LOKASI : PT.

WBI
No. DIMENSI UNIT VOLUME SATUAN
PONDASI TANK 3.000 MT
1 Concrete Foundation 111.81 M3 268.34 Ton
2 Aspal bitument 215.71 M2 22.65 Ton
3 Sand compacted 135.74 M3 217.19 Ton
4 Steel structure tank 124.57 Ton
5 Isi Tank 3,000.00 MT 2,373.90 Ton
Total Beban Pondasi Tank 3.000 T 3,006.65 Ton
Daya dukung tiang pancang 55 Ttk 54.67 Ton/ttk
1 POINT OF PILING 60 TON
PERHITUNGAN BEBAN PONDASI TANK 3.000 MT
BEBAN PONDASI
REBAR FOUNDATION
REBAR WORK ( Dia. 16 MM ) PLATE FOUNDATION
No. R Jarak Panjang Tekuk Kait Total Sambungan
mtr mtr mtr mtr mtr mtr
1 8.31 - 16.62 0.80 0.30 34.34 2.50
2 8.31 0.20 16.62 0.80 0.30 34.33 2.50
3 8.31 0.40 16.60 0.80 0.30 34.30 2.49
4 8.31 0.60 16.58 0.80 0.30 34.25 2.49
5 8.31 0.80 16.54 0.80 0.30 34.19 2.49
6 8.31 1.00 16.50 0.80 0.30 34.10 2.48
7 8.31 1.20 16.45 0.80 0.30 33.99 2.47
8 8.31 1.40 16.38 0.80 0.30 33.86 2.46
9 8.31 1.60 16.31 0.80 0.30 33.72 2.45
10 8.31 1.80 16.23 0.80 0.30 33.55 2.44
11 8.31 2.00 16.13 0.80 0.30 33.36 2.43
12 8.31 2.20 16.03 0.80 0.30 33.15 2.41
13 8.31 2.40 15.91 0.80 0.30 32.92 2.39
14 8.31 2.60 15.79 0.80 0.30 32.67 2.38
15 8.31 2.80 15.65 0.80 0.30 32.40 2.36
16 8.31 3.00 15.50 0.80 0.30 32.10 2.33
17 8.31 3.20 15.34 0.80 0.30 31.78 2.31
18 8.31 3.40 15.17 0.80 0.30 31.43 2.29
19 8.31 3.60 14.98 0.80 0.30 31.06 2.26
20 8.31 3.80 14.78 0.80 0.30 30.66 2.23
21 8.31 4.00 14.57 0.80 0.30 30.24 2.20
22 8.31 4.20 14.34 0.80 0.30 29.78 2.17
23 8.31 4.40 14.10 0.80 0.30 29.30 2.13
24 8.31 4.60 13.84 0.80 0.30 28.78 2.09
25 8.31 4.80 13.57 0.80 0.30 28.23 2.05
26 8.31 5.00 13.27 0.80 0.30 27.65 2.01
27 8.31 5.20 12.96 0.80 0.30 27.03 1.97
28 8.31 5.40 12.63 0.80 0.30 26.37 1.92
29 8.31 5.60 12.28 0.80 0.30 25.66 1.87
30 8.31 5.80 11.90 0.80 0.30 24.90 1.81
31 8.31 6.00 11.50 0.80 0.30 24.10 1.75
32 8.31 6.20 11.07 0.80 0.30 23.23 1.69
33 8.31 6.40 10.60 0.80 0.30 22.30 1.62
34 8.31 6.60 10.10 0.80 0.30 21.30 1.55
35 8.31 6.80 9.55 0.80 0.30 20.21 1.47
36 8.31 7.00 8.96 0.80 0.30 19.01 1.38
37 8.31 7.20 8.30 0.80 0.30 17.70 1.29
38 8.31 7.40 7.56 0.80 0.30 16.22 1.18
39 8.31 7.60 6.72 0.80 0.30 14.54 1.06
40 8.31 7.80 5.73 0.80 0.30 12.57 0.91
41 8.31 8.00 4.50 0.80 0.30 10.09 0.73
42 8.31 8.20 2.70 0.80 0.30 6.49 0.47
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
REBAR WORK ( Dia. 16 MM ) OUTSIDE RING BEAM
No. Vertikal 1 Vertikal 1 Panjang Tekuk Kait Total Sambungan
mtr mtr mtr mtr mtr mtr mtr
1 1.025 0.935 1.96 1.20 0.30 3.46
2 52.19 30.00 821.87 59.77
REBAR WORK ( Dia. 16 MM ) INSIDE RING BEAM
No. Vertikal 1 Vertikal 1 Panjang Tekuk Kait Total Sambungan
mtr mtr mtr mtr mtr mtr mtr
1 0.802 0.802 1.60 0.79 0.30 2.70
2 5.65 30.00 285.22 20.74
REBAR WORK ( Dia. 16 & 10 MM ) CASING FOR PIPE DRAIN
No. Utama dia. 16 Sengkang dia. 10 Jumlah Panjang Kait Total Sambungan
mtr mtr btg mtr mtr mtr mtr
1 7.36 6.000 44.16 1.20 45.36
2 1.10 47.33 52.07 9.47 61.53
Jumlah Total P
mtr mtr
1.00 73.67
2.00 147.31
2.00 147.18
2.00 146.98
2.00 146.69
2.00 146.31
2.00 145.85
2.00 145.31
2.00 144.68
2.00 143.96
2.00 143.16
2.00 142.26
2.00 141.27
2.00 140.19
2.00 139.01
2.00 137.73
2.00 136.35
2.00 134.87
2.00 133.27
2.00 131.56
2.00 129.74
2.00 127.79
2.00 125.72
2.00 123.50
2.00 121.15
2.00 118.64
2.00 115.97
2.00 113.13
2.00 110.10
2.00 106.86
2.00 103.40
2.00 99.69
2.00 95.70
2.00 91.39
2.00 86.70
2.00 81.59
2.00 75.94
2.00 69.62
2.00 62.41
2.00 53.92
2.00 43.31
2.00 27.85
Total M' 4,851.74 M'
Total Kg 7,656.05 Kg
Jumlah Total P
mtr mtr
350.00 1,212.40
881.64 881.64
Total M' 2,094.04 M'
Total Kg 3,304.40 Kg
Jumlah Total P
mtr mtr
40.00 107.92
305.96 305.96
Total M' 413.88 M'
Total Kg 653.10 Kg
Total P Berat
mtr kg
45.36 71.58
61.53 37.97
Total Kg 109.54 Kg
WILMAR
MATERIAL UPAH MATERIAL UPAH
METHANOL TANK FOUNDATION 3.000 MT 1.00 unit
I PILING WORK
1 Spun pile 400 1,980.00 m' 200,000.00 Rp 75,000.00 Rp 396,000,000.00 Rp 148,500,000.00 Rp
2 Cut of top spun pile 400 55.00 nos 45,000.00 Rp - Rp 2,475,000.00 Rp
396,000,000.00 Rp 150,975,000.00 Rp
II CONCRETE
A Fill into Top Spunpile
1 Concretting K300 2.70 m3 850,000.00 Rp 75,000.00 Rp 2,293,671.88 Rp 202,382.81 Rp
2 Reinforcing U32 deformed bar dia. 10 mm 144.79 kg 10,500.00 Rp 1,800.00 Rp 1,520,288.00 Rp 260,620.80 Rp
3 Reinforcing U32 deformed bar dia.19 mm 1,322.24 kg 10,500.00 Rp 1,800.00 Rp 13,883,562.00 Rp 2,380,039.20 Rp
B Foundation Slab
1 Soil Excavation 121.13 m3 35,000.00 Rp - Rp 4,239,650.08 Rp
2 Refill with soil 18.17 m3 25,000.00 Rp - Rp 454,248.22 Rp
3 Disposal soil 102.96 m3 20,000.00 Rp - Rp 2,059,258.61 Rp
4 Soil Caompaction 220.24 m2 7,500.00 Rp - Rp 1,651,811.72 Rp
5 Sand fill 10cm thk 22.02 m3 125,000.00 Rp 35,000.00 Rp 2,753,019.53 Rp 770,845.47 Rp
6 Lean concrete 1:3:5 (5 cm thk) 11.01 m3 620,000.00 Rp 45,000.00 Rp 6,827,488.44 Rp 495,543.52 Rp
7 Formwork plywood 118.87 m2 65,000.00 Rp 25,000.00 Rp 7,726,284.28 Rp 2,971,647.80 Rp
8 Concretting K300 109.11 m3 850,000.00 Rp 75,000.00 Rp 92,741,863.05 Rp 8,183,105.56 Rp
9 Reinforcing U32 deformed bar 11,723.09 kg 10,500.00 Rp 1,800.00 Rp 123,092,469.22 Rp 21,101,566.15 Rp
C Other Work
1 Sand fill compacted 135.74 m3 187,500.00 Rp 35,000.00 Rp 25,452,056.96 Rp 4,751,050.63 Rp
2 Asphalt pavement t=5 cm 215.71 m2 150,000.00 Rp 25,000.00 Rp 32,355,863.10 Rp 5,392,643.85 Rp
3 Pipa PVC 2" + ijuk 17.40 m' 25,000.00 Rp 10,000.00 Rp 434,890.00 Rp 173,956.00 Rp
4 Pipa PVC 6" 8.00 m' 100,000.00 Rp 20,000.00 Rp 800,000.00 Rp 160,000.00 Rp
5 Finishing cement 102.45 m2 25,000.00 Rp 7,500.00 Rp 2,561,298.00 Rp 768,389.40 Rp
312,442,754.46 Rp 56,016,759.83 Rp
708,442,754.46 Rp 206,991,759.83 Rp
915,434,514.29 Rp
Dihitung oleh : Diketahui oleh : Disetujui oleh :
Boy Hidayat Teguh D H Tanmin
RENCANA ANGGARAN BIAYA
METHANOL TANK FOUNDATION 3.000 MT - PT. WBI
SUB TOTAL
HARGA SATUAN
VOLUME SATUAN U R A I A N NO
TOTAL
TOTAL MATERIAL & UPAH
RENCANA ANGGARAN BIAYA
MATRIAL UPAH MATRIAL UPAH
STEEL STRUCTURE WORK
1 Bottom Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20', Annular Plate 7,875.90 kg 10,300.00 3,500.00 81,121,770.00 27,565,650.00
b. Plate m/s 8 mm thk, 5' x 20' 13,301.90 kg 10,300.00 3,500.00 137,009,570.00 46,556,650.00
c. Flat bar 3 mm thk, 50 mm width 11.41 kg 10,300.00 3,500.00 117,480.56 39,920.58
2 Shell Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20' (shell # 1 & # 2) 19,600.00 kg 10,300.00 5,500.00 201,880,000.00 107,800,000.00
b. Plate m/s 8 mm thk, 5' x 20' (shell # 3 & # 4) 16,800.00 kg 10,300.00 5,500.00 173,040,000.00 92,400,000.00
c. Plate m/s 6 mm thk, 5' x 20' (shell # 5, # 6 & # 7) 21,002.40 kg 10,300.00 5,500.00 216,324,720.00 115,513,200.00
d. Plate m/s 4.5 mm thk, 5' x 20' (shell # 8,# 9,# 10, # 11) 22,403.20 kg 10,300.00 5,500.00 230,752,960.00 123,217,600.00
f. UNP 120 x 55 x 6 x 6000mm (Ring top) 675.00 kg 11,650.00 5,500.00 7,863,750.00 3,712,500.00
g. Besi siku 80 x 80 x 8 mm (Bottom Ring) 521.64 kg 11,650.00 5,500.00 6,077,106.00 2,869,020.00
3 Truss
Main Rafter & Crown Ring
a. Main rafter UNP 200x80x7.5 2,583.00 kg 11,650.00 3,500.00 30,091,950.00 9,040,500.00
b. Rafter UNP 75x40x5 816.70 kg 11,650.00 3,500.00 9,514,536.36 2,858,444.40
b. Plate m/s 8 mm thk,6' x 20' (Stiffener & Cleat Plate truss) 160.69 kg 10,300.00 3,500.00 1,655,076.84 562,404.75
c. Plate m/s 10 mm thk, 4' x 8' (Gusset) 248.31 kg 10,300.00 3,500.00 2,557,639.35 869,100.75
d. Plate m/s 10 mm thk, 6' x 20' (Gusset & Crown ring) 175.73 kg 10,300.00 5,500.00 1,810,008.08 966,509.17
e. Flange 1020 OD x 900 ID, plate 12 mm thk. 154.52 kg 10,300.00 5,500.00 1,591,512.28 849,836.65
Purlin
a. Purlin No.1 UNP 75x40x5 258.38 kg 11,650.00 3,500.00 3,010,114.88 904,326.36
b. Purlin No.2 UNP 75x40x5 139.89 kg 11,650.00 3,500.00 1,629,773.49 489,631.52
c. Purlin No.3 UNP 75x40x5 36.52 kg 11,650.00 3,500.00 425,501.80 127,833.16
4 Roof plate
a. Plate m/s 4.5 mm thk, 5' x 20' 11,026.40 kg 10,300.00 3,500.00 113,571,920.00 38,592,400.00
b. Flat bar 3 mm thk, 50 mm width 11.41 kg 10,300.00 3,500.00 117,480.56 39,920.58
c. Vent. Pipe dia. 6" Sch.40 22.50 kg 15,000.00 3,500.00 337,500.00 78,750.00
d. Elbow Sch. 40 dia. 6" 2.00 nos 610,000.00 70,000.00 1,220,000.00 140,000.00
5 Shell Manhole 24" (M1)
a. Plate Mild Steel 1255 x 1255 x 14 mm 173.10 kg 10,300.00 5,500.00 1,782,881.05 952,023.86
b. Plate Mild Steel 190 x 1936 x 12 mm 34.65 kg 10,300.00 5,500.00 356,900.44 190,577.90
c. Plate Mild Steel 820 x 820 x 12 mm 63.34 kg 10,300.00 3,500.00 652,402.82 221,690.28
d. Flange ANSI 150 lbs dia. 24" (820 OD x 626 ID) 1.00 set 1,100,000.00 150,000.00 1,100,000.00 150,000.00
e. Bolt & Nut m/s M22 x 2 1/2" 20.00 set 18,500.00 1,000.00 370,000.00 20,000.00
f. Support ( engsel ) u/ penutup Man Hole 1.00 set 120,000.00 50,000.00 120,000.00 50,000.00
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 220,000.00 25,000.00 220,000.00 25,000.00
h. Handle RB dia. 16 x 450 1.42 kg 11,500.00 5,500.00 16,332.30 7,811.10
6 Roof Manhole 20" (M2)
a. Plate Mild Steel 1050 x 1050 x 6 mm 51.93 kg 10,300.00 3,500.00 534,855.83 181,747.13
b. Plate Mild Steel 200 x 1596 x 6 mm 15.03 kg 10,300.00 5,500.00 154,853.50 82,688.76
c. Flange ANSI 150 lbs dia. 20" (650 OD) 1.00 set 950,000.00 135,000.00 950,000.00 135,000.00
d. Bolt & Nut m/s M20 x 2 1/2" 16.00 set 17,000.00 1,000.00 272,000.00 16,000.00
e. Handle RB dia. 16 x 450 1.42 kg 11,500.00 5,500.00 16,332.30 7,811.10
f. Support ( engsel ) u/ penutup Man Hole 1.00 set 120,000.00 50,000.00 120,000.00 50,000.00
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 220,000.00 25,000.00 220,000.00 25,000.00
7 Shell Inlet Nozzle 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Pad Plate & Cleat Plate 12.83 kg 10,300.00 3,500.00 132,197.93 44,921.63
b. Pipe NPS 12" Sch.40 dia. 6" 498.60 kg 15,000.00 3,500.00 7,479,000.00 1,745,100.00
c. Flange ANSI 150 lbs dia. 6" 1.00 set 610,000.00 60,000.00 610,000.00 60,000.00
d. Bolt & Nut m/s M19 x 2 1/2" 8.00 set 16,000.00 1,000.00 128,000.00 8,000.00
e. Elbow NPS 6" Sch.40 3.00 set 610,000.00 70,000.00 1,830,000.00 210,000.00
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 220,000.00 25,000.00 220,000.00 25,000.00
g. Besi siku 50 x 50 x 5 mm 5.67 kg 10,300.00 3,500.00 58,401.00 19,845.00
h. U bolts 6 mm & nuts dia. 6" 5.00 set 12,000.00 1,000.00 60,000.00 5,000.00
8 Shell Outlet Nozzle 8" (N2)
a. Plate Mild Steel 585 x 585 x 6 mm 16.12 kg 10,300.00 3,500.00 166,023.61 56,415.79
b. Pipe NPS 8" Sch.40 374.69 kg 15,000.00 3,500.00 5,620,350.00 1,311,415.00
c. Elbow NPS 8" Sch.40 1.00 set 700,000.00 70,000.00 700,000.00 70,000.00
d. Flange ANSI 150 lbs dia. 8" 1.00 set 700,000.00 60,000.00 700,000.00 60,000.00
e. Bolt & Nut m/s M19 x 2 1/2" 10.00 set 16,000.00 1,000.00 160,000.00 10,000.00
f. Besi siku 50 x 50 x 5 mm 34.97 kg 11,650.00 3,500.00 407,342.25 122,377.50
g. U bolts 6 mm & nuts (dia. 8") 5.00 set 15,000.00 1,250.00 75,000.00 6,250.00
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 220,000.00 25,000.00 220,000.00 25,000.00
9 Drain Pipe 4"
a. Pipe NPS 4" Sch.40 dia. 4" 128.00 kg 15,000.00 3,500.00 1,920,000.00 448,000.00
b. Flange ANSI 150 lbs dia. 4" 2.00 set 500,000.00 36,000.00 1,000,000.00 72,000.00
c. Bolt & Nut m/s M19 x 2 1/2" 6.00 set 16,000.00 1,000.00 96,000.00 6,000.00
10 Steam Coil Nozzle 2"
a. SS 304 SUS Sch.10 Seamless Pipe dia. 2" 437.48 m' 109,791.15 25,000.00 48,031,432.30 10,937,000.00
b. SS Pipa Bend 400 mm c/c SUS 304 Sch 10 dia 2 " 34.80 m' 109,791.15 25,000.00 3,820,732.02 870,000.00
c. Flange ANSI 150 lbs dia. 2" 5.00 pcs 250,000.00 30,000.00 1,250,000.00 150,000.00
d. Bolt & Nut m/s M13 x 2 " 30.00 set 14,000.00 1,000.00 420,000.00 30,000.00
SUB TOTAL HARGA (Rp)
DESCRITION
PROJECT : PT. WBI
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
NO VOL SAT
HARGA SATUAN (Rp)
RENCANA ANGGARAN BIAYA
MATRIAL UPAH MATRIAL UPAH
SUB TOTAL HARGA (Rp)
DESCRITION
PROJECT : PT. WBI
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
NO VOL SAT
HARGA SATUAN (Rp)
e. Besi siku 50 x 50 x 5 mm 531.45 kg 11,650.00 3,500.00 6,191,426.05 1,860,085.08
f. U bolts M10 & nuts dia. 2" 272.00 pcs 11,000.00 1,000.00 2,992,000.00 272,000.00
11 Shell Over Flow Drain 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Cleat Plate 12.72 kg 10,300.00 3,500.00 130,985.10 44,509.50
b. Pipe NPS 12" Sch.40 dia. 6" 387.80 kg 15,000.00 3,500.00 5,817,000.00 1,357,300.00
c. Flange ANSI 150 lbs dia. 6" 1.00 set 610,000.00 60,000.00 610,000.00 60,000.00
d. Bolt & Nut m/s M22 x 2 1/2" 8.00 set 18,500.00 1,000.00 148,000.00 8,000.00
e. Elbow NPS 6" Sch.40 2.00 set 610,000.00 70,000.00 1,220,000.00 140,000.00
f. Besi siku 50 x 50 x 5 mm 7.56 kg 11,650.00 3,500.00 88,074.00 26,460.00
g. U bolts 6 mm & nuts dia. 6" 4.00 set 12,000.00 1,000.00 48,000.00 4,000.00
12 Handrail at roof
a. Pipa SGP dia. 1 1/2" (middle rail & post) 558.48 kg 15,000.00 5,500.00 8,377,200.00 3,071,640.00
b. Pipa SGP dia. 1 1/2" (top rail) 193.32 kg 15,000.00 5,500.00 2,899,800.00 1,063,260.00
c. Flat Bar Mild Steel 75 mm x 6 mm x 6 m 402.42 kg 10,850.00 3,500.00 4,366,257.00 1,408,470.00
RENCANA ANGGARAN BIAYA
MATRIAL UPAH MATRIAL UPAH
SUB TOTAL HARGA (Rp)
DESCRITION
PROJECT : PT. WBI
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
NO VOL SAT
HARGA SATUAN (Rp)
13 Staircase c/w Handrail & Terminal
a. Expanded Metal Type 50080 uk 1200x2400 (300 x 700 x 6 mm) 286.99 kg 10,850.00 3,500.00 3,113,829.93 1,004,461.27
b. Plate Mild Steel 150 x 700 x 4.5 mm 329.31 kg 10,850.00 3,500.00 3,573,064.39 1,152,601.41
c. Pipa SGP dia. 1 1/2" (middle rail & post) 145.63 kg 15,000.00 3,500.00 2,184,516.00 509,720.40
d. Pipa SGP dia. 1 1/2" (top rail) 69.81 kg 15,000.00 3,500.00 1,047,150.00 244,335.00
e. Flat Bar 25x4.5x6000 mm 154.38 kg 10,850.00 3,500.00 1,675,043.83 540,336.72
14 Internal Ladder
a. Round Bar dia. 19 x 600mm 74.93 kg 11,500.00 3,500.00 861,672.00 262,248.00
15 Pemasangan pipa untuk level switch
a. Pipa Sch 40 dia. 2" 91.20 kg 15,000.00 4,600.00 1,367,942.40 419,502.34
b. Flange ANSI 150 lbs dia. 2" 1.00 pcs 96,000.00 50,000.00 96,000.00 50,000.00
16 Level Indicator c/w float
a. Besi siku 50 x 50 x 5 x 6 m 691.29 kg 11,650.00 3,500.00 8,053,486.56 2,419,502.40
b. Float m/s plate 1 mm thk 1.00 pcs 350,000.00 150,000.00 350,000.00 150,000.00
c. Roller 2.00 pcs 50,000.00 25,000.00 100,000.00 50,000.00
d. Wire rope s/s dia. 3 mm 36.00 m 3,000.00 3,500.00 108,000.00 126,000.00
e. Wire rope s/s dia. 6 mm 36.00 m 8,000.00 3,500.00 288,000.00 126,000.00
f. Wire rope clip dia. 3 mm 4.00 pcs 3,000.00 2,500.00 12,000.00 10,000.00
g. Wire rope clip dia. 6 mm 8.00 pcs 5,000.00 2,500.00 40,000.00 20,000.00
1,359,470,854.81 610,002,305.09
FINISHING WORK
1 Sandblasting & Painting 3 times (Inner Shell) 1,314.64 m2 80,000.00 15,000.00 105,170,840.47 19,719,532.59
2 Sandblasting & Painting 3 times (Outer Shell) 1,156.95 m2 80,000.00 15,000.00 92,555,672.93 17,354,188.68
3 Water Test 3,000.00 m3 4,000.00 12,000,000.00 -
4 Calibration 1.00 nos 10,000,000.00 - 10,000,000.00
5 Piping connected to existing system 1.00 lot 150,000,000.00 15,000,000.00 150,000,000.00 15,000,000.00
6 Splinker System 1.00 lot 15,000,000.00 2,000,000.00 15,000,000.00 2,000,000.00
Sub Total Finishing Work 374,726,513.41 64,073,721.26
GRAND TOTAL
Dihitung oleh : Diketahui oleh : Disetujui oleh :
Boy Hidayat Teguh D H Tanmin
2,408,273,394.57
Sub Total 1 s/d 16
RENCANA KEBUTUHAN MATERIAL
STEEL STRUCTURE WORK
1 Bottom Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20', Annular Plate 7,875.90 kg 9.00 sht
b. Plate m/s 8 mm thk, 5' x 20' 13,301.90 kg 19.00 sht
c. Flat bar 3 mm thk, 50 mm width 11.41 kg 2.00 sht
21,189.21
2 Shell Plate (ASTM A283 Grade C)
a. Plate m/s 10 mm thk, 5' x 20' (shell # 1 & # 2) 19,600.00 kg 16.00 sht
b. Plate m/s 8 mm thk, 5' x 20' (shell # 3 & # 4) 16,800.00 kg 16.00 sht
c. Plate m/s 6 mm thk, 5' x 20' (shell # 5, # 6 & # 7) 21,002.40 kg 24.00 sht
d. Plate m/s 4.5 mm thk, 5' x 20' (shell # 8,# 9,# 10, # 11) 22,403.20 kg 32.00 sht
f. UNP 120 x 55 x 6 x 6000mm (Ring top) 675.00 kg 9.00 btg
g. Besi siku 80 x 80 x 8 mm (Ring bottom) 521.64 kg 9.00 btg
81,002.24
3 Truss
Main Rafter & Crown Ring
a. Main rafter UNP 200x80x7.5 2,583.00 kg 18.00 btg
b. Rafter UNP 75x40x5 816.70 kg 20.00 btg
b. Plate m/s 8 mm thk,6' x 20' (Stiffener & Cleat Plate truss) 160.69 kg 1.00 sht
c. Plate m/s 10 mm thk, 4' x 8' (Gusset) 248.31 kg 1.00 sht
d. Plate m/s 10 mm thk, 6' x 20' (Gusset & Crown ring) 175.73 kg - sht
e. Flange 1020 OD x 900 ID, plate 12 mm thk 5' x 20'. 154.52 kg 1.00 sht
Purlin
a. Purlin No.1 UNP 75x40x5 258.38 kg 7.00 btg
b. Purlin No.2 UNP 75x40x5 139.89 kg 4.00 btg
c. Purlin No.3 UNP 75x40x5 36.52 kg 1.00 btg
4,573.74
4 Roof plate
a. Plate m/s 4.5 mm thk, 5' x 20' 11,026.40 kg 28.00 sht
b. Flat bar 3 mm thk, 50 mm width 11.41 kg 2.00 sht
c. Vent. Pipe dia. 6" Sch.40 22.50 kg
d. Elbow Sch. 40 dia. 6" 2.00 nos 2.00 nos
11,037.81
5 Shell Manhole 24" (M1)
a. Plate Mild Steel 1255 x 1255 x 14 mm 173.10 kg 1.00 sht
b. Plate Mild Steel 190 x 1936 x 12 mm 34.65 kg 1.00 sht
c. Plate Mild Steel 820 x 820 x 12 mm 63.34 kg sht
d. Flange ANSI 150 lbs dia. 24" (820 OD x 626 ID) 1.00 set 1.00 set
e. Bolt & Nut m/s M20 x 2 1/2" 20.00 set 20.00 set
f. Support ( engsel ) u/ penutup Man Hole 1.00 set 1.00 set
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 1.00 lbr
h. Handle RB dia. 16 x 450 1.42 kg m'
272.51
6 Roof Manhole 20" (M2)
a. Plate Mild Steel 1050 x 1050 x 6 mm 51.93 kg 1.00 sht
b. Plate Mild Steel 200 x 1596 x 6 mm 15.03 kg sht
c. Flange ANSI 150 lbs dia. 20" (650 OD) 1.00 set 1.00 set
d. Bolt & Nut m/s M20 x 2 1/2" 16.00 set 16.00 set
e. Handle RB dia. 16 x 450 1.42 kg 1.00 btg
f. Support ( engsel ) u/ penutup Man Hole 1.00 set 1.00 set
g. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr 1.00 lbr
68.38
7 Shell Inlet Nozzle 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Pad Plate & Cleat Plate 12.83 kg - sht
b. Pipe NPS 12" Sch.40 dia. 6" 498.60 kg 3.00 btg
c. Flange ANSI 150 lbs dia. 6" 1.00 set 1.00 set
d. Bolt & Nut m/s M22 x 2 1/2" 8.00 set 8.00 set
JUMLAH UNIT
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
PROJECT : PT. WBI
DESCRITION NO VOL SAT
RENCANA KEBUTUHAN MATERIAL
JUMLAH UNIT
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
PROJECT : PT. WBI
DESCRITION NO VOL SAT
e. Elbow NPS 6" Sch.40 3.00 set 3.00 set
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr - lbr
g. Besi siku 50 x 50 x 5 mm 5.67 kg 0.25 btg
h. U bolts 6 mm & nuts dia. 6" 5.00 set 5.00 set
RENCANA KEBUTUHAN MATERIAL
JUMLAH UNIT
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
PROJECT : PT. WBI
DESCRITION NO VOL SAT
8 Shell Outlet Nozzle 8" (N2)
a. Plate Mild Steel 585 x 585 x 6 mm 16.12 kg 1.00 sht
b. Pipe NPS 8" Sch.40 374.69 kg 2.00 btg
c. Elbow NPS 8" Sch.40 1.00 set 1.00 set
d. Flange ANSI 150 lbs dia. 8" 1.00 set 1.00 set
e. Bolt & Nut m/s M22 x 2 1/2" 10.00 set 10.00 set
f. Besi siku 50 x 50 x 5 mm 34.97 kg 2.00 btg
g. U bolts 6 mm & nuts (dia. 8") 5.00 set 5.00 set
f. Gasket Tombo 1100 ukuran 1270 x 1270 x 3 mm thk 1.00 lbr - lbr
16.12
9 Drain Pipe 4"
a. Pipe NPS 4" Sch.40 dia. 4" 128.00 kg 2.00 btg
b. Flange ANSI 150 lbs dia. 4" 2.00 set 2.00 set
c. Bolt & Nut m/s M19 x 2" 6.00 set 6.00 set
10 Steam Coil Nozzle 2"
a. SS 304 SUS Sch.10 Seamless Pipe dia. 2" 437.48 m' 73.00 btg
b. SS Pipa Bend 400 mm c/c SUS 304 Sch 10 dia 2 " 34.80 m' 6.00 m'
c. Flange ANSI 150 lbs dia. 2" 5.00 set 5.00 set
d. Bolt & Nut s/s M13 x 2 " 30.00 set 30.00 set
e. Besi siku 50 x 50 x 5 mm 531.45 kg 24.00 btg
f. U bolts M6 & nuts dia. 2" 272.00 pcs 272.00 pcs
11 Shell Over Flow Drain 6"
a. Plate Mild Steel 400 x 400 x 6 mm, Cleat Plate 12.72 kg - sht
b. Pipe NPS 12" Sch.40 dia. 6" 387.80 kg 3.00 btg
c. Flange ANSI 150 lbs dia. 6" 1.00 set 1.00 set
d. Bolt & Nut m/s M22 x 2 1/2" 8.00 set 8.00 set
e. Elbow NPS 6" Sch.40 2.00 set 2.00 set
f. Besi siku 50 x 50 x 5 mm 7.56 kg 1.00 btg
g. U bolts 6 mm & nuts dia. 6" 4.00 set 4.00 set
2,961.37
12 Handrail at roof
a. Pipa SGP dia. 1 1/2" t=3.2 mm (middle rail & post) 558.48 kg 26.00 btg
b. Pipa SGP dia. 1 1/2" (top rail) 193.32 kg 9.00 btg
c. Flat Bar m/s 75 mm x 6 mm x 6 m 402.42 kg 19.00 btg
1,154.22
13 Staircase c/w Handrail & Terminal
a. Expanded Metal Type 50080 uk 1200x2400 (300 x 700 x 6 mm) 286.99 kg 8.00 sht
b. Plate m/s 150 x 700 x 4.5 mm 329.31 kg 2.00 sht
c. Pipa SGP dia. 1 1/2" (middle rail & post) 145.63 kg 7.00 btg
d. Pipa SGP dia. 1 1/2" (top rail) 69.81 kg 4.00 btg
e. Flat Bar 25x4.5x6000 mm 154.38 kg 30.00 btg
986.13
14 Internal Ladder
a. Round Bar dia. 19 x 600mm 74.93 kg 3.00 btg
15 Pemasangan pipa untuk level switch
a. Pipa Sch 40 dia. 2" 91.20 kg 3.00 btg
b. Flange ANSI 150 lbs dia. 2" 1.00 pcs 1.00 pcs
91.20
16 Level Indicator c/w float
a. Besi siku 50 x 50 x 5 x 6 m 760.42 kg 6.00 btg
b. Float m/s plate 1 mm thk 1.00 pcs 1.00 pcs
c. Roller 2.00 pcs 2.00 pcs
d. Wire rope s/s dia. 3 mm 34.00 m 34.00 m'
e. Wire rope s/s dia. 6 mm 34.00 m 34.00 m'
f. Wire rope clip dia. 3 mm 4.00 pcs 4.00 pcs
g. Wire rope clip dia. 6 mm 8.00 pcs 8.00 pcs
RENCANA KEBUTUHAN MATERIAL
JUMLAH UNIT
SUBJECT : STORAGE TANK Cap : 3.000 T, 1 Unit
PROJECT : PT. WBI
DESCRITION NO VOL SAT
760.42
17 Water Test
a. Pipe NPS 4" Sch.40 dia. 4" 482.10 kg 5.00 btg
b. Elbow NPS 4" Sch.40 4.00 pcs 4.00 pcs
18 Splinker system
a. Pipe NPS 4" Sch.40 dia. 4" 385.68 kg 4.00 btg
b. Elbow NPS 4" Sch.40 2.00 pcs 2.00 pcs
c. Flange ANSI 150 lbs dia. 4" 2.00 set 2.00 set
Total Berat Steel Structure Tank Methanol 124,573.94 kg