJAAN BAK PENENANG


Cor Beton K-225

RUMAH PEMBANGKIT&DUDUKAN TURBIN


1
Galian Tanah

Pasangan Batu Kali (Saluran Pembuangan dan Pondasi)

M3

4.80

Cor Beton Bertulang (Kolom & Balok)

3.00

Pasangan Batako

56.00

5
6
7
8
9
10
11
12

Plesteran 1:2 dan Acian


Pek Pasangan Gerendel Pintu
Pek Pasangan Kunci Pintu
Pek Pasangan Pintu Panel
Pek Pesangan Engsel Pintu
Pengecatan Tembok
Pekerjaan Jendela
Pemasangan Kuda-kuda

M
Set
Bh
Bh
Set
M2
Bh
M3

112.00
1.00
1.00
1.00
2.00
112.00
1.00
0.42

13

Pasangan Atapseng BJLS

M2

33.00

14

Pasangan Perabung

6.00

15

Ventilasi

2.00

16

Pasangan List Plank Papan

22.00

VII

TANGGA INSPEKS
1
Galian Tanah Cadas

M3

60.00

Pondasi Cor Beton K-225

17.50

Pengecatan cat minyak

52.50

Urugan Tanah Kembali

12.00

JUMLAH PEKERJAAN SIPIL ( A )


B
1
2
3
4
5
6
7
8

PEKERJAAN MEKANIKAL ELEKTRIKAL


PERALATAN MEKANIKAL ELEKTRIKAL
Turbin Crossflow lengkap
Generator (Brushess, 3 Sinkronus Alternator + AVR)
Kontrol , Electronic Load Control
Ballast Load
Transmisi Mekanik + Aksesoris
Erektion
Grounding, wiring, penangkal petir
Tool Kits

1
2
3
4
5

TRANSMISI DAN DISTRIBUSI


Tiang Beton (6 m) Lokal
Kabel Twisted 3 x 35 + 1 x 25
Aksesories
Erection
Persiapan Uji Coba (Comisioning)

II

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

81.00
4,000.00
81.00
81.00
1.00
JUMLAH PEKERJAAN MEKANIKAL ELEKTRIKAL (B)

N B IAYA

O (PLTMH) DI PEDESAAN
AN KABUPATEN SEKADAU

HARGA
SAT UAN
(Rp.)
5

JUMLAH
H A R G A
(Rp.)
6

666.38

746,342.52

5,000.00

200,000.00
946,342.52

163,217.66

11,751,671.25

1,505,770.81

47,431,780.59

1,505,770.81

43,646,649.21

1,326,066.16

8,950,946.55

44,101.27

4,994,468.69

21,324.07
3,426,563.00

307,066.64
3,426,563.00
120,509,145.94

1,505,770.81

13,822,976.06

44,101.27
3,426,563.00
5,400,000.00
61,980.00
80,000.00
200,000.00

2,024,248.24
3,426,563.00
5,400,000.00
371,880.00
80,000.00
200,000.00
25,325,667.29

163,217.66

6,120,662.11

1,326,066.16

12,093,723.35

44,101.27

3,351,696.43

846,326.00
500,000.00
100,000.00
59,513.00
55,000.00

126,948,900.00
500,000.00
3,800,000.00
178,539.00
12,375,000.00
165,368,520.88

150,000.00

3,000,000.00

1,326,066.16

6,365,117.55

3,505,770.81

10,517,312.44

412,467.52

23,098,180.88

44,101.27
39,210.81
48,004.51
750,000.00
48,004.51
36,582.17
150,000.00
7,577,009.00

4,939,342.10
39,210.81
48,004.51
750,000.00
96,009.02
4,097,202.96
150,000.00
3,200,528.60

83,301.02

2,748,933.66

97,383.30

584,299.82

100,000.00

200,000.00

95,420.60

2,099,253.20
61,933,395.54

163,217.66

9,793,059.38

1,505,770.81

26,350,989.22

36,582.17

1,920,563.89

21,324.07

255,888.86
38,320,501.34
412,403,573.51

LAH PEKERJAAN SIPIL ( A )

90,000,000.00
30,000,000.00
50,000,000.00
20,000,000.00
5,000,000.00
3,000,000.00
2,000,000.00
3,000,000.00

90,000,000.00
30,000,000.00
50,000,000.00
20,000,000.00
5,000,000.00
3,000,000.00
2,000,000.00
3,000,000.00
203,000,000.00

400,000.00
31,350.00
200,000.00
50,000.00
2,000,000.00

32,400,000.00
125,400,000.00
16,200,000.00
4,050,000.00
2,000,000.00
180,050,000.00
383,050,000.00

EKANIKAL ELEKTRIKAL (B)

P
Pembersihan Lapangan dan Perataan
Bendung
Penstok
Power House
Tangga Inspeksi
Bouplank
Bendung
Power House
PEKERJAAN BENDUNG
Galian Tanah Cadas
Pondasi Cor Beton K-225
Bendung Cor Beton K-225
Sayap Bendung
Pasangan Batu 1 : 2
Plesteran 1:2 dan Acian
Urugan Tanah Kembali
PEKERJAAN BAK PENENANG
Intake Cor Beton K-225
Plesteran 1:2 dan Acian
Urugan Tanah Kembali
Pintu Air
PEKERJAAN PIPA PESAT
Galian Tanah Cadas
Pasangan Batu 1 : 2
Plesteran 1:2 dan Acian
Pipa Pesat dia 12 inc
Pembungkus Pipa PVC
RUMAH PEMBANGKIT&DUDUKAN TURBIN
Galian Tanah
Pasangan Batu Kali Saluran Pembuang
Pasangan Batu Kali Pondasi
Sloop
Kolom Praktis
8
Ring Balok
Pondasi Turbin
Pasangan Batako

20
150
10
200

6
2
10
3

120
300
100
600
1120

20
10

6
10

20
15
13.65
8
15
15

6
3.5
1.15
0.4
1.5
7.55

0.6
0.6
1.5
1.7
0.3

13.5
27

0.4

1.7
1.7

45.9

150
0.6
1.2

0.5
0.4
0.8

0.5
1
1

76

150

1.5

5
14
5
14
0.1
14
2
14

4
0.3
0.3
0.2
0.1
0.2
1

113.25
20%

225

1
0.5
1.8
0.3
4
0.3
0.5
4

56

Plesteran 1:2 dan Acian


Pek Pasangan Gerendel Pintu
Pek Pasangan Kunci Pintu
Pek Pasangan Pintu Panel
Pek Pesangan Engsel Pintu
Pengecatan 3 X jalan
Pekerjaan Jendela
Ventilasi
Pemasangan Kuda-kuda
Pasangan Atapseng BJLS
Pasangan Perabung
Pasangan List Plank Papan

4
6
8
2

28

112

28
1
1
4
6
6
6
22

112

0.5
0.08
0.06
2.75

150
175
175

1
1
0.3

2
0.1
0.08
33

TANGGA INSPEKS
Galian Tanah Cadas
Pondasi Cor Beton K-225
Pengecatan cat minyak
Urugan Tanah Kembali

0.4
0.1
52.5

Kel

52
40
92
72.00
31.50
23.55
5.44
6.75
14.40

9.18

37.50
9.12

20.00
2.10
2.70
0.84
0.32
0.84
1.00

37.5

0.192
0.2304

60
17.5
12

DAFTAR HARGA BAHAN DAN UPAH KER

KABUPATEN SANGGAU TAHUN ANGGARAN


A.

HARGA BAHAN / MATERIAL BANGUNAN

No.

Jenis Bahan / Material Bangunan

2
I. BAHAN PASIR, BATU & TANAH ( SAND, STONE & SOIL )

Pasir Urug

Pasir Beton

Batu gunung atau quarry

Batu Quarry - Royalti

Kerikil galian - Royalti

Kerikil Sungai Royalti

Batu Belah ukuran

10 - 15 cm

Batu Belah ukuran

7 - 10 cm

Batu Belah ukuran

5 - 7 cm

10

Batu Belah ukuran

3 - 5 cm

11

Batu Belah ukuran

2 - 3 cm

12

Batu Belah ukuran

1 - 2 cm

13

Batu Belah ukuran

14

Stone Dust

15

Gorong-Gorong Beton Diameter 40 Cm

16

Gorong-Gorong Beton Diameter 60 Cm

17

Gorong-Gorong Beton Diameter 80 Cm

18

Gorong-Gorong Beton Diameter 100 Cm

19

Sirtu ( Tak Ayak)

20

Sirtu - Royalti

21

timbunan Pilihan

22

Aspal Bitumen

23

Minyak Aspal

24

Minyak tanah

25

Kayu Bakar

26

Kapur Bakar

27

Cat Jembatan

28

Baja Teralis

29

Terpal

30

Kawat Bronjong

31

Baut Baja

32

Besi Profil

33

Baja Konstruksi / Profil (galvanisir Untuk jembatan )

34 Paku Jembatan

0,5 - 1 cm (Kerikil Beton)

35 Besi Tulangan Beton


36

Kawat baja ( Binrat )

37

Kayu Untuk Perancah

38

Teer

39

Minyak Diesel / solar

( Harga Industri )

40

Bensin premium

( Harga Industri )

41

Minyak Pelumas / Oli

42

Beugel

43

Besi Spoor Plank

44

Timbunan Pilihan Setempat

45

Baut

46

Kayu pancang ( Dolken ) Dia. 10/15 Panjang 2,5 M

47

Bata Merah

48

Batako Cetak

49

Terawang / Rooster Batako

50

Paving Block

No.

Jenis Bahan / Material Bangunan

2
II. BAHAN SEMEN ( CEMENT )

Semen PC

Semen Warna / Oker


III. BAHAN KAYU ( TIMBER, WOODS )

Kayu Belian

Kayu Belian ( Ketam ) 8/8

Kayu Kls. I

Kayu Kls. I ( Ketam ) 8/8

Kayu Kls. II

Papan Kayu Belian

Papan Kayu Belian ( Ketam )

Papan Kayu Kls. I

Papan Kayu Kls. I (Ketam )

10

Papan Kayu Kls. II

11

Papan Bekisting / Mal Kayu Kls. III

12

Papan Jalusie / Renglat Kayu Kls. I

13 Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE )
1

Keramik Porselin uk. 20 x 20 Polos

Keramik Porselin uk. 20 x 20 Warna

Keramik Porselin uk. 20 x 20 Warna Anti Slip

Keramik Porselin uk. 20 x 25 Warna

Keramik Porselin uk. 30 x 30 Warna

Keramik Porselin uk. 30 x 30 Polos Anti Slip

Keramik Porselin uk. 30 x 30 Warna Anti Slip

Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 )

Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 )

10

Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 )

11

Keramik Porselin uk. 60 x 60 Unpolished

12 Lis Dinding Keramik WC uk. 8 x 20 cm


13 Lis Dinding Keramik WC uk. 10 x 40 cm
14

Porselin uk. 11 x 11 Putih

15

Porselin uk. 10 x 10 Warna


V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC )

Lis Profil Gypsum 8 cm

Lis Profil Gypsum 10 cm

Lis Profil Gypsum 12 cm

Lis Profil Gypsum 14 cm

Bunga Gypsum dia. 80 cm

Bunga Gypsum dia. 90 cm

Triplek tebal 3 mm

Triplek tebal 2 mm

GRC Board 3 mm

10

Gypsum Board tebal 9 mm

11 Pintu WC PVC
12 Pintu Double Alumunium
13 Pintu Panel kayu Kls. I
14 Pintu Panel Kayu Kls. II
15 Kusen Alumunium
VI. BAHAN ATAP ( ROOF )
1

Genteng Kodok / Glazuur Dengan Cat

Bubungan Genteng Kodok / Glazuur

Seng Gelombang BJLS 0,30

Seng Gelombang BJLS 0,20

Genteng Metal Warna Berpasir

uk. 0.88 x 0.88 M2, tebal 0.35 mm

Genteng Metal Warna Polos

uk. 0.88 x 0.88 M2, tebal 0.35 mm

Genteng Metal Warna Berpasir

uk. 0.88 x 0.44 M2, tebal 0.35 mm

Genteng Metal Warna Polos

uk. 0.88 x 0.44 M2, tebal 0.35 mm

Genteng Metal Multi Sirap Type Borneo

uk. 7.00 x 0.50 M2, tebal 0.40 mm

10

Nok Genteng Metal Warna Berpasir

uk. 1.00 x 0.91 M2, tebal 0.35 mm

11

Nok Genteng Metal Warna Polos

uk. 1.00 x 0.91 M2, tebal 0.35 mm

12

Nok Genteng Metal Multi Sirap

uk. 0.46 x 0.23 M2, tebal 0.40 mm

13

Seng Datar BJLS 0,30

14

Seng Datar BJLS 0,20

15

Atap Fibreglass Gelombang 3 mm

16 Pagar Besi Hollo


17 Pagar Besi Stainlish
18 Huruf Stainlish T = 8 mm
19 Huruf Stainlish T = 6 mm

No.

Jenis Bahan / Material Bangunan

2
VII. BAHAN KACA ( GLASS )

Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos

Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban

Kaca Polos

3 mm

Kaca Polos

5 mm

Kaca Warna 3 mm

Kaca Buram 3 mm

Kaca Buram Warna 3 mm

Kaca Rayban 3 mm

Kaca Rayban 5 mm

10

Kaca Cermin 3 mm
VIII. BAHAN CAT ( PAINT )

Amplas Kayu / Besi / Tembok

Dempul

Cat Dasar Tembok

Cat Dasar Kayu

Meni Besi

Cat Kilat

Plamur

Cat Khusus Tembok Luar

Pelitur

10

Melamic

11

Vernis

12

Minyak Cat / Thinner

13

Ter / Residu
IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE )

Besi Simpai Kawat

Besi Tulangan Beton

Kawat Ikat Beton

Kawat Harmonika

Kawat Nyamuk / Besi

Kawat Nyamuk / Plastik (Kassa)

Kawat Ikat Beronjong / Galvanis

Wiremesh Besi Ulir diam. 4 mm

1 Gulung = 2.10 x 54.00 M2

Wiremesh Besi Ulir diam. 5 mm

1 Gulung = 2.10 x 54.00 M2

10

Wiremesh Besi Ulir diam. 6 mm

1 Gulung = 2.10 x 54.00 M2

11

Multi Truss ( Rangka Atap Baja Ringan )

bentang < 12.00 M

12

Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip )

13 B e u g e l

1 Roll = 5.0 x 5.0 M2

14

Alumunium Foil

15

Alumunium Tape

uk. 60,00 x 1,25 M2

X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE )


1

Paku Campuran 1" - 5 "

Paku Atap Seng / Paku Payung

Paku Genteng Metal Multi Sirap

Paku Gypsum

Paku Sekrup

Paku Beton

Paku Tripleks

Sekrup / Baut / Mur

Baut Besar

10

Kunci Pintu Tanam Antik

11

Kunci Pintu Tanam

12

Kunci Pintu Tanam KM / WC

13

Kunci Silinder

14

Kunci Lemari

No.

Jenis Bahan / Material Bangunan

1
15

2
Selot Pintu

16

Selot Jendela

17

Engsel Pintu

Biasa

18

Engsel Jendela

Biasa

19

Engsel Pintu

Kuningan

20

Engsel Jendela

Kuningan

21

Kait Angin

22

Handle Pintu & Jendela

23

Lem Kayu / Tripleks

24

Lem PVC

25

Lem Genteng Metal Multi Sirap

26

Seal Tape
XI. BAHAN SANITAIR ( SANITARY )

Kloset Duduk / Monoblok

Kloset Jongkok Standar

Urinoir

Bidet

Wastafel Keramik

Bak Mandi Fibreglass

Badkip / Bathtub Porselin

Panjang

Badkip / Bathtub Porselin

Sudut

Bak Air Fibreglass vol. 1 m3

10

Bak Cuci Piring Stainless Steel Double

11

Water Drain + Acessories

12

Shower ( Tray )

13

Tempat Sabun / Soap Dish

14

Kran Air Lokal 3/4 "

15

Floor Drain

16

Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter

1 lubang

XII. BAHAN PIPA ( PIPES )


1

Pipa GIP class medium

diameter

200 mm ( 8 " )

Pipa GIP class medium

diameter

150 mm ( 6 " )

Pipa GIP class medium

diameter

100 mm ( 4 " )

Pipa GIP class medium

diameter

75 mm ( 3 " )

Pipa GIP class medium

diameter

50 mm ( 2 " )

Pipa PVC S - 12,5 RRJ

diameter

630mm ( 24 " )

Pipa PVC S - 12,5 RRJ

diameter

500 mm ( 20 " )

Pipa PVC S - 12,5 RRJ

diameter

450 mm ( 18 " )

Pipa PVC S - 12,5 RRJ

diameter

400 mm ( 16 " )

10

Pipa PVC S - 12,5 RRJ

diameter

355 mm ( 14 " )

11

Pipa PVC S - 12,5 RRJ

diameter

300 mm ( 12 " )

12

Pipa PVC S - 12,5 RRJ

diameter

275 mm ( 11 " )

13

Pipa PVC S - 12,5 RRJ

diameter

250 mm ( 10 " )

14

Pipa PVC S - 12,5 RRJ

diameter

225 mm ( 9 " )

15

Pipa PVC S - 12,5 RRJ

diameter

200 mm ( 8 " )

16

Pipa PVC S - 12,5 RRJ

diameter

150 mm ( 6 " )

17

Pipa PVC S - 12,5 RRJ

diameter

125 mm ( 5 " )

18

Pipa PVC S - 12,5 RRJ

diameter

100 mm ( 4 " )

19

Pipa PVC S - 12,5 RRJ

diameter

75 mm ( 3 " )

20

Pipa PVC S - 12,5 RRJ

diameter

65 mm ( 2,5 " )

21

Pipa PVC S - 12,5 RRJ

diameter

50 mm ( 2 " )

22

Pipa PVC Tipe AW

diameter

250 mm ( 10 " )

23

Pipa PVC Tipe AW

diameter

200 mm ( 8 " )

24

Pipa PVC Tipe AW

diameter

150 mm ( 6 " )

25

Pipa PVC Tipe AW

diameter

125 mm ( 5 " )

26

Pipa PVC Tipe AW

diameter

100 mm ( 4 " )

27

Pipa PVC Tipe AW

diameter

75 mm ( 3 " )

28

Pipa PVC Tipe AW

diameter

50 mm ( 2 " )

29

Pipa PVC Tipe AW

diameter

40 mm ( 1,5 " )

30

Pipa PVC Tipe AW

diameter

25 mm ( 1 " )

31

Pipa PVC Tipe AW

diameter

18.75 mm ( 3/4 " )

32

Pipa PVC Tipe AW

diameter

12.5 mm ( 1/2 " )

33

Pipa Flexibel

diameter

150 mm ( 6 " )

34

Pipa Flexibel

diameter

100 mm ( 4 " )

No.

Jenis Bahan / Material Bangunan

2
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )

All Socket Tee PVC dia 200 x 200 mm

All Socket Tee PVC dia 200 x 160 mm

All Socket Tee PVC dia 200 x 110 mm

All Socket Tee PVC dia 200 x 90 mm

All Socket Tee PVC dia 150 x 150 mm

All Socket Tee PVC dia 150 x 100 mm

All Socket Tee PVC dia 160 x 90 mm

All Socket Tee PVC dia 150 x 75 mm

All Socket Tee PVC dia 110 x 90 mm

10

All Socket Tee PVC dia 100 x 50 mm

11

All Socket Tee PVC dia 75 x 75 mm

12

All Socket Tee PVC dia 75 x 50 mm

13

All Socket Tee PVC dia 50 x 50 mm


All Flanged Gate Valve dia 250 mm

14

All Flanged Gate Valve dia 200 mm

15

All Flanged Gate Valve dia 150 mm

16

All Flanged Gate Valve dia 100 mm


All Flanged Gate Valve dia 75 mm
All Flanged Gate Valve dia 50 mm

17

All Flanged Spigot PVC dia 300 mm

18

All Flanged Spigot PVC dia 250 mm

19

All Flanged Spigot PVC dia 200 mm

20

All Flanged Spigot PVC dia 160 mm

21

All Flanged Spigot PVC dia 110 mm

22

All Flanged Spigot PVC dia 90 mm

23

All Flanged Spigot PVC dia 63 mm

24

All Flange Bend GIP

45 x 150 mm

25

All Flange Bend GIP

90 x 150 mm

26

All Socket Bend PVC dia 315 mm

90

27

All Socket Bend PVC dia 250 mm

90

All Socket Bend PVC dia 250 mm

45

All Socket Bend PVC dia 250 mm

22,5

All Socket Bend PVC dia 200 mm

90

All Socket Bend PVC dia 200 mm

45

All Socket Bend PVC dia 200 mm

22,5

All Socket Bend PVC dia 160 mm

90

All Socket Bend PVC dia 160 mm

45

All Socket Bend PVC dia 160 mm

22,5

28

29

30

31
32
33
34

35

All Socket Bend PVC dia 140 mm

90

All Socket Bend PVC dia 140 mm

45

All Socket Bend PVC dia 140 mm

22,5

All Socket Bend PVC dia 110 mm

90

All Socket Bend PVC dia 110 mm

45

All Socket Bend PVC dia 90 mm

90

All Socket Bend PVC dia 90 mm

45

All Socket Bend PVC dia 75 mm

90

All Socket Bend PVC dia 75 mm

45

All Socket Bend PVC dia 63 mm

90

All Socket Bend PVC dia 63 mm

45

Flage Socket PVC

Diameter 100 mm

Flage Socket PVC

Diameter 75 mm

Flage Socket PVC

Diameter 50 mm

All Flange Reducer GIP

diam. 250 x 200 mm

All Flange Reducer GIP

diam. 250 x 150 mm

All Flange Reducer GIP

diam. 200 x 150 mm

All Flange Reducer GIP

diam. 200 x 100 mm

All Flange Reducer GIP

diam. 150 x 100 mm

36

All Flange Reducer PVC dia 315 x 250 mm

37

All Flange Reducer PVC dia 250 x 200 mm

38

All Flange Reducer PVC dia 200 x 150 mm


All Flange Reducer PVC dia 200 x 100 mm

39

All Flange Reducer PVC dia 160 x 110 mm

40

All Flange Reducer PVC dia 110 x 90 mm

41

All Flange Reducer PVC dia 110 x 63 mm

42

All Flange Reducer PVC dia 90 x 63 mm

XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )


Bend 90GIP

Diameter

250 mm

Bend 45GIP

Diameter

250 mm

Bend 22,5GIP

Diameter

250 mm

Bend 90GIP

Diameter

200 mm

Bend 45GIP

Diameter

200 mm

Bend 22,5GIP

Diameter

200 mm

Bend 90GIP

Diameter

150 mm

Bend 45GIP

Diameter

150 mm

Bend 22,5GIP

Diameter

150 mm

Bend 90GIP

Diameter

100 mm

Bend 45GIP

Diameter

100 mm

Bend 90GIP

Diameter

75 mm

Bend 45GIP

Diameter

75 mm

Bend 90GIP

Diameter

50 mm

Bend 45GIP

Diameter

50 mm

43

Flange GIP

diam. 50 mm

44

Flange GIP

diam. 75 mm

45

Flange GIP

diam. 100 mm

46

Flange GIP

diam. 150 mm

47

Flexibel Joint

diam. 150 mm

XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )


1

Hidran Umum Polyethylene ( PE )

vol. 1,0 m3

Hidran Umum Polyethylene ( PE )

vol. 2,0 m3

Hidran Umum Polyethylene ( PE )

vol. 3,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 1,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 2,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 3,0 m3

Water Meter

Jenis Bahan / Material Bangunan

No.
1

2
XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS )

Sekring Biasa

Sekring Otomatic 16 A ( Jerman )

Stop Kontak

Saklar

Lampu Pijar 10 Watt

Lampu Pijar 25 Watt

Lampu Pijar 60 Watt

Lampu Neon (TL) 10 Watt

Lampu Neon (TL) 20 Watt

10

Lampu Kap Baret

11

Lampu Sorot Lengkap 120 Watt

12

Lampu SL 18 Watt

13

Lampu SL 20 Watt

14

Lampu SL 50 Watt

B.

UPAH KERJA

No.

Jenis Pekerja / Tukang

1
1

2
Pekerja

Mandor

Kepala Tukang

Tukang Kayu

Tukang Semen

Tukang Batu

Tukang Besi

Tukang Pipa

Tukang Cat

Mandor lapangan

L061

Mekanik

L071

Mekanik pembantu

L072

Tukang kepala

L073

Tukang

L079

Operator terlatih

L081

Operator kurang terlatih

L082

Pembantu operator

L083

Supir material

L091

10 Supir personil

L092

11 Pembantu sopir / kernet

L099

12 Buruh lapangan tak terlatih

L101

13 Buruh lapangan semi terlatih

L103

14 Buruh lapangan terlatih

L106

RGA BAHAN DAN UPAH KERJA

ANGGAU TAHUN ANGGARAN 2011


Harga Bahan
Satuan
3

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)
4

(Rp.)
5

E & SOIL )
M3

72,500.00

90,625.00

M3

72,500.00

90,625.00

M3

110,000.00

137,500.00

M3

110,000.00

137,500.00

M3

125,000.00

156,250.00

M3

150,000.00

187,500.00

M3

228,571.00

285,713.75

M3

257,143.00

321,428.75

M3

275,000.00

343,750.00

M3

425,000.00

531,250.00

M3

512,000.00

640,000.00

M3

515,000.00

643,750.00

M3

550,000.00

687,500.00

M3

440,000.00

550,000.00

M'

335,000.00

418,750.00

M'

525,000.00

656,250.00

M'

650,000.00

812,500.00

M'

975,000.00

1,218,750.00

M3

72,500.00

90,625.00

M3

84,166.67

105,208.34

M3

21,600.00

27,000.00

Kg

10,350.00

12,937.50

Lt

1,500.00

1,875.00

Lt

3,750.00

4,687.50

M3

60,000.00

75,000.00

M3

6,000.00

7,500.00

Kg

27,500.00

34,375.00

Kg

9,300.00

11,625.00

12,000.00

15,000.00

Kg

25,000.00

31,250.00

Buah

21,000.00

26,250.00

Kg

16,000.00

20,000.00

Kg

32,000.00

40,000.00

Kg

22,500.00

28,125.00

Kg

9,900.00

12,375.00

Kg

25,000.00

31,250.00

M3

350,000.00

437,500.00

Lt

6,000.00

7,500.00

Lt

7,977.00

9,971.25

Lt

9,747.00

12,183.75

Lt

27,000.00

33,750.00

Batang

22,500.00

28,125.00

Buah

22,500.00

28,125.00

M3

21,600.00

27,000.00

Buah

6,500.00

8,125.00

Batang

9,600.00

12,000.00

Buah

1,300.00

1,625.00

Buah

1,200.00

1,500.00

Buah

1,600.00

2,000.00

Buah

1,650.00

2,062.50

Harga Bahan
Satuan
3

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

50 Kg / Zak

75,000.00

93,750.00

Kg

7,500.00

9,375.00

M3

7,750,000.00

9,687,500.00

M3

9,690,000.00

12,112,500.00

M3

4,030,000.00

5,037,500.00

M3

5,130,000.00

6,412,500.00

M3

3,410,000.00

4,262,500.00

M3

7,750,000.00

9,687,500.00

M3

9,690,000.00

12,112,500.00

M3

4,485,000.00

5,606,250.00

M3

4,830,000.00

6,037,500.00

M3

4,140,000.00

5,175,000.00

M3

2,553,000.00

3,191,250.00

M3

3,300,000.00

4,125,000.00

M3

11,165,000.00

13,956,250.00

Kotak

40,000.00

50,000.00

Kotak

42,000.00

52,500.00

Kotak

45,000.00

56,250.00

Kotak

54,000.00

67,500.00

Kotak

51,200.00

64,000.00

Kotak

50,000.00

62,500.00

Kotak

60,000.00

75,000.00

Kotak

115,000.00

143,750.00

Kotak

100,000.00

125,000.00

Kotak

160,000.00

200,000.00

Kotak

146,000.00

182,500.00

Buah

3,800.00

4,750.00

Buah

15,000.00

18,750.00

M2

42,500.00

53,125.00

M2

45,000.00

56,250.00

M'

9,000.00

11,250.00

M'

10,500.00

13,125.00

M'

11,000.00

13,750.00

M'

11,000.00

13,750.00

Buah

300,000.00

375,000.00

RBLE )

IC )

Buah

375,000.00

468,750.00

Lembar

55,000.00

68,750.00

Lembar

42,000.00

52,500.00

Lembar

57,500.00

71,875.00

Lembar

67,500.00

84,375.00

Buah

250,000.00

312,500.00

Buah

800,000.00

1,000,000.00

Buah

800,000.00

1,000,000.00

Buah

650,000.00

812,500.00

M'

85,000.00

106,250.00

Buah

2,500.00

3,125.00

Buah

5,500.00

6,875.00

Lembar

65,500.00

81,875.00

Lembar

37,500.00

46,875.00

Buah/2 susun

70,000.00

87,500.00

Buah/2 susun

60,000.00

75,000.00

Buah/1 susun

36,000.00

45,000.00

Buah/1 susun

25,500.00

31,875.00

Buah

240,000.00

300,000.00

Buah

70,000.00

87,500.00

Buah

65,000.00

81,250.00

Buah

48,000.00

60,000.00

Lembar

66,500.00

83,125.00

Lembar

38,000.00

47,500.00

Lembar

67,500.00

84,375.00

M'

450,000.00

562,500.00

M'

650,000.00

812,500.00

Cm

8,500.00

10,625.00

Cm

7,000.00

8,750.00

Harga Bahan
Satuan

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

Set

250,000.00

312,500.00

Set

260,000.00

325,000.00

M2

90,000.00

112,500.00

M2

120,000.00

150,000.00

M2

150,000.00

187,500.00

M2

175,000.00

218,750.00

M2

200,000.00

250,000.00

M2

110,000.00

137,500.00

M2

145,000.00

181,250.00

M2

225,000.00

281,250.00

Lembar

2,500.00

3,125.00

Kg

23,000.00

28,750.00

Kaleng/5kg

35,000.00

43,750.00

Kg

27,000.00

33,750.00

Kg

27,000.00

33,750.00

Kg

33,000.00

41,250.00

Kg

42,500.00

53,125.00

Kaleng/5ltr

90,000.00

112,500.00

Liter

45,000.00

56,250.00

Liter

55,000.00

68,750.00

Liter

37,500.00

46,875.00

Liter

15,000.00

18,750.00

Liter

42,300.00

52,875.00

Kg

16,000.00

20,000.00

Kg

9,900.00

12,375.00

Kg

20,000.00

25,000.00

Roll

350,000.00

437,500.00

M2

13,000.00

16,250.00

M2

18,000.00

22,500.00

Kg

25,000.00

31,250.00

Gulung

2,000,000.00

2,500,000.00

Gulung

2,400,000.00

3,000,000.00

Gulung

3,040,000.00

3,800,000.00

288,000.00

360,000.00

Batang

9,618.00

12,022.50

Batang

22,500.00

28,125.00

ALUMUNIUM & WIRE )

M2

M2

7,500.00

9,375.00

Roll

75,000.00

93,750.00

Kg

15,000.00

18,750.00

Kg

20,000.00

25,000.00

Kg

17,000.00

21,250.00

Kg

29,000.00

36,250.00

Buah

6,000.00

7,500.00

Kotak/100 Bh

20,000.00

25,000.00

Kg

26,000.00

32,500.00

Kg

2,500.00

3,125.00

Buah

6,500.00

8,125.00

Buah

200,000.00

250,000.00

Buah

175,000.00

218,750.00

Buah

36,300.00

45,375.00

Buah

36,500.00

45,625.00

Buah

12,500.00

15,625.00

( NAILS, KEYS & GLUE )

Harga Bahan
Satuan
3
Buah

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

5
13,500.00

16,875.00

Buah

5,000.00

6,250.00

Buah

7,000.00

8,750.00

Buah

6,000.00

7,500.00

Buah

12,500.00

15,625.00

Buah

10,000.00

12,500.00

Buah

7,500.00

9,375.00

Buah

5,000.00

6,250.00

Kg

37,500.00

46,875.00

Kg

46,500.00

58,125.00

Cup

20,000.00

25,000.00

Buah

5,000.00

6,250.00

Buah

1,375,000.00

1,718,750.00

Buah

150,000.00

187,500.00

Buah

950,000.00

1,187,500.00

Buah

0.00

0.00

Buah

475,000.00

593,750.00

Buah

1,500,000.00

1,875,000.00

Buah

2,750,000.00

3,437,500.00

Buah

7,200,000.00

9,000,000.00

Buah

1,400,000.00

1,750,000.00

Buah

366,250.00

457,812.50

Set

375,000.00

468,750.00

Buah

85,000.00

106,250.00

Buah

37,500.00

46,875.00

Buah

12,500.00

15,625.00

Buah

17,500.00

21,875.00

Buah

1,850,000.00

2,312,500.00

M'

233,500.00

291,875.00

M'

188,000.00

235,000.00

M'

151,000.00

188,750.00

M'

117,000.00

146,250.00

M'

55,000.00

68,750.00

M'

2,394,750.00

2,993,437.50

M'

1,506,700.00

1,883,375.00

M'

1,385,550.00

1,731,937.50

M'

933,000.00

1,166,250.00

M'

724,500.00

905,625.00

M'

575,000.00

718,750.00

M'

312,750.00

390,937.50

M'

402,500.00

503,125.00

M'

322,500.00

403,125.00

M'

279,600.00

349,500.00

M'

154,000.00

192,500.00

M'

118,000.00

147,500.00

M'

78,500.00

98,125.00

M'

49,200.00

61,500.00

M'

33,750.00

42,187.50

M'

24,100.00

30,125.00

M'

176,500.00

220,625.00

M'

119,500.00

149,375.00

M'

91,250.00

114,062.50

M'

76,000.00

95,000.00

M'

47,250.00

59,062.50

M'

28,350.00

35,437.50

M'

14,500.00

18,125.00

M'

11,250.00

14,062.50

M'

6,250.00

7,812.50

M'

4,500.00

5,625.00

M'

4,500.00

5,625.00

M'

166,700.00

208,375.00

M'

166,700.00

208,375.00

Harga Bahan
Satuan
3

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

PIPE'S ACESSORIES )
Buah

1,000,000.00

1,250,000.00

Buah

850,000.00

1,062,500.00

Buah

750,000.00

937,500.00

Buah

600,000.00

750,000.00

Buah

581,800.00

727,250.00

Buah

504,800.00

631,000.00

Buah

900,000.00

1,125,000.00

Buah

800,000.00

1,000,000.00

Buah

320,000.00

400,000.00

Buah

275,000.00

343,750.00

Buah

200,000.00

250,000.00

Buah

175,000.00

218,750.00

Buah

130,000.00

162,500.00

Buah

4,200,000.00

5,250,000.00

Buah

2,782,500.00

3,478,125.00

Buah

1,575,000.00

1,968,750.00

Buah

787,500.00

984,375.00

Buah

630,000.00

787,500.00

Buah

420,000.00

525,000.00

Buah

1,100,000.00

1,375,000.00

Buah

1,890,000.00

2,362,500.00

Buah

1,365,000.00

1,706,250.00

Buah

840,000.00

1,050,000.00

Buah

400,000.00

500,000.00

Buah

287,500.00

359,375.00

Buah

172,500.00

215,625.00

Buah

660,000.00

825,000.00

Buah

800,000.00

1,000,000.00

Buah

1,379,300.00

1,724,125.00

Buah

1,365,000.00

1,706,250.00

Buah

1,050,000.00

1,312,500.00

Buah

945,000.00

1,181,250.00

Buah

735,000.00

918,750.00

Buah

630,000.00

787,500.00

Buah

525,000.00

656,250.00

Buah

420,000.00

525,000.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

185,000.00

231,250.00

Buah

105,000.00

131,250.00

Buah

55,400.00

69,250.00

Buah

0.00

0.00

Buah

37,850.00

47,312.50

Buah

0.00

0.00

Buah

31,500.00

39,375.00

Buah

26,500.00

33,125.00

Buah

472,500.00

590,625.00

Buah

367,500.00

459,375.00

Buah

236,500.00

295,625.00

Buah

0.00

0.00

Buah

420,000.00

525,000.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

275,000.00

343,750.00

Buah

580,200.00

725,250.00

Buah

420,000.00

525,000.00

Buah

262,500.00

328,125.00

Buah

302,000.00

377,500.00

Buah

126,000.00

157,500.00

Buah

80,000.00

100,000.00

Buah

70,000.00

87,500.00

Buah

46,050.00

57,562.50

PIPE'S ACESSORIES )
Buah

577,500.00

721,875.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

294,000.00

367,500.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

50,000.00

62,500.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

0.00

0.00

Buah

30,000.00

37,500.00

Buah

33,000.00

41,250.00

Buah

40,000.00

50,000.00

Buah

75,000.00

93,750.00

Buah

1,280,000.00

1,600,000.00

Unit

2,925,000.00

3,656,250.00

Unit

5,680,000.00

7,100,000.00

Unit

7,530,000.00

9,412,500.00

Unit

1,700,000.00

2,125,000.00

Unit

2,800,000.00

3,500,000.00

Unit

3,800,000.00

4,750,000.00

Unit

365,000.00

456,250.00

( WATER TANKS )

Harga Bahan
Satuan

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

S, LAMPS )
Buah

25,000.00

31,250.00

Buah

18,000.00

22,500.00

Buah

15,000.00

18,750.00

Buah

15,600.00

19,500.00

Buah

4,800.00

6,000.00

Buah

6,000.00

7,500.00

Buah

6,000.00

7,500.00

Set

10,100.00

12,620.00

Set

12,000.00

15,000.00

Set

132,000.00

165,000.00

Set

156,000.00

195,000.00

Buah

30,000.00

37,500.00

Buah

35,000.00

43,750.00

Buah

95,000.00

118,750.00

Upah Kerja
Satuan

3
Org / Hari

Tanpa Jasa & Pajak Dengan Jasa & Pajak


(Rp.)

(Rp.)

5
70,950.00

88,687.50

Org / Hari

98,230.00

122,787.50

Org / Hari

91,630.00

114,537.50

Org / Hari

77,990.00

97,487.50

Org / Hari

77,990.00

97,487.50

Org / Hari

77,990.00

97,487.50

Org / Hari

77,990.00

97,487.50

Org / Hari

77,990.00

97,487.50

Org / Hari

77,990.00

97,487.50

Org / Hari

75,600.00

94,500.00

Org / Hari

63,000.00

78,750.00

Org / Hari

59,000.00

73,750.00

Org / Hari

63,000.00

78,750.00

Org / Hari

59,000.00

73,750.00

Org / Hari

63,000.00

78,750.00

Org / Hari

59,000.00

73,750.00

Org / Hari

55,000.00

68,750.00

Org / Hari

63,000.00

78,750.00

Org / Hari

60,000.00

75,000.00

Org / Hari

52,500.00

65,625.00

Org / Hari

45,000.00

56,250.00

Org / Hari

47,500.00

59,375.00

Org / Hari

53,000.00

66,250.00

DAFTAR HARGA UPAH KERJA BA

A.

UPAH KERJA

No

Jenis Pekerja / Tukang

Pekerja

Mandor

Kepala Tukang

Tukang Kayu

Tukang Semen

Tukang Batu

Tukang Besi

Tukang Pipa

Tukang Cat

A.

HARGA BAHAN / MATERIAL BANGUNAN


Jenis Bahan / Material
No.
Bangunan
1

Batako

Batu 0,5 - 1 (Kerikil Beton)

Batu Belah 10 - 15 cm

Baut

Besi Strip

Cat Dasar Tembok

Cat Tembok

Kayu Kelas I (Ketam)

Kayu Kelas II

10

Paku

11

Paku Payung

12

Papan Kayu Kelas I (Ketam)

13

Papan Kayu Klas II

14

Pasir Beton/Pasang

15

Plamur

16

Semen Portland

17

Seng Datar BJLS 0,20

18

Seng Gelombang BJLS 0,20

19 Ensel Pintu
20 Gerendel Pintu
21 Kunci Tanam Biasa
22 Turbin Crossflow lengkap

23 Generator (Brushess, 3 Sinkronus Alternator + AVR)


24 Kontrol , Electronic Load Control
25 Ballast Load
26 Transmisi Mekanik + Aksesoris
27 Grounding, wiring, penangkal petir
28 Tool Kits
29 Tiang Beton
30 Kabel Twisted 3 x 35 + 1 x 25
31 Aksesories
32 Persiapan Uji Coba (Comisioning)
33 Saringan
34 Pipa PVC 4 inc (Penguras)
35 Elbow 4 inc
36 Stop Kran 4 inc
37 Pipa PVC dia 12 inc (Pipa Pesat)
Besi Beton (Polos/Ulir)
Kawat Ikat Beton

No.

Jenis Bahan / Material


Bangunan

2
II. BAHAN SEMEN ( CEMENT )

Semen PC

Semen Warna / Oker


III. BAHAN KAYU ( TIMBER, WOODS )

Kayu Belian

Kayu Belian ( Ketam ) 8/8

Kayu Kls. I

Kayu Kls. I ( Ketam ) 8/8

Kayu Kls. II

Papan Kayu Belian

Papan Kayu Belian ( Ketam )

Papan Kayu Kls. I

Papan Kayu Kls. I (Ketam )

10

Papan Kayu Kls. II

11

Papan Bekisting / Mal Kayu Kls. III

12

Papan Jalusie / Renglat Kayu Kls. I

13 Kayu Belian uk. 15 cm x 15 cm / Btg Rp. 1.015.000,IV. BAHAN UBIN ( TILE, CERAMIC, GRANITE, MARBLE )
1

Keramik Porselin uk. 20 x 20 Polos

Keramik Porselin uk. 20 x 20 Warna

Keramik Porselin uk. 20 x 20 Warna Anti Slip

Keramik Porselin uk. 20 x 25 Warna

Keramik Porselin uk. 30 x 30 Warna

Keramik Porselin uk. 30 x 30 Polos Anti Slip

Keramik Porselin uk. 30 x 30 Warna Anti Slip

Keramik Porselin uk. 40 x 40 Anti Gores ( KW 1 )

Keramik Porselin uk. 40 x 40 Anti Gores ( KW 2 )

10

Keramik Porselin uk. 60 x 60 Anti Gores ( KW 1 )

11

Keramik Porselin uk. 60 x 60 Unpolished

12 Lis Dinding Keramik WC uk. 8 x 20 cm


13 Lis Dinding Keramik WC uk. 10 x 40 cm
14

Porselin uk. 11 x 11 Putih

15

Porselin uk. 10 x 10 Warna


V. BAHAN LANGIT - LANGIT ( PLAFOND, ACOUSTIC )

Lis Profil Gypsum 8 cm

Lis Profil Gypsum 10 cm

Lis Profil Gypsum 12 cm

Lis Profil Gypsum 14 cm

Bunga Gypsum dia. 80 cm

Bunga Gypsum dia. 90 cm

Triplek tebal 3 mm

Triplek tebal 2 mm

GRC Board 3 mm

10

Gypsum Board tebal 9 mm

11 Pintu WC PVC
12 Pintu Double Alumunium
13 Pintu Panel kayu Kls. I
14 Pintu Panel Kayu Kls. II
15 Kusen Alumunium
VI. BAHAN ATAP ( ROOF )
1

Genteng Kodok / Glazuur Dengan Cat

Bubungan Genteng Kodok / Glazuur

Seng Gelombang BJLS 0,30

Seng Gelombang BJLS 0,20

Genteng Metal Warna Berpasir

uk. 0.88 x 0.88 M2, tebal 0.35 mm

Genteng Metal Warna Polos

uk. 0.88 x 0.88 M2, tebal 0.35 mm

Genteng Metal Warna Berpasir

uk. 0.88 x 0.44 M2, tebal 0.35 mm

Genteng Metal Warna Polos

uk. 0.88 x 0.44 M2, tebal 0.35 mm

Genteng Metal Multi Sirap Type Borneo

uk. 7.00 x 0.50 M2, tebal 0.40 mm

10

Nok Genteng Metal Warna Berpasir

uk. 1.00 x 0.91 M2, tebal 0.35 mm

11

Nok Genteng Metal Warna Polos

uk. 1.00 x 0.91 M2, tebal 0.35 mm

12

Nok Genteng Metal Multi Sirap

uk. 0.46 x 0.23 M2, tebal 0.40 mm

13

Seng Datar BJLS 0,30

14

Seng Datar BJLS 0,20

15

Atap Fibreglass Gelombang 3 mm

16 Pagar Besi Hollo


17 Pagar Besi Stainlish
18 Huruf Stainlish T = 8 mm
19 Huruf Stainlish T = 6 mm

No.

Jenis Bahan / Material


Bangunan

2
VII. BAHAN KACA ( GLASS )

Naco + Bingkai ( 80 x 15 cm ) 10 Daun Polos

Naco + Bingkai ( 80 x 15 cm ) 10 Daun Rayban

Kaca Polos

3 mm

Kaca Polos

5 mm

Kaca Warna 3 mm

Kaca Buram 3 mm

Kaca Buram Warna 3 mm

Kaca Rayban 3 mm

Kaca Rayban 5 mm

10

Kaca Cermin 3 mm
VIII. BAHAN CAT ( PAINT )

Amplas Kayu / Besi / Tembok

Dempul

Cat Dasar Tembok

Cat Dasar Kayu

Meni Besi

Cat Kilat

Plamur

Cat Khusus Tembok Luar

Pelitur

10

Melamic

11

Vernis

12

Minyak Cat / Thinner

13

Ter / Residu
IX. BAHAN BESI , ALUMINIUM & KAWAT ( IRON, ALUMUNIUM & WIRE )

Besi Simpai Kawat

Besi Tulangan Beton

Kawat Ikat Beton

Kawat Harmonika

Kawat Nyamuk / Besi

Kawat Nyamuk / Plastik (Kassa)

Kawat Ikat Beronjong / Galvanis

Wiremesh Besi Ulir diam. 4 mm

1 Gulung = 2.10 x 54.00 M2

Wiremesh Besi Ulir diam. 5 mm

1 Gulung = 2.10 x 54.00 M2

10

Wiremesh Besi Ulir diam. 6 mm

1 Gulung = 2.10 x 54.00 M2

11

Multi Truss ( Rangka Atap Baja Ringan )

bentang < 12.00 M

12

Besi Plat T = 1.00 mm L = 2 cm ( Besi Strip )

13 B e u g e l

1 Roll = 5.0 x 5.0 M2

14

Alumunium Foil

15

Alumunium Tape

uk. 60,00 x 1,25 M2

X. BAHAN PENGGANTUNG, KUNCI & PEREKAT ( NAILS, KEYS & GLUE )


1

Paku Campuran 1" - 5 "

Paku Atap Seng / Paku Payung

Paku Genteng Metal Multi Sirap

Paku Gypsum

Paku Sekrup

Paku Beton

Paku Tripleks

Sekrup / Baut / Mur

Baut Besar

10

Kunci Pintu Tanam Antik

11

Kunci Pintu Tanam

12

Kunci Pintu Tanam KM / WC

13

Kunci Silinder

14

Kunci Lemari

No.

Jenis Bahan / Material


Bangunan

1
15

2
Selot Pintu

16

Selot Jendela

17

Engsel Pintu

Biasa

18

Engsel Jendela

Biasa

19

Engsel Pintu

Kuningan

20

Engsel Jendela

Kuningan

21

Kait Angin

22

Handle Pintu & Jendela

23

Lem Kayu / Tripleks

24

Lem PVC

25

Lem Genteng Metal Multi Sirap

26

Seal Tape
XI. BAHAN SANITAIR ( SANITARY )

Kloset Duduk / Monoblok

Kloset Jongkok Standar

Urinoir

Bidet

Wastafel Keramik

Bak Mandi Fibreglass

Badkip / Bathtub Porselin

Panjang

Badkip / Bathtub Porselin

Sudut

Bak Air Fibreglass vol. 1 m3

10

Bak Cuci Piring Stainless Steel Double

11

Water Drain + Acessories

12

Shower ( Tray )

13

Tempat Sabun / Soap Dish

14

Kran Air Lokal 3/4 "

15

Floor Drain

16

Pemanas Air / Water Heater + Lapisan Anti Karat kap. 15 liter

1 lubang

XII. BAHAN PIPA ( PIPES )


1

Pipa GIP class medium

diameter

200 mm ( 8 " )

Pipa GIP class medium

diameter

150 mm ( 6 " )

Pipa GIP class medium

diameter

100 mm ( 4 " )

Pipa GIP class medium

diameter

75 mm ( 3 " )

Pipa GIP class medium

diameter

50 mm ( 2 " )

Pipa PVC S - 12,5 RRJ

diameter

630mm ( 24 " )

Pipa PVC S - 12,5 RRJ

diameter

500 mm ( 20 " )

Pipa PVC S - 12,5 RRJ

diameter

450 mm ( 18 " )

Pipa PVC S - 12,5 RRJ

diameter

400 mm ( 16 " )

10

Pipa PVC S - 12,5 RRJ

diameter

355 mm ( 14 " )

11

Pipa PVC S - 12,5 RRJ

diameter

300 mm ( 12 " )

12

Pipa PVC S - 12,5 RRJ

diameter

275 mm ( 11 " )

13

Pipa PVC S - 12,5 RRJ

diameter

250 mm ( 10 " )

14

Pipa PVC S - 12,5 RRJ

diameter

225 mm ( 9 " )

15

Pipa PVC S - 12,5 RRJ

diameter

200 mm ( 8 " )

16

Pipa PVC S - 12,5 RRJ

diameter

150 mm ( 6 " )

17

Pipa PVC S - 12,5 RRJ

diameter

125 mm ( 5 " )

18

Pipa PVC S - 12,5 RRJ

diameter

100 mm ( 4 " )

19

Pipa PVC S - 12,5 RRJ

diameter

75 mm ( 3 " )

20

Pipa PVC S - 12,5 RRJ

diameter

65 mm ( 2,5 " )

21

Pipa PVC S - 12,5 RRJ

diameter

50 mm ( 2 " )

22

Pipa PVC Tipe AW

diameter

250 mm ( 10 " )

23

Pipa PVC Tipe AW

diameter

200 mm ( 8 " )

24

Pipa PVC Tipe AW

diameter

150 mm ( 6 " )

25

Pipa PVC Tipe AW

diameter

125 mm ( 5 " )

26

Pipa PVC Tipe AW

diameter

100 mm ( 4 " )

27

Pipa PVC Tipe AW

diameter

75 mm ( 3 " )

28

Pipa PVC Tipe AW

diameter

50 mm ( 2 " )

29

Pipa PVC Tipe AW

diameter

40 mm ( 1,5 " )

30

Pipa PVC Tipe AW

diameter

25 mm ( 1 " )

31

Pipa PVC Tipe AW

diameter

18.75 mm ( 3/4 " )

32

Pipa PVC Tipe AW

diameter

12.5 mm ( 1/2 " )

33

Pipa Flexibel

diameter

150 mm ( 6 " )

34

Pipa Flexibel

diameter

100 mm ( 4 " )

No.

Jenis Bahan / Material


Bangunan

2
XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )

All Socket Tee PVC dia 200 x 200 mm

All Socket Tee PVC dia 200 x 160 mm

All Socket Tee PVC dia 200 x 110 mm

All Socket Tee PVC dia 200 x 90 mm

All Socket Tee PVC dia 150 x 150 mm

All Socket Tee PVC dia 150 x 100 mm

All Socket Tee PVC dia 160 x 90 mm

All Socket Tee PVC dia 150 x 75 mm

All Socket Tee PVC dia 110 x 90 mm

10

All Socket Tee PVC dia 100 x 50 mm

11

All Socket Tee PVC dia 75 x 75 mm

12

All Socket Tee PVC dia 75 x 50 mm

13

All Socket Tee PVC dia 50 x 50 mm


All Flanged Gate Valve dia 250 mm

14

All Flanged Gate Valve dia 200 mm

15

All Flanged Gate Valve dia 150 mm

16

All Flanged Gate Valve dia 100 mm


All Flanged Gate Valve dia 75 mm
All Flanged Gate Valve dia 50 mm

17

All Flanged Spigot PVC dia 300 mm

18

All Flanged Spigot PVC dia 250 mm

19

All Flanged Spigot PVC dia 200 mm

20

All Flanged Spigot PVC dia 160 mm

21

All Flanged Spigot PVC dia 110 mm

22

All Flanged Spigot PVC dia 90 mm

23

All Flanged Spigot PVC dia 63 mm

24

All Flange Bend GIP

45 x 150 mm

25

All Flange Bend GIP

90 x 150 mm

26

All Socket Bend PVC dia 315 mm

90

27

All Socket Bend PVC dia 250 mm

90

All Socket Bend PVC dia 250 mm

45

All Socket Bend PVC dia 250 mm

22,5

All Socket Bend PVC dia 200 mm

90

All Socket Bend PVC dia 200 mm

45

All Socket Bend PVC dia 200 mm

22,5

All Socket Bend PVC dia 160 mm

90

All Socket Bend PVC dia 160 mm

45

All Socket Bend PVC dia 160 mm

22,5

28

29

30

31
32
33
34

35

All Socket Bend PVC dia 140 mm

90

All Socket Bend PVC dia 140 mm

45

All Socket Bend PVC dia 140 mm

22,5

All Socket Bend PVC dia 110 mm

90

All Socket Bend PVC dia 110 mm

45

All Socket Bend PVC dia 90 mm

90

All Socket Bend PVC dia 90 mm

45

All Socket Bend PVC dia 75 mm

90

All Socket Bend PVC dia 75 mm

45

All Socket Bend PVC dia 63 mm

90

All Socket Bend PVC dia 63 mm

45

Flage Socket PVC

Diameter 100 mm

Flage Socket PVC

Diameter 75 mm

Flage Socket PVC

Diameter 50 mm

All Flange Reducer GIP

diam. 250 x 200 mm

All Flange Reducer GIP

diam. 250 x 150 mm

All Flange Reducer GIP

diam. 200 x 150 mm

All Flange Reducer GIP

diam. 200 x 100 mm

All Flange Reducer GIP

diam. 150 x 100 mm

36

All Flange Reducer PVC dia 315 x 250 mm

37

All Flange Reducer PVC dia 250 x 200 mm

38

All Flange Reducer PVC dia 200 x 150 mm


All Flange Reducer PVC dia 200 x 100 mm

39

All Flange Reducer PVC dia 160 x 110 mm

40

All Flange Reducer PVC dia 110 x 90 mm

41

All Flange Reducer PVC dia 110 x 63 mm

42

All Flange Reducer PVC dia 90 x 63 mm

XIII. ASESORI PIPA TRANSMISI & DISTRIBUSI ( PIPE'S ACESSORIES )


Bend 90GIP

Diameter

250 mm

Bend 45GIP

Diameter

250 mm

Bend 22,5GIP

Diameter

250 mm

Bend 90GIP

Diameter

200 mm

Bend 45GIP

Diameter

200 mm

Bend 22,5GIP

Diameter

200 mm

Bend 90GIP

Diameter

150 mm

Bend 45GIP

Diameter

150 mm

Bend 22,5GIP

Diameter

150 mm

Bend 90GIP

Diameter

100 mm

Bend 45GIP

Diameter

100 mm

Bend 90GIP

Diameter

75 mm

Bend 45GIP

Diameter

75 mm

Bend 90GIP

Diameter

50 mm

Bend 45GIP

Diameter

50 mm

43

Flange GIP

diam. 50 mm

44

Flange GIP

diam. 75 mm

45

Flange GIP

diam. 100 mm

46

Flange GIP

diam. 150 mm

47

Flexibel Joint

diam. 150 mm

XIV. BAHAN TANKI AIR UNTUK HIDRAN UMUM ( WATER TANKS )


1

Hidran Umum Polyethylene ( PE )

vol. 1,0 m3

Hidran Umum Polyethylene ( PE )

vol. 2,0 m3

Hidran Umum Polyethylene ( PE )

vol. 3,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 1,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 2,0 m3

Hidran Umum Fibreglass ( FRP )

vol. 3,0 m3

Water Meter

Jenis Bahan / Material Bangunan


1

2
XV. BAHAN ELEKTRIKAL ( ELECTRICAL, CABLES, LAMPS )

Sekring Biasa

Sekring Otomatic 16 A ( Jerman )

Stop Kontak

Saklar

Lampu Pijar 10 Watt

Lampu Pijar 25 Watt

Lampu Pijar 60 Watt

Lampu Neon (TL) 10 Watt

Lampu Neon (TL) 20 Watt

10

Lampu Kap Baret

11

Lampu Sorot Lengkap 120 Watt

12

Lampu SL 18 Watt

13

Lampu SL 20 Watt

14

Lampu SL 50 Watt

B.

UPAH KERJA

DAFTAR HARGA UPAH KERJA BAHAN DAN

Satuan

Upah Kerja
(Rp.)

Org / Hari

70,950.00

Org / Hari

98,230.00

Org / Hari

91,630.00

Org / Hari

77,990.00

Org / Hari

77,990.00

Org / Hari

77,990.00

Org / Hari

77,990.00

Org / Hari

77,990.00

Org / Hari

77,990.00

Satuan

Harga Bahan

(Rp.)
4

M3

2,478.00

1,126,290.00

M3

384,560.00

M3
M3
M3

35,239.00

M3

39,675.00

M3

5,133,902.00

M3

2,990,460.00

M3

24,478.00

M3

25,788.00

M3

5,133,902.00

M3

3,278,535.00

M3

147,290.00

M'

49,594.00

M'

103,070.00

M'

72,738.00

M'

75,652.00

M3

14,898.00

M3

88,277.00

M3

80,590.00

Kg

90,000,000.00

Unit

30,000,000.00

Unit

50,000,000.00

Unit

20,000,000.00

M3
Kg
Kg
Btg
M
Set
Kg
Set
M

61,980.00

Bh

80,000.00

Bh

200,000.00

846,326.00

Kg

23,295.00

Kg

33,933.00

Satuan

Harga Bahan
Tanpa Jasa & Pajak
(Rp.)

50 Kg / Zak

75,000.00

Kg

7,500.00

M3

7,750,000.00

M3

9,690,000.00

M3

4,030,000.00

M3

5,130,000.00

M3

3,410,000.00

M3

7,750,000.00

M3

9,690,000.00

M3

4,485,000.00

M3

4,830,000.00

M3

4,140,000.00

M3

2,553,000.00

M3

3,300,000.00

M3

11,165,000.00

Kotak

40,000.00

Kotak

42,000.00

Kotak

45,000.00

Kotak

54,000.00

Kotak

51,200.00

Kotak

50,000.00

Kotak

60,000.00

Kotak

115,000.00

Kotak

100,000.00

Kotak

160,000.00

Kotak

146,000.00

Buah

3,800.00

Buah

15,000.00

M2

42,500.00

M2

45,000.00

M'

9,000.00

M'

10,500.00

M'

11,000.00

M'

11,000.00

Buah

300,000.00

Buah

375,000.00

Lembar

55,000.00

Lembar

42,000.00

Lembar

57,500.00

Lembar

67,500.00

Buah

250,000.00

Buah

800,000.00

Buah

800,000.00

Buah

650,000.00

M'

85,000.00

Buah

2,500.00

Buah

5,500.00

Lembar

65,500.00

Lembar

37,500.00

Buah/2 susun

70,000.00

Buah/2 susun

60,000.00

Buah/1 susun

36,000.00

Buah/1 susun

25,500.00

Buah

240,000.00

Buah

70,000.00

Buah

65,000.00

Buah

48,000.00

Lembar

66,500.00

Lembar

38,000.00

Lembar

67,500.00

M'

450,000.00

M'

650,000.00

Cm

8,500.00

Cm

7,000.00

Satuan

Harga Bahan
Tanpa Jasa & Pajak
(Rp.)

Set

250,000.00

Set

260,000.00

M2

90,000.00

M2

120,000.00

M2

150,000.00

M2

175,000.00

M2

200,000.00

M2

110,000.00

M2

145,000.00

M2

225,000.00

Lembar

2,500.00

Kg

23,000.00

Kaleng/5kg

35,000.00

Kg

27,000.00

Kg

27,000.00

Kg

33,000.00

Kg

42,500.00

Kaleng/5ltr

90,000.00

Liter

45,000.00

Liter

55,000.00

Liter

37,500.00

Liter

15,000.00

Liter

42,300.00

Kg

16,000.00

Kg

9,900.00

Kg

20,000.00

Roll

350,000.00

M2

13,000.00

M2

18,000.00

Kg

25,000.00

Gulung

2,000,000.00

Gulung

2,400,000.00

Gulung

3,040,000.00

M2

288,000.00

Batang

9,618.00

Batang

22,500.00

M2

7,500.00

Roll

75,000.00

Kg

15,000.00

Kg

20,000.00

Kg

17,000.00

Kg

29,000.00

Buah

6,000.00

Kotak/100 Bh

20,000.00

Kg

26,000.00

Kg

2,500.00

Buah

6,500.00

Buah

200,000.00

Buah

175,000.00

Buah

36,300.00

Buah

36,500.00

Buah

12,500.00

Satuan

Harga Bahan
Tanpa Jasa & Pajak
(Rp.)

3
Buah

4
13,500.00

Buah

5,000.00

Buah

7,000.00

Buah

6,000.00

Buah

12,500.00

Buah

10,000.00

Buah

7,500.00

Buah

5,000.00

Kg

37,500.00

Kg

46,500.00

Cup

20,000.00

Buah

5,000.00

Buah

1,375,000.00

Buah

150,000.00

Buah

950,000.00

Buah

0.00

Buah

475,000.00

Buah

1,500,000.00

Buah

2,750,000.00

Buah

7,200,000.00

Buah

1,400,000.00

Buah

366,250.00

Set

375,000.00

Buah

85,000.00

Buah

37,500.00

Buah

12,500.00

Buah

17,500.00

Buah

1,850,000.00

M'

233,500.00

M'

188,000.00

M'

151,000.00

M'

117,000.00

M'

55,000.00

M'

2,394,750.00

M'

1,506,700.00

M'

1,385,550.00

M'

933,000.00

M'

724,500.00

M'

575,000.00

M'

312,750.00

M'

402,500.00

M'

322,500.00

M'

279,600.00

M'

154,000.00

M'

118,000.00

M'

78,500.00

M'

49,200.00

M'

33,750.00

M'

24,100.00

M'

176,500.00

M'

119,500.00

M'

91,250.00

M'

76,000.00

M'

47,250.00

M'

28,350.00

M'

14,500.00

M'

11,250.00

M'

6,250.00

M'

4,500.00

M'

4,500.00

M'

166,700.00

M'

166,700.00

Satuan

Harga Bahan
Tanpa Jasa & Pajak
(Rp.)

Buah

1,000,000.00

Buah

850,000.00

Buah

750,000.00

Buah

600,000.00

Buah

581,800.00

Buah

504,800.00

Buah

900,000.00

Buah

800,000.00

Buah

320,000.00

Buah

275,000.00

Buah

200,000.00

Buah

175,000.00

Buah

130,000.00

Buah

4,200,000.00

Buah

2,782,500.00

Buah

1,575,000.00

Buah

787,500.00

Buah

630,000.00

Buah

420,000.00

Buah

1,100,000.00

Buah

1,890,000.00

Buah

1,365,000.00

Buah

840,000.00

Buah

400,000.00

Buah

287,500.00

Buah

172,500.00

Buah

660,000.00

Buah

800,000.00

Buah

1,379,300.00

Buah

1,365,000.00

Buah

1,050,000.00

Buah

945,000.00

Buah

735,000.00

Buah

630,000.00

Buah

525,000.00

Buah

420,000.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

185,000.00

Buah

105,000.00

Buah

55,400.00

Buah

0.00

Buah

37,850.00

Buah

0.00

Buah

31,500.00

Buah

26,500.00

Buah

472,500.00

Buah

367,500.00

Buah

236,500.00

Buah

0.00

Buah

420,000.00

Buah

0.00

Buah

0.00

Buah

275,000.00

Buah

580,200.00

Buah

420,000.00

Buah

262,500.00

Buah

302,000.00

Buah

126,000.00

Buah

80,000.00

Buah

70,000.00

Buah

46,050.00

Buah

577,500.00

Buah

0.00

Buah

0.00

Buah

294,000.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

50,000.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

0.00

Buah

30,000.00

Buah

33,000.00

Buah

40,000.00

Buah

75,000.00

Buah

1,280,000.00

Unit

2,925,000.00

Unit

5,680,000.00

Unit

7,530,000.00

Unit

1,700,000.00

Unit

2,800,000.00

Unit

3,800,000.00

Unit

365,000.00

Satuan
3

Harga Bahan
(Rp.)
4

Buah

25,000.00

Buah

18,000.00

Buah

15,000.00

Buah

15,600.00

Buah

4,800.00

Buah

6,000.00

Buah

6,000.00

Set

10,100.00

Set

12,000.00

Set

132,000.00

Set

156,000.00

Buah

30,000.00

Buah

35,000.00

Buah

95,000.00

ANALISA HARGA SATUAN


Galian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m3 )
HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
KUANTITAS
( Rp. )
1
2
3
4
5
A TENAGA
1 Pekerja
OH
88,687.50
1.500
2 Mandor
OH
122,787.50
0.125
Jumlah
B BAHAN
Jumlah
C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga / M3

10%

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m3 )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Semen
OH
631,000.00
2 Pekerja
OH
88,687.50
3 Kepala Tukang
OH
114,537.50
4 Mandor
OH
122,787.50
Jumlah
B BAHAN
1 Semen Portland
Kg
1,875.00
2 Pasir Beton/Pasang
M3
90,625.00
3
3 Batu 0,5 - 1 (Kerikil Beton)
M
687,500.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
10%
E Harga Satuan

KUANTITAS
5
0.250
1.650
0.025
0.080

323.000
0.520
0.780

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m3 )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Batu
OH
25,000.00
2 Pekerja
OH
88,687.50
3 Kepala Tukang
OH
114,537.50
4 Mandor
OH
122,787.50
Jumlah
B BAHAN
1 Semen Portland
Kg
1,875.00
3
2 Pasir Beton/Pasang
M
90,625.00
3 Batu Belah 10 - 15 cm
M3
285,713.75
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
10%
E Harga Satuan

KUANTITAS
5
1.200
3.600
0.120
0.180

264.500
0.4275
1.000

Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

12,620.00
88,687.50
114,537.50
122,787.50

0.150
0.200
0.015
0.010

Kg
M3

1,875.00
90,625.00

8.520
0.017

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
Jumlah
C Jumlah A + B

D
E

Biaya Umum dan Keuntungan


Harga Satuan

10%

Urugan Kembali Tanah Galian ( PT.05 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.192
0.0192

Jumlah
B

BAHAN
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

24.000
8.000
2.400
0.400

M3
Kg

6,412,500.00
18,750.00

1.100
0.050

Jumlah
B

BAHAN
1 Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m2 )

No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

1,706,250.00
88,687.50
114,537.50
122,787.50

0.150
0.450
0.015
0.0225

Bh
Kg
M3

1,500.00
1,875.00
90,625.00

22.000
20.600
0.0333

Jumlah
B

BAHAN
1 Batako
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

1 buah pasang kunci tanam biasa


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

590,625.00
88,687.50
114,537.50
122,787.50

0.500
0.010
0.010
0.005

Bh

1,500.00

22.000

Jumlah
B

BAHAN
1 Kunci Tanam Biasa
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

1 Pasang Gerendel Pintu


HARGA
No.

URAIAN PEKERJAAN

SATUAN

KUANTITAS

No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

0.00
88,687.50
114,537.50
122,787.50

0.500
0.010
0.010
0.005

Bh

1,500.00

22.000

Jumlah
B

BAHAN
1 Gerendel Pintu
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

1 Pasang Engsel Pintu


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

50,000.00
88,687.50
114,537.50
122,787.50

0.150
0.015
0.015
0.00075

Bh

1,500.00

22.000

Jumlah
B

BAHAN
1 Ensel Pintu
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m3 )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4

KUANTITAS
5

A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

18.000
6.000
2.000
0.300

M3

6,412,500.00

1.100

Jumlah
B

BAHAN
1 Kayu Kelas I (Ketam)
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

12.000
4.000
1.200
0.200

M3
Btg
Bh
Kg

4,262,500.00
12,022.50
8,125.00
18,750.00

1.100
15.000
40.000
0.400

Jumlah
B
1
2
3
4

BAHAN
Kayu Kelas II
Besi Strip
Baut
Paku
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

Pemasangan Rangka Atap Seng ( PK.16 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

1
A

2
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.100
0.150
0.010
0.0075

M3
Kg

4,262,500.00
18,750.00

0.0111
0.100

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Paku
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Kayu
OH
97,487.50
2 Pekerja
OH
88,687.50
3 Kepala Tukang
OH
114,537.50
4 Mandor
OH
122,787.50
Jumlah
B BAHAN
1 Papan Kayu Kelas I (Ketam)
M3
6,037,500.00
2 Paku
Kg
18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
10%
E Harga Satuan

KUANTITAS
5
0.100
0.100
0.010
0.050

0.010
0.025

Pemasangan Atap Seng Gelombang BJLS 0,20 ( PPA.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

A
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.060
0.120
0.006
0.006

Lbr
Kg

81,875.00
25,000.00

0.700
0.020

Jumlah
B

BAHAN
1 Seng Gelombang BJLS 0,20
2 Paku Payung
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

Pemasangan Bubungan / Nok Atap Seng Gelombang ( PPA.06 / m' )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Kayu
OH
97,487.50
2 Pekerja
OH
88,687.50
3 Kepala Tukang
OH
114,537.50
4 Mandor
OH
122,787.50
Jumlah
B BAHAN
1 Papan Kayu Klas II
M3
5,175,000.00
2 Seng Datar BJLS 0,20
Lbr
47,500.00
3 Paku
Kg
18,750.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
10%
E Harga Satuan

KUANTITAS
5
0.070
0.150
0.008
0.006

0.010
0.300
0.040

Pengecatan Tembok Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,


1 Lapis Cat Penutup ( PC.05 / m2 )
No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

1
A

2
1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.063
0.020
0.0063
0.0025

Kg
Kg
Ltr

53,125.00
43,750.00
112,500.00

0.100
0.100
0.130

Jumlah
B

BAHAN
1 Plamur
2 Cat Dasar Tembok
3 Cat Tembok
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
E Harga Satuan

10%

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Besi
OH
77,990.00
2 Pekerja
OH
70,950.00
3 Kepala Tukang
OH
91,630.00
4 Mandor
OH
98,230.00
Jumlah
B BAHAN
1 Besi Beton (Polos/Ulir)
Kg
23,295.00
2 Kawat Ikat Beton
Kg
33,933.00
Jumlah
C Jumlah A + B
D Biaya Umum dan Keuntungan
10%
E Harga Satuan

KUANTITAS
5
0.007
0.007
0.0007
0.0003

1.050
0.015

Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

1
A

2
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.260
0.300
0.026
0.005

M3
Kg

3,191,250.00
18,750.00

0.040
0.300

Jumlah
B

BAHAN
1 Papan Kayu Bekisting
2 Paku
Jumlah
C Jumlah A + B
D

Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28
Galian Tanah Biasa sedalam 1 meter ( PT.01 / m3 )

No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH
Jumlah

BAHAN
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga Satuan

10%

HARGA
SATUAN
( Rp. )
4
70,950.00
98,230.00

KUANTITAS
5
0.0075
0.0008

BIAYA
SATUAN
( Rp. )
6
133,031.25
15,348.44
148,379.69

0.00
148,379.69
14,837.97
163,217.66

BIAYA
SATUAN
( Rp. )
6
157,750.00
146,334.38
2,863.44
9,823.00
316,770.81
605,625.00
47,125.00
536,250.00
1,189,000.00
1,505,770.81
150,577.08
1,505,770.81

BIAYA
SATUAN
( Rp. )
6
30,000.00
319,275.00
13,744.50
22,101.75
385,121.25
495,937.50
38,742.19
285,713.75
820,393.44
1,205,514.69
120,551.47
1,326,066.16

BIAYA
SATUAN
( Rp. )
6
1,893.00
17,737.50
1,718.06
1,227.88
22,576.44
15,975.00
1,540.63
17,515.63
40,092.06

Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUMLAH

Hari/Orang
Hari/Orang
Hari/Orang
Hari/Orang

1.500
0.600
0.060
0.075

Batu belah 10/15 cm

M3

1.100

Semen Portland
Pasir pasang

Kg
M3

267.000
0.427

BAHAN

4,009.21
44,101.27

BIAYA
SATUAN
( Rp. )
6
17,028.00
2,357.52
19,385.52

0.00
19,385.52
1,938.55
21,324.07

BIAYA
SATUAN
( Rp. )
6
2,339,700.00
709,500.00
274,890.00
49,115.00
3,373,205.00
7,053,750.00
937.50
7,054,687.50
10,427,892.50
1,042,789.25
11,470,681.75

BIAYA
SATUAN
( Rp. )
6
255,937.50
39,909.38
1,718.06
2,762.72
300,327.66
33,000.00
38,625.00
3,017.81
74,642.81
374,970.47
37,497.05
412,467.52

BIAYA
SATUAN
( Rp. )
6
295,312.50
886.88
1,145.38
613.94
297,958.69
33,000.00
33,000.00
330,958.69
33,095.87
364,054.56

BIAYA

SATUAN
( Rp. )
6
0.00
886.88
1,145.38
613.94
2,646.19
33,000.00
33,000.00
35,646.19
3,564.62
39,210.81

BIAYA
SATUAN
( Rp. )
6
7,500.00
1,330.31
1,718.06
92.09
10,640.47
33,000.00
33,000.00
43,640.47
4,364.05
48,004.51

BIAYA
SATUAN
( Rp. )
6

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Hari/Orang
0.015
Hari/Orang
0.150
Hari/Orang
0.015
Hari/Orang 0.00075

1,754,775.00
532,125.00
229,075.00
36,836.25
2,552,811.25
7,053,750.00
7,053,750.00
9,606,561.25
960,656.13
10,567,217.38

BIAYA
SATUAN
( Rp. )
6
1,169,850.00
354,750.00
137,445.00
24,557.50
1,686,602.50
4,688,750.00
180,337.50
325,000.00
7,500.00
5,201,587.50
6,888,190.00
688,819.00
7,577,009.00

BIAYA
SATUAN
( Rp. )

6
9,748.75
13,303.13
1,145.38
920.91
25,118.16
47,361.11
1,875.00
49,236.11
74,354.27
7,435.43
81,789.69

BIAYA
SATUAN
( Rp. )
6
9,748.75
8,868.75
1,145.38
6,139.38
25,902.25
60,375.00
468.75
60,843.75
86,746.00
8,674.60
95,420.60

BIAYA
SATUAN
( Rp. )
6

5,849.25
10,642.50
687.23
736.73
17,915.70
57,312.50
500.00
57,812.50
75,728.20
7,572.82
83,301.02

BIAYA
SATUAN
( Rp. )
6
6,824.13
13,303.13
916.30
736.73
21,780.28
51,750.00
14,250.00
750.00
66,750.00
88,530.28
8,853.03
97,383.30

BIAYA
SATUAN
( Rp. )

6
6,141.71
1,773.75
721.59
306.97
8,944.02
5,312.50
4,375.00
14,625.00
24,312.50
33,256.52
3,325.65
36,582.17

BIAYA
SATUAN
( Rp. )
6
545.93
496.65
64.14
29.47
1,136.19
24,459.75
509.00
24,968.75
26,104.94
2,610.49
28,715.43

BIAYA
SATUAN
( Rp. )

6
25,346.75
26,606.25
2,977.98
613.94
55,544.91
127,650.00
5,625.00
133,275.00
188,819.91
188,819.91

BIAYA
SATUAN
( Rp. )
6
532.13
73.67
605.80

0.00
605.80
60.58
666.38

DAFTAR ANALISA HARGA SATUAN


Galian Tanah Biasa sedalam 1 meter ( PT.01 / m3 )
No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.400
0.040

40,386.50

1.315

Jumlah
B

BAHAN
Jumlah

C
D
E

Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
Acuan : SNI.2835.b - 6.1 & SNI.2835.b - 6.2

Galian Tanah Keras / Liat sedalam 1 meter ( PT.02 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.625
0.0625

63,103.91

1.315

Jumlah
B

BAHAN
Jumlah

C
D
E

Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
Acuan : SNI.2835.b - 6.4 & PT.01

Galian Tanah Cadas / Padas yang banyak Batu / Kerikil sedalam 1 meter ( PT.03 / m3 )
No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4
88,687.50
122,787.50

KUANTITAS
5
1.500
0.125

Jumlah
B

BAHAN
Jumlah

C
D
E

Jumlah A + B
Biaya Umum dan Keuntungan
Harga / M3
Acuan : SNI.2835.b - 6.5 & PT.01

10%

Galian Tanah Lumpur sedalam 1 meter ( PT.04 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.823
0.0823

83,095.22

1.315

Jumlah
B

BAHAN
Jumlah

C
D
E

Jumlah A + B
Harga Satuan
Galian sedalam > 1 meter
Acuan : SNI.2835.b - 6.6 & PT.01

Urugan Kembali Tanah Galian ( PT.05 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.192
0.0192

Jumlah
B

BAHAN
Jumlah

0
D

Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.9

Menimbun dengan Tanah Datang secara Manual ( PT.06 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH

88,687.50
122,787.50

0.192
0.0192

M3

27,000.00

1.200

Jumlah
B

BAHAN
1 Tanah Urug/Tanah Datang

Jumlah
C
D

Jumlah A + B
Harga Satuan
Acuan : Tenaga = SNI.2835.b - 6.9

Bahan = SNI.2835.b - 6.11

Pemadatan Tanah secara Manual ( PT.07 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

OH
OH

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

88,687.50
122,787.50

0.500
0.050

Jumlah
B

BAHAN
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.10

Urugan Pasir di Bawah Lantai Bangunan/Alas Jalan, Terhitung Penyiramannya ( PT.08 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH

88,687.50
122,787.50

0.300
0.010

M3

90,625.00

1.200

Jumlah
B

BAHAN
1 Pasir Urug
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.11

Urugan Sirtu/Pasir Batu ( PT.09 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Pekerja
2 Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH

88,687.50
122,787.50

0.250
0.025

M3

105,208.34

1.200

Jumlah
B

BAHAN
1 Sirtu/Pasir Batu
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.2835.b - 6.15

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.01 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.100
0.320
0.010
0.015

Bh
Kg
M3

1,625.00
1,875.00
90,625.00

70.000
18.950
0.038

Jumlah
B

BAHAN
1 Bata Merah
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.9

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.02 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.100
0.320
0.010
0.015

Bh
Kg
M3

1,625.00
1,875.00
90,625.00

70.000
14.370
0.040

Jumlah
B

BAHAN
1 Bata Merah
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.10

Pasangan Bata Merah tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.03 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.100
0.320
0.010
0.015

Bh
Kg
M3

1,625.00
1,875.00
90,625.00

70.000
11.500
0.043

Jumlah
B

BAHAN
1 Bata Merah
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.11

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 2 Ps ( PPBC.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.450
0.015
0.0225

Bh
Kg
M3

1,500.00
1,875.00
90,625.00

22.000
20.600
0.0333

Jumlah
B

BAHAN
1 Batako
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27

Bahan = G.33.l

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 3 Ps ( PPBC.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.450
0.015
0.0225

Bh
Kg
M3

1,500.00
1,875.00
90,625.00

22.000
15.750
0.0378

Jumlah
B

BAHAN
1 Batako
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27

Bahan = G.33.i

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 4 Ps ( PPBC.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

A
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.450
0.015
0.0225

Bh
Kg
M3

1,500.00
1,875.00
90,625.00

22.000
12.650
0.0406

Jumlah
B

BAHAN
1 Batako
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.27

Bahan = G.33.h

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 2 Ps ( PPBC.07 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

1.200
3.600
0.120
0.180

Kg
M3
M3

1,875.00
90,625.00
285,713.75

264.500
0.4275
1.000

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
3 Batu Belah 10 - 15 cm
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26

Bahan = G.32.k

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 3 Ps ( PPBC.08 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

1.200
3.600
0.120
0.180

Kg
M3
M3

1,875.00
90,625.00
285,713.75

200.000
0.456
1.000

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
3 Batu Belah 10 - 15 cm
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26

Bahan = G.32.l

Pasangan Batu Kali uk. 10 - 15 cm, camp. 1 PC : 4 Ps ( PPBC.09 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

KUANTITAS

1
A

2
1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

1.200
3.600
0.120
0.180

Kg
M3
M3

1,875.00
90,625.00
285,713.75

163.000
0.522
1.000

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
3 Batu Belah 10 - 15 cm
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = G.26

Bahan = G.32.h

Pasangan Rooster/Terawang ( PPBC.10/ m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.100
0.300
0.010
0.015

Bh
Kg
M3

2,000.00
1,875.00
90,625.00

25.000
12.800
0.035

Jumlah
B

BAHAN
1 Terawang/Rooster Batako
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.a - 6.25

Pemasangan Paving Block, Pasir t = 10 cm ( PPBC.11 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Batu
2 Pekerja

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH

97,487.50
88,687.50

0.100
0.400

Bh
M3

2,062.50
90,625.00

36.000
0.120

Jumlah
B

BAHAN
1 Paving Block
2 Pasir Urug
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : G.60

Pemasangan Dinding Batu Alam ( PPBC.12 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Batu
2 Pekerja

OH
OH

HARGA
SATUAN
( Rp. )
4
97,487.50
88,687.50

KUANTITAS
5
0.350
0.620

3 Kepala Tukang
4 Mandor

OH
OH

114,537.50
122,787.50

0.035
0.030

M2
Kg
M3

4,750.00
1,875.00
90,625.00

1.050
11.750
0.035

Jumlah
B

C
D

BAHAN
1 Batu Alam Marmo uk. 10 x 20 cm abu-abu
2 Semen Portland
3 Pasir Beton/Pasang

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.74

Bronjong dengan Kawat Galvanis ( PPBC.13 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Anyam Bronjong
2 Pekerja
3 Mandor
Jumlah
B BAHAN
1 Kawat Galvanis
2 Batu Belah 10 - 15 cm
Jumlah
C Jumlah A + B
D (Jumlah A + B) x 1/3
E Harga Satuan
Acuan : G.5.a

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH

97,487.50
88,687.50
122,787.50

2.000
6.100
0.155

Kg
M3

#NAME?
285,713.75

25.000
3.000

0.333

FTAR ANALISA HARGA SATUAN

BIAYA
SATUAN
( Rp. )
6
35,475.00
4,911.50
40,386.50

0.00
40,386.50
40,386.50
53,108.25

BIAYA
SATUAN
( Rp. )
6
55,429.69
7,674.22
63,103.91

0.00
63,103.91
63,103.91
82,981.64

BIAYA
SATUAN
( Rp. )
6
133,031.25
15,348.44

148,379.69

0.00
148,379.69
14,837.97
163,217.66

BIAYA
SATUAN
( Rp. )
6
72,989.81
10,105.41
83,095.22

0.00
83,095.22
83,095.22
109,270.22

BIAYA
SATUAN
( Rp. )
6
17,028.00
2,357.52
19,385.52

0.00
19,385.52
19,385.52

BIAYA
SATUAN
( Rp. )
6
17,028.00
2,357.52
19,385.52
32,400.00

32,400.00
51,785.52
51,785.52

BIAYA
SATUAN
( Rp. )
6
44,343.75
6,139.38
50,483.13

0.00
50,483.13
50,483.13

BIAYA
SATUAN
( Rp. )
6
26,606.25
1,227.88
27,834.13
108,750.00
108,750.00
136,584.13
136,584.13

BIAYA
SATUAN
( Rp. )
6
22,171.88
3,069.69
25,241.56
126,250.01
126,250.01

151,491.57
151,491.57

BIAYA
SATUAN
( Rp. )
6
9,748.75
28,380.00
1,145.38
1,841.81
41,115.94
113,750.00
35,531.25
3,443.75
152,725.00
193,840.94
193,840.94

BIAYA
SATUAN
( Rp. )
6
9,748.75
28,380.00
1,145.38
1,841.81
41,115.94
113,750.00
26,943.75
3,625.00
144,318.75
185,434.69
185,434.69

BIAYA
SATUAN
( Rp. )
6

9,748.75
28,380.00
1,145.38
1,841.81
41,115.94
113,750.00
21,562.50
3,896.88
139,209.38
180,325.31
180,325.31

BIAYA
SATUAN
( Rp. )
6
14,623.13
39,909.38
1,718.06
2,762.72
59,013.28
33,000.00
38,625.00
3,017.81
74,642.81
133,656.09
133,656.09

BIAYA
SATUAN
( Rp. )
6
14,623.13
39,909.38
1,718.06
2,762.72
59,013.28
33,000.00
29,531.25
3,425.63
65,956.88
124,970.16
124,970.16

BIAYA
SATUAN
( Rp. )
6

14,623.13
39,909.38
1,718.06
2,762.72
59,013.28
33,000.00
23,718.75
3,679.38
60,398.13
119,411.41
119,411.41

BIAYA
SATUAN
( Rp. )
6
116,985.00
319,275.00
13,744.50
22,101.75
472,106.25
495,937.50
38,742.19
285,713.75
820,393.44
1,292,499.69
1,292,499.69

BIAYA
SATUAN
( Rp. )
6
116,985.00
319,275.00
13,744.50
22,101.75
472,106.25
375,000.00
41,325.00
285,713.75
702,038.75
1,174,145.00
1,174,145.00

BIAYA
SATUAN
( Rp. )

6
116,985.00
319,275.00
13,744.50
22,101.75
472,106.25
305,625.00
47,306.25
285,713.75
638,645.00
1,110,751.25
1,110,751.25

BIAYA
SATUAN
( Rp. )
6
9,748.75
26,606.25
1,145.38
1,841.81
39,342.19
50,000.00
24,000.00
3,171.88
77,171.88
116,514.06
116,514.06

BIAYA
SATUAN
( Rp. )
6
9,748.75
35,475.00
45,223.75
74,250.00
10,875.00
85,125.00
130,348.75
130,348.75

BIAYA
SATUAN
( Rp. )
6
34,120.63
54,986.25

4,008.81
3,683.63
96,799.31
4,987.50
22,031.25
3,171.88
30,190.63
126,989.94
126,989.94

BIAYA
SATUAN
( Rp. )
6
194,975.00
540,993.75
19,032.06
755,000.81
#NAME?
857,141.25
#NAME?
#NAME?
#NAME?
#NAME?

Dinding Plesteran Simpai t = 3 cm, Simpai Kawat, camp. 1 PC : 3 Ps ( PPs.01 / m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.250
0.320
0.025
0.015

Kg
M3
Kg
M3
Kg

1,875.00
90,625.00
20,000.00
3,191,250.00
18,750.00

14.150
0.039
0.250
0.020
0.150

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
3 Besi Simpai Kawat
4 Papan Mal Kayu Kls. III
5 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.24

Plesteran t = 1 cm, camp. 1 PC : 2 Ps ( PPs.02 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.200
0.015
0.010

Kg
M3

1,875.00
90,625.00

8.520

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D

Harga Satuan
Acuan : Tenaga = SNI.2837.b - 6.1

0.017

Bahan = G.50.h

Plesteran t = 1 cm, camp. 1 PC : 3 Ps ( PPs.03 / m2 )


HARGA
No.

URAIAN PEKERJAAN

SATUAN

KUANTITAS

No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.200
0.015
0.010

Kg
M3

1,875.00
90,625.00

5.400
0.013

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2837.b - 6.1

Bahan = G.50.j

Plesteran t = 1,5 cm, camp. 1 PC : 2 Ps ( PPs.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.200
0.015
0.010

Kg
M3

1,875.00
90,625.00

8.520
0.017

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.2

Plesteran t = 1,5 cm, camp. 1 PC : 3 Ps ( PPs.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.150
0.200
0.015
0.010

Kg
M3

1,875.00
90,625.00

6.480
0.019

Jumlah
B

BAHAN
1 Semen Portland
2 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2837.b - 6.3

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kerikil ( PBe.01 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

KUANTITAS
5

A
1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.250
1.650
0.025
0.080

1,875.00
90,625.00
187,500.00

218.000
0.520
0.870

Jumlah
B

BAHAN
1 Semen Portland
Kg
2 Pasir Beton/Pasang
M3
3 Kerikil
M3
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Batu Pecah ( PBe.02 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

KUANTITAS
5

97,487.50
88,687.50
114,537.50
122,787.50

0.250
1.650
0.025
0.080

1,875.00
90,625.00
687,500.00

218.000
0.520
0.870

Jumlah
B

BAHAN
1 Semen Portland
Kg
2 Pasir Beton/Pasang
M3
3 Batu Belah 0,5 - 1 (Kerikil Beton)
M3
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.1

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( PBe.03 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Semen
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

KUANTITAS
5

97,487.50
88,687.50
114,537.50
122,787.50

0.250
1.650
0.025
0.080

1,875.00
90,625.00
687,500.00

323.000
0.520
0.780

Jumlah
B

BAHAN
1 Semen Portland
Kg
2 Pasir Beton/Pasang
M3
3 Batu Belah 0,5 - 1 (Kerikil Beton)
M3
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.5

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( PBe.04 / kg )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN

KUANTITAS

No.
1
A

URAIAN PEKERJAAN
2

1
2
3
4

TENAGA
Tukang Besi
Pekerja
Kepala Tukang
Mandor

SATUAN
3

KUANTITAS
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

0.007
0.007
0.0007
0.0003

12,375.00
25,000.00

1.050
0.015

Jumlah
B

BAHAN
1 Besi Beton (Polos/Ulir)
Kg
2 Kawat Ikat Beton
Kg
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25

Pekerjaan Pembesian dengan Wiremesh Besi Ulir ( PBe.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Besi
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

KUANTITAS
5

97,487.50
88,687.50
114,537.50
122,787.50

0.007
0.007
0.0007
0.0003

33,509.70
25,000.00

1.050
0.015

Jumlah
B

BAHAN
1 Wiremesh Besi Ulir diam. 5 mm
M2
2 Kawat Ikat Beton
Kg
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.25

Pemasangan Bekisting / Cetakan Beton ( PBe.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

HARGA
SATUAN
( Rp. )
4
97,487.50
88,687.50
114,537.50
122,787.50

KUANTITAS
5
0.260
0.300
0.026
0.005

Jumlah
B

BAHAN
1 Papan Kayu Bekisting
M3
3,191,250.00
2 Paku
Kg
18,750.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Beton - 6.28

0.040
0.300

BIAYA
SATUAN
( Rp. )
6
24,371.88
28,380.00
2,863.44
1,841.81
57,457.13
26,531.25
3,534.38
5,000.00
63,825.00
2,812.50
101,703.13
159,160.25
159,160.25

BIAYA
SATUAN
( Rp. )
6
14,623.13
17,737.50
1,718.06
1,227.88
35,306.56
15,975.00
1,540.63
17,515.63
52,822.19
52,822.19

BIAYA

SATUAN
( Rp. )
6
14,623.13
17,737.50
1,718.06
1,227.88
35,306.56
10,125.00
1,178.13
11,303.13
46,609.69
46,609.69

BIAYA
SATUAN
( Rp. )
6
14,623.13
17,737.50
1,718.06
1,227.88
35,306.56
15,975.00
1,540.63
17,515.63
52,822.19
52,822.19

BIAYA
SATUAN
( Rp. )
6
14,623.13
17,737.50
1,718.06
1,227.88
35,306.56
12,150.00
1,721.88
13,871.88
49,178.44
49,178.44

BIAYA
SATUAN
( Rp. )
6

24,371.88
146,334.38
2,863.44
9,823.00
183,392.69
408,750.00
47,125.00
163,125.00
619,000.00
802,392.69
802,392.69

BIAYA
SATUAN
( Rp. )
6
24,371.88
146,334.38
2,863.44
9,823.00
183,392.69
408,750.00
47,125.00
598,125.00
1,054,000.00
1,237,392.69
1,237,392.69

BIAYA
SATUAN
( Rp. )
6
24,371.88
146,334.38
2,863.44
9,823.00
183,392.69
605,625.00
47,125.00
536,250.00
1,189,000.00
1,372,392.69
1,372,392.69

BIAYA
SATUAN

( Rp. )
6
682.41
620.81
80.18
36.84
1,420.24
12,993.75
375.00
13,368.75
14,788.99
14,788.99

BIAYA
SATUAN
( Rp. )
6
682.41
620.81
80.18
36.84
1,420.24
35,185.19
375.00
35,185.19
36,605.42
36,605.42

BIAYA
SATUAN
( Rp. )
6
25,346.75
26,606.25
2,977.98
613.94
55,544.91
127,650.00
5,625.00
133,275.00
188,819.91
188,819.91

Pemasangan Pondasi Tiang Tongkat Kayu Belian ( PK.01 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Bh

9,687,500.00
8,125.00

Jumlah
B

BAHAN
1 Kayu Belian (Tidak Ketam)
2 Baut
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.1.b

Pemasangan Rangka Keep Kayu Belian ( PK.02 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

9,687,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Belian (Tidak Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.3

Pekerjaan Gelegar/Balok Lantai Kayu Belian ( PK.03 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

M3
Kg

9,687,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Belian (Tidak Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.1

Pekerjaan Gelegar/Balok Lantai Kayu Kelas I ( PK.04 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

5,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas I
2 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : F.1.a

Pemasangan Lantai Papan Kayu Belian ( PK.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

12,112,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Belian (Ketam), t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.37

Pemasangan Lantai Papan Kayu Kelas I ( PK.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

M3
Kg

6,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Kelas I (Ketam), t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.37.a

Pekerjaan Rangka Badan Kayu Belian ( PK.07 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

12,112,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Belian (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.27

Pekerjaan Rangka Badan Kayu Kelas I ( PK.08 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

6,412,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : F.27.a

Pekerjaan Dinding Papan Kayu Belian ( PK.09 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

M3
Kg

6,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Belian (Ketam), t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.55

Pekerjaan Dinding Papan Kayu Kelas I ( PK.10 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

6,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Kelas I (Ketam), t = 2 cm
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.54

Pemasangan Dinding Tripleks Satu Sisi, tebal 3 mm ( PK.11 / m2 )


Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm
No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Lbr
Kg

11,250.00
32,500.00

Jumlah
B

BAHAN
1 Tripleks tebal 3 mm
2 Paku Tripleks
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.59

Pemasangan Dinding Tripleks Rangkap, tebal 3 mm ( PK.12 / m2 )


Untuk bahan dinding lainnya, dapat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm
No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )

1
A

2
1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Lbr
Kg

11,250.00
32,500.00

Jumlah
B

BAHAN
1 Tripleks tebal 3 mm
2 Paku Tripleks
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.59

Pemasangan Kusen Pintu dan Jendela Kayu Belian ( PK.13 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3

12,112,500.00

Jumlah
B

BAHAN
1 Kayu Belian (Ketam)
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.3

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( PK.14 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3

6,412,500.00

Jumlah
B

BAHAN
1 Kayu Kelas I (Ketam)
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.2

Pekerjaan Konstruksi Rangka Kuda-kuda ( PK.15 / m3 )

Untuk memasang kembali kuda-kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari ana
No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

M3
Btg
Bh
Kg

4,262,500.00
12,022.50
8,125.00
18,750.00

Jumlah
B
1
2
3
4

BAHAN
Kayu Kelas II
Besi Strip
Baut
Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.27

Pemasangan Rangka Atap Seng ( PK.16 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

4,262,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : Tenaga = F.18

Bahan : F.19

Pemasangan Gording, Nok, Ikatan Angin ( PK.17 / m3 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

4,262,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : F.22.a

Pemasangan Kasau + Reng Atap Genteng/Metal ( PK.18 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

M3
Kg

4,262,500.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.3434 - 6.31

Pemasangan Lisplang uk. (2 x 30) cm, Kayu Kelas I ( PK.19 / m' )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

6,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.3434 - 6.52

Bahan : SNI.3434 - 6.50

Pemasangan Lisplang uk. 2 x (2 x 20) cm, Kayu Kelas I ( PK.20 / m' )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

6,037,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Kelas I (Ketam)
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3434 - 6.52

Pemasangan Atap Genteng Kodok / Glazuur ( PPA.01 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA
1 Tukang Kayu

OH

HARGA
SATUAN
( Rp. )
4
97,487.50

2 Pekerja
3 Kepala Tukang
4 Mandor

OH
OH
OH

88,687.50
114,537.50
122,787.50

Bh

3,125.00

Jumlah
B

BAHAN
1 Genteng Kodok/Glazuur
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.2

Pemasangan Bubungan / Nok Atap Genteng Kodok / Glazuur ( PPA.02 / m' )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Bh
Kg
M3

6,875.00
1,875.00
90,625.00

Jumlah
B

BAHAN
1 Bubungan Genteng Kodok/Glazuur
2 Semen Portland
3 Pasir Beton/Pasang
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.5

Pemasangan Atap Genteng Metal ( PPA.03 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Bh
Kg

75,000.00
18,750.00

Jumlah
B

BAHAN
1 Genteng Metal
2 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.3436 - 6.32

Pemasangan Atap Genteng Metal Multi Sirap ( PPA.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA

HARGA
SATUAN
( Rp. )
4

1
2
3
4

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Buah
Kg
Cup

300,000.00
21,250.00
25,000.00

Jumlah
B

BAHAN
1 Genteng Multi Sirap Type Borneo
2 Paku Genteng Multi Sirap
3 Lem Genteng Multi Sirap
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.32

Pemasangan Atap Seng Gelombang BJLS 0,20 ( PPA.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Lbr
Kg

81,875.00
25,000.00

Jumlah
B

BAHAN
1 Seng Gelombang BJLS 0,20
2 Paku Payung
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.38

Pemasangan Bubungan / Nok Atap Seng Gelombang ( PPA.06 / m' )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Lbr
Kg

5,175,000.00
47,500.00
18,750.00

Jumlah
B

BAHAN
1 Papan Kayu Klas II
2 Seng Datar BJLS 0,20
3 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.39

Pemasangan Bubungan / Nok Atap Genteng Metal ( PPA.07 / m' )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA

1
2
3
4

Tukang Kayu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M'
Kg

81,250.00
18,750.00

Jumlah
B

BAHAN
1 Bubungan/Nok Genteng Metal
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.36

Pemasangan Bubungan / Nok Atap Genteng Metal Multi Sirap ( PPA.08 / m' )
HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN
( Rp. )
1
2
3
4
A TENAGA
1 Tukang Kayu
OH
97,487.50
2 Pekerja
OH
88,687.50
3 Kepala Tukang
OH
114,537.50
4 Mandor
OH
122,787.50
Jumlah
B BAHAN
1 Nok Genteng Multi Sirap
Bh
60,000.00
2 Paku Genteng Multi Sirap
Kg
21,250.00
3 Lem Genteng Multi Sirap
Cup
25,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.3436 - 6.36.a

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

5.000
5.000
0.500
0.250

487,437.50
443,437.50
57,268.75
30,696.88
1,018,840.63

1.100
40.000

10,656,250.00
325,000.00
10,981,250.00
12,000,090.63
12,000,090.63

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

8.000
8.000
0.800
0.400

779,900.00
709,500.00
91,630.00
49,115.00
1,630,145.00

1.100
3.000

10,656,250.00
56,250.00
10,712,500.00
12,342,645.00
12,342,645.00

KUANTITAS
5
5.000

BIAYA
SATUAN
( Rp. )
6
487,437.50

5.000
0.500
0.250

443,437.50
57,268.75
30,696.88
1,018,840.63

1.100
3.000

10,656,250.00
56,250.00
10,712,500.00
11,731,340.63
11,731,340.63

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

5.000
5.000
0.500
0.250

487,437.50
443,437.50
57,268.75
30,696.88
1,018,840.63

1.100
3.000

5,541,250.00
56,250.00
5,597,500.00
6,616,340.63
6,616,340.63

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.800
0.280
0.080
0.014

77,990.00
24,832.50
9,163.00
1,719.03
113,704.53

0.020
0.100

242,250.00
1,875.00
244,125.00
357,829.53
357,829.53

KUANTITAS
5
0.800

BIAYA
SATUAN
( Rp. )
6
77,990.00

0.280
0.080
0.014

24,832.50
9,163.00
1,719.03
113,704.53

0.020
0.100

120,750.00
1,875.00
122,625.00
236,329.53
236,329.53

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

24.000
8.000
2.400
0.400

2,339,700.00
709,500.00
274,890.00
49,115.00
3,373,205.00

1.100
0.050

13,323,750.00
937.50
13,324,687.50
16,697,892.50
16,697,892.50

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

24.000
8.000
2.400
0.400

2,339,700.00
709,500.00
274,890.00
49,115.00
3,373,205.00

1.100
0.050

7,053,750.00
937.50
7,054,687.50
10,427,892.50
10,427,892.50

KUANTITAS
5
0.450

BIAYA
SATUAN
( Rp. )
6
43,869.38

0.150
0.045
0.075

13,303.13
5,154.19
9,209.06
71,535.75

0.022
0.100

132,825.00
1,875.00
134,700.00
206,235.75
206,235.75

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.450
0.150
0.045
0.075

43,869.38
13,303.13
5,154.19
9,209.06
71,535.75

0.022
0.100

132,825.00
1,875.00
134,700.00
206,235.75
206,235.75

pat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm


KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.075
0.025
0.0075
0.0013

7,311.56
2,217.19
859.03
159.62
10,547.41

0.347
0.050

3,906.23
1,625.00
5,531.23
16,078.63
16,078.63

pat dipakai plywood tebal 4 mm atau teakwood tebal 4 mm


KUANTITAS

BIAYA
SATUAN
( Rp. )

6
0.075
0.025
0.0075
0.0013

7,311.56
2,217.19
859.03
159.62
10,547.41

0.694
0.100

7,812.45
3,250.00
11,062.45
21,609.86
21,609.86

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

18.000
6.000
2.000
0.300

1,754,775.00
532,125.00
229,075.00
36,836.25
2,552,811.25

1.100

13,323,750.00
13,323,750.00
15,876,561.25
15,876,561.25

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

18.000
6.000
2.000
0.300

1,754,775.00
532,125.00
229,075.00
36,836.25
2,552,811.25

1.100

7,053,750.00
7,053,750.00
9,606,561.25
9,606,561.25

kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari analisa ini
KUANTITAS
5
12.000

BIAYA
SATUAN
( Rp. )
6
1,169,850.00

4.000
1.200
0.200

354,750.00
137,445.00
24,557.50
1,686,602.50

1.100
15.000
40.000
0.400

4,688,750.00
180,337.50
325,000.00
7,500.00
5,201,587.50
6,888,190.00
6,888,190.00

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.150
0.010
0.0075

9,748.75
13,303.13
1,145.38
920.91
25,118.16

0.0111
0.100

47,361.11
1,875.00
49,236.11
74,354.27
74,354.27

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

18.000
6.000
1.800
0.300

1,754,775.00
532,125.00
206,167.50
36,836.25
2,529,903.75

1.100
2.000

4,688,750.00
37,500.00
4,726,250.00
7,256,153.75
7,256,153.75

KUANTITAS
5
0.100

BIAYA
SATUAN
( Rp. )
6
9,748.75

0.100
0.010
0.005

8,868.75
1,145.38
613.94
20,376.81

0.012
0.150

51,150.00
2,812.50
53,962.50
74,339.31
74,339.31

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.100
0.010
0.050

9,748.75
8,868.75
1,145.38
6,139.38
25,902.25

0.007
0.015

40,245.98
281.25
40,527.23
66,429.48
66,429.48

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.100
0.010
0.050

9,748.75
8,868.75
1,145.38
6,139.38
25,902.25

0.010
0.025

60,375.00
468.75
60,843.75
86,746.00
86,746.00

KUANTITAS
5
0.075

BIAYA
SATUAN
( Rp. )
6
7,311.56

0.150
0.0075
0.0075

13,303.13
859.03
920.91
22,394.63

25.000

78,125.00
78,125.00
100,519.63
100,519.63

KUANTITAS
5
0.200
0.400
0.020
0.002

19,497.50
35,475.00
2,290.75
245.58
57,508.83

5.000
8.000
0.032

34,375.00
15,000.00
2,900.00
52,275.00
109,783.83
109,783.83

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.200
0.010
0.001

9,748.75
17,737.50
1,145.38
122.79
28,754.41

1.620
0.200

121,500.00
3,750.00
125,250.00
154,004.41
154,004.41

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

BIAYA
SATUAN
( Rp. )
6

0.100
0.200
0.010
0.001

9,748.75
17,737.50
1,145.38
122.79
28,754.41

1.0000
0.200
0.200

300,000.00
4,250.00
5,000.00
309,250.00
338,004.41
338,004.41

KUANTITAS
5
0.060
0.120
0.006
0.006

5,849.25
10,642.50
687.23
736.73
17,915.70

0.700
0.020

57,312.50
500.00
57,812.50
75,728.20
75,728.20

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.070
0.150
0.008
0.006

6,824.13
13,303.13
916.30
736.73
21,780.28

0.010
0.300
0.040

51,750.00
14,250.00
750.00
66,750.00
88,530.28
88,530.28

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

BIAYA
SATUAN
( Rp. )
6

0.150
0.250
0.015
0.013

14,623.13
22,171.88
1,718.06
1,596.24
40,109.30

0.500
0.050

40,625.00
937.50
41,562.50
81,671.80
81,671.80

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.150
0.250
0.015
0.013

14,623.13
22,171.88
1,718.06
1,596.24
40,109.30

2.500
0.050
0.050

150,000.00
1,062.50
1,250.00
152,312.50
192,421.80
192,421.80

Pemasangan Lantai Keramik ukuran 30 x 30 cm Polos ( PPLD.01 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4
B
1
2
3
4
C
D

TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 30 x 30 cm Polos
Semen Portland
Pasir Beton/Pasang
Semen Warna

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ktk
Kg
M3
Kg

50,000.00
1,875.00
90,625.00
9,375.00

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.44

Pemasangan Lantai Keramik ukuran 30 x 30 cm Warna ( PPLD.02 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4
B
1
2
3
4
C
D

TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 30 x 30 cm Warna
Semen Portland
Pasir Beton/Pasang
Semen Warna

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ktk
Kg
M3
Kg

52,500.00
1,875.00
90,625.00
9,375.00

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.47

Pemasangan Lantai Keramik ukuran 30 x 30 cm Warna, Anti Slip ( PPLD.03 / m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA

HARGA
SATUAN
( Rp. )
4

1
2
3
4
B
1
2
3
4
C
D

Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 30 x 30 cm Warna Anti Slip
Semen Portland
Pasir Beton/Pasang
Semen Warna

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ktk
Kg
M3
Kg

64,000.00
1,875.00
90,625.00
9,375.00

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.48

Pemasangan Dinding Porselin Putih ukuran 11 x 11 cm ( PPLD.04 / m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Jumlah
B

BAHAN
1 Porselen Putih uk. 11 x 11 cm
M2
53,125.00
2 Semen Portland
Kg
1,875.00
3 Pasir Beton/Pasang
M3
90,625.00
4 Semen Warna
Kg
9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.58

Pemasangan Dinding Porselin Warna ukuran 11 x 11 cm ( PPLD.05 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

0.00
88,687.50
114,537.50
122,787.50

Jumlah
B

BAHAN
1 Porselen Warna uk. 11 x 11 cm
M2
56,250.00
2 Semen Portland
Kg
1,875.00
3 Pasir Beton/Pasang
M3
90,625.00
4 Semen Warna
Kg
9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.59

Pemasangan Dinding Keramik ukuran 30 x 30 cm ( PPLD.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA

HARGA
SATUAN
( Rp. )
4

1
2
3
4

Tukang Batu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

0.00
88,687.50
114,537.50
122,787.50

Jumlah
B

BAHAN
1 Keramik uk. 30 x 30 cm Polos
Ktk
50,000.00
2 Semen Portland
Kg
1,875.00
3
3 Pasir Beton/Pasang
M
90,625.00
4 Semen Warna
Kg
9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.68
Pemasangan Dinding Keramik ukuran 20 x 25 cm ( PPLD.06.a / m2 )
No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Batu
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

HARGA
SATUAN
( Rp. )
4
0.00
88,687.50
114,537.50
122,787.50

Jumlah
B

BAHAN
1 Keramik uk. 20 x 25 cm Polos
Ktk
55,000.00
2 Semen Portland
Kg
1,875.00
3
3 Pasir Beton/Pasang
M
90,625.00
4 Semen Warna
Kg
9,375.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.68
Pemasangan Lantai Keramik ukuran 40 x 40 cm Warna ( PPLD.02.a / m2 )
No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4
B
1
2
3
4

TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 40 x 40 cm Warna
Semen Portland
Pasir Beton/Pasang
Semen Warna

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ktk
Kg
M3
Kg

85,000.00
1,875.00
90,625.00
9,375.00

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.47
Pemasangan Lantai Keramik ukuran 20 x 20 cm Warna, Anti Slip ( PPLD.03.a / m 2 )

No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4
B
1
2
3
4
C
D

TENAGA
Tukang Batu/Semen
Pekerja
Kepala Tukang
Mandor
Jumlah
BAHAN
Keramik uk. 20 x 20 cm Warna Anti Slip
Semen Portland
Pasir Beton/Pasang
Semen Warna

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ktk
Kg
M3
Kg

55,000.00
1,875.00
90,625.00
9,375.00

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Penutup Lantai & Dinding - 6.48

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.350
0.620
0.035
0.030

34,120.63
54,986.25
4,008.81
3,683.63
96,799.31

1.000
11.380
0.042
0.100

50,000.00
21,337.50
3,806.25
937.50
76,081.25
172,880.56
172,880.56

Perumahan utk Pek. Penutup Lantai & Dinding - 6.44

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.350
0.620
0.035
0.030

34,120.63
54,986.25
4,008.81
3,683.63
96,799.31

1.000
11.380
0.042
0.100

52,500.00
21,337.50
3,806.25
937.50
78,581.25
175,380.56
175,380.56

Perumahan utk Pek. Penutup Lantai & Dinding - 6.47

uran 30 x 30 cm Warna, Anti Slip ( PPLD.03 / m 2 )


KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

Perumahan utk Pek. Penutup Lantai & Dinding - 6.48

0.350
0.620
0.035
0.030

34,120.63
54,986.25
4,008.81
3,683.63
96,799.31

1.000
11.380
0.042
0.100

64,000.00
21,337.50
3,806.25
937.50
90,081.25
186,880.56
186,880.56

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.500
0.620
0.050
0.030

48,743.75
54,986.25
5,726.88
3,683.63
113,140.50

1.000
9.300
0.018
0.100

53,125.00
17,437.50
1,631.25
937.50
73,131.25
186,271.75
186,271.75

Perumahan utk Pek. Penutup Lantai & Dinding - 6.58

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.500
0.620
0.050
0.030

0.00
54,986.25
5,726.88
3,683.63
64,396.75

1.000
9.300
0.018
0.100

56,250.00
17,437.50
1,631.25
937.50
76,256.25
140,653.00
140,653.00

Perumahan utk Pek. Penutup Lantai & Dinding - 6.59

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.600
0.045
0.030

0.00
53,212.50
5,154.19
3,683.63
62,050.31

1.000
9.300
0.018
0.100

50,000.00
17,437.50
1,631.25
937.50
70,006.25
132,056.56
132,056.56

Perumahan utk Pek. Penutup Lantai & Dinding - 6.68

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.100
0.600
0.045
0.030

0.00
53,212.50
5,154.19
3,683.63
62,050.31

1.000
9.300
0.018
0.100

55,000.00
17,437.50
1,631.25
937.50
75,006.25
137,056.56
137,056.56

Perumahan utk Pek. Penutup Lantai & Dinding - 6.68

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.350
0.620
0.035
0.030

34,120.63
54,986.25
4,008.81
3,683.63
96,799.31

1.000
11.380
0.042
0.100

85,000.00
21,337.50
3,806.25
937.50

111,081.25
207,880.56
207,880.56

Perumahan utk Pek. Penutup Lantai & Dinding - 6.47

uran 20 x 20 cm Warna, Anti Slip ( PPLD.03.a / m 2 )


KUANTITAS

Perumahan utk Pek. Penutup Lantai & Dinding - 6.48

BIAYA
SATUAN
( Rp. )
6

0.350
0.620
0.035
0.030

34,120.63
54,986.25
4,008.81
3,683.63
96,799.31

1.000
11.380
0.042
0.100

55,000.00
21,337.50
3,806.25
937.50
81,081.25
177,880.56
177,880.56

Pemasangan Langit-langit Tripleks t = 3 mm + Rangka Kayu Kelas II ( PL.01 / m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Lbr
Kg

4,262,500.00
11,250.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Tripleks t = 3 mm
3 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : SNI.2838 - 6.21

Pemasangan Langit-langit Gypsum Board t = 9 mm + Rangka Kayu Kelas II ( PL.02 / m 2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Lbr
Kg

4,262,500.00
#NAME?
36,250.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 Gypsum Board t = 9 mm
3 Paku Gypsum
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : Tenaga = SNI.2838 - 6.21

Bahan = SNI.2838 - 6.24

Pemasangan Langit-langit GRC T = 4 mm + Rangka Kayu Kelas II ( PL.03 / m2 )


HARGA
SATUAN
No.
URAIAN PEKERJAAN
SATUAN

No.
1
A

URAIAN PEKERJAAN
2

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

SATUAN
3

( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Lbr
Kg

4,262,500.00
84,375.00
18,750.00

Jumlah
B

BAHAN
1 Kayu Kelas II
2 GRC t = 4 mm
3 Paku
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : Tenaga = SNI.2838 - 6.21

Bahan = SNI.2838 - 6.24

Pemasangan Langit-langit Jalusi / Reng Lat Kayu Kelas I ( PL.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Kayu
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

M3
Kg

4,125,000.00
18,750.00

Jumlah
B

BAHAN
1 Papan Reng Lat Kayu Kelas I
2 Paku
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI.2838 - 6.16

Pendempulan dan Penggosokan Permukaan yang akan Dicat ( PC.01 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg
Lbr

28,750.00
3,125.00

Jumlah
B

BAHAN
1 Dempul
2 Amplas

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.6

Pengecatan Bidang Kayu Lama ( PC.02 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

HARGA
SATUAN
( Rp. )
4

A
1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg

41,250.00

Jumlah
B

C
D

BAHAN
1 Cat Kilat

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.7 & 6.8

Pengecatan Bidang Kayu Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,


1 Lapis Cat Penutup ( PC.03 / m2 )
No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg
Kg
Kg

53,125.00
33,750.00
41,250.00

Jumlah
B

BAHAN
1 Plamur
2 Cat Dasar Kayu
3 Cat Kilat

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.8

Pengecatan Bidang Kayu dengan Vernis ( PC.04 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Ltr

46,875.00

Jumlah
B

BAHAN
1 Vernis

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.13

Pengecatan Tembok Baru (1 Lapis Plamur), 1 Lapis Cat Dasar,


1 Lapis Cat Penutup ( PC.05 / m2 )
HARGA
No.

URAIAN PEKERJAAN

SATUAN

No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg
Kg
Ltr

53,125.00
43,750.00
112,500.00

Jumlah
B

BAHAN
1 Plamur
2 Cat Dasar Tembok
3 Cat Tembok
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.14

Pengecatan Tembok Lama ( PC.06 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg

112,500.00

Jumlah
B

BAHAN
1 Cat Tembok 2 kali
Jumlah

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.15

Pengecatan Permukaan Besi / Baja dengan Meni Besi ( PC.07 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

1
2
3
4

TENAGA
Tukang Cat
Pekerja
Kepala Tukang
Mandor

HARGA
SATUAN
( Rp. )
4

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg
Ltr

33,750.00
18,750.00

Jumlah
B

BAHAN
1 Meni Besi
2 Minyak Cat / Thinner

C
D

Jumlah A + B
Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.20

Pengecatan Atap Seng ( PC.08 / m2 )


No.

URAIAN PEKERJAAN

SATUAN

1
A

TENAGA

HARGA
SATUAN
( Rp. )
4

1
2
3
4

Tukang Cat
Pekerja
Kepala Tukang
Mandor

OH
OH
OH
OH

97,487.50
88,687.50
114,537.50
122,787.50

Kg
Ltr

33,750.00
18,750.00

Jumlah
B

C
D

BAHAN
1 Meni Besi
2 Minyak Cat / Thinner
Jumlah A + B
Harga Satuan
Acuan : Upah = K.23

Bahan = K.18 & K.21

s t = 3 mm + Rangka Kayu Kelas II ( PL.01 / m2 )


KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.400
0.270
0.040
0.0135

38,995.00
23,945.63
4,581.50
1,657.63
69,179.76

0.023
0.347
0.060

98,037.50
3,906.23
1,125.00
103,068.73
172,248.48
172,248.48

m Board t = 9 mm + Rangka Kayu Kelas II ( PL.02 / m2 )


KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.400
0.270
0.040
0.0135

38,995.00
23,945.63
4,581.50
1,657.63
69,179.76

0.023
0.347
0.110

98,037.50
3,987.50
102,025.00
171,204.76
171,204.76

T = 4 mm + Rangka Kayu Kelas II ( PL.03 / m2 )


KUANTITAS

BIAYA
SATUAN

KUANTITAS
( Rp. )
6

5
0.400
0.270
0.040
0.0135

38,995.00
23,945.63
4,581.50
1,657.63
69,179.76

0.023
0.347
0.110

98,037.50
29,296.69
2,062.50
129,396.69
198,576.44
198,576.44

KUANTITAS
5
0.600
0.200
0.060
0.010

58,492.50
17,737.50
6,872.25
1,227.88
84,330.13

0.010
0.060

41,250.00
1,125.00
42,375.00
126,705.13
126,705.13

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.040
0.040
0.004
0.0025

3,899.50
3,547.50
458.15
306.97
8,212.12

0.080
2.000

2,300.00
6,250.00
8,550.00
16,762.12
16,762.12

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

BIAYA
SATUAN
( Rp. )
6

0.009
0.070
0.006
0.0025

877.39
6,208.13
687.23
306.97
8,079.71

0.170

7,012.50
7,012.50
15,092.21
15,092.21

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.009
0.070
0.006
0.0025

877.39
6,208.13
687.23
306.97
8,079.71

0.150
0.170
0.130

7,968.75
5,737.50
5,362.50
19,068.75
27,148.46
27,148.46

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.160
0.160
0.016
0.0025

15,598.00
14,190.00
1,832.60
306.97
31,927.57

0.150

7,031.25
7,031.25
38,958.82
38,958.82

BIAYA
KUANTITAS

KUANTITAS
5

SATUAN
( Rp. )
6

0.063
0.020
0.0063
0.0025

6,141.71
1,773.75
721.59
306.97
8,944.02

0.100
0.100
0.130

5,312.50
4,375.00
14,625.00
24,312.50
33,256.52
33,256.52

KUANTITAS
5
0.042
0.028
0.0042
0.0025

4,094.48
2,483.25
481.06
306.97
7,365.75

0.180

20,250.00
20,250.00
27,615.75
27,615.75

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

0.200
0.020
0.020
0.010

19,497.50
1,773.75
2,290.75
1,227.88
24,789.88

0.100
0.0012

3,375.00
22.50
3,375.00
28,164.88
28,164.88

KUANTITAS
5

BIAYA
SATUAN
( Rp. )
6

BIAYA
SATUAN
( Rp. )
6

0.075
0.050
0.0075
0.0025

7,311.56
4,434.38
859.03
306.97
12,911.94

0.120
0.0014

4,050.00
27.00
4,050.00
16,961.94
16,961.94

PRO

1 Satu
2 Dua
3 Tiga
4 Empat
5 Lima
6 Enam
7 Tujuh
8 Delapan
9 Sembilan
10 Sepuluh
11 Sebelas
12 Dua Belas
13 Tiga Belas
14 Empat Belas
15 Lima Belas
16 Enam Belas
17 Tujuh Belas
18 Delapan Bela
19 Sembilan Bel
20 Dua Puluh
21 Dua Puluh Sa
22 Dua Puluh D
23 Dua Puluh Ti
24 Dua Puluh E
25 Dua Puluh Li
26 Dua Puluh E
27 Dua Puluh Tu
28 Dua Puluh De
29 Dua Puluh Se
30 Tiga Puluh
31 Tiga Puluh Sa
32 Tiga Puluh D
33 Tiga Puluh Ti
34 Tiga Puluh E
35 Tiga Puluh L
36 Tiga Puluh E
37 Tiga Puluh Tu
38 Tiga Puluh D

10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
200.00
300.00
400.00
500.00
600.00
700.00
800.00
900.00
1,000.00
2,000.00
3,000.00
4,000.00
5,000.00
6,000.00
7,000.00
8,000.00
9,000.00
10,000.00
11,000.00
12,000.00
13,000.00
14,000.00
15,000.00
16,000.00
17,000.00
18,000.00
19,000.00
20,000.00

Rupiah
Sepuluh
Dua Puluh
Tiga Puluh
Empat Puluh
Lima Puluh
Enam Puluh
Tujuh Puluh
Delapan Pulu
Sembilan Pul
Seratus
Dua Ratus
Tiga Ratus
Empat Ratus
Lima Ratus
Enam Ratus
Tujuh Ratus
Delapan Ratu
Sembilan Rat
Seribu
Dua Ribu
Tiga Ribu
Empat Ribu
Lima Ribu
Enam Ribu
Tujuh Ribu
Delapan Ribu
Sembilan Rib
Sepuluh Ribu
Sebelas Ribu
Dua Belas Ri
Tiga Belas Ri
Empat Belas
Lima Belas Ri
Enam Belas R
Tujuh Belas R
Delapan Bela
Sembilan Bel
Dua Puluh Ri

- Sen
0.01 Satu
0.01 Satu
0.01 Satu
0.01 Satu
0.01 Satu
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.02 Dua
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.03 Tiga
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.04 Empat
0.05 Lima
0.05 Lima
0.05 Lima

Bilangan Ya
Trilyun
Ratus Milyar
Puluhan Milyar
Ratus Juta
Puluhan Juta
Ratus Ribu
Puluhan Ribu
Ratusan
Puluhan
Rupiah
Sen
Hasil
(akan keluar
otomatis).

Terbilang:
Delapan Ratus Tujuh Puluh Em

Note: Don't change any th


How to Use

39 Tiga Puluh S
40 Empat Puluh
41 Empat Puluh
42 Empat Puluh
43 Empat Puluh
44 Empat Puluh
45 Empat Puluh
46 Empat Puluh
47 Empat Puluh
48 Empat Puluh
49 Empat Puluh
50 Lima Puluh
51 Lima Puluh S
52 Lima Puluh D
53 Lima Puluh T
54 Lima Puluh E
55 Lima Puluh L
56 Lima Puluh
57 Lima Puluh T
58 Lima Puluh D
59 Lima Puluh S
60 Enam Puluh
61 Enam Puluh
62 Enam Puluh
63 Enam Puluh T
64 Enam Puluh
65 Enam Puluh
66 Enam Puluh
67 Enam Puluh T
68 Enam Puluh
69 Enam Puluh
70 Tujuh Puluh
71 Tujuh Puluh
72 Tujuh Puluh
73 Tujuh Puluh T
74 Tujuh Puluh
75 Tujuh Puluh
76 Tujuh Puluh
77 Tujuh Puluh T
78 Tujuh Puluh
79 Tujuh Puluh
80 Delapan Pulu
81 Delapan Pulu
82 Delapan Pulu
83 Delapan Pulu
84 Delapan Pulu
85 Delapan Pulu
86 Delapan Pul
87 Delapan Pulu
88 Delapan Pulu
89 Delapan Pulu
90 Sembilan Pul
91 Sembilan Pul

21,000.00
22,000.00
23,000.00
24,000.00
25,000.00
26,000.00
27,000.00
28,000.00
29,000.00
30,000.00
31,000.00
32,000.00
33,000.00
34,000.00
35,000.00
36,000.00
37,000.00
38,000.00
39,000.00
40,000.00
41,000.00
42,000.00
43,000.00
44,000.00
45,000.00
46,000.00
47,000.00
48,000.00
49,000.00
50,000.00
51,000.00
52,000.00
53,000.00
54,000.00
55,000.00
56,000.00
57,000.00
58,000.00
59,000.00
60,000.00
61,000.00
62,000.00
63,000.00
64,000.00
65,000.00
66,000.00
67,000.00
68,000.00
69,000.00
70,000.00
71,000.00
72,000.00
73,000.00

Dua Puluh Sa
Dua Puluh Du
Dua Puluh Tig
Dua Puluh Em
Dua Puluh Li
Dua Puluh En
Dua Puluh Tu
Dua Puluh De
Dua Puluh Se
Tiga Puluh Ri
Tiga Puluh Sa
Tiga Puluh Du
Tiga Puluh Ti
Tiga Puluh E
Tiga Puluh Li
Tiga Puluh E
Tiga Puluh Tu
Tiga Puluh De
Tiga Puluh Se
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Empat Puluh
Lima Puluh R
Lima Puluh Sa
Lima Puluh D
Lima Puluh Ti
Lima Puluh E
Lima Puluh L
Lima Puluh E
Lima Puluh Tu
Lima Puluh D
Lima Puluh S
Enam Puluh R
Enam Puluh S
Enam Puluh D
Enam Puluh T
Enam Puluh E
Enam Puluh L
Enam Puluh
Enam Puluh T
Enam Puluh D
Enam Puluh S
Tujuh Puluh R
Tujuh Puluh S
Tujuh Puluh
Tujuh Puluh T

0.05 Lima
0.05 Lima
0.05 Lima
0.05 Lima
0.05 Lima
0.05 Lima
0.05 Lima
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.06 Enam
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.07 Tujuh
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.08 Delapan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.09 Sembilan
0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh

92 Sembilan Pul
93 Sembilan Pul
94 Sembilan Pul
95 Sembilan Pul
96 Sembilan Pu
97 Sembilan Pul
98 Sembilan Pul
99 Sembilan Pul

74,000.00 Tujuh Puluh


75,000.00 Tujuh Puluh L
76,000.00 Tujuh Puluh
77,000.00 Tujuh Puluh T
78,000.00 Tujuh Puluh
79,000.00 Tujuh Puluh
80,000.00 Delapan Pulu
81,000.00 Delapan Pulu
82,000.00 Delapan Pulu
83,000.00 Delapan Puluh
84,000.00 Delapan Pulu
85,000.00 Delapan Pulu
86,000.00 Delapan Pulu
87,000.00 Delapan Pulu
88,000.00 Delapan Pulu
89,000.00 Delapan Pulu
90,000.00 Sembilan Pul
91,000.00 Sembilan Pul
92,000.00 Sembilan Pul
93,000.00 Sembilan Pulu
94,000.00 Sembilan Pul
95,000.00 Sembilan Pul
96,000.00 Sembilan Pul
97,000.00 Sembilan Pul
98,000.00 Sembilan Pul
99,000.00 Sembilan Pul
100,000.00 Seratus
200,000.00 Dua Ratus
300,000.00 Tiga Ratus
400,000.00 Empat Ratus
500,000.00 Lima Ratus
600,000.00 Enam Ratus
700,000.00 Tujuh Ratus
800,000.00 Delapan Ratu
900,000.00 Sembilan Rat
### Satu Juta
### Dua Juta
### Tiga Juta
### Empat Juta
### Lima Juta
### Enam Juta
### Tujuh Juta
### Delapan Juta
### Sembilan Juta
### Sepuluh Juta
### Sebelas Juta
### Dua Belas Jut
### Tiga Belas Ju
### Empat Belas
### Lima Belas Ju
### Enam Belas J
### Tujuh Belas J
### Delapan Belas

0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh
0.10 Sepuluh
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.11 Sebelas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.12 Dua Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.13 Tiga Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.14 Empat Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas
0.15 Lima Belas

### Sembilan Bela


### Dua Puluh Ju
### Dua Puluh Sat
### Dua Puluh Du
### Dua Puluh Tig
### Dua Puluh Em
### Dua Puluh Li
### Dua Puluh En
### Dua Puluh Tuj
### Dua Puluh De
### Dua Puluh Se
### Tiga Puluh Ju
### Tiga Puluh Sa
### Tiga Puluh Du
### Tiga Puluh Ti
### Tiga Puluh Em
### Tiga Puluh Li
### Tiga Puluh E
### Tiga Puluh Tu
### Tiga Puluh De
### Tiga Puluh Se
### Empat Puluh
### Empat Puluh
### Empat Puluh
### Empat Puluh T
### Empat Puluh
### Empat Puluh
### Empat Puluh
### Empat Puluh
### Empat Puluh
### Empat Puluh
### Lima Puluh Ju
### Lima Puluh Sa
### Lima Puluh D
### Lima Puluh Ti
### Lima Puluh E
### Lima Puluh Li
### Lima Puluh E
### Lima Puluh Tu
### Lima Puluh D
### Lima Puluh S
### Enam Puluh J
### Enam Puluh S
### Enam Puluh D
### Enam Puluh T
### Enam Puluh E
### Enam Puluh L
### Enam Puluh E
### Enam Puluh T
### Enam Puluh D
### Enam Puluh S
### Tujuh Puluh J
### Tujuh Puluh S

0.15 Lima Belas


0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.16 Enam Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.17 Tujuh Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.18 Delapan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.19 Sembilan Belas
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.20 Dua Puluh
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu

### Tujuh Puluh D


### Tujuh Puluh T
### Tujuh Puluh
### Tujuh Puluh L
### Tujuh Puluh
### Tujuh Puluh T
### Tujuh Puluh D
### Tujuh Puluh S
### Delapan Puluh
### Delapan Puluh
### Delapan Pulu
### Delapan Puluh
### Delapan Pulu
### Delapan Pulu
### Delapan Pulu
### Delapan Puluh
### Delapan Pulu
### Delapan Pulu
### Sembilan Pulu
### Sembilan Pulu
### Sembilan Pul
### Sembilan Pulu
### Sembilan Pul
### Sembilan Pul
### Sembilan Pul
### Sembilan Pulu
### Sembilan Pul
### Sembilan Pul
### Seratus
### Dua Ratus
### Tiga Ratus
### Empat Ratus
### Lima Ratus
### Enam Ratus
### Tujuh Ratus
### Delapan Ratu
### Sembilan Rat
### Satu Milyar
### Dua Milyar
### Tiga Milyar
### Empat Milyar
### Lima Milyar
### Enam Milyar
### Tujuh Milyar
### Delapan Milya
### Sembilan Mily
### Sepuluh Milya
### Sebelas Milya
### Dua Belas Mil
### Tiga Belas Mil
### Empat Belas M
### Lima Belas Mi
### Enam Belas M

0.21 Dua Puluh Satu


0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.21 Dua Puluh Satu
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.22 Dua Puluh Dua
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.23 Dua Puluh Tiga
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.24 Dua Puluh Empat
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.25 Dua Puluh Lima
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam

### Tujuh Belas M


### Delapan Belas
### Sembilan Bela
### Dua Puluh Mil
### Dua Puluh Sat
### Dua Puluh Du
### Dua Puluh Tig
### Dua Puluh Em
### Dua Puluh Lim
### Dua Puluh En
### Dua Puluh Tuj
### Dua Puluh De
### Dua Puluh Sem
### Tiga Puluh Mi
### Tiga Puluh Sa
### Tiga Puluh Du
### Tiga Puluh Ti
### Tiga Puluh Em
### Tiga Puluh Li
### Tiga Puluh En
### Tiga Puluh Tu
### Tiga Puluh De
### Tiga Puluh Se
### Empat Puluh M
### Empat Puluh S
### Empat Puluh
### Empat Puluh T
### Empat Puluh
### Empat Puluh L
### Empat Puluh
### Empat Puluh T
### Empat Puluh
### Empat Puluh
### Lima Puluh Mi
### Lima Puluh Sa
### Lima Puluh Du
### Lima Puluh Ti
### Lima Puluh Em
### Lima Puluh Li
### Lima Puluh E
### Lima Puluh Tu
### Lima Puluh De
### Lima Puluh Se
### Enam Puluh M
### Enam Puluh S
### Enam Puluh D
### Enam Puluh Ti
### Enam Puluh E
### Enam Puluh L
### Enam Puluh E
### Enam Puluh Tu
### Enam Puluh D
### Enam Puluh S

0.26 Dua Puluh Enam


0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.26 Dua Puluh Enam
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.27 Dua Puluh Tujuh
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.28 Dua Puluh Delapan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.29 Dua Puluh Sembilan
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.30 Tiga Puluh
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu
0.31 Tiga Puluh Satu

### Tujuh Puluh M


### Tujuh Puluh S
### Tujuh Puluh D
### Tujuh Puluh T
### Tujuh Puluh E
### Tujuh Puluh L
### Tujuh Puluh
### Tujuh Puluh T
### Tujuh Puluh D
### Tujuh Puluh S
### Delapan Puluh
### Delapan Puluh
### Delapan Pulu
### Delapan Puluh
### Delapan Pulu
### Delapan Puluh
### Delapan Pulu
### Delapan Puluh
### Delapan Pulu
### Delapan Puluh
### Sembilan Pulu
### Sembilan Pulu
### Sembilan Pulu
### Sembilan Pulu
### Sembilan Pul
### Sembilan Pulu
### Sembilan Pul
### Sembilan Pulu
### Sembilan Pulu
### Sembilan Pulu
### Seratus
### Dua Ratus
### Tiga Ratus
### Empat Ratus
### Lima Ratus
### Enam Ratus
### Tujuh Ratus
### Delapan Ratu
### Sembilan Rat
### Satu Trilyun
### Dua Trilyun
### Tiga Trilyun
### Empat Trilyun
### Lima Trilyun
### Enam Trilyun
### Tujuh Trilyun
### Delapan Trily
### Sembilan Tril
### Sepuluh Trily

0.31 Tiga Puluh Satu


0.31 Tiga Puluh Satu
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.32 Tiga Puluh Dua
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.33 Tiga Puluh Tiga
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.34 Tiga Puluh Empat
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.35 Tiga Puluh Lima
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh

0.37 Tiga Puluh Tujuh


0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.38 Tiga Puluh Delapan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.39 Tiga Puluh Sembilan
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.40 Empat Puluh
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.41 Empat Puluh Satu
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua

0.42 Empat Puluh Dua


0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.42 Empat Puluh Dua
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.43 Empat Puluh Tiga
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.44 Empat Puluh Empat
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.45 Empat Puluh Lima
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.46 Empat Puluh Enam
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh

0.47 Empat Puluh Tujuh


0.47 Empat Puluh Tujuh
0.47 Empat Puluh Tujuh
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.48 Empat Puluh Delapan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.49 Empat Puluh Sembilan
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.50 Lima Puluh
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.51 Lima Puluh Satu
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua
0.52 Lima Puluh Dua

0.53 Lima Puluh Tiga


0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.53 Lima Puluh Tiga
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.54 Lima Puluh Empat
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.55 Lima Puluh Lima
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.56 Lima Puluh Enam
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.57 Lima Puluh Tujuh
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan

0.58 Lima Puluh Delapan


0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.58 Lima Puluh Delapan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.59 Lima Puluh Sembilan
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.60 Enam Puluh
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.61 Enam Puluh Satu
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.62 Enam Puluh Dua
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga

0.63 Enam Puluh Tiga


0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.63 Enam Puluh Tiga
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.64 Enam Puluh Empat
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.65 Enam Puluh Lima
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.66 Enam Puluh Enam
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.67 Enam Puluh Tujuh
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan
0.68 Enam Puluh Delapan

0.68 Enam Puluh Delapan


0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.69 Enam Puluh Sembilan
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.70 Tujuh Puluh
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.71 Tujuh Puluh Satu
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.72 Tujuh Puluh Dua
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.73 Tujuh Puluh Tiga
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat

0.74 Tujuh Puluh Empat


0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.74 Tujuh Puluh Empat
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.75 Tujuh Puluh Lima
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.76 Tujuh Puluh Enam
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.77 Tujuh Puluh Tujuh
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.78 Tujuh Puluh Delapan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan

0.79 Tujuh Puluh Sembilan


0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.79 Tujuh Puluh Sembilan
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.80 Delapan Puluh
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.81 Delapan Puluh Satu
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.82 Delapan Puluh Dua
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.83 Delapan Puluh Tiga
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat
0.84 Delapan Puluh Empat

0.84 Delapan Puluh Empat


0.84 Delapan Puluh Empat
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.85 Delapan Puluh Lima
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.86 Delapan Puluh Enam
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.87 Delapan Puluh Tujuh
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.88 Delapan Puluh Delapan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.89 Delapan Puluh Sembilan
0.90 Sembilan Puluh

0.90 Sembilan Puluh


0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.90 Sembilan Puluh
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.91 Sembilan Puluh Satu
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.92 Sembilan Puluh Dua
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.93 Sembilan Puluh Tiga
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.94 Sembilan Puluh Empat
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima

0.95 Sembilan Puluh Lima


0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.95 Sembilan Puluh Lima
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.96 Sembilan Puluh Enam
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.97 Sembilan Puluh Tujuh
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.98 Sembilan Puluh Delapan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
0.99 Sembilan Puluh Sembilan
1.00
1.00
1.00
1.00
1.00

PROGRAM TERBILANG
OLEH : WIJI NUGROHO

Masukkan
PTnilai
ATLASangka
INT.
yang dimaksud (akan
diterjemahkan dalam
huruf)

874,998,000.00

uluhan Milyar

uluhan Juta

uluhan Ribu

(akan keluar
matis).

Cek Bilangan

800,000,000.00
74,000,000.00
900,000.00
98,000.00
-

Delapan Ratus
Tujuh Puluh Empat Juta
Sembilan Ratus
Sembilan Puluh Delapan Ribu

Rupiah

874,998,000.00 ok!

Delapan Ratus Tujuh Puluh Empat Juta Sembilan Ratus Sembilan Puluh Delapan Ribu Rupiah

Note: Don't change any thing without confirmation. It could be dangerous !!!
1. Hubungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"
2. Hubungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi
3. Have a nice season

0.01
0.01
0.01

Regulator
Selang
kran
Cekak
Minjet
Karbulator

65000
20000
10000
4500
60000
75000
234500