Diagram Alir Skema Pengolahan Air

Raw Water dari KTI


T = 30oC
P = 2 kgf/cm2
pH = 7
SS = 74 mg/L
TDS = 577,1 mg/L

PROGRAM STUDI TEKNIK KIMIA


FAKULTAS TEKNIK
UNIVERSITAS MULAWARMAN
TU - 01

DIAGRAM ALIR UTILITAS


SKEMA PENGOLAHAN AIR

Nama

Fika Dwi Oktavia


Magdalena Maritia

NIM

1309065002
1309065031

SP

CL

Dosen Mata Kuliah

Yudi Sukmono

TANGGAL: 4 JANUARI 2017

PWT - 01
Mengurangi
materi yang
mengendap

Blowdown

BU - 01

Menghilangkan sisa
sisa materi yang
mengendap

Air Rumah Tangga dan


Kantor
T = ambient
P = 1,5 kgf/cm2
TDS = 50 mg/L

PWT -02

T = 30oC
pH = 6,8 8,5
Conductivity = 30 mhos/
cm
SiO2 = 60 ppb (max)
P = 4 kgf/cm2 (max)

SS = 1 mg/
L
pH = 8 - 9
LPS

Gas Buang

NaH2PO 4

AE

KE

T = ambient
pH = >5,8
Conductivity = 0,5 mhos/cm
(max)
SiO2 = 10 ppb (max)
Na = 10 ppb (max)
Fe = 10 ppb (max)
P = 8 kgf/cm2 (max)

Hidrazine
Boiler Feed Water

DE
TJ - 02

PWT - 06
PWT - 05

PWT - 04
PWT - 03

TU -03