Anda di halaman 1dari 1

No.

KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

JUMLAH
Rp
8=(4X7)
301,875.00
109,679.54
187,788.85

3
230.0000
0.6379
0.7607

4
Kg
m3
m3

Portland Semen
Pasir Beton (Cepu)
Kerikil (maksimum 30 mm)

1.2000
0.2000
0.0200

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

41,400.00
9,775.00
1,035.00

326.0000
0.5429
0.7622

Kg
m3
m3

1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

779,811.34
427,875.00
93,344.29
188,154.56

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

352.0000
0.5221
0.7637

Kg
m3
m3

1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm,w/c = 0,61
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

810,740.22
462,000.00
89,782.46
188,520.26

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

371.0000
0.4986
0.7756

Kg
m3
m3

1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

834,550.25
486,937.50
85,729.36
191,445.89

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

384.0000
0.4943
0.7696

Kg
m3
m3

1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm,w/c = 0,56
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

917,367.40
504,000.00
152,946.83
189,983.07

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

406.0000
0.4886
0.7600

Kg
m3
m3

1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (122)cm, w/c = 0,53
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

942,097.16
532,875.00
151,178.66
187,606.00

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

413.0000
0.4864
0.7563

Kg
m3
m3

1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (122)cm,w/c = 0,52
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

949,707.33
542,062.50
150,515.59
186,691.74

1.6500
0.2500
0.0250

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
12,218.75
1,293.75

439.0000
0.4786
0.7452

Kg
m3
m3

1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (122)cm,w/c = 0,49
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00

999,588.32
576,187.50
148,084.36
183,948.96

2.1000
0.3500
0.0350

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

G.5

G.6

G.7

G.8

G.9

G.10

G.11

HARGA SAT.
Rp
6
1,312.50
171,950.00
246,850.00

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

34,500.00
48,875.00
51,750.00

14

72,450.00
17,106.25
1,811.25

Anda mungkin juga menyukai