KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
JUMLAH
Rp
8=(4X7)
351,168.00
837.50
34,500.00
48,875.00
51,750.00
12,075.00
51,318.75
5,433.75
8,779,200.00
18,300.00
521,708.00
351,168.00
915.00
34,500.00
48,875.00
51,750.00
34,500.00
122,187.50
12,937.50
8,779,200.00
18,300.00
448,462.00
307,272.00
5,490.00
34,500.00
48,875.00
51,750.00
27,600.00
97,750.00
10,350.00
15,312,500.00
18,300.00
1,185,800.00
980,000.00
9,150.00
3
0.0400
0.0500
4
m3
Kg
0.3500
1.0500
0.1050
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0400
0.0500
m3
kg
1.0000
2.5000
0.2500
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0350
0.3000
m3
kg
0.8000
2.0000
0.2000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0640
0.5000
m3
kg
1.0000
3.0000
0.3000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
34,500.00
48,875.00
51,750.00
34,500.00
146,625.00
15,525.00
0.0250
0.0300
0.5000
1.0000
m3
Kg
Kg
Lbr
1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm
Kayu Bengkirai, papan
8,779,200.00
Paku Biasa 1/2" - 1"
16,750.00
Lem Kayu
18,300.00
Plywood tebal 4 mm
98,550.00
456,482.50
219,480.00
502.50
9,150.00
98,550.00
0.6000
2.0000
0.2000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0256
0.0300
0.5000
1.0000
m3
Kg
F.4
F.5
F.6
F.7
HARGA SAT.
Rp
6
8,779,200.00
16,750.00
34,500.00
48,875.00
51,750.00
20,700.00
97,750.00
10,350.00
Lbr
468,650.02
224,747.52
502.50
9,150.00
98,550.00
0.8000
2.0000
0.2000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0600
0.1500
m3
Kg
0.5000
2.0000
0.2000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0600
0.1500
m3
Kg
0.5000
2.0000
0.2000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
F.8
Kg
F.9
F.10
10
34,500.00
48,875.00
51,750.00
27,600.00
97,750.00
10,350.00
15,312,500.00
16,750.00
1,046,612.50
918,750.00
2,512.50
34,500.00
48,875.00
51,750.00
17,250.00
97,750.00
10,350.00
8,779,200.00
16,750.00
654,614.50
526,752.00
2,512.50
34,500.00
48,875.00
51,750.00
17,250.00
97,750.00
10,350.00