Anda di halaman 1dari 24

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURASI

LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Lapangan Sepak Bola Universitas Lampung


0526516 - 9407116
08.30 WIB - 23 April 2016
Kelompok 1
1
Sehabis Hujan

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1 Pengambilan 2
36
36
35
34
33
33
37
37
45
45
40
40
35
35
36
36
31
31
35
36
28
28
39
39
48
48
66
66
35
35
55
55
57
57
45
45

IS 1D KONFIGURASI SCHLUMBERGER

pung

Rho
112.78
92.42
96.38
84.38
74.33
69.71
75.52
74.53
52.27
51.93
58.57
57.45
57.21
75.98
101.07
135.92
95.93
103.67

Kurva Matc
1000.00

Rho

V(mV)
Pengambilan 1 Pengambilan 2
645
648
162
177.2
63.4
65.1
27.8
27.8
16.7
16.7
8.7
9.1
5.8
5.9
3.9
3.7
25.8
25.8
15.6
15.7
8.6
8.8
8.1
8.2
5.5
5.6
6.4
6.5
3.2
3.1
4.3
4.2
6.3
6.3
3
3

100.00

10.00

1.00
1

Kurva Matching - Kelompok 1

10
AB/2

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURAS


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Unknown
Unknown
24-Apr-16
Kelompok 5
5
Unknown

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
Pengambilan 2
54
54
52
52
41
41
55
55
66
66
49
49
52
52
76
75
75
75
88
88
100
100
48
48
80
80
80
80
52
52
68
68
68
68
69
69

S 1D KONFIGURASI SCHLUMBERGER

Rho
0.14
122.98
120.73
106.48
89.98
71.29
71.68
84.17
42.87
46.58
59.85
83.04
107.00
140.92
137.14
134.51
97.00
72.12

Kurva Ma

1000.00

100.00
Rho

V(mV)
Pengambilan 1 Pengambilan 2
1.193
1.18
341
339.3
95.1
104.9
52.6
51.7
30.3
29
11.3
11
8.4
8.1
9
9
51.2
51.2
35.2
34.4
32.2
31.3
14.3
14.7
17.4
17.2
14.6
14.4
6.4
6.3
5.2
5.2
7.8
7.4
3.1
3.3

10.00

1.00
1
0.10

Kurva Matching - Kelompok 2

10
AB/2

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURAS


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Unknown
Unknown
23-Apr-16
Kelompok 3
3
Unknown

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1 Pengambilan 2
75
75
77
78
73
73
77
77
76
76
73
73
78
78
83
83
83
83
87
87
87
87
71
70
72
72
83
83
78
78
63
63
63
63
63
62

S 1D KONFIGURASI SCHLUMBERGER

Rho
46.35
49.53
47.43
45.50
42.17
36.91
35.62
35.73
34.80
36.15
38.13
39.58
41.58
42.15
47.51
30.71
32.37
32.34

100.00

Rho

V(mV)
Pengambilan 1 Pengambilan 2
605
502
205.2
203.2
71.5
68.4
31.2
31.2
17.3
14.7
8.2
9
6.3
6
4.3
4.1
46.1
45.9
27
26.4
17.9
17.3
10.2
10.1
6
6.1
4.5
4.5
3.3
3.3
1
1.2
2.4
2.3
1.4
1.2

10.00

1.00
1

Kurva Mathing - Kelompok 3

AB/2
10

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURA


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Puskom Universitas Lampung


UTM 48M - 0526803 - 9407237 - Elevasi 123m
24-Apr-16
Kelompok 4
4
Hujan

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
32
35
30
31
41
41
51
49
48
51
38
46
44
45
42
39
39
75

TAHANAN JENIS 1D KONFIGURASI SCHLUMBERGER

ung
7237 - Elevasi 123m

Rho
0.25
0.32
350.38
334.55
370.00
150.15
260.89
267.31
221.04
147.25
112.36
100.10
98.40
83.80
77.54
85.69
62.31
29.86

1000.00

100.00
Rho

I (mA)
V(mV)
Pengambilan 2 Pengambilan 1 Pengambilan 2
32
1.273
1.274
35
0.597
0.592
30
212.9
211.8
31
92
92.7
31
63
70
41
19.9
19.4
51
29.9
29
49
18.6
18.5
48
168.6
169.3
51
66.3
61.2
38
22.7
22.6
46
16.4
17.1
44
8.4
9.1
45
4.8
4.9
42
3.1
2.7
39
1.9
1.9
39
2.3
3.3
76
1.1
1.8

10.00

1.00
1
0.10

Kurva Matching - Kelompok 4

1000.00

100.00

10.00

1.00
1
0.10

10
AB/2

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURA


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Fakultas Kedokteran
0526722 - 9407456
30-Apr-16
Kelompok 5
5
Berawan

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
59
90
85
71
81
117
88
67
67
103
51
107
158
130
82
94
93
70

TAHANAN JENIS 1D KONFIGURASI SCHLUMBERGER

Rho
28.80
39.50
18.62
25.54
25.88
27.82
30.47
323.32
43.20
44.72
44.23
47.72
51.06
50.82
55.12
49.59
45.73
48.87

1000.00

Rho

I (mA)
V(mV)
Pengambilan 2 Pengambilan 1 Pengambilan 2
59
270.6
270.6
96
192.5
198.3
83
29.4
33.8
71
16.3
16
80
10.5
10.3
115
10.3
10.3
84
5.8
5.8
66
31
29.9
66
46
45.5
103
40.1
38.1
50
11.8
11.9
105
18
18.8
155
15.5
16.8
127
8.4
8.4
81
3.9
4.1
94
2.6
2.7
93
4.9
4.9
70
2.2
2.2

100.00

10.00

1.00
1

Kurva Matching - Kelompok 5

1000.00

100.00

10.00

1.00
1

10
AB/2

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURA


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Depan LAB Terpadu Peternakan


0526943 - 9400516
1-May-16
Kelompok 6
6
Mndung Berawan

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
116
115
122
95
69
67
70
73
72
59
90
87
66
94
69
44
45
75

TAHANAN JENIS 1D KONFIGURASI SCHLUMBERGER

nakan

Rho
3.96
39.22
29.35
26.54
13.79
10.05
28.72
25.81
2.44
6.69
10.85
8.58
27.20
35.76
65.92
97.94
252.66
161.72

1000.00

Rho

I (mA)
V(mV)
Pengambilan 2 Pengambilan 1 Pengambilan 2
116
76.1
70.2
115
239
240.8
120
71.4
72.1
95
22.2
22.7
69
6
3.5
67
1.3
3
70
4
4.9
72
2.7
2.6
72
2.8
2.8
59
1.9
4.8
89
5.2
5.1
86
2.6
2.8
65
3.4
3.8
93
4.4
4.2
69
4.5
3.6
44
2.4
2.5
45
13.1
13.1
75
7
8.6

100.00

10.00

1.00
1

Kurva Matching - Kelompok 6

1000.00

100.00

10.00

1.00
1

10
AB/2

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURA


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Samping Lapangan Universitas Lampung Menghadap Rusun


526522 - 9406996
13.21 - 16.15 WIB - 30 April 2016
Kelompok 7
7
Cerah Berawan

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
72
76
63
76
72
62
72
64
59
68
23
48
57
53
51
50
31
34

TAHANAN JENIS 1D KONFIGURASI SCHLUMBERGER

sitas Lampung Menghadap Rusunawa

ril 2016

Rho
5.76
5.23
38.46
30.86
28.15
27.29
27.61
36.96
33.05
37.35
50.27
50.97
56.49
62.94
76.72
124.37
51.81
91.47

1000.00

Rho

I (mA)
V(mV)
Pengambilan 2 Pengambilan 1 Pengambilan 2
72
66
66
78
22.4
20.44
63
49.4
48.5
75
20.8
20.7
71
10.1
10
62
5.6
5.2
72
4.7
4.1
64
3.4
3.3
63
30.6
33.6
67
21.5
21.3
22
5.5
6.5
48
8.4
9.4
56
6.5
6.4
52
4.3
4.2
50
3.2
3.7
49
2
5
36
2
2
34
2
2

100.00

10.00

1.00
1

Kurva Matching - Kelompok 7

1000.00

100.00

10.00

1.00
1

AB/2
10

100

PENGUKURAN METODE GEOLISTRIK TAHANAN JENIS 1D KONFIGURA


LOKASI
KOORDINAT
WAKTU DAN TANGGAL
OPERATOR
KELOMPOK
KEADAAN CUACA

Depan GSG Universitas Lampung


UTM 48M - 05266069 - 9407285 - Elevasi 152m
11.51 WIB - 01 Mei 2016
Semua Anggota Kelompok
8
Mendung

No

AB/2

MN/2

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

1.5
2.5
4
6
8
10
12
15
15
20
25
30
40
50
60
75
75
100

0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
5
5
5
5
5
5
5
5
10
10

6.28
18.8
49.5
112.3
200.3
313.3
451.8
706.1
62.8
117.8
188.5
274.9
494.8
777.5
1123
1759
867.9
1555

I (mA)
Pengambilan 1
55
52
55
59
56
70
66
52
52
58
46
49
27
58
58
55
54
87

TAHANAN JENIS 1D KONFIGURASI SCHLUMBERGER

mpung
07285 - Elevasi 152m

Rho
0.12
0.52
0.54
62.29
70.38
80.02
84.88
90.98
87.56
62.63
52.66
49.88
52.23
40.85
42.60
25.82
20.89
30.39

Kur

100.00

Rho

I (mA)
V(mV)
Pengambilan 2 Pengambilan 1 Pengambilan 2
55
1.081
1.064
52
1.341
1.56
55
0.512
0.684
58
33
31.9
55
20.4
18.6
69
17.9
17.6
66
12.2
12.6
52
6.7
6.7
52
72.5
72.5
59
31.2
31
46
12.4
13.3
48
8.7
8.9
27
2.8
2.9
60
3.3
2.9
58
2.3
2.1
54
0.7
0.9
54
1.2
1.4
87
1.7
1.7

10.00

1.00
1

0.10

Kurva Matching - Kelompok 8

00

00

00

10

10

AB/2

100

Anda mungkin juga menyukai