KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
G.12
HARGA SAT.
Rp
6
JUMLAH
Rp
8=(4X7)
448.0000
0.4764
0.7407
Kg
m3
m3
1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (122)cm, w/c = 0,48
Portland Semen
1,312.50
Beton (Muntilan)
309,430.00
Kerikil (maksimum 30 mm)
246,850.00
2.1000
0.3500
0.0350
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
72,450.00
17,106.25
1,811.25
1.0500
0.0150
Kg
Kg
a=
11,100.00
17,850.00
12,542.60
11,655.00
267.75
0.0070
0.0070
0.0007
OH
OH
OH
Pekerja
Tukang Besi
Kepala Tukang
34,500.00
48,875.00
51,750.00
241.50
342.13
36.23
G.13
a x 110
a x 125
1,009,640.64
588,000.00
147,421.29
182,851.85
1,379,686.00
1,567,825.00
1.0500
0.0100
Kg
Kg
18,550.00
17,850.00
20,098.75
19,477.50
178.50
0.0050
0.0050
0.0005
OH
OH
OH
Pekerja
Tukang Besi
Kepala Tukang
34,500.00
48,875.00
51,750.00
172.50
244.38
25.88
0.0400
0.3000
0.1000
m3
Kg
Ltr
2,062,500.00
16,750.00
22,000.00
121,718.00
82,500.00
5,025.00
2,200.00
0.5200
0.2600
0.0260
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
34,500.00
48,875.00
51,750.00
17,940.00
12,707.50
1,345.50
0.3996
0.4000
m3
Kg
1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan Papan
Kayu Perancah
2,062,500.00
Paku biasa 2" - 5"
16,750.00
868,250.00
824,175.00
6,700.00
0.3000
0.5000
0.0500
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0450
0.3000
0.1000
m3
Kg
Ltr
0.5200
0.2600
0.0260
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
m3
Kg
Ltr
m3
Lbr
Btg
0.6600
0.3300
0.0330
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
G.15
G.15a
G.16
G.17
15
34,500.00
48,875.00
51,750.00
10,350.00
24,437.50
2,587.50
2,062,500.00
16,750.00
22,000.00
132,030.50
92,812.50
5,025.00
2,200.00
34,500.00
48,875.00
51,750.00
17,940.00
12,707.50
1,345.50
2,062,500.00
16,750.00
22,000.00
3,281,300.00
135,200.00
35,700.00
302,146.00
82,500.00
6,700.00
4,400.00
49,219.50
47,320.00
71,400.00
34,500.00
48,875.00
51,750.00
22,770.00
16,128.75
1,707.75