Anda di halaman 1dari 193

DAFTAR HARGA UPAH PEKERJA

Nama Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

No Jenis Upah Satuan Harga (Rp)


1 Tenaga/Pekerja OH 60,000
2 Mandor OH 75,000
3 Kepala Tukang Batu OH 70,000
4 Tukang Batu OH 70,000
5 Pembantu Tukang Batu OH 60,000
6 Kepala Tukang Kayu OH 80,000
7 Tukang Kayu Kasar OH 70,000
8 Tukang Kayu Halus OH 75,000
9 Pembantu Tukang Kayu OH 60,000
10 Tukang Pasang Keramik OH 80,000
11 Kepala Tukang Besi OH 80,000
12 Tukang Besi OH 70,000
13 Pembantu Tukang Besi OH 60,000
14 Kepala Tukang Cat/Politur OH 75,000
15 Tukang Cat/Politur OH 70,000
16 Tukang Listrik OH 75,000
17 Tenaga (Instalasi Listrik) OH 80,000
18 Tukang Gali Sumur OH 100,000
19 Tukang Pipa OH 75,000
20 Tukang Pipa Air Bersih OH 70,000
21 Kepala Tukang Aspal OH 80,000
22 Juru Godog Aspal OH 70,000
23 Juru Semprot Aspal OH 70,000
24 Mekanik Terlatih OH 80,000
25 Pembantu Mekanik OH 70,000
26 Operator Terlatih OH 75,000
27 Operator Semi Terlatih OH 70,000
28 Pembantu Operator OH 65,000
29 Operator Alat Berat OH 75,000
30 Tukang Bongkar OH 70,000
31 Pekerja Galian dan Urug OH 70,000
32 Uang Layar Hari 100,000
33 Pengambil/Pengirim Sampel Hari 65,000
34 Juru Malaria Desa Bulan 400,000
35 Petugas Operasi SAR Hari 60,000
36 Petugas Piket SAR Hari 50,000
37 Pendatan Potensi Pajak KB WP 5,000
DAFTAR HARGA BAHAN BANGUNAN

Nama Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

NO. JENIS BAHAN BANGUNAN SATUAN

1 Air 1 tengki

2 Aluminium Foil
1 Aluminium foil lokal 1,25x60m (single) roll
2 Aluminium foil luar 1,25x60m (single) roll
3 Aluminium foil luar 1,25x60m (double) roll

3 Aspal
1 Aspal curah kg
2 Aspal emulasi (CRS-1/R-65) kg
3 Aspal modifikasi (BNA) kg
4 Aspal modifikasi (JAP-57) kg
5 Aspal modifikasi (retona) kg
6 Aspal modifikasi (starbit) kg
7 Aspal modifikasi (STR-55) kg

4 Asbes
1 Asbes gelombang besar (200 x 110 x 0,5) lbr
2 Asbes gelombang besar (180 x 110 x 0,5) lbr
3 Asbes penutup langit-langit 3mm, 100x100 lbr
4 Asbes semen gelombang besar (3000 x 1100 x 5)mm lbr
5 Asbes semen gelombang besar (2500 x 1100 x 5)mm lbr
6 Asbes semen gelombang besar (2250 x 1100 x 5)mm lbr
7 Asbes semen gelombang besar (2000 x 1100 x 5)mm lbr
8 Asbes semen gelombang besar (1500 x 1100 x 5)mm lbr
9 Asbes semen gelombang besar (1000 x 1100 x 5)mm lbr
10 Asbes semen gelombang besar (1000 x 2000 x 5)mm lbr
11 Asbes semen gelombang besar (600 x 2000 x 2,8)mm lbr
12 Asbes semen gelombang besar (500 x 1000 x 2,8)mm lbr
13 Asbes semen gelombang besar (400 x 1000 x 2,8)mm lbr
14 Asbes semen gelombang besar (300 x 1000 x 2,8)mm lbr
15 Asbes semen gelombang kecil (3000 x 1050 x 4)mm lbr
16 Asbes semen gelombang kecil (2700 x 1050 x 4)mm lbr
17 Asbes semen gelombang kecil (2400 x 1050 x 4)mm lbr
18 Asbes semen gelombang kecil (2100 x 1050 x 4)mm lbr
19 Asbes semen gelombang kecil (1800 x 1050 x 4)mm lbr
20 Asbes semen gelombang kecil (1500 x 1050 x 4)mm lbr
5 Genteng
1 Genteng fiber semen
1 1 1150 x 850 x 4 mm lb
1 2 Asbes nok kecil bj
1 3 Asbes nok besar bj

2 Atap genteng metal


2 1 Genteng metal zinc alumne type prima roof m²
2 2 Nok atas (u) type prima roof bh
2 3 Nok atas bulat type c prima roof, P= 40cm bh
2 4 Nok pinggir (P) type prima roof (110 x 7 x 10)cm bh

6 Batu bata
1 Batu bata 3,5 x 10 x 20 bj
2 Batu bata 5 x 10 x 22 bj

7 Batako
1 Batako pejal bj

8 Batu belah
1 Batu belah 15/20 m³
2 Batu pecah 10/15 m³
3 Batu pecah 5/7 m³
4 Batu pecah 4/6 m³
5 Batu pecah 3/4 m³
6 Batu pecah 2/3 m³
7 Batu split 1/2 m³
8 Batu belah putih m³
9 Batu alam andesit t= 10cm m³

9 Baja dan Besi


1 Baja WF kg
2 Besi cor kg
3 Besi beton bulat kg
4 Besi beton D form C ulir kg
5 Baut kg
6 Besi beton kg
7 Besi bergelombang kg
8 Baja prategang kg
9 Baja struktur, titik leleh 2400 - 2800 kg kg
10 Baja tulangan (polos) U24 kg
11 Baja tulangan (polos) U32 kg
12 Baja tulangan (ulur) D32 kg
13 Baja tulangan (ulur) D38 kg
14 Baja tulangan (ulur) D48 kg
15 Kawat beton kg
16 Kawat beronjon kg

10 Bambu
1 Bambu apus ljr
2 Bambu wulung ljr
3 Bambu petung ljr

11 Buis beton
1 Diameter 15 cm x 1 m bj
2 Diameter 20 cm x 1 m bj
3 Diameter 25 cm x 1 m bj
4 Diameter 30 cm x 1 m bj
5 Diameter 40 cm x 1 m bj
6 Diameter 50 cm x 1 m bj
7 Diameter 50 cm x 0,5 m bj
8 Diameter 60 cm x 1 m bj
9 Diameter 60 cm x 0,5 m bj
10 Diameter 80 cm x 1 m bj
11 Diameter 80 cm x 0,5 m bj
12 Diameter 100 cm x 1 m bj
13 Diameter 100 cm x 0,5 m bj
14 Buis beton 1/2 D 20 cm bj
15 Buis beton 1/2 D 25 cm bj

12 Cat kayu, besi, tembok


1 Emco biasa kg
2 Emco segitiga kg
3 Emco bintang kg
4 Cat dasar kg
5 Cat besi kg
6 Cat tembok maxtilite galon
7 Cat tembok decolith kg
8 Cat tembok catylac biasa kg
9 Cat tembok catylac bintang kg
10 Cat tembok mowilek dalam kg
11 Cat tembok mowilek luar kg
12 Cat dulux dalam kg
13 Cat dulux luar kg
14 Cat tembok flora kg
15 Cat tembok E x ICI kg
16 Oker hitam kg
17 Cat genteng air revinol kg
18 Cat besi es emco bintang kg
19 Cat kayu es emco bintang kg
20 Cat maika (non thermoplas) kg
21 Cat maika (thermoplas) kg
22 Cat kg
23 Cat anti karat kg

13 Daun pintu
1 Daun pintu baja B-100, H-3, 50 m unit
2 Daun pintu kayu jati B-80, H-200 unit
3 Daun pintu kayu jati B-80, H-200 unit
4 Daun pintu plat baja B-180, H-0,50 unit
5 Faberglass gelombang kecil 80 x 300 unit

14 Dempul kayu
1 Dempul kayu type A putih jago kg
2 Dempul lilin/kayu biji

15 Gebalan rumput
1 Rumput gebulan m²
2 Rumput biasa m²
3 Rumput manila m²
4 Rumput akar wangi m²
5 Rumput serai m²

16 Gadek
1 Gadek bambu kulit ljr
2 Gadek bambu daging ljr

17 Genteng
1 Genteng beton besar bj
2 Genteng beton kecil bj
3 Genteng tanah liat paris bj
4 Genteng tanah liat kodok bj
5 Genteng kaca pasir bj
6 Genteng kaca kodok bj
7 Genteng kaca beton bj
8 Genteng KIA warna bj
9 Genteng kaca lengkung 3mm bj
10 Genteng kaca lengkung 5mm bj
11 Genteng kaca 3m bj
12 Genteng kaca 5mm bj
13 Metal roof m²
18 Ijuk ikat

19 Kaca
1 Kaca bening
1 1 3mm m²
1 2 5mm m²
2 Kaca buram
2 1 3mm m²
2 2 5mm m²
3 Kaca cermin
3 1 3mm m²
3 2 5mm m²
4 Kaca patri m²
5 Kaca reyband
5 1 3mm m²
5 2 5mm m²

20 Kayu
1 Kayu bakar m³
2 Kayu bekisting m³
3 Kayu dolken m³

4 Kayu jat
4 Kayu jat kelas I
4 1 Papan m³
4 2 Balok m³
5 Kayu jat kelas II
5 1 Papan m³
5 2 Balok m³
6 Kayu jat kelas III
6 1 Papan m³
6 2 Balok m³
6 3 Reng m³

7 Kayu lis
7 1 Lis dan jalusi kelas I ukuran 2/6 m
7 2 Lis dan jalusi kelas I ukuran 2/4 m
7 3 Lis dan jalusi kelas I ukuran 1/5 m

8 Kaca bingkai
8 1 Bingkai kayu kelas I 5/7 m
8 2 Bingkai kayu kelas I 4/6 m
8 3 Bingkai kayu kelas I 3/4,35 m
8 4 Bingkai kayu kelas I 2/3 m

9 Kayu bengkirai
9 1 Papan m³
9 2 Balok m³

10 Kayu bingkai
10 1 Bingkai kayu kelas I 5/7 m
10 2 Bingkai kayu kelas I 4/6 m
10 3 Bingkai kayu kelas I 3/4,35 m
10 4 Bingkai kayu kelas I 2/3 m

11 Lis
11 1 Lis dan jalusi kelas I 2/4 m
11 2 Lis dan jalusi kelas I 1/5 m
11 3 Lis dan jalusi kelas I 1/3 m

12 Kayu kamper
12 1 Papan m³
12 2 Balok m³

13 Kayu bingkai
13 1 Bingkai reng dan kaso kelas I 5/7 m
13 2 Bingkai reng dan kaso kelas I 4/6 m
13 3 Bingkai reng dan kaso kelas I 3/4 m
13 4 Bingkai reng dan kaso kelas I 2/3 m

14 Lis
14 1 Lis dan jalusi kelas I 2/4 m
14 2 Lis dan jalusi kelas I 1/5 m
14 3 Lis dan jalusi kelas I 1/3 m

15 Kayu kruing
15 1 Papan m³
15 2 Balok m³

16 Kayu bingkai
16 1 Bingkai reng dan kaso kelas I 5/7 m
16 2 Bingkai reng dan kaso kelas I 4/6 m
16 3 Bingkai reng dan kaso kelas I 3/4 m
16 4 Bingkai reng dan kaso kelas I 2/3 m

17 Lis
17 1 Lis dan jalusi kelas I 2/4 m
17 2 Lis dan jalusi kelas I 1/5 m
17 3 Lis dan jalusi kelas I 1/3 m

18 Kayu merant
18 1 Papan m³
18 2 Balok m³

21 Kapur
1 Kapur pasang m³
2 Tepung gypsum kg
3 Alkasit kg
4 Gypsum board lb
5 Kasa gypsum roll
6 List profil gypsum lebar 5 cm m³
7 List profil gypsum lebar 6-10 cm m³
8 List profil gypsum lebar >10 cm m³
9 Kalsi board (122 x 244 x 0,35) lb

22 Kawat
1 Kawat ayakan m
2 Kawat beton kg
3 Kawat nyamuk m
4 Bronjong kawat galvanized kg
5 Kawat las kg
6 Kawat galvari kg
7 Kawat duri roll
8 Besi jaring kawat baja kg
9 Kawat kasa m²
10 Kawat burung m²
11 Kawat harmonika m²

23 Kuas
1 Kuas rol bh
2 Kuas ukuran 3,5" bh
3 Kuas ukuran 2,5" bh
4 Kuas kecil 1" bh

24 Bronjong kawat galvanis


1 ukuran d=2,70mm
1 1 2,00 x 1,00 x 0,5 unit
1 2 3,00 x 1,00 x 0,5 unit
1 3 3,00 x 1,50 x 0,5 unit
1 4 4,00 x 1,00 x 0,5 unit
1 5 4,50 x 1,00 x 0,5 unit
1 6 2,00 x 1,00 x 1,00 unit
1 7 3,00 x 1,00 x 1,00 unit
1 8 4,00 x 1,00 x 1,00 unit
2 ukuran d=3,00mm
2 1 2,00 x 1,00 x 0,5 unit
2 2 3,00 x 1,00 x 0,5 unit
2 3 3,00 x 1,50 x 0,5 unit
2 4 4,00 x 1,00 x 0,5 unit
2 5 4,50 x 1,00 x 0,5 unit
2 6 2,00 x 1,00 x 1,00 unit
2 7 3,00 x 1,00 x 1,00 unit
2 8 4,00 x 1,00 x 1,00 unit
3 Bronjong kawat galvanis + Lapis PVC
3 1 2,00 x 1,00 x 0,5 unit
3 2 3,00 x 1,00 x 0,5 unit
3 3 3,00 x 1,50 x 0,5 unit
3 4 4,00 x 1,00 x 0,5 unit
3 5 4,50 x 1,00 x 0,5 unit
3 6 2,00 x 1,00 x 1,00 unit
3 7 3,00 x 1,00 x 1,00 unit
3 8 4,00 x 1,00 x 1,00 unit

4 Kawat anyam galvanized ukuran 2,70 unit


5 Kawat bronjong kg

25 Kerikil beton m³

26 Kunci tanam
1 Kunci tanam besar bj
2 Kunci tanam kecil bj

27 Kloset
1 Kloset duduk
1 1 Kloset duduk lengkap INA bj
1 2 Kloset duduk standar porselin dengan tangki bj
1 3 Kloset duduk porselin luc dengan tangki bj
1 4 Kloset duduk putih dengan tangki TOTO bj
1 5 Kloset duduk warna dengan tangki TOTO bj

2 Kloset jongkok
2 1 Kloset jongkok porselin type CE7 standar bj
2 2 Kloset jongkok porselin type CE8 standar bj
2 3 Kloset jongkok putih bj
2 4 Kloset jongkok warna bj
2 5 Kloset jongkok standar / keramik bj

28 Wastafel
1 Wastafel standar INA bj
2 Wastafel lux INA set
3 Bak cuci stainless stell set
4 Water drain & accessories set

29 Sanitasi
1 Meja cuci dapur 125z 50cm bh
2 Tempat sabun tunggal bh
3 Kran diameter 3/4 atau 1/2 Ez TOTO bh
4 Seat type bh
5 Floordrain bh
6 Floordrain (TZ1AN) 4" Ez TOTO bh

30 Lem Aica Aibon kg


31 Melamin kg
32 Minyak tanah lt
33 Mayleran bh

34 Oli
1 Oli persneling lt
2 Oli gardan lt
3 Oli mesin lt

35 Paku
1 Paku besar, sedang kg
2 Paku kecil triplek/eternit kg
3 Paku payung kg
4 Paku gording 125 x 1mm kg
5 Paku gording 100 x 4,2mm kg
6 Paku usuk 80 x 3,8 kg
7 Paku reng 55 x 3,1 kg
8 Paku plepet 40 x 2,1 kg
9 Paku eternit 20 x 1,5 kg
10 Paku beton 5cm bh
11 Paku pancing bh
12 Paku asbes bh
13 Paku sumbat bh
14 Paku sekrup bh
15 Paku akrup kg
16 Paku gypsum kg
17 Paku hak panjang 15cm kg
18 Paku reng kg
19 Paku usuk kg
20 Paku anti karat kg
21 Paku skrop atau polikarbonat bh
22 Paku beton 5cm bh

36 Pasir
1 Pasir pasang progo m³
2 Pasir urug lokal (campur tanah) m³
3 Pasir beton m³
4 Sirtu pihan m³
5 Tanah urug biasa m³
6 Tanah urug pilihan m³

37 Pipa
1 Pipa galvanis
1 1 Galvanis medium SNI d=0.5" m
1 2 Galvanis medium SNI d=0.75" m
1 3 Galvanis medium SNI d=1" m
1 4 Galvanis medium SNI d=1.25" m
1 5 Galvanis medium SNI d=1.5" m
1 6 Galvanis medium SNI d=2" m
1 7 Galvanis medium SNI d=3" m
1 8 Galvanis medium SNI d=4" m
1 9 Galvanis medium SNI d=5" m
1 10 Galvanis d=0.5" btg m
1 11 Galvanis d=0.75" btg m
1 12 Galvanis d=1" btg m
1 13 Galvanis d=1.25" btg m
1 14 Galvanis d= 1.5" btg m
1 15 Galvanis 6m, d=1/2" med.A btg
1 16 Galvanis 6m, d=1 1/4" med.A btg
1 17 Galvanis 6m, d=1 1/2" med.A btg
1 18 Galvanis 6m, d=2" med.A btg
1 19 Galvanis 6m, d=2 1/2" med.A btg
1 20 Galvanis 6m, d=3" med.A btg
1 21 Galvanis 6m, d=4" med.A btg
1 22 Galvanis 6m, d=5" med.A btg
1 23 Galvanis 6m, d=6" med.A btg
1 24 Galvanis 6m, d=8" med.A btg
1 25 Galvanis 6m, d=1/2" med.B btg
1 26 Galvanis 6m, d=3/4" med.B btg
1 27 Galvanis 6m, d=1" med.B btg
1 28 Galvanis 6m, d=1 1/4" med.B btg
1 29 Galvanis 6m, d=1 1/2" med.B btg
1 30 Galvanis 6m, d=2" med.B btg
1 31 Galvanis 6m, d=2 1/2" med.B btg
1 32 Galvanis 6m, d=3" med.B btg
1 33 Galvanis 6m, d=4" med.B btg
1 34 Galvanis 6m, d=5" med.B btg
1 35 Galvanis d=2" med.B btg
1 36 Galvanis d=2 1/2" med.B btg
1 37 Galvanis d=3" med.B btg
1 38 Galvanis d=4" med.B btg
1 39 Galvanis d=5" med.B btg
1 40 Galvanis d=1/2" STR btg
1 41 Galvanis d=3/4" STR btg
1 42 Galvanis d=1" STR btg
1 43 Galvanis d=1 1/4" STR btg
1 44 Galvanis d=1 1/2" STR btg
1 45 Galvanis d=2" STR btg
1 46 Galvanis d=2 1/2" STR btg
2 Pipa baja hitam, standar: ASTM A53:A
2 1 pipa d=1/2" btg
2 2 pipa d=3/4" btg
2 3 pipa d=1" btg
2 4 pipa d=1 1/4" btg
2 5 pipa d=1 1/2" btg
2 6 pipa d=2" btg
2 7 pipa d=2 1/2" btg
2 8 pipa d=3" btg
2 9 pipa d=4" btg
2 10 pipa d=5" btg
2 11 pipa d=6" btg
2 12 pipa d=8" btg
2 13 pipa d=10" btg
2 14 pipa d=12" btg
2 15 pipa d=14" btg
2 16 pipa d=16" btg
2 17 pipa d=18" btg
2 18 pipa d=20" btg
2 19 pipa d=24" btg
2 20 pipa hitam d=1/2" Sch 40 btg
2 21 pipa hitam d=3/4" Sch 41 btg
2 22 pipa hitam d=1" Sch 42 btg
2 23 pipa hitam d=1 1/4" Sch 43 btg
2 24 pipa hitam d=1 1/2" Sch 44 btg
2 25 pipa hitam d=2" Sch 45 btg
2 26 pipa hitam d=2 1/2" Sch 46 btg
2 27 pipa hitam d=3" Sch 47 btg
2 28 pipa hitam d=4" Sch 48 btg
2 29 pipa hitam d=6" Sch 49 btg
2 30 pipa hitam d=1/2" 1.2 btg
2 31 pipa hitam d=1/2" 2 btg
2 32 pipa hitam d=1/2" 2A btg
2 33 pipa hitam d=3/4" 1.2 btg
2 34 pipa hitam d=3/4" 1.6 btg
2 35 pipa hitam d=3/4" 2 btg
2 36 pipa hitam d=3/4" 2A btg
2 37 pipa hitam d=1" 1.2 btg
2 38 pipa hitam d=1" 1.6 btg
2 39 pipa hitam d=1" 2 btg
2 40 pipa hitam d=1" 2.3 btg
2 41 pipa hitam d=1 1/4" 1.2 btg
2 42 pipa hitam d=1 1/4" 1.6 btg
2 43 pipa hitam d=1 1/4" 2 btg
2 44 pipa hitam d=1 1/4" 2A btg
2 45 pipa hitam d=1 1/4" 2.3 btg
2 46 pipa hitam d=2" 1.2 btg
2 47 pipa hitam d=2" 1.6 btg
2 48 pipa hitam d=2" 2 btg
2 49 pipa hitam d=2" 2.3 btg
2 50 pipa hitam d=2 1/2" 1.6 btg
2 51 pipa hitam d=2 1/2" 2 btg
2 52 pipa hitam d=2 1/2" 2.5 btg
2 53 pipa hitam d=2 1/2" 3 btg
2 54 pipa hitam d=3" 1.6 btg
2 55 pipa hitam d=3" 2 btg
2 56 pipa hitam d=3" 2.5 btg
2 57 pipa hitam d=4" 1.6 btg
2 58 pipa hitam d=4" 2 btg
2 59 pipa hitam d=4" 2.5 btg
2 60 pipa hitam d=5" 2.5 btg
2 61 pipa hitam d=5" 3.3 btg
2 62 pipa hitam d=5" 3.8 btg
2 63 pipa hitam d=6" 2.5 btg
2 64 pipa hitam d=6" 2.8 btg
2 65 pipa hitam d=8" 4.5 btg
2 66 pipa hitam d=8" 5.3 btg
2 67 pipa hitam d=10" 5.3 btg
2 68 pipa hitam d=10" 6.3 btg
2 69 pipa hitam 12" btg
2 70 pipa hitam 14" btg
2 71 pipa hitam 16" btg
2 72 pipa hitam 18"

3 PVC
3 1 PVC 4m d=0.5" btg
3 2 PVC 4m d=0.75" btg
3 3 PVC 4m d=0.1" btg
3 4 PVC 4m d=1.25" btg
3 5 PVC 4m d=1.5" btg
3 6 PVC 4m d=2" btg
3 7 PVC 4m d=3" btg
3 8 PVC 4m d=4" btg
3 9 PVC 4m d=1/2" WAVIN AW (10kg/cm²) btg
3 10 PVC 4m d=3/4" WAVIN AW (10kg/cm²) btg
3 11 PVC 4m d=1" WAVIN AW (10kg/cm²) btg
3 12 PVC 4m d=1 1/4" WAVIN AW (10kg/cm²) btg
3 13 PVC 4m d=1 1/2" WAVIN AW (10kg/cm²) btg
3 14 PVC 4m d=2" WAVIN AW (10kg/cm²) btg
3 15 PVC 4m d=2 1/2" WAVIN AW (10kg/cm²) btg
3 16 PVC 4m d=3" WAVIN AW (10kg/cm²) btg
3 17 PVC 4m d=4" WAVIN AW (10kg/cm²) btg
3 18 PVC 4m d=5" WAVIN AW (10kg/cm²) btg
3 19 PVC 4m d=6" WAVIN AW (10kg/cm²) btg
3 20 PVC 4m d=8" WAVIN AW (10kg/cm²) btg
3 21 PVC 4m d=10" WAVIN AW (10kg/cm²) btg
3 22 PVC 4m d=12" WAVIN AW (10kg/cm²) btg
3 23 PVC 4m d=1 1/4" WAVIN AW (5g/cm²) btg
3 24 PVC 4m d=1 1/2" WAVIN AW (5kg/cm²) btg
3 25 PVC 4m d=2" WAVIN AW (5kg/cm²) btg
3 26 PVC 4m d=2 1/2" WAVIN AW (5kg/cm²) btg
3 27 PVC 4m d=3" WAVIN AW (5kg/cm²) btg
3 28 PVC 4m d=4" WAVIN AW (5kg/cm²) btg
3 29 PVC 4m d=5" WAVIN AW (5kg/cm²) btg
3 30 PVC 4m d=6" WAVIN AW (5kg/cm²) btg
3 31 PVC 4m d=8" WAVIN AW (5kg/cm²) btg
3 32 PVC 4m d=10" WAVIN AW (5kg/cm²) btg
3 33 PVC 4m d=12" WAVIN AW (5kg/cm²) btg

4 Pipa PVC S-12.5 panjang 6m (MOF)


4 1 pipa d=1/2" m
4 2 pipa d=3/4" m
4 3 pipa d=1" m
4 4 pipa d=1 1/4" m
4 5 pipa d=1 1/2" m
4 6 pipa d=2" m
4 7 pipa d=2 1/2" m
4 8 pipa d=3" m
4 9 pipa d=4" m
4 10 pipa d=6" m
4 11 pipa d=8" m
4 12 pipa d=10" m
4 13 pipa d=12" m

5 Pipa PVC S-12.5 panjang 6m rubber ring


5 1 pipa d=2" m
5 2 pipa d=2.5" m
5 3 pipa d=3" m
5 4 pipa d=4" m
5 5 pipa d=6" m
5 6 pipa d=8" m
5 7 pipa d=10" m
5 8 pipa d=12" m
5 9 pipa d=14" m
5 10 pipa d=16" m

6 Pipa PVC S-10 panjang 6m (MOF)


6 1 pipa d=1/2" m
6 2 pipa d=3/4" m
6 3 pipa d=1" m
6 4 pipa d=1 1/4" m
6 5 pipa d=1 1/2" m
6 6 pipa d=2" m
6 7 pipa d=2 1/2" m
6 8 pipa d=3" m
6 9 pipa d=4" m
6 10 pipa d=6" m
6 11 pipa d=8" m
6 12 pipa d=10" m
6 13 pipa d=12" m

7 Pipa PVC S-10 panjang 6m rubber ring


7 1 pipa d=2" m
7 2 pipa d=2.5" m
7 3 pipa d=3" m
7 4 pipa d=4" m
7 5 pipa d=6" m
7 6 pipa d=8" m
7 7 pipa d=10" m
7 8 pipa d=12" m
7 9 pipa d=14" m
7 10 pipa d=16" m

8 Pipa PVC S-8 panjang 6m (MOF)


8 1 pipa d=1/2" m
8 2 pipa d=3/4" m
8 3 pipa d=1" m
8 4 pipa d=1 1/4" m

9 Pipa PVC S-8 panjang 6m rubber ring


9 1 pipa d=2" m
9 2 pipa d=2.5" m
9 3 pipa d=3" m
9 4 pipa d=4" m
9 5 pipa d=6" m
9 6 pipa d=8" m
9 7 pipa d=10" m
9 8 pipa d=12" m

10 Pipa stainless steel


10 1 pipa d=1/2" 0.8 STAR btg
10 2 pipa d=5/8" 0.8 STAR btg
10 3 pipa d=3/4" 0.8 STAR btg
10 4 pipa d=1" 0.8 STAR btg
10 5 pipa d=1 1/4" 0.8 STAR btg
10 6 pipa d=1 1/2" 0.8 STAR btg
10 7 pipa d=2" 0.8 STAR btg
10 8 pipa d=1/2" 1 STAR btg
10 9 pipa d=5/8" 1 STAR btg
10 10 pipa d=3/4" 1 STAR btg
10 11 pipa d=1" 1 STAR btg
10 12 pipa d=1 1/4" 1 STAR btg
10 13 pipa d=1 1/2" 1 STAR btg
10 14 pipa d=2" 1 STAR btg

38 1 Paving / conblock
1 1 abu abu tebal 6mm K200 btg
1 2 abu abu tebal 8mm K200 btg
1 3 type segi4 unit 6 tebal 8cm K400 btg
1 4 type uni dan segi4 tebal 8cm K300 btg
1 5 type uni dan segi4 tebal 6cm K300 btg
1 6 type segi4 tebal 8cm K200 btg
1 7 type segi6 tebal 6cm K200 btg
1 8 type segi6 tebal 8cm K200 btg

2 Warna merah / hitam


2 1 type segi4 unit segi8 tebal 8cm warna K400 btg
2 2 type segi4 tebal 8cm warna K000 btg
2 3 type segi4 tebal 6cm warna K200 btg
2 4 type segi4 tebal 8cm warna K200 btg
2 5 type segi6 tebal 6cm warna K200 btg
2 6 type segi8 tebal 8cm warna K200 btg
2 7 grass block bulat tebal 10cm btg
2 8 grass block tebal 10cm btg

39 Plastk gelombang lbr

40 Plamur
1 Plamur kayu jago btg
2 Plamur tembok acrilye btg
3 Plamur jenis sirsak kuning btg
4 Plamur putih batangan btg
5 Plamur kuning serbuk btg

41 Pernis
1 Politur jadi lt
2 Tek oli fuji lt
3 Pernis lt
4 Glass bit lt
5 Ter petin lt
6 Minyak cat lt
7 Tiner lt
8 Spiritus lt
9 Amplas lt
10 Batu apung kg
11 Teer lt

42 Plywood
1 900x2100x4 cm lb
2 1200x2400x4 cm lb

43 Seng Plat
1 Bj Ls 30 L60 ml
2 Bj Ls 20 L60 lbr ml
3 Bj Ls 30 L90 lbr ml
4 Bj Ls 20 L90 lbr ml

44 Seng Gelombang
1 Bj Ls 20 90x120 cm bj
2 Bj Ls 20 90x180 cm bj
3 Bj Ls 20 90x210 cm bj
4 Bj Ls 20 90x240 cm bj

45 Seng BJLS
1 Aluminium foil m²
2 Tek Wood 90x120 lb

46 Tanah Urug
1 Tanah Urug Biasa m³
2 Tanah Urug Pilihan m³
3 Sirtu m³

47 Tegel Keramik
1 Keramik Polos
1 1 Keramik 10x20 cm m²
1 2 Keramik 20x20 cm m²
1 3 Keramik 30x30 cm m²
1 4 Keramik 20x25 cm m²
1 5 Keramik 40x40 cm m²
1 6 Keramik Putih 30x30 cm m²

2 Keramik Bermotf
2 1 Keramik (25x25) dos
2 2 Keramik (20x20) dos
2 3 Keramik (8x20) bj
2 4 Keramik (20x25) dos
2 5 Keramik (20x25) dos
2 6 Keramik (8x20) bj

3 Keramik Berglazir
3 1 Keramik 10/20 Berglazir m²
3 2 Keramik 20/20 Berglazir m²
3 3 Keramik 30/30 Berglazir std m²
3 4 Keramik 40/40 Berglazir m²
3 5 Keramik 20/20 dan 30/30 putih m²
3 6 Keramik Mozaik m²

48 Triplek
1 Triplek 3mm lb
2 Multiplek 4mm lb
3 Multiplek 6mm lb
4 Multiplek 9mm lb
5 Multiplek 12mm lb

49 Material Listrik
1 Kabel NYM 2x2.5 mm² m
2 Kabel NYM 2x4 mm² m
3 Condensator bh

50 Bina Merga
1 Mortar semen/grout kg
2 Begel kalung bh
3 Baut 12mm bh
4 Drum aspal bh
5 Abu batu kg
6 Additive slurry seal lt
7 Aspal panas kg
8 Aspal emulsi type CRS-2 kg
9 Aspal emulsi type CRS-1 kg
10 Aspal emulsi type CRS-1 polymer kg
11 AC_WCL (bahan) ton
12 Batu bata (5x10x22) bh
13 Batu belah hitam m³
14 Cat dasar/meni kg
15 Cat thermoplastic kg
16 Conoblock segi6 6-6 cm m²
17 Elastobond kg
18 Filter rami m
19 Glass bead kg
20 Kapur pasang m³
21 Kerb k3 bh
22 Kerb k4 (devider) bh
23 Kawat bronjong (2x1x0,5) unit
24 Pasir urug m³
25 Primer lt
26 Rubber joint m
27 Sika grout 215 M kg
28 Sikadur 732-731 kg
29 Tegel kembang heksagon abu abu 30x30 cm m²
30 Air lt

51 Agregat
1 Agregat bahan m³
2 Agregat kasar m³
3 Asbuton halus ton
4 Agregat pecah mesin 0.5mm m³
5 Agregat pecah mesin 20-30mm m³
6 Agregat pecah mesin 5-10mm dan 10mm m³
7 Bahan agr. Base kelas A m³
8 Bahan agr. Base kelas B m³
9 Bahan agr. Base kelas C m³
10 Bahan agr. Base kelas C2 m³
11 Bahan agr. Base kelas S m³
12 Additive lt
13 Anchorage bh
14 Anti stripping agent lt
15 Arbocile kg
16 Arseliline bh
17 Bahan pengawet-kreosel lt

52 Beton
1 Beton K-125 m³
2 Beton K-175 m³
3 Beton K-250 m³
4 Beton K-300 m³
5 Beton K-350 m³
6 Beton K-400 m³
7 Beton K-500 m³
8 Casing m²

53 Chipping
1 Chipping m³
2 Chipping (kg) kg
3 Cerucuk d=10-15 cm m
4 Curing compond lt
5 Ducting (kabel presstres) m
6 Ducting (strand presstres) m
54 Elastomer
1 Elastomer jenis 1 (35x30x3,6)cm bh
2 Elastomer jenis 2 (45x35x3,9)cm bh
3 Elastomer jenis 3 (45x40x4,5)cm bh

55 Expansion
1 Expansion cap m²
2 Expansion joint baja siku m
3 Expansion joint tipe rubber m
4 Expansion joint tipe torma m
5 Expansion joint tipe asphaltic plug m

56 Glass
1 Glass bead kg
2 Joint sealent kg
3 Joint socket pile 16x16x16 set
4 Joint socket pile 35x35x35 set

57
1 Keru type A bh
2 Marmer nama jembatan bh
3 Mata kucing bh
4 Matras concrete (tebal-10) m²
5 Mini pile 16x16x16 m
6 Mini timber pile bh
7 Multiplek 12mm lbr
8 Oxygen (isi 6) btl

58 Portland Semen
1 Nusantara, Tiga roda portlan semen kg
2 Putih kg
3 Semen merah m³
4 Warna kg
5 Sekop pasir bh
6 Senggrong bh
7 Semen/PC (50kg) sak
8 Semen/PC kg
9 Filler cement kg

Beton Curah Slump


1 Mortar
2 BO 10±3
3 K100 10±4
4 K125 10±5
5 K150 10±6
6 K175 10±7
7 K200 10±8
8 K225 10±9
9 K250 10±10
10 K275 10±11
11 K300 10±12
12 K325 10±13
13 K350 10±14
14 K375 10±15
15 K400 10±16
16 K425 10±17
17 K450 10±18
18 K475 10±19
19 K500 10±20
20 Fs 45 10±21

*) Harga beton curah sampai ditempat dengan radius/jarak dari pabrik ke proyek 20km
Jika proyek lebih dari 20km, harga ditambah Rp30.000,- per m³
Alat kelengkapan lain seperti pompa dan feberator belum termasuk dalam harga tersebut

Sumber: Peraturan Gubernur DIY, No. 45 tahun 2015 Tentang Standar Harga Barang dan Ja
HARGA (Rp.)

27000

261000
462000
31000

10000
10000
10000
10000
9000
12000
10000

60000
55000
17000
107000
93000
84000
78000
73000
61000
15000
33000
21000
17000
14000
84000
78000
68000
60000
46000
49000
54000
17000
31000

38000
50000
37000
59000

1000
1000

3000

143000
158000
242000
248000
254000
261000
267000
14000
1775000

13000
12000
10000
11000
4000
14000
12000
19000
28000
11000
11000
11000
11000
11000
17000
18000

11000
11000
54000

31000
33000
38000
38000
47000
46000
41000
34000
44000
54000
82000
120000
98000
37000
49000

49000
52000
60000
24000
59000
59000
47000
21000
21000
50000
75000
57000
93000
27000
84000
38000
36000
46000
46000
77000
49000
17000
41000

1630000
489000
522000
326000
77000

24000
7000

15000
22000
27000
12000
10000

82000
49000

4000
4000
2000
2000
10000
12000
50000
9000
8000
12000
10000
13000
82000
6000

59000
79000
93000
104000

107000
142000
959000

68000
71000

176000
2550000
100000

33519000
33138000

g
26076000

16298000
15754000
4889000

40000
27000
170000

116000
80000
40000
20000

12495000
11408000

32000
23000
5000
4000

10000
6000
4000

9779000
9779000

27000
20000
5000
4000

5000
5000
3000

8149000
7062000

24000
16000
5000
4000

6000
4000
3000

5976000
5976000

6000
5000
17000
57000
12000
8000
11000
15000
56000

16000
15900
19000
22000
23000
22000
71000
19000
11000
17000
27000

15000
8000
6000
3000

361000
553000
728000
718000
420000
228000
813000
1064000

389000
560000
827000
807000
468000
582000
896000
1191000
540000
824000
1135000
1064000
652000
854000
1205000
1601000

322000
25000

207000

33000
27000

1087000
896000
1250000
1684000
2119000

82000
122000
87000
82000
82000

294000
288000
158000
27000

245000
27000
33000
3000
9000
109000

49000
58000
11000
6000

44000
47000
47000

14000
17000
23000
14000
13000
14000
14000
17000
20000
525
21000
1000
525
525
22000
26000
22000
14000
14000
16000
525
525

165000
150000
185000
108000
74000
107000
23000
30000
45000
60000
69000
93000
119000
154000
223000
409000
63000
71000
87000
10000
125000
112000
145000
225000
288000
332000
450000
372000
730000
1073000
1443000
1717000
2443000
85000
110000
110000
140000
173000
2062000
258000
332000
500000
793000
32000
42000
52000
39000
79000
98000
141000
261000
353000
26000
34000
50000
68000
82000
109000
173000
226000
322000
437000
565000
666000
873000
1015000
114000
1272000
1438000
1605000
1932000
125000
158000
22900
294000
348000
430000
718000
869000
1250000
2390000
50000
57000
28000
28000
50000
67000
74000
35000
68000
79000
109000
43000
78000
104000
112000
147000
54000
93000
117000
133000
147000
196000
71000
131000
152000
212000
169000
196000
298000
353000
190000
245000
304000
261000
299000
380000
592000
761000
1032000
4509000
5324000
6682000
7497000

15000
20000
26000
26000
29000
37000
59000
92000
15000
22000
28000
41000
44000
57000
83000
114000
189000
345000
435000
827000
1278000
1801000
27000
29000
37000
54000
73000
96000
195000
294000
389000
658000
924000

3000
4000
6000
9000
13000
20000
28000
41000
59000
126000
204000
320000
510000

22000
31000
43000
63000
131000
211000
330000
579000
678000
859000
3000
4000
10000
10000
16000
24000
34000
48000
73000
154000
260000
393000
625000

26000
37000
52000
101000
159000
259000
402000
638000
821000
1019000

4000
6000
9000
13000

34000
68000
10100

211000
331000
510000
816000

46000
58000
70000
90000
114000
137000
184000
56000
71000
86000
113000
142000
171000
229000

54000
54000
77000
72000
47000
68000
47000
68000

84000
79000
60000
79000
74000
79000
60000
60000

25000

23000
16000
6000
29000
22000

30000
26000
27000
24000
17000
17000
16000
9000
3000
11000
18000

90000
153000

21000
14000
32000
21000

39000
41000
44000
48000

13000
74000

39000
55000
78000

49000
49000
49000
46000
48000
46000

49000
49000
4000
49000
49000
4000

49000
49000
47000
52000
43000
60000

45000
57000
69000
102000
148000

6000
6000
131000

15000
22000
24000
462000
200
55000
11000
10000
10000
10000
1020000
800
133000
26000
45000
46000
56000
9000
26000
135000
46000
82000
265000
87000
19000
1122000
9000
148000
56000
100

236000
236000
1026000
181000
193000
162000
284000
281000
302000
302000
107000
66000
1543000
64000
33000
267000
5000

889000
1008000
1331000
1400000
1600000
1751000
1870000
27000

170000
3000
20000
40000
154000
52000
390000
476000
625000

7000
1095000
1386000
1405000
1894000

55000
37000
67000
598000

66000
411000
96000
181000
28000
140000
174000

2000
3000
9000
11000
28000
12000
66000
2000
1000

Harga per m³ *)

618000
714000
742000
769000
797000
824000
852000
879000
934000
934000
961000
989000
1023000
1058000
1092000
1126000
1167000
1209000
1236000

rga tersebut

ndar Harga Barang dan Jasa Daerah


DAFTAR HARGA UPAH PEKERJA TERPILIH

Nama Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

No Jenis Upah Satuan Harga (Rp)


1 Kepala Tukang Batu OH 70000
2 Kepala Tukang Besi OH 80000
3 Kepala Tukang Cat OH 75000
4 Kepala Tukang Kayu OH 80000
5 Kepala Tukang Politur OH 75000
6 Mandor OH 75000
7 Pekerja OH 60000
8 Tenaga gali tanah/pondasi OH 70000
9 Tukang batu OH 70000
10 Tukang besi OH 70000
11 Tukang cat OH 70000
12 Tukang kayu OH 70000
13 Tukang keramik OH 80000
14 Tukang listrik OH 75000
15 Tukang politur OH 70000
DAFTAR HARGA BAHAN BANGUNAN TERPILIH

Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

NO JENIS BAHAN/BARANG SATUAN


A AIR
Air Ltr
B BATU BATA
1 Batu bata 5 x 10 x 22 Bj
2 Bata berongga/rooster Bj
C BATU BELAH
1 Batu belah 15/20 m3
D PASIR
1 Pasir pasang progo m3
2 Pasir urug lokal (campur tanah) m3
3 Pasir beton (kasar) m3
4 Sirtu pilihan m3
E KERIKIL BETON
1 Kerikil beton biasa kg
F PORTLAND CEMEN (PC)
1 Portlan cemen (PC) kg
2 Semen Warna kg
G TEGEL/KERAMIK
1 Keramik 15x15 cm m2
2 Keramik 20x20 cm m2
3 Keramik 30x30 cm m2
4 Keramik 40x40 cm m2
Keramik bermotif
5 Keramik 50x50 cm m2(4/dos)
H KAYU JATI
1 Kayu jati papan kelas II m3
I KAYU KRUING
1 Kayu kruing balok m3
2 Kayu kruing papan m3
J KAYU GLUGU, DOLKEN , DAN BEKISTING
1 Kayu meranti balok m3
2 Kayu meranti papan m3
3 Kayu meranti papan btg
4 Kayu dolken m3
5 Plywood 900x2100x4 cm lb
6 Penjaga jarak bekisting Bh
7 Kayu glugu balok m3
K KLOSET
1 Kloset duduk lengkap INA Bj
L WASTAFEL
1 Wasrafel standar INA Bj
2 Bak cuci stainless steel Set
3 Water drain & assesoris Set
M SANITAIR
1 Kran air d:3/4 atau 1/2 Bh
2 Seal tape Bh
3 Floodrain Bh
N PIPA
Pipa PVC S- 12.5 panjang 6 m' (MOF)
1 Pipa diameter 1" M'
2 Pipa diameter 3" M'
3 Pipa diameter 4" M'
Knie Bh
O GENTENG
1 Genteng KIA warna Bj
2 Nok Atas bulat (C) type Prima Roof, P=40 cm Bh
P SENG
1 Seng BJLS 0.30 lembaran 60 cm lebar m
2 Profil Alumunium "T" m
Q KAPUR
1 Kapur pasang m3
2 GRC / Virsaboard Lb
3 Gypsum Board Lb
R KACA
1 Kaca Bening 5 mm m2
S CAT
1 Cat menie besi Kg
2 Cat menie kayu Kg
3 Cat Dasar Kayu Kg
4 Cat Baja Kg
5 Cat Tembok Dulux luar Kg
6 Minyak Bekisting lt
7 Plamur Kayu Jago Btg
8 Politur jadi Ltr
9 Thinner / pengencer Ltr
10 Lem kayu kg
11 Sealant kg
12 Amplas lbr
T KUAS
1 Kuas Roll Bh
2 Kuas 2,5" Bh
U BAJA & BESI
1 Baja WF Kg
2 Baja Strip ( 0,2 x 2 ) cm Kg
3 Besi Beton Kg
4 Baja Tulangan (polos) U24 Kg

V KAWAT
1 Kawat Beton / bindrat Kg
2 Kawat Nyamuk m
3 Pipa Galvanis diameter 1.5 tebal 1.6 mm 6 meter Batang
W BATU HALAMAN / PAVING BLOK
1 WARNA NATURAL / ABU-ABU
Type segi empat tebal 6 cm K200 btg
X BAHAN TUMBUHAN
1 Ijuk Ikat
Y PAKU
1 Paku Besar, sedang Kg
2 Paku Sekrup bh
3 Skrup fixer bh
PENGGANTUNG / PENGUNCI
1 Kunci silinder Bj
2 Kunci tanam besar Bj
3 Engsel kupu- kupu Bj
4 Engsel angin Bj
5 Engsel pintu Bj
6 Spring knip Bj
7 Kait angin Bj
8 Kunci slot Bj
Z DAFTAR HARGA SATUAN KOMPONEN LISTRIK
Kabel
1 Kabel NYA 1 x 2,5 mm m
2 Lampu PH Esensial 8W "Philips" Bh
3 Lampu PH Esensial 13W "Philips" Bh
4 Lampu PH Esensial 15W "Philips" Bh
5 Lampu PH Esensial 20W "Philips" Bh
Box Panel
1 Box Panel 20 x 40 x 50 Bh
Fitting
1 Fitting Duduk Bh
2 Stop kontak Bh
Lain-lain
1 Pengelasan cm
2 Isolasi bh
HARGA SATUAN (Rp)

27,000

1,000
15,000

143,000

165,000
150,000
185,000
108,000

207,000

2,000
11,000

49,000
49,000
49,000
52,000

123,500

24,827,000

7,062,000
8,149,000

5,976,000
5,976,000
105,000
100,000
90,000
20,000
4,500,000

1,081,000

294,000
158,000
27,000

33,000
3,000
9,000

6,000
41,000
59,000
3,000

9,000
37,000

21,000
75,000

6,000
140,800
57,000

79,000

12,000
12,000
17,000
60,000
93,000
15,000
23,000
30,000
16,000
30,000
25,000
3,000

15,000
6,000

13,000
19,800
14,000
11,000

17,000
16,000
145,000

54,000

6,000

14,000
525
3,500

70,000
33,000
20,000
20,000
20,000
22,000
3,500
35,000

6,500
31,500
35,500
38,500
41,500

145,000

5,000
240,000

13,650
2,464
ANALISA VOLUME PEKERJAAN

Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

No.

B
C

H
1
2

3
4
5

I
J
1
2
3
4
5

6
7
1
2
3
4
5

1
2
3
4

3
1
2
3

A.
1
M
1
3
4

TOTAL
PENGE
CATAN
PERMU
KAAN
BAJA
DENGA
N
MENIE
BESI
ANALISA VOLUME PEKERJAAN

Proyek : Rumah Tinggal 2 lantai


Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

Uraian Pekerjaan (sketsa)

PEKERJAAN GALIAN DAN TANAH


GALIAN TANAH PONDASI
Pondasi

Total volume galian tanah


PASIR URUG BAWAH PONDASI 5 CM
pondasi

Total volume pasir urug bawah pondasi


URUGAN TANAH KEMBALI

VOLUME TANAH URUG = 1/3 x GAlian tanah

PENINGGIAN TANAH

PASIR PASANG BAWAH LANTAI


PEKERJAAN PONDASI
ANSTAMPING / BATU KOSONGAN
Pondasi

Total volume anstamping


PONDASI BATU KALI CAMPURAN 1 PC : 3 KP : 10 PS
Total Volume Rabat Beton
PONDASI
Pondasi

total volume pondasi Lajur

PEMASANGAN LANTAI
Pemasangan Keramik 20x20
Pemasangan Keramik 50x50

Pemasangan Keramik 40x40


LT.2

Pemasangan Keramik 15x15


Pemasangan Keramik 30x30

PEKERJAAN PLAFOND
Pemasangan Gypsum Board
Pemasangan CalsiBoard
PEKERJAAN INSTALASI LISTRIK
Single Saklar
Double Saklar
Stop Kontak
Pemasangan Titik Lampu
Pemasangan Lampu
Lampu SL 8 wat
Lampu SL 10 wat
Lampu SL 13 wat
Lampu SL 20 wat
Pemasangan Meteran
Pemasangan Sekring
PEKERJAAN SANITAIR
Pemasangan Kloset Duduk
Pemasangan Wastafel
Pemasangan Shower
Pemasangan Kran Air
Pemasangan Floor Drain

PEKERJAAN INSTALASI AIR


Pemasangan PDAM dan pompa
Pemasangan sumur resapanair kotor
Pemasangan bak penampung lemak
Pemasangan septitank
Lanatai 1
Pipa air bersih Ø 1"

Pipa air kotor Ø 3"

Pipa kotoran Ø 4"


Lantai 2
Pipa air bersih Ø 1"

Pipa air kotor Ø 3"

Pipa kotoran Ø 4"


Pekerjaan Atap
Gunung-gunung 1 (kayu)
Gunung-gunung 2 (kayu)

Gunung-gunung 3 (kayu) (1/2 kuda-kuda)

Nook 8/12
Gording 8/12

Usuk 5/7

Reng 2/3
Pasang Genteng
Pasang Bubungan Atap

Pekerjaan Listplank 3/20

PEKERJAAN PERSIAPAN
PEKERJAAN PENGECATAN

LISPLANK

LIST PLAFOND
DINDING SEBELAH KIRI

DINDING SEBELAH KANAN

DINDING BELAKANG

DINDING DAPUR
DINDING RUANG TIDUR 1

DINDING KAMAR MANDI 1

DINDING RUANG TIDUR 2

DINDING KAMAR MANDI 2

DINDING RUANG TIDUR PEMBANTU

DINDING KAMAR MANDI 3

DINDING CARPORT
DINDING DEPAN

DINDING RUANG TIDUR 3

DINDING RUANG TIDUR 4

DINDING RUANG TAMU

DINDING KAMAR MANDI 4


DINDING RUANG KELUARGA

TO

PELABURAN 1M2 BIDANG KAYU DENGAN POLITUR

TOTAL PELABURAN 1M2


PENGECATAN PERMUKAAN BAJA DENGAN MENIE BESI

PEKERJAAN BETON BERTULANG


PEMASANGAN SLOOF 15/25
PEKERJAAN KOLOM
PEKERJAAN KOLOM 15/15

total kolm 15/15


PEKERJAAN KOLOM 25/25

PEKERJAAN RING BALK


PEKERJAAN RING BALK 25/40

Total Volume Ringbalk 15/20


PEKERJAAN RING BALK 20/30

PEKERJAAN DINDING DAN PLESTERAN


DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS
Trasram dinding
trasram dinding kamar mandi

total luas dinding trasram


DINDING BATA MERAH 1/2 BATU 1 PC : 3 PS : 10 KP
Dinding Bangunan
lantai 1

dikurangi lubang pintu dan jendela


PJ 1
PJ2
P1
P2
P3
J1
J2
V1
total
luas dinding lantai 1
lantai 2

dikurangi lubang pintu dan jendela lantai 2


P1
PJ1
P2
J2
J3
J4
total
luas dinding lantai 2
TOTAL VOLUME DINDING BANGUNAN
TOTAL VOLUME DINDING

PEKERJAAN PLESTERAN 1 PC : 3 PS TEBAL 1,5 CM


volume = 2x tembok trasram
PEKERJAAN PLESTERAN 1 PC : 3 KP : 10 PS TEBAL 1,5 CM
volume = 2x tembok bangunan

No.
G
1

6
Variable Dimensi Satuan Uraian Dimensi

panjang 72.80 m VERTIKAL


(1.00+130) 21.50 11.50 7.00
lebar /2=1.15 m
HORIZONTAL
tinggi 1.20 m 10.50 9.80 12.50

VERTIKAL
21.50 11.50 7.00
panjang 72.80 m
HORIZONTAL
lebar (1.00 +1.30) m 10.50 9.80 12.50
/2=1.15
tinggi 0.05 m

volume 110.22 m3

luas 69.75 m2
tinggi 0.20 m
luas 69.75 m2

tinggi 0.10 m

Panjang 72.80 m

Lebar 1.00 m

Tinggi 0.20 m

VERTIKAL
panjang 72.80 m 21.50 11.50 7.00

(0.3+0.8) HORIZONTAL
lebar /2 = 0.55 m 10.50 9.80 12.50

tinggi 0.80 m

panjang 1.1 m
lebar 2.7 m
1.05 m
3m

panjang 2.5 m
lebar 2m

panjang 2.2 m
lebar 0.85 m
0.51 m
0.7 m
panjang 2m
lebar 3m

panjang 4.5 m
lebar 3m
2.2 m
1.9 m
1.5 m
1.5 m

panjang 3m
lebar 4m
1m
2m
1.6 m
3m

panjang 3m
lebar 2.5 m

panjang 2.5 m
lebar 3m

panjang 3m
lebar 3.2 m

panjang 3m
lebar 3m
panjang 3m
lebar 3m

panjang 2.5 m
lebar 2.5 m

panjang 1.3 m
lebar 1.5 m

panjang 1.5 m
lebar 1.2 m

panjang 2.2 m
lebar 0.85 m

panjang 3m
lebar 1.3 m

panjang 2m
lebar 1.5 m
Panjang 13.75 m
Lebar 8.75 m
Panjang 28.5 m
Lebar 8.75 m
Panjang 16.5 m
Lebar 8.75 m

panjang 4.5 m
lebar 3m
2.2 m
1.9 m
1.5 m
1.5 m

panjang 3m
lebar 4m
1m
2m
1.6 m
3m
panjang 3m
lebar 2.5 m

panjang 2.5 m
lebar 3m

panjang 3m
lebar 3.2 m

panjang 3m
lebar 3m

panjang 3m
lebar 3m

panjang 2.5 m
lebar 2.5 m

panjang 1.3 m
lebar 1.5 m

panjang 1.5 m
lebar 1.2 m

panjang 2.2 m
lebar 0.85 m

panjang 3m
lebar 1.3 m

panjang 2m
lebar 1.5 m

panjang 2m
lebar 3m

panjang 1.1 m
lebar 2.7 m
1.05 m
3m

panjang 2.5 m
lebar 2m

panjang 2.2 m
lebar 0.85 m
0.51 m
0.7 m

jumlah 5 bh
jumlah 12 bh
jumlah 7 bh
jumlah 30 tk
jumlah
jumlah 4 bh
jumlah 11 bh
jumlah 7 bh
jumlah 8 bh
jumlah 1 bh
jumlah 1 bh
jumlah 3 bh
jumlah 3 bh
jumlah 4 bh
jumlah 4 bh
jumlah 4 bh

jumlah 1 bh
jumlah 1 bh
jumlah 1 bh
jumlah 1 bh

panjang 2.90 m
panjang 1.40 m
panjang 0.30 m
panjang 0.10 m
panjang 0.60 m
panjang 2.80 m
panjang 15.50 m
panjang 1.50 m
panjang 0.30 m
panjang 0.20 m
panjang 7.50 m
panjang 1.95 m
panjang 0.20 m
panjang 0.10 m

panjang 7.46 m
panjang 1.65 m
panjang 4.00 m
panjang 3.90 m
panjang 4.50 m
panjang 3.90 m
panjang 1.74 m

panjang 8.13 m
panjang 4.45 m
3.00
panjang 0.12 m
panjang 2.46 m
panjang 6.74 m
panjang 5.00 m
panjang 1.60 m
panjang 0.64 m
panjang 0.23 m
panjang 0.15 m

panjang 1.79 m
panjang 4.45 m
panjang 0.50 m
panjang 2.00 m
panjang 3.90 m

panjang 4.45 m
panjang 3.17 m
panjang 0.90 m
Panjang 11.511 m' 5.35 3.084 3.077
Tinggi 2.9 m'
Luas 33.3819 m2
Panjang 8.3 m' 3.85 2.2 2.25
Tinggi 1.1 m'
Luas 9.13 m2

Panjang 4.12 m' 1.9 1.1 1.12


Tinggi 0.56 m'
Luas 2.3072 m2

Panjang 5.061 m' 2 2 1.061


Luas 0.0096 m2 0.08 0.12
Panjang 12 m'
Luas 0.0096 m2 0.08 0.12
Panjang 188.8428 m'
Luas 0.0035 m2 0.05 0.07

Panjang 219.896 m'


Luas 0.0006 m2 0.02 0.03
Luas 101.83 m2 Lantai 1 Lantai 2
25.37 6.96 7.70 16.97 5.51 39.32
Panjang 5.061 m' 2 2 1.061
Luas 0.0096 m2 0.08 0.12

Panjang 30.3892 m' 5.56 7.56 2.0002 2.075 3.56 9.634


Luas 0.006 0.03 0.2

PEMBERSIHAN LOKASI
panjang 7 m
lebar 16 m
PENGECATAN BIDANG KAYU BARU
panjang 70.4 m

panjang 2.85 m
2.35 m

panjang 2.85 m

panjang 1.85 m
1.6 m

panjang 2.85 m

panjang 1.85 m
2.85 m

panjang 1.35 m
3.35 m

panjang 1.35 m
1.6 m
panjang 2.85 m
2.85 m
1.75 m
1.5 m
1.1 m

panjang 3.35 m
3.85 m
2 m
0.15 m
5 m

panjang 2.85 m
3 m
2.5 m
3.35 m
3 m

panjang 1.25 m
1.85 m
1.25 m
4.5 m

panjang 9.65
10.15
3
1
3.65
1
3
10.5
24.54
11.77
6
2
5.77

TOTAL
panjang 16 m
tinggi 7.5 m

panjang 16 m
tinggi 7.5 m
luas
m2
bukaan
m2

panjang 7 m
tinggi 7.5 m
luas
2.1 m2
bukaan
3.6 m2

panjang 3 m
tinggi 3.75 m
luas
1.5 m2
bukaan

panjang 2 m
tinggi 3.75 m
luas
0.8 m2
bukaan

panjang 3 m
tinggi 3.75 m
luas
0.8 m2
bukaan

panjang 3.2 m
tinggi 3.75 m
luas
0.9 m2
bukaan

panjang 1.3 m
tinggi 3.75 m

panjang 3 m
tinggi 3.75 m
luas
0.9 m2
bukaan
0.8 m2

panjang 2.5 m
tinggi 3.75 m

panjang 1.5 m
tinggi 3.75 m

panjang 2.5 m
tinggi 3.75 m
luas
0.9 m2
bukaan

panjang 2.5 m
tinggi 3.75 m

panjang 1.5 m
tinggi 3.75 m

panjang 4.5 m
tinggi 3.75 m
luas
1 m2
bukaan

panjang 3 m
tinggi 3.75 m
luas
1.4 m2
bukaan

panjang 7 m
tinggi 7.5 m
luas
2 m2
bukaan
1.2 m2
1.3 m2
2 m2
0.7 m2

panjang 3 m
tinggi 3.75 m
luas
0.9 m2
bukaan

panjang 3 m
tinggi 3.75 m

panjang 3 m
tinggi 3.75 m
luas
0.9 m2
bukaan

panjang 3 m
tinggi 3.75 m

panjang 2.5 m
tinggi 3.75 m
luas
2 m2
bukaan

panjang 3 m
tinggi 3.75 m

panjang 1.8 m
tinggi 3.75 m

panjang 2 m
tinggi 3.75 m
luas
0.8 m2
bukaan

panjang 3 m
tinggi 3.75 m
luas
1.85 m2
bukaan

panjang 4 m
tinggi 3.75 m
luas
2 m2
bukaan
0.74 m2
TOTAL PENGECATAN TEMBOK

panjang 1.2 m
tinggi 2.1 m

panjang 0.9 m
tinggi 2.1 m

ABURAN 1M2 BIDANG KAYU DENGAN POLITUR


tinggi 1.6 m
panjang 0.57 m
kaca 0.55 m2

tinggi 1.6 m
panjang 0.57 m
kaca 0.55 m2

tinggi 1.6 m
panjang 0.42 m
kaca 0.4 m2

tinggi 1.6 m
panjang 0.32 m
kaca 0.3 m2

tinggi 1.66 m
panjang 0.37 m
kaca 0.25 m2
VERTIKAL
panjang 72.80 m 21.50 11.50 7.00

HORIZONTAL
10.50 9.80 12.50

Lebar 0.15 m
tinggi 0.25 m 72.80

Panjang 0.15 m
Lebar 0.15 m
Tinggi 3.20 m 0.15

Panjang 0.25 m
Lebar 0.25 m
Tinggi 3.20 m 0.25

panjang 26.50 m HORIZONTAL


lebar 0.25 m 7.00 7.00 3.00 4.00 5.50
tinggi 0.40 m 26.50

VERTIKAL
8.00 6.00 6.00 3.00 4.00
panjang 27.00 m
lebar 0.20 m
tinggi 0.30 m 27.00

panjang 72.80 m VERTIKAL


tinggi 0.35 m
HORIZONTAL 72.80

panjang 6.68 m

tinggi 1.55 m 6.68

panjang 70.80 m VERTIKAL


16.00 16.00 9.00 4.50 3.00
5.90
HORIZONTAL
10.00 9.50 3.20 7.50 4.00
4.00
tinggi 3.20 m
70.80
jumlah luas
1.00 3.82 m2
1.00 2.59 m2
3.00 6.45 m2
3.00 5.16 m2
1.00 2.85 m2
2.00 2.14 m2
1.00 2.04 m2
1.00 0.21 m2
21.00 25.26 m2

panjang 70.80 m VERTIKAL


8.00 2.00 16.00 16.00

HORIZONTAL
14.00 4.80 6.00 4.00
tinggi 3.20 m
jumlah luas 70.80
2.00 4.30 m2
1.00 3.82 m2
1.00 1.70 m2
2.00 4.08 m2
1.00 3.67 m2
1.00 1.24 m2
volume 31.79 m2

volume 284.67 m2

Uraian PekVariabel Dimensi Satuan Uraian DimPanjang Lebar Tinggi Un/ L


PERSIAPAN PINTU JENDELA
Pemasangan Kunci Pintu Utama
PJ 1
Pemasangan Kunci Pintu Dalam
P1
Pemasangan Kunci Pintu Kamar Mandi
P2
Pemasangan Kunci Pintu Belakang
P3 ; PJ2
TOTAL
Pemasangan
Jenis PintuJumlah Pintu
Jumlah Engsel Tiap Pintu Jumlah Engsel per 1 Jenis Pintu
PJ1;PJ2;P1
P1 5 4 20
P2 4 2 8
P3 1 8 8
PJ1 2 8 16
PJ2 1 4 4
Jumlah Total 56
TOTAL
Pemasangan Jenis JendeJumlah Jen Jumlah Engsel per 1 Jenis Pintu
Jumlah Engsel Tiap Jendela
Engsel 1 Engsel 2 Engsel 1 Engsel 2
J1 2 0 0 0 0
J2 3 4 2 12 6
J3 1 0 0 0 0
J4 1 4 2 4 2
V1 1 0 0 0 0
Jumlah Total 16 8
TOTAL
PemasangaJenis PintuJumlah PinJumlah Handle Tiap PinJumlah Handle per 1 Jenis Pintu
P1 5 1 5
P2 4 1 4
P3 1 1 1
PJ1 2 1 2
PJ2 1 1 1
Jumlah Total 13
TOTAL
PemasangaJenis JendeJumlah JenJumlah Grendle Tiap Je Jumlah Grendle per 1 Jenis Jendela
J1 2 0 0
J2 3 2 6
J3 1 0 0
J4 1 2 2
V1 1 0 0
Jumlah Total 8
TOTAL
Keterangan Volume Terhitung
P L T Un/L Vol Satuan

72.80 1.15 1.20 100.46 m3

100.46 m3

72.80 1.15 0.05 4.19 m3

4.19 m3

36.74 m3

13.95 m3
6.98 m3

72.80 1.00 0.20 14.56 m3


14.56 m3

14.56 m3

72.80 0.55 0.80 1.00 32.03 m3


32.03 m3

3.7 1.1 4.07 m2

1.05 3 3.15 m2

2.5 2 5 m2

2.2 0.85 1.87 m2

0.51 0.7 0.357 m2


14.447 m2

2 3 6 m2

4.5 3 13.5 m2

2.2 1.9 4.18 m2

1.5 1.5 2.25 m2

3 4 12 m2

1 2 2 m2

1.6 3 4.8 m2

3 2.5 7.5 m2

52.23 m2

2.5 3 7.5 m2

3 0.2 0.6 m2

3 3 9 m2
3 3 9 m2

2.5 2.5 6.25 m2

1.3 1.5 1.95 m2

34.3 m2

1.5 1.2 1.8 m2

2.2 0.85 1.87 m2

3 1.3 3.9 m2

2 1.5 3 m2
10.57 m2

13.75 8.75 120.3125 m2

28.5 8.75 249.375 m2

16.5 8.75 144.375 m2

514.063 m2
615.0395 m2

4.5 3 13.5 m2

2.2 1.9 4.18 m2

1.5 1.5 2.25 m2

3 4 12 m2

1 2 2 m2

1.6 3 4.8 m2
3 2.5 7.5 m2

2.5 3 7.5 m2

3 0.2 0.6 m2

3 3 9 m2

3 3 9 m2

2.5 2.5 6.25 m2

1.3 1.5 1.95 m2

80.53 m2

1.5 1.2 1.8 m2

2.2 0.85 1.87 m2

3 1.3 3.9 m2

2 1.5 3 m2

2 3 6 m2

3.7 1.1 4.07 m2

1.05 3 3.15 m2

2.5 2 5 m2

2.2 0.85 1.87 m2


0.51 0.7 0.357 m2

31.017 m2
111.547 m2

5 5 bh
12 12 bh
7 7 bh
30 30 tk

4 4 bh
11 11 bh
7 7 bh
8 8 bh
1 1 bh
1 1 bh
3 3 bh
3 3 bh
4 4 bh
4 4 bh
4 4 bh

1 1 bh
1 1 bh
1 1 bh
1 1 bh

2.90 35.35 m
1.40
0.30
0.10
0.60
2.80
15.50
1.50
0.30
0.20
7.50
1.95
0.20
0.10

7.46 27.15 m
1.65
4.00
3.90
4.50
3.90
1.74

8.13 15.58 m
4.45
3.00
0.12 16.94 m
2.46
6.74
5.00
1.60
0.64
0.23
0.15

1.79 12.64 m
4.45
0.50
2.00
3.90

4.45 8.52 m
3.17
0.90
p = 5.35+3.084+3.077 11.511 0.05 33.3819 3.33819 m3

L = 11.511*2.9
p = 3.85+2.2+2.25 8.3 0.05 9.13 0.4565 m3

L = 8.3*1.1

p = 1.9+1.1+1.12 4.12 0.05 2.3072 0.11536 m3

L = 4.12*0.56

p = 2+2+1.061 5.061 0.0096 0.048586 m3


L = 0.08*0.12
p = 2+4+2+4 12 0.0096 0.1152 m3
L = 0.08*0.12
p = (3.798*4)+26.8828+18.568+(6 188.8428 0.0035 0.66095 m3
L = 0.05*0.07

p = 25.966+13.615+84.765+95.55 219.896 0.0006 0.131938 m3


L = 0.02*0.03
L = 25,37+6,96+7,70+16,97+5,51+39,32 101.83 m2
p = 2+2+1.061 5.061 0.0096 0.048586 m3
L = 0.08*0.12

p = 5.56+7.56+2.0002+2.075+3.5 30.3892 0.006 0.182335 m3


L = 0.03*0.20

106.9251

7 16 112 m2
70.4 70.4 m

2.85 2 10.4 m
2.35 2

2.85 4 11.4 m

1.85 2 6.9 m
1.6 2

2.85 4 11.4 m

1.85 2 9.4 m
2.85 2

1.35 2 9.4 m
3.35 2

1.35 2 5.9 m
1.6 2
2.85 1 10.05 m
2.85 1
1.75 1
1.5 1
1.1 1

3.35 1 14.35 m
3.85 1
2 1
0.15 1
5 1

2.85 1 14.7 m
3 1
2.5 1
3.35 1
3 1

1.25 1 8.85 m
1.85 1
1.25 1
4.5 1

9.65 1 92.03 m
10.15 1
3 1
1 1
3.65 1
1 1
3 1
10.5 1
24.54 1
11.77 1
6 1
2 1
5.77 1

275.18 m
275.18 m
16 2 240 m2
7.5

16 2 240 m2
7.5

7 2 105 m2
7.5

3 2 22.5 m2
3.75
3 2 22.5 m2
3.75

3 2 22.5 m2
3.75

3.2 2 24 m2
3.75

1.3 2 9.75 m2
3.75

3 2 22.5 m2
3.75

2.5 2 18.75 m2
3.75

1.5 2 11.25 m2
3.75

2 2 15 m2
3.75

2.5 2 18.75 m2
3.75

1.5 2 11.25 m2
3.75

4.5 2 33.75 m2
3.75
3 2 22.5 m2
3.75

7 2 105 m2
7.5

3 2 22.5 m2
3.75

3 2 22.5 m2
3.75

3 2 22.5 m2
3.75

3 2 22.5 m2
3.75

2.5 2 18.75 m2
3.75

3 2 22.5 m2
3.75

1.8 2 13.5 m2
3.75

2 2 15 m2
3.75
3 2 22.5 m2
3.75

4 2 30 m2
3.75

1157.25 m2

1.2 2.1 3 7.56 m2

0.9 2.1 6 11.34 m2

18.9 m2
0.57 1.6 3 2.736 m2

0.57 1.6 6 5.472 m2

0.42 1.6 5 3.36 m2

0.42 1.6 2 1.344 m2

0.42 1.6 5 3.36 m2

16.272 m2
0.15 0.25 1.00 2.73 m3

0.15 3.20 20.00 1.44 m3

#REF! m3

0.25 3.20 4.00 0.80 m3

0.25 0.40 2.65 m3

2.65 m3

0.20 0.30 1.62 m3


0.35 25.48 m2

1.55 10.35 m2

35.83 m2

3.20 226.56 m2

201.30 m2

3.20 226.56 m2
222.89 m2
424.19 m2
424.19 m2

2.00 63.58 m2

2.00 569.34 m2

Volume Satuan Keterangan

2 Buah

5 Buah

4 Buah

2 Buah
13 Total = 2+5+4+2

20 Buah
8 Buah
8 Buah
16 Buah
4 Buah

56 Buah Total = 20+8+8+16+4

Engsel 1 Engsel 2
0 0 Buah
12 6 Buah
0 0 Buah
4 2 Buah
0 0 Buah

16 8 Buah

Buah
Buah
Buah
Buah
Buah
Total = 5+4+1+2+1
13 Buah
Buah
Buah
Buah
Buah
Buah

8 Buah
Keterangan
Teras 1

Teras 2

Balkon

Teras Belakang
Dapur

Ruang Keluarga + Ruang Makan

Lorong R.keluarga + R. Makan 1

Lorong R. Keluarga + R. Makan 2

R. Keluarga

Lorong R.Keluarga 1

Lorong R.Keluarga 2

Ruang Tamu

Kamar Tidur 1

Kamar Tidur 2

Ruang Tidur
Ruang Tidur (2)

Kamar Pembantu

lorong dekat dapur

KM/WC

KM dekat dapur

Kamar mandi R.Tidur 2

Kamar Mandi R.Tidur 1


Tangga

Ruang Keluarga + Ruang Makan

Lorong R.keluarga + R. Makan 1

Lorong R. Keluarga + R. Makan 2

R. Keluarga

Lorong R.Keluarga 1

Lorong R.Keluarga 2
Ruang Tamu

Kamar Tidur 1

Kamar Tidur 2

Ruang Tidur

Ruang Tidur (2)

Kamar Pembantu

lorong dekat dapur

KM/WC

KM dekat dapur

Kamar mandi R.Tidur 2

Kamar Mandi R.Tidur 1

Dapur

Teras 1

Teras 2

Balkon
Teras Belakang
v = 33.3819*0.05*2
v = 9.13*0.4565*1

v = 2.3072*0.05*1

v = 5.061*0.0096
v = 12*0.0096

v = 188.8428*0.0035

v = 219.896*0.0006
v = 5.061*0.0096

v = 30.3892*0.006
J1

J2

J3

J4

PJ1
ANALISIS HARGA SATUAN
Proyek : Rumah Tinggal 2 lantai
Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

NO MACAM PEKERJAAN
PEKERJAAN DINDING

PENUTUP ATAP
O
P
R
elajar, km 8

MACAM PEKERJAAN

PASANG BATA MERAH TEBAL 1 BATA, 1Pc: 3Ps


Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

PASANG BATA MERAH TEBAL 1 BATA, 1Pc:4Ps


Bata Merah
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 m2 MEMASANG LANGIT-LANGIT ASBES SEMEN (2500x1100x5)mm


Asbes Semen
Paku Kecil
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEMASANGAN LANGIT-LANGIT TRIPLEKS UK. 120X240 TEBAL 3mm


Tripleks
Paku Kecil
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEMASANGAN 1m2 LANGIT-LANGIT GYPSUM BOARD


Gypsum Board
Paku Skrup
Pekerja
TukangKayu
Kepala Tukang Kayu
Mandor

PEMASANGAN LANGIT-LANGIT LIST GYIPSUM PROFIL


List Gypsum Profit
Tepung gypsum
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEMASANGAN PLAFON KARSI BOARD


Karsi Board
Paku Skrup
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BOW HARGA UPAH PEKERJA JUMLAH

140.00 Bh x Rp. 1,000.00 = Rp 140,000.00


32.95 Kg x Rp. 2,000.00 = Rp 65,900.00
0.09 m3 x Rp. 165,000.00 = Rp 15,015.00
0.65 OH x Rp. 60,000.00 = Rp 39,000.00
0.20 OH x Rp. 70,000.00 = Rp 14,000.00
0.02 OH x Rp. 70,000.00 = Rp 1,400.00
0.03 OH x Rp. 75,000.00 = Rp 2,250.00
Jumlah (belum PPN) Rp 277,565.00
Jasa 10% Rp 27,756.50
Jumlah Rp 305,321.50
Dibulatkan Rp 305,300.00

140.00 Bh x Rp. 1,000.00 = Rp 140,000.00


265.50 Kg x Rp. 2,000.00 = Rp 531,000.00
0.09 m3 x Rp. 165,000.00 = Rp 15,345.00
0.65 OH x Rp. 60,000.00 = Rp 39,000.00
0.20 OH x Rp. 70,000.00 = Rp 14,000.00
0.02 OH x Rp. 70,000.00 = Rp 1,400.00
0.03 OH x Rp. 75,000.00 = Rp 2,250.00
Jumlah (belum PPN) Rp 742,995.00
Jasa 10% Rp 74,299.50
Jumlah Rp 817,294.50
Dibulatkan Rp 817,300.00

1.10 lbr x Rp. 93000 = Rp. 102,300.00


0.01 kg x Rp. 17000 = Rp. 170.00
0.03 OH x Rp. 60000 = Rp. 1,800.00
0.07 OH x Rp. 70000 = Rp. 4,900.00
0.01 OH x Rp. 80000 = Rp. 800.00
0.0015 OH x Rp. 75000 = Rp. 112.50
Jumlah (belum PPN) 110,082.50
Jasa 10% 11,008.25
Jumlah 121,090.75
Dibulatkan 121,100.00
0.38 lbr x Rp. 45000 = Rp. 17,100.00
0.03 kg x Rp. 17000 = Rp. 510.00
0.10 OH x Rp. 60000 = Rp. 6,000.00
0.10 OH x Rp. 70000 = Rp. 7,000.00
0.01 OH x Rp. 80000 = Rp. 800.00
0.01 OH x Rp. 75000 = Rp. 750.00
Jumlah (belum PPN) 32,160.00
Jasa 10% 3,216.00
Jumlah 35,376.00
Dibulatkan 35,380.00

0.36 lbr x Rp. 57000 = Rp. 20,520.00


0.11 bh x Rp. 525 = Rp. 57.75
0.10 OH x Rp. 60000 = Rp. 6,000.00
0.05 OH x Rp. 70000 = Rp. 3,500.00
0.01 OH x Rp. 80000 = Rp. 800.00
0.01 OH x Rp. 75000 = Rp. 750.00
Jumlah (belum PPN) 31,627.75
Jasa 10% 3,162.78
Jumlah 34,790.53
Dibulatkan 34,790.00

1.05 m x Rp. 8000 = Rp. 8,400.00


0.15 kg x Rp. 5000 = Rp. 750.00
0.06 OH x Rp. 75000 = Rp. 4,500.00
0.06 OH x Rp. 70000 = Rp. 4,200.00
0.005 OH x Rp. 80000 = Rp. 400.00
0.003 OH x Rp. 75000 = Rp. 225.00
Jumlah (belum PPN) 18,475.00
Jasa 10% 1,847.50
Jumlah 20,322.50
Dibulatkan 20,323.00

0.36 lbr x Rp. 56000 = Rp. 20,160.00


0.11 bh x Rp. 525 = Rp. 57.75
0.1 OH x Rp. 60000 = Rp. 6,000.00
0.05 OH x Rp. 70000 = Rp. 3,500.00
0.005 OH x Rp. 80000 = Rp. 400.00
0.05 OH x Rp. 75000 = Rp. 3,750.00
Jumlah (belum PPN) 33,867.75
Jasa 10% 3,386.78
Jumlah 37,254.53
Dibulatkan 37,255.00
ANALISIS RAB
Proyek : Rumah Tinggal 2 lantai
Alamat : Jalan Palagan Tentara Pelajar, km 8
Kota : Sleman

HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN
PEKERJAAN PLAFOND
1 Pemasangan Gypsum Board 80.53 m2
2 Pemasangan Plafond Karsi Board 31.017 m2

PEKERJAAN PENUTUP ATAP


HARGA SATUAN
Rp JUMLAH HARGA (Rp)

34,790.00 Rp 2,801,638.70
37,255.00 Rp 1,155,538.34
Rp 3,957,177.04

Anda mungkin juga menyukai