Anda di halaman 1dari 7

CONTOH PERHITUNGAN

Beban
Beban Pilar V = 400 ton

Properties Tiang
Dimensi tiang D = 49 cm Pancang
Panjang Tiang L = 21 m
Luas Ujung Tiang Ap = 0.24 m2
Luas Selimut As = 5.04 m2
Mutu bahan fc' = 400 kg/cm2
Berat Tiang W = 12.10 ton

Pengaruh Ujung tiang


atas 10 D 490 cm = 4.9 m
bawah 4 D 196 cm = 1.96 m

Penyelidikan Tanah

Kedalaman N-SPT Kedalaman N-SPT


0 22 34
2 3 24 38
4 4 26 43
6 5 28 50
8 6 30 50
10 15 32 50
12 17 34 50
14 18 36 50
16 35 38 50
18 24 40 50
20 26 42 50 Ujung

Tahanan ujung tiang

Qtiang = 40. Nb. Ap

N-SPT ujung tiang (N)


10D 28.33
4D 36.00
Np rata-rata 32.17

Qp 308.93 ton

Tahanan selimut tiang


Qs = a x Cu x P x Li
a 0.55
Cu 210.7 kN/m2 21.069 ton/m2

Qs 37.44 ton

Kekuatan Bahan
Ptiang = sbahan x Atiang
Tegangan ijin beton 100 kg/cm2 1000 t/m2

Ptiang 240.10 ton

DAYA DUKUNG ULTIMATE


Qu = Qp + Qs
Qall = Qu/SF
SF = angka keamanan (2.5-3) dan 5

Qu = 346.37 ton
Qp = 102.976222 ton
Qs = 7.48833158 ton
Berat tiang = 12.101 ton
Qall = 110.46 ton
Beban netto yang diijinkan Qall - Berat Tiang
= 98.364 ton

Kelompok Tiang
𝑁𝑝=𝑉/𝑄𝑡𝑖𝑎𝑛𝑔

v 400 ton
Np 4.067
Dibulatkan menjadi 6

Syarat spasi antar tiang


2.5 D ≤ S ≤ 3D
digunakan s 3D
s 1.47 m
Efisiensi Kelompok Tiang

𝐸𝑔=1−𝜃/90 [((𝑛−1)𝑚+(𝑚−1)𝑛)/𝑚𝑛]

q arc. Tan (d/s)


18.4349488
m 2
n 3
Eg 0.76102844 s

Cek daya dukung kelompok tiang

Qtotal = Eq x n x Qtiang
Qtotal 449.14 OK
ton
PT.Waskita Karya (Persero) Tbk. Analisa Daya Dukung Bored Pile
Industri Konstruksi dan Enjinering Penahan Sliding Tanah Timbunan

DAYA DUKUNG LATERAL IJIN TIANG

DATA PONDASI TIANG PANCANG


A. Bahan / Material Pondasi ;
Mutu beton, K= 500
Kuat tekan beton , fc ' = 41.50 MPa.
Mutu baja tulangan , U= 4,000
Tegangan leleh baja , fy' = 400 MPa.
Modulus Elastis beton , Ec = 30,278 MPa.
25.00 kN/m .
3
Berat jenis beton bertulang , gc =
18.00 kN/m .
3
Berat volume tanah , gs =
Sudut gesek dalam tanah , f= 15 o

Kohesi tanah , Tf = 764 kg/cm. C= 24.79 kN/m2.


B. Dimensi Pile Cap ;
Lebar arah x , Bx = 3.00 m.
Lebar arah y , By = 10.50 m.
Tebal pile cap , hp = 1.00 m.
C. Data Susunan Bored Pile ;
Jumlah bored pile arah sumbu x , m nx = 3 buah.
Jumlah bored pile arah sumbu y , n ny = 2 buah.
Jarak bored pile arah x , x= 1.29 m.
Jarak bored pile arah y , y= 1.29 m.

1.1. BERDASARKAN KEKUATAN BAHAN (MATERIAL STRENGTH)

2
Kekuatan tekan beton, K= 500 kg/cm . fc ' = 41.50 MPa.
2
Tegangan ijin beton, fc = 0,30 * fc' * 1000 = 12,450 kN/m .
Diameter bored pile, D= 0.43 m.
Luas penampang bored pile, A = p / 4 * D2 = 0.1452 m2.
Panjang bored pile , L= 43.00 m.
Berat bored pile , W = A * L * gc = 156.11 kN.
Daya dukung ijin bored pile, Pijin = (A * fc - W)/3 = 550.63 kN.

1.2. BERDASARKAN DAYA DUKUNG TANAH (SOIL BEARING CAPACITY)

1.2.1. Menurut Terzaghi Dan Thomlinson (pengujian hasil Lab)


qult = 1.3 * C * Nc + gs * Df * Nq + 0.6 * gs * R * Ng
Df = kedalaman bored pile , Df = L = 43.00 m.
R = jari-jari bored pile , R=D/2= 0.22 m.
Parameter kekuatan tanah di ujung bored pile (end bearing) ;
gs = berat volume tanah , gs = 18.00 kN/m3.
f = sudut gesek dalam tanah , f= 15 o
C = kohesi tanah , C= 24.79 kN/m2.
Faktor daya dukung menurut Thomlinson ;
Nc = (228 + 4.3 * f) / (40 - f) = 12
Nq = (40 + 5 * f) / (40 - f) = 5
Ng = (6 * f) / (40 - f) = 4
qult = 1.3 * C * Nc + gs * Df * Nq + 0.6 * gs * R * Ng = 3,946 kN/m2.
Luas penampang bored pile , A = p / 4 * D2 = 0.1452
Faktor keamanan , FK = 3 m2 .
Daya dukung ijin bored pile , Pijin = A * qult / SF = 191 kN.

Pengendalian Divisi Sipil 3


PT.Waskita Karya (Persero) Tbk. Analisa Daya Dukung Bored Pile
Industri Konstruksi dan Enjinering Penahan Sliding Tanah Timbunan

1.2.2. Menurut Meyerhoff (pengujian hasil SPT lapangan)


qult = 40 * N' (dalam ton/m2) dengan, N' = nilai SPT terkoreksi.
Nilai SPT hasil pengujian, N= 6 pukulan / 30 cm
Nilai SPT terkoreksi, N' = 15 + 1/2 * (N - 15 ) = 10.50 pukulan / 30 cm
Daya dukung bored pile, qult = 40 * N' = 420 ton/m2. = 2
4,200 kN/m .
Luas penampang bored pile, A = p / 4 * D2 = 0.1452 m2.
Faktor keamanan, FK = 3
Daya dukung ijin bored pile, Pijin = A * qult / SF = 203 kN.

1.2.3. Menurut Bagement (pengujian CPT)


Pijin = A * qc / 3 + K * qf / 5
qc = nilai konus pada L = 14 m. 12.00 kg/cm2. qc = 1,200 kN/m2.
Tf = total friction pada L = 14 m. 764.00 kg/cm. Tf = 764.000 kN/m.
A = luas penampang bored pile, A = p / 4 * D2 = 0.145 m2.
K = keliling penampang bored pile, K=p*D= 1.351 m.
L = panjang bored pile, L= 43.00 m.
Daya dukung ijin bored pile, Pijin = A * qc / 3 + K * Tf / 5 = 265 kN.

1.2.4. Rekap Daya Dukung Aksial Bored Pile

No. Hasil Analisa Daya Dukung Aksial Tiang Pancang P (kN)


1 Berdasarkan kekuatan bahan 551
2 Pengujian Lab Hasil boring (Terzaghi dan Thomlinson) 191
3 Pengujian SPT (Meyerhoff ) 203
4 Pengujian CPT (Bagement) 265
Daya dukung tiang dipakai nilai yang terkecil Ptiang = 191 kN.

Jumlah baris bored pile, ny = 2 bh


Jumlah bored pile dlm.satu baris, nx = 3 bh
Jarak antara bored pile : x= 2.00 m. y= 1.00 m.
Jarak antara bored pile terkecil : S= 1.00 m.
Diameter bored pile, D= 0.43 m.
Efisiensi kelompok bored pile (menurut BDM) :
Ef = [2*(ny + nx - 2)*S + 4*D] / (p*D*ny*nx) = 0.952
Pijin = P * Ef = 182 kN.
Diambil daya dukung aksial ijin bored pile : Pijin = 98 kN.

1.2.4. Hasil Analisa Berat Beban Upper Structure dan Lower Structures (including Earthquake)

No. Hasil Analisa Berat Beban Upper & Lower Structure P (ton)
1 Berat pile cap L = 11.50 m. Sub Total (P1) = 100.63
2 Berat tanah timbunan L = 11.50 m. Sub Total (P2) = 72.45
3 Beban Akibat Gempa (koef.gempa K = 0,15) K * (P1 + P2) = 25.96
4 Berat structure total Ptot = 199.04 ton
Ptot = 1,990.36 kN
Jumlah bored pile yang dibutuhkan n = Ptot / Ptiang = 6.00 bh.

Pengendalian Divisi Sipil 4


PT.Waskita Karya (Persero) Tbk. Analisa Daya Dukung Bored Pile
Industri Konstruksi dan Enjinering Penahan Sliding Tanah Timbunan

2. DAYA DUKUNG LATERAL IJIN BORED PILE A


H
La
Kedalaman ujung tiang, F1 M1
C G
La = Hp = 1.00 m. F2 M2
L H
Sudut geser, f= 15 o D
F3 F M3
Panjang Tiang Pancang, Ld
E M I
L= 43.00 m.
F4 M4
Panjang jepitan tiang pancang, D
F L2 J
N
F5 M5
Ld = 1 /3 * L = 14.33 m.
By = 6.50 m. L O K
3
gs = 18.00 kN/m .
L2
Koefisien tekanan tanah pasif,
Kp = tan2(450 + f /2) = 1.70
R S

Diagram Tekanan Tanah Pasif Efektif :


H H*gs*Kp P
Bag. Kedalaman Bagian
(m) (kN/m2) (kN/m2)
OK La + Ld = 15.33 468.757 O 0.000
FJ La + 3/4 * Ld = 11.75 359.211 FN = 1/4 * FJ 89.803
EI La + 1/2 * Ld = 8.17 249.664 EM = 1/2 * EI 124.832
DH La + 1/4 * Ld = 4.58 140.118 DL = 3/4 * DH 105.088
CG La = 1.00 30.571 CG 30.571

P1 P2 Panjang Bagian F Lengan M


Kode
(kN/m2) (kN/m2) Notasi (m) (kN) thd.O (m) (kN.m)
F1 0.000 89.803 La = 1.00 898 14.667 13171
F2 89.803 124.832 Ld / 4 = 3.58 7691 12.542 96459
F3 124.832 105.088 Ld / 4 = 3.58 8239 8.958 73806
F4 105.088 30.571 Ld / 4 = 3.58 4861 5.375 26129
F5 30.571 0.000 Ld / 4 = 3.58 1095 2.389 2617
Total, F= 22785 M= 212182
L2 = M / F = 9.313 m.
Jumlah momen terhadap titik S : SMs = 0 maka : F * (2 * L2) = H * (L2 + Ld + La)
Gaya Lateral, H = F * (2 * L2) / (L2 + Ld + La) = 17,218.43 kN.
Jumlah baris bored pile, ny = 10 bh
Jumlah bored pile dlm.satu baris, nx = 2 bh
Gaya lateral satu bored pile, h = H / (nx * ny) = 860.92 kN.
FK = 3.00
hijin = h / SF = 287 kN.
Diambil daya dukung lateral ijin bored pile : hijin = 298 kN.

Pengendalian Divisi Sipil 5


PT.Waskita Karya (Persero) Tbk. Analisa Daya Dukung Bored Pile
Industri Konstruksi dan Enjinering Penahan Sliding Tanah Timbunan

2.1. MOMEN PADA TIANG PANCANG AKIBAT GAYA LATERAL

2.1.1. Perhitungan Dengan Cara Bending Moment Diagram

hi = jarak gaya lateral H terhadap gaya Fi yang ditinjau,


yi = jarak gaya Fi terhadap titik yang ditinjau
Momen akibat gaya lateral H, Mhi = H * hi
Besarnya momen di suatu titik, Mi = Mhi - S(Fi * yi)

Fi * yi (kN.m) Diagram
hi Mhi
Kode F1 F2 F3 F4 F5 Mi
(m) (kN.m) 898 7691 8239 4861 1095 (kN.m)
M1 0.67 11479 - - - - - 11479
M2 2.79 48068 1419 - - - - 46649
M3 6.38 109768 2541 9614 - - - 97612
M4 9.96 171467 3664 19228 10299 - - 138277
M5 12.94 222883 4786 28842 30896 12153 - 146207
17.41 299693 6647 44777 47966 28301 2270 169730
19.51 335851 8533 60929 65268 38510 4570 158041
21.61 372010 10419 77080 82569 48718 6871 146353
Momen terbesar, M= 169730 kN.m.
Jumlah tiang pancang per kolom, ny = 10 bh.
Jumlah tiang pancang per row, nx = 2 bh.
Faktor keamanan, FK = 3
Momen maksimum yang diijinkan untuk satu Bored Pile,
Mmax = M/ (SF * nx * ny) = 2,829 kN.m.

2.1.2. Perhitungan Dengan Rumus Empiris

Beban maksimum pada bored pile, Pmax = Pijin = 98 kN.


Kedalaman bored pile, Z = L + La = 44,000.00 mm.
Diameter bored pile, D= 430 mm.
Mutu Beton : K - 500 Kuat tekan beton, fc' = 41.50 MPa.
Modulus elastik beton, Ec = 4700 * √fc' = 30,278 MPa.
Inersia penampang bored pile, p
Ic = /64 * D = 4
1.68E+09 mm4.
Untuk tanah berpasir maka nilai, kl = 550.00 MPa.
K = kl * Z/D = 56,279 MPa.
l = 40 √[D * K / (4*Ec*Ic)] = 0.0138
Eksentrisitas, e = 2.778 / l = 144.23 mm.
e= 0.1442 m.
Momen maksimum pada bored pile, Mmax = Pmax * e = 14 kN.m.

2.1.3. Momen Maksimum Yang Diijinkan Pada Bored Pile

Dari hasil perhitungan momen maksimum pada bored pile akibat beban lateral yang di lakukan dengan
cara Bending Momen dan Rumus Empiris dipilih nilai yang terbesar, maka di ambil :
Momen maksimum yang diijinkan pada bored pile , Mmax = 2,829 kN.m.

Pengendalian Divisi Sipil 6


PT.Waskita Karya (Persero) Tbk. Analisa Daya Dukung Bored Pile
Industri Konstruksi dan Enjinering Penahan Sliding Tanah Timbunan

N-SPT m.a.t

5
b 0.4
D 10
4 Pasir halus berlanau Qu 120
g = 17.6 kN/m3 f'c 34
g’ = 7.8 kN/m3 E 27405.47
6 10 m I 0.001257
Phi 30
Qa 40
8

Pengendalian Divisi Sipil 7

Anda mungkin juga menyukai