Anda di halaman 1dari 2

PT PLN (PERSERO)

Unit Induk Pembangunan Jaringan Sumatera I


Unit Pelaksana Konstruksi Jaringan Sumatera Regional II
Jl. Jendral No. 45 Kel. Labuh Baru Kec. Payung Sekaki Pekanbaru.

LAPORAN HARIAN
KONTRAK NO.
TANGGAL
PEKERJAAN
TANGGAL LAPORAN
CUACA
LOKASI

: 026/PJ2011/133/INKITRING SUAR/2011
: 22 Desember 2011
: PEMBANGUNAN JARINGAN TRANSMISI 150 kV DUMAI - KI DUMAI
28,9 KMR, 2CCT, ACSR SX240 MM2
: ......................................
Waktu : ............. s/d ..............
: PAGI :
.............
Siang : .............
Sore :
:

...........

1. KEGIATAN :
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
2. BAHAN MATERIAL YANG DIDATANGKAN :
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
3. KENDALA/MASALAH YANG TIMBUL :
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
________________________________________________________________________________________________
4. PENGARAHAN/PETUNJUK DIREKSI :
________________________________________________________________________________________________
________________________________________________________________________________________________
5. PERALATAN YANG DIGUNAKAN :
A. Peralatan
B. Kendaraan
a. Theodolit
:
set
a. Pick Up
:
b. Rig Bore - Pile
:
set
b. Jeep
:
c. Mesin Molen
:
set
c. Colt Diesel
:
d. Mesin Pompa
:
set
d. Sepeda Motor
:
e. Vibrator
:
set
f. Cetakan Kubus
:
set
g. Chain Block
:
set
C. Tenaga Kerja Tak Langsung
- Pekerja Transport Material Pondasi
6. TENAGA KERJA
- Mandor Kepala
:
A. Direksi Pengawas
- Pekerja
:
- Pengawas PLN
:
Org
- Pencatat Material
:
B. Tenaga Kerja Tak Langsung
- Site Manager
- Pelaksana
- Administrasi
- Logistik
- Drafter
- Surveyor
- Driver
- Helper

:
:
:
:
:
:
:
:

Diperiksa dan Disetujui


PT PLN (Persero)
UIP RING SUM 1
UPK RING SUM REG 2

Kiki K.
S. Azis
Pengawas

Org
Org
Org
Org
Org
Org
Org
Org

- Pekerja Boring/Pondasi
- Operator
- Tenaga Bantu Rig Bor
- Tukang Besi
- Tukang Kayu
- Tukang Batu
- Pekerja

:
:
:
:
:
:

Dibuat Oleh
PT SANGKAN JAYA (Tbk)

Pengawas

_____________
_____________
_____________

_____________
_____________
_____________
_____________

_____________
_____________
_____________
_____________
_____________
_____________

_____________
_____________

AN JAYA (Tbk)

Unit
Unit
Unit
Unit

Org
Org
Org

Org
Org
Org
Org
Org
Org

Anda mungkin juga menyukai