PROCESS,
TECHNOLOGY AND
ENVIRONMENT
2013
2013
PEOPLE, PROCESS,
TECHNOLOGY AND
ENVIRONMENT
DAFTAR ISTILAH
Glossary
B
BBLS
BCFG
BOPD
DELINEASI
EXISTING
LIFTING
MBBLS
MMBO
MMBOE
MBOPD
Juta barel minyak per hari | Million barrels of oil per day
MMBOEPD
MSCF
MMSCFD
Juta kaki kubik gas per hari | Million standard cubic feet per day
R
RJPP
RKAP
SEISMIC
SUBSURFACE
SURFACE
SURFACTANT
PEOPLE
PROCESS
TECHNOLOGY
ENVIRONMENT
275%
5.47%
155
Pencapaian
knowledge sharing
Knowledge sharing
achievement
Penghematan
pengelolaan rantai
pasokan dari nilai OE/
PR
Supply chain saving of
OE/PR value
Field telah
menerapkan SSOP
untuk meningkatkan
produksi
Fields have applied
POSS to increase
production
Kabupaten tercakup
dalam program Pusat
Pemberdayaan Masyarakat
Pertamina
Regencies covered in
Pertamina Community
Development program
6.92
Rata-rata learning
days setiap pekerja
Average learning days
per employee
3.22
Hasil survei kepuasan
pekerja
Employee satisfaction
survey result
87,594,329
Jam kerja selamat
Safe working hours
59.7
Rata-rata penilaian
sistem HSE Kontraktor
Average evaluation
score on Contractor
HSE system
100%
45%
Pemanfaatan kembali
Penghematan biaya
air terproduksi dan
beroperasi secara zero percetakan
Printing cost saving
discharge
Produced water reused
and zero discharge
operation
87.2%
Penurunan minyak
mentah yang hilang
di Tempino - Plaju
Decline in crude oil
losses at TempinoPlaju
615
Solar cell telah dipasang
Solar cells installed
392,587
Pohon yang ditanam
dan dipastikan tumbuh
dengan baik
Planted trees and grow
properly
25.7%
Pemanfaatan kembali
limbah non-B3
Reuse of Non-hazardous
waste
83%
Peningkatan realisasi
anggaran CSR di wilayah
kerja Pertamina EP
Increase in CSR budget
realization at Pertamina EPs
working areas
STANDAR PELAPORAN
REPORTING STANDARDS
RUANG LINGKUP
Laporan ini mencakup kinerja keuangan dan kinerja
keberlanjutan dalam kurun waktu 1 Januari hingga
31 Desember 2013. Informasi dalam laporan tahunan
terintegrasi ini berasal dari seluruh unit operasional dan
unit bisnis di wilayah kerja PT Pertamina EP, melalui sistem
pengendalian, khususnya Pengendalian Internal atas
Pelaporan Keuangan (ICoFR). Dengan perubahan signifikan
dalam menggunakan panduan laporan GRI 4.0, terutama
penentuan materialitas, laporan kedua ini hanya akan
menampilkan topik bahasan yang material dengan analisa
lebih dalam. [G4-28] [G4-20]
SCOPE
This report contains financial and sustainability performance
in the period January 1 to December 31, 2013. The
information in this integrated annual report is collected
from all operating and business units in the working areas
of PT Pertamina EP, through the control system, particularly
the Internal Control over Financial Reporting (ICoFR). With
significant changes in the use of the GRI 4.0 reporting
guidelines, especially materiality determination, this second
report will only display material issues with deeper analysis.
[G4-28] [G4-20]
Ruang lingkup
Laporan Tahunan
Terintegrasi
PERTAMINA EP 2013
Distributor
Inside Org.
Parent Company
Scope of PERTAMINA
EP 2013 integrated
report
PERTAMINA EP
Joint Venture
Customer
Supplier
Outside Org.
Subsidiary
LAPORAN INTEGRASI
PERTAMINA EP MERUPAKAN
INTEGRASI LAPORAN
TAHUNAN DAN LAPORAN
KEBERLANJUTAN
Pertamina EP Integrated
Report is an Integration
between Annual Report and
Sustainability Report
OPSI PELAPORAN
Dengan diterapkannya pedoman GRI 4.0, opsi aplikasi
laporan kini terbatas pada pilihan core & comprehensive.
Dengan menyadari keterbatasan dan informasi material yang
kami rumuskan, kami menyatakan laporan ini telah merujuk
pada standar GRI 4.0 pada opsi CORE yang menyajikan
informasi dari setiap aspek yang dinilai material. [G4-32]
REPORTING OPTION
With the application of the GRI 4.0 guidelines, the reporting
application now only limited to options of core & comprehensive. Aware of the limitations and material information
that we compile, we declare this report is in accordance with
GRI 4.0 standards at CORE option, which presents information of every aspect deemed as material. [G4-32]
PEOPLE, PROCESS,
TECHNOLOGY AND ENVIRONMENT
PENCAPAIAN
MENGHADAPI TANTANGAN
Achievements in facing
Challenges
Penemuan Sumber Daya Migas dan Hasil Test Terbesar di
Tahun 2013 | The largest Oil and Gas Resource Discovery and
Test Results in 2013
Pemboran Jati Asri (JAS)-1 di Jawa Barat memiliki sumber daya
migas sebesar 67 MMBOE (RR) dan merupakan sumberdaya
migas terbesar dengan hasil test sebesar 3.110 BOPD.
Jati Asri (JAS)-1 drilling in West Java has 67 MMBOE (RR) of oil
and gas resources. It is the largest oil and gas resources with test
results of 3,110 BOPD.
Penemuan Sumberdaya Gas Terbesar Tahun 2013 | Largest
Gas Resource Discovery in 2013
Sumur Azalea (AZL)-1 di Jambi memiliki sumber daya kontijen
gas sebesar 156 BCFG (RR).
Azalea well (AZL)-1 in Jambi has the gas contingent resource of
156 BCFG (RR).
Play Stratigrafi Eksplorasi Tahun 2013 | Exploration
Stratigraphic Play in 2013
Dengan terbuktinya konsep baru stratigrafi pada penemuan
tambahan cadangan terbukti dalam pemboran JAS-1 maka
peluang untuk mencari tambahan cadangan migas semakin
besar.
With the proven new concept of stratigraphic play by
discovering proven additional reserves in JAS-1 drilling, there
will be greater opportunity to find additional oil and gas
reserves.
Pengamanan Aset | Protection of Assets
Bekerjasama dengan pemangku kepentingan, Perusahaan
berhasilkan mengamankan penurunan sekitar 87,2% minyak
mentah yang hilang di Tempino - Plaju.
By cooperating with stakeholders, Company has managed to
reduce the crude oil losses at Tempino - Plaju to approximately
87.2%.
People
Process
Technology
Environmen
nt
3,219
Pekerja | Employees
Perubahan organisasi dan penetapan jabatan pekerja. Tim Talent Mangement dibentuk untuk
mengelola pengembangan pekerja yang lebih baik.
Organizational changes and employee job appointment. Management Talent Team was
established to better manage employee development.
Assets
Restrukturisasi organisasi dan pengelompokan asset yang memampukan pencapaian
Strategi Induk dalam meningkatkan produksi.
Organizational restructuring and grouping of assets enable the Grand Strategy achievement in
increasing production.
45%
Penghematan biaya percetakan melalui managed printing services, yang menjadi salah
satu pencapaian ICT Master Plan. ICT memiliki peranan besar dalam memenuhi kebutuhan
perubahan organisasi 2013.
Printing cost saving through managed printing services that becomes one of ICT Master Plan
achievements. ICT plays a big role in fulfilling the needs of organizational changes in 2013.
1,000
Pohon/Sumur | Trees/Well
Penanaman pohon untuk setiap sumur pengeobran merupakan salah satu CSR strategic
Perusahaan. Deklarasi untuk Bumi merupakan bentuk integrasi program CSR kedalam bisnis
Perusahaan
Tree planting of every drilling well is one the Companys strategic CSR programs. Declaration for
Earth is a form of CSR integration into Company business.
Proc
ess o
f Ma
teria
lity T
est
O2
Qualifying Material
Information Reviewed By
Senior Management
O3
Determining Material
Information In Adjacent To
Reporting Standards
Low
More Important
2
4
Less Important
Low
Important
O1
High
3
5
Important
High
INFORMASI LAINNYA
Laporan terintegrasi Pertamina EP tahun 2013 ini diterbitkan
dalam bahasa Indonesia dan bahasa Inggris. Informasi
tambahan dapat dilihat di website kami: www.pertamina-ep.
com. Untuk pertanyaan, silahkan mengisi lembar umpan
balik yang telah disediakan di laporan ini atau menghubungi
kami pada alamat: [G4-31]
OTHER INFORMATION
Pertamina EP 2013 integrated report is published in
Indonesian and English languages. Additional information
can be viewed on our website: (www.pertamina-ep.com).
For inquiries, please fill out the feedback sheet that has been
provided in this report or contact us at the address: [G4-31]
ECONOMIC PERFORMANCE
PEOPLE
PROCESS
TECHNOLOGY
PERTAMINA EP
KANTOR PUSAT | HEAD OFFICE [G4-31]
VP. Legal & Relations
Standard Chartered Tower
Jl. Prof. Dr. Satrio No. 164
Jakarta 12950 - Indonesia
Telp: (021) 57893199
Fax: (021) 57946279
ajiprayudi@ pertamina.com
ENVIRONMENT
DAFTAR ISI
CONTENTS
KINERJA
PERTAMINA EP
2013
Pertamina EP 2013
Performance
14 SEKILAS PERTAMINA EP
Pertamina EP at a Glance
30 VISI, MISI, DAN NILAI PERUSAHAAN
Vision, mission and corporate values
32 STRUKTUR ORGANISASI
Organizational structure
34 PEJABAT SENIOR PERUSAHAAN
Corporate senior officers
42 IKHTISAR KINERJA KEUANGAN,
OPERASIONAL, KEBERLANJUTAN
Financial, Operational and
Sustainability Performance Highlights
46 PERISTIWA PENTING 2013
Significant Events 2013
MANAJEMEN
RISIKO
Risk Management
10
LAPORAN DEWAN
KOMISARIS DAN
LAPORAN DIREKSI
Board of Commissioners
Report and Board of
Directors Report
PEOPLE, PROCESS,
TECHNOLOGY,
ENVIRONMENT
People, Process,
Technology,
Environment
ANALISIS DAN
PEMBAHASAN
MANAJEMEN
Management
discussion and
analysis
INFORMASI
LAIN
PERUSAHAAN
Our Other
Information
TATA KELOLA
PERUSAHAAN
Corporate
Governance
208 PEOPLE
People
231 PROCESS
Process
244 TECHNOLOGY
Technology
253 ENVIRONMENT
Environment
11
KINERJA 2013
2013 Performance
12
KINERJA 2013
2013 Performance
PENGELOMPOKAN MENJADI 5
ASET MERUPAKAN STRATEGI
PERUSAHAAN MENGHADAPI
TANTANGAN MASA DEPAN
Grouping into 5 Assets is the
Companys Strategy to Face Future
Challenges
13
SEKILAS PT PERTAMINA EP
PT Pertamina EP at a Glance
298.5 MBOEPD
Produksi setara minyak 2013
2013 Oil equivalent
production
EKSPLORASI
Exploration
KOMPOSISI KEPEMILIKAN SAHAM [G4-7]
Share Ownership Composition
0.01%
99.99%
PT Pertamina (Persero)
Pertamina Dana Ventura
14
EKSPLOITASI
Exploitation
Temuan cadangan
432 (2C-Inplace atau
161 MMBOE
(2C-RR)
Produksi gas
Gas production
1,031 MMSCFD
Reserve discovery of
432 (2C-Inplace) or
161 MMBOE (2C-RR)
Produksi minyak
Oil production
120.6 MBOPD
KOMERSIALITAS
Commerciality
Penjualan minyak
mentah
Crude oil sales
43,159 MBBLS
Penjualan gas
Gas sales
287,171 MMSCF
BAPEPAM-LK NO.X.K.6
Nama dan alamat Perusahaan
Name and address of the Company
Riwayat singkat Perusahaan
Brief history of the Company
BAPEPAM-LK NO.X.K.6
Kegiatan usaha
Business activities
Persentase kepemilikan pemegang saham
Percentage of shareholding
2013
2012
2011
2007
2005
Established
Pencapaian produksi
minyak sebesar
110,3 MBOPD
Oil production
achievementof
110.3 MBOPD
Pencapaian
produksi migas
sebesar
310 MBOEPD
Oil and gas
production
achievement of 310
MBOEPD
Penemuan
cadangan migas
2C recoverable 229
MMBOE
Discovery of Oil and
gas 2C recoverable
reserves 229 MMBOE
Pembentukan
organisasi baru
Establishment of new
organization
15
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
KINERJA 2013
2013 Performance
AREA OPERASI
OPERATION AREA
SUMATERA
Sumatera
JAWA
Java
KTI
KTI
JUMLAH
TOTAL
Field
11
15
23
15
25
ASSET
FIELD
Asset 1
Asset 2
Asset 3
Asset 4
Cepu, Poleng
Asset 5
16
SEJAK 28 FEBRUARI
2013, PERTAMINA
EP MELAKUKAN
RESTRUKTURISASI DAN
KINI AREA OPERASI
DIKELOMPOKKAN
MENJADI 5 ASSET.
Since February 28,
2013, Pertamina EP
conducted restructuring
and operating areas are
currently grouped into 5
Assets.
ASSET 1
ASSET 2
ASSET 3
ASSET 4
ASSET 5
JUMLAH
Total
Field
20
Proyek pengembangan
Development project
Area unitisasi Unitization area
Kemitraan Partnership
Area kemitraan TAC
SUMATERA
16
JAWA
4
KTI
6
26
17
30
17
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
KINERJA 2013
2013 Performance
18
4.
19
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
KINERJA 2013
2013 Performance
20
PROSES OPERASI
EKSPLORASI DAN
EKSPLOITASI
EXPLORATION TO POD
1-8 YEARS
STUDY
DEVELOPMENT
Build -Up
1-5 Years
DEVELOPMENT WELLS
OPERATING PROCESS
OF EXPLORATION AND
EXPLOITATION
LOITASI/PRODUCTION
PLATEAU
Facility Capacity
2-8 Years
PLATEAU
Facility Capacity
2-8 Years
UPDATED &
EVALUATE GGR
BROW N FIELD
21
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
KINERJA 2013
2013 Performance
4
5
2
3
Asset 1
AREA OPERASI
OPERATION AREA
GEOGRAFIS
Geographic
P1
FIELD
1. Field Rantau
Aceh
Sumatera Utara
3. Field Lirik
Riau
4. Field Jambi
Jambi
5. Field Ramba
P2
1
2
1
Sumatera Selatan
UNITISASI UNITIZATION
Unitisasi Tanjung Laban
Unitisasi Suban
Asset 2
Asset 3
AREA OPERASI
OPERATION AREA
GEOGRAFIS
Geographic
AREA OPERASI
OPERATION AREA
FIELD
GEOGRAFIS
Geographic
FIELD
1. Field Prabumulih
Sumatera Selatan
1. Field Subang
Jawa Barat
2. Field Pendopo
Sumatera Selatan
2. Field Jatibarang
Jawa Barat
3. Field Limau
Sumatera Selatan
3. Field Tambun
Jawa Barat
Sumatera Selatan
PROYEK PROJECT
P1. Proyek Pengembangan Gas
Paku Gajah
Sumatera Selatan
UNITISASI UNITIZATION
Unitisasi Air Serdang
22
P3
PROYEK PROJECT
P2. Proyek Pengembangan Pondok
Makmur
Jawa Barat
UNITISASI UNITIZATION
Unitisasi Sukowati
Unitisasi MB Unit
20
Fields
4
Proyek Pengembangan
Development Projects
2
5
155
P4
4
Utara : North
Timur : East
Asset 4
Barat : West
Selatan : South
Asset 5
AREA OPERASI
OPERATION AREA
GEOGRAFIS
Geographic
AREA OPERASI
OPERATION AREA
GEOGRAFIS
Geographic
FIELD
FIELD
1. Field Cepu
1. Field Sangatta
Kalimatan Timur
2. Field Poleng
Jawa Timur
2. Field Bunyu,
Kalimantan Timur
3. Field Tanjung
Kalimantan Selatan
4. Field Sangasanga
Kalimatan Timur
5. Field Tarakan
Kalimanatan Timur
PROYEK PROJECT
P3. Proyek Pengembangan
Gas Jawa
Jawa Tengah
UNITISASI UNITIZATION
Unitisasi Sukowati
Unitisasi Jambaran-Tiung Biru
6. Field Papua
Papua Barat
PROYEK PROJECT
Sulawesi Tengah
23
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
FIELD
KINERJA 2013
2013 Performance
GEOGRAFIS
Geographic
FIELD
Aceh Timur
Sumatera Utara
Sumatera Utara
Sumatera Utara
Sumatera Utara
Jambi
Jambi
Jambi
Jambi
Jambi
Jambi
Jambi
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Offshore Natuna
Jatinegara
Pabuaran
Sukatani
Haurgeulis
Jatirarangon
Kendal
Trembes - Sendang
Tawun Gegunung
Sambidoyong
Kawengan, Ledok, Ngelobo & Semanggi
Banyubang
Block Suci
Poleng
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Barat
Jawa Tengah
Cepu
Cepu
Cepu
Cepu
Cepu
Jawa Timur
Jawa Timur
FIELD
GEOGRAFIS
Geographic
SUMATERA
Langsa
Telaga Said
Diski
Perlak
Glagah Kambuna
Merua Senami
Tuba Obi Timur
Babat, Kukui
Sungai Gelam-A, B, D
Meruap
West Jambi
West Jambi II
Uno Dos - Rayu
Tanjung Lontar Timur
Tanjung Tiga Timur
Sungai Lilin
Benakat Barat
Talang Akar Pendopo
Tangai, Sukananti
Kampung Minyak
Benakat Timur
Betun Selo
Loyak Talang Gula
Sungai Tahan-Batu Keras-Suban Jeriji
Struktur Seksi P, Q22,Q51
Tanjung Miring Timur
Tanjung Lontar
Ramok Senabing
Sukaraja, Pendopo
Kruh
Kaya
Pondan, Petanan, Tapus
Udang Natuna
GEOGRAFIS
Geographic
JAWA
KTI
Klamono Selatan
Wiriagar
Sabaku, Salawati-A, D
Salawati-C, E, F, N
Linda-A, C, G, Sele
Mogoi, Waisan
Kamundan
Semberah
Bangkudulis
Sembakung
WILAYAH UNITISASI
Unitization Area
FIELD
Tanjung Laban | 74.99%
Suban | 10%
Air Serdang | 21.95% & 19.93%
MB Unit | 47.4%
Sukowati | 80%
Jambaran-Tiung Biru | 8%
Wakamuk | 50%
24
Papua
Papua
Papua
Papua
Papua
Papua
Papua
Kalimantan Timur
Kalimantan Timur
Kalimantan Timur
GEOGRAFIS
Geographic
Sumatera Selatan
Sumatera Selatan
Sumatera Selatan
Jawa Barat
Jawa Timur
Jawa Timur
Papua
BAPEPAM-LK NO.X.K.6
Penghargaan dan sertifikasi yang diterima perusahaan
Awards and certifications received by the company
OHSAS 18001:2007
ISO 14001:2004
ISO/IEC 27001:2005
Inforrmation
Security System
for Supply Chain
Management
ISO 20000-1:2011
IT Service
Management for
Data G&G Service
Nama Organisasi
Name of Organization
Ikatan Ahli Geologi Indonesia (IAGI)
Indonesian Geologists Association (IAGI)
Himpunan Ahli Geofisika Indonesia (HAGI)
Association of Indonesian Geophysicists (HAGI)
American Association of Petroleum Geologists (AAPG)
American Association of Petroleum Geologists (AAPG)
Indonesian Petroleum Association (IPA)
Indonesian Petroleum Association (IPA)
Ikatan Ahli Teknik Perminyakan Indonesia (IATMI)
Association of Indonesian Petroleum Engineers
Institut Akuntan Manajemen Indonesia (IAMI)
Indonesian Institute of Management Accountant (IAMI)
Ikatan Akuntan Indonesia (IAI)
Indonesian Institute of Accountants (IAI)
25
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
3%
KINERJA 2013
2013 Performance
Total
Total
97%
2011
Pekerja Waktu Tidak Tertentu (PWTT)*
Permanent Employee*
Total
3,286
3,379
97%
21
3,667
3,646
2012
Pekerja Waktu Tertentu
Direct Contract Employee
2013
* PWTT mencakup rekrutmen Pertamina EP dan PT Pertamina (Persero)
Permanent employees include recruitment by Pertamina EP and
PT Pertamina (Persero)
26
BAPEPAM-LK NO.X.K.6
Jumlah karyawan dan deskripsi pengembangan kompetensinya
Number of employees and description of their competency
development
702
684
540
Asset 1
Asset 2
Asset 3
161
Asset 4
Asset 5
60
Usia Age
10%
14%
Pendidikan Education
31%
7%
51%
28%
PWTT
PWTT
3,646
PWTT
3,646
22%
3,646
90%
33%
14%
Wanita
Female
Pria
Male
> 31
31 - 40
s/d SLTA
up to High School
Diploma
Associate Degree
41 - 50
> 50
Sarjana S1
Bachelors Degree
Sarjana S2 & S3
Masters & Doctoral
Degree
TOTAL
TOTAL
USIA AGE
LAKI-LAKI
MALE
PEREMPUAN
FEMALE
<30
31-50
>50
Direksi Directors
VP./GM
26
24
14
12
179
172
131
48
Total
210
200
10
146
64
27
SEKILAS PERTAMINA EP
PT Pertamina EP at a Glance
KINERJA 2013
2013 Performance
2011
2012
2013
Domestik Domestic
6,443
5,249
7,678
6.92
Rata-rata hari pelatihan
setiap pekerja
Average learning days per
employee
28
362
1,874
478
9,230
10,096
10,077
6,332
5,291
4,962
22,367
22,510
23,195
BAPEPAM-LK NO.X.K.6
Penghargaan dan sertifikasi yang diterima perusahaan
Awards and certifications received by the company
BAPEPAM-LK NO.X.K.6
Jumlah Karyawan & deskripsi pengembangan kompetensi
Number of employees and description of their competency development
NAMA PENGHARGAAN
Name of award
PEMBERI PENGHARGAAN
Awarding body
PT Pertamina (Persero)
PT Pertamina (Persero)
PT Pertamina (Persero)
Category Gold in Annual Pertamina Quality Award 2013 for Exploration and 4 Fields, as well
as Silver for 1 FIeld
PT Pertamina (Persero)
Category Diamond for Exploration & Platinum for 4 Fields in Temu Karya Mutu &
Produktivitas Nasional XVII 2013
PT Pertamina (Persero)
Category Excellence for 2 Fields international Convention on Quality Control Circles 2013
PT Pertamina (Persero)
PT Pertamina (Persero)
Best Achievement Organization: The Highest Number of CRMP Graduation, year of 2012 Lembaga Sertifikasi Profesi Manajemen
Risiko (LSPMR) | Institute of Risk Management
Professional Certification (LSPMR)
Best Achievement Organization: The Highest Passing Rate CRMP Exam, year of 2012
PTPN IX (Persero)
PT Pertamina (Persero)
CSR-PKBL AWARDS
SKK Migas
29
BAPEPAM-LK NO.X.K.6
Visi dan misi Perusahaan
Company vision and mission
BAPEPAM-LK NO.X.K.6
Pokok-pokok budaya perusahaan
Principles of Corporate culture
[G4-56]
KINERJA 2013
2013 Performance
2014
2011
PENDEKATAN ORBEX ORBEX engagement
Technical Side & Social Side
2008
2006
VISI Vision
REPETITA I (2006-2008)
Menjadi perusahaan minyak dan
gas bumi yang efektif dan efisien.
To be an effective and efficient oil
and gas company.
REPETITA II (2009-2011)
Menjadi produsen migas nomor
satu di Indonesia.
To be the number 1 oil and gas
company in Indonesia.
30
MISI Mission
Melaksanakan pengusahaan sektor
hulu minyak dan gas dengan
berwawasan lingkungan, sehat dan
mengutamakan keselamatan serta
keunggulan yang memberikan nilai
tambah bagi pemangku kepentingan.
To operate upstream oil and gas
sector that is environmentally
friendly, healthy with priority to safety
and excellence that provide added
value for stakeholders.
TATA NILAI
6C
Values
Clean (Bersih)
Dikelola secara profesional, menghindari benturan
kepentingan, tidak menoleransi suap, menjunjung tinggi
kepercayaan dan integritas. Berpedoman pada asas-asas tata
kelola korporasi yang baik.
Professionally managed, avoiding conflicts of interest, zero
tolerance to bribery, upholding trust and integrity. Guided
by the principles of good corporate governance.
Competitive (Kompetitif)
Mampu berkompetisi dalam skala regional maupun internasional, mendorong
pertumbuhan melalui investasi, membangun budaya sadar biaya dan menghargai
kinerja.
Able to compete in the regional and international scale, encouraging growth
through investment, build a cost conscious culture and appreciate performance.
Commercial (Komersial)
Capable (Berkemampuan)
Dikelola oleh pemimpin dan pekerja yang profesional dan memiliki talenta dan
penguasaan teknis tinggi, berkomitmen dalam membangun kemampuan riset dan
pengembangan.
Managed by professional leaders and workers who have talent and high technical
competencies, committed in building capacity for research and development.
31
STRUKTUR ORGANISASI
Organizational structure
KINERJA 2013
2013 Performance
President Director
ADRIANSYAH
Development Director
DODDY PRIAMBODO
SATOTO AGUSTONO
Technical Support
HERUTAMA
TRIKORANTO
Exploration
Surface Facility
Asset (s)
BENI J. IBRADI AD
LUKITANINGSIH
Exploitation
NANANG ABDUL
MANAF
JAMSATON
NABABAN
New Discovery
Project (s)
Jawa Gas Development Project
Matindok Gas Development
Project
Pondok Makmur Development
Project
Paku Gajah Development
Project
PPGJ
PPGME O R
R.PDM
PANJI SUMIRAT
Paku Gajah
Drilling
BAMBANG
WIDJANARKO
Business Parthership
ACHMAD MURSJIDI
YELLY HESNETI
ERRY KRISNANTO
ICT
LUKITO SUWARNO
LANDONG PARASI T.
SILALAHI
AJI PRAYUDI
32
MEIDAWATI
OC & OE
TOLINGUL ANWAR
Internal Audit
FIRDAUS BAMBANG
SAPUTRA
HSSE
LELIN EPRIANTO
ELIZAR P.
HASIBUAN
Human Resources
BENNY SYARIF
HIDAYAT
BAPEPAM-LK NO.X.K.6
BAPEPAM-LK NO.X.K.6
BAPEPAM-LK NO.X.K.6
Informasi mengenai pemegang saham utama dan pengendali perusahaan Nama entitas anak, perusahaan asosiasi, perusahaan ventura Struktur organisasi perusahaan dalam bagan
Information on majority and controlling shareholders of the company
Name of subsidiaries, associated companies, venture
Organizational structure of the company in chart
companies
Menteri ESDM
Energy and Mineral
Resources Minister
Menteri BUMN
SOE Minister
Dewan Komisaris
Board of Commissioners
Direksi
Board of Directors
Chief Audit
Executive
Corporate
Secretary
SPV Integrated
Supply Chain
Gas Director
Investment
Planning & Risk
Management
Director
Menteri Keuangan
Finance Minister
Chief Legal
Counsel
Upstream
Director
Processing
Director
Marketing &
Trade Director
Refinery
Fuel, Lubrican,
Shipping, Etc.
General
Director
Human
Resources
Director
Finance
Director
Shareholder
Meeting
Gas Business
Upstream Main
Subsidiaries
PT PERTAMINA GAS
PT PERTAMINA EP
Asset 1, Asset 2, Asset 3, Asset 4, Asset 5,
Development Project, KSO and TAC
PERTAMINA EP CEPU
Joint Operation Agreement (JOA) dengan International
Oil Company (Exxonmobil)
KKKS
SKK
MIGAS
PT Pertamina EP
tidak memiliki anak
Perusahaan. Dengan
demikian, kami tidak
melaporkan persentase
kepemilikan entitas
perusahaan.
Pertamina EP has no
subsidiary. Therefore we
do not report percentage
of stake in the Companys
subsidiary entities.
Investment &
Partnership
Geothermal
Technology Services
Partner
Directorate General
of Mineral, Coal &
Geothermal
Eksternal
Internal
Business
Services
PT PERTAMINA DRILLING
SERVICES INDONESIA
PT ELNUSA
33
KINERJA 2013
2013 Performance
R. PANJI SUMIRAT
VP. EOR
Mengawali karir di PT Pertamina (Persero) pada tahun
1989 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai VP. EOR sejak 01 Oktober 2011.
ERRY KRISNANTO
VP. Controller and Partnership Financial
34
ELIZAR P. HASIBUAN
VP. Supply Chain Management & General Services
Mengawali karir di PT Pertamina (Persero) pada tahun
1990 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai VP. Supply Chain Management &
General Services sejak tahun 2013.
TOLINGUL ANWAR
VP. OC & OE
Mengawali karir di PT Pertamina (Persero) pada tahun
1990 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai VP. OC & OE sejak tahun 2013.
35
MEIDAWATI
VP. STGC Plan & Risk Management
KINERJA 2013
2013 Performance
BAMBANG WIDJANARKO
VP. Drilling
Mengawali karir di PT Pertamina (Persero) pada tahun
1989 dan bergabung di PT Pertamina EP tahun 2005.
Menjabat sebagai VP. Drilling sejak tahun 2013.
AJI PRAYUDI
VP. Legal & Relation
36
JAMSATON NABABAN
VP. Surface Facilities
Mengawali karir di PT Pertamina (Persero) pada tahun
1990 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai VP. Surface Facilities sejak tahun
2013.
LELIN EPRIANTO
VP. Health Safety Security & Environment
Mengawali karir di PT Pertamina (Persero) pada
tahun 1991 dan bergabung di PT Pertamina EP tahun
2006. Menjabat sebagai VP. Health Safety Security &
Environment sejak tahun 2013.
37
ACHMAD MURSJIDI
VP. Business Parthership
KINERJA 2013
2013 Performance
IRWANSYAH
GM Asset 1
38
MUSALAM LATUCONSINA
GM Paku Gajah
Mengawali karir di PT Pertamina (Persero) pada tahun
1995 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai GM Paku Gajah Development Project
sejak tahun 2013.
YELLY HESNETI
VP. Treasury & Finance Operation
Mengawali karir di Pertamina (Persero) pada tahun
1992 dan bergabung di Pertamina EP pada tahun
2006. Menjabat sebagai VP. Treasury & Finance
Operation sejak 1 Maret 2013.
39
ARIEF WAHIDIN
GM PDM
KINERJA 2013
2013 Performance
HERUTAMA TRIKORANTO
VP. Exploitation
Mengawali karir di PT Pertamina (Persero) pada tahun
1990 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai VP. Exploitation sejak tahun 2013.
LUKITO SUWARNO
VP. ICT
40
PRIBADI MAHAGUNABANGSA
GM Asset 4
Mengawali karir di PT Pertamina (Persero) pada tahun
1998 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai Asset 4 General Manager sejak tahun
2013.
ABDUL CHALIK
GM Asset 5
Mengawali karir di PT Pertamina (Persero) pada tahun
1989 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai Asset 5 General Manager sejak tahun
2013.
TUBAGUS NASIRUDDIN
GM Asset 2
Mengawali karir di PT Pertamina (Persero) pada tahun
1989 dan bergabung di PT Pertamina EP tahun 2006.
Menjabat sebagai Asset 2 General Manager sejak tahun
2013.
DODY SASONGKO
GM PPGJ
Mengawali karir di PT Pertamina (Persero) pada tahun
1998 dan bergabung di PT Pertamina EP tahun 2005.
Menjabat sebagai GM Proyek Pengembangan Gas Jawa
sejak tahun 2013.
41
1,940
1,946
1,989
36.60
39.78
2.2%
Peningkatan Laba Bersih
Net Profit Increase
39.78%
2011
2012
2013
EBITDA
2011
2012
2013
3,519
3,532
3,585
2011
2012
2013
10,920
9,890
2011
2012
2013
19
87,594,324
75,359,555
12
56,342,935
2011
42
2012
2013
2011
2012
2013
30.49%
Return on Investment
Return on Investment
BAPEPAM-LK NO.X.K.6
Ikhtisar data keuangan penting disajikan dalam bentuk
perbandingan selama 3 (tiga) tahun buku
Financial data highlights are presented in comparison
for 3 (three) financial years
2011
2012
2013
5,044
5,319
5,001
Beban Pokok Penjualan dan Beban Usaha Cost of Goods Sold and Operating Expenses
1,755
2,142
1,914
3,289
3,177
3,086
(4)
62
178
3,285
3,239
3,264
1,345
1,293
1,275
1,940
1,946
1,989
EBITDA
3,519
3,532
3,585
NERACA
BALANCE SHEET
2011
2012
2013
9,890
10,920
12,924
2,942
3,663
3,677
6,948
7,258
9,247
5,401
5,304
6,765
SATUAN
UNIT
2011
2012
2013
Current Ratio
487.26
474.79
574.85
Cash Ratio
12.33
8.09
14.70
42.35
50.47
39.77
29.75
33.54
28.45
22.27
30.97
24.36
15.65
20.58
17.43
ROE
38.74
36.65
27.41
ROI
39.51
36.04
30.49
65,20
59.73
61.72
38,46
36.60
39.78
Hari Days
52
22
15
Hari Days
11
57.97
55.56
45.10
70.25
66.46
71.55
9,068
9,670
12,189
8,779
9,380
10,451
43
Komersialitas [G4-9]
Commerciality
2011
2012 *
2013
16,464
17,912
Lifting Asset 1*
5,789
19,956
18,148
Lifting Asset 2*
8,225
8,600
9,757
Lifting Asset 3*
5,028
45,020
45,817
Lifting Asset 4*
9,814
2011
2012 *
Lifting Asset 5*
7,491
161,788
158,630
Total lifting
134,676
130,177
GAS (MMSCF)
GAS
6,812
2,312
2,124
298,775
290,931
43,159
2013
Lifting Asset 1*
31,771
Lifting Asset 2*
123,708
Lifting Asset 3*
115,191
Lifting Asset 4*
5,677
Lifting Asset 5*
1,658
9,168
287,171
Total lifting
Keterangan Note:
Operasional [G4-9]
Operational
EKSPLORASI
EXPLORATION
2011
2012 1)
261
4,054
926
1,549
2,381
1,830
2013
11
24
17
83%
79%
73%
256
455
432
94
229
161
2011
2012
2013
96
140
118 2)
140
148
156 3)
1,070
1,054
1,031
124.90
127.31
120.6
310
309
298.5
Realisasi Produksi Setara Minyak (MBOEPD) Realization of Oil Equivalent Production (MBOEPD)
Catatan:
44
Note:
BAPEPAM-LK NO.X.K.6
Informasi mengenai saham setiap 2 (dua) triwulan
Information on shares every 2 (two) quarters
Aksi Korporasi terhadap saham
Corporate action on shares
Perdagangan saham
Share trading
Kronologis pencatatan saham dan perubahan jumlah saham
Chronology of share listing and change of number of shares
Ikhtisar keberlanjutan
Sustainability highlights
KINERJA KEBERLANJUTAN
SUSTAINABILITY PERFORMANCE
Jam Kerja Selamat Safe Working Hours
2011
2012
2013
56,342,935*
75,359,555
87,594,329
0.28
0.09
0.14
322.28
139.49
142.27
Hijau Green
12
19
Biru Blue
17
14
Merah Red
353**
504
578
10
80%
90%
96.55%
ISO 14001
15
19
19 Field + 1 KSO
OHSAS 18001
15
19
19 Field + 1 KSO
1:0.7
1:2.7
1:23
6.7
6.6
6.92
2.97
3.01
3.22
Kebakaran Fire
376,283
199,128
392,587
N/A
29.3%
25.7%
N/A
207
615
* P Pada Tahun 2011 jam kerja selamat kegiatan seismik mulai dimasukkan dalam pencatatan.
P In 2011 safe working hours of seismic activities started to be recorded.
** S Sistem pelaporan kejadian di tahun 2011 semakin baik dan lebih lengkap.
S Incident reporting system in 2011 has improved and more detailed.
*** P Pohon yang ditanam 100% tumbuh dengan baik melalui tehnik sulam yang dibantu masyarakat lokal.
100% of planted trees have grown well through replanting system with support from local community.
P
45
KINERJA 2013
2013 Performance
Maret March
April
Perubahan Organisasi
Pertamina EP
Organizational change
of Pertamina EP
Mei May
Juli July
Oktober October
Perolehan penghargaan Excellence
Award dari ajang internasional ICQCC 2013 Taipei
Receiving Excellence Award at the
international event ICQCC-2013, Taipei
Best of The Best APQA
46
Desember December
Bantuan korban bencana erupsi Gunung Sinabung
Disaster Relief for evacuees of Mount Sinabung eruption
FGD Bersama Pemerintah Daerah Bojonegoro
FGD with Bojonegoro Regional Government
Perolehan 19 Proper Hijau Dari Kementerian
Lingkungan Hidup
Receiving 19 Green PROPER from Environment Ministry
Peresmian Proyek CPP Gundih
Inauguration of Gundih CPP project
Memperoleh Penghargaan Best Runner Up CSR
Disclosure ISRA
Receiving Best Runner Up of CSR Disclosure ISRA
November
Pergantian Jabatan President Director
Pt Pertamina EP
Inauguration of new President Director of
PT Pertamina EP
Mengalirnya Gas Dari Sumur Bgl -01
Sumut
Gas blowout from Bgl -01 Well, North
Sumatra
47
48
49
MUHAMAD HUSEN
LAPORAN DEWAN KOMISARIS & DIREKSI
Board of Commissioner Report and
Board of Directors Report
Komisaris Utama
President Commissioner
50
BAPEPAM-LK NO.X.K.6
Penilaian terhadap kinerja Direksi mengenai pengelolaan perusahaan
Assessment on Board of Directors performance regarding company management
51
SUSILO SISWOUTOMO
MULYANI WAHYONO
MUHAMMAD HUSEN
Komisaris
Commissioner
Komisaris
Commissioner
Komisaris Utama
President Commissioner
52
M AFDHAL BAHAUDIN
ACHMAD LUTHFI
Komisaris
Commissioner
Komisaris Independen
Independent Commissioner
Komisaris Independen
Independent Commissioner
53
FREQUENCY MONITORING
Monitoring Frequency
Bobot (%)
Weight Value
Kinerja
Performance
I. Financial
Bulanan Monthly
35%
36%
II. Operational
Bulanan Monthly
40%
37.7%
Bulanan Monthly
15%
11.3%
Tri-wulanan Quarterly
10%
11.0%
100%
96.3%
FREQUENCY MONITORING
Monitoring Frequency
TARGET
Kinerja
Performance
1. GCG Compliance
Tri-wulanan Quarterly
85
88.85
2. PROPER
3. Emission Reduction
Tri-wulanan Quarterly
Jumlah Total
17
19
Tri-wulanan Quarterly
% Reduction
16.51
Tri-wulanan Quarterly
% Reduction
12
17.47
5. Learning Index
Tri-wulanan Quarterly
50
53.57
Tri-wulanan Quarterly
80
87.81
Bulanan Monthly
15
18
8. Knowledge sharing
Tri-wulanan Quarterly
20.00
24
54
BAPEPAM-LK NO.X.K.6
Penilaian terhadap kinerja Direksi mengenai pengelolaan perusahaan
Assessment of the Board of Directors performance on management
of the company
BAPEPAM-LK NO.X.K.6
Komite-komite yang berada dibawah pengawasan Dewan Komisaris
Committees under Board of Commissioners supervision
96.3%
Realisasi Pencapaian
Kesepakatan Kinerja 2013
Realization of 2013 Performance
Agreement Achievement
Komite Audit
Membantu Dewan Komisaris melaksanakan pengawasan
untuk memastikan telah terselenggaranya fungsi
pengawasan atas proses penyelesaian Laporan
Keuangan, Pelaksanaan Audit atas Laporan Keuangan
dan Keandalan Sistem Pengendalian Internal Perusahaan.
Komite Audit dipimpin oleh M. Afdal Bahaudin.
Audit Committee
To assist the Board of Commissioners in oversight to
ensure the implementation of oversight function over
the completion of the Financial Statements, Audit over
Financial Statementsl and Internal Control System
Reliability of the Company. Audit Committee is chaired
by M. Afdal Bahaudin.
55
56
BAPEPAM-LK NO.X.K.6
Pandangan atas prospek usaha perusahaan yang disusun oleh Direksi
View on the prospects of the companys business as established by
the Board of Directors.
BAPEPAM-LK NO.X.K.6
Penilaian terhadap kinerja Direksi mengenai pengelolaan Perusahaan
Assessment of the Board of Directors performance on management
of the Company
Kegiatan Eksploitasi
Memahami kondisi aset produksi yang sudah tua, dalam
mencapai target produksi Dewan komisaris memberi
rekomendasi untuk meningkatkan produksi melalui kegiatan
reaktivasi beberapa sumur yang memiliki potensi produksi
dan kerjasama pengusahaan minyak bumi pada sumur tua.
Exploitation Activities
Aware of old conditions of production assets, in bids to meet
the production targets, the Board of Commissioners has
made recommendations to increase production through
reactivation of wells with production potential and oil joint
operation of the old wells.
Permodalan
Dewan Komisaris merekomendasikan agar pertumbuhan
modal perusahaan dioptimalkan bersumber dari laba
perusahaan.
Capital
Board of Commissioners recommended that the companys
capital growth optimization derived from company profits.
Human Resources
In the business unit structure changes in 2013, the
Board of Commissioners has provided suggestions and
recommendations to the Management on acceleration of
human resources compliance including the fulfillment of
human resources skill/technical competency certifications
as required and continually develops engineering capacity,
managerial and human resources professionalism by
promoting the concept of solid and synergized teamwork.
57
Selain itu Dewan Komisaris juga mendukung langkahlangkah perbaikan kebijakan yang telah dilakukan oleh
Manajemen guna mendukung strategi bisnis perusahaan
melalui operational dan HSSE excellence. Dewan Komisaris
menekankan perlunya penerapan budaya dan etos
kerja yang berkualitas tinggi dan peran teknologi untuk
meningkatkan produktifitas ditengah perubahan yang ada.
Teknologi
Dukungan teknologi dalam pelaksanaan kegiatan eksplorasi
dan eksploitasi meliputi layanan sistem
dan project Geologi dan Geofisika (G&G) sangat penting
dalam studi dan mengelola data hasil survei seismik dan
laporan akhir sumur. Oleh karenanya Dewan Komisaris
memandang perlu untuk mengembangkan dan
mengevaluasi teknologi yang dimanfaatkan agar dapat lebih
mudah diakses dan terintegrasi.
Technology
Technology support in the exploration and exploitation
activities include service system and Geological &
Geophysical (G&G) project is very important in the study and
management of seismic survey data and final report of wells.
Therefore, the Board of Commissioners deemed it necessary
to develop and evaluate the applied technologies to be more
accessible and integrated.
HALAMAN
PAGE
58
BAPEPAM-LK NO.X.K.6
Perubahan komposisi anggota Dewan Komisaris
Change in Board of Commissioners membership
composition
JABATAN
POSITION
PERIODE
Period
Muhamad Husen
Komisaris Commissioner
Achmad Luthfi
Mulyani Wahyono
Komisaris Commissioner
Susilo Siswoutomo
Komisaris Commissioner
Gde Pradnyana
: M. Afdal Bahaudin
: - Ir. Mirma Fadjarwati Malik MBA
: - Muhammad Danial SE Ak, MM, CPA
59
M AFDAL BAHAUDIN
Komisaris Commissioner
Bergabung dengan PT Pertamina (Persero) pada tahun
1985 dan menjabat sebagai Komisaris PT Pertamina EP
sejak 2010.
ACHMAD LUTHFI
Komisaris Independen Independent Commissioner
60
BAPEPAM-LK NO.X.K.6
Profil dewan komisaris
Board of Commissioners Profile
MULYANI WAHYONO
Komisaris Commissioner
Bergabung dengan PT Pertamina (Persero) pada tahun
1984 dan Menjabat sebagai Komisaris PT Pertamina EP
sejak 1 November 2011.
SUSILO SISWOUTOMO
Komisaris Commissioner
Menjabat sebagai Komisaris PT Pertamina EP sejak 5
September 2012.
61
ADRIANSYAH
Presiden Direktur
President Director
62
BAPEPAM-LK NO.X.K.6
Kinerja perusahaan, yang mencakup antara lain kebijakan strategis, perbandingan antara
hasil yang dicapai dengan yang ditargetkan, dan kendala yang dihadapi perusahaan
The companys performance, encompassing among others strategic policies, comparison
between achievement of results and targets, and challenges faced by the company.
Naturally, the upstream oil and gas industry has a challenge in the
form of production decline potential. For Pertamina EP, the average
natural production decline reached 18 percent, which is due to
majority of fields operated by the Company are already old. On the
other hand, Pertamina EP is expected to contribute to the state
by increasing oil and gas production, through the achievement of
targets that have been set.
Wassalamualaikum wr wb
Wassalamualaikum wr wb
Jakarta,
Januari 2014
Presiden Direktur
Jakarta,
January 2014
President Director
Adriansyah
Adriansyah
63
LUKITANINGSIH
BAGUS SUDARYANTO
SYAMSU ALAM
ADRIANSYAH
Direktur Operasi
Operations Director
Presiden Direktur
President Director
Presiden Direktur
President Director
Sampai dengan 20
November 2013
Until November 20 2013
64
SATOTO AGUSTONO
DODDY PRIAMBODO
Direktur Pengembangan
Development Director
65
LAPORAN DIREKSI
66
REALISASI PRODUKSI
Production realization
2011
2012
289,899
279,412
3.256
3.174
Sumber Source:
Kementerian ESDM dan
SKK Migas
Energy & Mineral Resources
Ministry and SKK Migas
BAPEPAM-LK NO.X.K.6
Gambaran tentang prospek usaha
Overview on business prospect
PROSPEK USAHA
BUSINESS PROSPECTS
67
LAPORAN DIREKSI
Board of Directors Report
68
BAPEPAM-LK NO.X.K.6
Kinerja perusahaan, yang mencakup antara lain kebijakan strategis, perbandingan antara
hasil yang dicapai dengan yang ditargetkan, dan kendala yang dihadapi perusahaan
The companys performance, encompassing among others strategic policies, comparison
between achievement of results and targets, and challenges faced by the company.
10%
69
LAPORAN DIREKSI
Board of Directors Report
PEMENUHAN
RKAP 2013
Fulfillment of
Corporate Work
Plan & Budget
2013
100%
100%
3. Pemboran Drilling
54%
91%
89%
70%
61%
70
BAPEPAM-LK NO.X.K.6
Kinerja perusahaan, yang mencakup antara lain kebijakan strategis, perbandingan antara
hasil yang dicapai dengan yang ditargetkan, dan kendala yang dihadapi perusahaan
The companys performance, encompassing among others strategic policies, comparison
between achievement of results and targets, and challenges faced by the company.
89%
Policies to support
target achievement in 2014
71
LAPORAN DIREKSI
Board of Directors Report
CORPORATE GOVERNANCE
Good Corporate Governance (GCG) at Pertamina EP is
implemented in stages, starting with in-depth understanding
by formulating basis of work and business ethics adapted to
the Companys vision. The policy formulation process and
implementation of GCG principles at Pertamina EP refers to
the existing rules and regulations as well as the application of
Good Corporate Governance (GCG) best practices, the Code
of Corporate Governance (CoCG), and other references issued
by separate agencies such as the KNKG (National Committee
on Governance).
72
Improvement of corporate
governance in 2013
1. Completing and refining Standard Working
Procedures (STK), especially for PT Pertamina EPs new
business process
2. Reviewing and revising the Audit Charter
3. Preparing board manual to be adjusted with the New
Organizational Change of PT Pertamina EPs 2013
Manpower Utilization Plan (RPTK).
4. Improvement of GCG Compliance Online material
BAPEPAM-LK NO.X.K.6
Penerapan Tata kelola Perusahaan
Corporate governance implementation
Perubahan Komposisi Direksi dan alasan perubahannya
Change in Board of Directors membership composition and its reasons
ANGGOTA DIREKSI
BOD Member
JABATAN
Position
ANGGOTA DIREKSI
BOD Member
JABATAN
Position
Syamsu Alam
Adriansyah
Doddy Priambodo
Doddy Priambodo
Lukitaningsih
Satoto Agustono
Lukitaningsih
73
PROFIL DIREKSI
SYAMSU ALAM
Presiden Direktur President Director
LAPORAN DEWAN KOMISARIS & DIREKSI
Board of Commissioner Report and
Board of Directors Report
DODDY PRIAMBODO
Direktur Eksplorasi dan Penemuan Cadangan Baru Exploration and New Reserve Discovery Project Director
Mengawali karir di PT Pertamina (Persero) pada tahun 1989
dan bergabung di PT Pertamina EP tahun 2005 Menjabat
sebagai Direktur Eksplorasi dan Penemuan Cadangan Baru
sejak tanggal 10 Mei 2011
74
BAPEPAM-LK NO.X.K.6
Profil Direksi
Board of Directors Profile
SATOTO AGUSTONO
Direktur Pengembangan Development Director
Mengawali karir di PT Pertamina (Persero) pada tahun 1989 dan
bergabung di PT Pertamina EP tahun 2005 Menjabat sebagai
Direktur Pengembangan sejak September 2013 .
LUKITANINGSIH
Direktur Keuangan Finance Director
Mengawali karir di PT Pertamina (Persero) pada tahun 1983 dan
bergabung di PT Pertamina EP tahun 2008. Menjabat sebagai
Direktur Keuangan pada 23 Februari 2012.
BAGUS SUDARYANTO
Direktur Operasi Operational Director
Mengawali karir di PT Pertamina (Persero) pada tahun 1986 dan
bergabung di PT Pertamina EP tahun 2008. Menjabat sebagai
Direktur Operasi sejak 29 September 2011.
75
MUHAMAD HUSEN
ACHMAD LUTHFI
Komisaris Utama
President Commissioner
Komisaris
Commissioner
Komisaris Independen
Independent Commissioner
Sampai dengan 08 Mei 2013
Until May 08 2013
76
MULYANI WAHYONO
SUSILO SISWOUTOMO
GDE PRADNYANA
Komisaris
Commissioner
Komisaris
Commissioner
Komisaris Independen
Independent Commissioner
DIREKSI DIRECTORS
SYAMSU ALAM
ADRIANSYAH
Presiden Direktur
President Director
Presiden Direktur
President Director
BAGUS SUDARYANTO
DODDY PRIAMBODO
Direktur Operasi
Operation Director
SATOTO AGUSTONO
LUKITANINGSIH
Direktur Pengembangan
Development Director
77
ANALISIS
DANPEMBAHASAN
ANALISIS DAN
PEMBAHASAN
MANAJEMEN MANAJEMEN
Management
Discussion & Analysis
Analisis dan Pembahasan
Manajemen
78
79
BAPEPAM-LK NO.X.K.6
Tinjauan operasi per segmen operasi sesuai dengan jenis industri
Operational review per operational segment based on type of industry
161
MMBOE
ANALISIS & PEMBAHASAN MANAJEMEN
Management Discussion & Analysis
298.5
MBOEPD
80
AREA OPERASI
OPERATION AREA
2013
TARGET
2014
Asset 1
16,821
18,709
Asset 2
22,654
24,147
12,813
15,560
27,665
30,248
2012
LAPANGAN FIELD
73,265
Asset 3
Asset 4
20,532
22,607
33,355
1,251
2,889
106,620
101,736
111,271
Asset 5
Proyek pengembangan
Development Project
Jumlah operasi sendiri
Total own operation
TAC
Jumlah kemitraan
2012
2013
217,317
236,261
Asset 2
742,128
Asset 3
189,654
Asset 4
32,967
Asset 5
117,902
103,261
5,300
TAC
190,865
164,255
KSO
69,085
203,918
1,105,339
1,166,994
Proyek pengembangan
Development Project
Total Pertamina EP
9,937
4,075
4,803
6,792
20,869
18,851
16,729
127,309
120,588
128,000
Total partnership
Jumlah Pertamina EP
Asset 1
Jumlah Pertamina EP
KEMITRAAN Partnership
14,048
16,614
KSO
AREA OPERASI
OPERATION AREA
Total Pertamina EP
87.9%
81
82
Gas bumi yang diangkat berasal dari sumur gas bumi pada
wilayah kerja Pertamina EP, baik di area operasi sendiri
maupun area operasi kemitraan. Hingga akhir periode
pelaporan ada 20 field yang dioperasikan sendiri dan ada 56
area operasi kemitraan.
AREA OPERASI
OPERATION AREA
2013
TARGET
2014
Asset 1
111
107
Asset 2
426
429
388
421
26
83
2012
LAPANGAN FIELD
868.2
Asset 3
Asset 4
13
13
121.5
28
107
989.7
992
1,052
Asset 5
Proyek pengembangan
Development project
Jumlah operasi sendiri
Total own operation
TAC
KEMITRAAN Partnership
39
64.1
KSO
Jumlah kemitraan
AREA OPERASI
OPERATION AREA
2012
2013
151,513
Asset 1
465,230
Asset 2
891,381
Asset 3
197,778
Asset 4
7,066
Asset 5
114,140
266,614
253,151
TAC
92,737
192,272
KSO
6,067
49,817
1,256,799
1,430,969
Proyek pengembangan
Development project
Jumlah Pertamina EP
Total Pertamina EP
15
64.1
39
18
1,053.8
1,031
1,072
Total partnership
Jumlah Pertamina EP
Total Pertamina EP
89%
83
84
KEGIATAN EKSPLORASI
Bidang usaha Pertamina EP adalah pemanfaatan cadangan
minyak mentah dan gas bumi, yang ada di dalam lapisan
kulit bumi. Mengingat keberadaan cadangan minyak
mentah dan gas bumi bersifat tidak bisa diperbaharui, maka
Perusahaan dituntut melakukan pencarian serta penemuan
cadangan baru minyak mentah maupun gas bumi.
EXPLORATION ACTIVITIES
Pertamina EPs business field is the utilization of crude oil
and natural gas reserves located in the earths crust. Given
the existence of crude oil and natural gas reserves are nonrenewable, the Company is required to conduct search and
discovery of crude oil and natural gas new reserves.
85
86
2012
2013
PERBANDINGAN VS
RKAP 2013
PERBANDINGAN VS
TARGET REVISI
TARGET
2014
4,054
2,381
926
1,830
113%
100%
113%
100%
233
2125
9
14+1 TW (Twin Well)
4
11
13
2
15
6
54% (selesai)
94% (selesai)
100%
100%
271
1.067
455
300
766
432
149% (MMBOE)
173
948
337
95
777
229
66
550
161
114% (MMBOE)
54
717
179
9
3
12
11
87
88
89
The additional reserves of crude oil and natural gas that have
been proven by exploration drilling, has made Pertamina
EP optimistic to maintain sustainability of growth as well as
improve and meet the oil and gas lifting target in the coming
years.
90
RKAP
Realisasi Realization
RKAP
Realisasi Realization
Asset 1
66
33
35
24
Asset 2
38
21
46
17
Asset 3
22
23
13
12
Asset 4
Asset 5
38
32
11
174
33
101
72
18
39
35
46
192
1561)
136
1182)
Catatan | Notes:
1) 156 = 142 sumur selesai, 14 dalam pelaksanaan | 156 = 142 completion wells, 14 on progress
2) 118 = 115 sumur selesai, 3 dalam pelaksanaan | 118 = 115 completion wells, 3 on progress
94%
91
PROYEK PENGEMBANGAN
GAS MATINDOK
Matindok Gas Development Project
PROYEK PENGEMBANGAN
GAS JAWA
Java Gas Development Project
LOKASI Location
Lapangan ini terletak di Cekungan Ciputat
yang merupakan salah satu dari sub
cekungan yang ada di Cekungan Jawa
Barat Utara, 35 km arah timur laut kota
Jakarta, wilayah Kecamatan Cabang Bungin,
Kabupaten Bekasi, Jawa Barat.
92
93
OPERATOR
Operator
KOLEKTIBILITAS KREDIT
Credit Collectability
LOKASI
Location
Air Serdang
Wakamuk
Sukowati
Suban
Tiung Biru
MB Unit
Tanjung Laban
94
EKSPLORASI
Exploration
EKSPLOITASI
Exploitation
Temuan cadangan
432 (2C-Inplace atau
161 MMBOE (2C-RR)
Reserve discovery of
432 (2C-Inplace) or
161 MMBOE (2C-RR)
Produksi gas
Gas production
1,031 MMSCFD
Produksi minyak
Oil production
120.6 MBOPD
KOMERSIALITAS
Commerciality
Penjualan minyak
mentah
Crude oil sales
43,159 MBBLS
Penjualan gas
Gas sales
287,171 MMSCF
Pendapatan 2013
2013 Revenues
61,72%
95
BAPEPAM-LK NO.X.K.6
BAPEPAM-LK NO.X.K.6
Pendapatan Pendapatan, beban, laba (rugi), pendapatan komprehensif lain
Revenue
expenses, profit (loss), other comprehensive revenues
TINJAUAN KEUANGAN
Pembahasan dan analisis berikut mengacu kepada Laporan
Keuangan PT Pertamina EP untuk tahun buku yang berakhir
pada 31 Desember 2013 dan 2012 yang disajikan dalam
buku Laporan Tahunan ini. Laporan Keuangan disusun sesuai
dengan Pernyataan Standar Akuntansi Keuangan (PSAK)
di Indonesia. Laporan Keuangan telah diaudit oleh Kantor
Akuntan Publik Tanudiredja, Wibisana, dan Rekan (member
of Price Waterhouse Coopers), dengan opini Wajar Tanpa
Pengecualian (Unqualified Opinion).
FINANCIAL REVIEW
The following discussion and analysis refer to PT Pertamina
EP Financial Statements for the year ended December 31,
2013 and 2012, which are presented in this Annual Report.
Financial Statements were prepared in accordance with
Statement of Financial Accounting Standards (SFAS) in
Indonesia. The Financial Statements have been audited by
Public Accounting Firm Tanudiredja, Wibisana, and Partners
(member of Price Waterhouse Coopers), with an Unqualified
Opinion.
PENDAPATAN USAHA
dalam ribuan USD
KETERANGAN
Penjualan dalam negeri minyak mentah, gas
bumi, dan liquefied petroleum gas (LPG)
Penjualan ekspor minyak mentah dan gas bumi
TOTAL
REVENUE
in thousand USD
2013
2012
DESCRIPTION
4.869.684
5.129.432
(5)
131.198
189.100
(31)
5.000.883
5.318.532
(6)
TOTAL
96
The decline in crude oil sales during 2013 was due to the
sales (lifting) of crude oil of 43,158 MBBLs, decreased by
2,658 MBBLs or by -6% from 45,817 MBBLs in 2012, besides
Pertamina EPs crude oil price (weight average price/WAP) in
2013 was USD104.97/BBLs, declined by -8% from USD113.98/
BBLs in 2012.
BEBAN USAHA
Beban usaha terdiri dari beban eksplorasi, beban produksi,
beban administrasi dan umum, keuntungan lainnya-bersih,
pendapatan keuangan, dan biaya Keuangan. Beban usaha
selama tahun 2013 sebesar USD1,737 miliar mengalami
penurunan sebesar USD343 juta atau sebesar -16% dari
tahun 2012 sebesar USD2,080 miliar.
OPERATING EXPENSES
Operating expenses consist of exploration expenses,
production expenses, administrative and general expenses,
other gains-net, finance income and finance costs. Operating
expenses during 2013 of USD1.737 billion, decreased by
USD343 million or -16% from USD2.080 billion in 2012.
BEBAN USAHA
dalam ribuan USD
KETERANGAN
Beban eksplorasi
Beban produksi
Beban umum dan administrasi
Keuntungan lainnya-bersih
Pendapatan keuangan
Biaya keuangan
TOTAL
OPERATING EXPENSES
in thousand USD
2013
2012
DESCRIPTION
145.590
1.604.691
164.142
(246.103)
(5.067)
73.409
201.589
1.698.389
241.616
(121.439)
(4.691)
64.138
(28)
(6)
(32)
103
8
14
Exploration expenses
Production expenses
General and administration expenses
Other gains-net
Finance income
Finance cost
1.736.662
2.079.601
(16)
TOTAL
97
BAPEPAM-LK NO.X.K.6
Profitabilitas
Profitability
16%
Penurunan beban usaha
Decrease in operating expenses
OPERATING INCOME
LABA USAHA
LABA USAHA
dalam ribuan USD
KETERANGAN
Laba sebelum pajak penghasilan
Beban pajak penghasilan
Laba tahun berjalan
PROFIT
in thousand USD
2013
2012
DESCRIPTION
3.264.221
(1.274.759)
1.989.462
3.238.930
(1.292.539)
1.946.391
0,78
(1,38)
2,21
98
BAPEPAM-LK NO.X.K.6
Aset lancar, aset tidak lancar, dan total aset
Current Assets, non-Current Assets, dan total asset
Aset Lancar
jumlah aset lancar per 31 Desember 2013 sebesar
USD8,190 miliar naik sebesar 22% dibandingkan tahun
2012. Kenaikan ini menggambarkan adanya peningkatan
kegiatan Perusahaan untuk mendukung tercapainya
target yang ditetapkan di tahun 2013.
Current Assets
Total current assets as of December 31, 2013 was USD8.190
billion, an increase of 22% compared to 2012. This increase
indicated an increase in the companys activities to support
the achievement of target set in 2013.
CURRENT ASSET
in thousand USD
2013
2012
DESCRIPTION
209.461
7.448.323
71.514
45.955
148.550
232.107
33.656
114.554
6.115.794
103.573
22.098
115.916
200.101
47.100
83
22
(31)
108
28
16
(29)
8.189.565
6.719.135
22
TOTAL
99
100
Piutang Usaha
Saldo piutang usaha per 31 Desember 2013 sebesar
USD7,448 miliar naik sebesar 22% dibandingkan tahun
2012 sebesar USD6,116 juta, kenaikan saldo piutang
usaha ini berasal dari hasil penjualan minyak mentah dan
gas bumi selama tahun 2013
Trade Receivables
The balance of trade receivables as of December 31, 2013
was USD7.448 billion, increased by 22% compared to
USD6.116 million in 2012, the increase in trade receivable
balance derived from crude oil and natural gas sales
during 2013.
Piutang Lain-lain
Saldo piutang lain-lain per 31 Desember 2013 sebesar
USD46 juta meningkat sebesar 108% dibandingkan
tahun 2012 sebesar USD22 juta, piutang lain-lain
sebagian besar merupakan biaya dibayar dimuka yang
dibayarkan oleh Perusahaan atas nama Mitra Usaha KBT/
KSO kepada pihak lain
Other Receivables
The balance of other receivables as of December 31,
2013 was USD46 million, increased by 108% compared to
USD22 million in 2012 amounted, other receivables are
mostly prepaid expenses paid by the Company on behalf
of the KBT/KSO Business Partner to other parties
Persediaan
Saldo persediaan setelah dikurangi penyisihan
persediaan usang dan tidak terpakai per 31 Desember
2013 sebesar USD149 juta meningkat sebesar 28%
dibandingkan tahun 2012 sebesar USD116 juta,
Kenaikan tersebut disebabkan oleh kenaikan persediaan
material umum selama tahun 2013 dalam rangka proses
percepatan investasi
Inventories
The inventory balance net of provision for obsolete and
unused inventories as of December 31, 2013 was USD149
million, increased by 28% compared to USD116 million
in 2012. The increase was due to increasing quantity
of general material inventories during 2013 in order to
accelerate investment process.
Reimbursable VAT
The balance of reimbursable VAT as of December 31, 2013
was USD232 million increased by USD32 million or 16%
compared to USD200 million in 2012. Reimbursable VAT
is the amount of VAT that will be or are in the process of
reimbursement to SKK Migas.
BAPEPAM-LK NO.X.K.6
Kolektibilitas piutang
Receivables collectability
Non-current Assets
Total non-current assets as of December 31, 2013 was
USD4.734 billion, increased by 13% compared to 4.201
million in 2012. This increase was due to the increase in
value of oil and natural gas assets resulting from asset
capitalization during 2013.
NON-CURRENT ASSET
in thousand USD
2013
2012
DESCRIPTION
4.611.866
122.909
4.117.287
84.070
12
46
4.734.774
4.201.357
13
TOTAL
Aset Lain-lain
Saldo aset lain-lain per 31 Desember 2013 sebesar
USD123 juta mengalami kenaikan sebesar USD39 juta
atau sebesar 46% dari tahun 2012 sebesar USD84 juta,
peningkatan terbesar berasal dari pencadangan dana
dan penyelesaian material stock on hand adjustment.
Other Assets
The balance of other assets as of December 31, 2013 was
USD123 million, increased by USD39 million or 46% from
USD84 million in 2012. The largest increase was from
fund reserves and stock on hand adjustment material
settlement.
101
BAPEPAM-LK NO.X.K.6
Liabilitas jangka pendek, liabilitas jangka panjang
Current liabilities, Non-current liabilities
LIABILITAS
Pada tahun 2013 total liabilitas perusahaan sebesar USD3,677
miliar yang terdiri dari liabilitas jangka pendek sebesar
USD1,425 miliar (39%) dan liabilitas jangka panjang sebesar
USD2,253 miliar (61%), sedangkan total liabilitas pada tahun
2012 sebesar USD3,663 miliar
LIABILITIES
In 2013, the companys total liabilities was USD3.677 billion,
which consisted of current liabilities of USD1.425 billion
(39%) and non-current liabilities of USD2.253 billion (61%),
while total liabilities in 2012 was USD3.663 billion.
Current Liabilities
Realized current liabilities as of December 31, 2013 increased
by 1% when compared to 2012, a fairly substantial increase
was on the trade payables post by 45%.
102
CURRENT LIABILITIES
in thousand USD
2013
2012
DESCRIPTION
444.242
293.451
28.607
172.401
15.772
469.757
637
306.340
377.439
72.112
193.808
28.339
432.632
4.507
45
(22)
(60)
(11)
(44)
9
(86)
Trade payables
Ammount due to the government
Other payables
Corporate and devidend tax payables
aother tax payables
Accured expenses
Finance lease payables, current portion
1.424.866
1.415.177
TOTAL
Utang Usaha
Saldo utang usaha per 31 Desember 2013 sebesar
USD444 juta meningkat sebesar USD138 juta atau
sebesar 45% dari tahun 2012, Peningkatan saldo utang
usaha selama tahun 2012 disebabkan oleh transaksi yang
berhubungan dengan pembelian material dan jasa untuk
mendukung kegiatan operasional perusahaan
Trade Payables
The balance of trade payables as of December 31, 2013
was USD444 million increased by USD138 million or
45% from 2012. The increase, balance of trade payables
during 2012 was due to the transactions on purchase
of materials and services to support the Companys
operations.
Utang Lain-lain
Utang Lain-lain per 31 Desember 2013 sebesar USD29
juta mengalami penurunan sebesar USD44 juta atau
sebesar -60% dari tahun 2012, Penurunan saldo utang
lain-lain disebabkan adanya penyelesaian atas utang
PNBP dari pajak dan GOI.
Other Payables
Other payables as of December 31, 2013 were USD29
million, decreased by USD44 million or 60% from 2012.
The decrease of other payables balances was due to the
settlement of non-tax state revenues payable from taxes
and GOI.
Accrued Expenses
The balance accrued expenses as of December 31, 2013
was USD470 million, increased by USD37 million or 9%
from USD433 million in 2012. The increase was due to
increase in cost to suppliers to meet needs of material
and services.
Non-current Liabilities
Total non-current liabilities per December 31, 2013
increased by 0.22% from 2012, this increase was due
to the increase in balance of deferred tax liabilities and
provision for employee benefits.
NON-CURRENT LIABILITIES
in thousand USD
2013
2012
DESCRIPTION
144.454
3.587
67.064
1.050.273
38.895
948.423
183.283
4.225
66.560
744.607
30.562
1.218.550
(21)
(15)
1
41
27
(22)
2.252.697
2.247.786
0,22
TOTAL
103
104
BAPEPAM-LK
NO.X.K.6
Ekuitas Arus kas
Equity
Cash flow
Equity
The balance of equity as of December 31, 2013 was USD9.247
billion, increased by USD1.989 billion or 27% from USD7.258
billion in 2012. The inrease was due to the achievement of
the Companys profit achievement of USD1.989 billion in
2013.
EKUITAS
Saldo ekuitas per 31 Desember 2013 sebesar USD9,247
miliar mengalami kenaikan sebesar USD1,989 atau sebesar
27% dari tahun 2012 sebesar USD7,258 miliar, peningkatan
ini disebabkan oleh pencapaian laba perusahaan sebesar
USD1,989 miliar pada tahun 2013.
KOMPOSISI EKUITAS
dalam ribuan USD
KETERANGAN
Modal saham
Saldo laba
TOTAL
EQUITY
in thousand USD
2013
2012
DESCRIPTION
24.730
9.222.262
24.730
7.232.800
(2)
Share Capital
Retained earnings
9.246.992
7.257.530
(2)
TOTAL
ARUS KAS
dalam ribuan USD
KETERANGAN
Arus kas dari aktivitas operasi
Arus kas dari aktivitas investasi
Arus kas dari aktivitas pendanaan
(Penurunan)/kenaikan bersih kas dan
setara kas
Saldo kas dan setara kas pada awal tahun
Efek perubahan nilai kurs pada kas dan
setara kas
Saldo kas dan setara kas pada akhir tahun
CASH FLOWS
in thousand USD
2013
2012
DESCRIPTION
1.119.466
(1.004.712)
(4.506)
110.246
652.978
(681.341)
(23.682)
(52.045)
71
47
(81)
(312)
114.554
(15.339)
171.999
(5.400)
(33)
209.461
114.554
184
83
83.85%
Peningkatan saldo kas yang
dipengaruhi kenaikan harga jual dan
penerimaan pembayaran.
Increase in cash balance due to
increase in sales price and receipt of
payments.
105
RASIO KEUANGAN
FINANCIAL RATIO
RASIO KEUANGAN
KETERANGAN
RASIO PROFITABILITAS
Margin pendapatan operasi
Margin Laba Bersih
Imbalan investasi
Imbalan kepada pemegang saham
RASIO LIKUIDITAS
Rasio Lancar
Rasio Kas
RASIO SOLVABILITAS
Rasio total hutang terhadap modal sendiri
Rasio total hutang terhadap total aset
Rasio hutang jangka panjang terhadap modal
Rasio hutang jangka panjang terhadap asset
Rasio total modal sendiri terhadap total aset
RASIO PERPUTARAN
Perputaran piutang
Perputaran persediaan
Perputaran Aset
FINANCIAL RATIO
2013
2012
DESCRIPTION
59,73%
36,60%
36,04%
36,65%
PROFITABILITY RATIO
Operating profit margin
Net profit margin
Return on investment (ROI)
Return on equity (ROE)
1,98
3,19
-5,55
-9,23
475%
8%
LIQUIDITY RATIO
Current ratio
Cash ratio
100,06
6,61
50,47%
33,54%
30,97%
20,58%
66,46%
SOLVABILITY RATIO
Debt to equity ratio
Debt to asset ratio
Long term debt to equity
Long term debt to asset
Equity to asset ratio
-10,70
-5,09
-6,61
-3,15
5,09
TURNOVER RATIO
Collection period
Inventory turnover
Total asset turnover
RASIO PROFITABILITAS
Rasio profitabilitas mengukur tingkat kemampuan
Perusahaan dalam menghasilkan keuntungan dari semua
potensi atau sumber daya yang dimiliki.
PROFITABILITY RATIO
Profitability ratio measures the Companys ability to generate
profit from all of its potentials or resources.
Imbalan Investasi
Imbalan investasi tahun 2013 sebesar 30,49% menurun -55%
dari tahun 2012 sebesar 36,04%, penurunan ini menunjukkan
tingkat pengembalian investasi Perusahaan yang masih
belum maksimal.
Return on Investment
Return on Investment in 2013 was 30.49% decreased by
-55% from 36.04% in 2012. This decrease indicated that
the Companys return on investment rate has not been
optimized.
106
BAPEPAM-LK NO.X.K.6
kemampuan membayar utang dalam rasio
Ability to meet debts in ratio
Return on Equity
Return on equity in 2013 was 27.41%, decreased by -9.23%
from 36.65% in 2012. This decrease indicated the companys
performance commitment to the shareholders needs to be
improved.
RASIO LIKUIDITAS
Rasio likuiditas menunjukkan tingkat kemampuan
perusahaan dalam memenuhi kewajiban lancarnya.
LIQUIDITY RATIO
Liquidity ratio indicates the rate of the companys ability to
meet its current liabilities.
Rasio Lancar
Rasio lancar tahun 2013 sebesar 575% meningkat 100,06%
dari tahun 2012 sebesar 475%, peningkatan ini disebabkan
jumlah aset lancar pada tahun 2013 yang lebih tinggi dari
tahun sebelumnya.
Current ratio
Current ratio in 2013 was 575%, increased by 100.06% from
475% in 2012. The increase was due to higher amount of
current assets in 2013 than the previous year.
Rasio Kas
Rasio kas tahun 2013 sebesar 15% meningkat 6,61% dari
tahun 2012 sebesar 8%, kenaikan ini disebabkan adanya
kenaikan pos kas dan setara kas pada tahun 2013.
Cash ratio
Cash ratio in 2013 increased by 15 % from 6.61% in 2012 of
8 %, this increase was due to an increase in cash and cash
equivalents post in 2013.
RASIO SOLVABILITAS
Rasio solvabilitas digunakan untuk mengukur tingkat
pengelolaan pendanaan Perusahaan untuk menjalankan
kegiatan operasionalnya.
SOLVABILITY RATIO
Solvability ratio is used to measure the rate of the Companys
funding management in running its operations.
107
RASIO PERPUTARAN
Rasio perputaran digunakan untuk mengukur tingkat
efisiensi dan efektifitas pengelolaan sumber daya yang
dimiliki oleh Perusahaan.
TURNOVER RATIO
Turnover ratio is used to measure the efficiency and
effectively of the Companys resources management.
Perputaran Piutang
Selama tahun 2013 rasio perputaran piutang sebesar 15 hari
meningkat 32% dari tahun 2012 sebesar 22 hari, rasio ini
menunjukkan adanya peningkatan kemampuan perusahaan
dalam menyelesaikan piutang selama tahun 2013.
Collection period
During 2013 collection period ratio was 15 days, increased by
32 % from 22 days in 2012, this ratio indicated an increase in
the companys ability to settle collections in 2013.
Perputaran Persediaan
Selama tahun 2013 rasio perputaran persediaan sebesar 11
hari menurun -36% dari tahun 2012 sebesar 8 hari, rasio ini
menunjukkan pengelolaan persediaan yang masih perlu
ditingkatkan.
Inventory turnover
During 2013 inventory turnover ration was 11 days,
decreased by -36% from 8 days in 2012. This ration indicated
the Companys inventory management still needs to be
improved.
Perputaran Asset
Selama tahun 2013 rasio perputaran aset sebesar 45,01%
menurun -10,46% dari tahun 2012 sebesar 55,56%,
penurunan ini menunjukkan kemampuan aset Perusahaan
dalam memperoleh pendapatan yang masih belum
maksimal.
108
BAPEPAM-LK NO.X.K.6
Kebijakan dividen dan tanggal serta jumlah dividen per saham
Dividend policy and the date and amount of dividend per share
KEBIJAKAN DEVIDEN
Berdasarkan Resolusi Pemegang Saham tertanggal 23
Januari 2014, dividen sebesar USD2.152.051 (USD8,6/saham)
telah dibagi. Dividen kepada Pertamina akan saling hapus
dengan piutang dari Pertamina dan dividen ke PDV akan
dibayar tunai.
DIVIDEND POLICY
Based on the Shareholders Resolution dated January 23,
2014, dividends paid was USD2,152,051 (USD8.6/share).
Dividends to Pertamina will offset with trade receivables
from Pertamina and dividends to PDV will be paid in cash.
109
BAPEPAM-LK NO.X.K.6
Perubahan kebijakan akuntansi, alasan dan dampaknya
Changes in accounting policy, reasons and its impact
KEBIJAKAN AKUNTANSI
Kebijakan akuntansi yang diterapkan dalam penyusunan
Laporan Keuangan Perusahaan sesuai dengan Standar
Akuntansi Keuangan di Indonesia.
Kebijakan akuntansi telah diaplikasikan secara konsisten
terhadap semua tahun yang disajikan.
ACCOUNTING POLICY
The accounting policies applied in the preparation of the
Company Financial Statements are in accordance with
Financial Accounting Standards in Indonesia.
The accounting policies have been consistently applied to all
years presented.
110
ISAK 27, 28, dan 29 berlaku untuk tahun buku yang dimulai
sejak 1 Januari 2014, sedangkan standar baru dan revisi
lainnya akan berlaku efektif pada tahun buku yang dimulai 1
Januari 2015.
IFAS 27, 28, and 29 apply to the fiscal year that began January
1, 2014, while the other new and revised standards will be
effective in the fiscal year that begins January 1, 2015.
BENTURAN KEPENTINGAN
Pada setiap awal tahun, Para Dewan Komisaris dan Direksi
menandatangani Pernyataan Tidak Berbenturan Kepentingan
dimana intinya mereka memberikan jaminan bahwa Dewan
Komisaris dan Direksi akan tunduk kepada seluruh peraturan
Perusahaan dan peraturan yang berlaku secara umum dan
menyatakan bahwa mereka tidak mempunyai benturan
kepentingan terhadap PT Pertamina EP.
CONFLICT OF INTEREST
At the beginning of each year, the Board of Commissioners
and Board of Directors sign a Statement of No Conflict of
Interest, in which they essentially guarantee that Board of
Commissioners and Board of Directors will be subject to all
the Companys generally applicable rules and regulations
and declare that they have no conflict of interest with PT
Pertamina EP.
111
112
BAPEPAM-LK NO.X.K.6
Aspek pemasaran atas produk
dan jasa perusahaan
Marketing aspect of the
companys products and services
113
PEMBELI
Buyer
PLN Jambi Own PEP
PT Pertamina (Persero) - BBG
Pupuk Sriwijaya
PT Media Karya Sentosa
PT PLN (Persero) - Gelam
PT Bina Bangun Wibawa Mukti
PT Tossa Shakti
PT Energasindo Heksa Karya - Bitung
PT Energasindo Heksa Karya - Tegal gede
PT Pertiwi Nusantara Resources
PT Manggala Gita Karya
PT PGN (Persero) Tbk. - Sumur BGL-1
PT PGN (Persero) Tbk. - Jkt - Bogor
PT PGN (Persero) Tbk. - Sunyaragi
PT PGN (Persero) Tbk. - Cirebon
PT PGN (Persero) Tbk. - Medan
FIELD
JPH
0.7
114
HARGA AWAL
Initial Price
4.371
3.64
6.40
5.047
5.05
5.974
2.77
2.75
4.00
2.85
5.97
5.97
3.61
6.18
HARGA AKHIR
Final Price
5.047
4.720
5.89
7.00
6.000
6.00
7.750
6.36
6.36
5.00
6.45
8.00
7.50
7.06
5.00
7.50
LOKASI
Location
Jawa Barat | West Java
Jawa Barat | West Java
Jawa Barat | West Java
Sumatera Selatan | South Sumatra
Jawa Timur | East Java
Jambi
Jawa Barat | West Java
Jawa Tengah | Central Java
Jawa Barat | West Java
Jawa Barat | West Java
BAPEPAM-LK NO.X.K.6
Bahasan mengenai ikatan yang material
untuk investasi barang modal
Discussion on material ties for the
investment of capital goods
SUMBER GAS
Gas Source
KSO PD Migas Kota Bekasi
TAC PT Medco E&P Sembakung
SUMBER GAS
Gas Source
PT PGN (Persero) Tbk. - Medan
PT Pertamina (Persero)
PT Bina Bangun Wibawa Mukti
PT Bina Bangun Wibawa Mukti
PT PGN (Persero) Tbk. - Cirebon
PT PGN (Persero) Tbk. - Jkt, Bogor
PT PGN (Persero) Tbk. - Medan
PT Pertamina Gas
PT PLN (Persero)
PT Manggala Gita Karya
PT Pupuk Kujang
PT PGN (Persero) Tbk. - Medan
PT Pertiwi Nusantara Resources
PT Media Karya Sentosa
PT PGN (Persero) Tbk. - Cirebon
PT PGN (Persero) Tbk. - Jkt, Bogor
PT PGN (Persero) Tbk. - Medan
PT Pertamina (Persero)
PT PGN (Persero) Tbk. - Cirebon
PT PGN (Persero) Tbk. - Medan
LOKASI
Location
Jawa Barat | West Java
Kalimantan Timur | East Kalimantan
LOKASI
Location
Sumatera Utara | North Sumatra
Sumatera Selatan | South Sumatra
Jawa Barat | West Java
Jawa Barat | West Java
Jawa Barat | West Java
Jawa Barat | West Java
Sumatera Utara | North Sumatra
Jawa Barat | West Java
Jawa Timur | East Java
Jawa Barat | West Java
Jawa Barat | West Java
Sumatera Utara | North Sumatra
Jawa Barat | West Java
Jawa Timur | East Java
Jawa Barat | West Java
Jawa Barat | West Java
Sumatera Utara | North Sumatra
Sumatera Selatan | South Sumatra
Jawa Barat | West Java
Sumatera Utara | North Sumatra
115
BAPEPAM-LK NO.X.K.6
Tanggung jawab produk, seperti kesehatan dan keselamatan konsumen, informasi produk, sarana, jumlah dan penanggulangan atas pengaduan konsumen, dan lain-lain.
Product responsibility, such as consumer health and safety, product information, facilities, number of consumer complaints and their handling, etc.
116
117
BAPEPAM-LK NO.X.K.6
Perkara penting yang dihadapi oleh Emiten atau Perusahaan
Publik, entitas anak, anggota Dewan Komisaris dan Direksi
Significant cases faced by Publicly-listed Company, subsidiaries,
members of Board of Commissioners and Board of Directors
PERMASALAHAN HUKUM
Litigation Cases
NO.
INTISARI GUGATAN
Lawsuit Summary
Perkara perdata terkait masalah kontrak sehubungan dengan Upaya Hukum Partij Verzet
sehubungan dengan Klaim PT Lirik Petroleum atas pelaksanaan JOB, EOR LIRIK berkenaan
dengan Pipa Buntu, Advanced Payment dan Komersialitas.
Civil case on contractual issues in connection with Legal Action of the Defendant concerning the
Claim of PT Lirik Petroleum for the implementation of JOB, EOR LIRIK regarding Stuck Pipe, Advanced
Payment and Commerciality.
Perkara perdata terkait masalah kontrak sehubungan dengan Upaya Hukum Gugatan
Perbuatan Melawan hukum sehubungan dengan putusan arbitrase Klaim PT Lirik Petroleum
atas pelaksanaan JOB, EOR LIRIK berkenaan dengan Pipa Buntu, Advanced Payment dan
Komersialitas.
Civil case on contractual issues concerning Legal Action against unlawful act lawsuit regarding
arbitration ruling of PT Lirik Petroleum for the implementation of JOB, EOR LIRIK on Stuck Pipe,
Advanced Payment Commerciality.
Perkara perdata terkait masalah pertanahan sehubungan dengan Gugatan melawan hukum
dari Ny. Nortian Purba selaku penggugat terhadap Pemerintah RI Cq Mendteri ESDM Cq PT
Pertamina (Persero) Pertamina EP UBEP Jambi selaku Tergugat I dan Pemerintah RI Cq Ka. Badan
Pertanahan Nasional Cq Kakanwil Badan Pertanahan Nasional Jambi Cq Ka. Kantor Pertanahan
kota Jambi.
Civil case on land issues in connection with the lawsuit against unlawful act from Mrs. Nortian Purba
as the plaintiff against the Government of Indonesia Cq Minister of Energy and Mineral Resources Cq
PT Pertamina (Persero). Pertamina EP UBEP Jambi as Defendant I and the Government of Indonesia
Cq Head of National Land Agency Cq Regional Head of Jambi National Land Agency Cq Head of
Jambi City Land Agency.
Perkara perdata terkait masalah kontrak sehubungan dengan Gugatan wanprestasi dengan cara
ingkar janji atau tidak konsisten melaksanakan pembayaran sewa peralatan penggugat.
Pertamina EP Menang di
Pengadilan Tinggi & Pihak Lawan
Mengajukan Kasasi.
Pertamina EP Won in High Court &
the Plaintiff filed an Appeal.
4
ANALISIS & PEMBAHASAN MANAJEMEN
Management Discussion & Analysis
Civil case on contractual issues in connection with breach of contract lawsuit by breach of contract
or inconsistency in payment of the plaintiffs equipment rental.
118
NO.
5
INTISARI GUGATAN
Lawsuit Summary
Perkara perdata terkait masalah Pertanahan sehubungan dengan Gugatan melawan hukum dari
Sdr. Huseng selaku penggugat terhadap PT Pertamina (Persero) selaku tergugat I dan Pertamina
EP Kantor Pusat qq. UBEP Jambi selaku Tergugat II dalam perkara No. 48/PDT.G/2010/PN.JBI di
PN Jambi.
Civil case on Land issues in connection with lawsuit against unlawful act filed by Mr. Huseng as the
plaintiff against PT Pertamina (Persero) as Defendant I and Head Office of Pertamina EP qq. UBEP as
Defendant II in Case No. No. 48/PDT.G/2010/PN.JBI at Jambi District Court.
Perkara perdata terkait masalah Pertanahan sehubungan dengan Penanganan Perkara Jambi
No. 78/Pdt.G/2011/PN.JBI atas gugatan yg diajukan Sdr. Huseng.
Civil case on contractual issues concerning the Dispute Settlement of Jambi Case No. 78/Pdt.G/2011/
PN.JBI on lawsuit filed by Mr. Huseng.
Pertamina EP Menang di
tingkat Kasasi Pihak Lawan
mengajukan PK melalui 2 (dua) kali
permohonan.
Pertamina EP Won the Cassation,
the Plaintiff Filed for Judicial Review
through two appeals.
Civil case on employment issues concerning the Dispute Settlement of Industrial Relations case in
Industrial Relations Court of Banda Aceh District Court with case No. 02/PHI.G/2011/PN-BNA.
8
Perkara perdata terkait masalah Pertanahan sehubungan dengan Pengajuan Gugatan Perbuatan
Melawan Hukum di PN Tarakan terhadap Syamsuri dengan no perkara 14/Pdt.G/2011/Pn.Trk.
Civil case on Land issues concerning the Filing Lawsuit of Unlawful act at Tarakan District Court
against Syamsuri wih Case No. 14/Pdt.G/2011/Pn.Trk.
119
NO.
9
10
INTISARI GUGATAN
Lawsuit Summary
Perkara perdata terkait masalah kontrak sehubungan dengan Pengajuan gugatan Intervensi
dalam perkara Nomor 454/Pdt.G/2011/PN.Jak.Seltanggal 18 Agustus 2011 di Pengadilan Negeri
Jakarta Selatan.
Civil case on contractual issues related to Intervention Filing in case No. 454/Pdt.G/2011/PN.Jak.Sel.
dated August 18, 2011 at South Jakarta District Court.
Perkara perdata terkait masalah kontrak sehubungan dengan Pengajuan gugatan pembatalan
putusan arbitrase perkara Nomor 680/Pdt.G/2011/PN.Jak.Seldi Pengadilan Negeri Jakarta
Selatan.
Civil case on contractual issues concerning the filing of arbitration decision nullification Case No.
680/ Pdt.G/2011/PN.Jak.Sel. at South Jakarta District Court.
11
Perbuatan melawan hukum berupa penyerobotan tanah adat yang terletak di area perumahan
dinas lido Jl. Yos Sudarso kota Sorong dalam perkara Perdata No. 38/PDT.G/2012.PN. SRG.
12
Proses di PN Sengeti.
13
Pertamina EP Menang di
Pengadilan Negeri Pihak Lawan
mengajukan Banding.
Unlawful act of customary land encroachment located in the company residential area Lido on Jl. Yos Pertamina EP Won at District Court,
Sudarso, Sorong City in civil case No. 38/PDT.G/2012.PN. SRG.
Plaintiff Filed an Appeal.
120
NO.
14
15
16
17
18
INTISARI GUGATAN
Lawsuit Summary
PN Sorong.
PN Sorong.
PN Sorong.
Gugatan Perbuatan Melawan hukum No. 78/PDT.G/2013/PN. JBI oleh M. Ali Rais dkk terkait
sengketa kepemilikan tanah di Kasang.
Lawsuit against Unlawful act No. 78/PDT.G/2013/PN.JBI by M. Ali Rais et al on land ownership
dispute in Kasang.
PN Jambi.
Gugatan Basthoeni Haroen dalam perkara perdata No. 22/PDT.G/2013/PN ME terkait sengketa
dalam pelaksanaan kontrak pengadaan Jasa peningkatan Jalan di daerah Talang Akar Asset 2.
Haroen Basthoeni lawsuit in civil case No. 22/PDT.G/2013/PN ME on dispute of road improvement
service procurement contract in Talang Akar area of Asset 2.
PN Muara Enim.
121
TATA KELOLA
PERUSAHAAN
Corporate Governance
122
123
Perubahan organisasi
baru diterapkan
melalui implementasi
tata kelola, salah
satunya dengan
menyusun kembali
board manual
The organizational
change has only
been applied
through governance
implementation, such
as reformulating board
manual
124
GOVERNANCE IMPLEMENTATION
PT Pertamina EPs corporate governance is implemented
through three phases that have been implemented since
2007. The Company is currently in the third stage and
continues to work to realize the target of good Corporate
Governance implementation by achieving excellence in its
GCG assessment results, which states a condition where the
GCG is implemented consistently in the entire operations of
the Company.
Ulasan
Review
Peraturan Teknis & Pelaksanaan Technical Rules & Implementation
Prosedur & Proses Bisnis Business Process & Procedure
Piagam Komite Committee Charter
Implementasi Implementation
125
BAPEPAM-LK NO.X.K.6
Pengungkapan bahwa kode etik berlaku bagi Dewan Komisaris, Direksi, dan karyawan
Disclosure that code of conduct is applicable to Board of Commissioners, Board of Directors, and employees
3. Continuous Improvement
The Company already has competencies in business
practices based on the GCG principles and implement
continuous improvement of proper GCG business
practices, GCG learning & sharing, GCG internalization
and dissemination to all members of management
and employees, and annual GCG Assessment by an
independent assessor until it becomes the Companys
culture.
126
BAPEPAM-LK NO.X.K.6
Pokok pokok kode etik
Code of conduct principles
E-Learning EKB
LP2P (Laporan Pajak-Pajak Pribadi)
Code of Conduct
Gratifikasi
Conflic of Interest
ECBC E-Learning
LP2P (Personal Tax Reports)
Code of Conduct
Gratification
Conflict of Interest
127
85.71%
128
PENILAIAN PENERAPAN
TATA KELOLA PERUSAHAAN
Penilaian penerapan tata kelola perusahaan (GCG assessment)
bermanfaat untuk menilai kualitas penerapan GCG secara
berkesinambungan. Selama tahun 2013, Pertamina EP
melakukan independent assessment menggunakan Parameter
Peraturan Menteri BUMN No. PER-01/MBU/2011 tentang
Penerapan Tata Kelola Perusahaan yang Baik (Good Corporate
Governance) pada Badan Usaha Milik Negara (BUMN). Melalui
penilaian tersebut dapat pula diketahui adanya peningkatan
kualitas penerapan prinsip GCG secara berkesinambungan ke
dalam proses bisnis internal. [G4-57] [G4-58]
CORPORATE GOVERNANCE
IMPLEMENTATION ASSESSMENT
Corporate governance implementation assessment (GCG
assessment) is useful to evaluate the quality of GCG
implementation continuously. During 2013, Pertamina EP
conducted an independent assessment using the parameters
of SOE Minister Regulation No. PER-01/MBU/2011 on
Implementation of Good Corporate Governance in State
Owned Enterprises (SOEs). This assessment can also identify
quality improvement of GCG principles implementation
continuously into the internal business process. [G4-57] [G458]
129
NILAI MAKSIMUM
Maximum score
SKOR CAPAIAN
Achievement score
TINGKAT PEMENUHAN
Compliance level
7.000
6.321
9.000
8.051
35.000
30.475
35.000
32.829
9.000
8.056
5.000
Jumlah Total
2013
PENILAI GCG
GCG Assessor
SCORE
(100 Scale)
KATEGORI
Category
88.85
Sangat Baik
Very Good
81.58
84.69
130
Baik
Good
TAHUN
Year
3.125
88.857
Baik
Good
Sangat Baik
Kategori atas penilaian
Independent
assessment GCG
Very Good
Category by Independent
GCG assessment
TUJUAN PELAKSANAAN
TATA KELOLA PERUSAHAAN:
MANFAAT PENERAPAN
TATA KELOLA PERUSAHAAN:
131
GOVERNANCE STRUCTURE
Pursuant to Law No. 40 of 2007 on Limited Liability
Companies, PT Pertamina EPs governance structure
comprises General Meeting of Shareholders (GMS), the Board
of Commissioners and Board of Directors.
Board of
Commissioners
President Director
Board of Commissioners
Secretariate
Development
Director
Production &
Operation Director
Audit Committee
Technical Support
Exploitation
Asset (s)
Treasury &
Finance Operation
Exploration
Surface Facility
Drilling
Controller &
Partnership Financial
New Discovery
Project (s)
EOR
Partnership
ICT
Oil & Gas
Monetization
Strategic Planning
& Risk Management
OC & OE
Internal Audit
HSSE
Human Resources
132
BAPEPAM-LK NO.X.K.6
Uraian program kepemilikan saham oleh
karyawan dan manajemen
Description on employee stock
ownership program
0.01%
99.99%
PT Pertamina (Persero)
Pertamina Dana Ventura
133
BAPEPAM-LK NO.X.K.6
Keputusan RUPS tahun sebelumnya dan realisasinya
Previous years GMS resolutions and their realization
PELAKSANAAN RUPS
RUPS terbagi RUPS Sirkuler dan RUPS
Tahunan. Selama Tahun 2013, Pertamina
EP bersama para pemegang saham telah
mengadakan 24 kali RUPS Sirkuler dan 1
kali RUPS Tahunan.
01 Februari 2013
15 Januari 2013
07 Januari 2013
Penetapan Dividen
Menetapkan dividen untuk
Tahun Buku Yang Berakhir
Sampai Dengan 31 Desember
2011 kepada Para Pemegang
Saham Perseroan sebesar
Rp15.824.590.208.057 (lima belas
triliun delapan ratus dua puluh
empat miliar lima ratus sembilan
puluh juta dua ratus delapan ribu
lima puluh tujuh rupiah)
05 Maret 2013
Pengangkatan Direktur Operasi
dan Produksi
134
04 April 2013
Pengangkatan Direktur
Pengembangan
Mengangkat Sdr. Beni Jaffilius
Ibradi AD sebagai PJ. Direktur
Pengembangan Perseroan,
berlaku efektif terhitung mulai
tanggal Keputusan Pemegang
Saham Secara Sirkuler ini
ditandatangani, untuk jangka
waktu 1 (satu) periode
sebagaimana dimaksud dalam
Anggaran Dasar Perseroan atau
sampai dengan Rapat Umum
Pemegang Saham Perseroan
memutuskan lain.
Pemberhentian Direktur
Operasi dan Produksi
Memberhentikan dengan
hormat Sdr. Bagus Sudaryanto
sebagai Direktur Operasi dan
Produksi Perseroan, beriaku
efektif terhitung mulai tanggal
Keputusan Pemegang Saham
secara Sirkuler ini ditandatangani
dan disertai ucapan terima
kasih atas jasa-jasanya terhadap
Perseroan.
29 April 2013
Penetapan penghargaan atas
kinerja tahunan kepada Direksi
dan Dewan Komisaris untuk tahun
buku 2012 sebesar 28,1 kali gaji/
honorarium tanpa tunjangan yang
berlaku pada Tahun Buku 2012
21 Februari 2013
Rencana Kerja dan Anggaran
Perusahaan Tahun Buku 2013
21 Februari 2013
05 Februari 2013
Persetujuan Pengalihan
Saham milik Koperasi
Energi Indonesia kepada PT
Pertamina Dana Ventura
Menyetujui pengalihan 25
(dua puluh lima) lembar
saham Perseroan yang
dimiliki oleh Koperasi
Energi Indonesia kepada PT
Pertamina Dana Ventura.
Persetujuan
penandatanganan Suban
Field Unitization & Unit
Operating Agreement
Menyetujui Direksi Perseroan
untuk melaksanakan
penandatanganan Suban
field Unitization and Unit
Operating Agreement antara
Perseroan, PT Pertamina
Hulu Energi Corridor,
Talisman (Corridor) Ltd dan
ConocoPhillips {Grissik) Ltd.
03 Juni 2013
13 Mei 2013
08 Mei 2013
Pemberhentian Komisaris
Penggantian Komisaris
135
25 Juni 2013
17 Juni 2013
17 Juni 2013
13 Juni 2013
Persetujuan
Penandatanganan
Perjanjian KSO
Produksi Operasi
Lapangan Pandan
Petanang-Tapus
Menyetujui Direksi
Perseroan untuk
melaksanakan
penandatanganan
Perjanjian Kerjasama
Operasi (KSO) Produksi
Area Operasi Lapangan
Pandan-Petanang-Tapus.
Perubahan
Anggaran Dasar
Menyetujui
untuk melakukan
perubahan
pasal-pasal dalam
Anggaran Dasar
Perseroan.
Key Performance
Indicator (KPI)/
Kesepakatan
Kinerja Tahun 2013
Menyetujui Key
Performance
Indicator (KPI) /
Kesepakatan Kinerja
Perseroan Tahun
2013 sebagaimana
teriampir dan
menjadi bagian yang
tidak terpisahkan
dari RKAP 2013
Perseroan.
20 September 2013
Pergantian Direktur Pengembangan dan Direktur Operasi dan Produksi
1. Memberhentikan dengan hormat Sdr. Satoto Agustono sebagai Direktur Operasi dan
Produksi Perseroan, beriaku efektif terhitung mulai tanggal Keputusan Pemegang Saham
secara Sirkuler ini ditandatangani dan disertai ucapan terima kasih atas jasa-jasanya
terhadap Perseroan.
2. Memberhentikan dengan hormat Sdr. Beni Jaffilius Ibradi AD sebagai Direktur
Pengembangan Perseroan, beriaku efektif terhitung mulai tanggal Keputusan Pemegang
Saham secara Sirkuler ini ditandatangani dan disertai ucapan terima kasih atas jasa-jasanya
terhadap Perseroan.
3. Mengangkat Sdr. Satoto Agustono sebagai PJ. Direktur Pengembangan Perseroan,
berlaku efektif terhitung mulai tanggal Keputusan Pemegang Saham Secara Sirkuler
ini ditandatangani, untuk jangka waktu 1 (satu) periode sebagaimana dimaksud dalam
Anggaran Dasar Perseroan atau sampai dengan Rapat Umum Pemegang Saham Perseroan
memutuskan lain.
4. Mengangkat Sdr. Beni Jaffilius Ibradi AD sebagai PJ. Direktur Operasi dan Produksi
Perseroan, berlaku efektif terhitung mulai tanggal Keputusan Pemegang Saham Secara
Sirkuler ini ditandatangani, untuk jangka waktu 1 (satu) periode sebagaimana dimaksud
dalam Anggaran Dasar Perseroan atau sampai dengan Rapat Umum Pemegang Saham
Perseroan memutuskan lain.
136
Penetapan Pejabat
Definitif Direktur
Operasi dan
Produksi
Menetapkan Sdr.
Satoto Agustono
semula sebagai PJ.
Direktur Operasi
dan Produksi
Perseroan, menjadi
Direktur Operasi dan
Produksi Perseroan
berlaku efektif
terhitung mulai
tanggal keputusan
Pemegang Saham
secara Sirkuler ini
ditandatangani.
18 Oktober 2013
Pemberhentian Komisaris
1. Memberhentikan dengan
hormat Sdr. Susilo
Siswoutomo sebagai
Komisaris Perseroan, berlaku
efektif terhitung mulai
tanggal Keputusan Pemegang
Saham secara Sirkuler ini
ditandatangani dan disertai
ucapan terima kasih atas jasajasanya terhadap Perseroan.
2. Memberhentikan dengan
hormat Sdr. Gde Pradnyana
sebagai Komisaris Perseroan,
berlaku efektif terhitung mulai
tanggal Keputusan Pemegang
Saham secara Sirkuler ini
ditandatangani dan disertai
ucapan
26 Juni 2013
26 Juni 2013
Penetapan Pejabat
Definitif Direktur
Pengembangan
Menetapkan
Sdr. Beni Jaffilius
Ibradi AD semula
sebagai PJ. Direktur
Pengembangan
Perseroan,
menjadi Direktur
Pengembangan
Perseroan berlaku
efektif terhitung mulai
tanggal Keputusan
Pemegang Saham
secara Sirkuler ini
ditandatangani.
31 Juli 2013
Revisi (Perbaikan)
Luasan Area
Penyisihan Wilayah
Kerja (Relinquish)
Menyetujui Direksi
Perseroan untuk
melaksanakan revisi
luasan area penyisihan
wilayah kerja
(relinquish) Perseroan
di 8 (delapan) Area
20 November 2013
Penggantian Presiden Direktur
30 Oktober 2013
Penandatanganan
Perjanjian KSO
Produksi-EOR Area
Operasi Kawengan,
Ledok, Nglobo dan
Semanggi (Perjanjian
KSO Area Cepu Cluster)
Menyetujui Direksi
Perseroan untuk
melaksanakan
penandatanganan
Perjanjian Kerja Sama
Operasi (KSO) untuk
Produksi-EOR untuk
Area Operasi Kawengan,
Ledok, Nglobo dan
Semanggi antara
Perseroan dengan PT
Geo Cepu Indonesia.
30 Oktober 2013
Penetapan Direktur Operasi
dan Produksi & Direktur
Pengembangan
Menetapkan:
Sdr. Beni Jaffilius Ibradi AD
semula sebagai PJ. Direktur
Operasi dan Produksi
Perseroan menjadi Direktur
Operasi dan Produksi
Perseroan
Sdr. Satoto Agustono
semula sebagai PJ.
Direktur Pengembangan
Perseroan menjadi Direktur
Pengembangan Perseroan
berlaku efektif terhitung
mulai tanggal Keputusan
Pemegang Saham secara
Sirkuler ini ditandatangani.
1. Memberhentikan dengan
hormat Sdr. Syamsu Alam
sebagai Presiden Direktur
Perseroan,berlaku efektif
terhitung mulai tanggal
Keputusan Pemegang Saham
secara Sirkuler ini ditandatangani
dan disertai ucapan terima
kasih atas jasa-jasanya terhadap
Perseroan.
2. Mengangkat Sdr. Adriansyah
sebagai PJ. Presiden Direktur
Perseroan, terhitung mulai
tanggal Keputusan Pemegang
Saham secara Sirkuler ini
ditandatangani untuk jangka
waktu 1(satu) periode
sebagaimana dimaksud dalam
Anggaran Dasar Perseroan atau
sampai dengan Rapat Umum
Pemegang Saham Perseroan
memutuskan lain.
30 Desember 2013
Penetapan Pejabat
Definitif Presiden
Direktur
Menetapkan sdr
Adriansyah yang
semula sebagai PJ
Presiden Direktur
Perseroan menjadi
Presiden Direktur
Perseroan, berlaku
efektif terhitung mulai
tanggal Keputusan
Pemegang Saham
secara Sirkuler ini
ditandatangan.
137
GMS IMPLEMENTATION
GMS is divided into Circular GMS and the
Annual General Meeting of Shareholders
(AGMS). During 2013, Pertamina EP
together with shareholders have held 24
Circular GMS and 1 AGMS
February 1, 2013
January 15, 2013
January 7, 2013
Dividend Approval
Resolved that dividend payment
for the Year Ended December
31, 2011, to the Companys
Shareholders amounted to
Rp15,824,590,208,057 (fifteen
trillion eight hundred twenty four
billion five hundred ninety million
two hundred eight thousand fifty
seven rupiah)
March 5, 2013
Appointment of Operations
and Production Director
138
April 4, 2013
Appointment of Developmment
Director
Appointed Mr. Beni Jaffilius
Ibradi AD as Acting Director of
Operations and Production of
the Company effective from the
date of the Circular Shareholders
Resolution is signed, for a term of
one (1) period as stipulated in the
Articles of Association until the
General Meeting of Shareholders
of the Company decides
otherwise.
April, 29 2013
Approved appreciation for
Board of Directors and Board of
Commissioners performance for
the financial year 2012 as much
as 28.1 times the applied salary/
honorarium at Financial Year 2012.
Approval of Suban
Field Unitization & Unit
Operating Agreement
Signing
Approved Board of
Directors to sign Suban
Field Unitization and Unit
Operating Agreement
between the Company,
PT Pertamina Hulu Energi
Corridor, Talisman (Corridor)
Ltd and ConocoPhillips
(Grissik) Ltd
June 3, 2013
May 8, 2013
Commissioner Termination
Commissioner Replacement
Commerciality Activities in
Working Areas of Pertamina
and PT Pertamina EP
Instructed Board of
Directors to carry out
Decree of the Board of
Directors of PT Pertamina
(Persero) No.RRD-81/
C00000/2013-S0 dated April
30, 2013, which essentially
requires that the Companys
gas commercialization
activities are carried out by
the Directorate of Gas PT
Pertamina (Persero).
139
Amendment to
the Articles of
Association
Approved to
make changes
to the articles of
the Articles of
Association of the
Company.
Key Performance
Indicator (KPI)/
Performance
Agreement 2013
Approved Key
Performance
Indicators (KPIs)/
Performance
Agreements of the
Company in 2013
as attached and
become an integral
part of the 2013
Corporate Work
Plan & Budget of the
Company.
140
Appointment of
Definitive Officer
of Operations
and Production
Director.
Appointed Mr. Satoto
Agustono, formerly
Acting Director of
Operations and
Production of
the Company, to
assume position
as Operations and
Production Director
effective from the
date of Circular
Shareholders
Resolution is signed.
141
Tanggal Date
Tempat Place
142
BAPEPAM-LK NO.X.K.6
Dasar penetapan Dewan Komisaris
Board of Commissioners basis of appointment
DEWAN KOMISARIS
Dewan Komisaris merupakan organ tata kelola yang
bertugas mengawasi dan memberikan nasihat kepada
Direksi. Pelaksanaan tugas, kewenangan dan tanggung
jawab Dewan Komisaris diatur dalam Anggaran Dasar
Perusahaan berpedoman pada Anggaran Dasar Perusahaan.
BOARD OF COMMISSIONERS
Board of Commissioners is the governance body organ that
oversees and provides advices to the Board of Directors. The
implementation of duties, authority and responsibilities of
the Board of Commissioners is stipulated in the Companys
Articles of Association.
143
JABATAN
Position
PERIODE
Period
Muhamad Husen
Komisaris Commisioner
Achmad Luthfi
Mulyani Wahyono
Komisaris Commisioner
Susilo Siswoutomo
Komisaris Commisioner
Gde Pradnyana
144
BAPEPAM-LK NO.X.K.6
Uraian pelaksanaan tugas Dewan Komisaris
Description of the Board of Commissioners
duty implementation
BAPEPAM-LK NO.X.K.6
Perubahan struktur Dewan Komisaris
Change of the Board of
Commissioners structure
145
146
a. To Shareholders 7 times.
147
BAPEPAM-LK NO.X.K.6
Pelatihan Dewan Komisaris
Board of Commissioners training
a. Jambi
b. Cepu
c. Prabumulih
d. Tanjung
a. Jambi
b. Cepu
c. Prabumulih
d. Tanjung
Tanggal
Date
DEWAN KOMISARIS
BOC
1.
4 Mei May 4
Achmad Luthfi
148
NO
BAPEPAM-LK NO.X.K.6
Pengungkapan kebijakan perusahaan dan pelaksanaan Dewan Komisaris
Disclosure of the companys policies and implementation by Board of
Commissioners
Muhamad Husen
Susilo Siswoutomo
1. Mengawasi kinerja Direksi dalam aspek kepatuhan terhadap peraturan dan perundang-undangan
Overseeing the Board of Directors performance in the aspect of compliance with laws and regulations
2. Mengawasi kinerja Direksi dalam bidang Pengembangan
Overseeing the Board of Directors performance in Development area
M. Afdal Bahaudin
Gde Pradnyana
Muhamad Husen
149
BAPEPAM-LK NO.X.K.6
Frekuensi rapat Dewan Komisaris
Frequency of Board of Commissioners meetings
BAPEPAM-LK NO.X.K.6
Remunerasi Dewan Komisaris
Board of Commissioners remuneration
BOC MEETING
Board of Commissioners meeting is held at least once in
every month. A binding resolution is declared valid if the
attendees or their representatives are more than (one
half ) of total members of the Board of Commissioners.
The meeting is also used as mechanism for BOC to assess
their duty and responsibility implementation performance,
including corporate social responsibility fulfillment. Board of
Commissioners meeting may invite BOD, Audit Committee as
well as Investment and Risk Management Committee. [G4-47]
1
23
Muhamad Husen
Mohamad Afdal
2
20
3
21
4
24
5
29
6
20
7
25
8
26
9
24
10
21
Assignment
Assignment
Achmad Luthfi
Mulyani Wahyono
Assignment
Susilo Siswoutomo
Gde Pradnyana
Meeting
11
29
12
29
Assignment
Assignment
Meeting
Meeting
Inauguration
Meeting
12
100%
12
58%
78%
100%
100%
80%
Assignment Assignment
Bahaudin
PERIODE
PERIOD
Muhamad Husen
Achmad Luthfi
Mulyani Wahyono
Susilo Siswoutomo
Gde Pradnyana
150
BAPEPAM-LK NO.X.K.6
Dasar penetapan Direksi
Board of Directors basis of appointment
71%
6%
Remunerasi &
Fasilitas
Remuneration
& Facilities
Tunjangan Hari
Raya Keagamaan
Religious Holiday
Allowance
TOTAL
Rp5.595.950.275
23%
TAX
TAX
DIREKSI
Direksi adalah organ tata kelola yang bertugas dan
bertanggung jawab secara kolegial dalam mengelola
Perusahaan. Masing-masing pejabat Direksi tidak memiliki
hubungan afiliasi dengan pemegang saham maupun Dewan
Komisaris dan sesama Direksi lainnya.
BOARD OF DIRECTORS
Board of Directors (BOD) is the Companys organ in charge
of and collegially responsible for managing the Company.
Each member of the Board of Directors has no affiliation with
shareholders or Board of Commissioners and other members
of Board of Directors.
151
KOMPOSISI DIREKSI
Komposisi Direksi pada tanggal 31 Desember 2013, terdiri
dari lima pejabat Direktur, dan salah seorang di antaranya
adalah perempuan. Tidak ada pejabat Direksi yang
melakukan rangkap jabatan sebagai pejabat perusahaan satu
tingkat di bawah Direktur. [G4-38] [G4-39]
152
BAPEPAM-LK NO.X.K.6
Dasar penetapan Direksi
Board of Directors basis
of appointment
BAPEPAM-LK NO.X.K.6
Perubahan struktur Direksi
Change of Board of
Directors structure
ANGGOTA DIREKSI
BOD Member
JABATAN
Position
ANGGOTA DIREKSI
BOD Member
JABATAN
Position
Syamsu Alam
Adriansyah
Doddy Priambodo
Doddy Priambodo
Lukitaningsih
Satoto Agustono
Lukitaningsih
153
BAPEPAM-LK NO.X.K.6
Ruang lingkup pekerjaan dan tanggung jawab
Scope of work and responsibilities
154
155
156
BAPEPAM-LK NO.X.K.6
BAPEPAM-LK NO.X.K.6
Pelatihan Direksi pengungkapan kebijakan perusahaan dan pelaksanaan Direksi
Board of Directors Disclosure of the companys policies and implementation by
training
Board of Directors
TANGGAL
Date
1.
2.
3.
4.
5.
6.
7.
8.
9.
Syamsu Alam
Adriansyah
11. Studi EOR & POFD EOR | EOR Study & EOR POFD
12. Indonesia Investment Forum 2013 Preparing for the New Era
13. Peran NOC terhadap Ketahanan Energi Nasional | The role of NOC in
National Energy Security
14. Workshop-Percepatan Produksi Migas Nasional | National Oil & Gas
Production Acceleration Workshop
15. Indonesian Institute for Corporate Directorship
DIREKSI
BOD
Doddy
Priambodo
Satoto
Agustono
Lukitaningsih
Beni Jaffilius
Ibradi AD.
157
Presiden Direktur
Menetapkan dan mengendalikan kebijakan dan sasaran
strategis kegiatan eksplorasi, pengembangan, operasi dan
produksi migas di wilayah kerja PT Pertamina EP melalui tata
kelola kegiatan yang efektif, efisien, aman dan berwawasan
lingkungan untuk memaksimalkan nilai tambah bagi
pemangku kepentingan dalam pencapaian sasaran strategis
perusahaan.
President Director
Establish and control policies and strategic goals of oil and
gas exploration, development, operations and production at
PT Pertamina EPs working areas through effective, efficient,
safe and environmentally friendly activity governance to
maximize added value for stakeholders in achieving the
companys strategic goals.
Direktur Pengembangan
Menetapkan dan mengendalikan kebijakan serta sasaran
strategis pengelolaan surface facilities, kegiatan eksploitasi
dan Enhanced Oil Recovery melalui tata kelola kegiatan
yang efektif, efisien, aman dan berwawasan lingkungan
untuk meningkatkan keberhasilan kegiatan engineering
dan pengembangan lapangan serta eksekusi proyek sesuai
kaidah good oil and gas engineering practice dan standar
operation excellence.
Development Director
Establish and control policies and strategic goals of surface
facility management, exploitation and Enhanced Oil
Recovery activities through effective, efficient, safe and
environmentally friendly activity governance to increase
the success of engineering activities and field development,
as well as project execution according to good oil and gas
engineering practices and standard operation excellence.
158
Responsible for:
Implementation of financial policies and management.
159
BAPEPAM-LK NO.X.K.6
Pengungkapan kebijakan perusahaan tentang penilaian kinerja Direksi
Disclosure of the companys policies on Board of Directors performance assessment
FREQ MONITORING
Monitoring Freq
BOBOT
Weight Value
I. Financial
Bulanan | Mothly
35%
36.0%
II. Operational
Bulanan | Mothly
40%
37.7%
Bulanan | Mothly
15%
11.3%
Tri-wulanan | Quarterly
10%
11.0%
NO
FREQ MONITORING
Monitoring Freq
SATUAN
Unit
TARGET
Target
1.
GCG Compliance
Tri-wulanan | Quarterly
85
88.85
2.
PROPER
Tri-wulanan | Quarterly
Jumlah Total
17
19
3.
Emission Reduction
Tri-wulanan | Quarterly
% Reduction
16.51
4.
Tri-wulanan | Quarterly
% Reduction
12
17.47
5.
Learning Index
Tri-wulanan | Quarterly
50
53.57
6.
Tri-wulanan | Quarterly
80
87.81
KINERJA
Performance
KINERJA
Performance
Bulanan | Mothly
15
18
8.
Knowledge sharing
Tri-wulanan | Quarterly
20.00
24
RAPAT DIREKSI
Sebagai bagian dari penerapan tata kelola perusahaan yang
baik, Direksi secara berkala maupun sewaktu-waktu dapat
melakukan rapat. Baik yang bersifat internal maupun dengan
satuan kerja terkait. Pelaksanaan rapat menjadi salah satu
mekanisme evaluasi pelaksanaan tugas, kewenangan dan
tanggung jawab Direksi, termasuk dalam hal pemenuhan
tanggung jawab sosial. Selama tahun 2013 Direksi telah
melakukan rapat sebanyak 31 kali. [G4-47]
BOD MEETING
As part of the implementation of good corporate
governance, the Board of Directors holds meeting regularly
and at any time required, both internally and with related
units. Implementation of meetings is one of evaluation
mechanisms on implementation of BODs duties, authorities
and responsibilities, including social responsibility fulfillment.
During 2013, BOD has held 31 meetings. [G4-47]
160
BAPEPAM-LK NO.X.K.6
Frekuensi rapat Direksi
Frequency of Board of Directors meetings
1
24/9
2
24/9
3
24/9
4
24/9
5
24/9
6
24/9
7
24/9
8
24/9
9
24/9
10
24/9
11
24/9
12
24/9
JUMLAH HADIR
Total attendance
JUMLAH RAPAT
Total meetings
50%
Adriansyah
Syamsu Alam
Doddy Priambodo
25
29
86%
Bagus Sudaryanto
25
31
80%
24
26
88%
Satoto Agustono
27
29
93%
Lukitaningsih
29
31
93%
Rata-rata Average
85%
JABATAN
Position
PERIODE
Period
Adriansyah
Presiden Direktur
Presiden Direktur
Presiden Direktur
Presiden Direktur
Direktur Operasi
Operations Director
Direktur Pengembangan
Development Director
Direktur Pengembangan
Development Director
Doddy Priambodo
Syamsu Alam
Bagus Sudaryanto
Beni Jafilius Ibradi AD
Satoto Agustono
Lukitaningsih
161
BAPEPAM-LK NO.X.K.6
Remunerasi Direksi
Board of Directors remuneration
23%
5%
TAX
TAX
Cuti
Leave
5%
Tunjangan Hari
Raya Keagamaan
Religious Holiday
Allowance
TOTAL
Rp17.827.271.396
66%
Remunerasi & Fasilitas
Remuneration &
Facilities
162
KOMITE AUDIT
Komite Audit dibentuk Dewan Komisaris dan secara
struktural berada langsung di bawah Dewan Komisaris.
Komite dibentuk untuk membantu dan memperkuat fungsi
Dewan Komisaris dalam menjalankan fungsi pengawasan
atas proses penyusunan laporan keuangan, pemilihan
auditor eksternal dan proses auditnya, termasuk melakukan
evaluasi independensi dari auditor eksternal, proses audit
oleh Internal Audit, assessment control dan risiko serta
penerapan GCG.
AUDIT COMMITTEE
Audit Committee was formed by the Board of Commissioners
and structurally is directly under the BOC. The Committee
was formed to assist and strengthen the function of BOC in
exercising oversight over the preparation process of financial
statements, the selection of external auditors and the audit
process, including performing evaluation of the external
auditor independence, audit by the Internal Audit Unit,
control and risk assessment as well as GCG implementation.
163
BAPEPAM-LK NO.X.K.6
Nama, hukum penetapan, riwayat jabatan dan pendidikan Komite Audit
Name, legal basis of appointment, history of job and education of Audit Committee
BAPEPAM-LK NO.X.K.6
Pengungkapan independensi Komite Audit
Disclosure of of Audit Committees independence
BAPEPAM-LK NO.X.K.6
Periode Jabatan Komite Audit
Office term of Audit Committee
M. AFDAL BAHAUDIN
164
BAPEPAM-LK NO.X.K.6
Uraian tugas dan tanggung jawab Komite Audit
Description of duties and responsibilities of
Audit Committee
165
166
BAPEPAM-LK NO.X.K.6
Pengungkapan independensi Komite Audit
Disclosure of of Audit Committees
independence
BAPEPAM-LK NO.X.K.6
Frekuensi rapat Komite Audit
Frequency of Audit
Committee meetings
BAPEPAM-LK NO.X.K.6
Uraian singkat pelaksaan tugas Komite Audit
Brief description of duty implementation of
Audit Committee
167
BAPEPAM-LK NO.X.K.6
Nama, hukum penetapan, riwayat jabatan dan pendidikan Komite Investasi dan Manajemen Risiko
Name, legal basis of appointment, history of job and education of Investment and Risk
Management Committee
BAPEPAM-LK NO.X.K.6
Periode Jabatan Komite Investasi dan Manajemen Risiko
Office term of Investment and Risk Management
Committee
M. AFDAL BAHAUDIN
168
BAPEPAM-LK NO.X.K.6
Uraian tugas dan tanggung jawab Komite
Investasi dan Manajemen Risiko
Description of duties and responsibilities of
Investment and Risk Management Committee
BAPEPAM-LK NO.X.K.6
Pengungkapan independensi Komite
Investasi dan Manajemen Risiko
Disclosure of of Investment and Risk
Management Committees independence
BAPEPAM-LK NO.X.K.6
Frekuensi rapat Komite Investasi
dan Manajemen Risiko
Frequency of Investment and Risk
Management Committee meetings
REKAPITULASI RAPAT DAN TINGKAT KEHADIRAN KOMITE INVESTASI DAN MANAJEMEN RISIKO
Investment and Risk Management Committee meeting recapitulation and attendance rate
NAMA
Name
JABATAN
Position
STATUS INDEPENDENSI
Independence status
JUMLAH RAPAT
Total meetings
JUMLAH KEHADIRAN
Total attendance
TINGKAT KEHADIRAN
Attendance rate
M. Afdal Bahaudin
Ketua Komite
Committee Chairman
Anggota Komite
Committee Member
Anggota Komite
Committee Member
Non independen
Non-independent
Independen
Independent
Independen
Independent
67%
67%
67%
169
BAPEPAM-LK NO.X.K.6
Uraian singkat pelaksaan tugas Komite Investasi dan Manajemen Risiko
Brief description of duty implementation of Audit Committee
170
BAPEPAM-LK NO.X.K.6
Nama, hukum penetapan, riwayat jabatan dan pendidikan Komite Etika dan GCG
Name, legal basis of appointment, history of job and education of Ethics and
GCG Committee
171
BAPEPAM-LK NO.X.K.6
Uraian tugas dan tanggung jawab Komite Etika dan GCG
Description of duties and responsibilities of Ethics and GCG Committee
172
BAPEPAM-LK NO.X.K.6
Frekuensi rapat Komite Etika dan GCG
Frequency of Ethics and GCG Committee meetings
JABATAN
Position
JUMLAH
RAPAT
Total
meeting
JUMLAH
KEHADIRAN
Total
attendance
TINGKAT
KEHADIRAN
Attendance
rate
8
11
7
10
88%
91%
VP. Exploration
VP. Exploitation
VP. Legal & Relation
VP. Organization Capabilities dan Operating Exellence
VP. Drilling
VP. Human Resource
VP. Supply Chain Management & General Services
VP. Health, Safety, Security, & Environment
VP. Strategic Planning & Risk Management
VP. Controller & Partnership Financial
VP. Information & Communication Technology
System & Process Manager
11
8
11
11
11
11
7
11
11
11
11
11
8
3
9
8
2
6
3
4
5
5
8
11
73%
38%
82%
73%
18%
55%
43%
36%
45%
45%
73%
100%
173
BAPEPAM-LK NO.X.K.6
Uraian singkat pelaksaan tugas Komite Etika dan GCG
Brief description of duty implementation of Ethics and GCG Committee
Penanganan pengaduan
Selama tahun 2013, jumlah pengaduan yang melalui
email kepada komite etika sebanyak 1 pengaduan. Atas
pengaduan tersebut sudah ditindaklanjuti dan saat ini
sedang dalam penyusunan laporan.
Complaint handling
During 2013, the number of complaints sent via email to
the committee was 1 complaint. The complaint has been
followed up and is currently in the process of reporting.
174
BAPEPAM-LK NO.X.K.6
Nama, hukum penetapan, riwayat jabatan dan pendidikan Sekretaris Perusahaan
Name, legal basis of appointment, history of job and education of Corporate
Secretary
SEKRETARIS PERUSAHAAN
Sekretaris Perusahaan berperan penting sebagai pejabat
penghubung antara pemegang saham, Dewan Komisaris,
Direksi dan pemangku kepentingan. Sekretaris Perusahaan
juga bertindak sebagai sumber informasi dan senantiasa
meningkatkan hubungan komunikasi internal dan eksternal
terkait dengan kegiatan usaha PT Pertamina EP.
AJI PRAYUDI
Sekretaris Perusahaan
Corporate Secretary
CORPORATE SECRETARY
The Company Secretary plays an important role as a
liaison officer between the shareholders, the Board of
Commissioners, Board of Directors and stakeholders.
Corporate Secretary also acts as information source and
constantly improve internal communications and external
relations regarding business activities of PT Pertamina EP.
1.
2.
3.
4.
Legal Manager
Public Relations Manager
Formalities Manager
Government Relations Manager
175
BAPEPAM-LK NO.X.K.6
Uraian tugas dan tanggung jawab Sekretaris Perusahaan
Description of duties and responsibilities of Corporate Secretary
176
BAPEPAM-LK NO.X.K.6
Uraian singkat pelaksanaan tugas sekretaris perusahaan
Brief description of corporate secretarys duty
implementation
INTERNAL AUDIT
Perusahaan membentuk Internal Audit (semula disebut
Satuan Pengawas Internal) yang berfungsi melakukan
pengawasan/audit keuangan maupun pelaksanaan
operasional. Internal Audit juga memastikan bahwa
Laporan Keuangan Konsolidasian disusun dalam suatu
sistem manajemen risiko yang sehat, memenuhi aturan dan
pengendalian internal Perusahaan serta dilaksanakan sesuai
dengan kebijakan dan peraturan perundang-undangan yang
berlaku.
INTERNAL AUDIT
The Company formed the Internal Audit (originally referred to
as Internal Control Unit) unit to perform supervisory/financial
audits and operational implementation. Internal Audit unit
also ensures that the Consolidated Financial Statements are
prepared in a sound risk management system, and comply
with the Companys rules and internal control as well being
implemented in accordance with policies and applicable laws
and regulations.
177
BAPEPAM-LK NO.X.K.6
Nama, hukum penetapan, riwayat jabatan dan pendidikan Audit internal
Name, legal basis of appointment, history of job and education of internal audit
BAPEPAM-LK NO.X.K.6
tugas dan tanggung jawab unit audit internal sesuai piagam charter
Duties and responsibilities of internal audit unit according to its charter
178
Compliance to standards.
179
BAPEPAM-LK NO.X.K.6
uraian singkat pelaksanaan tugas unit audit internal selama tahun buku
Brief description of internal audit units duty implementation during the financial year
BAPEPAM-LK NO.X.K.6
review efektivitas sistem pengendalian interen; (hasil audit)
Review on internal control system effectiveness; (audit findings)
JUMLAH OBJEK
PENUGASAN
Number of
Assigment Object
KETERANGAN
Description
Audit Audit
a. Audit Operasional Operational Audit
24
7
6
Meliputi 10 audit atas aktivitas internal Perusahaan dan audit atas 14 Mitra (KSO/TAC)
Covering 10 audits on the Companys internal activities and audit on 14 Partners (KSO/TAC)
Audit berakhirnya kontrak Mitra KSO/ TAC Audit on KSO/TAC Partners contract termination
Audit khusus atas permintaan Manajemen / tujuan tertentu / pengaduan masyarakat/
pihak yang terkait dengan kegiatan Perusahaan.
Special audit upon Management request/special purpose/public complaints/parties related
to the Companys activities
Pemberian konsultasi kepada manajemen. Providing consultation to management.
Assessment atas implementasi GCG Assessment on GCG implementation
Konsultasi Consultation
Assessment Assessment
180
53
1
BAPEPAM-LK NO.X.K.6
kualifikasi atau sertifikasi sebagai profesi audit internal
Professional qualification or certification as internal
auditor
PENYELENGGARA
Organizer
6
7
8
9
10
11
12
13
14
15
16
17
Tanggal
Date
27 Juni | June
21 Agustus | August
LSPMR
BPM Institute
YPIA
LSPMR
21 22 Oktober | October
APPI
18 20 Desember | December
ACFE
2 3 Desember | December
181
BAPEPAM-LK NO.X.K.6
pengendalian keuangan dan operasional, serta kepatuhan terhadap peraturan perundang-undangan lainnya
Control of finance and operations, and compliance with other laws and regulations
BAPEPAM-LK NO.X.K.6
review efektivitas sistem pengendalian interen; (hasil audit)
Review on internal control system effectiveness; (audit findings)
2013
2012
2011
2110
2009
182
183
BAPEPAM-LK NO.X.K.6
gambaran umum mengenai sistem manajemen risiko
General overview on risk management system
184
:
:
:
:
185
:
:
:
:
186
MEIDAWATI
VP. STGC Plan & Risk Management
Mengawali karir di PT Pertamina (Persero) pada
tahun 1989 dan bergabung di PT Pertamina
EP tahun 2006. Menjabat sebagai VP Strategic
Planning & Risk Management sejak tahun 2013.
187
:
:
:
:
ASSET
Penasehat Advisor
Koordinator Coordinator
Sekretaris Secretary
Tanggung jawab utama Tim & Sub Tim Unit Kerja Manajemen
Risiko, antara lain:
Mempersiapkan dan memastikan agar implementasi
Manajemen Risiko Perusahaan dapat berjalan dengan
lancar dan sesuai target yang direncanakan sesuai
dengan Kebijakan Manajemen Risiko Pertamina EP.
Melaksanakan aktifitas Manajemen Risiko pada fungsi
masing-masing.
Menyampaikan laporan tertulis secara berkala kepada
Komite Manajemen Risiko.
188
3. Upside risk is the risk that does not directly affects the
achievement of the Companys net income, but may
affect long-term performance and should be managed
intensively to reduce the potential future losses and
increase earning potential.
189
BAPEPAM-LK NO.X.K.6
uraian mengenai sistem pelaporan pelanggaran (whistleblowing system)
Description on whistleblowing system
190
The issues that may be reported are violations that meet the
following criteria:
Violate laws and regulations, such as signature forgery,
corruption, embezzlement, mark-ups, drug abuse,
vandalism.
191
REALISASI KINERJA
SUPPLY CHAIN MANAGEMENT [G4-12]
Pertamina EP menjalin kerjasama dengan perusahaanperusahaan sebagai pemasok barang maupun jasa, sesuai
kontrak kerja yang sudah disepakati bersama. Melalui fungsi
Supply Chain Management (SCM), perusahaan mengelola
rantai pasokan yang mencakup jasa alihdaya, material dan
jasa operasional, jasa logistik, serta jasa perkantoran dan
perumahan.
192
5.25 %
5.47 %
2010
2011
2012
2013
193
PENGHARGAAN PROPER
PROPER Awards
12
19
20
15
7
2011
2012
2013
2012
2013
27
27
26**
194
195
MANAJEMEN RISIKO
Risk Management
196
MANAJEMEN RISIKO
Risk Management
197
BAPEPAM-LK NO.X.K.6
Jenis risiko dan cara pengelolaannya
Types of risk and their management
2013
2009
- FirstRisk Register
- Establishing an
independent Risk
Management
Function
2010
-Risk Awareness
(Socialization of risk
to BoD and BoC PEP)
-Updating Risk
Register & Risk
Monitoring
-Certification of Risk
Management to Risk
Management Staff
and Risk Management
Team in Field/Other
Functions
-Establishment of Risk
Management Online
System
2011
- Continual
Improvement of
Risk Register &
Risk Monitoring
198
2012
- Risk Based
Inspection
- Development of
Risk Appetite &
Risk Tolerance
- Risk Based Audit
- Continual
Improvement of
Risk Register &
Risk Monitoring
- Implementation of
KPI Pengelolaan
ManajemenRisiko
for BoD and
Management Level
(VP & GM)
- Improvement of Risk
Management Online
System
- Continual
Improvement of Risk
Register & Risk
Monitoring
TOP 50 RISKS
Dari total 296 Risiko dipilih 50 risiko tertinggi berdasarkan
nilai Risk Priority Number (RPN) perkalian Probability dan
Impact yang dikelompokkan ke 9 jenis risiko sebagai
berikut:
TOP 50 RISKS
Of the total 296 Risks, 50 top risks are selected based on the
Risk Priority Number (RPN) multiplication of Probability and
Impact that are grouped into 9 types of risk, as follows:
1
Regulatory
Compliance Risk
6
Subsurface
Risk
11
HSE Risk
5
Social
Risk
3
Surface
Facility
Risk
50
Top Risks
1
Operation
Risk
12
Legal
Risk
1.
2.
3.
4.
5.
6.
7.
8.
9.
HSE Risk
Surface Facility Risk
Operation Risk
Business Risk
Financial Risk
Legal Risk
Social Risk
Subsurface Risk
Regulatory Compliance Risk
9
2
Business Risk
Financial Risk
199
MANAJEMEN RISIKO
Risk Management
MANAJEMEN RISIKO
Risk Management
TOP 10 RISK
Berdasarkan 50 risiko tertinggi Pertamina EP, telah
teridentifikasi Top 10 Risk berdasarkan nilai (RPN) perkalian
Probability dan Impact dan telah diuji dengan metode
Delphi dengan hasil sebagai berikut:
KEJADIAN RISIKO
Risk Event
10
200
TOP 10 RISK
Based on Pertamina EPs top 50 risks, Top 10 Risks have been
identified based on RPN multiplication of Probability and
Impact - and has been tested with Delphi method with the
following results:
PROBABILITY
6
Definitely-6
8
2
Almost
Certain-5
5
9
Likely-4
10
Moderate-3
Rare-2
Unlikely-1
IMPACT
Insignificant - 1
Low Risk
Minor - 2
Moderate - 3
Medium Risk
Significant - 4
High Risk
Catastrophic - 5
Extreme Risk
STRATEGIC RISK
Strategic risk is the risk that can hamper the achievement of
the Companys primary targets at any time, both of which
may happen now or in the future (multi-years), and has
significant impact that needs special handling.
Strategi jangka panjang yang kian menantang kami susun bersama, diantaranya
kami wujudkan dengan mengevaluasi Risk Register untuk 2014 dengan Draft RJPP
2014-2018 mendatang. Memperoleh apresiasi The Best Implementation of ERM
2012 menjadi landasan bagi kami untuk tetap menjaga budaya penerapan risiko di
tahun depan. ~VP. SPRM~
The increasingly challenging long term strategy that we formulated together,
is realized by evaluating the Risk Register for 2014 with the upcoming 2014-2018 RJPP Draft.
Receiving an appreciation of The Best Implementation of ERM 2012 became the foundation for
us to maintain a culture of risk implementation next year. ~VP. SPRM~
201
MANAJEMEN RISIKO
Risk Management
RISIKO STRATEGIS
Risiko strategis adalah risiko yang sewaktu-waktu dapat
mengganggu tercapainya target utama Perusahaan, baik
yang mungkin terjadi sekarang maupun waktu mendatang
(tahun jamak), dan dampaknya berpengaruh secara
signifikan sehingga perlu penanganan khusus.
BAPEPAM-LK NO.X.K.6
Review atas efektivitas sistem manajemen risiko perusahaan
Review on the companys risk management system efectiveness
MANAJEMEN RISIKO
Risk Management
Definitely-6
8
2
Almost
Certain-5
5
2
Likely-4
Moderate-3
Rare-2
Unlikely-1
10
9
10
IMPACT
Low Risk
Medium Risk
202
High Risk
Extreme Risk
NOW
Stage 4
Stage 3
Stage 2
Stage 1
Stage 0
Do Nothing
Awareness
Framework
Discipline
Habit
Internal Control
Ketergantungan
kepada Internal Audit
| Reliance on Internal
Audit
Program mitigasi
individual | Individual
mitigation program
Bergantung kepada
kualitas orang dan
budaya perusahaan
| Reliance on peoples
quality and corporate
culture
Leadership
Budaya Perusahaan |
Corporate Culture
Kematangan fungsi
unit | Unit function
maturity
Independensi |
Independence
Penentuan value yang
tepat | Determination
of appropriate value
Sasaran kuantitatif
dari Pengukuran
Risiko | Quantitative
target of Risk
Measurement
Komite RM yang
efektif | Effective RM
Committee
Adanya Leading
Indicators | The
presence of Leading
Indicators
Sistem Database &
Analisis Loss Event
yang komprehensif
| Comprehensive
Database System &
Loss Event Analysis
Model Ekonomi dari
Risiko yang bersifat
Bottom up | Bottom up
Risk Economic Model
Culture
Risk-Adjusted
Corporate Plan
Hubungan kuantitatif
antara KPI, KRI &
kerugian (Losses)
| KPI, KRI, & losses
Quantitative relations
Hubungan antara
Return - Kompensasi
yang sudah Risk
Adjusted (EVA) |
Return-Risk Adjusted
Compensation (EVA)
Relations
Hubungan antara
Pengelolaan
Risiko dengan
kompensasi SDM |
Risk Management and
HR Compensation
Relations
203
MANAJEMEN RISIKO
Risk Management
PEOPLE, PROCESS,
TECHNOLOGY,
ENVIRONMENT
204
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
205
People,
Process.
Technology,
Environment
2013
Growing
together with
social and
environment
2012
People,
process,
technology
approach
2011
NUMBER 1
OIL & GAS
PRODUCER IN
INDONESIA
WORLD CLASS
COMPANY
Sepanjang tahun 2011-2014 kegiatan usaha PT Pertamina
EP difokuskan dalam upaya pembangunan fondasi
pertumbuhan yang berkelanjutan. Pada tahun 2013,
Perusahaan melakukan perubahan organisasi yang
memampukan Perusahaan kembali mengembangkan
kompetensi tenaga kerja dalam Pertamina Leadership Model,
tetap efektif dalam beroperasi dengan teknik EOR dan
pengeboran terkini yang didukung sistem informatika real
time terintegrasi.
206
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
207
BAPEPAM-LK NO.X.K.6
praktik ketenagakerjaan, kesehatan, dan keselamatan kerja, seperti kesetaraan gender dan kesempatan kerja, sarana dan keselamatan kerja, tingkat
perpindahan tingkat kecelakaan kerja, pelatihan, dan lain-lain
Practices of employment, occupational health and safety, such as gender and job opportunity equality, transfer rate, work accident rate, training, etc;
MANUSIA PEOPLE
208
PEOPLE DEVELOPMENT
PT Pertamina EP is supported by good quality human
resources potential. The company understands that
employees are the main asset. Therefore the Company is
committed to the employees development as part of an
effort to realize the the Companys vision.
4.
5.
6.
7.
8.
9.
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC OUTCOME
Outcome
PROGRAM
Program
PIC
All
All
All
Core
Core
Core
Core
Core
All
Core
All
Core
209
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
PENGEMBANGAN MANUSIA
PT Pertamina EP diperkuat dengan potensi sumber daya
manusia yang berkualitas. Perusahaan memahami bahwa
pekerja merupakan aset utama. Untuk itu Perusahaan
berkomitmen untuk melakukan pengembangan pekerja
sebagai bagian dari upaya mewujudkan visi Perusahaan.
Program Kepemimpinan
Pengembangan pemimpin dibekali dengan pengembangan
kompetensi dan dual career yang mendukung peran
sebagai pemimpin. Kurikulum program pengembangan
kepemimpinan sudah disiapkan yang disesuaikan
dengan Pertamina Leader Model dan beberapa modul
pengembangan yang sudah diterapkan. Tiga metode yang
digunakan dalam pelaksanaan program yaitu training,
coaching & feedback dan job assignment.
Leadership program
Leadership development is prepared with competency
development and dual career that will support the role as a
leader. Curriculum of leadership development programs has
been prepared and adapted to Pertamina Leader Model and
several development modules that have been applied. Three
methods used in the implementation of the program are
training, coaching & feedback, and job assignment.
210
26
40
92
52
14
12
79
40
17
21
19
HARI PELATIHAN
Learning Days
5
5
5
2
7
5
2
6
4
5
5
6 Hari / Days
Minimum pelatihan pekerja
dipenuhi.
Minimum fulfilled employee
training.
Competencies of leaders
Change Mindset
Execute well
Develop Organization & HR
Communication
Build Work Relationships & Partnerships
Strategic Leadership
Leader of Changes
Aligning Performance for Business Success
Initiate action
Making Decision
Develop Others
Plan & Manage
Motivate Others
211
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
JUMLAH PESERTA
Number of participants
LEARNING DAYS
21%
43%
Certification
Certification
Inhouse
Inhouse
22%
47%
23,195
Overseas
Overseas
6.83
6.93
2012
2013
Certification
Certification
Inhouse
Inhouse
5,823
Learning days
2%
Trainings
33%
Domestic
Domestic
N/A
2%
Overseas
Overseas
29%
Domestic
Domestic
2011
212
275%
Terhadap target
Pencapaian
pelaksanaan
sharing knowledge
yang terlaksana 70x
of target achieved
from 70 times
sharing knowledge
implementation
213
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
PENILAIAN KINERJA
Pelaksanaan penilaian kinerja dilakukan secara objektif,
berdasarkan pertimbangan kolektif para pimpinan Fungsi
dan Perusahaan. Penilaian kinerja dilakukan dalam kurun
waktu satu tahun dan dijalankan berdasarkan pencapaian
target individu atas turunan sasaran kerja Perusahaan, dan
penilaian kompetensi perilaku.
PERFORMANCE ASSESSMENT
The performance assessment is performed objectively, based
on the collective judgment of the Company and Function
leaders. The performance assessment is conducted within
one year and is based on individual target achievement on
the Companys derivative work objectives and behavioral
competency assessment.
Rewards
dan
konsekuensi
Rewards and
Consequences
Target &
Kesepakatan
Kerja
Target & Work
Agreement
Performance
Dialogue
People
Review
214
Pemantauan
Monitoring
Menghitung Nilai
yang Diraih
Calculating
achieved scores
1,089
773
2011
2012
2013
215
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
216
2.97%
3.01%
2011
2012
3.22%
2013
PEKERJA
WAKTU TIDAK
TERTENTU*
Permanent
Employee*
PEKERJA
WAKTU
TERTENTU
Contract
Employee
Ada
Provided
Ada
Provided
Ada
Provided
Tidak
Not Provided
Ada
Provided
Ada
Provided
Ada
Provided
Ada
Provided
Ada
Provided
Ada
Provided
Ada
Provided
Tidak
Not Provided
Tidak
Not Provided
Ada
Provided
Tidak
Not Provided
Ada
Provided
156%
193%
Asset 1
199%
Asset 2
Asset 3
Asset 4
185%
170%
205%
Asset 5
Proyek Pengembangan
Development Project
156%
217
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
218
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
219
OPERATIONAL EXCELLENCE
Penerapan operational excellence mendukung
pencapaian menjadi perusahaan migas berstandar kelas
dunia dengan tujuan beroperasi dengan aman dan
ramah lingkungan, berproduksi dengan optimal, serta
memiliki fasilitas yang handal. operational Excellence
diindikasi dengan :
Tanpa kecelakaan kerja.
Ramah lingkungan meliputi zero discharge, zero
flaring dan konservasi sumber daya alam (air, energi).
Tanpa gangguan operasi.
Tanpa penyakit akibat kerja.
220
OPERATIONAL EXCELLENCE
is applied to support the achievement of becoming
world class oil and gas company with the aim to
operate safely, produce optimally, and facility reliability.
operational Excellence is indicated by:
Zero accident.
Environmentally friendly including zero discharge,
zero flaring and energy conservation.
Uninterrupted operation.
No occupational disease.
KEBIJAKAN HSE
HSE POLICY
PERENCANAAN
PLANNING
PERBAIKAN
BERKELANJUTAN
CONTINUOUS
IMPROVEMENT
PENERAPAN
IMPLEMENTATION
Implementasi 14 Elemen SMSHSE
| Implementation of 14 SMSHSE
Elements
PENELAAHAN MANAJEMEN
MANAGEMENT REVIEW
221
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
PREVENTIF
Preventive
KURATIF
Curative
Medical Check Up
Abatesasi Untuk Pencegahan DBD
Fogging
Program Papsmear
Pembasmian Anjing Liar
PMT Balita Gizi Buruk
0.52%
Persentase biaya HSSE dari
RKAP
HSSE costs percentage of
RKAP
222
223
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
In the next stage, the Road to Zero Accident will apply reward
& punishment to officers who in the their span of control
have an accident.
224
87,594,324
10
75,539,555
2011
2012
2013
15
4
5
3
11
2
4
0
26
6
4
2
56,342,935
2011
2012
2013
2011
2012
2013
60.7
59.7
51.4
RATA-RATA PENILAIAN
SISTEM PENILAIAN HSE
KONTRAKTOR (CSMS)
Average score of
Contractor HSE
Management System
(CSMS) Assessmen
2011
2012
2013
225
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
226
PENYELAMATAN SUMUR
TALANG JIMAR
TALANG JIMAR
WELL RESCUE
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
227
228
PRODUKTIVITAS PEKERJA
Employee Productivity
0.037
0.039
0.033
2012
2013
0.317
0.321
0.281
2011
2012
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
2011
2013
229
230
PROCESS Process
STRATEGI MENGHADAPI TANTANGAN OPERASI
Sejak didirikan pada tujuh tahun lalu, PT Pertamina EP
mengelola field migas yang masih eksis dan merupakan
bekas Wilayah Kerja induk perusahaan, PT Pertamina
(Persero). Kondisi ini tentu saja menjadi tantangan
Perusahaan meningkatkan produksi migas, sesuai target
yang ditetapkan ditetapkan pemegang saham.
P
enambangan liar pada sumur-sumur milik
Perusahaan oleh pihak-pihak tidak bertanggung
jawab.
Labor demands.
Perubahan regulasi.
Changes in regulations.
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
K
endala perizinan, teknis dan pendanaan dalam
pelaksanaan kegiatan eksplorasi.
K
endala perizinan, peruntukan lahan, perubahan
topografi, dan teknis lainnya dalam pelaksanaan
reaktivasi sumur suspended.
231
Non-Technical Challenges
In licensing issues, the Company is always trying to
coordinate with all stakeholders. This move resulted in the
issuance of the required permits, so that throughout 2013
exploration activities were able to be carried out, including
preliminary surveys, exploration, development, production,
and post-operation. The permits also enabled us to continue
the realization of planned exploitation activities.
Tantangan Nonteknis
Dalam masalah perizinan, khususnya, Perusahaan selalu
berusaha berkoordinasi dengan segenap pemangku
kepentingan. Langkah ini membuahkan hasil dengan
terbitnya perizinan yang dibutuhkan, sehingga sepanjang
tahun 2013 dapat dilakukan kegiatan eksplorasi meliputi
kegiatan survei awal, eksplorasi, pengembangan, produksi,
dan pasca operasi. Ijin yang diperoleh juga memampukan
kami melanjutkan realisasi kegiatan eksploitasi yang sudah
direncanakan .
PEMENUHAN PERIZINAN KEGIATAN USAHA HULU MIGAS
Fulfillment of Upstream oil and gas business operation licensing
SURVEI AWAL
Preliminary Survey
EKSPLORASI
Exploration
PENGEMBANGAN
Development
PRODUKSI
Production
PASCA OPERASI
Post Operation
JUMLAH JENIS
PERIZINAN
Number of
Licenses
24
69
95
90
72
JUMLAH IZIN TERPENUHI DALAM KEGIATAN E&P Number of Licenses Fulfilled in E&P Activities
PERBANDINGAN TINGKAT
PENCURIAN 2012 & 2013
Theft rate comparison 2012 &
2013
Kabel
Cable
Minyak Mentah & Kondensat
Crude Oil & Condensate
0
8
3
57
Fasilitas Produksi
Production Facilities
Pipa
Pipe
232
2012
36
57
45
8
2013
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
233
87.2%
Penurunan minyak mentah
yang hilang di Tempino - Plaju
Decrease in crude oil losses at
Tempino - Plaju
234
Tantangan Teknis
Sebagai tindak lanjut tantangan bersifat teknis, Pertamina
EP selama kurun waktu tahun 2013 melanjutkan
pelaksanaan grand strategy pembenahan simultan kondisi
fasilitas produksi di seluruh area, sehingga sesuai standar
perusahaan kelas dunia. Ada empat program yang secara
berkesinambungan telah dilaksanakan sejak tahun 2011,
yakni:
1. Program peningkatan (improvement) fasilitas produksi
eksisting.
2. Program penerapan pengelolaan proyek fasilitas
produksi (project system).
3. Program pemeliharaan inovasi (innovative/correction
maintenance).
4. Program peningkatan perangkat, sistem dan sumber
daya manusia (SDM).
Technical Challenges
As a follow-up measure to technical challenges, Pertamina EP
during 2013 continued the implementation of grand strategy
to simultaneously revamp the production facilities conditions
at all areas, to meet the World Class Company standard. There
are four programs that have been implemented continuously
since 2011, namely:
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Di pertengahan Tahun 2013, kami berhasil melakukan Rerouting Pipa L-Parigi - Cilamaya tanpa ada shutdown, dan dapat
menyelesaikan waktu 4 bulan lebih cepat dari yang ditetapkan.
~VP. Surface Facilities Jamsaton Nababan~
In mid 2013, we successfully conducted Re-routing of L-Parigi - Cilamaya
pipeline without shutdown, and completed the work four months earlier
than the initial plan.
~VP. Surface Facilities Jamsaton Nababan~
235
MANFAAT | Benefit
Improvement
Penghematan energi
Data komprehensif untuk pelaporan real-time
Penurunan losses dari rata-rata 10.7% menjadi
0.83%
Energy savings
Comprehensive data for real-time reporting
Impairment losses from average of 10.7% to 0.83%
Project system
Maintenance
People
Development
236
2013
PENCAPAIAN
2014
Achievement
TARGET
Target
2015
TARGET
Target
Produksi minyak
Oil production
Produksi minyak
Oil production
1,000 BOPD
1,420 BOPD
1,420 BOPD
Produksi gas
Gas production
Produksi gas
Gas production
Produksi gas
Gas production
41 MMSCFD
72 MMSCFD
Field
Pangkalan Susu
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Produksi minyak
Oil production
97 MMSCFD
Field
Tambun
Field
PPEJ
1,481 BOPD
7,710 BOPD
13,460 BOPD
37.4 MMSCFD
4 MMSCFD
10.6 MMSCFD
237
Dengan demikian persentase total realisasi reaktivasi sumursumur suspended terhadap total kandidat rekomendasi
reaktivasi sebesar 53 %.
2013
Reaktifasi 404 sumur.
Total kumulatif 938
reaktivasi sumur.
Total produksi awal
9,062 BOPD dari 740
sumur dengan ratarata awal produksi
minyak per sumur
16,5 BOPD.
Rata-rata awal
produksi gas 0,6
MMSCFD.
238
PENCAPAIAN
Achievement
Reactivation of 404
wells.
Total cumulative 938
reactivated wells.
Total Initial Production
9,062 BOPD from 740
wells with Average
Initial Production of oil
per well 16.5 BOPD.
Average initial
production of gas 0.6
MMSCFD.
2014
TARGET
Target
2015
TARGET
Target
Produksi
Production
Produksi
Production
1,329 BOPD
1,329 BOPD
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
239
PENCAPAIAN
TARGET
2013
Penambahan Produksi
Additional Production
TARGET
2014
2015
26,537 BOPD
Penambahan Produksi
Additional Production
Penambahan Produksi
Additional Production
Penambahan Cadangan
Additional Reserves
6,937 BPOD
15,374 BPOD
31 MMSTB
Proyek mencakup studi dan implementasi pilot secondary
recovery & tertiary recovery yang dilaksanakan sesuai Rencana
Kerja POFD Fullscale waterflood dan injeksi surfaktan yang
disetujui oleh SKK Migas, bekerjasama dengan universitas
dalam negeri.
MONITOR &
UPDATE GGR
MODELING
PREPARATION OF SECONDARY
& TERTIARY:
Advanced Seismic
processing
3D seismic aquititions
Updating data
New Concept applications
Modeling
Choosing technology
Pilot project
MONITOR &
UPDATE GGR
MODELING
TERTIARY
SECONDARY
PRIMARY
240
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
FIELD LIMAU
11
241
242
Enhance Reactivation of
old wells at existing fields.
TAC PEP-PBMSJ.
KSO PEP-Santika
Pendopo E.
TAC PEP-Pilona PPTL.
2
Menjalankan program
pressure maintenance
secara konsisten.
28 Lapangan Telah
menerapkan nihil air
buangan (zero water
discharge) untuk
menunjang program
pressure maintenance
secara konsisten.
Conduct Pressure
Maintenance program
consistently.
Twenty eight fields have
implemented zero water
discharge to support
Pressure Maintenance
program consistently.
Optimalisasi transportasi
minyak dari road tank
menggunakan pipa.
Optimization of oil transport from
road tank through pipe.
10
243
PEOPLE, PROCESS,
TECHNOLOGY, SOCIETY
Meningkatkan
reaktivasi sumur-sumur
tua di lapangan existing.
TECHNOLOGY Technology
VISI Vision
Menjadi penyedia layanan teknologi informasi dan komunikasi (ICT)
berkelas dunia pada industri hulu minyak dan gas
To become a world class service provider of information and communication
technology (ICT) in the upstream oil and gas industry
MISI Mission
1. Memposisikan teknologi informasi dan komunikasi sebagai pendaya strategis untuk
mencapai sasaran bisnis dengan berfokus pada efektivitas, efisiensi, kerahasiaan,
integritas, ketersediaan, kepatuhan dan kehandalan.
Positioning the information and communication technology as a strategic driver to achieve
business targets by focusing on effectiveness, efficiency, confidentiality, integrity, availability,
compliance and reliability.
2. Secara terus menerus meningkatkan kontribusi dan nilai teknologi informasi dan
komunikasi bagi bisnis Pertamina EP
Continuously increasing the contribution and value of information and communication
technology for Pertamina EPs business
244
245
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
OPERATIONAL EXCELLENCE
AUTOMATION DATABASE
Automation Database
INFRASTRUCTURE
Infrastructure
246
Capacity upgrade
and Additional
Link of MPLS PEP
Network
Production
Optimization
Synergy System
Teknologi
Webhosting
Aplikasi GGRPFDE
GGRPFDE
Application Web
hosting Technology
Managed Print
Service
Managed Print
Service
Development of
Digital Elevation
Model (DEM) at
Karbela Seismic
Area
Sistem Operasi
Terpadu Produksi
Integrated
Production
Operating System
Enterprise Project
Management
Enterprise Project
Management
Reposisi Sumur
Eksisting
Existing Well
Reposition
247
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Sistem Sinergi
Optimalisasi
Produksi
Pembangunan
Digital Elevation
Model (DEM) Area
Seismik Karbela
248
249
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
250
SEBELUM MPS
Before MPS
SESUDAH MPS
Sesudah MPS
Rp597
Rp88.77
Rp3,342
Rp630
48.58 %
0%
1.35 %
2.14 %
Rp708,347,218
Rp380,996,186
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
251
252
BAPEPAM-LK NO.X.K.6
Lingkungan hidup, seperti penggunaan material dan energi yang ramah lingkungan dan dapat didaur
ulang, sistem pengolahanlimbah perusahaan, sertifi kasi di bidang lingkungan yang dimiliki, dan lain-lain
The environment, such as the use of environmentally friendly and recyclable materials and energy, the
companys waste treatment systems, environmental certification, etc.
ENVIRONMENT Lingkungan
PT Pertamina EP melaksanakan operasional bisnisnya berdasarkan peraturan dan kode
etik bisnis yang bertanggung jawab. Tidak hanya menekankan pada proses pencapaian
ekonomi, namun juga memelihara lingkungan hidup dan masyarakat yang berada di
sekitar proyek Perusahaan. Kelestarian lingkungan dan kesejahteraan masyarakat sudah
menjadi bagian penting yang selalu dipertimbangkan dalam menjalankan proses bisnis,
terutama kegiatan proses utama 2013.
PT Pertamina EP carries out its business operations according to responsible ethics code and
business conduct. The Company does not only emphasize in the process of economic achievement,
but also environmental preservation and welfare of community residing around the companys
projects. The environmental preservation and community welfare have become an important part
that should always to be considered in carrying out the process of this business.
253
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
MELESTARIKAN LINGKUNGAN
PT Pertamina EP bersungguh-sungguh mewujudkan
komitmen menjaga kelestarian lingkungan. Selain
menerapkan praktik-praktik pertambangan yang baik,
komitmen untuk melestarikan lingkungan juga diwujudkan
melalui penyediaan anggaran khusus bagi pembiayaan
berbagai program dan kegiatan pelestarian lingkungan.
22%
Pengelolaan Emisi Udara
Air Emission Management
28%
Manajemen Pencegahan
Prevention Management
TOTAL
150,648,378,776
3%
Perlindungan Keanekaragaman Hayati dan Penghijauan
Biodiversity Conservation and Reforestation
21%
Pengelolaan Limbah Cair
Liquid Waste Management
6%
Pengelolaan Limbah Non B3 (Sampah)
Non-Hazardous Waste (Garbage)
Management
20%
Pengelolaan Limbah B3
Hazardous and Toxic Waste Management
254
Minyak Oil
Gas
Listrik Electricity
Jumlah Total
2011
2012
2013
55,698,421
4,838,854,955
926,310
54,302,336
5,890,906,504
846,841
52,580,199
6,746,511,802
165,282
4,895,479,686
5,946,055,682
6,799,257,286
*Mencakup area operasi sendiri dan kemitraan Covering own operation and partnership areas
168
152
615
129
86
65
15
Asset 1
Asset 2
Asset 3
Asset 4
Asset 5
Head
Office
SATUAN
Unit
BTU
BTU/Produksi BOE
BTU/Production BOE
2011
2012
2013
6,957,582,919,707.04
7,149,209,373,861.62
6,734,182,550,557.92
86,301.02
87,238.90
79,291.82
255
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Pengelolaan Air
Perusahaan berupaya mengelola penggunaan air seefektif
mungkin dan senantiasa menjaga ketersediannya di alam.
Pemanfaatan air terutama digunakan untuk kebutuhan
domestik dan proses produksi.
Water Management
The Company strives to manage the use of water as
effectively as possible and always maintain the availability
in the nature. Water is mainly used domestic needs and
production processes.
Jumlah Total
256
AIR
PERMUKAAN
SURFACE
WATER
8,155,016.47
1,082,128.77
6,812
29,756.65
AIR
DAUR ULANG
RECYCLED
WATER
3,400
AREA OPERASI
OPERATING AREA
Jumlah Total
2013
2012
2011
62,175,910.23
62,866,351.29
54,783,605.33
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Keterangan: Data dari 5 Kemitraan TAC/KSO | Note: Data from 5 TAC/KSO Partners
100%
Pemanfaatan kembali
air terproduksi dan
beroperasi secara zero
discharge
Reuse of produced water
and zero discharge
operation
257
Pengendalian Emisi
Pertamina EP mendukung kebijakan Pemerintah yang
menargetkan penurunan emisi gas rumah kaca (GRK) secara
nasional. Kami melanjutkan studi penggunaan kembali
CO2 yang dihasilkan dari sumur produksi. Sebagian CO2
digunakan kembali menjadi materi injeksi dan dimanfaatkan
untuk dijual. Melalui kebijakan yang masih dalam tahapan
studi ini, diharapkan nantinya CO2 yang dilepaskan ke udara
sebagai emisi GRK dapat dikurangi. [G4-EN19]
Emission Control
Pertamina EP supports the Governments policy that set a
target of national greenhouse gas (GHG) emission reduction.
We continue the study to reuse CO2 generated by production
wells. Some of CO2 is reused for injection material and for
sale. Through this policy, which is currently still in study
stage, the CO2 released into the air as GHG emission is
expected to be reduced. [G4-EN19]
SATUAN
Unit
2013
2012
2011
0.0374
0.0378
0.0474
518,626.27
770,736.75
475,630.16
16.51
9.87
6.09
258
Sesuai Peraturan Menteri Kehutanan No.P.38/MenhutII/2012, pemilihan lahan pengganti harus memenuhi kriteria
tertentu, di antaranya:
1. Terletak berbatasan langsung dengan kawasan hutan,
kecuali lahan kompensasi tersebut dapat dikelola dan
dijadikan satu unit pengolahan hutan;
2. Terletak dalam daerah aliran sungai, pulau, dan/atau
provinsi yang sama;
3. Dapat dihutankan kembali dengan cara konvensional;
4. Tidak dalam sengketa dan bebas dari segala jenis
pembebanan dan hak tanggungan;
5. Mendapat rekomendasi Gubernur atau Bupati.
Pursuant to Forestry Minister Regulation No.P.38/MenhutII/2012, the selection of replacement land must meet the
following criteria:
1. Located directly adjacent to the forest, unless the
compensation land can be managed and merged into
a single forest management unit;
2. Located in the same watershed, island, and/or
province;
3. Can be reforested by conventional methods;
4. Not in dispute and free from any kind of charges and
the right of land mortgage;
5. Recommended by Governor or Regent.
JUMLAH
POHON
DITANAM
[G4-EN13]
Number of
Planted Trees
18%
Asset 1
29%
Kantor Pusat*
Head Office
22%
Asset 5
Total
392,587
* Penanaman pohon
mencakup wilayah
diluar WKP
Tree planting covers
areas outside Working
Area
5%
Asset 2
13%
Asset 4
14%
Asset 3
259
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
260
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
261
Pengelolaan Limbah
Sejalan dengan Visi PT Pertamina EP untuk menjadi
perusahaan kelas dunia di sektor pertambangan, kami
berkomitmen untuk mengelola limbah yang dihasilkan dari
setiap kegiatan operasional yang dilaksanakan. Baik limbah
mengandung bahan berbahaya dan beracun (B3) maupun
limbah non-B3.
Waste Management
In lne with PT Pertamina EPs vision to become a World Class
Company in mining sector, we are committed to managing
waste generated from every operational activities. This
includes waste containing hazardous and toxic substances
and non-hazardous waste.
25.7%
Pemanfaatan kembali limbah non-B3 sebagai
bahan konstruksi dan kompos, serta pakan
ikan
Non-hazardous waste reused as construction
material and compost, and fish feed
262
VOLUME
DIKELOLA
volume
managed (ton)
SISA
Residue (Ton)
Besi bekas
Scrap metal
Limbah Organik
Organic Waste
57,897.83
57,871.6
26.23
16,053.48
15,846.38
207.10
Limbah Anorganik
Inorganic Waste
15,004.80
14,760.69
244.12
Kemasan non B3
Non-hazardous packaging
29,786.62
29,786.62
118,742.73
118,265.30
477.44
Jumlah Total
PENGELOLAAN
Management
VOLUME
DIHASILKAN
Volume Generated
(ton)
REUSE &
RECOVERY
(ton)
DIKELOLA PIHAK
KETIGA
Managed By Third
Party (ton)
DISIMPAN DI TPS
LIMBAH B3
Stored In Hazardous
Waste TPS (ton)
13,492.83
590.87
10,451.44
2,450.52
214.18
189.38
24.80
4.58
4.12
0.46
19.56
7.40
10.15
2.00
1,146.94
1,141.51
5.43
2,133.00
1,466.73
666.27
64.70
17,075.80
598.27
64.70
13,263.33
3,214.19
263
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
JENIS LIMBAH
Type of Waste
COMMUNITY ENVIRONMENT
The Companys operating sites are generally in the areas
with limited infrastructure and other supporting facilities.
This condition certainly affects their standard of living and
welfare.
264
BAPEPAM-LK NO.X.K.6
Pengembangan sosial dan kemasyarakatan, seperti penggunaan tenaga kerja lokal, pemberdayaan
masyarakat sekitar perusahaan, perbaikan sarana dan prasarana sosial, bentuk donasi lainnya, dan lain-lain
Social and community development, such as employment of local manpower, empowerment of the
companys surrounding community, social facilities and infrastructure improvements, other forms of
donations, etc.
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
265
LANDASAN HUKUM
1. Undang-Undang No.25 Tahun 2007 tentang Penanaman
Modal.
LEGAL BASIS
1. Law No. 25 of 2007 onInvestment.
266
Dimensi
DIMENSI
EKONOMI
EKONOMI
ECONOMIC
Dimension
Dimensi
DIMENSI
SOSIAL
SOSIAL
SOCIAL
Dimension
Dimensi
DIMENSI
LINGKUNGAN
LINGKUNGAN
KINERJA
PERUSAHAAN
ENVIRONMENTAL
Dimension
Company Performance
PROGRAM
KEHUMASAN
PROGRAM
KEMASYARAKATAN
PR Programs
(COMDEV/CSR)
CITRA
PERUSAHAAN
Company Image
Community
Programs (COMDEV/CSR)
267
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
PEMBERDAYAAN MASYARAKAT
Pelaksanaan pemenuhan tanggung jawab sosial selama
tahun 2013 diwujudkan melalui penyelenggaraan berbagai
progam dan kegiatan pemberdayaan masyarakat. Ini
sejalan dengan kelanjutan kegiatan survei citra perusahaan
dan pemetaan potensi sosial yang dilakukan tahun 2012
terhadap para pemangku kepentingan di 19 field Pertamina
EP. [G4-SO1]
COMMUNITY EMPOWERMENT
Implementation of social responsibility fulfillment during
2013 is realized through the implementation of various
community development programs and activities. This is
consistent with the continuation of the corporate image
survey and social potential mapping conducted in 2012 on
stakeholders at 19 fields of Pertamina EP. [G4-SO1]
Blueprint CSR
Pertamina EP
CAKUPAN PROGRAM
Scope of Program
2013
2014
Fields
Penentuan
Pendamping Program
Determination of Program
Facilitator
Implementasi Program
di Wilayah Masyarakat
Program Implementation
in the Communitys
Region
20
Proyek Pengembangan
Development Projects
155
Kabupaten di seluruh
Indonesia
Regencies across Indonesia
268
Seremoni Peresmian
PPMP
Inauguration Ceremony
of Pertamina Community
Empowerment Center
Pelaksanaan Program
oleh Pendamping
Program Implementation
by Facilitator
Proses Seleksi Masyarakat
Community Selection
Process
Laporan
Reporting
Infrastruktur
Menunjang
Pertumbuhan
Kemandirian Ekonomi
Masyarakat
Supporting Infrastructure
for Communitys
Economic Independent
Development
2015
Masyarakat Mandiri
Independent Community
KEGIATAN [G4-EC7]
Activities
2013*
(Rp | IDR)
2012
(Rp | IDR)
2011
(Rp | IDR)
68,232,055,215
35,424,304,004
20,748,866,151
5,983,608,338
25,961,254,893
18,544,708,698
19,954,334,896
5,051,837,800
13,780,574,797
4,407,299,500
344,500,000
3,500,000,000
525,000,000
45,000,000
863,200,000
522,000.,000
844,671,300
886,605,000
660,000,000
770,951,925
450,000,000
100,000,000
965,550,000
967,850,000
CSR PT PERTAMINA EP
PT PERTAMINA EP CSR
-**
942,500,000
572,996,000
-**
64,000,000
1,325,753,875
1,242,500,000
737,973,707
625,000,000
743,213,754
376,590,000
375,075,000
1,105,500,000
434,740,931
1,714,625,000
560,825,143
800,000,000
125,078,074,618
68,063,772,822
47,930,244,556
269
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Infrastruktur
Infrastructure
Kesehatan
Health
Lingkungan
Environmental
Pemberdayaan Ekonomi
Economic Empowerment
Budaya
Culture
Pendidikan
Education
Donasi Bencana Alam
Natural Disaster Relief
PEMBIAYAAN
Pembiayaan program dan kegiatan pemenuhan tanggung
jawab sosial yang dilakukan Perusahaan berasal dari
beberapa sumber. Penggunaan dan pemanfaatan anggaran
dilakukan dengan memperhatikan ketentuan yang mengatur
hal tersebut.
FINANCING
The financing for programs and activities of social
responsibility fulfillment conducted by the Company derived
from several sources. The budget is used and utilized in
accordance with applicable regulations.
IMPLEMENTASI TANGGUNG
JAWAB SOSIAL DAN LINGKUNGAN
PT PERTAMINA EP [G4-EC7]
PT Pertamina EP Social and
Environmental Responsibility
Implementation
Tanggung Jawab
Sosial & Lingkungan
(TJSL) PT Pertamina EP
Social & Enviromental
Responsibility of PT
Pertamina EP
Program CSR
Pertamina EP
Pertamina EP CSR
Program
Program Pendukung
Operasi
Operation Supporting
Program
Program Kehumasan
Public Relation Program
Program Bina
Lingkungan (PKBL)
Community
Development Program
270
271
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Kesehatan
Perusahaan menyediakan anggaran di bidang kesehatan
untuk tahun 2013, sebesar Rp880,463,754 yang bersumber
dari CSR PT Pertamina (Persero). Beberapa kegiatan yang
telah dilaksanakan sampai akhir periode pelaporan, di
antaranya:
Health
The Company provides health budget for 2013, amounting to
Rp880,463,754 from PT Pertamina (Persero) CSR. Some of the
activities carried out until the end of the reporting period,
including:
DESKRIPSI PROGRAM
Program Description
Lirik (Indragiri
Hulu)
Siswa-siswi SD, SMP, SMA yang mengalami gangguan mata dapat memiliki
kacamata agar kegiatan belajar mereka berjalan lancar dan tidak terhalang oleh
akibat yang ditimbulkan gangguan mata
Students of elementary school, middle school and high school who suffer from
vision disorders can have the eyeglasses to continue their learning activities
without trouble caused by the disorder
272
Anak-anak usia sekolah dasar yang mempunyai masalah kesehatan mata dan
membutuhkan kaca mata untuk menunjang kegiatan belajar, di lingkungan
ring 1wilayah kerja pertamina EP Field Ramba. Yang tergolong keluarga tidak
mampu.
Elementary school students who have vision disorders and need eyeglasses to
support their learning activities, within ring 1 of PT Pertamina EPs working area at
Ramba Field
WILAYAH KERJA
EKSEKUTOR
PROGRAM
Working Area
Of Program
Executor
DESKRIPSI PROGRAM
Program Description
PP-PDM (Bekasi)
Edukasi kesehatan gigi, mulut, cara menyikat gigi yang baik dan pemeriksaan
kesehatan gigi dan mulut sekaligus peringatan Hari Anak Nasional
Dental health education, oral, good brushing and oral health examinations, also
commemorating the National Children's Day
Siswa-siswi kurang mampu yang mengalami gangguan pengelihatan dapat
belajar dengan lebih mudah kembali
PPGM (Banggai)
Adera (Muara
Enim)
Mendeteksi kelainan fungsi Mata sejak awal, dan membantu para siswa dapat
membaca dan menerima pelajaran secara maksimal Memberi punyuluhan
sejak dini untuk merawat dan menjaga kesehatan gigi, serta mendeteksi dan
mencegah siswa terkena penyakit gigi
Early detecting of vision disorder, and help students to read and receive lessons
maximally Counseling early on to care and maintain dental health, as well as
detecting and preventing students from dental disease
Sehati
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Cepu
Underpriviledged students who suffer from vision disorders can ease their vision
problems and study more comfortably
Peningkatan status gizi bayi dan balita, perbaikan kesehatan ibu hamil
Nutrition status improvement of infants and toddlers, health improvement of
expecting mothers
Rekonsiliasi
Adalah kegiatan yang dilaksanakan berdasarkan kesepakatan
antara Pertamina EP dengan masyarakat atau pemerintah
daerah. Tujuannya meningkatkan keharmonisan hubungan
dan mengakomodasi kepentingan masing-masing pihak.
Hingga akhir tahun 2013, beberapa kegiatan rekonsiliasi
yang telah dilakukan adalah:
Reconciliation
This is an activity conducted based on agreement between
Pertamina EP and local community or government. The goal
is to increase harmonious relationship and accommodate
the interests of respective parties. By the end of 2013, the
reconciliation activities that have been carried out are:
273
274
DESKRIPSI PROGRAM
Program Description
Asset 3
Hubungan baik.
Humas EP
Asset 2
Good relationship.
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
EP PR
275
Pendidikan
Kegiatan pengembangan dan pemberdayaan masyarakat di
bidang pendidikan selama tahun 2013 dilakukan di sejumlah
daerah operasi, dengan besar anggaran pelaksanaan
kegiatan di bidang pendidikan bersumber dari CSR
Pertamina EP sebesar Rp965.550.000
276
Education
Community development and empowerment activities
in education during 2013 were carried out in a number
of operating areas, with a budget of Rp965,550,000 for
education implementation came from Pertamina EPs CSR.
Field Pendopo
Pendopo Field
Field Ramba
Ramba Field
Asset 1
Humas EP
EP PR
277
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Field Bunyu
Bunyu Field
DESKRIPSI PROGRAM
Program Description
278
Field CEPU
CEPU Field
Asset 1
Field Tambun
Tambun Field
Humas EP
EP PR
279
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
WILAYAH KERJA
EKSEKUTOR
PROGRAM
Working Area
Of Program
Executor
DESKRIPSI PROGRAM
Program Description
Limau
(Banyuasin)
Rantau (Aceh
Tamiang)
Pelatihan las.
Welding training.
280
WILAYAH KERJA
EKSEKUTOR
PROGRAM
Working Area
Of Program
Executor
DESKRIPSI PROGRAM
Program Description
Lirik (Indragiri
Hulu)
Peningkatan pendapatan
Peningkatan pendapatan
Peningkatan pendapatan
Generate additional income
Peningkatan pendapatan
Peningkatan pendapatan
PP-PDM (Bekasi)
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
281
Analisa Baseline Ke
Pertamina EP
Baseline Analysis to
Pertamina EP
282
Kunjungan lapangan,
bertemu mitra lokal &
membuat Analisa Gap
Field visit, meet local
partners & prepare Gap
Analysis
Membantu mitra
membuat Rencana
Implementasi Proyek
Assist partners to
prepare Project
implementation plan
WILAYAH KERJA
Working Area
PROGRAM
Program
1.
2.
Pendopo Field
3.
Rantau Field
4.
Bunyu Field
5.
Lirik Field
6.
Tarakan Field
7.
Asset 3
8.
Tanjung Field
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
283
OTHER STAKEHOLDERS
In addition to the shareholders and surrounding community
of Pertamina EPs operations, there are several other
stakeholders who directly or indirectly affect our business
sustainability. Through internal identification process
conducted based on the interactions that have been
established, stakeholders of Pertamina EP are shareholders,
communities, customers, employees, partners and business
partners, community, central and local governments, media,
as well as universities and other educational institutions. [G424] [G4-25]
DAFTAR PEMANGKU KEPENTINGAN, ISU UTAMA, METODE PENDEKATAN, DAN RESPON PERSEROAN
List of Stakeholders, Main Issues, Approach Methods and Company Response [G4-24] [G4-26] [G4-27]
PEMANGKU
KEPENTINGAN
Stakeholders
RESPON PERSEROAN
Company Responses
Pemegang
Saham
Pelaksanaan RUPS
Penyampaian laporan kinerja
Perusahaan
Masyarakat
Community
Pelanggan
1. Menjamin kualitas minyak mentah dan gas sesuai spesifikasi yang diminta pelanggan.
2. Menjamin kelancaran pasokan minyak mentah ke kilang Pertamina dan pasokan gas kepada
pembeli.
3. Menerima dan menindaklanjuti setiap keluhan yang disampaikan.
4. Melaksanakan perbaikan pelayanan dan kepuasan pelanggan.
1. Ensure the quality of crude oil and gas according to specification requested by customers.
2. Ensure stable crude oil supply for Pertaminas refineries and gas supply for customers.
3. Receive and follow up each complaint filed.
4. Improve customer service and satisfaction.
1. Pemenuhan hak-hak normatif pekerja seperti diatur dalam UU Ketenagakerjaan dan peraturan
perundang-undangan yang lain.
2. Menjamin pengembangan karir dan kompetensi tanpa adanya diskriminasi.
3. Meningkatkan kesejahteraan pekerja, termasuk menjamin kepatuhan pada keselamatan,
kesehatan kerja dan lindungan lingkungan.
1. Pemenuhan hak-hak normatif pekerja seperti diatur dalam UU Ketenagakerjaan dan peraturan
perundang-undangan yang lain.
2. Menjamin pengembangan karir dan kompetensi tanpa adanya diskriminasi.
3. Meningkatkan kesejahteraan pekerja, termasuk menjamin kepatuhan pada keselamatan,
kesehatan kerja dan lindungan lingkungan.
Shareholders
Customers
Pekerja
Employees
284
GMS Implementation
Presentation of the Companys
performance report
Periodic gathering.
Customer Satisfaction Index Survey.
DAFTAR PEMANGKU KEPENTINGAN, ISU UTAMA, METODE PENDEKATAN, DAN RESPON PERSEROAN
List of Stakeholders, Main Issues, Approach Methods and Company Response [G4-24] [G4-26] [G4-27]
PEMANGKU
KEPENTINGAN
Stakeholders
RESPON PERSEROAN
Company Responses
1. Pemenuhan pelaksanaan Contractor Safety Management System (CSMS) oleh setiap Mitra.
2. Pemenuhan hak-hak normatif terhadap para pekerja mereka, seperti diatur dalam UndangUndang Ketenagakerjaan dan peraturan perundang-undangan lainnya.
3. Pemenuhan pelaksanaan tanggung jawab sosial perusahaan, terutama bagi masyarakat di
sekitar lokasi kegiatan operasi.
1. Fulfillment of Contractor Safety Management System (CSMS) by every Partner.
2. Fulfillment of their employees basic rights as stipulated in Manpower Law and other applicable
laws and regulations.
3. Fulfillment of corporate social responsibility, especially for community around the operational
activities sites.
Media
Media
Universitas
dan Institusi
Pendidikan Lain
Partners and
Vendors
Pemerintah
Universities
and Other
Educational
Institutions
285
PEOPLE, PROCESS,
TECHNOLOGY, ENVIRONMENT
Government
INFORMASI LAIN
PERUSAHAAN
Our Other Information
286
INFORMASI PERUSAHAAN
Company Information
287
BAPEPAM-LK NO.X.K.6
Riwayat singkat Perusahaan
Brief history of the company
Era 1900
Masa Perjuangan | Time of Struggle
Era 2000
Perubahan Regulasi | Change of Regulation
Tahun 2001 Pemerintah menerbitkan UndangUndang No.22 Tahun 2001 Tentang Minyak dan
Gas Bumi. Sebagai konsekuensi penerapan UU
tersebut, PT Pertamina (Persero) tak lagi berperan
sebagai regulator dan hanya menjadi operator murni
sehingga dibentuklah sejumlah anak perusahaan
guna mengelola usaha hulu.
In 2001 the Government issued LawNo.22 of 2001 on Oil
and Natural Gas. As a consequence of theenactment of
the Law, PT Pertamina(Persero) no longer played a role
as a regulator and became a pure operator that led to the
establishment of several subsidiaries to operate
upstream business.
Era 2013
Pembentukan organisasi
baru PT Pertamina EP
Establishment of PT Pertamina EP
new organization
288
1883:
1957
Pembentukan Pertamina | The
Establishment of Pertamina
10 Desember 1957 Pemerintah mendirikan
Perusahaan Minyak Nasional (Permina), yang
kemudian berganti menjadi Pertamina setelah
penggabungan dengan Pertamin pada tahun 1968.
On December 10, 1957, the Government founded
Perusahaan Minyak Nasional (Permina), which later
changed into Pertamina after a merger with Pertamin in
1968.
2005
Pendirian PT Pertamina EP | Establishment of
PT Pertamina EP
13 September 2005
17 September 2005
KEMITRAAN PERUSAHAAN
Selama tahun 2013 Pertamina telah melakukan kerjasama
(kemitraan) dengan pihak swasta nasional maupun asing,
untuk mengelola kegiatan operasi pada lapangan-lapangan
minyak dan gas (migas) marginal. Tujuan kemitraan
adalah untuk meningkatkan produksi dan mendatangkan
keuntungan bagi kedua belah pihak.
COMPANY PARTNERSHIPS
During 2013, Pertamina has formed partnerships with
national and foreign private sector, to manage operations
in the oil and gas marginal fields. The purpose of the
partnership is to increase production and bring benefits for
both parties.
STUDY
Study
Patina Group selesai 100% 100% completed
Cooper Energy Sukananti selesai 100% 100% completed
Techwin Benakat Timur selesai 100% 100% completed
Benakat Barat Petroleum selesai 100% 100% completed
Santika Pendopo Energy selesai 100% 100% completed
Samudera Energy Tanjung Lontar selesai 100% 100% completed
Indrillco Hulu Energy selesai 90% 90% completed
Indrillco Hulu Energy selesai 100% 100% completed
Santika Pendopo Energy selesai 100% 100% completed
289
INFORMASI PERUSAHAAN
Company Information
Fasilitas Produksi
Guna mengoptimalkan operasional lapangan yang dikelola
para mitra, selama tahun 2013 telah dibangun sejumlah
fasilitas produksi, yakni;
Production Facilities
In order to optimize field operations managed by partners, a
number of production facilities have been built during 2013,
namely;
NAMA PROYEK
Projects Name
Perbaikan tanki 500 bbl 1 unit Repair of 1 unit of 500 bbl tank
Perbaikan heater 01 di SP-10 1 unit Repair of 1 unit of heater 01 at SP-10
Modifikasi manifold di SP-12 Manifold modification at SP-12
Penggantian line section 6 dari tanki ke transfer pump Replacement of 6 line section from tank to transfer pump
Binangat Bypass (Release BIN Plant)
SBR Plant Optimization (Release MPS)
Replace Diesel Engine by Gas Engine
SBR-8 & SBR-22 Optimization
Fan Belt Primover
Valve, Gate, Flanges, Gasket & Stud Bolt 6-150 #
Arrow Engine Part
Part Assembly Pumping Unit
Spark Plug P/n. 2N-2839 offer : TRN 79G
Pumping Unit C 228D-173-100
Tank On Site
Valve, Gate, Flanges, Gasket & Stud Bolt 8-150#
Wire Rope Blue Strand Class 6 x 36 Steel Core Diameter 7/8 1WRC
Warranty Suku Cadang 6 Bulan dari tanggal BAST
Engine Gas & Oil (US)
X-Mastree Single Completion Part
Part Of Arrow Engine Type C-96 & C-106
Flanges : 3-300# & Elbow Long Radius
ROD, POLISHED, 1-1/4 X 22 FT C/W COUPLING
Fan Belt B 88, Brand: BANDO
Replacement Rubber Supreme
ENGINE : CUMMINS KTA 19GC
RubberReplacement & Liner Cyl
Gate Valve , Adjustable Valve & Flange 2000 PSI CAMERON
Wellhead Part
Flowline Part
Adjustable Choke Valve (Positive choke)
290
OPERATORSHIP (TAC/KSO)
Operatorship (TAC/KSO)
PERMASALAHAN
Problems
291
INFORMASI PERUSAHAAN
Company Information
PERMASALAHAN
Problems
292
PERMASALAHAN
Problems
293
INFORMASI PERUSAHAAN
Company Information
PERMASALAHAN
Problems
294
PERMASALAHAN
Problems
INFORMASI PERUSAHAAN
Company Information
295
BAPEPAM-LK NO.X.K.6
Nama entitas anak, perusahaan asosisasi, perusahaan ventura
Name of subsidiaries, associated companies, venture companies
ASSET DAN
LAPANGAN
Asset and Field
ALAMAT KANTOR
Office Adress
Rantau
2
3
4
Pangkalan Susu
Lirik
Jambi
Ramba
ASSET 1 ASSET 1
6
7
8
Aset 2Asset 2
Prabumulih
Pendopo
Limau
ASSET 2 ASSET 2
Jl. Jend. Sudirman No.3 Prabumulih, Sumatera Selatan 31122
Jl. Plaju no. 38 Pendopo, Sumatera Selatan 31211
Jl. Jend. Sudirman No. 2/3 Prabumulih, Sumatera Selatan 31122
Adera
10
Aset 3Asset 3
Subang
11
12
14
15
16
Tambun
Jatibarang
Aset 4Asset 4
Cepu
Aset 4Asset 4
Sangatta
Bunyu
Papua
17
Tanjung
18
Sangasanga
19
Tarakan
296
13
T:(+62641) 31016
F:(+62641) 31944-45, 31010, 31941
T:(+62620) 51333, F:(+62620) 51385
T:(+62769) 7444106, F:(+62769) 41224
T:(+62741) 41938-39, F:(+62741) 42542
T:(+62711) 893324, F:(+62711) 893145
T:(+62711) 413966, 7077850
F:(+62711) 351962
ASSET 4 ASSET 4
Jl. Gajahmada PO.Box 1 Cepu
ASSET 5 ASSET 5
Jl. Gas No.1 Sangatta , Kutai Timur Kalimantan Timur 75613
Jl. Dermaga No.1 P. Bunyu, Kalimantan Timur 77181
Jl. Ahmad Yani, Sorong, Papua Barat 98414
SP
SPU
PPP
TITIK SERAH
Custody Transfer Point
10 SP
9 SP & 3TU
3 Manifold
1 Booster
7 SP
39 SP
23 SP
25 SP
1 SPU
3 SPU
7 SPU
5 SPU
9 SPU
PPP Rantau
PPP Pangkalan Susu
PPP Sei Karas
PPP Ukul
PPP Tempino
PPP Prabumulih
PPP Pangabuan
PPP Balongan
12 SP
3 SPU
6 SP
3 SP
6 BS
11 SP
6 SP
5 SP
3 SP
2 SP
1 SPU
1 SPU
4 SPU
1 SPU
3 SPU
-
SP
SPU
7 SP
11 SP
20 SP
5 SP
3 SP
7 SP
4 SKG
7 SKG
14 SKG
1 SKG
2 SKG
4 SKG
TITIK SERAH
Custody Transfer Point
Pada 5 titik serah At 5 custody transfer points
Pada 14 titik serah At 14 custody transfer points
Pada 37 titik serah At 37 custody transfer points
Pada 5 titik serah At 5 custody transfer points
Pada 2 titik serah At 2 custody transfer points
Pada 5 titik serah At 5 custody transfer points
297
INFORMASI PERUSAHAAN
Company Information
LOKASI
Location
JALUR PIPA
Pipeline
Keterangan: * Merupakan aset PT Pertagas yang digunakan untuk pengiriman minyak mentah Pertamina EP
Note: * Asset of PT Pertagas utilized for Pertamina EPs crude oil shipment
298
PANJANG PIPA
Pipe Length
(Km)
64
38
24
32
2
*265
102
146
34
65
69
70
25
23
2
2
4
19
238
37
19
48
17
BAPEPAM-LK NO.X.K.6
Nama dan alamat lembaga dan profesi penunjang pasar modal
Name and address of supporting institutions and/or professionals of stock exchange
AUDITOR EKSTERNAL
External Auditor
Tanudiredja, Wibisana & Rekan
Jl HR Rasuna Said Kav C-3 Mega Plaza Lt 4,
Karet, Setiabudi, Jakarta 12920 - Indonesia
Tel : (62-21) 521 1134, Fax: (62-31) 531 4503
Website: pwcglobal.com
299
NILAI
Score
BOBOT
Value
TERAUDIT 2013
2013 Audited
NILAI
Score
BOBOT
Value
27,41%
30,49%
61,72%
39,78%
14,70%
574,85%
15 hari days
11 hari days
45,10%
71,55%
102,97%
20
15
3
3
2
300
5
3
3
1,5
4
3
62.5
SEHAT HEALTHY
(18,60%)
(5,97%)
8,71%
(20,55%)
2,21%
0
0
3
0
1
4
KURANG TUMBUH LESS GROWTH
7 Calender days
16 Calender days
Maret March
Agustus August
2
2
3
3
10
TERTIB IN ORDER
72.5
76.5
SEHAT A HEALTHY: A
SEHAT A HEALTHY: A
INFORMASI PERUSAHAAN
Company Information
301
BAPEPAM-LK NO.X.K.6
Laporan Keuangan teraudit sebagaimana diatur pada Peraturan Nomor
Audited Financial Statements as stipuated by Regulation No.
REFERENSI PERATURAN
BAPEPAM - LK NO.X.K.6
HALAMAN
PAGE (S)
UMUM GENERAL
Laporan tahunan wajib memuat
Annual report is required to contain
a. Ikhtisar data keuangan penting
Key financial Highlights
42-45
48-59
c. Laporan Direksi
Board of Directors' Report
62-73
d. Profil perusahaan
Company profile
62
78-121
f.
122-203
204-285
319
76, 320
43
44
44
Perdagangan saham
Share trading
44
302
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
LAPORAN DEWAN KOMISARIS DAN DIREKSI BOARD OF COMMISSIONERS AND BOARD OF DIRECTORS REPORT
Laporan Dewan Komisaris Board Of Commissioners Report
1) Penilaian terhadap kinerja Direksi mengenai pengelolaan perusahaan
Assessment of the Board of Directors performance on management of the company
51-55
56
59
55
63-71
67
72
73
15
3) Kegiatan usaha perusahaan menurut Anggaran Dasar terakhir, jenis produk dan jasa
Business activities of the company based on the most recent Articles of Association, type of products and services
14
4) Struktur organisasi perusahaan dalam bentuk bagan, disertai nama dan jabatan
Organizational structure of the company in chart, with names and positions
32
30
60
74
INFORMASI PERUSAHAAN
Company Information
303
KETERANGAN
DESCRIPTION
8) Perubahan susunan Dewan Komisaris / Direksi sesudah dan sebelum
Change of Board of Commissioners/Directors' composition before and after
9) Jumlah karyawan dan deskripsi pengembangan kompetensinya
Number of employees and description of their competency development
HALAMAN
PAGE (S)
144, 153
26-28
14
33
33
44
44
299
16) Nama dan alamat lembaga dan/atau profesi penunjang pasar modal
Name and address of supporting institutions and/or professionals of stock exchange
299
25, 29
80
b) Pendapatan
Revenues
96
c) Profitabilitas
Profitability
98
304
99
102
c) Ekuitas
Equity
105
96
e) Arus kas
Cash flow
105
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
107
4) Kolektibilitas piutang
Receivables collectability
100
57, 99-105
114
112
66
12) Kebijakan dividen dan tanggal serta jumlah dividen per saham
Dividend policy and the date and amount of dividend per share
109
N/A
14) Informasi transaksi material yang mengandung benturan kepentingan dan/atau transaksi dengan pihak afiliasi
Information on material transactions with conflict of interest and/or transactions with related parties
111
N/A
109
INFORMASI PERUSAHAAN
Company Information
145
143, 150
148
149, 150
305
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
154
151, 162
157, 160
d) Keputusan RUPS tahun sebelumnya dan realisasinya; dan alasan dalam hal terdapat keputusan yang belum
direalisasi
Previous years GMS resolutions and their realization; and reasons for unrealized resolutions
134-142
e) Pelatihan Direksi
Board of Directors training
157
160
164
164
c) Riwayat pendidikan
History of education
164
164
164
165-167
165-167
168, 171
168, 171
c) Riwayat pendidikan
History of education
168, 171
306
168
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
169, 171
169, 172
175
b) Riwayat jabatan, pengalaman kerja yang dimiliki, dan dasar hukum penunjukan
History of job, work experience, and legal basis of appointment
175
c) Riwayat pendidikan
History of education
175
175
176, 177
b) Riwayat jabatan, pengalaman kerja yang dimiliki, dan dasar hukum penunjukan
History of job, work experience, and legal basis of appointment
178
181
INFORMASI PERUSAHAAN
Company Information
a) Nama
Name
32, 178
e) Tugas dan tanggung jawab unit audit internal sesuai piagam charter
Duties and responsibilities of internal audit unit according to its Charter
178
f ) Uraian singkat pelaksanaan tugas unit audit internal selama tahun buku
Brief description of internal audit unit's activity implementation during the financial year
180
182-183
180, 182
307
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
184
198
202
9) Perkara penting yang dihadapi oleh Emiten atau Perusahaan Publik, entitas anak, anggota Dewan Komisaris dan
Direksi
Significant cases faced by Publicly-listed Company, subsidiaries, members of Board of Commissioners and Board of
Directors
118
118
125-128
133
190-191
253
b) Praktik ketenagakerjaan, kesehatan, dan keselamatan kerja, seperti kesetaraan gender dan kesempatan kerja,
sarana dan keselamatan kerja, tingkat perpindahan tingkat kecelakaan kerja, pelatihan, dan lain-lain
Practices of employment, occupational health and safety, such as gender and job opportunity equality, transfer
rate, work accident rate, training, etc.
208
c) Pengembangan sosial dan kemasyarakatan, seperti penggunaan tenaga kerja lokal, pemberdayaan
masyarakat sekitar perusahaan, perbaikan sarana dan prasarana sosial, bentuk donasi lainnya, dan lain-lain
Social and community development, such as employment of local manpower, empowerment of the companys
surrounding community, social facilities and infrastructure improvements, other forms of donations, etc.
265
d) Tanggung jawab produk, seperti kesehatan dan keselamatan konsumen, informasi produk, sarana, jumlah
dan penanggulangan atas pengaduan konsumen, dan lain-lain
Product responsibility, such as consumer health and safety, product information, facilities, number of consumer
complaints and their handling, etc.
116
2) Emiten atau Perusahaan Publik dapat mengungkapkan informasi sebagaimana dimaksud dalam angka 1) pada
laporan tahunan atau laporan tersendiri
Publicly-listed company may disclose information as referred to in point 1) in annual report or separate report
308
KETERANGAN
DESCRIPTION
HALAMAN
PAGE (S)
76, 320
321
321,322
Lampiran
Attachment
1-5
5) Pengungkapan dalam catatan atas laporan keuangan ketika entitas menerapkan suatu kebijakan akuntansi secara
retrospektif atau membuat penyajian kembali pos-pos laporan keuangan, atau ketika entitas mereklasifikasi pospos dalam laporan keuangannya
Disclosure in notes to the financial statement when the company applies an accounting policy retrospectively or
restates an account in the financial statement or reclassifies an account in the financial statement
Lampiran
Attachment
5/12-5/35
Lampiran
Attachment
2
Lampiran
Attachment
4
Lampiran
Attachment
5/12-5/29
Lampiran
Attachment
5/52-5/57
Lampiran
Attachment
5/48-5/51
Lampiran
Attachment
5/39-5/41
Lampiran
Attachment
5/25, 5/56
INFORMASI PERUSAHAAN
Company Information
Lampiran
Attachment
5/35-5/51, 5/575/65
Lampiran
Attachment
5/73
309
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
STRATEGI DAN ANALISIS | STRATEGI AND ANAYSIS
G4-1
54
G4-2
Uraian dampak, risiko dan peluang | Description of key impacts, risks, and opportunities
54
G4-3
14
G4-4
Merek, produk, dan layanan jasa | Primary brands, products and services
14
G4-5
G4-6
G4-7
G4-8
G4-9
G4-10
G4-11
Pekerja terlindungi perjanjian kerja bersama (PKB) | Employees covered by collective bargaining
agreements
G4-12
G4-13
G4-14
G4-15
Kepatuhan pada prinsip-prinsip dan inisiatif eksternal | Externally charters, principles, or other initiatives
G4-16
14
19, 22
14, 133
16, 82, 84
17, 26, 43, 44
26, 27
191
192
14, 16, 32, 133
194
25, 221, 223, 249
25
G4-18
Proses menentukan isi laporan dan pembatasan | Process for defining the report content and
boundaries
3, 43
G4-19
G4-20
2, 3
G4-21
G4-22
G4-23
8
9
310
G4-24
G4-25
Dasar identifikasi dan seleksi pemangku kepentingan | Basis for identification and selection of
stakeholders
G4-26
284, 285
G4-27
Topik kunci dan respon organisasi | Key topics and organization response
284, 285
284, 285
284
kami menyatakan laporan ini telah merujuk pada standar GRI 4.0 pada opsi
core yang menyajikan informasi dari setiap aspek yang dinilai material.
we declare this report is in accordance with GRI 4.0 standards at core option,
which presents information of every aspect deemed as material
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
PROFIL PELAPORAN | REPORT PROFILE
G4-28
G4-29
G4-30
G4-31
G4-32
G4-33
Penjaminan | Assurance
G4-34
G4-35
G4-36
34
G4-37
285
G4-38
Komposisi pejabat tertinggi badan tata kelola | Composition of the highest governance
144, 152
G4-39
Indikasi rangkap jabatan | Indicate whether the Chair of the highest governance body is also an
executive officer
132, 152
G4-40
Nominasi dan seleksi pejabat badan tata kelola | Nomination and selection for the highest governance
body
G4-41
G4-42
Pernyataan misi, nilai dan tujuan organisasi | Organization purpose, values and mission statements
G4-43
Kompetensi dan kinerja badan tata kelola | Competencies and performance governance body
G4-44
Penilaian kompetensi dan kinerja badan tata kelola | Evaluation for competencies and performance
governance body
G4-45
G4-46
G4-47
G4-48
8, 76
G4-49
8, 195
G4-50
G4-51
G4-52
162
G4-53
162
G4-54
162
G4-56
Nilai-nilai, prinsip, dan norma organisasi | Organizational values, principles and norms
G4-57
Pemberian saran dan perilaku patuh hukum | Seeking advice on ethical and lawful behavior
G4-58
Pelaporan perilaku tak beretika/tak patuh hukum | Reporting about unethical/unlawful behavior
3, 310
3
TATA KELOLA | GOVERNANCE
55, 59, 73, 132,
153, 163
34
184, 198
150, 160, 169, 184,
198
195
151, 162
311
INFORMASI PERUSAHAAN
Company Information
184, 198
DMA* DAN
INDIKATOR
DMA* AND
INDICATOR
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
PENGECUALIAN
OMMISSIONS
Kinerja Ekonomi
Economic
Performance
Anti Korupsi
Anti-Corruption
G4-EC1
43
G4-EC2
96
G4-EC3
228
G4-EC4
96
G4-EC5
217
G4-SO3
G4-SO4
G4-SO5
Dilaporkan | reported
180, 182
181
180, 191
MANUSIA | PEOPLE
Ketenagakerjaan
Employement
312
G4-LA1
G4-LA2
G4-LA3
218
G4-LA4
216
26, 28
217, 222
Dilaporkan | reported
kami menyatakan laporan ini telah merujuk pada standar GRI 4.0 pada opsi
core yang menyajikan informasi dari setiap aspek yang dinilai material.
we declare this report is in accordance with GRI 4.0 standards at core option,
which presents information of every aspect deemed as material
DMA* DAN
INDIKATOR
DMA* AND
INDICATOR
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
PENGECUALIAN
OMMISSIONS
224
G4-LA6
225
G4-LA7
223
Dilaporkan | Reported
G4-LA8
221
G4-LA9
G4-LA10
228
G4-LA11
215
Keragaman dan
Kesempatan yang
Sama
Diversity and Equal
Opportunity
G4-LA12
27
G4-LA13
217
Penilaian Pemasok
Terhadap Praktik
Ketenagakerjaan
Supplier Assessment
for Labor Practices
G4-LA14
225
Praktik Penanganan
Keluhan Terkait
Ketenagakerjaan
Labor Practices
Grievance
Mechanisms
G4-LA16
217
Non Diskriminasi
Non-Discrimination
G4-HR3
217
Keselamatan dan
Kesehatan Kerja
(K3)
Occupational Health
and Safety (OHS)
Pelatihan dan
Pendidikan
Training and
Education
INFORMASI PERUSAHAAN
Company Information
G4-LA5
Dilaporkan | Reported
313
DMA* DAN
INDIKATOR
DMA* AND
INDICATOR
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
PENGECUALIAN
OMMISSIONS
PROSES | PROCESS
OG1
81, 83, 86
OG5
257
OG6
86, 87, 89
OG7
263
Aset dan
Keamanan Proses
Asset Integrity and
Process Safety
OG13
Pencantuman
Label Produk dan
Jasa
Product and Service
Labeling
G4-PR5
116, 117
Komunitas Lokal
Local Community
G4-SO2
232, 267
Praktik Penanganan
Keluhan Terkait
Kemasyarakatan
Grievance
Mechanisms for
Impacts on Society
G4-SO11
Cadangan
Reserve
Dilaporkan | Reported
233
Dilaporkan | Reported
TEKNOLOGI | TECHNOLOGY
Keamanan Produk
Product Safety
G4-PR1
248
Informasi Produk
Product Information
G4-PR3
248
Kerahasiaan
Pelanggan
Customer Privacy
G4-PR8
250
Energi
Energy
G4-EN6
251, 254
314
Dilaporkan | reported
kami menyatakan laporan ini telah merujuk pada standar GRI 4.0 pada opsi
core yang menyajikan informasi dari setiap aspek yang dinilai material.
we declare this report is in accordance with GRI 4.0 standards at core option,
which presents information of every aspect deemed as material
DMA* DAN
INDIKATOR
DMA* AND
INDICATOR
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
PENGECUALIAN
OMMISSIONS
LINGKUNGAN | ENVIRONMENT
Energi
Energy
Air
Water
G4-EN3
254, 255
G4-EN4
254, 255
G4-EN5
241, 255
G4-EN7
255
G4-EN8
256
G4-EN9
256, 257
G4-EN10
256, 257
G4-EN11
258
G4-EN12
258
G4-EN13
259
G4-EN14
260
Keanekaragaman
Hayati
Biodiversity
Dilaporkan | reported
INFORMASI PERUSAHAAN
Company Information
Dilaporkan | reported
315
Emisi
Emissions
DMA* DAN
INDIKATOR
DMA* AND
INDICATOR
URAIAN
DESCRIPTION
HALAMAN
PAGE (S)
G4-EN15
258
G4-EN16
258
G4-EN17
258
G4-EN18
258
G4-EN19
G4-EN22
262
G4-EN23
G4-EN24
262
G4-EN25
263
G4-EN26
256, 262
Umum
General
G4-EN31
253, 254
Dampak ekonomi
tidak langsung
Indirect economic
impacts
G4-EC7
G4-EC8
G4-SO1
Komunitas Lokal
Local Community
316
PENGECUALIAN
OMMISSIONS
262, 263
268
Dilaporkan | Reported
Feedback Sheet
fax/pos.
Profil Anda Your Profile
Nama (bila berkenan) | Name (if you please)
: ............................................................................................................................................................
Institusi/Perusahaan | Institution/Company
: ............................................................................................................................................................
Surel | Email
: ............................................................................................................................................................
Telp/Hp | Phone/Mobile
: ............................................................................................................................................................
LSM | NGO
Perusahaan | Corporate
Masyarakat | Community
Media
Akademik | Academic
2.
Tidak Setuju
Disagree
Netral
Neutral
Setuju
Agree
Sangat Setuju
Strongly Agree
Laporan ini menggambarkan kinerja Perusahaan meliputi aspek ekonomi, sosial dan lingkungan:
INFORMASI PERUSAHAAN
Company Information
This report describes the Companys performance in economic, social and environmental aspects:
Sangat Tidak Setuju
Strongly disagree
3.
Tidak Setuju
Disagree
Netral
Neutral
Setuju
Agree
Sangat Setuju
Strongly Agree
Tidak Setuju
Disagree
Netral
Neutral
Setuju
Agree
Sangat Setuju
Strongly Agree
Tidak Setuju
Disagree
Netral
Neutral
Setuju
Agree
Sangat Setuju
Strongly Agree
4.
5.
Tidak Setuju
Disagree
Netral
Neutral
Setuju
Agree
Sangat Setuju
Strongly Agree
317
318
PT PERTAMINA EP
LAPORAN KEUANGAN
Financial Statements
31 DESEMBER 2013 DAN 2012
31 December 2013 and 2012
INFORMASI PERUSAHAAN
Company Information
319
PT PERTAMINA EP
Lampiran 1 Schedule
LAPORAN POSISI KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS, kecuali nilai nominal
dan data saham)
Catatan/
Notes
2013
2012
ASET
ASET LANCAR
Kas dan setara kas
Piutang usaha
Piutang dari Pemerintah
Piutang lain-lain
Persediaan
PPN yang dapat ditagihkan kembali
Uang muka dan biaya dibayar dimuka
ASSETS
6
7
12a
8
9
21a
14
10
209,461
7,448,323
71,514
45,955
148,550
232,107
33,656
114,554
6,115,794
103,573
22,098
115,916
200,101
47,099
CURRENT ASSETS
Cash and cash equivalents
Trade receivables
Amounts due from the Government
Other receivables
Inventories
Reimbursable VAT
Advances and prepayments
8,189,566
6,719,135
122,818
4,611,866
90
76,281
4,117,287
7,789
NON-CURRENT ASSETS
Restricted cash
Oil and gas properties
Other assets
4,734,774
4,201,357
12,924,340
10,920,492
TOTAL ASSETS
13
444,027
293,451
5,379
23,228
172,401
15,772
469,757
306,340
377,439
57,770
14,056
193,808
28,339
432,632
CURRENT LIABILITIES
Trade payables
Amounts due to the Government
Other payables
Customer advances
Corporate and dividend tax payables
Other tax payables
Accrued expenses
17
637
-
4,507
286
1,424,652
1,415,177
144,454
183,283
3,587
67,064
1,050,273
38,895
4,224
66,560
744,607
30,562
948,423
1,218,549
NON-CURRENT LIABILITIES
Amounts due to the Government
Finance lease payables,
non-current portion
Deferred revenue
Deferred tax liabilities
Provision for employee benefits
Provision for decommissioning
and site restoration
2,252,696
2,247,785
JUMLAH LIABILITAS
3,677,348
3,662,962
TOTAL LIABILITIES
11
12b
21b
EKUITAS
Modal saham
Modal dasar - 1.000.000 saham
dengan nilai nominal
Rp1.000.000 per saham (nilai
penuh) Modal ditempatkan dan
disetor - 250.000 saham
Saldo laba
JUMLAH EKUITAS
JUMLAH LIABILITAS DAN EKUITAS
12c
21e
14
EQUITY
Share capital
15
24,730
9,222,262
24,730
7,232,800
9,246,992
7,257,530
TOTAL EQUITY
12,924,340
10,920,492
PT PERTAMINA EP
Lampiran 2 Schedule
LAPORAN LABA RUGI KOMPREHENSIF
UNTUK TAHUN-TAHUN YANG BERAKHIR
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS)
2013
PENDAPATAN USAHA
Penjualan dalam negeri minyak
mentah, gas bumi, dan Liquefied
Petroleum Gas (LPG)
Penjualan ekspor minyak mentah
dan gas bumi
JUMLAH PENDAPATAN USAHA
BEBAN USAHA
Beban eksplorasi
Beban produksi
Beban umum dan administrasi
Keuntungan lainnya-bersih
Pendapatan keuangan
Biaya keuangan
LABA SEBELUM PAJAK
PENGHASILAN
BEBAN PAJAK PENGHASILAN
2012
131,198
189,100
REVENUES
Domestic sales of crude oil,
natural gas and Liquefied
Petroleum Gas (LPG)
Export sales of crude oil
and natural gas
5,000,883
5,318,532
TOTAL REVENUES
4,869,685
18
5,129,432
(145,590)
(1,604,691)
19a
19b
(201,589)
(1,698,389)
(164,142)
246,103
5,067
(73,409)
19c
19d
(241,616)
121,439
4,691
(64,138)
20
3,264,221
1,989,462
1,946,392
PENDAPATAN KOMPREHENSIF
LAIN
OTHER COMPREHENSIVE
INCOME
1,989,462
1,946,392
TOTAL COMPREHENSIVE
INCOME FOR THE YEAR
(1,274,759)
OPERATING EXPENSES
Exploration expenses
Production expenses
General and administration
expenses
Other gains-net
Finance income
Finance costs
21c
PT PERTAMINA EP
Lampiran 3 Schedule
LAPORAN PERUBAHAN EKUITAS
UNTUK TAHUN-TAHUN YANG BERAKHIR
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS)
Catatan/
Notes
Modal
ditempatkan
dan disetor/
Issued
and paid-up
capital
Saldo laba/
Retained
earnings
Jumlah
ekuitas/
Total
equity
6,922,870
6,947,600
Balance as at
1 January 2012
(1,636,462)
(1,636,462)
Dividend declared
1,946,392
1,946,392
Comprehensive income
for the year
24,730
7,232,800
7,257,530
Balance as at
31 December 2012
1,989,462
1,989,462
Comprehensive income
for the year
24,730
9,222,262
9,246,992
Balance as at
31 December 2013
24,730
17
PT PERTAMINA EP
Lampiran 4 Schedule
LAPORAN ARUS KAS
UNTUK TAHUN-TAHUN YANG BERAKHIR
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS)
2012
3,412,665
2,539,744
(1,310,681)
(990,500)
133,492
(1,732,943)
(1,060,410)
917,441
(46,150)
5,067
(6,487)
(8,722)
4,691
(6,823)
1,197,406
652,978
(1,082,368)
(681,341)
(1,082,368)
(681,341)
(286)
(4,506)
(23,682)
(4,792)
(23,682)
KENAIKAN/(PENURUNAN) BERSIH
KAS DAN SETARA KAS
110,246
NET INCREASE/(DECREASE) IN
(52,045) CASH AND CASH EQUIVALENTS
114,554
171,999
(15,339)
209,461
(5,400)
114,554
PT PERTAMINA EP
Lampiran 5/1 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
1.
UMUM
a.
1.
Pendirian Perusahaan
GENERAL
Muhammad Husen
M. Afdal Bahaudin
2012
Komisaris dan Pejabat
Komisaris Utama
Komisaris
Komisaris
Komisaris
Komisaris
Muhammad Husen
M. Afdal Bahaudin
Ahmad Lutfi
Susilo Siswoutomo
Mulyani Wahyono
PT PERTAMINA EP
Lampiran 5/2 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
1.
UMUM (lanjutan)
b.
1.
GENERAL (continued)
b. Board of Commissioners and Board of
Directors (continued)
The composition of the Companys Board of
Directors was as follows:
Doddy Priambodo
President Director
Production and Operation Director
Explorations and New Discovery Project
Director
Lukitaningsih
Satoto Agustono
Adriansyah
Beni Jafilius Ibradi
2012
Presiden Direktur
Pelaksana Tugas Harian Direktur
Operasi
Direktur Eksplorasi dan Pengembangan
Direktur Keuangan
c.
Bagus Sudaryanto
Doddy Priambodo
Lukitaningsih
Domisili
Kantor pusat Perusahaan berlokasi di Menara
Standard Chartered Lantai 21-29, Jl. Prof. Dr.
Satrio Kav. 164, Jakarta Selatan.
d.
President Director
Syamsu Alam
SKK MIGAS
c. Principal Address
The Companys head office is located on
Menara Standard Chartered 21st-29th floor,
Jl. Prof. Dr. Satrio Kav. 164, South Jakarta.
d. SKK MIGAS
PT PERTAMINA EP
Lampiran 5/3 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
1.
UMUM (lanjutan)
d.
2.
1.
GENERAL (continued)
d. SKK MIGAS (continued)
2.
a.
a.
Wilayah Kerja
Wilayah kerja KKS adalah wilayah dimana
Perusahaan dapat melaksanakan kegiatan
operasi minyak dan gas bumi. Area tersebut
merupakan area eksplorasi dan produksi
Pertamina Lama selain Blok Cepu dan Blok
Randugunting.
Working Area
The Cooperation Contract working area is a
designated area in which the Company may
conduct oil and gas operations. The area
represents the former Pertamina Entitys
exploration and production areas excluding
the Cepu Block and the Randugunting Block.
PT PERTAMINA EP
Lampiran 5/4 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
2.
c.
d.
2.
c.
Cost Recovery
Kredit Investasi
d.
Investment Credit
The Company is entitled to an investment
credit entitlement to additional cost recovery of
a maximum of 110% of the direct capital
investments required to develop crude oil and
natural gas production facilities, subject to
approval by SKK MIGAS.
e.
PT PERTAMINA EP
Lampiran 5/5 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
2.
g.
Minyak Mentah
Crude Oil
i.
Gas Bumi
Natural Gas
g.
PT PERTAMINA EP
Lampiran 5/6 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
2.
2.
PERJANJIAN
LAIN
KERJASAMA
DENGAN
PIHAK
3.
COOPERATION
OTHER PARTIES
ARRANGEMENTS
WITH
The
Company
can establish cooperation
arrangements with other parties in conducting oil
and gas activities in certain parts of its Cooperation
Contract working area, under a Technical
Assistance Contract or Operation Cooperation
Contract with the approval of the Government
through SKK MIGAS.
a.
a.
PT PERTAMINA EP
Lampiran 5/7 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
3.
PERJANJIAN KERJASAMA
LAIN (lanjutan)
a.
DENGAN
PIHAK
3.
a.
Wilayah Kerja/
Working Area
Wilayah/
Area
WITH
Mitra Usaha/
Partner
COOPERATION
ARRANGEMENTS
OTHER PARTIES (continued)
Tanggal Efektif
Kontrak/
Effective Date of
Contract
Tanggal Mulai
Produksi/
Date of
Commencement of
Production
Tanggal Akhir
Kontrak/
Date of End of
Contract
Produksi/
Production
Kalimantan
Timur/
East Kalimantan
22/12/1993
01/05/1994
21/12/2013
Minyak/Oil
Jawa Timur/
East Java
22/12/1993
01/5/1998
21/12/2013
Minyak/Oil dan/and
Gas
Babat, Kukui
Jambi
12/7/1994
12/11/2003
11/7/2014
Minyak/Oil
PT Binawahana
Petrindo Meruap
Meruap
Jambi
12/7/1994
30/8/2000
11/7/2014
Minyak/Oil
PT Patrindo Persada
Maju
Mogoi, Wasian
Papua
12/7/1994
22/9/2000
11/7/2014
Minyak/Oil
PT Radiant Energi
Sukatani
Sukatani
Jawa
Barat/West
Java
16/6/1995
18/11/1999
15/6/2015
Minyak/Oil
PT Pelangi Haurgeulis
Resources
Haurgeulis
Jawa
Barat/West
Java
17/11/1995
26/6/2003
16/11/2015
Gas
PT Radiant Ramok
Senabing
Ramok Senabing
Sumatera
Selatan/South
Sumatra
09/1/1995
23/09/2003
08/1/2015
Minyak/Oil
Sabaku, Salawati A, D
Papua
09/1/1995
01/12/1995
08/1/2015
Minyak/Oil
Salawati - C,E,N
dan F
Papua
09/1/1995
01/10/1995
08/1/2015
Minyak/Oil
PT Sembrani Persada
Oil (SEMCO)
Semberah
Kalimantan
Timur/East
Kalimantan
17/11/1995
28/11/2004
16/11/2015
Minyak/Oil dan/and
Gas
Salamander Energy
(North Sumatra)
Ltd**)
Glagah, Kambuna
Sumatera
Utara/North
Sumatra
17/12/1996
17/9/2009
16/12/2016
Minyak/Oil dan/and
Gas
Tanjung Miring
Timur
Sumatera
Selatan/South
Sumatra
17/12/1996
23/10/2000
16/12/2016
Minyak/Oil
Tanjung Lontar
Sumatera
Selatan/South
Sumatra
07/10/1996
27/03/1998
06/10/2016
Minyak/Oil
PT Akar Golindo
Jambi
15/5/1997
11/10/2011
14/5/2017
Minyak/Oil
PT Insani Mitrasani
Gelam
Sungai Gelam - A,
B, D
Jambi
15/5/1997
13/10/2004
14/5/2017
Minyak/Oil dan/and
Gas
Langsa
Aceh
15/5/1997
28//11/2001
14/5/2017
Minyak/Oil
PT Medco E&P
Sembakung *)
Sembakung
Korea Development
(Poleng) Co Ltd*)
Poleng
PT PERTAMINA EP
Lampiran 5/8 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
3.
PERJANJIAN KERJASAMA
LAIN (lanjutan)
a.
DENGAN
PIHAK
3.
Mitra Usaha/
Partner
PT Putra Kencana Diski
Petroleum
Wilayah Kerja/
Working Area
Linda - A, C, G,
Sele
PT Indama Putera
Kayapratama
Kaya
Ellipse Energy
Jatirarangon
Wahana Ltd
Jatirarangon
PT Binatek Reka
Kruh
Kruh
PT Eksindo Telaga
Said Darat
Telaga Said
PT Pertalahan
Arnebatara
Natuna
Udang Natuna
PT Indo Jaya
Sukaraja (Easco
Sukaraja)
Sukaraja,
Pendopo
PT Prakarsa Betung
Meruo Senami
Meruo Senami
a.
Wilayah/
Area
Tanggal Efektif
Kontrak/
Effective Date of
Contract
Aceh
16/11/1998
Diski
COOPERATION
ARRANGEMENTS
OTHER PARTIES (continued)
Tanggal Akhir
Kontrak/
Date of End of
Contract
Produksi/
Production
15/11/2018
Minyak/Oil
13/2/2002
Papua
16/11/1998
04/9/2000
15/11/2018
Minyak/Oil
Sumatera
Selatan/South
Sumatra
22/5/2000
19/3/2013
21/5/2020
Minyak/Oil
Jawa
Barat/West
Java
22/5/2000
06/10/2004
21/5/2020
Minyak/Oil dan/and
Gas
Sumatera
Selatan/South
Sumatra
22/5/2000
06/2/2003
21/5/2020
Minyak/Oil
Aceh
07/8/2002
16/2/2006
06/8/2022
Minyak/Oil
Kepulauan
Riau/Riau
Archipelago
07/8/2002
28/11/2005
06/8/2022
Minyak/Oil
Sumatera
Selatan/South
Sumatra
07/8/2002
19/6/2008
06/8/2022
Minyak/Oil
Jambi
14/8/2002
15/2/2012
13/8/2022
Minyak/Oil
*)
Pada tanggal 21 Desember 2013 kontrak TAC
antara Perusahaan dengan PT Medco E&P
Sembakung dan Korea Development (Poleng) Co Ltd
berakhir.
**)
Pada tanggal 31 Desember 2013 kontrak TAC
antara Perusahaan dengan Salamander Energy (North
Sumatra) Ltd tidak dilanjutkan oleh Salamander Energy
(North Sumatra) Ltd.
WITH
b.
a.
b.
a.
b.
PT PERTAMINA EP
Lampiran 5/9 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
3.
PERJANJIAN KERJASAMA
LAIN (lanjutan)
DENGAN
b.
Operasi
Kontrak Kerja
(lanjutan)
Sama
PIHAK
(KSO)
3.
COOPERATION
ARRANGEMENTS
OTHER PARTIES (continued)
b.
WITH
Apabila
total
biaya
produksi
yang
dikeluarkan untuk operasi tahun berjalan
lebih rendah dari total pendapatan NSO,
maka pengembalian diberikan sebesar 70%
dari total biaya produksi tahun berjalan
tersebut, dan kekurangan biaya produksi
tidak diperhitungkan lagi pada tahun-tahun
berikutnya.
Apabila
total
biaya
produksi
yang
dikeluarkan sehubungan dengan operasi
tahun berjalan lebih tinggi dari total
pendapatan NSO, maka pengembaliannya
diberikan sebesar 50% dari total pendapatan
NSO
dan
kekurangannya
tidak
diperhitungkan lagi pada tahun-tahun
berikutnya.
PT PERTAMINA EP
Lampiran 5/10 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
3.
PERJANJIAN KERJASAMA
LAIN (lanjutan)
DENGAN
b.
Operasi
Kontrak Kerja
(lanjutan)
Sama
3.
COOPERATION
ARRANGEMENTS
OTHER PARTIES (continued)
b.
WITH
Specified
investment
expenditure
commitments are required to be made in the
first three years after the OC contract date. To
ensure that these expenditure commitments
will be met, the Partners are required to
provide the Company with irrevocable and
unconditional bank guarantees. The OC
Partners are also required to make payments
to the Company before the date of signing the
OC contracts, of the amounts stated in the bid
documents.
Mitra Usaha/
Partner
Wilayah Kerja/
Working Area
Suci
Kendal
PT Kamundan Energy
PT Formasi Sumatera Energy
Kamundan
Tanjung Tiga Timur
Sungai Lilin
Bangkudulis
Perlak
Benakat Barat
Wiriagar
Talang Akar
Tangai Sukananti
PD Migas Bekasi***)
Jatinegara
Tanjung Lontar
Timur
Kampung Minyak
Jambi Barat
Muara Enim
Tawun Gegunung
Trembes Sendang
PT IEV Pabuaran***)
Pabuaran
Klamono Selatan
Jambi Barat
Loyak Talang Gula
Pandan-PetananTapus
Kawengan, Ledok,
Nglobo
dan/and
Semanggi
Banyubang
Benakat Timur
Sambidoyong
Wilayah/
Area
Jawa Timur/
East Java
Jawa Tengah/
Central Java
Papua
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Kalimantan Timur/
East Kalimantan
Sumatera Utara/
North Sumatra
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Papua Barat/
West Papua
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Jawa Barat/
West Java
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Jambi
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Jawa Timur/
East Java
Jawa Timur/
East Java
Jawa Barat/
West Jawa
Jawa Barat/
West Jawa
Papua
Jambi
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Sumatera Selatan/
South Sumatra
Jawa Timur/
East Java
Jawa Timur/
East Java
*)
Produksi dibawah NSO
**)
Pada tanggal 24 April 2013, kontrak KSO antara Perusahaan
dengan PT Kendal Oil and Gas dan Pacifik Oil & Gas Ltd tidak
dilanjutkan karena mereka tidak melaksanakan kewajiban sesuai
perjanjian
***) Tanggal mulai produksi merupakan tanggal efektif kontrak
Tanggal Efektif
Kontrak/
Effective
Date of Contract
Tanggal Mulai
Produksi/
Commencement
of Production
Tanggal Akhir
Kontrak/
Date of End of
Contract
Produksi/
Production
25/4/2007
24/4/2027
25/4/2007
24/4/2027
25/4/2007
25/4/2007
25/4/2007
24/4/2027
24/4/2022
Minyak/Oil
25/4/2007
25/4/2007
24/4/2022
Minyak/Oil
25/4/2007
01/1/2011
24/4/2022
Minyak/Oil
25/4/2007
Juli/July 2011
24/4/2022
Minyak/Oil
19/12/2007
18/12/2007
Minyak/Oil
16/3/2009
16/3/2009
15/3/2024
Minyak/Oil
02/9/2009
02/9/2009
01/9/2024
Minyak/Oil
05/6/2010
05/7/2010
04/6/2025
Minyak/Oil
26/7/2010
26/7/2010
25/7/2025
Minyak/Oil
017/2/2011
017/2/2011
16/2/2026
Gas
017/2/2011
16/2/2031
15/7/2011
15/7/2012
14/7/2026
Minyak/Oil
13/6/2011
12/6/2031
01/5/2012
01/5/2012
30/4/2027
Minyak/Oil
28/6/2012
28/6/2012
27/6/2027
Minyak/Oil
28/6/2012
28/6/2012
27/6/2027
Minyak/Oil
28/6/2012
28/6/2012
27/6/2027
Minyak/Oil
26/7/2012
26/7/2012
25/7/2027
Minyak/Oil
03/8/2012
03/8/2012
02/8/2027
Gas
22/11/2012
23/11/2012
28/12/2012
01/01/2013
21/11/2032
22/11/2032
27/12/2027
Minyak/Oil
15/02/2013
01/07/2013
14/02/2028
Minyak/Oil
01/03/2013
01/03/2013
28/02/2033
Minyak/Oil
05/07/2013
05/07/2013
04/07/2028
Minyak/Oil
01/12/2013
01/12/2013
30/11/2033
Minyak/Oil
20/12/2013
20/12/2013
19/12/2033
Minyak/Oil
*)
Production is less than NSO
**)
On 24 April 2013, the KSO contracts between the Company and PT
Kendal Oil and Gas and Pacifik Oil & Gas Limited was discontinued due to
they did not not perform their obligation under the agreements
***)
PT PERTAMINA EP
Lampiran 5/11 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
3.
PERJANJIAN KERJASAMA
LAIN (lanjutan)
DENGAN
b.
Operasi
Kontrak Kerja
(lanjutan)
Sama
PIHAK
3.
(KSO)
COOPERATION
ARRANGEMENTS
OTHER PARTIES (continued)
b.
WITH
Kontrak Unitisasi
c.
Unitisation Agreement
Karena
beberapa
pelamparan
reservoir
Perusahaan
memasuki
Wilayah
Kerja
kontraktor lainnya, Perusahaan melakukan
perikatan Perjanjian Unitisasi dengan beberapa
kontraktor. Pada tanggal 31 Desember 2013
Perusahaan memiliki Perjanjian Unitisasi
sebagai berikut:
Para Pihak/Parties
Operator
Lapa
ngan/
Field
Tanggal
Efektif
Kontrak/
Effective
Date of
Contract
Tanggal
Mulai
Produksi /
Commence
ment of
Production
Tanggal
Akhir
Kontrak/
Date of
End of
Contract
Bagian/
Share of
PT
Pertamina
EP
(PEP)
Air
Serdang,
Sumatera
Selatan/
South
Sumatra
Sorong,
Papua
22/07/91
22/07/91
16/09/35
Minyak/Oil:
21.96%
dan/and
Gas: 19.93%
13/11/06
13/11/06
16/09/35
Minyak/Oil
dan/and
Gas: 50%
Lokasi/
Location
Talisman
Ogan
Komering
Ltd
Air
Serdang
Petrochina
International
(Bermuda)
Ltd
Waka
muk
JOB
PertaminaPetrochina
East Java
Suko
wati
Tuban,
Jawa
Timur/
East Java
02/07/04
2/07/04
16/09/35
Minyak/Oil
dan/and
Gas: 80%
PEP, ConocoPhilips
(Grissik) Ltd , Talisman,
PHE
ConocoPhilip
s (Grissik) Ltd
Suba
n
Suban,
Jambi
11/03/13
Juni/June
2011
23/01/23
Minyak/Oil
dan/and
Gas: 10%
PEP
Tanju
ng
Laba
n
Tanjung
Laban,
Sumatera
Selatan/
South
Sumatra
18/06/87
2005
16/09/35
Minyak/Oil
dan/and
Gas: 74.99
%
PHE ONWJ
MB
Unit
Jawa
Barat/
West Java
23/12/85
23/12/85
16/09/35
Minyak/Oil
dan/ and
Gas:
47.4%
PT
Pertamina
EP Cepu *)
Tiung
Biru
Jambaran,
Jawa
Timur/
East Java
14/09/12
16/09/35
Gas:
8.06%
PT PERTAMINA EP
Lampiran 5/12 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
4.
SUMMARY
POLICIES
OF
SIGNIFICANT
ACCOUNTING
a.
a.
b.
4.
Basis of preparation
statements
of
the
financial
Perubahan
pada
Pernyataan
Standar
Akuntansi
Keuangan
dan
Interpretasi
Standar Akuntansi Keuangan
b.
4.
PT PERTAMINA EP
Lampiran 5/13 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
b.
Perubahan
pada
Pernyataan
Standar
Akuntansi
Keuangan
dan
Interpretasi
Standar Akuntansi Keuangan (lanjutan)
b.
c.
PT PERTAMINA EP
Lampiran 5/14 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
4.
SUMMARY OF SIGNIFICANT
POLICIES (continued)
c.
ACCOUNTING
2013
Rupiah 10.000 (Rp)
d. Kas dan Setara Kas
2012
1.22
0.97
d.
e. Piutang Usaha
e.
Trade Receivables
PT PERTAMINA EP
Lampiran 5/15 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
4.
SUMMARY OF SIGNIFICANT
POLICIES (continued)
f.
ACCOUNTING
Inventories
Consumable inventories such as spare parts,
fuel, lubricants, chemicals and supplies are
valued at cost less a provision for obsolete
and slow moving inventory. Consumable
inventories are charged to profit or loss in the
period in which they are consumed during
operation. Cost is determined based on the
weighted average cost method. Provision for
obsolete and slow moving inventory is
determined on the basis of estimated future
usage or sale of individual inventory items.
g.
Financial Assets
1. Classifications,
measurement
recognition
and
Perusahaan
mengklasifikasikan
aset
keuangan dalam kategori berikut: (i) nilai
wajar melalui laba rugi, (ii) dimiliki hingga
jatuh tempo, (iii) pinjaman dan piutang dan
(iv) tersedia untuk dijual. Klasifikasi ini
tergantung pada tujuan saat aset keuangan
tersebut diperoleh. Manajemen menentukan
klasifikasi aset keuangan tersebut pada saat
pengakuan awal.
PT PERTAMINA EP
Lampiran 5/16 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
PT PERTAMINA EP
Lampiran 5/17 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
h.
h.
Pengeluaran-pengeluaran
sehubungan
dengan kegiatan eksplorasi dan evaluasi
minyak dan gas bumi dicatat dengan
menggunakan metode akuntansi successful
efforts.
Biaya-biaya
yang
terjadi
diakumulasikan berdasarkan lapangan per
lapangan.
Geological
and
geophysical
costs,
including seismic surveys for exploration
purposes are expensed as incurred.
PT PERTAMINA EP
Lampiran 5/18 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Aset Pengembangan
2.
Aset Produksi
Aset produksi merupakan agregasi aset
eksplorasi dan evaluasi dan pengeluaran
pengembangan yang berhubungan dengan
sumur berproduksi.
Aset produksi
dideplesikan menggunakan metode unit
produksi berdasarkan cadangan terbukti
sejak dimulainya produksi komersialnya dari
masing-masing lapangan.
Assets
Development Assets
The costs of drilling development wells
including the costs of drilling unsuccessful
development wells and development-type
stratigraphic wells together with the
reclassified exploration and evaluation
assets are capitalised as part of assets
under construction-development wells
until drilling is completed. When the
development well is completed on a
specific field, it is transferred to the
production wells.
Biaya-biaya
pengeboran
sumur
pengembangan termasuk biaya pengeboran
sumur
pengembangan
yang
tidak
menghasilkan dan sumur pengembangan
stratigrafi bersama dengan aset eksplorasi
dan evaluasi dikapitalisasi sebagai bagian
dari aset dalam penyelesaian - sumur
pengembangan hingga proses pengeboran
selesai. Pada saat pengembangan sumur di
lapangan tertentu telah selesai, maka sumur
tersebut akan ditransfer menjadi sumur
produksi.
3.
Evaluation
and
3.
Production Assets
Production
assets
are
aggregated
exploration and evaluation assets and
development expenditures associated
with the producing wells.
Production
assets are depleted using a unit-ofproduction method on the basis of proved
reserves, from the date of commercial
production of the respective field.
PT PERTAMINA EP
Lampiran 5/19 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
4.
3
10
5
2
30
20
30
27
Installations
LPG plant
Buildings
Moveable equipment
The
accumulated
costs
of
the
construction, installation or completion of
buildings, plant and infrastructure
facilities such as platforms and pipelines
are capitalised as assets under
construction - others. These costs are
reclassified to the fixed asset accounts
when the construction or installation is
completed. Depreciation is charged from
that date.
PT PERTAMINA EP
Lampiran 5/20 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
4.
5.
Ownership
Operation
Interest
in
Unitisation
In a unitisation, all the operating and nonoperating participants pool their assets in
a producing field to form a single unit and
in return receive an undivided interest in
that unit. As such, a unitisation operation
is a jointly controlled asset arrangement.
Under this arrangement, the Company
records its share of the joint asset, any
liabilities it incurs, its share of any
liabilities incurred jointly with the other
parties relating to the joint arrangement,
any revenue from the sale or use of its
share of the output of the joint asset and
any expenses it incurs in respect of its
interest in the joint arrangement.
PT PERTAMINA EP
Lampiran 5/21 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
j.
Utang Usaha
j.
Trade Payables
PT PERTAMINA EP
Lampiran 5/22 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Sewa
4.
SUMMARY OF SIGNIFICANT
POLICIES (continued)
k.
ACCOUNTING
Leases
The
determination
of
whether
an
arrangement contains a lease is based on
the substance of the arrangement at the
inception date and whether the fulfillment of
the arrangement is dependent on the use of
a specific asset and the arrangement
conveys a right to use the asset. If an
arrangement contains a lease, the Company
will assess whether such lease is a finance or
operating lease. If an arrangement contains a
lease that transfers substantially to the
lessee all of the risks and rewards incidental
to ownership of the leased item, it is
classified as a finance lease, otherwise it is
classified as an operating lease.
PT PERTAMINA EP
Lampiran 5/23 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Provisi
1.
4.
SUMMARY OF SIGNIFICANT
POLICIES (continued)
l.
ACCOUNTING
Provision
1.
PT PERTAMINA EP
Lampiran 5/24 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Provisi (lanjutan)
1.
4.
Provision (continued)
1.
2.
Other Provision
PT PERTAMINA EP
Lampiran 5/25 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Provisi (lanjutan)
2.
Provision (continued)
2.
m. Borrowing Costs
Interest and other borrowing costs, such as
discount fees on loans either directly or
indirectly used in financing the construction
of a qualifying asset, are capitalised up to the
date when construction is complete. For
borrowings directly attributable to a qualifying
asset, the amount to be capitalised is
determined as the actual borrowing costs
incurred during the year, less any income
earned on the temporary investment of such
borrowings. For borrowings that are not
directly attributable to a qualifying asset, the
amount to be capitalised is determined by
applying a capitalisation rate to the amount
expended on the qualifying asset. The
capitalisation rate is the weighted-average of
the borrowing costs applicable to the total
borrowings outstanding during the year,
excluding borrowings directly attributable to
financing the qualifying asset under
construction.
Kewajiban pensiun
Skema pensiun dapat diklasifikasikan
sebagai program iuran pasti atau program
imbalan pasti, tergantung pada substansi
ekonomis syarat dan kondisi utama
program tersebut. Program iuran pasti
adalah program imbalan pascakerja yang
mewajibkan
Perusahaan
membayar
sejumlah iuran tertentu kepada entitas
terpisah. Perusahaan tidak memiliki
kewajiban hukum dan konstruktif untuk
membayar iuran lebih lanjut jika entitas
tersebut tidak memiliki aset yang cukup
untuk
membayar
seluruh
imbalan
pascakerja sebagai imbalan atas jasa
yang diberikan pekerja pada periode
berjalan dan periode lalu.
n.
Pension obligations
Pension schemes are classified as
either defined contribution plans or
defined benefit plans, depending on the
economic substance of the plan as
derived from its principal terms and
conditions. A defined contribution plan
is a pension plan under which the
Company pays fixed contributions into a
separate entity. The Company has no
legal or constructive obligations to pay
further contributions if the fund does not
hold sufficient assets to pay all
employee the benefits relating to
employee service in the current and
prior years.
PT PERTAMINA EP
Lampiran 5/26 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Program
(lanjutan)
(i)
Pensiun
dan
Imbalan
Kerja
4.
Pension Plan
(continued)
(i)
and
Employee
Benefits
PT PERTAMINA EP
Lampiran 5/27 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Program
(lanjutan)
(i)
o.
Pensiun
dan
Imbalan
Kerja
4.
Pension Plan
(continued)
(i)
and
Employee
Benefits
Modal Saham
o.
Share Capital
PT PERTAMINA EP
Lampiran 5/28 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
Dividen
Dividends
q.
the amount of
measured reliably;
revenue
can
be
PT PERTAMINA EP
Lampiran 5/29 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
4.
r.
Revenue
and
(continued)
Expense
Recognition
Pajak Penghasilan
r.
Income Tax
PT PERTAMINA EP
Lampiran 5/30 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
CRITICAL ACCOUNTING
JUDGEMENTS
ESTIMATES
AND
a.
a.
Pertimbangan
Judgements
(i)
(i)
PT PERTAMINA EP
Lampiran 5/31 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
Pertimbangan (lanjutan)
CRITICAL ACCOUNTING
JUDGEMENTS (continued)
a.
Development expenditure
Development activities commence after a
project is sanctioned by the appropriate
level of management. Judgement is
applied by management in determining
when a project is economically viable. In
exercising this judgement, management
is required to make certain estimates and
assumptions similar to those described
above for capitalised exploration and
evaluation expenditure.
AND
Judgements (continued)
(ii)
ESTIMATES
b.
(i)
(i)
Estimasi Cadangan
Cadangan minyak dan gas bumi terbukti
adalah perkiraan jumlah minyak mentah,
gas alam dan gas alam cair yang
berdasarkan data geologis dan teknis dapat
diambil dengan tingkat kepastian yang
memadai di tahun-tahun mendatang dari
reservoir yang ada berdasarkan kondisi
ekonomi dan operasi yang sekarang ada,
yaitu harga dan biaya pada tanggal
estimasi tersebut dibuat. Cadangan terbukti
meliputi:
(i)
cadangan
terbukti
dikembangkan: jumlah hidrokarbon yang
diharapkan akan diambil melalui sumur,
fasilitas, dan metode operasi yang
sekarang ada; dan (ii) cadangan terbukti
yang
belum
dikembangkan:
jumlah
hidrokarbon yang diharapkan dapat diambil
setelah adanya pengeboran, fasilitas dan
metode operasi baru. Berdasarkan jumlah
cadangan
ini,
Perusahaan
telah
menetapkan
pengeluaran
program
pengembangan yang bertujuan untuk
mengembangkan
cadangan
tersebut.
Cadangan
terbukti
tidak
termasuk
cadangan terindikasi dan cadangan tereka.
Reserve Estimates
Proved oil and gas reserves are the
estimated quantities of crude oil, natural
gas and natural gas liquids which
geological
and
engineering
data
demonstrate with reasonable certainty to
be recoverable in future years from
known
reservoirs
under
existing
economic and operating conditions, i.e.,
prices and costs as at the date the
estimate is made. Proved reserves
include: (i) proved developed reserves:
amounts of hydrocarbons that are
expected to be retrieved through existing
wells, facilities and operating methods;
and (ii) undeveloped proved reserves:
amounts of hydrocarbons that are
expected to be retrieved following new
drilling, facilities and operating methods.
Based on these amounts the Company
has already defined a clear development
expenditure program which is an
expression
of
the
Company's
determination
to
develop
existing
reserves. Proved reserves do not include
probable or possible reserves.
PT PERTAMINA EP
Lampiran 5/32 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
5.
CRITICAL ACCOUNTING
JUDGEMENTS (continued)
b.
ESTIMATES
AND
Depreciation
and
amortisation
charged in the statements of income
may change where such charges are
determined on a unit of production
basis, or where the useful economic
lives of assets change.
Decommissioning, site restoration
and environmental provision may
change where changes in estimated
reserves affect expectations about
the timing or cost of these activities.
PT PERTAMINA EP
Lampiran 5/33 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
5.
CRITICAL ACCOUNTING
JUDGEMENTS (continued)
b.
AND
ESTIMATES
(ii)
PT PERTAMINA EP
Lampiran 5/34 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
Nilai
Aset
5.
CRITICAL ACCOUNTING
JUDGEMENTS (continued)
b.
Non-Keuangan
ESTIMATES
AND
Impairment
(continued)
of
Non-Financial
Assets
PT PERTAMINA EP
Lampiran 5/35 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
5.
5.
CRITICAL ACCOUNTING
JUDGEMENTS (continued)
b.
6.
2013
Kas
Bank
Deposito berjangka
202
84,480
124,779
252
11,307
102,995
Cash on hand
Cash in banks
Time deposits
209,461
114,554
Rupiah
Dolar AS
7.
AND
(iv) Taxation
(iv) Pajak
6.
ESTIMATES
2013
2012
3.5% - 9.80%
0.20% - 0.50%
3.5% - 6.25%
0.25% - 0.33%
PIUTANG USAHA
Pihak ketiga
Pihak berelasi (Catatan 22c)
7.
TRADE RECEIVABLES
2013
2012
134,301
7,314,022
224,477
5,895,395
7,448,323
6,119,872
7,448,323
Rupiah
US Dollars
(4,078)
6,115,794
Third parties
Related parties (Note 22c)
PT PERTAMINA EP
Lampiran 5/36 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
7.
7.
2013
2012
26,581
19,631
8,180
2,503
43,743
7,799
20,749
-
Overdue:
Less than three months
3 6 months
6 12 months
>12 months
Jumlah
56,895
72,291
Total
2013
Saldo awal
Pembalikan selama tahun berjalan
Saldo akhir
2012
4,078
(4,078)
-
4,078
-
Beginning balance
Reversal during year
4,078
Ending balance
PT PERTAMINA EP
Lampiran 5/37 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
7.
8.
7.
Berdasarkan
evaluasi
manajemen
terhadap
kolektibilitas saldo masing-masing piutang usaha
pada tanggal 31 Desember 2013, manajemen
berpendapat bahwa seluruh jumlah piutang akan
tertagih oleh karena itu tidak ada provisi penurunan
nilai yang perlu dicatat.
PIUTANG LAIN-LAIN
8.
2013
Pihak ketiga
Pihak yang berelasi (Catatan 22d)
OTHER RECEIVABLES
2012
44,422
3,502
19,471
4,615
Third parties
Related parties (Note 22d)
47,924
24,086
(1,969)
(1,988)
45,955
22,098
2013
2012
25,095
970
3,053
346
Overdue:
Less than 3 months
3 6 months
Jumlah
26,065
3,399
Total
715
660
6,335
395
3,711
2,856
Overdue:
6 12 months
12 24 months
>24 months
Jumlah
7,710
6,962
Total
PT PERTAMINA EP
Lampiran 5/38 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
8.
2013
9.
2012
Saldo awal
Pemulihan dari penurunan nilai
piutang lain-lain
Selisih kurs
1,988
Saldo akhir
1,969
2,048
(19)
(55)
(5)
1,988
Beginning balance
Reversal of provision for
impairment
Foreign exchange
Ending balance
Berdasarkan
evaluasi
manajemen
terhadap
kolektibilitas saldo masing-masing piutang lain-lain
pada tanggal 31 Desember 2013 dan 2012,
manajemen berpendapat bahwa jumlah penurunan
nilai piutang lain-lain sudah memadai untuk
menutupi kemungkinan kerugian dari tidak
tertagihnya piutang lain-lain tersebut.
PERSEDIAAN
9.
2013
Material umum
Penyisihan persediaan usang
dan tidak terpakai
151,965
Jumlah
148,550
(3,415)
INVENTORIES
2012
117,043
(1,127)
115,916
General materials
Allowance for obsolete
and unusable inventories
Total
PT PERTAMINA EP
Lampiran 5/39 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Saldo awal/
Beginning
balance
Penambahan/
Additions
Reklasifikasi/
Reclassifications
Penghapusan/
Disposal
Saldo akhir/
Ending
balance
Nilai perolehan
Acquisition cost
Pemilikan langsung
Owned assets
7,257
2,914,572
797,880
3,309
30,852
111,255
19
14,357
617
205
320,859
174,323
872
17,828
(287,707)
(22,059)
-
7,276
2,962,081
950,761
3,309
31,724
129,288
Sub-jumlah
3,865,125
15,198
513,882
(309,766)
4,084,439
Sub-total
367,560
546,083
276,987
174,279
630,069
288,072
(152,148)
(168,711)
(193,023)
(24,705)
-
1,190,630
1,092,420
(513,882)
(24,705)
308,508
44,218
58,801
17,405
Sub-jumlah
428,932
5,484,687
1,107,618
Sub-jumlah
Sub-total
308,508
44,218
58,801
17,405
428,932
Sub-total
6,257,834
(334,471)
Akumulasi penyusutan,
deplesi dan amortisasi
Pemilikan langsung
Sumur produksi
Instalasi
Pabrik LPG
Bangunan
Harta bergerak
Accumulated depreciation,
depletion and amortisation
(595,036)
(330,444)
(4,025)
(6,112)
(63,761)
(208,216)
(57,028)
(695)
(1,384)
(11,649)
(9,967)
9,967
Sub-jumlah akumulasi
penyusutan, deplesi
dan amortisasi
(999,378)
(278,972)
(240,192)
(60,800)
(53,393)
(13,637)
(8,613)
(3,515)
(876)
(502)
Sub-jumlah akumulasi
penyusutan, deplesi
dan amortisasi
(368,022)
(1,367,400)
4,117,287
(13,506)
(292,478)
(11,256)
24,972
194
(803,252)
(397,439)
(4,720)
(7,496)
(65,443)
Owned assets
Production wells
Installations
LPG plants
Buildings
Moveable equipment
Sub-total accumulated
depreciation, depletion
(1,278,350)
and amortisation
(260,061)
(39,343)
(54,269)
(13,945)
13,910
Sub-total accumulated
depreciation, depletion
(367,618)
and amortisation
13,910
Total accumulated
depreciation, depletion
(1,645,968)
and amortisation
4,611,866
PT PERTAMINA EP
Lampiran 5/40 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Saldo awal/
Beginning
balance
Penambahan/
Additions
Reklasifikasi/
Reclassifications
Penghapusan/
Disposal
Saldo akhir/
Ending
balance
Nilai perolehan
Acquisition cost
Pemilikan langsung
Tanah dan hak atas tanah
Sumur produksi
Instalasi
Pabrik LPG
Bangunan
Harta bergerak
4,806
1,995,582
654,175
3,309
23,258
82,125
2,451
422,059
29,897
-
496,931
113,808
7,594
29,130
7,257
2,914,572
797,880
3,309
30,852
111,255
Owned assets
Land and land rights
Production wells
Installations
LPG plants
Buildings
Moveable equipment
Sub-jumlah
2,763,255
454,407
647,463
3,865,125
Sub-total
633,002
179,170
190,655
49,402
603,814
236,864
(260,030)
(236,901)
(150,532)
(54,814)
-
1,002,827
890,080
(647,463)
(54,814)
308,508
44,218
58,801
17,405
Sub-jumlah
428,932
4,195,014
1,344,487
Sub-total
308,508
44,218
58,801
17,405
428,932
Sub-total
5,484,687
(54,814)
Akumulasi penyusutan,
deplesi dan amortisasi
Pemilikan langsung
Sumur produksi
Instalasi
Pabrik LPG
Bangunan
Harta bergerak
Accumulated depreciation,
depletion and amortisation
(440,234)
(268,497)
(3,330)
(4,556)
(50,539)
(154,802)
(61,947)
(695)
(1,556)
(13,222)
(595,036)
(330,444)
(4,025)
(6,112)
(63,761)
Owned assets
Production wells
Installations
LPG plants
Buildings
Moveable equipment
Sub-jumlah akumulasi
penyusutan, deplesi
dan amortisasi
(767,156)
(232,222)
Sub-total accumulated
depreciation, depletion
(999,378)
and amortisation
(234,684)
(39,438)
(52,315)
(13,004)
(5,508)
(21,362)
(1,078)
(633)
(240,192)
(60,800)
(53,393)
(13,637)
Sub-total accumulated
depreciation, depletion
(368,022)
and amortisation
Sub-jumlah akumulasi
penyusutan, deplesi
dan amortisasi
Jumlah akumulasi penyusutan,
deplesi dan amortisasi
Nilai buku bersih
(339,441)
(28,581)
(1,106,597)
(260,803)
3,088,417
(1,367,400)
4,117,287
Total accumulated
depreciation, depletion
and amortisation
Net book value
PT PERTAMINA EP
Lampiran 5/41 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Nilai
pertanggungan
asuransi
sebesar
AS$1.346.039 yang mencakup pertanggungan
seluruh aset didarat (onshore) yang dimiliki oleh
Perusahaan meliputi persediaan, fasilitas
produksi, terminal minyak dan gas, stasiun
pengumpul, minyak mentah, gas bumi, produkproduk minyak mentah dan gas bumi yang
disimpan dalam tangki-tangki penyimpanan,
harta bergerak dan peralatan berat.
Nilai
pertanggungan
asuransi
sebesar
AS$87.714 yang mencakup pertanggungan
seluruh aset lepas pantai yang dimiliki
Perusahaan.
Nilai
pertanggungan
asuransi
sebesar
AS$35.000 terhadap Tanggungan Dalam Satu
Limit Gabungan (Combined Single Limit of
Liability) setiap insiden di luar kendali
Perusahaan, misalnya peristiwa meledaknya
sumur di darat (blowout), untuk setiap polis
asuransi. Pada tanggal 31 Desember 2013,
Perusahaan memiliki 14 polis asuransi jenis ini.
Nilai
pertanggungan
asuransi
sebesar
AS$50.000 terhadap Tanggungan Dalam Satu
Limit Gabungan (Combined Single Limit of
Liability) setiap insiden di luar kendali
Perusahaan, misalnya peristiwa meledaknya
sumur lepas pantai (blowout), untuk setiap polis
asuransi. Pada tanggal 31 Desember 2013,
Perusahaan memiliki 1 polis asuransi jenis ini.
2012
Pihak ketiga
Pihak berelasi (Catatan 22e)
187,303
256,724
151,519
154,821
Third parties
Related parties (Note 22e)
Jumlah
444,027
306,340
Total
PT PERTAMINA EP
Lampiran 5/42 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
a.
2013
2012
DMO fees:
Saldo awal
Penambahan tahun berjalan
Offset piutang DMO fees
dengan kewajiban Pertamina
kepada Pemerintah
Dibayar tunai
Saldo akhir
DMO fees:
83,403
761,485
460,189
876,252
(567,810)
(205,564)
(331,039)
(922,000)
71,514
83,402
Piutang underlifting:
Saldo awal
Pembayaran
Penambahan tahun berjalan
Penyesuaian underlifting
tahun sebelumnya
Ending balance
Underlifting receivable:
20,171
(5,581)
-
28,190
(21,670)
20,171
(14,590)
(6,520)
Saldo akhir
Jumlah
Beginning balance
Addition during the year
Offset DMO fees receivable
against Pertaminas obligation
to the Government
Cash settlement
Beginning balance
Payment
Addition during the year
Adjustment for prior years
underlifting
20,171
Ending balance
71,514
103,573
Total
DMO
fees
merupakan
tagihan
kepada
Pemerintah sehubungan dengan kewajiban
Perusahaan dalam menyediakan minyak mentah
untuk memenuhi kebutuhan bahan bakar minyak
pasar dalam negeri sesuai KKS (Catatan 2f).
Piutang
underlifting
merupakan
piutang
Perusahaan dari SKK MIGAS karena volume
lifting minyak mentah dan gas bumi yang
dilakukan oleh SKK MIGAS melebihi bagian
yang menjadi haknya pada tahun yang
bersangkutan.
Underlifting
receivables
represent
the
Companys receivable from SKK MIGAS as a
result of SKK MIGAS lifting higher crude oil
and gas volumes than its entitlement for the
respective year.
b.
2013
2012
249,886
284,201
Jumlah
293,451
377,439
Total
43,565
93,238
PT PERTAMINA EP
Lampiran 5/43 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
c.
2012
394,340
467,484
(249,886)
(284,201)
144,454
183,283
Lessor
The Ministry of Finance
Less amounts due within one year
Total non-current portion
Future
lease
payments
as
at
31 December 2013 and 2012 are as follows:
2012
273,220
313,781
121,431
153,064
382,509
512,763
777,160
979,608
Total
(559,903)
(705,756)
Jumlah, bersih
Bagian yang jatuh tempo
dalam satu tahun
217,257
273,852
(72,803)
(90,569)
144,454
183,283
Jumlah
Dikurangi jumlah bagian
bunga
2012
Pokok
Bunga
72,803
177,083
90,569
193,632
Principal
Interest
249,886
284,201
PT PERTAMINA EP
Lampiran 5/44 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
2012
373,036
67,738
28,983
303,855
97,844
30,933
Jumlah
469,757
432,632
Total
2013
Saldo awal
(Pengurangan)/Penambahan selama
tahun berjalan
Beban akresi (Catatan 20)
Penyesuaian (Catatan 19d)
Saldo akhir
1,218,549
(309,766)
39,640
948,423
2012
756,156
451,956
27,593
(17,156)
1,218,549
Beginning balance
(Deduction)/Addition during the year
Accretion expenses (Note 20)
Adjustments (Note 19d)
Ending balance
PT PERTAMINA EP
Lampiran 5/45 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Lembar/Share
Nilai/Value
Persentase
kepemilikan/
Percentage of
ownership
PT Pertamina (Persero)
Pertamina Dana Ventura
249,975
25
24,728
2
99.99
0.01
PT Pertamina (Persero)
Pertamina Dana Ventura
Jumlah
250,000
24,730
100.00
Total
Lembar/Share
Nilai/Value
Persentase
kepemilikan/
Percentage of
ownership
PT Pertamina (Persero)
Koperasi Energi Indonesia
249,975
25
24,728
2
99.99
0.01
PT Pertamina (Persero)
Koperasi Energi Indonesia
Jumlah
250,000
24,730
100.00
Total
Saham
biasa
memberikan
hak
kepada
pemegangnya untuk memperoleh dividen dan hasil
dari pembubaran Perusahaan sesuai dengan
proporsi jumlah dan jumlah yang dibayarkan atas
saham yang dimiliki.
PT PERTAMINA EP
Lampiran 5/46 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
17. DIVIDEN
17. DIVIDENDS
2013
2012
2,787,052
914,975
32,235
3,059,821
747,499
36,698
3,734,262
3,844,018
Pihak ketiga:
Gas bumi
Minyak mentah
427,611
-
379,901
15,610
Third parties:
Natural gas
Crude oil
427,611
395,511
Pemerintah:
DMO fees - minyak mentah
(Overlifting)/Underlifting
Penyesuaian tahun sebelumnya
Lain - lain
761,486
(42,878)
(14,590)
3,794
876,252
20,171
(6,520)
-
Government:
DMO fees - crude oil
(Overlifting)/Underlifting
Adjustment for prior years
Others
707,812
889,903
5,129,432
4,869,685
a. Beban eksplorasi
a. Exploration expenses
2013
Seismik
Sumur kering
Geologi dan geofisika
Lain-lain
Jumlah
2012
89,656
24,706
22,619
8,609
111,636
54,814
20,328
14,811
Seismic
Dry hole
Geological and geophysical
Others
145,590
201,589
Total
PT PERTAMINA EP
Lampiran 5/47 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
b. Beban produksi
b. Production expenses
2013
2012
Kontrak
Mitra usaha
515,795
412,312
482,589
527,045
292,478
216,481
157,334
10,291
260,803
218,943
163,399
45,610
Contracts
Partners
Depreciation, depletion and
amortisation
Materials
Employee costs
Others
1,604,691
1,698,389
Total
Jumlah
c. Beban umum dan administrasi
Biaya karyawan
Jasa umum
Sewa
Lain-lain
Beban material dan perlengkapan
Pengembangan personalia
Jumlah
2012
99,161
26,438
15,422
9,832
7,647
5,642
80,975
52,730
36,176
11,014
50,977
9,744
Employee costs
General services
Rent
Others
Equipment and materials expenses
Personnel development
164,142
241,616
Total
d. Keuntungan lainnya-bersih
d. Other gains-net
2013
Pendapatan lain-lain
Laba selisih kurs, bersih
Penyesuaian atas provisi untuk
pembongkaran dan restorasi
lokasi aset (Catatan 14)
Beban lainnya
139,813
108,105
Jumlah
246,103
(1,815)
2012
82,951
25,148
Other income
Foreign exchange gain, net
Adjustment on provision for
decommissioning and site
restoration (Note 14)
Other expenses
17,156
(3,816)
121,439
Total
2012
39,640
33,769
27,593
36,545
Jumlah
73,409
64,138
Total
PT PERTAMINA EP
Lampiran 5/48 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
21. PERPAJAKAN
21. TAXATION
a.
2013
Sudah ditagih
Belum ditagih
2012
139,292
92,815
134,201
65,900
232,107
200,101
b.
2013
c.
2012
172,401
17,454
(1,867)
178,221
-
Jumlah
172,401
193,808
c.
2013
Kini (Catatan 21d)
Tangguhan (Catatan 21e)
Beban pajak penghasilan, bersih
d.
Billed
Unbilled
Reimbursable VAT
2012
969,093
305,666
1,110,108
182,430
1,274,759
1,292,538
Pajak kini
Rekonsiliasi antara laba sebelum pajak
penghasilan menurut laporan laba rugi dengan
laba sebelum pajak penghasilan dari kegiatan
usaha KKS untuk tahun yang berakhir pada
tanggal 31 Desember 2013 dan 2012 adalah
sebagai berikut:
d.
PT PERTAMINA EP
Lampiran 5/49 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
d.
2013
3,264,221
2012
3,238,930
(311)
(4,691)
(5,067)
3,259,154
3,233,928
31,006
13,100
(707,933)
(77,804)
(470,479)
6,935
(754,731)
(450,444)
Beda tetap:
Selisih kurs
Lain-lain
(108,105)
75,542
(25,148)
(17,328)
Permanent differences:
Foreign exchange differences
Others
(32,563)
(42,476)
2,471,860
40.5%
2,741,008
40.5%
1,001,103
1,110,108
Taxable income
Tax rate
Total corporate and
dividend tax expense
involving Cooperation
Contract activities
1,110,108
(32,010)
969,093
2013
2012
3,264,221
3,238,930
1,322,010
1,311,767
1,274,759
(2,053)
(13,188)
(32,010)
(2,026)
(17,203)
-
1,292,538
PT PERTAMINA EP
Lampiran 5/50 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
e.
Dicatat pada
laporan
laba rugi/
Charged to
statements
of income
Saldo akhir/
Ending
balance
31 Desember/
December 2013
462,619
(128,249)
334,370
30,680
192,867
26,957
2,913
631
(31,447)
204
(733)
31,311
161,420
27,161
2,180
716,036
(159,594)
556,442
(1,438,860)
(21,783)
(143,387)
(2,685)
(1,582,247)
(24,468)
(1,460,643)
(146,072)
(1,606,715)
(744,607)
(305,666)
(1,050,273)
Liabilitas pajak
tangguhan, bersih
Saldo awal/
Beginning
balance
31 Desember/
December 2011
25,310
202,191
26,957
2,937
536,642
279,247
Dicatat pada
laporan
laba rugi/
Charged to
statements
of income
183,372
5,370
(9,324)
(24)
179,394
Saldo akhir/
Ending
balance
31 Desember/
December 2012
30,680
192,867
26,957
2,913
716,036
462,619
(1,081,826)
(16,993)
(357,034)
(4,790)
(1,438,860)
(21,783)
(1,098,819)
(361,824)
(1,460,643)
(562,177)
(182,430)
(744,607)
Liabilitas pajak
tangguhan, bersih
PT PERTAMINA EP
Lampiran 5/51 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
e.
2013
2012
(89,901)
(947,973)
(654,706)
(1,050,273)
(744,607)
Total
(102,300)
Administrasi pajak
f.
g. Pemeriksaan pajak
g.
Tax audit
The Company is being audited by DGT for
financial years 2011 and 2012.
Tax administration
The taxation laws of Indonesia require that the
Company submits its tax returns on the basis
of
self
asessment.
Under
prevailing
regulations the Director General of Tax
(DGT) may assess or amend taxes within a
certain year. For the fiscal years of 2007 and
before, this period is within ten years of the
time the tax become due, but not later than
2013, while for the fiscal years of 2008 and
onwards, the period is within five years of the
time the tax becomes due.
a.
22. RELATED
PARTY
TRANSACTIONS
a.
Entitas sepengendali/
Entity under common control
Entitas sepengendali/
Entity under common control
Entitas sepengendali/
Entity under common control
Entitas sepengendali/
Entity under common control
Entitas sepengendali/
Entity under common control
Entitas berelasi dengan Pemerintah/
Government related entities
AND
PT Pertamina (Persero)
BALANCES
Sifat transaksi/Nature of
transactions
Penjualan minyak dan gas/
Oil and gas sales
Ekspor minyak/Oil export
Sewa rig/Rig service rent
Penjualan gas dan toll fee/
Gas sales and toll fee
Alokasi biaya/Cost sharing
Kesehatan/Medical
Penjualan gas/Gas sales
PT PERTAMINA EP
Lampiran 5/52 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
22. RELATED
PARTY
BALANCES
TRANSACTIONS (continued)
a.
PT Elnusa Tbk
Perusahaan asosiasi/Associates
PT Rekayasa Industri
PT Pembangkit Jawa-Bali
PT Pupuk Kujang
PT Krakatau Steel (Persero) Tbk
PT Perusahaan Gas Negara (Persero)
Tbk
PT Indonesia Power
PT Bina Bangun Wibawa Mukti
PT Jabar Energi
PT Sinergi Patriot Bekasi
PT Bank Negara Indonesia (Persero)
Tbk
AND
Sifat transaksi/Nature of
transactions
Layanan seismik dan pengeboran/
Seismic and drilling service
Jasa konstruksi dan teknik/
Construction and engineering
services
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Penjualan gas/Gas sales
Transaksi perbankan dan
deposito/Banking transaction
and time deposit
Transaksi perbankan dan
deposito/Banking transaction
and time deposit
Transaksi perbankan dan
deposito/Banking transaction
and time deposit
PT PERTAMINA EP
Lampiran 5/53 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
22. RELATED
PARTY
BALANCES
TRANSACTIONS (continued)
2012
Bank
Cash in banks
83,473
11,136
24
983
165
Sub-jumlah
84,480
11,307
Sub-total
84,574
39,290
72,626
27,022
915
3,347
Time deposits
PT Bank Rakyat Indonesia (Persero) Tbk
PT Bank Mandiri (Persero) Tbk PT Bank Negara Indonesia (Persero) Tbk
Sub-jumlah
124,779
102,995
Sub-total
Jumlah
209,259
114,302
Total
Deposito berjangka
- PT Bank Rakyat Indonesia
(Persero) Tbk
- PT Bank Mandiri (Persero) Tbk
- PT Bank Negara Indonesia
(Persero) Tbk
c.
AND
c.
2013
2012
- PT Pertamina (Persero)
- PT Pupuk Sriwidjaja
(Persero)
- PT Perusahaan Gas
Negara (Persero) Tbk
- Lain-lain
7,181,527
5,827,811
28,574
17,448
22,756
81,165
12,244
37,892
Jumlah
7,314,022
5,895,395
PT Pertamina (Persero)
PT Pupuk Sriwidjaja
(Persero)
PT Perusahaan Gas
Negara (Persero) Tbk
Others
Total
PT PERTAMINA EP
Lampiran 5/54 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
22. SALDO DAN TRANSAKSI
YANG BERELASI (lanjutan)
c.
d.
DENGAN
22. RELATED
PARTY
BALANCES
TRANSACTIONS (continued)
c.
AND
Piutang lain-lain
d.
2013
Other receivables
2012
2,876
626
4,197
418
Jumlah
3,502
4,615
Total
e. Utang usaha
e.
2013
PT Pertamina Gas
PT Pertamina Drilling Service
Indonesia
PT Pertamina (Persero)
PT Rekayasa Industri
Lain-lain
Jumlah
Trade payables
2012
85,784
34,142
71,253
59,951
39,736
92,666
10,773
17,240
PT Pertamina Gas
PT Pertamina Drilling Service
Indonesia
PT Pertamina (Persero)
PT Rekayasa Industri
Others
256,724
154,821
Total
PT PERTAMINA EP
Lampiran 5/55 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
DENGAN
PIHAK
f. Utang lain-lain
22. RELATED
PARTY
BALANCES
TRANSACTIONS (continued)
f.
2013
AND
Other payables
2012
1,532
3,260
1,035
667
Jumlah
4,792
1,702
Total
g.
2013
2012
147,985
207,669
30,321
36,084
Jumlah
178,306
243,753
Total
h. Deferred revenue
2013
67,064
2012
66,560
PT PERTAMINA EP
Lampiran 5/56 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
22. SALDO DAN TRANSAKSI
YANG BERELASI (lanjutan)
DENGAN
PIHAK
22. RELATED
PARTY
BALANCES
TRANSACTIONS (continued)
i. Pendapatan usaha
i.
2013
Revenue
2012
Dalam Negeri
Minyak mentah
PT Pertamina (Persero)
Gas Bumi
PT Pupuk Sriwidjaja (Persero)
PT Perusahaan Gas Negara
(Persero) Tbk
PT Bina Bangun Wibawa Mukti
PT Pertamina (Persero)
PT Pupuk Kujang
PT Pembangkit Jawa-Bali
PT Perusahaan Listrik
Negara (Persero)
PT Krakatau Steel
(Persero) Tbk
PT Pertamina Gas
PT Indonesia Power
LPG
PT Pertamina (Persero)
Domestic
Crude oil
PT Pertamina (Persero)
2,787,052
3,052,712
278,882
175,140
219,131
79,639
74,493
71,735
50,003
170,011
63,874
94,599
67,946
60,468
44,773
56,031
53,919
38,348
4,052
45,866
11,495
2,069
Natural Gas
PT Pupuk Sriwidjaja (Persero)
PT Perusahaan Gas Negara
(Persero) Tbk
PT Bina Bangun Wibawa Mukti
PT Pertamina (Persero)
PT Pupuk Kujang
PT Pembangkit Jawa-Bali
PT Perusahaan Listrik
Negara (Persero)
PT Krakatau Steel
(Persero) Tbk
PT Pertamina Gas
PT Indonesia Power
32,235
36,698
LPG
PT Pertamina (Persero)
Export crude oil
Pertamina Energy
Services Pte Ltd
AND
7,109
3,734,262
3,844,018
2013
2012
j. Beban usaha
j.
Total
Operating expenses
PT Pertamina Gas
PT Pertamina (Persero)
PT Pertamina Drilling
Service Indonesia
PT Pertamina Hulu Energi
Lain-lain
133,305
92,044
110,403
109,937
14,269
9,566
8,524
12,313
2,220
PT Pertamina Gas
PT Pertamina (Persero)
PT Pertamina Drilling
Service Indonesia
PT Pertamina Hulu Energi
Others
Jumlah
249,184
243,397
Total
k. Pendapatan lain-lain
k. Other income
2013
PT Pertamina Drilling
Service Indonesia
1,424
2013
Jumlah
23. TRANSAKSI NON-KAS
2,294
l.
2012
4,153
222
4,375
PT Pertamina Drilling
Service Indonesia
2012
3,824
302
4.126
23. NON-CASH TRANSACTIONS
Total
PT PERTAMINA EP
Lampiran 5/57 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
451,956
1,636,299
236,440
211,190
(309,766)
2012
PT PERTAMINA EP
Lampiran 5/58 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
25. MANAJEMEN RISIKO KEUANGAN (lanjutan)
I. Faktor risiko keuangan
a. Risiko pasar
(i)
Sebagian
besar
pendapatan
dan
pengeluaran operasi dari Perusahaan
didenominasi dalam mata uang Dolar AS,
yang secara tidak langsung merupakan
lindung nilai alami (natural hedge)
terhadap eksposur fluktuasi mata uang
asing. Pengeluaran signifikan dalam mata
uang asing (Rupiah) berhubungan
dengan pembayaran gaji dan utang sewa
pembiayaan
pada
Pemerintah
sehubungan dengan aset milik negara.
Dengan
demikian
pengeluaranpengeluaran tersebut memiliki eksposur
yang signifikan terhadap fluktuasi nilai
tukar mata uang asing.
PT PERTAMINA EP
Lampiran 5/59 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
25. MANAJEMEN RISIKO KEUANGAN (lanjutan)
I. Faktor risiko keuangan (lanjutan)
a. Risiko pasar (lanjutan)
(ii) Risiko harga (lanjutan)
-
Faktor-faktor
non-fundamental
(kekhawatiran
pasar
akibat
gangguan politik, keamanan dan
aksi spekulasi di pasar minyak).
PT PERTAMINA EP
Lampiran 5/60 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
31 Desember/
December 2013
Aset/Assets
Kas dan setara kas/
Cash and cash equivalents
Piutang usaha/Trade
receivables
Piutang dari Pemerintah/
Amounts due
from the Government
Piutang lain-lain/
Other receivables
Aset lain-lain/Other assets
Jumlah aset keuangan/
Total financial assets
Liabilitas/Liabilities
Utang usaha/Trade payables
Utang kepada Pemerintah/
Amounts due to
the Government
Biaya yang masih harus
dibayar/Accrued expenses
Utang sewa pembiayaan/
Finance lease payables
Utang lain-lain/
Other payables
Jumlah liabilitas keuangan/
Total financial liabilities
209,259
202
209,461
7,448,323
7,448,323
71,514
71,514
45,955
90
45,955
90
209,259
7,566,084
7,775,343
444,027
444,027
249,886
144,454
43,565
437,905
469,757
469,757
637
3,587
4,224
5,379
5,379
250,523
148,041
962,728
1,361,292
PT PERTAMINA EP
Lampiran 5/61 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
31 Desember 2012
Aset/Assets
Kas dan setara kas/
Cash and cash equivalents
Piutang usaha/Trade
receivables
Piutang dari Pemerintah/
Amounts due
from the Government
Piutang lain-lain/
Other receivables
Aset lain-lain/Other assets
Jumlah aset keuangan/
Total financial assets
Liabilitas/Liabilities
Utang usaha/Trade payables
Utang kepada Pemerintah/
Amounts due to
the Government
Biaya yang masih harus
dibayar/Accrued expenses
Utang sewa pembiayaan/
Finance lease payables
Utang lain-lain/
Other payables
Jumlah liabilitas keuangan/
Total financial liabilities
114,302
252
114,554
6,115,794
6,115,794
103,573
103,573
22,098
7,789
22,098
7,789
114,302
6,249,506
6,363,808
306,340
306,340
284,201
183,283
93,238
560,722
432,632
432,632
4,507
4,224
8,731
57,770
57,770
288,708
187,507
889,980
1,366,195
b. Risiko kredit
b. Credit risk
PT PERTAMINA EP
Lampiran 5/62 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
25. MANAJEMEN RISIKO KEUANGAN (lanjutan)
I. Faktor risiko keuangan (lanjutan)
b. Risiko kredit (lanjutan)
PT PERTAMINA EP
Lampiran 5/63 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
25. MANAJEMEN RISIKO KEUANGAN (lanjutan)
I. Faktor risiko keuangan (lanjutan)
b. Risiko kredit (lanjutan)
c. Risiko likuiditas
Risiko likuiditas merupakan risiko yang
muncul dalam situasi dimana posisi arus kas
Perusahaan mengindikasikan bahwa arus
kas masuk dari pendapatan jangka pendek
tidak cukup untuk memenuhi arus kas keluar
untuk pengeluaran jangka pendek. Sebagian
besar arus
kas
masuk
Perusahaan
bergantung pada dana dari Pertamina, dalam
bentuk cash call. Manajemen Perusahaan
secara rutin melakukan monitor atas
perkiraan arus kas dan arus kas aktual dan
melakukan koordinasi secara rutin atas
pendanaan dengan Pertamina.
c. Liquidity risk
Liquidity risk is defined as a risk that arises
in situations where a company's cash flow
indicates that the cash inflow from shortterm revenue is not enough to cover the
cash outflow of short-term expenditure.
Most of the Companys cash inflow
depends on funding in the form of cash
calls from Pertamina. The Companys
management
regularly
monitors
the
projected and actual cash flows and
regularly
coordinates
the
funding
arrangement with Pertamina.
PT PERTAMINA EP
Lampiran 5/64 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Lebih dari
5 tahun/
Later than
5 years
1-5 tahun/
1-5 years
31 Desember 2013
Utang usaha
Biaya yang masih harus
dibayar
Utang kepada Pemerintah
Utang lain-lain
Utang sewa pembiayaan
Jumlah
31 December 2013
444,027
469,757
293,451
28,607
637
144,454
3,587
Accrued expenses
382,509 Amounts due to the Government
Other payables
Finance lease payables
1,236,479
148,041
382,509
31 Desember 2012
Utang usaha
Biaya yang masih harus
dibayar
Utang kepada Pemerintah
Utang lain-lain
Utang sewa pembiayaan
Jumlah
Trade payables
Total
31 December 2012
306,340
432,632
407,019
58,056
4,507
153,064
4,785
Accrued expenses
512,763 Amounts due to the Government
Other payables
Finance lease payables
1,208,554
157,849
512,763
d. Nilai wajar
Trade payables
Total
d. Fair value
PT PERTAMINA EP
Lampiran 5/65 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
25. MANAJEMEN RISIKO KEUANGAN (lanjutan)
II. Manajemen risiko permodalan
AGREEMENTS
PT PERTAMINA EP
Lampiran 5/66 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
26. KONTRAK, PERJANJIAN DAN IKATAN YANG
MATERIAL (lanjutan)
a.
b.
Lease involving
(continued)
State-Owned
Assets
PT PERTAMINA EP
Lampiran 5/67 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
26. KONTRAK, PERJANJIAN DAN IKATAN YANG
MATERIAL (lanjutan)
c.
d.
e.
Komitmen KKS
Perubahan
terakhir
adalah
perjanjian
Amandemen dan Pernyataan Kembali pada
tanggal 31 Desember 2013 yang berlaku
1 Januari 2014 sampai dengan 31 Desember
2014 dengan nilai kontrak maksimal sebesar
AS$188.789.
PT PERTAMINA EP
Lampiran 5/68 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
Ikatan Pembelian
Pada tanggal 31 Desember 2013, Perusahaan
mempunyai pesanan barang dan jasa yang
belum diterima sebesar AS$20.059.188 dan
Rp129.951 juta.
Contractual
and Suppliers
Commitments-Contractors
g. Expenditure Commitment
As at 31 December 2013, the Company has
outstanding purchase orders and service
orders amounting to USS$20,059,188 and
Rp129,951 million.
27. CONTINGENT LIABILITIES
PT PERTAMINA EP
Lampiran 5/69 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
27. LIABILITAS KONTINJENSI (lanjutan)
PT Lirik Petroleum
PT Lirik Petroleum
PT PERTAMINA EP
Lampiran 5/70 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
27. LIABILITAS KONTINJENSI (lanjutan)
PT PERTAMINA EP
Lampiran 5/71 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
27. LIABILITAS KONTINJENSI (lanjutan)
PT PERTAMINA EP
Lampiran 5/72 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
27. LIABILITAS KONTINJENSI (lanjutan)
PT PERTAMINA EP
Lampiran 5/73 Schedule
CATATAN ATAS LAPORAN KEUANGAN
31 DESEMBER 2013 DAN 2012
(Disajikan dalam ribuan Dolar AS,
kecuali dinyatakan lain)
29. PENGKLASIFIKASIAN LAPORAN KEUANGAN
29. RECLASIFICATION
STATEMENTS
OF
FINANCIAL
Pada
tahun
2013,
Perusahaan
telah
mengklasifikasikan dana yang dideposito khusus
untuk biaya pembongkaran dan restorasi lokasi
aset sebesar AS$76.281 yang mana sebelumnya
dicatat
sebagai
pengurang
provisi
biaya
pembongkaran dan restorasi lokasi aset sebagai
dana yang dibatasi penggunaanya untuk laporan
keuangan
yang
berakhir
pada
tanggal
31 Desember 2012. Perusahaan tidak menyajikan
laporan posisi keuangan pada permulaan dari
periode komparatif terawal karena Perusahaan
berpendapat bahwa jumlah tersebut tidak
berdampak material terhadap total aset dan
liabilitas
yang
disajikan
pada
tanggal
1 Januari 2012.
Jika Perusahaan menyajikan
laporan
posisi
keuangan
pada
tanggal
1 Januari 2012, maka dana yang dibatasi
penggunaanya
akan
direklasifikasi
sebesar
AS$66.656. Tidak ada perubahaan lainnya yang
diharuskan atas laporan posisi keuangan pada
tanggal 1 Januari 2012.