KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
JUMLAH
Rp
8=(4X7)
301,875.00
109,679.54
187,788.85
3
230.0000
0.6379
0.7607
4
Kg
m3
m3
Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)
1.2000
0.2000
0.0200
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
41,400.00
9,775.00
1,035.00
326.0000
0.5429
0.7622
Kg
m3
m3
1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
779,811.34
427,875.00
93,344.29
188,154.56
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
352.0000
0.5221
0.7637
Kg
m3
m3
1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
810,740.22
462,000.00
89,782.46
188,520.26
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
371.0000
0.4986
0.7756
Kg
m3
m3
1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
834,550.25
486,937.50
85,729.36
191,445.89
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
384.0000
0.4943
0.7696
Kg
m3
m3
1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00
917,367.40
504,000.00
152,946.83
189,983.07
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
406.0000
0.4886
0.7600
Kg
m3
m3
1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00
942,097.16
532,875.00
151,178.66
187,606.00
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
413.0000
0.4864
0.7563
Kg
m3
m3
1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00
949,707.33
542,062.50
150,515.59
186,691.74
1.6500
0.2500
0.0250
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
12,218.75
1,293.75
439.0000
0.4786
0.7452
Kg
m3
m3
1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00
999,588.32
576,187.50
148,084.36
183,948.96
2.1000
0.3500
0.0350
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
G.5
G.6
G.7
G.8
G.9
G.10
G.11
HARGA SAT.
Rp
6
1,312.50
171,950.00
246,850.00
34,500.00
48,875.00
51,750.00
14
72,450.00
17,106.25
1,811.25