KODE
1
KOEF
SAT.
URAIAN PAKERJAAN
F.26
0.0280
0.1500
m3
Kg
0.1500
0.4500
0.0450
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0280
0.1500
0.8600
0.5600
277,827.60
245,817.60
2,512.50
34,500.00
48,875.00
51,750.00
5,175.00
21,993.75
2,328.75
m3
Kg
Lbr
Kg
372,828.60
245,817.60
2,512.50
84,753.00
10,248.00
0.1500
0.4500
0.0450
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
0.0070
0.1000
0.1500
m3
Kg
Kg
0.6000
1.8000
0.1800
OH
OH
OH
0.4000
0.5000
34,500.00
48,875.00
51,750.00
5,175.00
21,993.75
2,328.75
15,312,500.00
16,750.00
22,800.00
230,272.50
107,187.50
1,675.00
3,420.00
Pekerja
Tukang Kayu
Kepala Tukang
34,500.00
48,875.00
51,750.00
20,700.00
87,975.00
9,315.00
Lbr
Kg
98,550.00
16,750.00
52,711.25
39,420.00
8,375.00
0.0250
0.0750
0.0075
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
34,500.00
48,875.00
51,750.00
862.50
3,665.63
388.13
1.5000
0.0140
0.0500
0.0030
m2
m3
Kg
m'
17,050.00
3,281,300.00
16,750.00
6,500.00
78,522.70
25,575.00
45,938.20
837.50
19.50
0.1000
0.0500
0.0050
OH
OH
OH
Pekerja
Tukang Kayu
Kepala Tukang
34,500.00
48,875.00
51,750.00
3,450.00
2,443.75
258.75
685,402.95
324,187.50
106,731.82
182,669.00
F.28
F.29
F.30
G.1
247.0000
0.6207
0.7400
Kg
m3
m3
1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
1.6500
0.2750
0.0280
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
56,925.00
13,440.63
1,449.00
276.0000
0.5914
0.7496
Kg
m3
m3
1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
745,316.22
362,250.00
101,696.14
185,046.07
1.6500
0.2750
0.0280
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
80,643.75
14,231.25
1,449.00
299.0000
0.5707
0.7533
Kg
m3
m3
1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72
Portland Semen
1,312.50
Pasir Beton (Cepu)
171,950.00
Kerikil (maksimum 30 mm)
246,850.00
748,346.78
392,437.50
98,134.32
185,960.33
1.6500
0.2750
0.0280
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
G.2
G.3
G.4
JUMLAH
Rp
8=(4X7)
8,779,200.00
16,750.00
F.27
VII
HARGA SAT.
Rp
6
34,500.00
48,875.00
51,750.00
1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
13
56,925.00
13,440.63
1,449.00
651,553.39