URAIAN PAKERJAAN

C.3

1.200
61.000
0.147
0.492

m3
kg
m3
m3

1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps


Batu Belah 15/20
Portland Sement
Kapur Pasang
Pasir Pasang

1.500
0.600
0.060

OH
OH
OH

1.200
0.432
0.700
0.390
0.039

JUMLAH
Rp
8=(4X7)

95,700.00
1,312.50
196,000.00
144,800.00

379,136.10
114,840.00
80,062.50
28,812.00
71,241.60

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

51,750.00
29,325.00
3,105.00

m3
m3

1M3 Pasang Pondasi Batu Kosong


Batu Belah 15/20
Pasir Urug

95,700.00
61,950.00

186,831.90
114,840.00
26,762.40

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

24,150.00
19,061.25
2,018.25

0.480
126.000
194.000
0.312
0.468
1.800

m3
Kg
Kg
m3
m3
Kg

1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
Batu Belah 15/20
Besi Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kawat Beton

3.000
0.850
0.085

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

0.450
194.000
0.312
0.468

m3
Kg
m3
m3

1M3 Pasang Pondasi Sumuran diameter 100 cm


Batu Belah 15/20 cm
Portland Semen
Pasir Pasang
Koral Beton

2.380
0.300
0.030

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240

m3
m3
m3
Kg
Kg
Kg
m3
Kg
Lt
Kg

1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang


Pasir Urug Darat
Pasir Beton (Cepu)
Koral Beton
Portland Semen
Besi Beton
Kawat beton
Kayu Kaso 5/7
Paku
Minyak Bekisting
Plamuur Tembok

1.000
0.670
0.067

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

0.1250
0.0125
0.1500
0.0100

org
org
org
lot

SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)


Tukang Kayu
48,875.00
Kepala Tukang
51,750.00
Pekerja
34,500.00
alat bantu
13,750.00

12,068.75
6,109.38
646.88
5,175.00
137.50

0.0400
0.0040
1.8000
0.0100

org
org
org
lot

1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK


Tukang Kayu
Kepala Tukang
Pekerja
alat bantu

64,399.50
1,955.00
207.00
62,100.00
137.50

C.4

HARGA SAT.
Rp
6

C.5

C.6

C.7

C.8

C.9

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

2,056,646.90
95,700.00
11,100.00
1,312.50
171,950.00
261,250.00
17,850.00

45,936.00
1,398,600.00
254,625.00
53,648.40
122,265.00
32,130.00

34,500.00
48,875.00
51,750.00

103,500.00
41,543.75
4,398.75

95,700.00
1,312.50
144,800.00
261,250.00

563,457.60
43,065.00
254,625.00
45,177.60
122,265.00

34,500.00
48,875.00
51,750.00

82,110.00
14,662.50
1,552.50

61,950.00
171,950.00
261,250.00
1,312.50
11,100.00
17,850.00
46,215.49
16,750.00
22,000.00
19,250.00

732,301.50
1,177.05
16,163.30
39,187.50
79,406.25
499,500.00
16,065.00
1,478.90
2,010.00
1,980.00
4,620.00

34,500.00
48,875.00
51,750.00

34,500.00
32,746.25
3,467.25

48,875.00
51,750.00
34,500.00
13,750.00