KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
E.3
1.8400
0.0060
0.0140
Kg
m3
m3
0.2000
0.1500
0.0015
OH
OH
OH
Pekerja
Tukang batu
Kepala Tukang
10.3680
0.0310
Kg
m3
0.2600
0.2000
0.0200
OH
OH
OH
Pekerja
Tukang batu
Kepala Tukang
5.1840
0.0260
Kg
m3
0.1500
0.0700
0.0070
OH
OH
OH
0.0570
0.0380
0.0380
19,927.08
2,415.00
1,176.00
2,027.20
34,500.00
48,875.00
51,750.00
6,900.00
7,331.25
77.63
1,312.50
144,800.00
37,876.80
13,608.00
4,488.80
34,500.00
48,875.00
51,750.00
8,970.00
9,775.00
1,035.00
1,312.50
144,800.00
19,527.30
6,804.00
3,764.80
Pekerja
Tukang batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
5,175.00
3,421.25
362.25
OH
OH
OH
34,500.00
48,875.00
51,750.00
5,790.25
1,966.50
1,857.25
1,966.50
4.3200
0.0060
Kg
m3
1,312.50
144,800.00
20,568.80
5,670.00
868.80
0.2500
0.1000
0.0100
OH
OH
OH
Pekerja
Tukang batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
8,625.00
4,887.50
517.50
6.3400
0.0120
Kg
m3
1,312.50
144,800.00
27,975.85
8,321.25
1,737.60
0.3000
0.1400
0.0140
OH
OH
OH
Pekerja
Tukang batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
10,350.00
6,842.50
724.50
3.2500
Kg
1M2 Acian
Portland Semen
1,312.50
14,845.63
4,265.63
0.1500
0.1000
0.0100
OH
OH
OH
Pekerja
Tukang batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
5,175.00
4,887.50
517.50
1.1000
1.2500
1.0000
m3
Kg
Kg
PEKERJAAN K A Y U
1M3 Membuat Kosen Pintu & Jendela Kayu klas I
Kayu Klas I (Jati) , Balok
Paku Biasa 2" - 5 "
Lem Kayu
6.0000
20.0000
2.0000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
1.1000
1.2500
1.0000
m3
Kg
Kg
6.0000
20.0000
2.0000
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
E.5
E.6
E.7
E.8
E.9
F
F.1
F.2
F.3
JUMLAH
Rp
8=(4X7)
1,312.50
196,000.00
144,800.00
E.4
VI
HARGA SAT.
Rp
6
15,312,500.00
16,750.00
18,300.00
18,170,987.50
16,843,750.00
20,937.50
18,300.00
34,500.00
48,875.00
51,750.00
207,000.00
977,500.00
103,500.00
8,779,200.00
16,750.00
18,300.00
10,984,357.50
9,657,120.00
20,937.50
18,300.00
34,500.00
48,875.00
51,750.00
207,000.00
977,500.00
103,500.00
420,833.00