KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
C.3
1.200
61.000
0.147
0.492
m3
kg
m3
m3
1.500
0.600
0.060
OH
OH
OH
1.200
0.432
0.700
0.390
0.039
JUMLAH
Rp
8=(4X7)
95,700.00
1,312.50
196,000.00
144,800.00
379,136.10
114,840.00
80,062.50
28,812.00
71,241.60
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
51,750.00
29,325.00
3,105.00
m3
m3
95,700.00
61,950.00
186,831.90
114,840.00
26,762.40
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
24,150.00
19,061.25
2,018.25
0.480
126.000
194.000
0.312
0.468
1.800
m3
Kg
Kg
m3
m3
Kg
1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
Batu Belah 15/20
Besi Beton
Portland Semen
Pasir Beton (Cepu)
Koral Beton
Kawat Beton
3.000
0.850
0.085
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
0.450
194.000
0.312
0.468
m3
Kg
m3
m3
2.380
0.300
0.030
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
0.019
0.094
0.150
60.500
45.000
0.900
0.032
0.120
0.090
0.240
m3
m3
m3
Kg
Kg
Kg
m3
Kg
Lt
Kg
1.000
0.670
0.067
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
0.1250
0.0125
0.1500
0.0100
org
org
org
lot
12,068.75
6,109.38
646.88
5,175.00
137.50
0.0400
0.0040
1.8000
0.0100
org
org
org
lot
64,399.50
1,955.00
207.00
62,100.00
137.50
C.4
HARGA SAT.
Rp
6
C.5
C.6
C.7
C.8
C.9
2,056,646.90
95,700.00
11,100.00
1,312.50
171,950.00
261,250.00
17,850.00
45,936.00
1,398,600.00
254,625.00
53,648.40
122,265.00
32,130.00
34,500.00
48,875.00
51,750.00
103,500.00
41,543.75
4,398.75
95,700.00
1,312.50
144,800.00
261,250.00
563,457.60
43,065.00
254,625.00
45,177.60
122,265.00
34,500.00
48,875.00
51,750.00
82,110.00
14,662.50
1,552.50
61,950.00
171,950.00
261,250.00
1,312.50
11,100.00
17,850.00
46,215.49
16,750.00
22,000.00
19,250.00
732,301.50
1,177.05
16,163.30
39,187.50
79,406.25
499,500.00
16,065.00
1,478.90
2,010.00
1,980.00
4,620.00
34,500.00
48,875.00
51,750.00
34,500.00
32,746.25
3,467.25
48,875.00
51,750.00
34,500.00
13,750.00