1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR


MAX KEDALAMAN 1 M' TENAGA MANUSIA
Pekerja
34,500.00
Alat bantu
13,750.00

0.625
0.250

org
lot

1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA


Pekerja
34,500.00
Alat bantu
13,750.00

25,000.00
21,562.50
3,437.50

0.005
0.704
0.018
0.005
0.005
0.005
0.005

unit
liter
liter
Kg
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3
Excavator 0,7 m3
500,000.00
Solar
4,500.00
Olie (minyak pelumas)
20,000.00
Stempet
20,050.00
Operator Alat Berat
49,450.00
Pemb. Operator Alat Berat
40,250.00
Pekerja
34,500.00

6,481.45
2,286.63
3,169.27
365.86
91.69
226.15
184.07
157.78

0.006
0.921
0.024
0.006
0.006
0.006
0.006

unit
liter
liter
Kg
org
org
org

1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3
Excavator 0,7 m3
500,000.00
Solar
4,500.00
Olie (minyak pelumas)
20,000.00
Stempet
20,050.00
Operator Alat Berat
49,450.00
Pemb. Operator Alat Berat
40,250.00
Pekerja
34,500.00

8,475.74
2,990.21
4,144.43
478.43
119.91
295.73
240.71
206.32

0.0101
0.2515
0.0101
0.0050
0.0101
0.0101

buah
liter
liter
Kg
org
org

MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.


Dump Truck
Solar
Olie (minyak pelumas)
Stempet
Sopir
Pekerja

250,000.00
4,500.00
20,000.00
20,050.00
46,575.00
34,500.00

4,764.77
2,515.18
1,131.83
201.21
100.86
468.58
347.10

buah
liter
liter
Kg
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


KURANG DARI 1,5 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
20,000.00
Stempet
20,050.00
Sopir
46,575.00
Pekerja
34,500.00

6,497.68
3,429.94
1,543.47
274.40
137.54
639.00
473.33

buah
liter
liter
Kg
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 1,5 S/D 3 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
20,000.00
Stempet
18,200.00
Sopir
46,575.00
Pekerja
34,500.00

10,808.32
5,716.57
2,572.46
457.33
208.08
1,065.00
788.89

0.0320
0.8003
0.0320
0.0160
0.0320
0.0320

buah
liter
liter
Kg
org
org

1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK


JARAK ANTARA 3 S/D 5 KM.
Dump Truck
250,000.00
Solar
4,500.00
Olie
20,000.00
Stempet
20,050.00
Sopir
46,575.00
Pekerja
34,500.00

15,161.26
8,003.20
3,601.44
640.26
320.93
1,491.00
1,104.44

0.2500
0.1250

org
lot

1 M3 MERATAKAN TANAH
Pekerja
Alat bantu

34,500.00
13,750.00

10,343.75
8,625.00
1,718.75

1.2000
0.3000
0.1000

m3
org
lot

1 M3 PEK. URUGAN TANAH PILIHAN


Tanah pilihan
Pekerja
Alat bantu

68,750.00
34,500.00
13,750.00

94,225.00
82,500.00
10,350.00
1,375.00

B.18

B.19

B.20

B.21

B.22
0.0137
0.3430
0.0137
0.0069
0.0137
0.0137
B.23
0.0229
0.5717
0.0229
0.0114
0.0229
0.0229
B.24

B.25

B.26

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

55,187.50
51,750.00
3,437.50