Anda di halaman 1dari 34

T k

0.5 1 0.5 1 0.6 1.05


0.6 1.05 0.51 1.005 0.61 1.055
0.7 1.1 0.52 1.01 0.62 1.060
0.8 1.15 0.53 1.015 0.63 1.065
0.9 1.2 0.54 1.02 0.64 1.070
1 1.25 0.55 1.025 0.65 1.075
1.1 1.3 0.56 1.03 0.66 1.080
1.2 1.35 0.57 1.035 0.67 1.085
1.3 1.4 0.58 1.04 0.68 1.090
1.4 1.45 0.59 1.045 0.69 1.095
1.5 1.5 0.6 1.05 0.05 0.7 1.10
1.6 1.55
1.7 1.6
1.8 1.65
1.9 1.7
2 1.75
2.1 1.8
2.2 1.85
2.3 1.9
2.4 1.95
2.5 2
0.005
PERHITUNGAN BEBAN GEMPA STATIK EKIVALEN
BERDASARKAN SNI 03-1726-2012

CONTOH :

Dimensi Struktur :
- Balok : 30/50 cm
- Kolom: 60/60 cm
- Tebal Plat : 12 cm

Data Perencanaan

Tinggi bangunan ###


Fungsi bangunan Apartment
Mutu beton (f'c) ### Mpa
Mutu baja (fy) 400 MPa
Lokasi Padang
Kondisi tanah sedang

1. Menghitung Berat Total Bangunan (W)


Berat Lantai 20 (dak)
Beban Mati :
- Pelat = ### x 30 x ### x 0.12 = 259,200 kg
- Balok Melintang = ( 5 x 30 ) x 0.3 x 0.5 x 2400 = 54,000 kg
- Balok Memanjang = ( 5 x 30 ) x 0.3 x 0.5 x 2400 = 54,000 kg
- Kolom = 36 x 2 0.6 x 0.6 x ### = 62,208 kg
- Dinding = 30 x 2 30 x 2 x 250 x 2 = 60,000 kg
- Plafond + ME = 30 x 30 x 100 = 90,000 kg
W = 579,408 kg
Beban Hidup :
- beban hidup atap = 250 kg/m2 (dek sebagai shalter)(kalau dek biasa beban atao 100 kg/m2)
- koefisien reduksi = 0.3 Wh5 = 0.3 x ( ### x ### ) x 250 = 67500 kg
- beban lantai 20 : W20 = 579408 + 67500 = 646,908 kg
= 646.908 ton
Berat Lantai 19
Beban Mati :
- Pelat = 30 x 30 0.12 x 2400 = ### kg
- Balok Melintang = ( 5 x 30 ) x 0.3 x 0.5 x 2400 = 54,000 kg
- Balok Memanjang = ( 5 x 30 ) x 0.3 x 0.5 x 2400 = 54,000 kg
- Kolom = 36 x 4 0.6 x 0.6 x ### = ### kg
- Dinding = 30 x 4 30 x 2 x 250 x 4 = ### kg
- Plafond+ME+lain2 = 30 x 30 x 120 = ### kg
W = ### kg
Beban Hidup :
- beban hidup lantai = 250 kg/m2
- koefisien reduksi = 0.3 Wh5 = 0.3 x ( ### x ### ) x 250 = 67,500 kg
- beban lantai 3 : W19 = 779,616 + 67,500 = 847,116 kg
= 847.116 ton
Berat lantai2 dan lantai 1 sama dengan lantai 3
Berat lantai total : Wt
Wt = W20 + W3 + W2
= 646,908 +### ( 847,116 ) = 16,742,112 kg

2. Menentukan Faktor Keutamaan (Ie)


Dipakai Ie = 1

3. Menentukan S DS

Berdasarkan gambar diperoleh

S DS = 0.9
4 Menentukan R

Sistem struktus yang digunakan Sistem Rangka Pemikul Momen (SRPM)


Lokasi bangunan (Padang) Resiko Gempa Kuat ---- SRPMK (Khusus)

Tabel. Faktor R (SMI-1726-2012)


Berarti dipaka angka R = 8
5 Mengjitung Gaya Geser dasar (V)

V = S DS x Ie
x W
R

= 0.9 x 1
x 16,742,112
8

V = 1,875,116.54 kg
= 1,875.12 ton

6 Menghitung Distribusi Gaya Geser (Fx)

Fx = Cvx . V dimana

Menentukan nilai T (Periode Fundamental Struktur)

Ta = Ct . hnx

Tabel. Nilai pendekatan Ct dan x


Untuk rangka beton pemikul momen, nilai Ct 0.0466 = 0.9
h = 80 m
Ta = 0.0466 x 80 ^ 0.9
Ta = 2.405 detik

Atau dapat juga digunakan ketentuan berikut :

Ta = 0.1 x 4
Ta = 0.4 detik

Nilai T yang digunakan adalah T = ### detik

T = 2.405 k = 1.9525 (interpolasi)

Tingkat hi Wi Wi . hi Fi x,y Untuk tiap portal


ke - (m) (ton) (ton) ke - 1/6 Fi,x 1/6 Fi,y
20 80 646.908 3362216.86 203.24 33.873 33.873
19 76 847.116 3983193.67 240.77 40.129 40.129
18 72 847.116 3584136.85 216.65 36.109 36.109
17 68 847.116 3205653.20 193.77 32.296 32.296
16 64 847.116 2847798.68 172.14 28.690 28.690
15 60 847.116 2510632.82 151.76 25.294 25.294
14 56 847.116 2194219.18 132.63 22.106 22.106
13 52 847.116 1898625.95 114.77 19.128 19.128
12 48 847.116 1623926.62 98.16 16.360 16.360
11 44 847.116 1370200.86 82.83 13.804 13.804
10 40 847.116 1137535.65 68.76 11.460 11.460
9 36 847.116 926026.72 55.98 9.329 9.329
8 32 847.116 735780.40 44.48 7.413 7.413
7 28 847.116 566916.30 34.27 5.711 5.711
6 24 847.116 419570.88 25.36 4.227 4.227
5 20 847.116 293902.95 17.77 2.961 2.961
4 16 847.116 190102.20 11.49 1.915 1.915
3 12 847.116 108403.74 6.55 1.092 1.092
2 8 847.116 49116.35 2.97 0.495 0.495
1 4 847.116 12690.10 0.77 0.128 0.128
Σ 31020649.98 1875.12 312.519 312.519

Pembebanan Horizontal (Gempa)

33.873 33.873
###

40.129 40.129
###

36.109 36.109
###

32.296 32.296
###

28.690 28.690
###

25.294 25.294
###

22.106 22.106
###

19.128 19.128
###

16.360 16.360
###

13.804 13.804
###

11.460 11.460
###
9.329 9.329
9

7.413 7.413
8

5.711 5.711
7

4.227 4.227
6

2.961 2.961
5

1.915 1.915
4

1.092 1.092
3

0.495 0.495
2

0.128 0.128
1

6 6 6 6 6 6 6 6

Portal arah x (memanjang) Portal arah y (melintang)

Pembebanan Vertikal
Beban mati (Dead Load)

5.715 t/m
20

5.940 t/m 19

5.940 t/m 18
5.940 t/m 17

5.940 t/m 16

5.940 t/m 15

5.940 t/m 14

5.940 t/m 13

5.940 t/m 12

5.940 t/m 11

5.940 t/m 10

5.940 t/m 9

5.940 t/m 8

5.940 t/m 7

5.940 t/m 6

5.940 t/m 5

5.940 t/m 4

5.940 t/m 3
5.940 t/m 2

5.940 t/m 1

Portal arah y
Portal arah x (memanjang)

Beban Hidup (Live Load)

0.844 t/m 20

19
0.844 t/m

18
0.844 t/m

17
0.844 t/m

16
0.844 t/m

15
0.844 t/m

14
0.844 t/m

13
0.844 t/m

12
0.844 t/m

11
0.844 t/m

10
0.844 t/m

9
0.844 t/m

8
0.844 t/m

7
0.844 t/m

6
0.844 t/m

5
0.844 t/m

4
0.844 t/m

3
0.844 t/m

2
0.844 t/m

1
0.844 t/m

Portal arah x (memanjang) Portal arah y


20

19

18

17

16

15

14

13

12

11

10
9

6 6

(melintang)

5.08 t/m

5.28 t/m

5.28 t/m
5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m

5.28 t/m
5.28 t/m

5.28 t/m

(melintang)

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m
0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

0.75 t/m

(melintang)
PERHITUNGAN BEBAN GEMPA STATIK EKIVALEN
BERDASARKAN SNI 03-1726-2012

SOAL MID TEST GENAP 2013/2014

Diketahui :
Suatu bangunan kantor bertingkat 4 yang berada di Padang
dengan kondisi tanah di bawah bangunan adalah jenis tanah lunak
Data Perancanaan
Fungsi gedung : Rumah Sakit
Tinggi kolom : 3,8 m
Tinggi bangunan ; 15.2 m
Bangunan beton bertulang
(Struktur Rangka Pemikil Momen-SRPM)
Data lain (jika dibutuhkan) tentukan sendiri.

W4 199,011.00 kg
W3 310,931.00 kg
W2 310,931.00 kg
W1 310,931.00 kg

dengan menggunakan Peta Gempa indonesia Tahun 2010 dan SNI-1726-2012


Hitung gaya gempa statik ekivalen pada setiap portal !

1. Menghitung Berat Total Bangunan (W)


Berat lantai total : Wt
Wt = W4 + W3 + W2 + W1
= 199,011 + 3 ( ### ) = 1,131,804 kg

2. Menentukan Faktor Keutamaan (Ie)


Dipakai Ie = 1.5

3. Menentukan S DS
Berdasarkan g

S DS

Berdasarkan gambar diperoleh S DS = 0.82

4 Menentukan R

Sistem struktus yang digunakan : Sistem Rangka Pemikul Momen (SRPM)


Lokasi bangunan (Padang) : Resiko Gempa Kuat ---- SRPMK (Khusus)

Tabel. Faktor R (SMI-1726-2012)


Berarti dipaka angka R = 8

5 Mengjitung Gaya Geser dasar (V)


V = S DS x Ie
x W
R

= 0.82 x 1.5
x 1,131,804
8

V = 174,014.87 kg
= 174.01 ton

6 Menghitung Distribusi Gaya Geser (Fx)

Fx = Cvx . V dimana

Menentukan nilai T (Periode Fundamental Struktur)

Ta = Ct . hnx

Tabel. Nilai pendekatan Ct dan x

Untuk rangka beton pemikul momen, nilai Ct= 0.0466 x = 0.9


h = 15.2 m
Ta = 0.0466 x 15.2 ^ 0.9
Ta = 0.540 detik

Atau dapat juga digunakan ketentuan berikut :

Ta = 0.1 x 4
Ta = 0.4 detik

Nilai T yang digunakan adalah T = 0.540 detik


lihat denah bangunan lihat denah ba

T = 0.540 k= 1.02 (interpolasi) arah sb. X ; 4 potal arah sb. X


arah sby ; 5 potal arah sby
Tingkat hi Wi Wi . hi Fi x,y Untuk tiap portal
ke - (m) (ton) (ton) ke - 1/4 Fi,x 1/5 Fi,y
4 15.2 199,011.00 3194166.43 52.487 13.122 10.497
3 11.4 310931.00 3721405.30 61.150 15.288 12.230
2 7.6 310931.00 2460899.56 40.438 10.109 8.088
1 3.8 310,931.00 1213509.81 19.940 4.985 3.988
Σ 10589981.10 174.01 43.504 34.803

13.122

15.288

10.109

4.985

Portal arah X

10.497
12.230

8.088

3.988

Portal arah Y
Berdasarkan gambar diperoleh

S DS = 0.82
lihat denah bangunan

arah sb. X ; 4 potal


arah sby ; 5 potal

Anda mungkin juga menyukai