KODE
1
II
KOEF
SAT.
URAIAN PAKERJAAN
HARGA SAT.
Rp
6
JUMLAH
Rp
8=(4X7)
PEKERJAAN TANAH
0.400
OH
34,500.00
13,800.00
13,800.00
1.000
OH
34,500.00
34,500.00
34,500.00
1.500
OH
34,500.00
51,750.00
51,750.00
1.200
OH
34,500.00
41,400.00
41,400.00
0.050
OH
34,500.00
1,725.00
1,725.00
0.330
OH
34,500.00
11,385.00
11,385.00
B.1
B.2
B.3
B.4
B.5
B.6
Suppl. B 6
MENGGUNAKAN RUMUS = K :
275
B.7
B.8
( L + 75 )
K = Biaya
a = Upah Pekerja
L = Jarak pembuangan
0.500
OH
1.200
m3
61,950.00
84,690.00
74,340.00
0.300
OH
Pekerja
34,500.00
10,350.00
0.300
OH
34,500.00
10,350.00
10,350.00
0.400
0.135
0.948
m3
m3
m3
61,950.00
196,000.00
55,000.00
152,600.00
24,780.00
26,460.00
52,140.00
0.800
0.400
0.040
OH
OH
OH
Pekerja
Tukang Batu
Kepala Tukang
34,500.00
48,875.00
51,750.00
27,600.00
19,550.00
2,070.00
6.000
kg
13,700.00
87,375.00
82,200.00
0.150
OH
Pekerja
34,500.00
5,175.00
1.200
m3
106,600.00
136,545.00
127,920.00
0.250
OH
Pekerja
34,500.00
8,625.00
0.526
OH
34,500.00
18,147.00
18,147.00
0.735
0.050
org
lot
26,045.00
25,357.50
687.50
0.944
0.050
org
lot
33,255.50
32,568.00
687.50
1.153
0.050
org
lot
40,466.00
39,778.50
687.50
B.9
B.9a
B.10
B.11
B.12
B.13
B.14
B.15
B.16
34,500.00
17,250.00