No.
PEKERJA
SAT
(1)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
(2)
(3)
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Mandor
Kepala Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Style Bali
Tukang Kayu
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Gali
Tukang Style Bali
Tukang Bongkar Begesting
Pekerja
HARGA UPAH
(Rp)
(4)
150000.00
130000.00
130000.00
130000.00
130000.00
130000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
125000.00
100000.00
TOTAL HARGA
UPAH
32,473,208.79
(5)
1,172,655.90
213,156.45
157,123.07
771,650.59
103,983.75
2,049,581.25
1,510,798.75
2,282,510.16
999,843.75
15,120,000.00
1,550,725.00
6,541,180.13
0.02
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
No.
SAT
(1)
1
2
3
4
5
6
7
(2)
(3)
M3
M3
M3
M3
M3
M3
M3
HARGA SATUAN
(Rp)
(4)
1975000.00
2350000.00
875000.00
1200000.00
1250000.00
4000000.00
875000.00
VOLUME BAHAN
(5)
1.31
0.13
-
0.03
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
M2
M2
Bh
M2
Bh
M2
M3
M3
M3
M3
M3
M3
M3
Zak
Biji
Biji
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Lbr
Kg
M2
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
31000.00
28500.00
1500.00
17500.00
500.00
25000.00
54000.00
250000.00
250000.00
50000.00
250000.00
40000.00
30000.00
65000.00
500.00
650.00
1200.00
13000.00
2500.00
460.00
2800.00
12000.00
5000.00
5000.00
8250.00
8000.00
30000.00
7000.00
10000.00
7500.00
24000.00
24000.00
24000.00
24000.00
24000.00
8000.00
10000.00
3.37
3.28
1.52
31.70
270.65
12.51
388.43
6.74
0.26
12.49
0.51
0.45
8.44
1.71
841,756.25
819,318.75
379,782.00
2,060,476.73
135,324.00
150,084.00
2,719,018.75
67,397.50
6,134.40
299,700.00
12,268.80
10,800.00
202,500.00
17,055.00
45
46
47
48
49
50
51
52
53
54
55
56
57
58
Amplas
Pagar BRC p = 2.4 , t = 0.9 m
Tiang Pgr d = 1.5" , t = 0.9 m
Plywood 4 mm ( 0.9 x 2 )m2
Multipleks 6 mm
Plywood Aluminium
Ultran Polituran
Water Proof Aqua Proof
Impra Dasar
Minyak Thinner
Minyak Bekisting
Lbr. Asbes Glm ( 1.8x1.05 ) m2
Lbr. Asbes Bubungan
Loster 20 x 20
Lbr
Bh
Bh
Lbr
Lbr
Lbr
Ltr
Ltr
Kg
Ltr
Ltr
Lbr
Lbr
Bh
5000.00
115000.00
55000.00
47500.00
37000.00
58505.00
20625.00
27500.00
22500.00
7500.00
7500.00
25000.00
5000.00
10000.00
17.78
0.05
-
88,875.00
405.00
-
69,230.05
286,069.08
388,087.31
79,022.13
586,413.45
27,506.64
37,316.09
24,699.60
56,385.91
36,355.32
5,516.03
120,000.00
No.
SAT
1
A
1M2
M'
B
1
URAIAN
SAT
3
PEKERJAAN PERSIAPAN AWAL
KOEF
4
HARGA
SATUAN
(Rp)
5
HARGA BAHAN
JUM HARGA
(Rp)
6
(Rp)
7
(Rp)
8
12,500.00
1,300.00
10,000.00
750.00
78,915.00
6,125.00
48,000.00
240.00
12,500.00
1,300.00
10,000.00
750.00
11.00
0.08
0.13
0.22
1.10
0.11
1.10
0.06
125000.00
150000.00
97,500.00
93,750.00
3,750.00
97,500.00
93,750.00
3,750.00
0.00
37.80
1.26
0.75
0.025
125000.00
150000.00
97,500.00
93,750.00
3,750.00
97,500.00
93,750.00
3,750.00
0.00
37.80
1.26
0.9
0.045
125000.00
150000.00
119,250.00
112,500.00
6,750.00
119,250.00
112,500.00
6,750.00
50.40
45.36
2.27
57,500.00
57,500.00
0.00
0.007
0.012
0.02
0.1
0.01
0.1
0.005
875000.00
4000000.00
12000.00
125000.00
130000.00
100000.00
150000.00
0.75
0.025
24,550.00
M3
M3
Kg
O/H
O/H
O/H
O/H
15.00
1.50
0.75
100000.00
150000.00
17,500.00
10,000.00
7,500.00
VOL
17,500.00
10,000.00
7,500.00
0.1
0.05
Pasangan Bouwplank
Kayu Begesting Papan
Kayu Meranti Balok
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
HARGA UPAH
54,365.00
6,125.00
48,000.00
240.00
1M3
1M3
1M3
No.
1
0.5
0.05
HARGA
SATUAN
(Rp)
5
100000.00
150000.00
1.2
0.3
0.01
40000.00
100000.00
150000.00
1.2
0.3
0.01
30000.00
100000.00
150000.00
0.25
0.01
100000.00
150000.00
1.2
0.3
0.01
50000.00
100000.00
150000.00
URAIAN
SAT
2
SAT
4
Pekerja
Mandor
5
1M3
1M3
1M3
1M3
KOEF
4
HARGA UPAH
(Rp)
6
50,000.00
7,500.00
31,500.00
HARGA BAHAN
(Rp)
7
JUM HARGA
(Rp)
8
50,000.00
7,500.00
VOL
9
0.00
0.00
48,000.00
48,000.00
79,500.00
48,000.00
30,000.00
1,500.00
0.00
0.00
0.00
0.00
36,000.00
36,000.00
30,000.00
1,500.00
67,500.00
36,000.00
30,000.00
1,500.00
0.00
0.00
0.00
0.00
26,500.00
25,000.00
1,500.00
26,500.00
25,000.00
1,500.00
1.32
0.33
0.01
60,000.00
60,000.00
91,500.00
60,000.00
30,000.00
1,500.00
0.00
0.00
0.00
0.00
293,200.00
339,250.00
0.52
35,000.00
18,200.00
240,000.00
35,000.00
18,200.00
240,000.00
12,500.00
1,300.00
30,000.00
36.29
0.15
0.50
0.05
0.01
0.16
30,000.00
1,500.00
31,500.00
31,500.00
30,000.00
1,500.00
1M3
46,050.00
Bh
Zak
M3
O/H
O/H
O/H
70
0.28
0.96
0.1
0.01
0.3
500.00
65000.00
250000.00
125000.00
130000.00
100000.00
12,500.00
1,300.00
30,000.00
No.
1
4
0.015
HARGA
SATUAN
(Rp)
5
150000.00
70
0.23
0.043
0.1
0.01
0.3
0.015
450.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
Zak
M3
O/H
O/H
O/H
O/H
7.776
0.023
0.1
0.01
0.3
0.015
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
Zak
M3
O/H
O/H
O/H
O/H
0.10368
0.026
0.15
0.015
0.2
0.01
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
Zak
M3
O/H
O/H
O/H
0.08824
0.027
0.15
0.015
0.2
65000.00
250000.00
125000.00
130000.00
100000.00
URAIAN
SAT
2
3
Mandor
1M3
1M2
1M2
1M2
SAT
4
O/H
KOEF
HARGA UPAH
(Rp)
6
2,250.00
46,050.00
HARGA BAHAN
(Rp)
7
57,200.00
31,500.00
14,950.00
10,750.00
103,250.00
31,500.00
14,950.00
10,750.00
12,500.00
1,300.00
30,000.00
2,250.00
3.35
234.36
0.77
0.14
0.33
0.03
1.00
0.05
511,190.00
505,440.00
5,750.00
557,240.00
505,440.00
5,750.00
12,500.00
1,300.00
30,000.00
2,250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
13,239.20
6,739.20
6,500.00
55,439.20
6,739.20
6,500.00
18,750.00
1,950.00
20,000.00
1,500.00
33.75
3.50
0.88
5.06
0.51
6.75
0.34
12,485.60
5,735.60
6,750.00
54,685.60
5,735.60
6,750.00
18,750.00
1,950.00
20,000.00
0.00
0.00
0.00
0.00
0.00
0.00
12,500.00
1,300.00
30,000.00
2,250.00
42,200.00
18,750.00
1,950.00
20,000.00
1,500.00
42,200.00
18,750.00
1,950.00
20,000.00
VOL
(Rp)
8
2,250.00
12,500.00
1,300.00
30,000.00
2,250.00
46,050.00
JUM HARGA
0.01
No.
1
URAIAN
SAT
2
3
Mandor
10
11
12
1M2
1M2
1M2
D
1
4
O/H
4
0.01
HARGA
SATUAN
(Rp)
5
150000.00
Zak
M3
O/H
O/H
O/H
O/H
0.072
0.022
0.3
0.03
0.5
0.025
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
Zak
M3
O/H
O/H
O/H
O/H
0.065
0.1
0.01
0.15
0.0075
65000.00
125000.00
130000.00
100000.00
150000.00
1.1
0.225
0.0225
0.15
0.0075
27500.00
125000.00
130000.00
100000.00
150000.00
6
1.76
0.76
1.65
0.083
0.275
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
SAT
KOEF
HARGA UPAH
(Rp)
6
1,500.00
95,150.00
(Rp)
7
(Rp)
8
1,500.00
VOL
9
0.00
105,330.00
4,680.00
5,500.00
37,500.00
3,900.00
50,000.00
3,750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,225.00
4,225.00
34,150.00
4,225.00
12,500.00
1,300.00
15,000.00
1,125.00
33.75
2.19
3.38
0.34
5.06
0.25
58,375.00
30,250.00
28,125.00
77,425.00
30,250.00
28,125.00
2,925.00
15,000.00
1,125.00
0.00
0.00
0.00
0.00
0.00
0.00
1,020,000.00
390,000.00
440,000.00
190,000.00
1,235,400.00
390,000.00
440,000.00
190,000.00
165,000.00
12,450.00
34,375.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,500.00
1,300.00
15,000.00
1,125.00
19,050.00
JUM HARGA
10,180.00
4,680.00
5,500.00
37,500.00
3,900.00
50,000.00
3,750.00
29,925.00
Pek. Waterprofing
Water Proof Aqua Proof
Tukang Cat
Kepala Tukang Cat
Pekerja
Mandor
HARGA BAHAN
2,925.00
15,000.00
1,125.00
PEK. BETON
1 M3
215,400.00
Zak
M3
M3
O/H
O/H
O/H
165,000.00
12,450.00
34,375.00
No.
1
SAT
2
1 M3
1 M3
URAIAN
3
Kepala Tukang Batu
Pek. Beton K-200
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Pek. Beton Cycloof
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Pek. Pasangan Batu kali (1:5)
Batu Kali
Semen Gresik 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
1 M3
4
O/H
4
0.0275
HARGA
SATUAN
(Rp)
5
130000.00
Zak
M3
M3
O/H
O/H
O/H
O/H
7.04
2.3
1.57
1.65
0.083
0.275
0.0275
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
Zak
M3
M3
O/H
O/H
O/H
O/H
0.6
6.512
0.54
0.82
6
0.3
1
0.1
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
Zak
M3
M3
O/H
O/H
O/H
O/H
0.48
1.2
2.72
0.544
1.2
0.12
3.6
0.18
54000.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
Zak
1
6
SAT
KOEF
HARGA UPAH
(Rp)
6
3,575.00
215,400.00
65000.00
HARGA BAHAN
(Rp)
7
1,425,100.00
457,600.00
575,000.00
392,500.00
JUM HARGA
(Rp)
8
3,575.00
VOL
9
0.00
165,000.00
12,450.00
34,375.00
3,575.00
1,640,500.00
457,600.00
575,000.00
392,500.00
165,000.00
12,450.00
34,375.00
3,575.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
600,000.00
45,000.00
125,000.00
13,000.00
1,374,264.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
423,280.00
135,000.00
205,000.00
64,800.00
176,800.00
136,000.00
150,000.00
15,600.00
360,000.00
27,000.00
390,000.00
930,200.00
64,800.00
176,800.00
136,000.00
150,000.00
15,600.00
360,000.00
27,000.00
2,405,665.00
1,235,400.00
390,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.54
3.24
No.
1
SAT
2
1 M3
URAIAN
3
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Minyak Bekisting
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Sloof Beton 15/20
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
SAT
4
M3
M3
O/H
O/H
O/H
O/H
Kg
Kg
O/H
O/H
O/H
M3
Kg
Ltr
O/H
O/H
O/H
O/H
O/H
KOEF
4
1.76
0.76
1.65
0.083
0.275
0.0275
1
110
1.65
0.77
0.077
0.77
1
0.045
0.3
0.1
0.26
0.026
0.52
0.026
0.52
1
6.512
0.54
0.82
6
0.3
1
0.1
1.5
110
HARGA
SATUAN
(Rp)
5
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
7500.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
440,000.00
190,000.00
165,000.00
12,450.00
34,375.00
3,575.00
770,000.00
16,500.00
96,250.00
10,010.00
77,000.00
39,375.00
3,600.00
750.00
32,500.00
3,380.00
52,000.00
3,900.00
65,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
JUM HARGA
(Rp)
8
440,000.00
190,000.00
165,000.00
12,450.00
34,375.00
3,575.00
969,760.00
770,000.00
16,500.00
96,250.00
10,010.00
77,000.00
200,505.00
39,375.00
3,600.00
750.00
32,500.00
3,380.00
52,000.00
3,900.00
65,000.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
VOL
9
0.95
0.41
0.89
0.04
0.15
0.01
59.40
0.89
0.42
0.04
0.42
0.02
0.16
0.05
0.14
0.01
0.28
0.01
0.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
SAT
2
1 M3
URAIAN
3
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Sloof Beton 12/15
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
SAT
4
KOEF
4
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
HARGA
SATUAN
(Rp)
5
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
JUM HARGA
(Rp)
8
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
5,950,530.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
SAT
2
1 M3
1 M3
URAIAN
3
Pekerja
Mandor
Tukang Bongkar Begesting
SAT
4
KOEF
4
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1.5
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
HARGA
SATUAN
(Rp)
5
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
HARGA UPAH
(Rp)
6
200,000.00
15,000.00
500,000.00
HARGA BAHAN
(Rp)
7
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
JUM HARGA
(Rp)
8
200,000.00
15,000.00
500,000.00
VOL
9
0.00
0.00
0.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
0.00
8,551,780.00
1,546,280.00
423,280.00
135,000.00
205,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
SAT
2
1 M3
URAIAN
3
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Balok Induk 30/50
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
SAT
4
KOEF
4
6
0.3
1
0.1
2
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
2
110
2
6.75
2.25
HARGA
SATUAN
(Rp)
5
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
HARGA UPAH
(Rp)
6
600,000.00
45,000.00
125,000.00
13,000.00
HARGA BAHAN
(Rp)
7
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
JUM HARGA
(Rp)
8
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
8,551,780.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
10
SAT
2
1 M3
URAIAN
3
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Ring Balok 20/25 (K-150)
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
SAT
4
Zak
M3
M3
O/H
O/H
O/H
O/H
Kg
Kg
O/H
O/H
O/H
M3
Kg
O/H
O/H
O/H
O/H
O/H
KOEF
4
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
HARGA
SATUAN
(Rp)
5
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
HARGA UPAH
(Rp)
6
675,000.00
HARGA BAHAN
(Rp)
7
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
JUM HARGA
(Rp)
8
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
5,950,530.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.68
4.40
0.36
0.55
4.05
0.20
0.68
0.07
74.25
1.35
4.56
1.52
4.56
0.27
2.70
3.38
0.34
1.35
0.07
2.70
No.
SAT
11
1 M3
13
1 M3
URAIAN
3
SAT
4
KOEF
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1.5
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
Zak
M3
M3
O/H
O/H
O/H
HARGA
SATUAN
(Rp)
5
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
HARGA UPAH
HARGA BAHAN
JUM HARGA
(Rp)
6
(Rp)
7
(Rp)
8
VOL
9
0.06
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
0.30
600,000.00
45,000.00
125,000.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
423,280.00
135,000.00
205,000.00
0.37
0.03
0.05
0.34
0.02
0.06
0.01
9.28
0.17
0.57
0.19
0.57
0.02
0.23
0.28
0.03
0.11
0.01
0.23
1.95
0.16
0.25
1.80
0.09
0.30
No.
1
14
SAT
2
1 M3
URAIAN
3
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Kolom Beton 25/25
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
SAT
4
O/H
KOEF
4
0.1
1.5
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1.5
110
2
6.75
2.25
6.75
1
0.4
HARGA
SATUAN
(Rp)
5
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
HARGA UPAH
(Rp)
6
13,000.00
HARGA BAHAN
(Rp)
7
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
JUM HARGA
(Rp)
8
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
VOL
9
0.03
49.50
0.90
3.04
1.01
3.04
0.12
1.20
1.50
0.15
0.60
0.03
1.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
15
16
SAT
2
1 M3
1 M3
URAIAN
3
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Kolom Beton 30/30
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Kolom Beton 40/40
M3 Pekerjaan Beton
SAT
4
KOEF
4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
1.5
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
HARGA
SATUAN
(Rp)
5
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
JUM HARGA
(Rp)
8
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
7,251,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
0.00
8,551,780.00
1,546,280.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
17
SAT
2
1 M3
URAIAN
3
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Kolom Beton 45/45
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
SAT
4
KOEF
4
6.512
0.54
0.82
6
0.3
1
0.1
2
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
2.5
110
HARGA
SATUAN
(Rp)
5
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
JUM HARGA
(Rp)
8
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
9,852,405.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
18
SAT
2
1 M3
URAIAN
3
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Pelat Lantai ( K-150 )
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
SAT
4
KOEF
4
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
1
6.512
0.54
0.82
6
0.3
1
0.1
0.7
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
HARGA
SATUAN
(Rp)
5
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
JUM HARGA
(Rp)
8
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
5,170,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
6.51
0.54
0.82
6.00
0.30
1.00
0.10
77.00
1.40
4.73
1.58
4.73
0.40
4.00
5.00
0.50
No.
1
19
21
SAT
2
1 M3
1 M3
URAIAN
3
Pekerja
Mandor
Tukang Bongkar Begesting
Pek. Atap Dak Beton ( K-150 )
M3 Pekerjaan Beton
Semen Gresik 50 kg
Pasir Beton
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
Pekerjaan Begisting
Kayu Begesting Papan
Paku Usuk
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Bongkar Begesting
SAT
4
KOEF
4
2
0.1
4
M3
Kg
O/H
O/H
O/H
O/H
O/H
1
6.512
0.54
0.82
6
0.3
1
0.1
0.7
110
2
6.75
2.25
6.75
1
0.4
4
5
0.5
2
0.1
4
Zak
M3
1
7.04
2.3
Zak
M3
M3
O/H
O/H
O/H
O/H
Kg
Kg
O/H
O/H
O/H
HARGA
SATUAN
(Rp)
5
100000.00
150000.00
125000.00
65000.00
250000.00
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
875000.00
12000.00
125000.00
130000.00
100000.00
150000.00
125000.00
65000.00
250000.00
HARGA UPAH
(Rp)
6
200,000.00
15,000.00
500,000.00
HARGA BAHAN
(Rp)
7
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
457,600.00
575,000.00
JUM HARGA
(Rp)
8
200,000.00
15,000.00
500,000.00
5,170,155.00
1,546,280.00
423,280.00
135,000.00
205,000.00
600,000.00
45,000.00
125,000.00
13,000.00
2,601,250.00
770,000.00
20,000.00
843,750.00
292,500.00
675,000.00
1,803,000.00
350,000.00
48,000.00
625,000.00
65,000.00
200,000.00
15,000.00
500,000.00
2,824,760.00
1,640,500.00
457,600.00
575,000.00
VOL
9
2.00
0.10
4.00
1.00
6.51
0.54
0.82
6.00
0.30
1.00
0.10
77.00
1.40
4.73
1.58
4.73
0.40
4.00
5.00
0.50
2.00
0.10
4.00
0.30
2.11
0.69
No.
1
SAT
2
E
1
URAIAN
3
Kerikil Beton
Pekerja
Mandor
Tukang Batu
Kepala Tukang Batu
Kg Pekerjaan besi
Besi Beton
Kawat Ikat Beton
Tukang Besi
Kepala Tukang Besi
Pekerja
SAT
4
M3
O/H
O/H
O/H
O/H
Kg
Kg
O/H
O/H
O/H
KOEF
4
1.57
1.65
0.083
0.275
0.0275
1.0
140
2.1
0.77
0.077
0.77
HARGA
SATUAN
(Rp)
5
250000.00
100000.00
150000.00
125000.00
130000.00
7000.00
10000.00
125000.00
130000.00
100000.00
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
7
392,500.00
165,000.00
12,450.00
34,375.00
3,575.00
980,000.00
21,000.00
96,250.00
10,010.00
77,000.00
JUM HARGA
(Rp)
8
392,500.00
165,000.00
12,450.00
34,375.00
3,575.00
1,184,260.00
980,000.00
21,000.00
96,250.00
10,010.00
77,000.00
VOL
9
0.47
0.50
0.02
0.08
0.01
42.00
0.63
0.23
0.02
0.23
1 M2
1 M'
37,200.00
23
0.15
0.015
0.15
0.01
460.00
125000.00
130000.00
100000.00
150000.00
23
0.15
0.015
0.15
0.01
2500.00
125000.00
130000.00
100000.00
150000.00
4
0.338
0.032
2800.00
65000.00
250000.00
10,580.00
10,580.00
47,780.00
10,580.00
18,750.00
1,950.00
15,000.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
57,500.00
94,700.00
0.00
57,500.00
57,500.00
18,750.00
1,950.00
15,000.00
1,500.00
0.00
0.00
0.00
0.00
0.00
41,170.00
11,200.00
21,970.00
8,000.00
111,770.00
11,200.00
21,970.00
8,000.00
0.00
0.00
0.00
0.00
18,750.00
1,950.00
15,000.00
1,500.00
37,200.00
18,750.00
1,950.00
15,000.00
1,500.00
70,600.00
No.
1
SAT
2
1 M2
1 M2
1 M3
1 M2
0.2
0.02
0.4
0.02
HARGA
SATUAN
(Rp)
5
125000.00
130000.00
100000.00
150000.00
0.0105
0.1
0.0571
0.0057
0.0571
0.0028
1200000.00
12000.00
125000.00
130000.00
100000.00
150000.00
0.006
0.15
0.0428
0.0042
0.0428
0.0021
1975000.00
5000.00
125000.00
130000.00
100000.00
150000.00
Pek. Kuda-Kuda
Kayu Kruing Balok
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
1.1
24
2.4
8
0.4
1200000.00
125000.00
130000.00
100000.00
150000.00
0.025
0.1
0.8
0.08
2350000.00
5000.00
125000.00
130000.00
URAIAN
3
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SAT
4
KOEF
4
HARGA UPAH
(Rp)
6
25,000.00
2,600.00
40,000.00
3,000.00
14,008.50
HARGA BAHAN
(Rp)
7
100,000.00
10,400.00
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12,600.00
11,850.00
750.00
23,091.00
11,850.00
750.00
5,350.00
546.00
4,280.00
315.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,320,000.00
1,320,000.00
5,492,000.00
1,320,000.00
3,000,000.00
312,000.00
800,000.00
60,000.00
0.00
0.00
0.00
0.00
0.00
0.00
59,250.00
58,750.00
500.00
199,750.00
58,750.00
500.00
100,000.00
10,400.00
0.00
0.00
0.00
0.00
0.00
3,000,000.00
312,000.00
800,000.00
60,000.00
140,500.00
VOL
27,808.50
12,600.00
1,200.00
7,137.50
741.00
5,710.00
420.00
5,350.00
546.00
4,280.00
315.00
4,172,000.00
(Rp)
8
25,000.00
2,600.00
40,000.00
3,000.00
13,800.00
12,600.00
1,200.00
7,137.50
741.00
5,710.00
420.00
10,491.00
JUM HARGA
No.
1
4
0.28
0.014
HARGA
SATUAN
(Rp)
5
100000.00
150000.00
1.1
26
2.6
10
0.5
1975000.00
125000.00
130000.00
100000.00
150000.00
0.035
0.8
0.1
3
0.6
2
0.1
2350000.00
30000.00
8000.00
125000.00
130000.00
100000.00
150000.00
1.1
0.1
1
0.2
0.7
0.07
30000.00
8000.00
125000.00
130000.00
100000.00
150000.00
0.04
3.6
2350000.00
125000.00
URAIAN
SAT
2
3
Pekerja
Mandor
KOEF
HARGA UPAH
(Rp)
6
28,000.00
2,100.00
HARGA BAHAN
(Rp)
7
JUM HARGA
(Rp)
8
28,000.00
2,100.00
VOL
9
0.00
0.00
F
1
SAT
1 M3
1 M2
1 M2
1 M2
4,663,000.00
2,172,500.00
2,172,500.00
6,835,500.00
2,172,500.00
3,250,000.00
338,000.00
1,000,000.00
75,000.00
0.00
0.00
0.00
0.00
0.00
0.00
107,050.00
82,250.00
24,000.00
800.00
775,050.00
82,250.00
24,000.00
800.00
375,000.00
78,000.00
200,000.00
15,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
33,800.00
33,000.00
800.00
265,300.00
33,000.00
800.00
125,000.00
26,000.00
70,000.00
10,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
94,000.00
94,000.00
698,300.00
94,000.00
450,000.00
0.00
0.00
0.00
3,250,000.00
338,000.00
1,000,000.00
75,000.00
668,000.00
375,000.00
78,000.00
200,000.00
15,000.00
231,500.00
125,000.00
26,000.00
70,000.00
10,500.00
604,300.00
450,000.00
No.
1
SAT
2
1 M2
1 M2
1 M2
URAIAN
3
Kepala Tukang Kayu
Pekerja
Mandor
Pek. Pas. Daun Pintu
Plywood+Aluminium
Kayu Kamper Papan
Plywood 4 mm ( 0.9 x 2 )m2
Plywood Aluminium
Paku List
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Kayu
Pek. Pas. Daun Pintu Plywood
Double
Kayu Kamper Papan
Plywood 4 mm ( 0.9 x 2 )m2
Paku List
Kepala Tukang Kayu
Pekerja
Mandor
Tukang Kayu
Pek. Dinding Partisi
Multipleks 6 mm
Kayu Kamper Balok
Paku Usuk
Paku Reng
Tukang Kayu
Kepala Tukang Kayu
Pekerja
SAT
4
KOEF
4
0.36
1
0.05
HARGA
SATUAN
(Rp)
5
130000.00
100000.00
150000.00
HARGA UPAH
(Rp)
6
46,800.00
100,000.00
7,500.00
548,375.00
0.015
0.625
0.625
0.1
0.3
1.25
0.0625
3
2350000.00
47500.00
58505.00
8000.00
130000.00
100000.00
150000.00
125000.00
2350000.00
47500.00
8000.00
130000.00
100000.00
150000.00
125000.00
0.8
0.015
0.02
0.2
0.7
0.07
0.35
37000.00
1975000.00
12000.00
5000.00
125000.00
130000.00
100000.00
(Rp)
7
87,500.00
9,100.00
35,000.00
(Rp)
8
46,800.00
100,000.00
7,500.00
VOL
9
0.00
0.00
0.00
650,678.13
0.00
35,250.00
29,687.50
36,565.63
800.00
35,250.00
29,687.50
36,565.63
800.00
39,000.00
125,000.00
9,375.00
375,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
95,425.00
643,800.00
0.00
35,250.00
59,375.00
800.00
35,250.00
59,375.00
800.00
39,000.00
125,000.00
9,375.00
375,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60,465.00
29,600.00
29,625.00
240.00
1,000.00
210,965.00
29,600.00
29,625.00
240.00
1,000.00
87,500.00
9,100.00
35,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
39,000.00
125,000.00
9,375.00
375,000.00
150,500.00
JUM HARGA
102,303.13
39,000.00
125,000.00
9,375.00
375,000.00
548,375.00
0.015
1.25
0.1
0.3
1.25
0.0625
3
HARGA BAHAN
No.
1
URAIAN
SAT
2
3
Mandor
G
1
SAT
4
4
0.126
HARGA
SATUAN
(Rp)
5
150000.00
1
0.015
0.02
0.2
0.2
0.02
0.5
0.025
8250.00
1200000.00
8000.00
12000.00
125000.00
130000.00
100000.00
150000.00
0.0040
0.0400
0.1
0.02
0.002
0.01
1975000.00
8000.00
100000.00
125000.00
130000.00
150000.00
1
0.25
0.02
0.25
0.025
0.5
0.025
31000.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
3.5
1500.00
KOEF
HARGA UPAH
(Rp)
6
18,900.00
HARGA BAHAN
(Rp)
7
JUM HARGA
(Rp)
8
18,900.00
VOL
9
0.00
1 M'
1 M2
1 M'
81,350.00
28,810.00
8,250.00
18,000.00
160.00
2,400.00
110,160.00
8,250.00
18,000.00
160.00
2,400.00
25,000.00
2,600.00
50,000.00
3,750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,220.00
7,900.00
320.0000
22,480.00
7,900.00
320.0000
10,000.00
2,500.00
260.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
52,250.00
31,000.00
16,250.00
5,000.00
140,500.00
31,000.00
16,250.00
5,000.00
31,250.00
3,250.00
50,000.00
3,750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,765.00
5,250.00
26,815.00
5,250.00
0.00
0.00
25,000.00
2,600.00
50,000.00
3,750.00
14,260.00
10,000.00
2,500.00
260.00
1,500.00
88,250.00
31,250.00
3,250.00
50,000.00
3,750.00
19,050.00
No.
1
SAT
2
1 M2
1 M2
1 M'
4
0.031
0.002
0.05
0.01
0.1
0.01
HARGA
SATUAN
(Rp)
5
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
1
0.25
0.02
0.25
0.025
0.5
0.025
28500.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
1
0.25
0.02
0.25
0.025
0.5
0.025
17500.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
3.5
0.031
0.002
0.05
0.01
0.1
0.01
500.00
65000.00
250000.00
125000.00
130000.00
100000.00
150000.00
URAIAN
3
Semen Gresik 50 kg
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SAT
4
KOEF
HARGA UPAH
(Rp)
6
HARGA BAHAN
(Rp)
8
2,015.00
500.00
6,250.00
1,300.00
10,000.00
1,500.00
49,750.00
28,500.00
16,250.00
5,000.00
138,000.00
28,500.00
16,250.00
5,000.00
31,250.00
3,250.00
50,000.00
3,750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
38,750.00
17,500.00
16,250.00
5,000.00
127,000.00
17,500.00
16,250.00
5,000.00
31,250.00
3,250.00
50,000.00
3,750.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,265.00
1,750.00
2,015.00
500.00
23,315.00
1,750.00
2,015.00
500.00
6,250.00
1,300.00
10,000.00
1,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,250.00
3,250.00
50,000.00
3,750.00
88,250.00
31,250.00
3,250.00
50,000.00
3,750.00
19,050.00
6,250.00
1,300.00
10,000.00
1,500.00
VOL
(Rp)
7
2,015.00
500.00
6,250.00
1,300.00
10,000.00
1,500.00
88,250.00
JUM HARGA
9
0.00
0.00
0.00
0.00
0.00
0.00
No.
SAT
1 M2
H
1
URAIAN
3
Pek. Pas. Paving Block
Paving Block Kelas I
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SAT
4
KOEF
4
1
0.31
0.031
0.625
0.031
HARGA
SATUAN
(Rp)
5
25000.00
125000.00
130000.00
100000.00
150000.00
HARGA UPAH
HARGA BAHAN
JUM HARGA
(Rp)
6
(Rp)
7
(Rp)
8
109,930.00
25,000.00
25,000.00
134,930.00
25,000.00
38,750.00
4,030.00
62,500.00
4,650.00
0.00
0.00
0.00
0.00
0.00
0.00
17,880.00
65,055.00
33.75
8,880.00
6,000.00
2,500.00
500.00
8,880.00
6,000.00
2,500.00
500.00
28,125.00
2,925.00
15,000.00
1,125.00
12.49
8.44
16.88
1.69
7.59
0.76
5.06
0.25
18,824.00
65,999.00
1.80
6,816.00
6,000.00
2,500.00
3,408.00
100.00
6,816.00
6,000.00
2,500.00
3,408.00
100.00
28,125.00
2,925.00
15,000.00
1,125.00
0.51
0.45
0.90
0.26
0.02
0.41
0.04
0.27
0.01
38,750.00
4,030.00
62,500.00
4,650.00
VOL
9
1 M2
47,175.00
0.37
0.25
0.50
0.05
0.225
0.0225
0.15
0.0075
24000.00
24000.00
5000.00
10000.00
125000.00
130000.00
100000.00
150000.00
28,125.00
2,925.00
15,000.00
1,125.00
47,175.00
0.284
0.25
0.5
0.142
0.01
0.225
0.0225
0.15
0.0075
24000.00
24000.00
5000.00
24000.00
10000.00
125000.00
130000.00
100000.00
150000.00
28,125.00
2,925.00
15,000.00
1,125.00
No.
SAT
1
I
1 M'
URAIAN
3
SAT
4
KOEF
4
HARGA
SATUAN
(Rp)
5
HARGA UPAH
HARGA BAHAN
JUM HARGA
(Rp)
6
(Rp)
7
(Rp)
8
85,000.00
57,500.00
27,500.00
89,600.00
57,500.00
27,500.00
3,125.00
325.00
1,000.00
150.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
350,000.00
40,000.00
14,750.00
3,500.00
5,000.00
7,500.00
75,000.00
75,000.00
25,000.00
4,050.00
25,000.00
20,000.00
100,000.00
175,000.00
17,500.00
2,500.00
2,000.00
25,000.00
40,500.00
2,500.00
2,000.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
2.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VOL
9
PEK. BORONGAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
4,600.00
0.5
0.5
0.025
0.0025
0.01
0.001
115000.00
55000.00
125000.00
130000.00
100000.00
150000.00
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
350,000.00
40,000.00
14,750.00
3,500.00
5,000.00
7,500.00
75,000.00
75,000.00
25,000.00
4,050.00
25,000.00
20,000.00
100,000.00
175,000.00
17,500.00
2,500.00
2,000.00
25,000.00
40,500.00
2,500.00
2,000.00
3,125.00
325.00
1,000.00
150.00
No.
1
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
SAT
2
URAIAN
3
Pas. Grendel Pintu
Pas. Grendel Jendela
Pas. Kait Angin
Pas. Kloset Warna KIA
Pas. Bak Mandi
Pas. Floor Drain
Pas. Keran Air
Pas. Pipa Air Bersih 1/2"
Pas. Pipa Air Kotor 4"
Pas. Pipa Air Kotor 3"
Pas. Septik Tank dan Peresapan
Pas Wastafel Putih KIA
Pek. Meja Kayu Kamper
Penanaman Abesia
Penanaman Rumput Gajah
Penanaman Kembang Kertas
Penanaman Bambu Jepang
Penanaman Cempaka
Penanaman Pangkas Kuning
Penanaman Soka Bangkok
Penanaman Jepun Bali
Penanaman Helliconia Golden
Penanaman Lili Paris
Penanaman Ketapang
Penanaman Nagasari
Penanaman Bayam Merah
Penanaman Lantana
Penanaman krokot merah
Penanaman puring Nuri
Penanaman Teh-tehan
Penanaman Pohon Cempaka
Pek. Penyambungan Listrik
Pek. Penyambungan Air
SAT
4
KOEF
4
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
HARGA
SATUAN
(Rp)
5
9,000.00
3,000.00
4,000.00
78,000.00
85,000.00
15,000.00
14,500.00
4,000.00
17,500.00
13,375.00
2,500,000.00
650,000.00
180,000.00
25,000.00
4,000.00
20,000.00
25,000.00
25,000.00
15,000.00
15,000.00
25,000.00
25,000.00
25,000.00
25,000.00
20,000.00
15,000.00
20,000.00
20,000.00
20,000.00
15,000.00
25,000.00
4,000,000.00
1,000,000.00
HARGA UPAH
HARGA BAHAN
(Rp)
6
(Rp)
7
JUM HARGA
(Rp)
8
9,000.00
3,000.00
4,000.00
78,000.00
85,000.00
15,000.00
14,500.00
4,000.00
17,500.00
13,375.00
2,500,000.00
650,000.00
180,000.00
25,000.00
4,000.00
20,000.00
25,000.00
25,000.00
15,000.00
15,000.00
25,000.00
25,000.00
25,000.00
25,000.00
20,000.00
15,000.00
20,000.00
20,000.00
20,000.00
15,000.00
25,000.00
4,000,000.00
1,000,000.00
VOL
9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
No.
1
55
SAT
2
URAIAN
3
Pek. Pintu Rolling + Box Aluminium
SAT
4
KOEF
4
1
HARGA
SATUAN
(Rp)
5
200000.00
HARGA UPAH
HARGA BAHAN
(Rp)
6
(Rp)
7
JUM HARGA
(Rp)
8
200,000.00
VOL
9
0.00
URAIAN PEKERJAAN
SAT
VOLUME
I
1
2
M2
M
15.00
11.00
262,500.00
262,500.00
598,015.00
TOTAL
26,702,059.25
6,045,180.00
6,010,200.00
34,980.00
-
KETERANGAN
7
M3
M2
M3
50.40
1.32
50.40
119,250.00
26,500.00
-
PEKERJAAN BETON
Kerikil Beton
Kepala Tukang Batu
Kerikil Beton
Kerikil Beton
Kerikil Beton
Kerikil Beton
Kerikil Beton
M3
M3
M3
M3
M3
M3
M3
0.30
0.54
0.68
1.00
1.00
0.06
0.30
190,000.00
19,500.00
190,000.00
190,000.00
190,000.00
190,000.00
190,000.00
643,467.50
57,000.00
10,530.00
128,250.00
190,000.00 Pelat Lantai t = 10 cm
190,000.00 Dak Beton t = 15 cm
10,687.50
57,000.00
M3
M3
M2
M2
0.52
3.35
33.75
33.75
293,200.00
57,200.00
13,239.20
4,225.00
932,917.23
151,994.88
191,505.60
446,823.00
142,593.75
No
1
3
URAIAN PEKERJAAN
2
PEKERJAAN BETON
Pek. Pelat Pondasi Telapak (K-200)
Pek. Sloof Beton 20/30 (K-150)
Pek. Ring Balok 20/25 (K-150)
Pek. Pelat Lantai ( K-150 )
Pek. Atap Dak Beton ( K-150 )
Pek. Kolom Praktis Beton 15/15 (K-150)
Pek. Kolom Beton 20/20 (K-150)
SAT
VOLUME
M3
M3
M3
M3
M3
M3
M3
0.30
0.54
0.68
1.00
1.00
0.06
0.30
33.75
1.80
Ttk
Ttk
Bh
Bh
Bh
Bh
Bh
17,880.00
18,824.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
GRAND TOTAL
637,333.20
603,450.00 - Pek. Pengecatan Tembok
33,883.20 - Pek. Pengecatan Kayu Listplank
-
26,964,559.25
No.
I
II
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN AWAL
6,045,180.00
932,917.23
643,467.50
637,333.20
(Exclude)
8,521,397.93
8,521,000.00
400,000.00
5,000,000.00
12,000,000.00
1,000,000.00
(Exclude)
18,600,000.00
18,600,000.00