Anda di halaman 1dari 3

DAFTAR KUANTITAS DAN HARGA

PEMBANGUNAN JALAN TOL MANADO - BITUNG

MATA
PEMBAYARAN

URAIAN

SATUAN

KUANTITAS

DIVISI 6
6.05 (3)
6.05 (9)
6.06 (1)
6.06 (3)
6.06 (4)
6.06 (5)
6.06 (10)
6.06 (11)
6.06 (14)
6.06 (16)
6.06 (27)
6.06 (29)

DRAINASE
Pipa Gorong- gorong Beton Bertulang, 40 cm, tipe B
Pipa Gorong- gorong Beton Bertulang, 100 cm, tipe B
Saluran U, Tipe DS-1
Saluran U, Tipe DS-3
Saluran U, Tipe DS-4
Saluran U, Tipe DS-5
Saluran U, Tipe DS-10
Saluran U, Tipe DS-11
Catchbasin, DC-1
Catchbasin, DC-3
Inlet Drain, Type DI-3
Outlet Drain, Type DO-1
SUB TOTAL DIVISI 6

m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh

565.00
301.00
40,032.00
27,890.00
137,607.00
28,466.00
26,187.00
24,310.00
1,740.00
579.00
23.00
23.00

HARGA SATUAN
(Rupiah)
e

726,000.00
1,950,000.00
472,400.00
864,459.00
935,350.00
965,200.00
1,533,000.00
1,722,000.00
2,600,000.00
4,122,500.00
427,000.00
457,623.00

JUMALAH HARGA
(Rupiah)
f = (d x e)

410,190,000.00
586,950,000.00
18,911,116,800.00
24,109,761,510.00
128,710,707,450.00
27,475,383,200.00
40,144,671,000.00
41,861,820,000.00
4,524,000,000.00
2,386,927,500.00
9,821,000.00
10,525,329.00
289,141,873,789.00

DAFTAR KUANTITAS DAN HARGA


PEMBANGUNAN JALAN TOL MANADO - BITUNG
Nama Paket : Pembangunan Jalan Tol Manado - Bitung
Station
: Sta 14 - 900 s/d Sta 39 - 900

NO ITEM
PEMBAYARAN
a
I
1.19
1.20
1.26
1.39
1.40
II
2.01 (1)
2.01 (04)
III
3.01 (1b)
3.01 (3)
IV
4.03.1
4.03.3
4.05
4.09
V
5.01 (1)
5.01 (2)
5.01 (3)
VI
6.05 (5)
6.05 (9)
6.06 (1)
6.06 (2)
6.06 (3)
6.06 (4)
6.06 (5)
6.06 (6)
6.06 (7)
6.06 (8)
6.06 (11)
6.06 (14)
6.06 (15)
6.06 (25)
6.06 (26)
6.06 (27)
6.06 (29)
6.06 (30)
VII
7.01
VIII
8.01 (1)
8.01 (1a)
8.01 (2)

URAIAN PEKERJAAN

SATUAN

KUANTITAS

UMUM
Pemeliharaan dan Perlindungan Lalu Lintas
Mobilisasi
Pekerjaan dan Penanganan Aliran Air yang Sudah Ada
Pengaman Lingkungan Hidup
Manajemen Mutu
SUB TOTAL PEKERJAAN UMUM
PEMBERSIHAN TEMPAT KERJA'
Pembersihan Tempat Kerja
Pemotongan pohon dia > 75 cm
SUB TOTAL PEKERJAAN PEMBERSIHAN TEMPAT KERJA
PEMBONGKARAN
Pembongkaran Pasangan Batu atau Beton
Pembongkaran Perkerasan Jalan Aspal atau Beton
SUB TOTAL PEKERJAAN PEMBONGKARAN
PEKERJAAN TANAH
Galian Tanah Untuk Timbunan
Galian Biasa Untuk dibuang
Common Borrow Material
Urugan Material Berbutir (Granural backfill)
SUB TOTAL PEKERJAAN PEKERJAAN TANAH
GALIAN STRUKTUR
Penggalian Struktur Kedalaman 0 - 2 m
Penggalian Struktur Kedalaman 2 - 4 m
Penggalian Struktur Sampai Kedalaman 4-6 m
SUB TOTAL PEKERJAAN GALIAN STRUKTUR
DRAINASE
Pipa Gorong- gorong Beton Bertulang, 40 cm, tipe B
Pipa Gorong- gorong Beton Bertulang, 100 cm, tipe B
Saluran U, Tipe DS-1
Saluran U, Tipe DS-2
Saluran U, Tipe DS-3
Saluran U, Tipe DS-4
Saluran U, Tipe DS-5
Saluran U, Tipe DS-6
Saluran U, Tipe DS-7
Saluran U, Tipe DS-8
Saluran U, Tipe DS-10
Saluran U, Tipe DS-11 (DV1)
Catchbasin, DC-1 (BK-1)
Catchbasin, DC-3 (BK-2)
Inlet Drain, Type DI-1
Inlet Drain, Type DI-2
Inlet Drain, Type DI-3 (MH-1)
Outlet Drain, Type DO-1
Outlet Drain, Type DO-1
SUB TOTAL PEKERJAAN DRAINASE
SUBGRADE
Persiapan Tanah Dasar
SUB TOTAL PEKERJAAN SUBGRADE
SUBBASE
Lapis Pondasi Agregat Kelas A (Bahu Jalan)
Lapis Pondasi Agregat Kelas A (Perkerasan Beton) t=15 cm
Lapis Pondasi Agregat Kelas B.

Harga Satuan

Total Harga

(Rupiah)
e

(Rupiah)
f = (d x e)

Ls
Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00
1.00

45,000,000.00
115,000,000.00
55,000,000.00
25,000,000.00
20,500,000.00

45,000,000.00
115,000,000.00
55,000,000.00
25,000,000.00
20,500,000.00
260,500,000.00

m2
bh

2,557,223.17
250.00

3,500.00
330,000.00

8,950,281,095.00
82,500,000.00
9,032,781,095.00
-

m3
m2

m3
m3
m3
m3

7,448,328.46
5,251,146.35
1,872,741.46
3,507.16

38,819.70
25,000.00
12,500.00
175,500.00

289,141,873,106.20
131,278,658,750.00
23,409,268,250.00
615,506,580.00
444,445,306,686.20

m3
m3
m3

14,290.81
12,659.06
15,917.08

35,500.00
72,300.00
110,000.00

507,323,755.00
915,250,038.00
1,750,878,800.00
3,173,452,593.00

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh

565.00
25,016.00

726,000.00

410,190,000.00

472,400.00

27,890.00
137,607.48
28,466.00

864,459.00
935,350.00
965,200.00

30,726.06
24,310.00
1,740.00
579.00

1,533,000.00
1,722,000.00
2,600,000.00
4,122,500.00

23.00

427,000.00

23.00

457,623.00

11,817,558,400.00
24,109,761,510.00
128,711,156,418.00
27,475,383,200.00
47,103,049,980.00
41,861,820,000.00
4,524,000,000.00
2,386,927,500.00
9,821,000.00
10,525,329.00
288,420,193,337.00

m2

471,596.40

2,750.00

1,296,890,100.00
1,296,890,100.00

m3
m3
m3

196,595.60
-

565,250.00

111,125,662,900.00
-

IX
9.04
9.05
9.07 (1)
9.07 (2)
9.07 (3)
9.07 (4)
9.07 (5)
9.07 (7)
9.08 (1)
9.08 (2)
9.08 (3)
9.09

SUB TOTAL PEKERJAAN SUBBASE


PERKERASAN
Bitumen Lapis Resap Pengikat (Prime Coat)
Bitumen Lapis Pengikat (Tack Coat)
Asphalt Concrete Base Course
Asphalt Concrete Binder Course
Asphalt Concrete Wearing Course
Asphal Keras
Bahan Anti Pengelupasan
Filler Added
Perkerasan Beton
Perkerasan Beton Double Wire mesh
Perkerasan Beton Single Wire mesh
Lean Concrete
ATB
SUB TOTAL PEKERJAAN PERKERASAN

111,125,662,900.00
Liter
Liter
ton
ton
ton
ton
kg
kg
m3
m3
m3
m3
ton

165,004.43
223,764.49

13,200.00
14,300.00

2,178,058,476.00
3,199,832,207.00

3,372.00
2,461.74
9,846.96

1,395,000.00
1,200,000.00
33,500.00

185,137.74
1,455.01
1,748.09
69,421.18
37,297.81

1,765,000.00
3,210,000.00
2,210,000.00
180,000.00
1,257,500.00

4,703,940,000.00
2,954,088,000.00
329,873,160.00
326,768,111,100.00
4,670,582,100.00
3,863,278,900.00
12,495,812,400.00
46,901,996,075.00
408,065,572,418.00

Anda mungkin juga menyukai