Anda di halaman 1dari 1

No.

KODE
1

KOEF

SAT.

URAIAN PAKERJAAN

F.26
0.0280
0.1500

m3
Kg

1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai


Kayu Bengkirai, balok
Paku Biasa 2" - 5"

0.1500
0.4500
0.0450

OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang

0.0280
0.1500
0.8600
0.5600

277,827.60
245,817.60
2,512.50

34,500.00
48,875.00
51,750.00

5,175.00
21,993.75
2,328.75

m3
Kg
Lbr
Kg

1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai


Kayu Bengkirai, balok
8,779,200.00
Paku Biasa 2" - 5"
16,750.00
Teakwood tebal 4mm
98,550.00
Lem kayu
18,300.00

372,828.60
245,817.60
2,512.50
84,753.00
10,248.00

0.1500
0.4500
0.0450

OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang

0.0070
0.1000
0.1500

m3
Kg
Kg

1M2 Pasang Dinding Lambriziring dari Papan jati


Kayu Jati, balok
Paku Biasa 2" - 5"
Paku Sekrup 3,5"

0.6000
1.8000
0.1800

OH
OH
OH

0.4000
0.5000

34,500.00
48,875.00
51,750.00

5,175.00
21,993.75
2,328.75

15,312,500.00
16,750.00
22,800.00

230,272.50
107,187.50
1,675.00
3,420.00

Pekerja
Tukang Kayu
Kepala Tukang

34,500.00
48,875.00
51,750.00

20,700.00
87,975.00
9,315.00

Lbr
Kg

1M2 Pasang Plywood tebal 4mm unt Dinding


Plywood tebal 4mm
Paku Biasa 1/2" - 1"

98,550.00
16,750.00

52,711.25
39,420.00
8,375.00

0.0250
0.0750
0.0075

OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang

34,500.00
48,875.00
51,750.00

862.50
3,665.63
388.13

1.5000
0.0140
0.0500
0.0030

m2
m3
Kg
m'

1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV


Bilik Bambu
Kayu Klas III (Meranti)
Paku Biasa 1/2" - 1"
List Kayu 2/4

17,050.00
3,281,300.00
16,750.00
6,500.00

78,522.70
25,575.00
45,938.20
837.50
19.50

0.1000
0.0500
0.0050

OH
OH
OH

Pekerja
Tukang Kayu
Kepala Tukang

34,500.00
48,875.00
51,750.00

3,450.00
2,443.75
258.75

685,402.95
324,187.50
106,731.82
182,669.00

F.28

F.29

F.30

PEKERJAAN PERKERASAN DAN BETON

G.1
247.0000
0.6207
0.7400

Kg
m3
m3

1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

1.6500
0.2750
0.0280

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

56,925.00
13,440.63
1,449.00

276.0000
0.5914
0.7496

Kg
m3
m3

1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

745,316.22
362,250.00
101,696.14
185,046.07

1.6500
0.2750
0.0280

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

80,643.75
14,231.25
1,449.00

299.0000
0.5707
0.7533

Kg
m3
m3

1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00

748,346.78
392,437.50
98,134.32
185,960.33

1.6500
0.2750
0.0280

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

G.2

G.3

G.4

JUMLAH
Rp
8=(4X7)

8,779,200.00
16,750.00

F.27

VII

HARGA SAT.
Rp
6

34,500.00
48,875.00
51,750.00

1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

13

56,925.00
13,440.63
1,449.00
651,553.39

Anda mungkin juga menyukai