No Nama Jembatan PU List Span Tipe Deskripsi Tipe Kelas Tahun Hyperlink
Span (m) Jalan (m) Abutment Slab / Plate Girder Steel Truss Special Remark
1 Pengambiran Yes 1 20.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1978 01. Pengambiran Good Good Good -
2 Kereta Api Yes 1 8.00 7.50 PTI Plat Beton Bertulang Indonesia A 1979 02. Kereta Api Good Good - -
3 Batang Arau Yes 3 36.00 7.50 GPI Gelagar Beton Pra-tekan Indonesia A 1979 03. Batang Arau Good Good Good -
4 Tanjung Sabar Yes 1 10.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1997 04. Tanjung Sabar Good Inaccessible Inaccessible -
5 Cengkeh 1 Yes 1 5.00 7.50 PTI Plat Beton Bertulang Indonesia A 1998 05. Cengkeh 1 Inaccessible Inaccessible Inaccessible -
6 Cengkeh 2 Yes 1 5.00 7.50 PTI Plat Beton Bertulang Indonesia A 1998 06. Cengkeh 2 Inaccessible Inaccessible Inaccessible -
7 Cengkeh 3 Yes 1 5.00 7.50 PTI Plat Beton Bertulang Indonesia A 1998 07. Cengkeh 3 Inaccessible Inaccessible Inaccessible -
8 Bandar Buat Yes 1 9.00 7.50 PTI Plat Beton Bertulang Indonesia A 1997 08. Bandar Buat Good Good - -
9 Bandar Buat Kecil No 1 4.00 7.50 PTI Plat Beton Bertulang Indonesia A 09. Bandar Buat Kecil Inaccessible Inaccessible - -
10 Kabun Yes 1 12.70 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1998 10. Kabun Inaccessible Inaccessible Inaccessible -
1 20.80 7.50 GBI Gelagar Baja Indonesia (cetakan) A 1998 Good Good Good -
11 Sungai Gayo Yes 11. Sungai Gayo
1 21.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1980 Good Good Good -
1 20.00 7.50 GBI Gelagar Baja Indonesia (cetakan) A 1998 Good Good Good -
12 Padang Besi Yes 12. Padang Besi
1 15.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1997 Good Good Good -
13 Sungai Limau Yes 1 10.70 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1998 13. Sungai Limau Good Inaccessible Good -
14 Conveyor Belt Yes 1 7.50 7.50 BTI Gorong - gorong Persegi Indonesia A 1997 14. Conveyor Belt Good Inaccessible - - Pelat atas sangat tebal
15 Indarung Yes 1 4.40 7.50 BTI Gorong - gorong Persegi Indonesia A 1980 15. Indarung Good Inaccessible - -
16 Sikayan Yes 1 21.80 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1995 16. Sikayan Good Inaccessible Inaccessible - Seems Good
Structure seems not well maintained from
17 Lubuk Peraku Yes 1 24.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1995 17. Lubuk Peraku Good Inaccessible Average - weather. However no crack had been
observed
50 Lubuk Kubang Yes 1 6.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1994 50. Lubuk Kubang Good Good Poor - Visible deflection at right side toward
muaralaboh
51 Alam Pariak Yes 1 3.00 7.50 PTI Plat Beton Bertulang Indonesia A 2014 51. Alam Pariak Good Inaccessible - -
52 Batang Taantak Yes 1 5.00 7.50 ETI Pelengkung Beton Indonesia A 52. Batang Taantak Good Good - -
53 Batang Lolo Yes 1 8.50 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1994 53. Batang Lolo Good Good Good -
54 Pisau Hilang Yes 1 8.50 4.00 GBI Gelagar Baja Indonesia (cetakan) C 1993 54. Pisau Hilang Good Average Poor - Had been reinforced
55 Sungai Indarung Yes 1 12.50 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1993 55. Sungai Indarung Good Good Good -
56 Kayu Manang Yes 1 13.00 5.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) B 1986 56. Kayu Manang Good Good Good -
57 Limau Hantu Yes 1 16.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 2012 57. Limau Hantu Good Good Good -
58 Kuti Anyir Yes 1 10.50 4.00 GBI Gelagar Baja Indonesia (cetakan) C 1940 58. Kuti Anyir Good Average Poor - Had been reinforced
59 Batang Kulamban Yes 1 20.00 6.00 GBA Gelagar Baja Australia (permanen) B 1992 59. Batang Kulamban Good Good Good -
60 Batang Suliti Yes 1 25.00 6.00 GBA Gelagar Baja Australia (permanen) B 1992 60. Batang Suliti Good Good Good -
61 Durian Garuik Yes 1 6.20 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) B 1940 61. Durian Garuik Good Good Good -
62 Batang Suliti Kecil Yes 1 8.00 6.00 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) B 1992 62. Batang Suliti Kecil Good Good Average - Visible deflection along bridge
63 Batu Bagendeng Yes 1 3.00 6.00 BTI Gorong - gorong Persegi Indonesia B 63. Batu Bagendeng Average Inaccessible - -
64 Tanjung Limau Kape Yes 1 10.00 6.00 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) B 1993 64. Tanjung Limau Kape Good Good Good - ll
65 Air Busuk 1 Yes 1 4.50 7.50 PTI Plat Beton Bertulang Indonesia A 65. Air Busuk 1 Good Good - -
66 Air Busuk 2 Yes 1 2.70 7.50 BTI Gorong - gorong Persegi Indonesia A 66. Air Busuk 2 Good Good - -
67 Muaro Pasampan Yes 1 20.50 5.50 GBA Gelagar Baja Australia (permanen) B 1993 67. Muaro Pasampan Good Good Good -
68 Urung Pelat Beton Yes 1 4.10 6.00 PTI Plat Beton Bertulang Indonesia B 1976 68. Urung Pelat Beton Good Good - -
69 Pasampan 1 Yes 1 2.50 6.00 BTI Gorong - gorong Persegi Indonesia 69. Pasampan 1 - -
70 Pasampan 2 Yes 1 2.50 7.50 BTI Gorong - gorong Persegi Indonesia A 70. Pasampan 2 Average Average - -
71 Sungai Kalu Yes 1 20.00 6.00 GBA Gelagar Baja Australia (permanen) B 1993 71. Sungai Kalu Good Good Good -
72 Pinang Balirik Yes 1 2.50 7.50 BTI Gorong - gorong Persegi Indonesia B Poor Good - - Abutment had been eroded, need to be
72. Pinang Balirik
rectify
73 Sungai Manau Yes 1 20.00 6.00 GBA Gelagar Baja Australia (permanen) B 1993 73. Sungai Manau Good Good Good -
74 Sei Impuh Yes 1 15.80 6.00 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) B 1993 74. Sei Impuh Good Good Good -
75 Balai Akat Yes 1 4.50 7.50 PTI Plat Beton Bertulang Indonesia A 75. Balai Akat Good Good - -
76 Batang Limpaung Yes 1 20.00 7.50 GBA Gelagar Baja Australia (permanen) A 1993 76. Batang Limpaung Good Good Good -
77 Sungai Lolo Kecil Yes 1 20.50 7.50 GBA Gelagar Baja Australia (permanen) A 1993 77. Sungai Lolo Kecil Good Good Good -
78 Sungai Lolo Besar Yes 1 25.00 7.50 GBA Gelagar Baja Australia (permanen) A 1993 78. Sungai Lolo Besar Good Good Good -
79 Sungai Barambun Yes 1 6.00 7.50 PTI Plat Beton Bertulang Indonesia A 1995 79. Sungai Barambun Good Good - -
80 Sungai Kapur Yes 1 8.20 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 80. Sungai Kapur Good Good Good -
81 Pakan Raba'a Yes 1 5.00 6.00 BTI Gorong - gorong Persegi Indonesia B 81. Pakan Raba'a Poor Good - - Abutment had been eroded, need to be
rectify
82 Sungai Aro Yes 1 11.50 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1994 82. Sungai Aro Good Good Good -
83 Sungai Pagu Yes 3 3.30 7.50 BTI Gorong - gorong Persegi Indonesia A 1995 83. Sungai Pagu Good Good - -
84 Utung Pelat Beton Yes 1 3.50 7.50 BTI Gorong - gorong Persegi Indonesia B 1980 84. Urung Pelat Beton Good Good - -
85 Pasir Talang Yes 1 5.00 7.50 PTI Plat Beton Bertulang Indonesia A 1976 Good Good - - Width had been added with Concrete
85. Pasir Talang
Girder Type
86 Batang Lundang Yes 1 20.00 7.50 GBA Gelagar Baja Australia (permanen) A 1993 86. Batang Lundang Good Good Good -
87 Batang Lundang 1 Yes 1 3.00 7.50 BTI Gorong - gorong Persegi Indonesia A 1993 87. Batang Lundang 1 Good Good - -
88 Batang Laweh Yes 1 8.50 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1993 88. Batang Laweh Good Inaccessible Good -
89 Rawang 2 Yes 1 10.00 7.50 BTI Gorong - gorong Persegi Indonesia A 1995 89. Rawang 2 Good Good - -
90 Rawang 1 Yes 1 10.00 7.50 BTI Gorong - gorong Persegi Indonesia A 1995 90. Rawang 1 Good Good - -
91 Batang Bangko Yes 1 51.00 6.00 RBB Rangka Baja Belanda Baru B 1988 91. Batang Bangko Good Good Good Good Sway of bridge quite moderate
92 Air Batu Yes 1 2.50 7.00 BTI Gorong - gorong Persegi Indonesia B 1981 92. Air Batu Good Good - -
93 Batang Kumingking Yes 1 8.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1980 93. Batang Kumingking Good Good Good -
94 Batang Pulakek Yes 1 11.00 7.50 GTI Gelagar Beton Indonesia (Gelagar cor ditempat) A 1940 94. Batang Pulakek Good Good Good -
95 Pinang Awan Yes 1 20.00 7.50 GPI Gelagar Beton Pra-tekan Indonesia A 2012 95. Pinang Awan Good Good Good -
Jan Feb Mar
No Pekerjaan
1 2 3 4 1 2 3 4 1 2 3 4
1 General Survey oleh Kontraktor
2 General Survey oleh Konsultan 15-Jan-18
3.1 Proses Administrasi
3.2 Detail Assessment oleh Konsultan Feb end
4.1 Proses Administrasi