Anda di halaman 1dari 5

TI 3201 – Pengendalian dan Penjaminan Mutu Nadia Fadhilah Riza (13406069)

Tugas 7 Prilla Sista Lily Jane (13406080)

EXERCISE 8-1
The following data represent individual observations on molecular weight taken hourly from a chemical
process. The target value of molecular weight is 1050 and the process standard deviation is thought to be
about 𝝈 = 𝟐𝟓

a). Set up a tabular cusum for the mean of this process. Design the cusum to quickly detect a shift of
about 1.0𝝈 in the process mean
μ0 1050 μ0+K 1062.5
σ 25 μ0-K 1037.5
μ1 1075 C0+ 0
K 12.5 C0- 0
H 125

a b
i xi xi - 1062.5 Ci+ N+ 1037.5 - xi Ci- N-
1 1045 -17.5 0 0 -7.5 0 0
2 1055 -7.5 0 0 -17.5 0 0
3 1037 -25.5 0 0 0.5 0.5 1
4 1064 1.5 1.5 1 -26.5 0 0
5 1095 32.5 34 2 -57.5 0 0
6 1008 -54.5 0 0 29.5 29.5 1
7 1050 -12.5 0 0 -12.5 17 2
8 1087 24.5 24.5 1 -49.5 0 0
9 1125 62.5 87 2 -87.5 0 0
10 1146 83.5 170.5 3 -108.5 0 0
11 1139 76.5 247 4 -101.5 0 0
12 1169 106.5 353.5 5 -131.5 0 0
13 1151 88.5 442 6 -113.5 0 0
14 1128 65.5 507.5 7 -90.5 0 0
15 1238 175.5 683 8 -200.5 0 0
16 1125 62.5 745.5 9 -87.5 0 0
17 1163 100.5 846 10 -125.5 0 0
18 1188 125.5 971.5 11 -150.5 0 0
19 1146 83.5 1055 12 -108.5 0 0
20 1167 104.5 1159.5 13 -129.5 0 0

Karena periode pertama dimana (Ci+)>(H=125) adalah pada periode ke-10,


maka dapat disimpulkan bahwa proses out of control saat periode tersebut.
Karena saat periode ke-10, N+ = 3, maka shift pertama kali terjadi setelah
periode ke 10-3=7, yaitu pada periode 8

b). Is the estimate of 𝝈 used in part a). of this problem is reasonable?

Perhitungan standar deviasi proses:

 Menggunakan perhitungan standar deviasi Microsoft Excel

Berdasarkan perhitungan pada Microsoft Excel didapatkan nilai standar deviasi proses
diatas sebesar
𝑁 𝑥 −𝜇 2
 Menggunakan rumus 𝜎 = 𝑖=1 𝑖 0
𝑁

1 5
TI 3201 – Pengendalian dan Penjaminan Mutu Nadia Fadhilah Riza (13406069)
Tugas 7 Prilla Sista Lily Jane (13406080)

i xi xi - μ0 (xi - μ0)^2
1 1045 -5 25
2 1055 5 25
3 1037 -13 169
4 1064 14 196
5 1095 45 2025
6 1008 -42 1764
7 1050 0 0
8 1087 37 1369
9 1125 75 5625
10 1146 96 9216
11 1139 89 7921
12 1169 119 14161
13 1151 101 10201
14 1128 78 6084
15 1238 188 35344
16 1125 75 5625
17 1163 113 12769
18 1188 138 19044
19 1146 96 9216
20 1167 117 13689
σ 87.88

Berdasarkan kedua perhitungan diatas didapatkan nilai standar deviasi proses yang lebih besar
daripada nilai standar deviasi proses yang ditetapkan soal, sebesar 25. Karena terdapat perbedaan
nilai standar deviasi yang sangat besar,maka diperkirakan nilai standar deviasi yang ditetapkan oleh
soal tidak menggambarkan penyimpangan yang sebenarnya terjadi pada proses.

EXERCISE 8-2
Rework exercise 8-1 using a standardized cusum.
μ0 1050 i xi yi Ci+ N+ Ci- N-
σ 25 1 1045 -0.2 0 0 0 0
k 0.5 2 1055 0.2 0 0 0 0
h 5 3 1037 -0.52 0 0 0.02 1
4 1064 0.56 0.06 1 0 0
5 1095 1.8 1.36 2 0 0
6 1008 -1.68 0 0 1.18 1
7 1050 0 0 0 0.68 2
8 1087 1.48 0.98 1 0 0
9 1125 3 3.48 2 0 0
10 1146 3.84 6.82 3 0 0
11 1139 3.56 9.88 4 0 0
12 1169 4.76 14.14 5 0 0
13 1151 4.04 17.68 6 0 0
14 1128 3.12 20.3 7 0 0
15 1238 7.52 27.32 8 0 0
16 1125 3 29.82 9 0 0
17 1163 4.52 33.84 10 0 0
18 1188 5.52 38.86 11 0 0
19 1146 3.84 42.2 12 0 0
20 1167 4.68 46.38 13 0 0

2 5
TI 3201 – Pengendalian dan Penjaminan Mutu Nadia Fadhilah Riza (13406069)
Tugas 7 Prilla Sista Lily Jane (13406080)

Karena periode pertama dimana (Ci+)>(h=5) adalah pada periode ke-10, maka
dapat disimpulkan bahwa proses out of control saat periode tersebut.
Karena saat periode ke-10, N+ = 3, maka shift pertama kali terjadi setelah
periode ke 10-3=7, yaitu pada periode 8

EXERCISE 8-15
Rework exercise 8-1 using an EMWA control chart with λ = 0.1 and L = 2.7. Compare your results to those
obtained with cusum.
μ0 1050 i xi zi UCL CL LCL
σ 25 1 1045 1049.5 1056.75 1050 1043.25
λ 0.1 2 1055 1050.05 1059.08 1050 1040.92
L 2.7 3 1037 1048.75 1060.6 1050 1039.4
z0 1050 4 1064 1050.27 1061.69 1050 1038.31
5 1095 1054.74 1062.5 1050 1037.5
6 1008 1050.07 1063.12 1050 1036.88
7 1050 1050.06 1063.6 1050 1036.4
8 1087 1053.76 1063.98 1050 1036.02
9 1125 1060.88 1064.28 1050 1035.72
10 1146 1069.39 1064.51 1050 1035.49
11 1139 1076.35 1064.7 1050 1035.3
12 1169 1085.62 1064.86 1050 1035.14
13 1151 1092.16 1064.98 1050 1035.02
14 1128 1095.74 1065.07 1050 1034.93
15 1238 1109.97 1065.15 1050 1034.85
16 1125 1111.47 1065.22 1050 1034.78
17 1163 1116.62 1065.27 1050 1034.73
18 1188 1123.76 1065.31 1050 1034.69
19 1146 1125.98 1065.34 1050 1034.66
20 1167 1130.09 1065.37 1050 1034.63

3 5
TI 3201 – Pengendalian dan Penjaminan Mutu Nadia Fadhilah Riza (13406069)
Tugas 7 Prilla Sista Lily Jane (13406080)

Dari EWMA control chart dapat dilihat bahwa proses out of control sejak
observasi ke-8. Hal tersebut memperlihatkan kesimpulan yang sama
dengan yang didapatkan dengan menggunakan tabular cusum pada 8-1.

EXERCISE 8-16
Consider a process with 𝝁𝟎 = 𝟏𝟎 and 𝝈 = 𝟏. Discuss the effect of Λ on the behavior of the control limits by
set up the following EWMA control charts:

a). Λ = 0.1, L = 3

μ0 10 i UCL CL LCL
σ 1 1 10.3 10 9.7
2 10.403609 10 9.5963913
λ 0.1 3 10.471115 10 9.5288854
L 3 4 10.519402 10 9.4805978
5 10.555446 10 9.4445536
n

b). Λ = 0.2, L = 3
μ0 10 i UCL CL LCL
σ 1 1 10.6 10 9.4
2 10.768375 10 9.2316251
λ 0 3 10.858985 10 9.1410146
L 3 4 10.912265 10 9.0877348
5 10.944789 10 9.0552112
n

4 5
TI 3201 – Pengendalian dan Penjaminan Mutu Nadia Fadhilah Riza (13406069)
Tugas 7 Prilla Sista Lily Jane (13406080)

c). Λ = 0.4, L = 3
μ0 10 i UCL CL LCL
σ 1 1 11.2 10 8.8
2 11.399428 10 8.6005715
λ 0 3 11.46459 10 8.53541
L 3 4 11.48735 10 8.5126505
5 11.495458 10 8.5045418
n

Dapat diliat dari poin a, b, dan c dengan nilai λ yang berbeda-beda bahwa
semakin besar nilai λ, semakin besar rentang control chart. Maka untuk
mendeteksi perubahan (shift) yang lebih kecil, gunakan nilai λ yang lebih kecil.

5 5

Anda mungkin juga menyukai