Stabilitas DPT Cantilever

PERHITUNGAN STABILITAS DPT CANTILEVER

Tinggi =
Data Tanah
berat isi=
sudut geser=
kohesi c1 =
sudut lereng=
cos=
cos1=
Ka =

H=

2.0

0.2857
=
=
c2 =

18 kN/m3
20.00 o
4 kN/m2
0.00 o
0.940
1.000
0.490

=
cos=
cos2=
Kp =
c=

Dimensi Dinding Cantilever


Tinggi miring lereng
Tinggi dinding
Tinggi fondasi
Tinggi timbunan tanah
Kedalaman galian fondasi
Tinggi air tanah
Tebal dinding atas
Lebar pelat depan (0.15H)
Tebal dinding bawah (0.15H)
Lebar pelat belakang (0.2H)
Lebar Pondasi (B2+B3+B4)

17 kN/m3
28 o
7 kN/m2
0 o
0.883
1.000
2.770

H1 =
H2 =
H3 =
H=
D=
Hw =
B1 =
B2 =
B3 =
B4 =
B=

Perhitungan Tekanan Lateral


Aktif
Pa = 1/2 (1 H Ka - 2 c1 (Ka)1/2) H =

m
m
m
m
m
m

0.30
0.40
0.40
0.50
1.30

m
m
m
m
m

Pa

Hw
2

2.C2.f2

0.50 kN/m

Pp =

17.54

Total Vertikal V =

B4

B3
3

0.17

2.92
42.44 kN.m/m

Perhitungan Momen Guling


Ph H/3 =
Pw Hw/3 =
Momen guling Mg =

17.15 kN.m/m
0.17 kN.m/m
17.31 kN.m/m

Perhitungan Perlawanan Geser


k1 = k2 = 0.67
(V tan (k12) =

17.03 kN.m/m

B.(k2c2) =
Pp =
Perlawanan Geser Pt =
Gaya Geser (Ph+ Pw) =

6.07
17.54
40.63
21.08

kN.m/m
kN.m/m
kN.m/m
kN.m/m

Faktor Keamanan Guling Mt/Mg =


Faktor Keamanan Geser =(Pt/Pg) =

2.45
1.93

> 1.5 --> OK


> 1.5 --> OK

Jarak x dari fondasi hilir (Mt- Mg)/V =


B/6 =
Eksentrisitas e = B/2 - x =

0.50
0.22
0.151

m
m
< B/6 --> OK

Tekanan Fondasi pmaks (V/B (1+ 6 e/B) =


Tekanan Fondasi pmin (V/B (1- 6 e/B) =
Volume Beton Dinding + Fondasi =

H3

L Momen Momen
m
kN-m
0.47
1.12
0.65
9.36
0.65
10.14
1.05
18.90
1.13
0.00
0.50
0.00

50.40 kN/m
Momen tahan Mt =

Pw

1HKa - 2c1(Ka)1/2

17.54 kN/m

0.10
0.60
0.65
1.00
0.00
Pv =

B2
Pp D

Pw = 1/2 w Hw2 =

1
2
3
4
5

H2

Pp = 1/2 2 D2 Kp + 2 c2 (Kp)1/2 D =

Berat
kN/m
2.40
14.40
15.60
18.00
0.00
0.00

H1

1.C1.f1

20.58 kN/m
20.58 kN/m
0.00 kN/m

Perhitungan Momen Tahan


Segmen
Luas
m2
No

1
5

24 kN/m3
0.00
2.00
0.50
2.50
0.50
1.00

Ph = Pa cos =
Pv = Pa sin =

Pasif

B1

65.86 kN/m2
11.68 kN/m2
1.35 m3

DPT aman terhadap geser

Stabilitas DPT Cantilever

Perhitungan "Tulangan BELAKANG" Dinding Bagian Bawah


Penulangan MOMEN
Momen Guling M =
17.31 kN.m/m
lebar penampang b = 1,000 mm
tinggi penampang h =
400
mm
selimut beton =
50
mm
tinggi efektif penampang d =
350
mm
Tegangan leleh baja fy =
240
Mpa
Tegangan hancur beton fc =
20
Mpa
MOMEN ultimit Mu = 1.4 M = 24.24 kN.m/m
rasio tul maks maks = 0.0316
rasio tul min min =
Mu/(bd2) = Ru =
rasio tul perlu =
tulangan momen perlu As =
desain diameter tul momen =
jumlah tul n =
desain luas tul momen As =
jarak antar tul =
Penulangan GESER
Sigma beton fc
Sigma geser ijin vc
Gaya geser ijin
Gaya horisontal (Ph + Pw)
tul geser min 0.0018 Ag
desain diameter tul geser
jumlah tul geser n
desain luas tul geser
jarak antar tul

0.0029
0.2328
0.0010
1,021
12
10
1,131
100

(Tabel Gideon Hal. 50)


Mpa
pakai p min
mm
mm
buah
mm
OK
mm

=
20
MPa
= 0.407 Mpa --> 1/11 fc
= 142.30 kN --> d.vc
= 21.08 kN
=
720
mm
=
10
mm
=
10
buah
=
mm
785
OK
=
100
mm

tulangan geser
10 mm 100 mm
tulangan momen
12 mm 100 mm

Perhitungan "Tulangan BELAKANG" Dinding Bagian Tengah & Atas


Perhitungan Tekanan Lateral Tinggi 1/2 H
Pa = 1/2 (1 H Ka - 2 c1 (Ka)1/2) H =
3.39 kN/m
3.39 kN/m
Ph = Pa cos =
Lengan Momen 0.5H/3 =
0.417 m
Penulangan MOMEN
Momen Guling M =
lebar penampang b =
tinggi penampang h =
selimut beton =
tinggi efektif penampang d =
Tegangan leleh baja fy =
Tegangan hancur beton fc =
MOMEN Mu = 1.4 M =
rasio tul maks maks =
rasio tul min min =
Mu/(bd2) = Ru =
rasio tul perlu =
tulangan momen perlu As =
desain diameter tul momen =
jumlah tul n =
desain luas tul momen As =
jarak antar tul =
Penulangan GESER
Sigma beton fc
Sigma geser ijin vc
Gaya geser ijin
Gaya horisontal Ph
tul geser min 0.0018 Ag
desain diameter tul geser
jumlah tul geser n
desain luas tul geser
jarak antar tul

1.41
1,000
300
50
250
240
20
1.98

tulangan geser
10 mm 143 mm

kN.m/m
mm
mm
mm
mm
Mpa
Mpa
kN.m/m

tulangan momen
12 mm 143 mm

0.0316
0.0029
0.0373
0.0002
729
12
7
792
143

(Tabel Gideon Hal. 50)


Mpa
pakai p min
mm
mm
buah
mm
OK
mm

=
20
MPa
= 0.407 Mpa --> 1/11 fc
= 101.64 kN --> d.vc
=
3.39
kN
=
540
mm
=
10
mm
=
7
buah
=
mm
550
OK
=
143
mm

Stabilitas DPT Cantilever


Perhitungan "Tulangan BAWAH" Pelat Fondasi Bagian Depan
Penulangan MOMEN
beban merata di dasar pelat depan p1 =
65.86 kN/m2
Momen jepit M1 di pelat depan (1/2 p1 B22) =
5.27 kN.m/m
lebar penampang b = 1,000 mm
tinggi penampang h =
500
mm
selimut beton =
50
mm
tinggi efektif penampang d =
450
mm
Tegangan leleh baja fy =
240
Mpa
Tegangan hancur beton fc =
20
Mpa
MOMEN Mu = 1.4 M =
7.38
kN.m/m
rasio tul maks maks = 0.0316
rasio tul min min =
Mu/(bd2) = Ru =
rasio tul perlu =
tulangan momen perlu As =
desain diameter tul momen =
jumlah tul n =
desain luas tul momen As =
jarak antar tul =
Penulangan GESER
Sigma beton fc
Sigma geser ijin vc
Gaya geser ijin
Gaya vertikal (p1 B2)
tul geser min 0.0018 Ag
desain diameter tul geser
jumlah tul geser n
desain luas tul geser
jarak antar tul

=
=
=
=
=
=
=
=
=

0.0029
0.0429
0.0002
1,313
16
7
1,407
143

(Tabel Gideon Hal. 50)


Mpa
pakai p min
mm
mm
buah
mm
OK
mm

21
0.417
99.98
26.35
900
12
8
905
125

MPa
Mpa --> 1/11 fc
kN --> d.vc
kN
mm
mm
buah
mm
OK
mm

Perhitungan "Tulangan ATAS" Pelat Fondasi Bagian Belakang


Penulangan MOMEN
beban merata di diatas pelat belakang p2 =
36.00 kN/m2
Momen jepit M2 di pelat belakang (1/2 p2 B42) =
4.5 kN.m/m
lebar penampang b = 1,000 mm
tinggi penampang h =
500
mm
selimut beton =
50
mm
tinggi efektif penampang d =
450
mm
Tegangan leleh baja fy =
240
Mpa
Tegangan hancur beton fc =
20
Mpa
MOMEN Mu = 1.4 M =
6.30
kN.m/m
rasio tul maks maks = 0.0316
rasio tul min min =
Mu/(bd2) = Ru =
rasio tul perlu =
tulangan momen perlu As =
desain diameter tul momen =
jumlah tul n =
desain luas tul momen As =
jarak antar tul =

0.0029
0.0366
0.0002
1,313
16
7
1,407
143

(Tabel Gideon Hal. 50)


Mpa
pakai p min
mm
mm
buah
mm
OK
mm

Penulangan GESER
Sigma beton fc
Sigma geser ijin vc
Gaya geser ijin
Gaya vertikal (p2 B4)
tul geser min 0.0018 Ag
desain diameter tul geser
jumlah tul geser n
desain luas tul geser
jarak antar tul

21
0.417
99.98
18.00
900
12
8
905
125

MPa
Mpa --> 1/11 fc
kN --> d.vc
kN
mm
mm
buah
mm
OK
mm

=
=
=
=
=
=
=
=
=

tulangan momen
16 mm 143 mm

tulangan geser
12 mm - 125
mm

tulangan geser
12 mm - 125 mm

tulangan momen
16 mm - 143 mm

PERENCANAAN DINDING PENAHAN TANAH PASANG

0,30

D
b

g4

b +d+g4

II.

PENDEKATAN & ASUMSI


H=
h

2.30 m
=

2.00 m

D=

0.30 m

b=

0.80 m

B=

1.40 m

d=

0.30 m

g4 =

0.30 m
0.3 m

Lebar atas =
Berat Jenis Pas. batu b:
III.

2.20 t/m3

KOEFISIEN TEKANAN TANAH AKTIF & PASIF


Tanah timbunan :
=
d

30 derajat

1.44 t/m3

sat =

1.80 t/m3

Ca

0.00 kg/cm2

Tanah dasar dibawah telapak :


=

30 derajat

sat =

1.80 t/m3

Cb

0.00 kg/cm2

20 derajat

Tekanan tanah aktif


Ka =

Tg2 (45 - / 2 )

Ka =

tan2 (3.14/4)-(/180)x(3.14/2)

Ka =

0.333

Sudut geser dalam

= / 180 x 3.14

= 0.5236

Tekanan tanah pasif

IV.

Kp =

tan2 (3.14/4)+(/180)x(3.14/2)

Kp =

3.000

GAYA-GAYA DINDING LATERAL


Ditinjau per

1.00 m panjang

Tinggi muka air


h2

h =

1.00 m

1.00 m

1.00 m

P1

Pv

P2

P3
Ph

P1

0.24 t

P2

0.48 t

P3

0.1 t

Pa

1.59 t

Pah

6.9843 t

Pav

0.4342 t

Pp1

0.243 t

Pp2

0.000 t

V.

KONTROL STABILITAS GULING


G1 =

1.40

0.30

G2 =

0.30

G3 =

0.50

2.00

G4 =

0.30

G5 =

0.30

G6 =

0.30

Gaya

V (t)

H (t)

1.000

Jarak (m)

G1

0.924

0.700

G2

1.320

0.500

G3

1.100

0.850

G4

0.864

1.200

G5

0.864

1.300

G6

0.300

1.250

Pa1

0.240

0.333

Pa2

0.480

0.500

Pa3

0.133

0.333

Pa

1.587

0.667

Pah

0.667

Pav

0.4

Pp1

0.243

0.100

Pp2

0.000

0.150

Jumlah

5.372

Fguling =
V.

2.683

3.30

1.5

KONTROL STABILITAS GESER


Gaya penggeser adalah (Pa)
Pa
tahanan geser (G

1/2 x g x H2 x Ka - 2 x C x Ka

0.960

f . VT

2.006

t/m2
ton

Maka keamanan geser :


SF Geser

Gaya penahan (GT) / Gaya geser (Pa)

2.090

>

1.5

Dimana :

VI.

VT

= jumlah gaya vertikal seluruhnya (ton).

= koefisien geser antara pondasi dan tanah dasar 0,6

To

= tegangan geser dam utama pada tanah dasar (to

= lebar dasar pondasi dam utama (m)

KONTROL EKSENTRISITAS

VII.

0.89 m

0.19 m

1/6 B =

0.23 m

e < 1/6 B

KONTROL KAPASITAS DAYA DUKUNG TELAPAK


Qmax =

6.95 t/m2

Qmin =

0.73 t/m2

(Kontrol)

Persamaan Hansen (1970) dan Vesic (1975)


Qult = dc. Ic .c. Nc +

dq.iq.Df.g.Nq

dy.iy.0.5.B.g.Ni

Dik :
Df =

1 m

D/B =

1.250 m

Kp =

3.00

Nq =

18.40

Nc =

30.13

Ng =

11.20

faktor kedalaman ponda

Faktor kemiringan Beban


1

ic =

0.375

dc =

2
3

iq =
ig =

0.431
0.294

dq =
dg =

Penyelesaian :
dc. Ic .c. Nc
dq.iq.Df.g.Nq
dg.ig.0.5.B.g.Ng
Maka :
Qult
Qult

=
=
=
=
=
=

Daya Dukung ijin


Sf =
=

1.40
2.88
1

0.375
0.431
0.294

dc. Ic .c. Nc + dq.iq.Df.g.Nq+dy.iy.0.5.B.g.


0
41.162
44.129
Qult / 3
14.71 t/m2

Tekanan Tanah Pada Dasar Pondasi


t 1.2 =
( VT / B) . ( 1 ( 6.e / B))
( t1) =
5.372
1.40
6.949 < q all =
=
( t2 ) =
0.726
>
Dimana :
t1 = tekanan tanah normal maksimum (ton/m2).
t2 = tekanan tanah normal minimum (ton/m2).
V = jumlah gaya vertikal yang bekerja (ton).
B = lebar dasar pondasi dam utama ( meter )
e = eksentrisitas pembebanan, atau jarak dari pusat sampai titik poton
VIII.

GAMBAR DESIGN DPT GRAVITASI


0.30

2.00

0.30

0.30

0.80
1.40 m

No
1 PENDEKATAN & ASUMSI
Tinggi dinding keseluruhan
Tinggi dinding efektif
Tebal pondasi telapak (poer)
Lebar efektif pondasi
Lebar pondasi

URAIAN
H
h
D
b
B

=
=
=
=
=

2.30
2.00
0.30
0.80
1.40

Lebar kaki bagian depan


=
d
Lebar kaki bagian belakang
=
g4
=
Lebar atas
Volume / m3
=
2 GAYA-GAYA DINDING LATERAL
Tanah diatas muka air, pada kondisi kering.
Tekanan Air di muka dan belakang dinding sama, jadi saling meniadakan
Tekanan pada dinding per meter
3 STABILITAS DPT
Kontrol Stabilitas Guling
Kontrol Stabilitas Geser
Daya Dukung pondasi

Qmax =
Qmin =

Tekanan Dasar pondasi


( t1)
( t2 )

=
=
=
=
SF ijin =
=
=

3.302
2.090
6.95
0.73
14.71
6.95
0.73

0.30
0.30
0.30
1.52

1.5
> 1.5
t/m2
t/m2
t/m2
< q all =
>

NAHAN TANAH PASANGAN BATU

/ 180 x 3.14

Kondisi A :
Tanah diatas muka air, pada kondisi kering.

P1

Pa1 =

0.5

h1^2

Ka

0.5

1.00

1.44

0.333

h1

Ka

h2

1.44

0.33

1.00

Pa2 =

= 1.00

P2

Pa3 =

0.5

h2^2

` = st-w

Ka

0.5

1.00

0.80

0.333

0.9

Ph

0.24

0.48

0.13

Tekanan Tanah aktif Total pada dinding permeter :


Pa =

P3

Pa1

= 0.240

Pa2

Pa3

0.480

0.133

Pw
Kondisi B :
Tekanan Air di muka dan belakang dinding sama, jadi saling meniadakan
pa =

0.5

H^2

sat

ka

0.5

5.29

1.80

0.333

4.761

Kondisi C
Tekanan pada dinding per meter
pa = 1/2 x x H2 x Ka - 2 x C x Ka
= 1.270

Tekanan air pada dinding arahnya tegak lurus dinding


Pw =

0.5

H2

sat

0.5

5.29

1.80

Pah =

Pw

Pa

Cos

1.270

Sin

= 4.761
Pav =

Pa

0.940 = 6.9843

1.59

= 1.270

2.20

2.00

2.20

x
x

0.342

0.924 t

2.20

1.320 t

0.5

1.100 t

2.00

1.44

0.864 t

2.00

1.44

0.864 t

0.300 t

0.4342

5.372 t
Mv (tm)

Mh (tm)

0.647
0.660
0.935
1.037
1.123

G2

0.375

G4
0.080

G3

0.240

G5

0.044
1.058

0.024
0.000
4.777
(OK)

x Ka - 2 x C x Ka

han (GT) / Gaya geser (Pa)


(OK)

1.447

Pp1

Pp2

G1

l seluruhnya (ton).

ara pondasi dan tanah dasar 0,6.

m utama pada tanah dasar (ton/m2/m)


dam utama (m)

(OK)
TELAPAK

dy.iy.0.5.B.g.Ni

faktor kedalaman pondasi


1.40
2.88
1

0
1
0.5

30.13
1.8 18.40
1.8 11.20

c + dq.iq.Df.g.Nq+dy.iy.0.5.B.g.Ni
2.967

Qmax Qijin

(OK)

=
=
=

0
41.16
2.97

( 1 ( 6.e / B))
1
14.710 ton/m2
0 ton/m2

6 0.189 1.40
(OK)
(OK)

ak dari pusat sampai titik potong resultant (m)

Pas. Batu

H=2m
L = 50 m
2.30

0.30

m
m
m
m
m

m
m
m
m3
=
=
=

0.9 ton
1.59 ton
1.270 ton

(OK)
(OK)

14.71 ton/m2
0.00 ton/m2

t
t
t

0,3
0

D
d

b
b
+d
+g
4

g4