Anda di halaman 1dari 1

4.

ABSENSI KEHADIRAN KONSULTAN


PEKERJAAN PENGEMBANGAN FASILITAS PELABUHA LAUT TANJUNG SILOPO
KAB.POLEWALI MANDAR PROV.SULAWESI BARAT APBN T.A 2014

NO.

NAMA

JABATAN DALAM
PROYEK
01

IR. BAKHTIAR CONDENG

IR. BASO PAMELLERI

MUH.RAJIH MUSDAR, A.M

M. IDRIS, ST

JAMALUDDIN, ST

02

03

04

05

06

07

08

09

10

11

12

13

BULAN JUNI 2014


TGL / PARAF/ TTD
14
15
16
17

18

19

20

21

22

23

24

25

26

27

28

29

Site Engineer
Quality/Quantity
Engineer

Inspector
Surveyor
Typist /
Op. Komputer

Silopo 30 JUNI 2014


KETERANGAN :

Belum Bertugas
KONSULTAN SUPERVISI
CV. NURITAMA MANDIRI

IR. BAKHTIAR CONDENG


Site Engineer

30

Anda mungkin juga menyukai