Anda di halaman 1dari 1

No.

KODE
1

II

KOEF

SAT.

URAIAN PAKERJAAN

HARGA SAT.
Rp
6

JUMLAH
Rp
8=(4X7)

PEKERJAAN TANAH

0.400

OH

1M3 Galian Tanah Biasa Sedalam 1 m


Pekerja

34,500.00

13,800.00
13,800.00

1.000

OH

1M3 Galian Tanah Keras Sedalam 1 m


Pekerja

34,500.00

34,500.00
34,500.00

1.500

OH

1M3 Galian Tanah Cadas Sedalam 1 m


Pekerja

34,500.00

51,750.00
51,750.00

1.200

OH

1M3 Galian Tanah Lumpur Sedalam 1 m


Pekerja

34,500.00

41,400.00
41,400.00

0.050

OH

1M2 Pekerjaan Striping Setinggi 1 m


Pekerja

34,500.00

1,725.00
1,725.00

0.330

OH

1M3 Membuang Tanah Sejauh 30 m'


Pekerja

34,500.00

11,385.00
11,385.00

B.1

B.2

B.3

B.4

B.5

B.6

Suppl. B 6

1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M


Keterangan :
a

MENGGUNAKAN RUMUS = K :

275

B.7
B.8

( L + 75 )

K = Biaya
a = Upah Pekerja
L = Jarak pembuangan

0.500

OH

1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)


1M3 Pemadatan Tanah
Pekerja

1.200

m3

1M3 Urugan Pasir


Pasir Urug

61,950.00

84,690.00
74,340.00

0.300

OH

Pekerja

34,500.00

10,350.00

0.300

OH

1M3 Urugan Tanah Biasa (Tanah Tersedia)


Pekerja

34,500.00

10,350.00
10,350.00

0.400
0.135
0.948

m3
m3
m3

1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL


Pasir Urug
Kapur Padam
Tanah Liat

61,950.00
196,000.00
55,000.00

152,600.00
24,780.00
26,460.00
52,140.00

0.800
0.400
0.040

OH
OH
OH

Pekerja
Tukang Batu
Kepala Tukang

34,500.00
48,875.00
51,750.00

27,600.00
19,550.00
2,070.00

6.000

kg

1M2 Pemasangan Lapisan Ijuk tebal 10 cm


Ijuk

13,700.00

87,375.00
82,200.00

0.150

OH

Pekerja

34,500.00

5,175.00

1.200

m3

1M3 Urugan Sirtu


Sirtu

106,600.00

136,545.00
127,920.00

0.250

OH

Pekerja

34,500.00

8,625.00

0.526

OH

1 M3 Galian Tanah Biasa Sedalam 2 meter


Pekerja

34,500.00

18,147.00
18,147.00

0.735
0.050

org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA


Pekerja
34,500.00
Alat bantu
13,750.00

26,045.00
25,357.50
687.50

0.944
0.050

org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA


Pekerja
34,500.00
Alat bantu
13,750.00

33,255.50
32,568.00
687.50

1.153
0.050

org
lot

1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA


Pekerja
34,500.00
Alat bantu
13,750.00

40,466.00
39,778.50
687.50

B.9

B.9a

B.10

B.11

B.12

B.13

B.14

B.15

B.16

C:\Users\COMPAQ\Downloads\analisa swakelola - mandor

34,500.00

17,250.00
17,250.00