No. KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
HARGA SAT.
Rp
6
JUMLAH
Rp
8=(4X7)
PEKERJAAN PERSIAPAN
A.1
35,700.00
1,312.50
54,850.00
144,800.00
261,250.00
3,281,300.00
16,750.00
16,100.00
385,915.10
44,625.00
3,281.25
65,820.00
724.00
2,351.25
236,253.60
1,005.00
7,245.00
48,875.00
34,500.00
51,750.00
9,775.00
13,800.00
1,035.00
4,855,125.00
16,750.00
4,855,125.00
101,437.38
58,261.50
335.00
33,985.88
48,875.00
34,500.00
51,750.00
4,887.50
3,450.00
517.50
35,700.00
3,281,300.00
16,750.00
16,200.00
1,312.50
144,800.00
261,250.00
425.00
54,850.00
54,450.00
96,250.00
66,800.00
5,950.00
98,550.00
1,180,572.00
44,625.00
590,634.00
14,237.50
17,820.00
45,937.50
36,200.00
39,187.50
12,750.00
13,712.50
108,900.00
7,700.00
10,020.00
1,785.00
5,913.00
48,875.00
48,875.00
34,500.00
51,750.00
97,750.00
48,875.00
69,000.00
15,525.00
35,700.00
3,281,300.00
16,750.00
1,312.50
171,950.00
261,250.00
54,850.00
1,011,665.25
60,690.00
689,073.00
5,025.00
13,781.25
5,158.50
13,062.50
82,275.00
Tukang Kayu
Pekerja
Kepala Tukang
48,875.00
34,500.00
51,750.00
97,750.00
34,500.00
10,350.00
34,500.00
3,450.00
3,450.00
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
Btg
Kg
Lbr
m3
m3
m3
Kg
Kg
0.2000
0.4000
0.0200
OH
OH
OH
Tukang Kayu
Pekerja
Kepala Tukang
0.0120
0.0200
0.0070
m3
Kg
m3
0.1000
0.1000
0.0100
OH
OH
OH
Tukang Kayu
Pekerja
Kepala Tukang
1.2500
0.1800
0.8500
1.1000
35.0000
0.2500
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.3000
0.0600
Btg
m3
Kg
Kg
Kg
m3
m3
buah
Lbr
daun
m2
buah
buah
Lbr
2.0000
1.0000
2.0000
0.3000
OH
OH
OH
OH
Tukang Kayu
Tukang Batu
Pekerja
Kepala Tukang
1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
Btg
m3
Kg
Kg
m3
m3
Lbr
2.0000
1.0000
0.2000
OH
OH
OH
0.1000
OH
A.2
A.3
A.4
A.5