KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
A.6
Btg
Kg
17,050.00
13,700.00
0.1700
0.2500
0.0020
OH
OH
OH
Tukang Kayu
Pekerja
Kepala Tukang
48,875.00
34,500.00
51,750.00
37,512.25
17,050.00
3,425.00
8,308.75
8,625.00
103.50
6.6670
OH
34,500.00
230,011.50
230,011.50
6.6670
OH
34,500.00
230,011.50
230,011.50
3.0000
Org
34,500.00
103,500.00
103,500.00
2.0000
Org
69,000.00
69,000.00
0.1250
Org
34,500.00
4,312.50
4,312.50
0.1000
Org
34,500.00
3,450.00
3,450.00
0.5000
Org
34,500.00
17,250.00
17,250.00
0.1500
0.0750
0.0075
Org
Org
Org
9,228.75
5,175.00
3,665.63
388.13
0.2000
0.1000
0.0100
Org
Org
Org
12,305.00
6,900.00
4,887.50
517.50
4.0000
6.0000
0.6000
Org
Org
Org
462,300.00
138,000.00
293,250.00
31,050.00
4.0000
3.0000
Org
Org
34,500.00
48,875.00
284,625.00
138,000.00
146,625.00
0.1000
0.3000
0.0300
Org
Org
Org
34,500.00
48,875.00
51,750.00
19,665.00
3,450.00
14,662.50
1,552.50
0.1500
Org
34,500.00
A.8
A.9
A.10
A.11
A.12
A.13
A.14
A.15
A.16
A.17
A.18
A.19
A.21
JUMLAH
Rp
8=(4X7)
1.0000
0.2500
A.7
A.20
HARGA SAT.
Rp
6
= K : (
a
( L + 75 ))
275.0000
= K : (
a
( L + 75 ))/25
275.0000
5,175.00
5,175.00
Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut
Keterangan :
K = Biaya
a = Upah Pekerja
L = Jarak angkut