Anda di halaman 1dari 119

RENCANA ANGGARAN BIAYA (RAB)

NO URAIAN PEKERJAAN BOBOT


1 2 3 4 5 6
I. PEKERJAAN PERSIAPAN
1 Pengukuran Lahan 0.00415 0.00415
2 Pembersihan Lahan 0.00415 0.00415
3 Direksi Keet 0.03647 0.03647
5 Gudang 0.00289 0.00289
6 Pemasangan Bowplang 0.00483 0.00483
7 Pagar Pengaman 0.00003 0.00003
8 Papan Proyek 0.00046 0.00046
9 Air Proyek 0.00041 0.00041
10 Listrik Kerja 0.00103 0.00103

II PEKERJAAN TANAH
1 Galian Pondasi Utuh (Batu Kali) 0.00571 0.00571
2 Galian Pondasi Setengah Tipe 1 (Batu Kali) 0.00149 0.00149
3 Galian Pondasi Setengah Tipe 2 (Batu Kali) 0.00098 0.00098
4 Galian Pondasi Rollag 0.00041 0.00041
5 Galian Pondasi Footplat 0.00372 0.00372
6 Galian Septic Tank 0.00024 0.00024
7 Galian Sumur Resapan 0.00008 0.00008
8 Urugan 0.07185 0.07185

III PEKERJAAN PONDASI


1 Pasir Urug 0.00084 0.00084
2 Aanstamping 0.00563 0.00563
3 Pondasi Utuh (Batu Kali) 0.03099 0.03099
4 Pondasi Setengah Tipe 1 (Batu Kali) 0.01162 0.01162
5 Pondasi Setengah Tipe 2 (Batu Kali) 0.01097 0.01097
6 Pondasi Rollag 0.00005 0.00005
7 Pondasi Footplat 0.01316 0.01316
8 Lantai Kerja 0.00054 0.00054

IV PEKERJAAN STRUKTUR LANTAI 1


1 Sloof 0.01610 0.0161
2 Kolom K1 0.02951 0.02951
3 Kolom K2 0.00836 0.00836
4 Balok B1 0.00932 0.00932
5 Balok B2 0.00794 0.00794
6 Tangga 0.00318 0.00318

V PEKERJAAN STRUKTUR LANTAI 2


1 Plat Lantai 0.05244
2 Dak Beton 0.00195
3 Balok Ampig 0.00151
4 Kolom K2 0.00930
5 Balok B2 0.00512
6 Ring Balok 0.00035

VI PEKERJAAN KUSEN LANTAI 1


1 Kusen Pintu 1 0.00063
2 Kusen Pintu 2 0.00062
3 Kusen Pintu 3 0.00004
4 Kusen Jendela 1 0.00029
5 Kusen Jendela 3 0.00106
6 Kusen Jendela 4 0.00057
7 Kusen Bouvenli 0.00033
8 Kusen Pintu Jendela 1 0.00158
9 Kusen Pintu Jendela 3 0.00068

VII PEKERJAAN KUSEN LANTAI 2


1 Kusen Pintu 1 0.00063
2 Kusen Pintu 2 0.00022
3 Kusen Jendela 1 0.00029
4 Kusen Jendela 2 0.00020
5 Kusen Jendela 3 0.00070
6 Kusen Jendela 4 0.00033
7 Kusen Pintu Jendela 1 0.00038
8 Bouvenli 0.00011
9 Kaca 0.00362
10 Daun Pintu 0.00857
11 Daun Jendela 0.00454

VIII PEKERJAAN DINDING LANTAI 1


1 Pas. Dinding Bata Merah 1:4 0.01871
Pas. Dinding Bata Merah 1:2 (Trasraam) 0.00547
2 Pas. Dinding Pagar Bata Merah 1:4 0.00425
3 Plesteran Dinding 1:4 0.01772
4 Plesteran Dinding1:2 0.00257
5 Plesteran Dinding1:4 0.00403
6 Acian Dinding 1:4 0.01036
7 Acian Dinding 1:2 0.00279

IX PEKERJAAN DINDING LANTAI 2


1 Pas. Dinding Bata Merah 1:4 0.01694
2 Pas. Dinding Bata Merah 1:2 (Trasraam) 0.00114
3 Plesteran Dinding 1:4 0.01604
4 Plesteran Dinding1:2 0.00053
5 Acian Dinding 1:4 0.00938
6 Acian Dinding 1:2 0.00058

X PEKERJAAN PENUTUP LANTAI 1


1 Pasangan Keramik Polos 40x40 0.03073 0.03073
2 Pasangan Keramik Granit 50x50 0.00427 0.03073
3 Pasangan Keramik 30x30 0.00150 0.0015
4 Pasangan Keramik Tangga 0.00046 0.00046
5 Pasangan Keramik 20x20 0.00283 0.00283
6 Batu Sikat 0.00642
7 Plin Lantai Keramik Polos 0.00062

XI PEKERJAAN PENUTUP LANTAI 2


1 Pasangan Keramik Polos 40x40 0.02595
2 Pasangan Keramik 20x20 0.00065
3 Plin Lantai Keramik Polos 0.00144

XII PEKERJAAN PLAFOND LANTAI 1


1 Rangka Plafond 0.02104
2 Penutup Plafond 0.00652
3 List Plafond 0.00666

XIII PEKERJAAN PLAFOND LANTAI 2


1 Rangka Plafond 0.01521
2 Penutup Plafond 0.00471
3 List Plafond 0.00341

XIV PEKERJAAN ATAP GENTENG


1 Penutup Atap Genteng 0.00961
2 Rangka Atap 0.02327
3 Bubungan 0.00097
4 Talang 0.00712
5 Lisplang 0.00002
6 Papan Ruiter 0.00001
7 Balok Nook 0.00001
8 Gording 0.00006
9 Balok Tembok 0.00005
10 Kuda-kuda 0.01119
11 Plat 0.00149
12 Baut 0.00423

XV PEKERJAAN PENGECATAN
1 Pengecatan Dinding 0.01614
2 Batu Alam 0.00068
3 Pengecatan Plafond 0.01153
4 Pengecatan Lisplang 0.00420
5 Pengecatan Kusen Pintu Dan Jendela 0.00450
6 Pengecatan Daun Pintu 0.00294
7 Pengecatan Daun Jendela 0.00156

XVI PEKERJAAN ME
1 Penangkal Petir 0.00074
2 Penyambung PLN 2400 W 0.00123
3 Stop Kontak 0.00204
4 Saklar Tunggal 0.00010
5 Saklar Seri 0.00010
6 Lampu Down Light 0.00388
7 Lampu TL 0.00064
8 Baret Bulat 0.00033
9 Lampu Taman 0.00034

XVII PEKERJAAN SANITASI


1 Pemasangan Instalasi Air Bersih 0.01968 0.01968
2 Pemasangan Instalasi Air Kotor 0.00638 0.00638
3 WC Duduk 0.00352 0.00352
4 WC Jongkok 0.00100 0.001
5 Wastafel 0.00189 0.00189
6 Bak Fiber 0.00097 0.00097
7 Kran Air 0.00103 0.00103
8 Floor Drain 0.00022 0.000222
9 Pompa Air 0.00023 0.00023
10 Tempat Sabun 0.00003 0.00003
11 Knee D 1/2" 0.00076 0.00076
12 Tee 1/2" 0.00001 0.00001
13 Pipa D 1/2" 0.00090 0.0009
14 Elbow D3" 0.00004 0.00004
15 Tee D 3" 0.00001 0.00001
16 Pipa D 3" 0.00593 0.00593
17 Kitcheb Sinks 0.00021
18 Bathtube 0.00191 0.00191

XVIIIPEKERJAAN ALAT PENGGANTUNG


1 Kunci Tanam Pintu Depan Dan Belakang 0.00083
2 Pegangan Pintu Depan Dan Belakang 0.00032
3 Kunci Tanam Pintu Depan Utama 0.00133
4 Kunci Tanam Pintu KM/WC 0.00125
5 Engsel Pintu 0.00184
6 Engsel Jendela 0.00155
7 Slot Pintu Depan Dan Belakang 0.00009
8 Slot Pintu KM/WC 0.00007
9 Slot Jendela 0.00044
10 Rel Handerson 0.00045
11 Railing Tangga 0.00153
12 Hak Angin 0.00058

XIX PEKERJAAN RUANG LUAR


1 Kolam 0.04727
2 Gazebo 0.00270
3 Tanaman semak hias 0.00315
4 Pohon Pelindung 0.00019
5 Atap Carport 0.11603
6 Carport 0.04056

BOBOT RENCANA 0.05442 0.11428 0.08616 0.056322 0.02044 0.06625


KOMULATIF BOBOT RENCANA 0.05442 0.1687 0.25486 0.311182 0.331622 0.397872
PELAKSANAAN
KOMULATIF PELAKSANAAN
MINGGU KE
7 8 9 10 11 12 13 14 15 16 17 18 19
`
0.05244
0.00195
0.00151
0.0093
0.00512
0.00035

0.00063
0.00062
0.00004
0.00029
0.00106
0.00057
0.00033
0.00158
0.00068
0.00063
0.00063
0.00029
0.00022
0.0007
0.00033
0.00038
0.00011
0.00362
0.00857
0.00454

0.01871
0.00547
0.00425
0.01772
0.00257
0.00403
0.01036
0.00279

0.01694
0.00114
0.01604
0.00053
0.00938
0.00058
0.00062

0.002595
0.00065
0.00144

0.02104
0.00652
0.00666

0.01521
0.00471
0.00341

0.00961
0.0237
0.00097
0.00712
0.00002
0.00001
0.00001
0.00006
0.00005
0.01119
0.00149
0.00423

0.01614
0.00068
0.01153
0.0042
0.0045
0.00294
0.00156

0.00074
0.00123
0.00204
0.0001
0.0001
0.00388
0.00064
0.00033
0.00034
0.00021

0.00083
0.00032
0.00133
0.00125
0.00184
0.00155
0.00009
0.00007
0.00044
0.00045
0.00153
0.00058
0.03 0.09 0.01 0.06 0.01604 0.00053 0.01828 0.03422 0.04073 0.01794 0.00108 0.02 0.04
0.43 0.52 0.53 0.59 0.61 0.61 0.63 0.66 0.70 0.72 0.72 0.75 0.79

-
KETERANGAN
20 21
0.00642
0.04727
0.0027
0.0035
0.00019
0.11603
0.04056

0.16 0.05
0.95 1.00
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LANTAI

NO. URAIAN+E575 KOEF/INDEKS SAT. HARGA SAT. (Rp.) JUMLAH (Rp.)


1 2 3 4 5 6=(3x5)
ABK Bangunan Gedung dan Perumahan Pekerjaan Persiapan
A002 1 zak
1 m' PC sementara
Pagar = 50 kg = 40dari
literseng
= 0.04 m3 = 1/25tinggi
gelombang m3 2 meter
maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a
Dolken 7 s/d 10 1.2500 Btg 31,000.00 38,750.00
a = Upah Pekerja Setempat (rupiah )
Semen
L PC
= Tiga10Roda
m1/ 50 kg = 0,01236 x a L = 0.0500 Zakdalam m1
Jarak angkut 73,750.00 3,687.50
L Gelombang
Seng = 50 BJLS
m1 28 = 0,01818 x a k = 1.2000
Harga angkutan
Lbr per m3 46,000.00 55,200.00
k
L = =a /275100( m1
L + = 75 ) 0,02545 x a (termasuk harga bahan3 dan peralatan angkut, bambu, dll)
Pasir beton 0.0050 M 258,000.00 1,290.00
L = 200 m1 = 0,04000 x a
Koral
L beton
= 300 m1 = 0,05454 x a 0.0090 M3 195,000.00 1,755.00
Kayu Albasia 0.0720 M3 1,260,000.00 90,720.00
Ket. : L = Jarak angkut dalam m1
Paku 4 cm s/d 7 cm 0.0600 Kg 15,000.00 900.00
a = Upah pekerja setempat ( Rupiah )
Meni Besi 0.4500 Kg 32,000.00 14,400.00
Tukang kayu 0.2000 OH 92,500.00 18,500.00
Pekerja 0.4000 OH 78,500.00 31,400.00
Kepala tukang 0.0200 OH 101,500.00 2,030.00
Mandor 0.0200 OH 110,500.00 2,210.00
Jumlah 260,842.50
Keuntungan Max. 26,084.25
Jumlah 286,926.75
Dibulatkan 286,920.00
A004 1 m' Pengukuran dan pemasangan bouwplank
Kayu Balok Borneo Super 0.0120 M3 4,700,000.00 56,400.00
Paku 4 cm s/d 7 cm 0.0200 Kg 15,000.00 300.00
Kayu Albasia 0.0070 M3 1,260,000.00 8,820.00
Tukang kayu 0.1000 OH 92,500.00 9,250.00
Pekerja 0.1000 OH 78,500.00 7,850.00
Kepala tukang 0.0100 OH 101,500.00 1,015.00
Mandor 0.0050 OH 110,500.00 552.50
Jumlah 84,187.50
Keuntungan Max. 8,418.75
Jumlah 92,606.25
Dibulatkan 92,600.00
A005 1 m2 Pembuatan kantor sementara, dengan lantai plesteran
Dolken 7 s/d 10 1.2500 Btg 31,000.00 38,750.00
Kayu Balok Borneo Super 0.1800 M3 4,700,000.00 846,000.00
Kayu Albasia 0.8500 Kg 1,260,000.00 1,071,000.00
Plat Besi 2 mm s/d 5 mm 1.1000 Kg - -
Semen PC Tiga Roda / 50 kg 0.7000 Zak 73,750.00 51,625.00
Pasir pasang 0.1500 M3 195,000.00 29,250.00
Pasir beton 0.1000 M3 258,000.00 25,800.00
Koral beton 0.1500 M3 195,000.00 29,250.00
Bata Merah Bakar Kelas II 30.0000 Bh 700.00 21,000.00
Seng Gelombang BJLS 28 0.2500 Lbr 46,000.00 11,500.00
Nako Lengkap Tralis 1 Daun 2.0000 Bh 75,000.00 150,000.00
Kaca Polos 5 mm ( ASAHI ) 0.0800 M2 95,000.00 7,600.00
Kunci 2 Slaag ROYAL 0.1500 Bh 90,000.00 13,500.00
Triplek 4 mm 120 x 240 0.0600 Lbr 61,850.00 3,711.00
Tukang kayu 2.0000 OH 92,500.00 185,000.00
Tukang batu 1.0000 OH 92,500.00 92,500.00
Pekerja 2.0000 OH 78,500.00 157,000.00
Kepala tukang 0.3000 OH 101,500.00 30,450.00
Mandor 0.0500 OH 110,500.00 5,525.00
Jumlah 2,769,461.00
Keuntungan Max. 276,946.10
Jumlah 3,046,407.10
Dibulatkan 3,046,400.00
A006 1 m2 Pembuatan gudang semen dan alat-alat
Dolken 7 s/d 10 1.7000 Btg 31,000.00 52,700.00
Kayu Albasia 0.2100 M3 1,260,000.00 264,600.00
Paku 4 cm s/d 7 cm 0.3000 Kg 15,000.00 4,500.00
Semen PC Tiga Roda / 50 kg 0.2100 Zak 73,750.00 15,487.50
Pasir beton 0.0300 M3 258,000.00 7,740.00
Koral beton 0.0500 M3 195,000.00 9,750.00
Seng Gelombang BJLS 28 1.5000 Lbr 46,000.00 69,000.00
Tukang kayu 2.0000 OH 92,500.00 185,000.00
Pekerja 1.0000 OH 78,500.00 78,500.00
Kepala tukang 0.2000 OH 101,500.00 20,300.00
Mandor 0.0500 OH 110,500.00 5,525.00
Jumlah 713,102.50
Keuntungan Max. 71,310.25
Jumlah 784,412.75
Dibulatkan 784,410.00
A008 1 m2 Membersihkan lapangan dan peralatan
Pekerja 0.1000 OH 78,500.00 7,850.00
Mandor 0.0500 OH 110,500.00 5,525.00
Jumlah 13,375.00
Keuntungan Max. 1,337.50
Jumlah 14,712.50
Dibulatkan 14,710.00
A011 1 m2 Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm
Bambu Ø 5 s.d 7 1.0000 Btg 15,500.00 15,500.00
Injuk 0.2500 Kg 5,675.00 1,418.75
Tukang kayu 0.0170 OH 92,500.00 1,572.50
Pekerja 0.0020 OH 78,500.00 157.00
Kepala tukang 0.2500 OH 101,500.00 25,375.00
Mandor 0.0130 OH 110,500.00 1,436.50
Jumlah 45,459.75
Keuntungan Max. 4,545.98
Jumlah 50,005.73
Dibulatkan 50,000.00
ABK bangunan gedung dan perumahan pekerjaan tanah
B001 1 m3 Galian tanah biasa sedalam 1 meter
Pekerja 0.7500 OH 78,500.00 58,875.00
Mandor 0.0250 OH 110,500.00 2,762.50
Jumlah 61,637.50
Keuntungan Max. 6,163.75
Jumlah 67,801.25
Dibulatkan 67,800.00
B002 1 m3 Galian tanah biasa sedalam 2 meter
Pekerja 0.9000 OH 78,500.00 70,650.00
Mandor 0.0450 OH 110,500.00 4,972.50
Jumlah 75,622.50
Keuntungan Max. 7,562.25
Jumlah 83,184.75
Dibulatkan 83,180.00
B009 1 m3 Urugan kembali galian
Pekerja 0.3333 OH 78,500.00 26,166.67
Mandor 0.0107 OH 110,500.00 1,178.67
Jumlah 27,345.33
Keuntungan Max. 2,734.53
Jumlah 30,079.87
Dibulatkan 30,070.00
B010 1 m3 Pemadatan tanah
Pekerja 0.5000 OH 78,500.00 39,250.00
Mandor 0.0500 OH 110,500.00 5,525.00
Jumlah 44,775.00
Keuntungan Max. 4,477.50
Jumlah 49,252.50
Dibulatkan 49,250.00
B011 1 m3 Urugan pasir urug
Pasir Urug 1.2000 M3 100,000.00 120,000.00
Pekerja 0.3000 OH 78,500.00 23,550.00
Mandor 0.0100 OH 110,500.00 1,105.00
Jumlah 144,655.00
Keuntungan Max. 14,465.50
Jumlah 159,120.50
Dibulatkan 159,120.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Pondasi
C005 1 m3 Pas. pondasi batu belah, 1 PC : 4 PP
Batu Belah Pondasi uk 15-25 cm 1.2000 M3 205,000.00 246,000.00
Semen PC Tiga Roda / 50 kg 3.2600 Zak 73,750.00 240,425.00
Pasir pasang 0.5200 M3 195,000.00 101,400.00
Pekerja 1.5000 Oh 78,500.00 117,750.00
Tukang batu 0.7500 Oh 92,500.00 69,375.00
Kepala tukang 0.0750 Oh 101,500.00 7,612.50
Mandor 0.0750 Oh 110,500.00 8,287.50
Jumlah 790,850.00
Keuntungan Max. 79,085.00
Jumlah 869,935.00
Dibulatkan 869,930.00
C012 1 m3 Pas. batu kosong (anstamping)
Batu Belah Pondasi uk 15-25 cm 1.2000 M3 205,000.00 246,000.00
Pasir Urug 0.4320 M3 100,000.00 43,200.00
Pekerja 0.7800 Oh 78,500.00 61,230.00
Tukang batu 0.3900 Oh 92,500.00 36,075.00
Kepala tukang 0.0390 Oh 101,500.00 3,958.50
Mandor 0.0390 Oh 110,500.00 4,309.50
Jumlah 394,773.00
Keuntungan Max. 39,477.30
Jumlah 434,250.30
Dibulatkan 434,250.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Dinding
D009 1 M2 Pasangan bata merah tebal 1/2 bata, 1 PC : 2 PP
Bata Merah Bakar Kelas I 70.0000 Bh 775.00 54,250.00
Semen PC Tiga Roda / 50 kg 0.3790 Zak 73,750.00 27,951.25
Pasir Pasang 0.0380 M3 195,000.00 7,410.00
Pekerja 0.3000 Oh 78,500.00 23,550.00
Tukang Batu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0150 Oh 110,500.00 1,657.50
Jumlah 125,083.75
Keuntungan Max. 12,508.38
Jumlah 137,592.13
Dibulatkan 137,590.00
D011 1 M2 Pasangan bata merah tebal 1/2 bata, 1 PC : 4 PP
Bata Merah Bakar Kelas I 70.0000 Bh 775.00 54,250.00
Semen PC Tiga Roda / 50 kg 0.2300 Zak 73,750.00 16,962.50
Pasir Pasang 0.0430 M3 195,000.00 8,385.00
Pekerja 0.3000 Oh 78,500.00 23,550.00
Tukang Batu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0150 Oh 110,500.00 1,657.50
Jumlah 115,070.00
Keuntungan Max. 11,507.00
Jumlah 126,577.00
Dibulatkan 126,570.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Plesteran
E002 1 M2 Plesteran 1 PC : 2 PP, tebal 15 mm
Semen PC Tiga Roda / 50 kg 0.2045 Zak 73,750.00 15,080.40
Pasir pasang 0.0200 M3 195,000.00 3,900.00
Pekerja 0.3000 Oh 78,500.00 23,550.00
Tukang Batu 0.1500 Oh 92,500.00 13,875.00
Kepala tukang 0.0150 Oh 101,500.00 1,522.50
Mandor 0.0150 Oh 110,500.00 1,657.50
Jumlah 59,585.40
Keuntungan Max. 5,958.54
Jumlah 65,543.94
Dibulatkan 65,540.00
E004 1 M2 Plesteran 1 PC : 4 PP, tebal 15 mm
Semen PC Tiga Roda / 50 kg 0.1248 Zak 73,750.00 9,204.00
Pasir pasang 0.0240 M3 195,000.00 4,680.00
Pekerja 0.3000 Oh 78,500.00 23,550.00
Tukang Batu 0.1500 Oh 92,500.00 13,875.00
Kepala tukang 0.0150 Oh 101,500.00 1,522.50
Mandor 0.0150 Oh 110,500.00 1,657.50
Jumlah 54,489.00
Keuntungan Max. 5,448.90
Jumlah 59,937.90
Dibulatkan 59,930.00
E037 1 M2 Plesteran sisir adukan, 1 PC : 2 PP
Semen PC Tiga Roda / 50 kg 0.0864 Zak 73,750.00 6,372.00
Pasir pasang 0.0160 M3 195,000.00 3,120.00
Pekerja 0.1500 Oh 78,500.00 11,775.00
Tukang Batu 0.0700 Oh 92,500.00 6,475.00
Kepala tukang 0.0070 Oh 101,500.00 710.50
Mandor 0.0080 Oh 110,500.00 884.00
Jumlah 29,336.50
Keuntungan Max. 2,933.65
Jumlah 32,270.15
Dibulatkan 32,270.00
E042 1 M2 Pas. Acian
Semen PC Tiga Roda / 50 kg 0.0650 Zak 73,750.00 4,793.75
Pekerja 0.2000 Oh 78,500.00 15,700.00
Tukang Batu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0100 Oh 110,500.00 1,105.00
Jumlah 31,863.75
Keuntungan Max. 3,186.38
Jumlah 35,050.13
Dibulatkan 35,050.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Kayu
F003 1 M3 Pasang kusen pintu dan jendela kayu borneo (kayu kelas II atau III)
Kayu Balok Borneo Super 1.2000 M3 4,700,000.00 5,640,000.00
Paku 8 cm s/d 12 cm 1.2500 Kg 15,000.00 18,750.00
Lem Kayu 1.0000 Kg 15,500.00 15,500.00
Pekerja 6.0000 Oh 78,500.00 471,000.00
Tukang kayu 18.0000 Oh 92,500.00 1,665,000.00
Kepala tukang 1.8000 Oh 101,500.00 182,700.00
Mandor 0.3000 Oh 110,500.00 33,150.00
Jumlah 8,026,100.00
Keuntungan Max. 802,610.00
Jumlah 8,828,710.00
Dibulatkan 8,828,710.00
F012 1 M2 Pasang pintu dan jendela kaca kayu borneo (kayu kelas I atau II)
Kayu Papan Borneo Super 0.0240 M3 5,600,000.00 134,400.00
Lem Kayu 0.3000 Kg 15,500.00 4,650.00
Pekerja 0.8000 Oh 78,500.00 62,800.00
Tukang kayu 2.4000 Oh 92,500.00 222,000.00
Kepala tukang 0.2400 Oh 101,500.00 24,360.00
Mandor 0.0400 Oh 110,500.00 4,420.00
Jumlah 452,630.00
Keuntungan Max. 45,263.00
Jumlah 497,893.00
Dibulatkan 497,890.00
F031 1 M3 Pasang konstruksi kuda-kuda konvensional, kayu borneo (kayu kelas I, II dan III) bentang 6 m
Kayu Balok Borneo Super 1.1000 M3 4,700,000.00 5,170,000.00
Besi Beugel kuda - kuda 15.0000 Kg 19,250.00 288,750.00
Paku 8 cm s/d 12 cm 5.6000 Kg 15,000.00 84,000.00
Pekerja 4.0000 Oh 78,500.00 314,000.00
Tukang kayu 12.0000 Oh 92,500.00 1,110,000.00
Kepala tukang 1.2000 Oh 101,500.00 121,800.00
Mandor 0.2000 Oh 110,500.00 22,100.00
Jumlah 7,110,650.00
Keuntungan Max. 711,065.00
Jumlah 7,821,715.00
Dibulatkan 7,821,710.00
F036 1 M2 Pasang rangka atap (kaso + reng) genteng keramik, kayu borneo (kayu kelas II)
Kayu Balok Borneo Super 0.0176 M3 4,700,000.00 82,720.00
Paku 4 cm s/d 7 cm 0.2500 Kg 15,000.00 3,750.00
Pekerja 0.1000 Oh 78,500.00 7,850.00
Tukang kayu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0050 Oh 110,500.00 552.50
Jumlah 105,137.50
Keuntungan Max. 10,513.75
Jumlah 115,651.25
Dibulatkan 115,650.00
F046 1 M2 Pasang rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Kaso-kaso 5/7 (Balok) Kayu (Kelas II atau III) 0.0163 M3 4,700,000.00 76,610.00
Paku 8 cm s/d 12 cm 0.2500 Kg 15,000.00 3,750.00
Pekerja 0.2000 Oh 78,500.00 15,700.00
Tukang kayu 0.3000 Oh 92,500.00 27,750.00
Kepala tukang 0.0300 Oh 101,500.00 3,045.00
Mandor 0.0100 Oh 110,500.00 1,105.00
Jumlah 127,960.00
Keuntungan Max. 12,796.00
Jumlah 140,756.00
Dibulatkan 140,750.00
F055 1 M2 Pasang lisplang ukuran 2x(2 x 20) cm, Kayu borneo
Kayu Papan Borneo Super 0.0088 M3 5,600,000.00 49,280.00
Paku 4 cm s/d 7 cm 0.0600 Kg 15,000.00 900.00
Pekerja 0.1000 Oh 78,500.00 7,850.00
Tukang kayu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0500 Oh 110,500.00 5,525.00
Jumlah 73,820.00
Keuntungan Max. 7,382.00
Jumlah 81,202.00
Dibulatkan 81,200.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Beton
G013 1 M3 Membuat beton bertulang 1 PC : 2 PB : 3 KR
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Koral Beton 0.8100 M3 195,000.00 157,950.00
Pekerja 2.0000 Oh 78,500.00 157,000.00
Tukang batu 0.3500 Oh 92,500.00 32,375.00
Kepala tukang 0.0350 Oh 101,500.00 3,552.50
Mandor 1.0000 Oh 110,500.00 110,500.00
Jumlah 1,096,297.50
Keuntungan Max. 109,629.75
Jumlah 1,205,927.25
Dibulatkan 1,205,920.00
G038 1 M3 Lantai kerja beton mutu f'c = 7,4 MPa (K 100)
Semen PC Tiga Roda / 50 kg 4.6000 Zak 73,750.00 339,250.00
Pasir Beton 0.6379 M3 258,000.00 164,567.14
Batu Pecah Mesin 2/3 0.7607 M3 237,500.00 180,675.93
Pekerja 1.2000 Oh 78,500.00 94,200.00
Tukang batu 0.2000 Oh 92,500.00 18,500.00
Kepala tukang 0.0200 Oh 101,500.00 2,030.00
Mandor 0.0600 Oh 110,500.00 6,630.00
Jumlah 805,853.07
Keuntungan Max. 80,585.31
Jumlah 886,438.38
Dibulatkan 886,430.00
G048 1 M3 Membuat pondasi beton bertulang (150 kg besi + bekisting)
Kayu Albasia 0.2000 M3 1,260,000.00 252,000.00
Paku 4 cm s/d 7 cm 1.5000 Kg 15,000.00 22,500.00
Plus Oil 0.4000 Lt 21,300.00 8,520.00
Besi Beton U-24 Rata - Rata ( Polos ) 157.5000 Kg 9,500.00 1,496,250.00
Kawat Beton 2.2500 Kg 17,600.00 39,600.00
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Batu Pecah Mesin 2/3 0.8100 M3 237,500.00 192,375.00
Pekerja 5.3000 Oh 78,500.00 416,050.00
Tukang batu 0.2750 Oh 92,500.00 25,437.50
Tukang kayu 1.3000 Oh 92,500.00 120,250.00
Tukang Besi Beton 1.0500 Oh 92,500.00 97,125.00
Kepala tukang 0.2620 Oh 101,500.00 26,593.00
Mandor 0.2650 Oh 110,500.00 29,282.50
Jumlah 3,360,903.00
Keuntungan Max. 336,090.30
Jumlah 3,696,993.30
Dibulatkan 3,696,990.00
G049 1 M3 Membuat sloof beton bertulang (200 kg besi + bekisting)
Kayu Albasia 0.2700 M3 1,260,000.00 340,200.00
Paku 4 cm s/d 7 cm 2.0000 Kg 15,000.00 30,000.00
Plus Oil 0.6000 Lt 21,300.00 12,780.00
Besi Beton U-24 Rata - Rata ( Polos ) 210.0000 Kg 9,500.00 1,995,000.00
Kawat Beton 3.0000 Kg 17,600.00 52,800.00
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Batu Pecah Mesin 2/3 0.8100 M3 237,500.00 192,375.00
Pekerja 5.6500 Oh 78,500.00 443,525.00
Tukang batu 0.2750 Oh 92,500.00 25,437.50
Tukang kayu 1.5600 Oh 92,500.00 144,300.00
Tukang Besi Beton 1.4000 Oh 92,500.00 129,500.00
Kepala tukang 0.3230 Oh 101,500.00 32,784.50
Mandor 0.2830 Oh 110,500.00 31,271.50
Jumlah 4,064,893.50
Keuntungan Max. 406,489.35
Jumlah 4,471,382.85
Dibulatkan 4,471,380.00
G050 1 M3 Membuat kolom beton bertulang (300 kg besi + bekisting)
Kayu Albasia 0.4000 M3 1,260,000.00 504,000.00
Paku 4 cm s/d 7 cm 4.0000 Kg 15,000.00 60,000.00
Plus Oil 2.0000 Lt 21,300.00 42,600.00
Besi Beton U-24 Rata - Rata ( Polos ) 315.0000 Kg 9,500.00 2,992,500.00
Kawat Beton 4.5000 Kg 17,600.00 79,200.00
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Batu Pecah Mesin 2/3 0.8100 M3 237,500.00 192,375.00
Kayu Balok Borneo Super 0.1500 M3 4,700,000.00 705,000.00
Multiplek 9 mm 120 x 240 3.5000 Lbr 128,000.00 448,000.00
Dolken 7 s/d 10 20.0000 Btg 31,000.00 620,000.00
Pekerja 7.0500 Oh 78,500.00 553,425.00
Tukang batu 0.2750 Oh 92,500.00 25,437.50
Tukang kayu 1.6500 Oh 92,500.00 152,625.00
Tukang Besi Beton 2.1000 Oh 92,500.00 194,250.00
Kepala tukang 0.4030 Oh 101,500.00 40,904.50
Mandor 0.3530 Oh 110,500.00 39,006.50
Jumlah 7,284,243.50
Keuntungan Max. 728,424.35
Jumlah 8,012,667.85
Dibulatkan 8,012,660.00
G051 1 M3 Membuat balok beton bertulang (200 kg besi + bekisting)
Kayu Albasia 0.3200 M3 1,260,000.00 403,200.00
Paku 4 cm s/d 7 cm 3.2000 Kg 15,000.00 48,000.00
Plus Oil 1.6000 Lt 21,300.00 34,080.00
Besi Beton U-24 Rata - Rata ( Polos ) 210.0000 Kg 9,500.00 1,995,000.00
Kawat Beton 3.0000 Kg 17,600.00 52,800.00
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Batu Pecah Mesin 2/3 0.8100 M3 237,500.00 192,375.00
Kayu Balok Borneo Super 0.1400 M3 4,700,000.00 658,000.00
Multiplek 9 mm 120 x 240 2.8000 Lbr 128,000.00 358,400.00
Dolken 7 s/d 10 16.0000 Btg 31,000.00 496,000.00
Pekerja 6.3500 Oh 78,500.00 498,475.00
Tukang batu 0.2750 Oh 92,500.00 25,437.50
Tukang kayu 1.6500 Oh 92,500.00 152,625.00
Tukang Besi Beton 1.4000 Oh 92,500.00 129,500.00
Kepala tukang 0.3330 Oh 101,500.00 33,799.50
Mandor 0.3180 Oh 110,500.00 35,139.00
Jumlah 5,747,751.00
Keuntungan Max. 574,775.10
Jumlah 6,322,526.10
Dibulatkan 6,322,520.00
G052 1 M3 Membuat plat beton bertulang (150 kg besi + bekisting)
Kayu Albasia 0.3200 M3 1,260,000.00 403,200.00
Paku 4 cm s/d 7 cm 3.2000 Kg 15,000.00 48,000.00
Plus Oil 1.6000 Lt 21,300.00 34,080.00
Besi Beton U-24 Rata - Rata ( Polos ) 157.5000 Kg 9,500.00 1,496,250.00
Kawat Beton 2.2500 Kg 17,600.00 39,600.00
Semen PC Tiga Roda / 50 kg 6.7200 Zak 73,750.00 495,600.00
Pasir Beton 0.5400 M3 258,000.00 139,320.00
Batu Pecah Mesin 2/3 0.8100 M3 237,500.00 192,375.00
Kayu Balok Borneo Super 0.1200 M3 4,700,000.00 564,000.00
Multiplek 9 mm 120 x 240 2.8000 Lbr 128,000.00 358,400.00
Dolken 7 s/d 10 32.0000 Btg 31,000.00 992,000.00
Pekerja 5.3000 Oh 78,500.00 416,050.00
Tukang batu 0.2750 Oh 92,500.00 25,437.50
Tukang kayu 1.3000 Oh 92,500.00 120,250.00
Tukang Besi Beton 1.0500 Oh 92,500.00 97,125.00
Kepala tukang 0.2650 Oh 101,500.00 26,897.50
Mandor 0.2650 Oh 110,500.00 29,282.50
Jumlah 5,477,867.50
Keuntungan Max. 547,786.75
Jumlah 6,025,654.25
Dibulatkan 6,025,650.00
G046 1 M' Membuat ring balok beton bertulang (10 x 15) cm
Kayu Albasia 0.0030 M3 1,260,000.00 3,780.00
Paku 4 cm s/d 7 cm 0.0200 Kg 15,000.00 300.00
Besi Beton U-24 Rata - Rata ( Polos ) 3.6000 Kg 9,500.00 34,200.00
Kawat Beton 0.0500 Kg 17,600.00 880.00
Semen PC Tiga Roda / 50 kg 0.1100 Zak 73,750.00 8,112.50
Pasir Beton 0.0090 M3 258,000.00 2,322.00
Batu Pecah Mesin 2/3 0.0150 M3 237,500.00 3,562.50
Pekerja 0.2970 Oh 78,500.00 23,314.50
Tukang batu 0.0330 Oh 92,500.00 3,052.50
Tukang kayu 0.0330 Oh 92,500.00 3,052.50
Tukang Besi Beton 0.0330 Oh 92,500.00 3,052.50
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0150 Oh 110,500.00 1,657.50
Jumlah 88,301.50
Keuntungan Max. 8,830.15
Jumlah 97,131.65
Dibulatkan 97,130.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Penutup Atap
H003 1 M2 Pasang atap genteng palentong super / besar
Genteng Plentong Jatiwangi 12.0000 Buah 2,050.00 24,600.00
Pekerja 0.1500 Oh 78,500.00 11,775.00
Tukang kayu 0.0600 Oh 92,500.00 5,550.00
Kepala tukang 0.0060 Oh 101,500.00 609.00
Mandor 0.0080 Oh 110,500.00 884.00
Jumlah 43,418.00
Keuntungan Max. 4,341.80
Jumlah 47,759.80
Dibulatkan 47,750.00
H006 1 M' Pasang bubung genteng palentong besar
Genteng bubung Palentong 4.0000 Buah 3,000.00 12,000.00
Semen PC Tiga Roda / 50 kg 0.1600 Zak 73,750.00 11,800.00
Pasir Pasang 0.0320 M3 195,000.00 6,240.00
Pekerja 0.4000 Oh 78,500.00 31,400.00
Tukang kayu 0.2000 Oh 92,500.00 18,500.00
Kepala tukang 0.0200 Oh 101,500.00 2,030.00
Mandor 0.0020 Oh 110,500.00 221.00
Jumlah 82,191.00
Keuntungan Max. 8,219.10
Jumlah 90,410.10
Dibulatkan 90,410.00
H041 1 M2 Pasang seng talang
Seng Talang 1.2000 M2 40,000.00 48,000.00
Paku hak panjang 15 cm 0.0400 Kg 32,000.00 1,280.00
Pekerja 0.1000 Oh 78,500.00 7,850.00
Tukang kayu 1.0000 Oh 92,500.00 92,500.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0100 Oh 110,500.00 1,105.00
Jumlah 151,750.00
Keuntungan Max. 15,175.00
Jumlah 166,925.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Langit-Langit
I023 1 M2 Langit-langit gypsum board, tebal 9 mm
Gypsum 120 x 240 t = 9 mm ex DN 0.3640 Lbr 65,750.00 23,933.00
Paku sekrup 0.1100 Kg 20,000.00 2,200.00
Pekerja 0.1000 Oh 78,500.00 7,850.00
Tukang kayu 0.0500 Oh 92,500.00 4,625.00
Kepala tukang 0.0050 Oh 101,500.00 507.50
Mandor 0.0050 Oh 110,500.00 552.50
Jumlah 39,668.00
Keuntungan Max. 3,966.80
Jumlah 43,634.80
Dibulatkan 43,630.00
I024 1 M' List plafond gypsum profil
List gypsum profil 1.0500 M' 24,000.00 25,200.00
Dempul Gipsum (Compound) 0.1500 Zak 92,000.00 13,800.00
Pekerja 0.0600 Oh 78,500.00 4,710.00
Tukang kayu 0.0600 Oh 92,500.00 5,550.00
Kepala tukang 0.0060 Oh 101,500.00 609.00
Mandor 0.0030 Oh 110,500.00 331.50
Jumlah 50,200.50
Keuntungan Max. 5,020.05
Jumlah 55,220.55
Dibulatkan 55,220.00
ABK Bangunan gedung dan perumahan pekerjaan sanitasi
J001 Memasang 1 buah kloset duduk/monoblok
Closet Duduk Warna Standard lengkap INA 1.0000 bh 1,341,650.00 1,341,650.00
Perlengkapan 0.0600 lot 250,500.00 15,030.00
Pekerja 3.3000 oh 78,500.00 259,050.00
Tukang batu 1.1000 oh 92,500.00 101,750.00
Kepala tukang 0.0110 oh 101,500.00 1,116.50
Mandor 0.1600 oh 110,500.00 17,680.00
Jumlah 1,736,276.50
Keuntungan Max. 173,627.65
Jumlah 1,909,904.15
Dibulatkan 1,909,900.00
J003 Memasang 1 buah kloset jongkok teraso
Kloset jongkok teraso 1.0000 bh 1,200,000.00 1,200,000.00
Bata Merah Bakar Kelas II 7.0000 bh 700.00 4,900.00
Semen PC Tiga Roda / 50 kg 0.1200 Zak 73,750.00 8,850.00
Pasir pasang 0.0100 m3 195,000.00 1,950.00
Pekerja 1.0000 oh 78,500.00 78,500.00
Tukang batu 1.5000 oh 92,500.00 138,750.00
Kepala tukang 0.3000 oh 101,500.00 30,450.00
Mandor 0.1100 oh 110,500.00 12,155.00
Jumlah 1,475,555.00
Keuntungan Max. 147,555.50
Jumlah 1,623,110.50
Dibulatkan 1,623,110.00
J005 Memasang 1 buah wastafel
Wastafel Lengkap INA 1.0000 bh 650,000.00 650,000.00
Perlengkapan 0.1200 lot 150,500.00 18,060.00
Semen PC Tiga Roda / 50 kg 0.1200 Zak 73,750.00 8,850.00
Pasir Pasang 0.0100 m3 195,000.00 1,950.00
Pekerja 1.2000 oh 78,500.00 94,200.00
Tukang batu 1.4500 oh 92,500.00 134,125.00
Kepala tukang 0.1500 oh 101,500.00 15,225.00
Mandor 0.1000 oh 110,500.00 11,050.00
Jumlah 933,460.00
Keuntungan Max. 93,346.00
Jumlah 1,026,806.00
Dibulatkan 1,026,800.00
J017 Memasang 1 buah bak kontrol pasangan batu bata ukuran (45x45) cm tinggi 50 cm
Bata Merah Bakar Kelas II 0.2500 m3 700.00 175.00
Semen PC Tiga Roda / 50 kg 1.5400 Zak 73,750.00 113,575.00
Pasir pasang 0.1300 m3 195,000.00 25,350.00
Batu Pecah Mesin 2/3 0.0200 m3 237,500.00 4,750.00
Besi Beton U-24 Rata - Rata ( Polos ) 2.6000 kg 9,500.00 24,700.00
Pasir Beton 0.0900 m3 258,000.00 23,220.00
Pekerja 1.4200 oh 78,500.00 111,470.00
Tukang batu 0.4730 oh 92,500.00 43,752.50
Kepala tukang 0.0470 oh 101,500.00 4,770.50
Mandor 0.0710 oh 110,500.00 7,845.50
Jumlah 359,608.50
Keuntungan Max. 35,960.85
Jumlah 395,569.35
Dibulatkan 395,560.00
J025 Memasang 1 m' pipa PVC tipe AW diameter ½"
Pipa PVC MASPION ABU Ø 1/2" (AW) 1.2000 m' 26,900.00 32,280.00
Perlengkapan 0.3500 lot 31,770.00 11,119.50
Pekerja 0.0360 oh 78,500.00 2,826.00
Tukang batu 0.0600 oh 92,500.00 5,550.00
Kepala tukang 0.0060 oh 101,500.00 609.00
Mandor 0.0018 oh 110,500.00 198.90
Jumlah 52,583.40
Keuntungan Max. 5,258.34
Jumlah 57,841.74
Dibulatkan 57,840.00
J026 Memasang 1 m' pipa PVC tipe AW diameter ¾"
Pipa PVC MASPION ABU Ø 3/4" (AW) 1.2000 m' 31,700.00 38,040.00
Perlengkapan 0.3500 lot 31,770.00 11,119.50
Pekerja 0.0360 oh 78,500.00 2,826.00
Tukang batu 0.0600 oh 92,500.00 5,550.00
Kepala tukang 0.0060 oh 101,500.00 609.00
Mandor 0.0018 oh 110,500.00 198.90
Jumlah 58,343.40
Keuntungan Max. 5,834.34
Jumlah 64,177.74
Dibulatkan 64,170.00
J031 Memasang 1 m' pipa PVC tipe AW diameter 3"
Pipa PVC MASPION ABU Ø 3" (AW) 1.2000 m' 193,900.00 232,680.00
Perlengkapan 0.3500 lot 31,770.00 11,119.50
Pekerja 0.0810 oh 78,500.00 6,358.50
Tukang batu 0.1350 oh 92,500.00 12,487.50
Kepala tukang 0.0135 oh 101,500.00 1,370.25
Mandor 0.0041 oh 110,500.00 453.05
Jumlah 264,468.80
Keuntungan Max. 26,446.88
Jumlah 290,915.68
Dibulatkan 290,910.00
J032 Memasang 1 m' pipa PVC tipe AW diameter 4"
Pipa PVC MASPION ABU Ø 4" (AW) 1.2000 m' 275,250.00 330,300.00
Perlengkapan 0.3500 lot 31,770.00 11,119.50
Pekerja 0.0810 oh 78,500.00 6,358.50
Tukang batu 0.1350 oh 92,500.00 12,487.50
Kepala tukang 0.0350 oh 101,500.00 3,552.50
Mandor 0.0041 oh 110,500.00 453.05
Jumlah 364,271.05
Keuntungan Max. 36,427.11
Jumlah 400,698.16
Dibulatkan 400,690.00
J033 Memasang 1 bh bak cuci piring stainles steel
Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.0000 m' 177,625.00 177,625.00
Water drain + asesories 1.0000 set 100,000.00 100,000.00
Pekerja 0.0300 oh 78,500.00 2,355.00
Tukang batu 0.3000 oh 92,500.00 27,750.00
Kepala tukang 0.0300 oh 101,500.00 3,045.00
Mandor 0.0015 oh 110,500.00 165.75
Jumlah 310,940.75
Keuntungan Max. 31,094.08
Jumlah 342,034.83
Dibulatkan 342,030.00
J035 Memasang 1 bh kran diameter ¾"atau ½"
Kran Tembok San Ei dia. 1/2 " 1.0000 bh 120,000.00 120,000.00
Seal tape 0.0250 bh 3,000.00 75.00
Pekerja 0.0100 oh 78,500.00 785.00
Tukang batu 0.1000 oh 92,500.00 9,250.00
Kepala tukang 0.0100 oh 101,500.00 1,015.00
Mandor 0.0050 oh 110,500.00 552.50
Jumlah 131,677.50
Keuntungan Max. 13,167.75
Jumlah 144,845.25
Dibulatkan 144,840.00
J036 Memasang 1 bh floor drain
Saringan Air Lt KM Stainless Steel 1.0000 bh 71,050.00 71,050.00
Pekerja 0.0100 oh 78,500.00 785.00
Tukang batu 0.1000 oh 92,500.00 9,250.00
Kepala tukang 0.0100 oh 101,500.00 1,015.00
Mandor 0.0050 oh 110,500.00 552.50
Jumlah 82,652.50
Keuntungan Max. 8,265.25
Jumlah 90,917.75
Dibulatkan 90,910.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Besi dan Alumunium
K019 1 M2 Pasang terali besi strip (2 x 3) mm
Plat Besi 2 mm s/d 5 mm 6.1770 Kg - -
Pengelasan 27.0800 Cm 1,898.00 51,397.84
Pekerja 1.6700 Oh 78,500.00 131,095.00
Tukang las 1.6700 Oh 92,500.00 154,475.00
Kepala tukang 0.1670 Oh 101,500.00 16,950.50
Mandor 0.0830 Oh 110,500.00 9,171.50
Jumlah 363,089.84
Keuntungan Max. 36,308.98
Jumlah 399,398.82
Dibulatkan 399,390.00
K020 1 M2 Pasang kawat harmonika
Kawat Harmonika 2 cm 1.1000 M2 22,350.00 24,585.00
Paku 1 cm s/d 3 cm 0.0200 Kg 20,714.29 414.29
Kayu Papan Kamper Banjar 0.0018 M3 9,000,000.00 16,200.00
Pekerja 0.1000 Oh 78,500.00 7,850.00
Tukang kayu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0005 Oh 110,500.00 55.25
Jumlah 59,369.54
Keuntungan Max. 5,936.95
Jumlah 65,306.49
Dibulatkan 65,300.00
K025 1 M' Pasang talang datar/jurai seng bjls 30 lebar 90 cm
Seng BJLS 30 lebar 90cm (1 rol 50 m' ) 1.0500 M' 40,500.00 42,525.00
Paku 1 cm s/d 3 cm 0.0150 Kg 20,714.29 310.71
Kayu Papan Borneo Super 0.0190 M3 5,600,000.00 106,400.00
Pekerja 0.2000 Oh 78,500.00 15,700.00
Tukang kayu 0.4000 Oh 92,500.00 37,000.00
Kepala tukang 0.0250 Oh 101,500.00 2,537.50
Mandor 0.0100 Oh 110,500.00 1,105.00
Jumlah 205,578.21
Keuntungan Max. 20,557.82
Jumlah 226,136.04
Dibulatkan 226,130.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Kunci dan Kaca
L001 1 Buah Pasang kunci tanam antik
Kunci tanam antik 1.0000 Bh 85,000.00 85,000.00
Pekerja 0.0600 Oh 78,500.00 4,710.00
Tukang kayu 0.6000 Oh 92,500.00 55,500.00
Kepala tukang 0.0600 Oh 101,500.00 6,090.00
Mandor 0.0030 Oh 110,500.00 331.50
Jumlah 151,631.50
Keuntungan Max. 15,163.15
Jumlah 166,794.65
Dibulatkan 166,790.00
L002 1 Buah Pasang kunci tanam biasa
Kunci tanam biasa 1.0000 Bh 75,000.00 75,000.00
Pekerja 0.0100 Oh 78,500.00 785.00
Tukang kayu 0.5000 Oh 92,500.00 46,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0050 Oh 110,500.00 552.50
Jumlah 123,602.50
Keuntungan Max. 12,360.25
Jumlah 135,962.75
Dibulatkan 135,960.00
L003 1 Buah Pasang kunci tanam kamar mandi
Kunci KM Bulat ALFA 1.0000 Bh 55,825.00 55,825.00
Pekerja 0.0050 Oh 78,500.00 392.50
Tukang kayu 0.5000 Oh 92,500.00 46,250.00
Kepala tukang 0.0050 Oh 101,500.00 507.50
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 103,251.25
Keuntungan Max. 10,325.13
Jumlah 113,576.38
Dibulatkan 113,570.00
L005 1 Buah Pasang engsel pintu
Engsel Pintu Unilon Standard besar 5" 1.0000 Bh 40,000.00 40,000.00
Pekerja 0.0150 Oh 78,500.00 1,177.50
Tukang kayu 0.1500 Oh 92,500.00 13,875.00
Kepala tukang 0.0150 Oh 101,500.00 1,522.50
Mandor 0.0008 Oh 110,500.00 82.88
Jumlah 56,657.88
Keuntungan Max. 5,665.79
Jumlah 62,323.66
Dibulatkan 62,320.00
L006 1 Buah Pasang engsel jendela kupu-kupu
Engsel Jendela Unilon 1.0000 Bh 25,850.00 25,850.00
Pekerja 0.0100 Oh 78,500.00 785.00
Tukang kayu 0.1000 Oh 92,500.00 9,250.00
Kepala tukang 0.0100 Oh 101,500.00 1,015.00
Mandor 0.0005 Oh 110,500.00 55.25
Jumlah 36,955.25
Keuntungan Max. 3,695.53
Jumlah 40,650.78
Dibulatkan 40,650.00
L009 1 Buah Pasang kait angin
Kait angin 1.0000 Bh 12,000.00 12,000.00
Pekerja 0.0150 Oh 78,500.00 1,177.50
Tukang kayu 0.1500 Oh 92,500.00 13,875.00
Kepala tukang 0.0150 Oh 101,500.00 1,522.50
Mandor 0.0008 Oh 110,500.00 82.88
Jumlah 28,657.88
Keuntungan Max. 2,865.79
Jumlah 31,523.66
Dibulatkan 31,520.00
L012 1 Buah Pasang pegangan pintu/door holder
Door holder 1.0000 Bh 75,500.00 75,500.00
Pekerja 0.0500 Oh 78,500.00 3,925.00
Tukang kayu 0.5000 Oh 92,500.00 46,250.00
Kepala tukang 0.0500 Oh 101,500.00 5,075.00
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 131,026.25
Keuntungan Max. 13,102.63
Jumlah 144,128.88
Dibulatkan 144,120.00
L014 1 Buah Pasang rel pintu dorong
Rel pintu dorong 1.0000 Bh 78,000.00 78,000.00
Pekerja 0.0600 Oh 78,500.00 4,710.00
Tukang kayu 0.6000 Oh 92,500.00 55,500.00
Kepala tukang 0.0600 Oh 101,500.00 6,090.00
Mandor 0.0030 Oh 110,500.00 331.50
Jumlah 144,631.50
Keuntungan Max. 14,463.15
Jumlah 159,094.65
Dibulatkan 159,000.00
L016 1 M2 Pasang kaca, tebal 3 mm
Kaca Polos 3 mm ( ASAHI ) 1.1000 M2 85,000.00 93,500.00
Pekerja 0.0150 Oh 78,500.00 1,177.50
Tukang kayu 0.1500 Oh 92,500.00 13,875.00
Kepala tukang 0.0150 Oh 101,500.00 1,522.50
Mandor 0.0008 Oh 110,500.00 82.88
Jumlah 110,157.88
Keuntungan Max. 11,015.79
Jumlah 121,173.66
Dibulatkan 121,170.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Penutup Lantai dan Dinding
M001 1 M2 Pasang lantai ubin PC abu-abu ukuran 40x40 cm
Ubin abu-abu 40x40 cm 6.6300 Bh 46,000.00 304,980.00
Semen PC Tiga Roda / 50 kg 0.1960 Zak 73,750.00 14,455.00
Pasir pasang 0.0450 M3 195,000.00 8,775.00
Pekerja 0.2500 Oh 78,500.00 19,625.00
Tukang batu 0.1250 Oh 92,500.00 11,562.50
Kepala tukang 0.0130 Oh 101,500.00 1,319.50
Mandor 0.0130 Oh 110,500.00 1,436.50
Jumlah 362,153.50
Keuntungan Max. 36,215.35
Jumlah 398,368.85
Dibulatkan 398,360.00
M002 1 M2 Pasang lantai ubin PC abu-abu ukuran 30x30 cm
Ubin abu-abu 30x30 cm 1.1000 Bh 42,100.00 46,310.00
Semen PC Tiga Roda / 50 kg 0.2000 Zak 73,750.00 14,750.00
Pasir pasang 0.0450 M3 195,000.00 8,775.00
Pekerja 0.2600 Oh 78,500.00 20,410.00
Tukang batu 0.1300 Oh 92,500.00 12,025.00
Kepala tukang 0.0130 Oh 101,500.00 1,319.50
Mandor 0.0130 Oh 110,500.00 1,436.50
Jumlah 105,026.00
Keuntungan Max. 10,502.60
Jumlah 115,528.60
Dibulatkan 115,520.00
M007 1 M2 Pasang lantai ubin teraso ukuran 40x40 cm
Ubin teraso 40x40 cm 6.6300 Bh 46,000.00 304,980.00
Semen PC Tiga Roda / 50 kg 0.1960 Zak 73,750.00 14,455.00
Pasir pasang 0.0450 M3 195,000.00 8,775.00
Semen warna 1.3000 Kg 11,900.00 15,470.00
Pekerja 0.2500 Oh 78,500.00 19,625.00
Tukang batu 0.1250 Oh 92,500.00 11,562.50
Kepala tukang 0.0130 Oh 101,500.00 1,319.50
Mandor 0.0130 Oh 110,500.00 1,436.50
Jumlah 377,623.50
Keuntungan Max. 37,762.35
Jumlah 415,385.85
Dibulatkan 415,380.00
M016 1 M' Pasang plint ubin PC abu-abu ukuran 15x20 cm
Plint ubin 15x20 cm 5.3000 Bh 32,000.00 169,600.00
Semen PC Tiga Roda / 50 kg 0.0330 Zak 73,750.00 2,433.75
Pasir pasang 0.0040 M3 195,000.00 780.00
Pekerja 0.0900 Oh 78,500.00 7,065.00
Tukang batu 0.0900 Oh 92,500.00 8,325.00
Kepala tukang 0.0090 Oh 101,500.00 913.50
Mandor 0.0050 Oh 110,500.00 552.50
Jumlah 189,669.75
Keuntungan Max. 18,966.98
Jumlah 208,636.73
Dibulatkan 208,630.00
M044 1 M2 Pasang lantai keramik ukuran 20x20 cm
Keramik 20 x 20 (KM) KWI DN Putih Polos 1.0500 M2 52,000.00 54,600.00
Semen PC Tiga Roda / 50 kg 0.2080 Zak 73,750.00 15,340.00
Pasir pasang 0.0450 M3 195,000.00 8,775.00
Semen warna 1.6200 Kg 11,900.00 19,278.00
Pekerja 0.7000 Oh 78,500.00 54,950.00
Tukang batu 0.3500 Oh 92,500.00 32,375.00
Kepala tukang 0.0350 Oh 101,500.00 3,552.50
Mandor 0.0350 Oh 110,500.00 3,867.50
Jumlah 192,738.00
Keuntungan Max. 19,273.80
Jumlah 212,011.80
Dibulatkan 212,010.00
M046 1 M2 Pasang lantai keramik 15x20 cm
Ubin keramik 15x20 cm 1.0500 Bh 34,000.00 35,700.00
Semen PC Tiga Roda / 50 kg 0.2276 Zak 73,750.00 16,785.50
Pasir pasang 0.0450 M3 195,000.00 8,775.00
Semen warna 1.6200 Kg 11,900.00 19,278.00
Pekerja 0.7000 Oh 78,500.00 54,950.00
Tukang batu 0.3500 Oh 92,500.00 32,375.00
Kepala tukang 0.0350 Oh 101,500.00 3,552.50
Mandor 0.0350 Oh 110,500.00 3,867.50
Jumlah 175,283.50
Keuntungan Max. 17,528.35
Jumlah 192,811.85
Dibulatkan 192,810.00
M060 1 M2 Pasang dinding porselin 15x15 cm, warna
Porselin 15x15 cm, warna 1.0500 Bh 35,000.00 36,750.00
Semen PC Tiga Roda / 50 kg 0.1860 Zak 73,750.00 13,717.50
Pasir pasang 0.0180 M3 195,000.00 3,510.00
Semen warna 1.5000 Kg 11,900.00 17,850.00
Pekerja 0.9000 Oh 78,500.00 70,650.00
Tukang batu 0.4500 Oh 92,500.00 41,625.00
Kepala tukang 0.0450 Oh 101,500.00 4,567.50
Mandor 0.0450 Oh 110,500.00 4,972.50
Jumlah 193,642.50
Keuntungan Max. 19,364.25
Jumlah 213,006.75
Dibulatkan 213,000.00
M072 1 M2 Pasang dinding batu tempel hitam
Batu Tempel Hitam 1.1000 M2 96,500.00 106,150.00
Semen PC Tiga Roda / 50 kg 0.2350 Zak 73,750.00 17,331.25
Pasir pasang 0.0350 M3 195,000.00 6,825.00
Pekerja 0.7000 Oh 78,500.00 54,950.00
Tukang batu 0.3500 Oh 92,500.00 32,375.00
Kepala tukang 0.0350 Oh 101,500.00 3,552.50
Mandor 0.0350 Oh 110,500.00 3,867.50
Jumlah 225,051.25
Keuntungan Max. 22,505.13
Jumlah 247,556.38
Dibulatkan 247,550.00
ABK Bangunan Gedung dan Perumahan Pekerjaan Pengecatan
N008 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Meni Kayu 0.2000 Kg 26,000.00 5,200.00
plamir 0.1500 Kg 35,910.00 5,386.50
Cat Kayu Sieve 0.4300 Kg 55,000.00 23,650.00
Pekerja 0.0700 Oh 78,500.00 5,495.00
Tukang Cat / Pelitur 0.0090 Oh 92,500.00 832.50
Kepala tukang 0.0060 Oh 101,500.00 609.00
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 41,449.25
Keuntungan Max. 4,144.93
Jumlah 45,594.18
Dibulatkan 45,590.00
N009 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
Meni Kayu 0.2000 Kg 26,000.00 5,200.00
plamir 0.1500 Kg 35,910.00 5,386.50
Cat dasar 0.5200 Kg 55,000.00 28,600.00
Pekerja 0.0700 Oh 78,500.00 5,495.00
Tukang Cat / Pelitur 0.1050 Oh 92,500.00 9,712.50
Kepala tukang 0.0040 Oh 101,500.00 406.00
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 55,076.25
Keuntungan Max. 5,507.63
Jumlah 60,583.88
Dibulatkan 60,580.00
N013 1 M2 Pelaburan bidang kayu dengan vernis
Vernis 0.1500 Ltr 80,000.00 12,000.00
Dempul Halus / Imfra ( Wood Filler ) 0.0500 Kg 73,075.00 3,653.75
Ampelas 0.1000 Lbr 4,350.00 435.00
Kwas 3" 0.0100 Bh 10,625.00 106.25
Pekerja 0.1600 Oh 78,500.00 12,560.00
Tukang Cat / Pelitur 0.1600 Oh 92,500.00 14,800.00
Kepala tukang 0.0160 Oh 101,500.00 1,624.00
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 45,455.25
Keuntungan Max. 4,545.53
Jumlah 50,000.78
Dibulatkan 50,000.00
N014 1 M2 Pengecatan tembok baru ex. ICI (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
plamir 0.1000 Kg 35,910.00 3,591.00
Cat Dasar ICI 0.3600 Kg 80,000.00 28,800.00
Pekerja 0.0200 Oh 78,500.00 1,570.00
Tukang Cat / Pelitur 0.0630 Oh 92,500.00 5,827.50
Kepala tukang 0.0063 Oh 101,500.00 639.45
Mandor 0.0025 Oh 110,500.00 276.25
Jumlah 40,704.20
Keuntungan Max. 4,070.42
Jumlah 44,774.62
Dibulatkan 44,770.00
XIII PEKERJAAN INSTALASI LISTRIK
ALS A. Penyambungan Listrik PLN 2400 watt (LS)
Penyambungan PLN LS 1.000 2,000,000.00 2,000,000.00
ALS B. Pemasangan Lampu SL 25 Watt (Bh)
Lampu SL 25 Watt Bh 1.000 30,000.00 30,000.00
ALS C. Pemasangan Sekering Group (Bh)
Sekering Group Bh 1.000 17,500.00 17,500.00
ALS D. Pemasangan Stop Kontak (Bh)
Stop kontak Bh 1.000 12,500.00 12,500.00
ALS E. Pemasangan Sakelar Tunggal (Bh)
Sakelar Tunggal Bh 1.000 17,500.00 17,500.00
ALS F. Pemasangan Sakelar Ganda (Bh)
Sakelar Ganda Bh 1.000 12,500.00 12,500.00
5 Lampu TL 18/20 watt bh 10,505.00
9. MEMASANG 1 BUAH BATHTUB
SNI Bathtub 1.000 buah Rp 2,475,000.00 Rp 2,475,000.00
6.11 Perlengkapan 12% harga Rp 2,475,000.00 Rp 297,000.00
modif Pekerja 3.000 Oh Rp 27,500.00 Rp 82,500.00
Tukang batu 4.500 Oh Rp 37,500.00 Rp 168,750.00
Kepala tukang 0.900 Oh Rp 42,500.00 Rp 38,250.00
Mandor 0.900 Oh Rp 50,000.00 Rp 45,000.00
JUMLAH Rp 334,500.00 Rp 2,772,000.00
Rp 3,106,500.00
HARGA BAHAN DAN MATERIAL
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN
TAHUN ANGGARAN 2015 & 2016

NO. JENIS BAHAN BANGUNAN

1 2

A. AGREGAT KASAR, BAHAN PEREKAT, DAN BAHAN JADINYA


1 Pasir Urug
2 Pasir Teras
3 Pasir Pasang
4 Pasir beton
5 Kerikil
6 Batu Belah Pondasi uk 15-25 cm
7 Krop Batu Belah ( Batu Belah > 25 )
8 Batu Bronjol ( Untuk Bronjong )
9 Koral beton
10 Batu Tempel Hitam
11 Batu Pinggir Beton 10 x 20 x 35 ( Kaanstein Beton )
12 Batu Pinggir Beton 15 x 35 x 50 ( K -225 )
13 Batu Telor
14 Bata Merah Press
15 Bata Merah Bakar Kelas I
16 Bata Merah Bakar Kelas II
17 Paving Blok Natural 6 cm ex. Nanjung
18 Grass Blok 30 x 40 x 6 Nanjung
19 Grass Blok 45 x 30 x 8
20 Kanstien uk. 40 x 60 Nanjung
21 Kanstien Taman
22 Kaanstien Paving Blok 8 x 15 x 40
23 Pondasi Batu Kali Menerus
24 Semen PC Tiga Roda / 50 kg
25 Tanah Urug
26 Tanah Merah
27 Readymix Beton K 125, tanpa pompa ( selang )
28 Material Agregat Kelas A ( Halus ) LPA
29 Material Agregat Kelas B ( Kasar ) LPA
30 Split Krop
31 Base Course Kelas A
Sewa Pompa Readymix Beton 40-60 m3

1
NO. JENIS BAHAN BANGUNAN

1 2

B. BAHAN FINISHING :
LABURAN, PENGISI, DAN ALATNYA
32 Plamir Tembok Sanlex
33 Plamir Tembok Dulux Interior
34 Plamir Tembok Dulux Exterior
35 Cat Tembok DULUX untuk interior
36 Cat Tembok DULUX untuk eksterior
37 Pelapis Alkali ICI ( Cat Dasar Beton Eksterior )
38 Cat Marka / Spotlight
39 Cat Marka
40 Water Profing Membrance 1x1.5
41 Kapur Pasang/ kapur tembok
42 Roll Cat Tembok
43 Kape Tembok 4'
44 Kape Kayu 2'
45 Kwas 3"
46 Oten ( Pewarna Plitur )
47 Spirtus
48 Plitur
49 Dempul Plitur Kayu
50 Dempul Halus / Imfra ( Wood Filler )
51 Terpentin
52 Tiner A
53 Tiner B
54 Kumpon
55 Melamik
56 Dempul Duco
57 Ampelas
58 Dempul Kayu Cap Kucing
59 Meni Besi
60 Meni Kayu
61 Dempul Tembok (Sanlex)
62 Cat Besi (Green Vespa 199 (NIPPE))
63 Cat Kayu Avian
64 Cat Besi Avian
65 Thinner
66 Thinner CH
67 Dempul Gipsum (Compound)

2
NO. JENIS BAHAN BANGUNAN

1 2
68 Lem Kayu
69 Vernis batu
70 Plastik Membran

C. BAHAN KAYU BERIKUT BAHAN JADINYA


71 Bambu Ø 5 s.d 7
72 Bambu Ø 7 s.d 10
73 Bambu Gombong
74 Kayu Balok Borneo Super
75 Kayu Papan Borneo Super
76 Kayu Balok Kamper Samarinda
77 Kayu Papan Kamper Samarinda
78 Kayu Balok Rasamala
79 Kayu Jati Jabar Tua dia. 80 cm keatas
80 Kayu Jati Jabar dia. 40 cm keatas
81 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban )
82 Kayu Albasia
83 Dolken 5 s/d 7
84 Dolken 7 s/d 10
85 List profil kamper 5 cm
86 List profil kamper 10 cm
87 Kayu Reng 2/3 Borneo Super
88 Kayu Kaso 5/7 Borneo Super
89 Kayu 5/10 Borneo Super
90 Kayu Meranti Kalimantan/Tembalun 2/3 x 400 (Ikatan)
91 Kayu Meranti Kalimantan/Tembalun 3/4 x 400 (lepasan)
92 Kayu Kamper Samarinda Oven 6/15 x 200
93 Kayu Kamper Samarinda Oven 6/15 x 250
94 Kayu Kamper Samarinda Oven 6/15 x 300

D. BAHAN PENUTUP RANGKA PLAFOND


95 Bahan plafond hardpleks 3 mm
96 Bahan plafond Asbes Semen 5 mm
97 Gypsum 120 x 240 t = 9 mm ex DN
98 Gypsum 120 x 240 t = 9 mm ex Luar
99 GRC
100 Acustik Amstrong 60 x 120
101 Plafon PVC ( SILAHKAN CARI HARGA)

3
NO. JENIS BAHAN BANGUNAN

1 2

E. BAHAN KAYU LAPIS


102 Triplek 3 mm 120 x 240
103 Triplek 4 mm 120 x 240
104 Triplek 4 mm Ukuran Pintu
105 Jabar Wood 4 mm
106 Wall Paper ( kls menengah )
107 Multiplek 9 mm 120 x 240
108 Multiplek 12 mm 120 x 240
109 Teak Wood 3 mm 120 x 240
110 Teak Wood 4 mm 120 x 240
111 Teak Wood 3 mm 120 x 240 Ukuran Pintu
112 Teak Wood ukuran Pintu 4 mm
113 Melamin 3mm 120 x 240 doff
114 Melamin 3mm 120 x 240 glossy
115 Formika motif kayu jati
116 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip
117 Keramik 20 x 20 (KM) KWI DN Putih Polos
118 Keramik 20 x 25 Dinding KM KWI DN Polos
119 Keramik 20 x 25 Dinding KM KWI DN Corak
120 Keramik 30 x 30 KW I DN putih polos
121 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP )
Keramik 40 x 40 KW I DN putih polos
Keramik 40 x 40 KW I DN Warna/Corak ( ANTI SLIP )
122 Plint Keramik 10 x 30 KW1 DN Putih/Polos
123 Vinyl Lantai Standar
124 Taraso Kerang 30 x 30
125 Plin Taraso 10 x 30

G. BAHAN SALURAN AIR KOTOR/BERSIH


126 Grafel U 20 cm' ex. NANJUNG
127 Grafel U 30 cm' ex. NANJUNG
128 Grafel U 40 cm' ex. NANJUNG
129 Grafel U 50 cm' ex. NANJUNG
130 Grafel U 60 cm' ex. NANJUNG
131 Buis Beton Ø 20 cm ( 1 m' ) ex. NANJUNG
132 Buis Beton Ø 30 cm ( 1 m' ) ex. NANJUNG
133 Buis Beton Ø 40 cm ( 1 m' ) ex. NANJUNG
134 Buis Beton Ø 50 cm ( 1 m' ) ex. NANJUNG

4
NO. JENIS BAHAN BANGUNAN

1 2
135 Injuk
136 Buis Beton Ø 80 cm ( 1/2 m' )
137 Buis Beton Ø 1 m ( 1/2 m' )
138 Pipa FJ Dia. 900 R - Class 2
139 Pipa FJ Dia. 1000 R - Class 2
140 Pipa FJ Dia. 1100 R - Class 2
141 Pipa FJ Dia. 1200 R - Class 2
142 Pipa FJ Dia. 1450 R - Class 2
143 Penutup U Ditch

H. BAHAN LOGAM DAN BAHAN JADINYA


144 Besi Beton U-24 Rata - Rata ( Polos )
145 Besi Beton U-32 Rata - Rata ( Ulir )
146 Besi Beton U-39 ( Ulir )
147 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) T 90 cm X240
148 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) T 120 cmX240
149 Bondek
150 IWF Ex DN SII
151 IWF Ex Jepang
152 Besi Profil DN SII
153 Besi Profil Ex LN
154 Besi Profil UNP 10
155 Besi Profil UNP 6,5
156 Besi Profil UNP 5
157 Besi C Lip Chanel
158 Besi C ex. DN. SII
159 Ongkos Galfanis Besi
160 Kawat Beton
161 Kawat Duri Kecil
162 Kawat Duri Besar
163 Wiremesh M5 2 x 5 m
164 Ram Nyamuk Alumunium
165 Plat Strip Ø 2 x 30 mm ( 6 m1 )
166 Plat Alumunium 0.4 mm
167 Plat Alumunium 0.5 mm
168 Pagar BRC lengkap tiang T= 90 cm
169 Pagar BRC T= 90 cm
170 Pagar BRC lengkap tiang T= 120 cm
171 Pagar BRC T= 120 cm

5
NO. JENIS BAHAN BANGUNAN

1 2
172 Roda Besi Bawah BCM kwalitas baik
173 Roda Besi Bawah BCM kwalitas sedang
174 Lem Kuning (aibond)
175 Lem Fox
176 Sling 8mm
Hollow Galvalum 2 x 4
Hollow Galvalum 4 x 4

I. BAHAN KACA
177 Kaca Polos 3 mm ( ASAHI )
178 Kaca Polos 5 mm ( ASAHI )
179 Kaca Rayband 5 mm ( ASAHI )
180 Kaca Rayband 8 mm ( ASAHI )
181 Kaca Rayband 12 mm ( ASAHI )
182 Kaca Patri Lokal Terpasang ( ASAHI )
183 Kaca Patri EX Luar negeri terpasang
184 Kaca 8 mm Gravver
185 Glass Block DN 20 x 20 ( Kedawung )
190 Kaca Polos 5 mm
191 Kaca Polos Sandblast
192 Acrylic P. Lampu
193 Acrylic 5mm

J. BAHAN PAKU DAN MUR BAUT


194 Paku 1 cm s/d 3 cm
195 Paku 4 cm s/d 7 cm
196 Paku 8 cm s/d 12 cm
197 Paku Beton 2 cm s/d 5 cm
198 Paku Beton 8 cm
199 Paku Kait Lengkap
200 Paku Cacing
201 Paku Sekrup
202 Sekrup fisher
203 Fisher
204 Besi Beugel kuda - kuda
205 Duk Angker
206 Angker Mur Baut dia.19 / panjang 60 cm
207 Mur Baut dia. 10 (3 cm)
208 Mur Baut HTB dia. 19 s/d 16 (6 cm)

6
NO. JENIS BAHAN BANGUNAN

1 2
209 Mur Baut besi 3/4 x 30 mm
210 Mur Baut besi 1/2x 30 mm

K. BAHAN PERPIPAAN
211 Besi Pipa untuk Hydrant BSP Ø 1"
212 Besi Pipa untuk Hydrant BSP Ø 1,25"
213 Besi Pipa untuk Hydrant BSP Ø 1,5"
214 Besi Pipa untuk Hydrant BSP Ø 2"
215 Besi Pipa untuk Hydrant BSP Ø 2,5"
216 Besi Pipa untuk Hydrant BSP Ø 3"
217 Besi Pipa untuk Hydrant BSP Ø 4"
218 Besi Pipa untuk Hydrant BSP Ø 6"
219 Besi Pipa Hitam Ø 1" t=2 mm
220 Besi Pipa Hitam Ø 1 1/2" t=2 mm
221 Besi Pipa Hitam Ø 2" t=2 mm
222 Besi Pipa Hitam Ø 3" t=2 mm
223 Besi Pipa Hitam Ø 4" t=2 mm
224 Besi Pipa Hitam Ø 6" t=2 mm
225 Pipa GIP Medium A Ø 1/2" ( 6 m1 )
226 Pipa GIP Medium A Ø 3/4" ( 6 m1 )
227 Pipa GIP Medium A Ø 1" ( 6 m1 )
228 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 )
229 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 )
230 Pipa GIP Medium A Ø 1 3/4"( 6 m1 )
231 Pipa GIP Medium A Ø 2" ( 6 m1 )
232 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 )
233 Pipa GIP Medium A Ø 3" ( 6 m1 )
234 Pipa GIP Medium A Ø 4" ( 6 m1 )
235 Pipa GIP Medium B Ø 2" ( 6 m1 )
236 Pipa GIP Medium B Ø 2 1/2" ( 6 m1 )
237 Pipa GIP Medium B Ø 3" ( 6 m1 )
238 Pipa GIP Medium B Ø 4" ( 6 m1 )
239 Macam2 Sambungan GIP Ø 1/2"
240 Macam2 Sambungan GIP Ø 3/4"
241 Macam2 Sambungan GIP Ø 1"
242 Macam2 Sambungan GIP Ø 1 1/4"
243 Macam2 Sambungan GIP Ø 1 1/2"
244 Macam2 Sambungan GIP Ø 1 3/4"
245 Macam2 Sambungan GIP Ø 2"

7
NO. JENIS BAHAN BANGUNAN

1 2
246 Macam2 Sambungan GIP Ø 2 1/2"
247 Macam2 Sambungan GIP Ø 3"
248 Macam2 Sambungan GIP Ø 4"
249 Pipa PVC RUCIKA type AW Ø 1/2"
250 Pipa PVC RUCIKA type AW Ø 3/4"
251 Pipa PVC RUCIKA type AW Ø 1"
252 Pipa PVC RUCIKA type AW Ø 1 1/4"
253 Pipa PVC RUCIKA type AW Ø 1 1/2"
254 Pipa PVC RUCIKA type AW Ø 2"
255 Pipa PVC RUCIKA type AW Ø 2 1/2"
256 Pipa PVC RUCIKA type AW Ø 3"
257 Pipa PVC RUCIKA type AW Ø 4"
258 Pipa PVC RUCIKA type AW Ø 6"
259 Pipa PVC RUCIKA type AW Ø 8"
260 Pipa PVC MASPION ABU Ø 1/2" (AW)
261 Pipa PVC MASPION ABU Ø 3/4" (AW)
262 Pipa PVC MASPION ABU Ø 1" (AW)
263 Pipa PVC MASPION ABU Ø 1 1/4" (AW)
264 Pipa PVC MASPION ABU Ø 1 1/2" (AW)
265 Pipa PVC MASPION ABU Ø 2" (AW)
266 Pipa PVC MASPION ABU Ø 2 1/2" (AW)
267 Pipa PVC MASPION ABU Ø 3" (AW)
268 Pipa PVC MASPION ABU Ø 4" (AW)
269 Pipa PVC MASPION ABU Ø 6" (AW)
270 Pipa PVC MASPION ABU Ø 1 1/4" (D)
271 Pipa PVC MASPION ABU Ø 2" (D)
272 Pipa PVC MASPION ABU Ø 4" (D)
273 Pipa PVC MASPION ABU Ø 6" (D)
274 Pipa PVC MASPION PUTIH Ø 2" (D)
275 Pipa PVC MASPION PUTIH Ø 1 1/4" (D)
276 Pipa PVC MASPION PUTIH Ø 4" (D)
277 Pipa PVC MASPION PUTIH Ø 6" (D)
278 Macam2 Sambungan Pipa PVC Ø 1/2"
279 Macam2 Sambungan Pipa PVC Ø 3/4"
280 Macam2 Sambungan Pipa PVC Ø 1"
281 Macam2 Sambungan Pipa PVC Ø 1 1/4"
282 Macam2 Sambungan Pipa PVC Ø 1 1/2"
283 Macam2 Sambungan Pipa PVC Ø 1 3/4"
284 Macam2 Sambungan Pipa PVC Ø 2"

8
NO. JENIS BAHAN BANGUNAN

1 2
285 Macam2 Samb. Pipa PVC Ø 2 1/2"
286 Macam2 Samb. Pipa PVC Ø 3"
287 Macam2 Samb. Pipa PVC Ø 4"
288 Sambungan Pipa PVC Jenis AW 4 " TY
289 Lem Paralon
290 Seal tape
291 Pipa PVC 4" berlobang jenis AW
292 Pipa PVC Pralon Ø 1/2" AW Putih
293 Pipa PVC Pralon Ø 3/4" AW Putih
294 Pipa PVC Pralon Ø 1" AW Putih
295 Pipa PVC Pralon Ø 2" AW Putih
296 Pipa PVC Pralon Ø 2.5" AW Putih
297 Pipa PVC Pralon Ø 3" AW Putih
298 Pipa PVC Pralon Ø 4" AW Putih
299 Keni Ø 1/2" Rucika
300 Keni Ø 3/4" Rucika
301 Keni Ø 1" Rucika
302 Keni Ø 1 1/2" Rucika
303 Keni Ø 2" Rucika
304 Keni Ø 2 1/2" Rucika
305 Keni Ø 3" Rucika
306 Keni Ø 4" Rucika

L. BAHAN SANITAIR
307 Stop Kran 3/4 " KITZ
308 Stop Kran 3/4 " ONDA
309 Stop Kran 1 " KITZ
310 Stop Kran 1 " ONDA
311 Stop Kran 1 1/2 " KITZ
312 Stop Kran 1 1/2 " ONDA
313 Stop Kran 2 " KITZ
314 Stop Kran 2 " ONDA
315 Stop Kran 2 1/2" KITZ
316 Stop Kran 2 1/2" ONDA
317 Stop Kran 3 " KITZ
318 Stop Kran 3 " ONDA
319 Check Valve 1/2 " PVC
320 Check Valve 1/2 " onda
321 Check Valve 2"

9
NO. JENIS BAHAN BANGUNAN

1 2
322 Double Neple 1/2 " PVC
323 Double Neple 1/2 " besi
324 Water Mur 1/2 " BESI
325 Water Mur 1/2 " PVC
326 Gate Valve 1/2 " KITZ
327 Gate Valve 1/2 " ONDA
328 Gate Valve 2" ONDA
325 Knee BESI Ø 2"
326 Knee BESI Ø 2 1/2"
327 Knee BESI Ø 3"
328 Knee BESI Ø 4"
329 Knee Ø 1 1 /4" PVC
330 KneeI Ø 1" PVC
331 Knee Ø 1/2" PVC
332 Saringan Air Lt KM Stainless Steel
333 Pressure Gauge
334 Soket langsung
335 Apooer Bath Tube

10
NO. JENIS BAHAN BANGUNAN

1 2
336 Kran stain less Lokal Kait
337 Shower Dengan Tiang
338 Shower Tanpa Tiang
339 Shower Dengan Tiang
340 Shower Tanpa Tiang
341 Kran Tembok San Ei dia. 1/2 "
342 Kran Tembok TOTO dia. 1/2 "
343 Kran Bebek San Ei 1/2 "
344 Kran Bebek TOTO 1/2 "
345 Kran Panas Dingin San Ei Standard
346 Bath Cape Washteren
347 Tempat Sabun Porslin
348 Tempat Sabun Keramik
349 Wastafel Lengkap TOTO
350 Wastafel Lengkap INA
351 Closet Jongkok KERAMIK warna INA
352 Closet Jongkok Standard Putih KERAMIK INA
353 Closet Duduk Warna Standard TOTO C 421 Lengkap
354 Wastafel Bulat Warna Standard Lengkap
355 Closet Duduk Warna Standard lengkap INA
356 Urinoar Lengkap TOTO Warna Standard lengkap
357 Penyekat Poslin Urinoar TOTO
358 Kitchen Zink Stainless Standard Lokal ( 1 Lobang )
359 Kithchen Zink Stainless Non Standard Franke ( 1 Lobang )
360 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )
361 Closet Jongkok Lengkap Sistem Jet TOTO
362 Kran San Ei (Poilet)
363 Kran Wastapel TOTO
364 Kran Closset
365 Fleksible 30 Cm
366 Fleksible 30 Cm San Ei (Keras)
367 Fleksible 30 Cm San Ei
368 Wastafel TOTO
369 Radar Otomatis
370 Radar
371 Bak Fiber kap. 0,3 m3

M. BAHAN PENUTUP ATAP


371 Atap Plastik Gelombang 80 x 180

11
NO. JENIS BAHAN BANGUNAN

1 2
372 Atap Fiber Glass Tipis 80 x 180 (gelombang)
373 Atap Fiber Glass Tebal 80 x 180 (gelombang)
374 Atap Genteng Plentong pres Bakar KW 1
375 Atap Genteng Plentong pres Molen Oven KW1
376 Atap Genteng Flam pres Molen Oven Jatiwangi
377 Atap Baja Ringan ex. Pryda
378 Bubung Genteng pres Bulat Ex Jatiwangi
379 Genteng Bubungan Ex Jatiwangi Segi Tiga
380 Genteng Bubungan Beton
#REF! Nok Atas Warna Khusus Ex. Cisangkan
383 Nok Bawah Warna Khusus Ex. Cisangkan
385 Nok Samping Warna Khusus Ex. Cisangkan
387 Nok Siku Warna Khusus Ex. Cisangkan
389 Nok Ujung Warna Khusus Ex. Cisangkan
391 Nok Samping Ujung Warna Khusus Ex. Cisangkan
391 Starter Warna Standard Ex. Cisangkan
392 Starter Siku Warna Standard Ex. Cisangkan
393 Apex Warna Standard Ex. Cisangkan
394 Tepi Kiri/Kanan O Warna Standard Ex. Cisangkan
395 Tepi Kiri/Kanan M Warna Standard Ex. Cisangkan
396 Genteng Kiri/Kanan O Warna Standard Ex. Cisangkan
397 Genteng Kiri/Kanan M Warna Standard Ex. Cisangkan
398 Genteng Sudut Kiri/Kanan O Warna Standard Ex. Cisangkan
399 Genteng Bawah O/RR Warna Standard Ex. Cisangkan
400 Apex O Warna Standard Ex. Cisangkan
401 Genteng Kaca 6mm (V/DS/F) Warna Standard Ex. Cisangkan
402 Genteng Kaca 5mm (M/O/RR/E) Warna Standard Ex. Cisangkan
403 Cat Genteng
404 Nok Pinggir Metal ( Rainbow Roof )
405 Nok Pinggir Hana
406 Genteng Plentong Natural Pleret
407 Genteng Plentong Glazur Pleret
408 Genteng Turbo Natural Pleret
409 Genteng Turbo Glazur Pleret
410 Genteng Morando Natural Pleret
411 Genteng Morando Glazur Pleret
412 Metal Roof Bahan
413 Metal Roof Terpasang
414 Ceramik Deck CB 10

12
NO. JENIS BAHAN BANGUNAN

1 2
415 Ceramik Deck CB 12
416 Bubung Murando Natural
417 Bubung Murando Glasur
418 Bubungan Genteng Keramik
419 Bubung Cisangkan
420 Seng Talang
421 Seng Gelombang BJLS 28
422 Seng BJLS 30 lebar 60cm (1 rol 50 m' )
423 Seng BJLS 30 lebar 90cm (1 rol 50 m' )
424 Poly Carbonat Carboron 2.1 x 11
425 Canopy Star Polly (Solartuff) 80x240
426 Policarbonate (Twinlite) 2.1 x 11
427 Genteng Plentong Jatiwangi
428 Cat genteng

N. BAHAN MEKANIKAL
429 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW )
430 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW )
431 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW )
432 Presure Tank kap. 500 liter lengkap
433 Hydran Box dalam Gedung (lengkap)
434 Fire House 1.5 x 30 m + nose
435 Exhouse Fan H 360 W 60 x 60 cm
436 Exhouse Fan H 380 W CFM 55 x 55 cm
446 AC SS TU. 32000
447 AC MS TU. 14000
448 AC MS TU. 18000
449 AC MS TU. 24000
450 Mesin AC Split DAIKIN (Indoor/Outdoor Unit)

O. BAHAN ELEKTRIKAL
451 Kabel NYA 1x 1.5 Prima (1 rol = 50 m')
452 Kabel NYA 1x 2.5 Prima (1 rol = 50 m')
453 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m')
454 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m')
455 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m')
456 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m')
457 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m')
458 Kabel NYM 2 x 4 Prima (1 rol = 50 m')

13
NO. JENIS BAHAN BANGUNAN

1 2
459 Kabel NYY 1.5
460 Kabel NYY 2.5
461 Kabel TM NA2XEYBY 20 KV/XLPE 3 X 240 sqmm
462 Kabel TR NYFGBY 220 V/380 V 4 x 240 sqmm
463 Kabel Pompa Submersible
464 Kabel Elektroda
Kabel NYYHY 3 x 0,75 WLC
465 Elektroda
466 Kabel Power
467 Kabel Single core D1 x 25 sqmm
468 Elektroda Automatic
469 NSFB FUJI EA - 100 A
470 NSFB FUJI EA - 150 A
471 Rumah Panel 30 x 60 cm (kosong)
472 Rumah Panel 40 x 60 cm (kosong)
473 Skring Kas 2 grop Biasa
474 Skring Kas 3 grop Biasa
475 Skring Kas 5 grop Biasa
476 MCB 1 PHASA
477 MCB 3 PHASA
478 Tahanan 50 A Merk Fuji
479 Saklar Broko Tunggal Standard ( 1 Phase )
480 Saklar Broko Seri Standard ( 1 Phase )
481 Stop Kontak Broko Standard ( 1 Phase )
482 Stop Kontak Broko 3 Phase ( Out Bow )
483 Stop Kontak Broko 3 Phase ( In Bow )
484 Stop Kontak Handle 3 Phase
485 Stop Kontak Nasional
486 Saklar Tunggal Nasional
487 Saklar Double Nasional
488 Saklar 3 Nasional
489 Kabel Tray Telephone
490 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat )
491 Lampu PLC
492 Lampu pijar 25 Watt s/d 100 Watt
493 Lampu Neon TL Philip 18 W
494 Lampu Neon TL Philip 20 W
495 Trapo TL 20 W ( Philip )
496 Trapo TL 40 W ( Philip )

14
NO. JENIS BAHAN BANGUNAN

1 2
497 Trapo TL 20 W ( Sinar )
498 Trapo TL 40 W ( Sinar )
499 Trafo 3 ph, 20 KV/400 V, 630 KVA
500 Stater Neon Philip
501 Stater Neon Biasa
502 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan )
503 Down Light + SL 25 W
504 Lampu Taman + Tiang + Lampu 1 Buah
505 Lampu Baret 30 cm + Neon
506 Lampu Neon Arcrilik 2 x 40 W lengkap
507 Jarum Penangkal Petir 16
508 Kawat BC ( Tembaga )
509 Pentanahan Penangkal Petir
510 Pentanahan Panel
511 Sakelar tunggal
512 Saklar Ganda
513 Kunci Silinder ALFA untuk Pintu Alumunium
514 Tarikan Pintu Alumunium
515 Tarikan Laci
516 Kunci 2 Slaag ROYAL
517 Rel Henderson Lengkap
518 Rel Maraton I Pintu
519 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
520 Kunci 2 Slaag Ancor Asli
521 Kunci 2 Slaag ISO
522 Kunci KM Bulat Kualitas Biasa
523 Kunci KM Bulat ALFA
524 Kunci 2 Slaag Silinder Utama Standard
525 Kunci Gembok Besar
526 Kunci 2 Slaag Kuda Terbang
527 Espangolet
528 Grendel 15 cm
529 Grendel 5 cm
530 Hak Angin Kait Jendela Biasa
531 Hak Angin Jendela Antik
532 Hak Angin Sendok Stainless / Kuningan
533 Nako Lengkap Tralis 1 Daun
534 Sloot Pintu berikut Rantai
535 Sloot Jendela Tunggal

15
NO. JENIS BAHAN BANGUNAN

1 2
536 Engsel Pintu Unilon Standard besar 5"
537 Engsel Jendela Unilon
538 Engsel Patrun
539 Engsel Harmonika
540 Door Closer Kelas Standard ( Kelas Sedang )
541 Door Closer Kelas Standard ( Kelas Baik )
542 Door Closer Kelas Rendah
543 Tarikan Almari Rata - rata
544 Kunci Pintu Kayu ex. SES
545 Kunci Pintu Besar ex. ALPHA
546 Kunci Pintu Kecil ex. ALPHA
547 Sloot Pintu Sedang untuk Jendela
548 Engsel Stainless
549 Door Closer Pintu Otomatis Buka Tutup
550 Dudukan gembok uk. Besar
551 Kunci 2 slaag standar
552 Engsel Pintu Stainless
553 Engsel Jendela Stainless

R. BAHAN PENGHISAP AIR SUMUR DALAM


549 Pompa Kodok
550 Pompa Dragon Tegal
551 Pompa Dragon Asli
552 Mesin Pompa Air 100 W - Sanyo
553 Mesin Pompa Air 125 W - Sanyo
554 Mesin Pompa Air 150 W - Sanyo
555 Pompa Zet pump 250 W - Sanyo
556 Pompa Zet pump 250 W - Simitsu
557 Pompa Zet pump 375W - Simitsu
558 Pompa Zet pump 450 W - Sanyo

S. BAHAN PENAMPUNG AIR


559 Tangki Air Fiber Glass 0.5 m3 ( Excel )
560 Tangki Air Fiber Glass 1 m3 ( Excel )
561 Tangki Air Fiber Glass 2 m3 ( Excel )
562 Tangki Air Pinguin 1500 Ltr
563 Tangki Air Pinguin 2000 Ltr
564 Tangki Air Pinguin 5000 Ltr
565 Torn 3000 lt

16
NO. JENIS BAHAN BANGUNAN

1 2
566 Torn 2000 lt
567 Torn 1500 lt
568 Torn 1000 lt
569 Bak KM Fiber 60 x 60
570 Bak Taraso WC 40 x 40
571 Bak KM Taraso 60 x 60
572 Tangki Hidropoore 1 M3
573 Tangki Hidropoore ½ M3
574 Pelampung 1"
575 Pelampung 2"
576 Pelampung 1" San Ei / kuningan New Star
577 Pelampung 2" San Ei (Kuningan)

U. ALAT TUKANG
578 Palu 0,5 kg
579 Cangkul
580 Singkup
581 Sekrop
582 Pengki
583 Linggis
584 Rool Meter 30 meter ( Bahan Plastik )
585 Rool Meter 5 meter ( Bahan Besi )
586 Selang Plastik untuk Water Pas dia. 0.5 cm
587 Water Pas Alumuniumm 60 cm
588 Kuwas 2"
589 Kuwas 3"
590 Kuwas 4"

17
A BAHAN DAN MATERIAL
CANA PEMBANGUNAN RUMAH 2 LANTAI
UN ANGGARAN 2015 & 2016

SAT. HARGA SURVEY (Rp.) 2015

m3 100,000
m3 150,000
m3 195,000
m3 258,000
m 3
202,500
m 3
205,000
m 3
200,000
m 3
175,000
m 3
195,000
m2 96,500
bh 14,700
bh 44,000
m 3
127,000
bh 800
bh 775
bh 700
m² 60,000
m² 115,000
bh 18,000
bh 31,000
bh 19,000
bh 36,000
m³ 693,000
zak 73,750
m³ 61,000
m³ 71,000
m³ 760,000
m³ 137,000
m³ 105,000
m³ 120,000
m3 99,200
ls 3,800,000

18
SAT. HARGA SURVEY (Rp.) 2015

kg 22,550
kg 25,500
kg 27,500
kg 88,000
kg 96,500
lt 79,500
kg 70,000
kg 56,000
m2 95,000
m³ 13,000
bh 25,500
bh 13,000
bh 41,000
bh 10,625
bks 12,500
lt 11,350
kg 46,000
kg 33,575
kg 73,075
lt 15,500
lt 20,400
lt 20,375
kg 36,500
kg 54,000
kg 41,000
lbr 4,350
kg 27,575
kg 32,000
kg 26,000
kg 15,500
kg 62,500
kg 53,750
kg 52,650
lt 20,500
lt 23,000
zak 92,000

19
SAT. HARGA SURVEY (Rp.) 2015

3
kg 15,500
ltr 66,000
m 2
5,300

bt 15,500
bt 20,675
bt 35,000
m³ 4,700,000
m³ 5,600,000
m³ 10,250,000
m³ 11,500,000
m³ 4,000,000
m³ 19,050,000
m³ 9,850,000
m³ 3,500,000
m³ 1,260,000
bt 36,000
bt 31,000
m 1
20,500
m 1
31,000
bt 36,875
m³ 4,710,000
m³ 5,800,000
m³ 4,000,000
m³ 4,300,000
m³ 9,150,000
m³ 9,150,000
m³ 9,150,000

m² 35,500
m² 49,000
lbr 65,750
lbr 72,000
lbr 58,325
lbr 99,500
lbr -

20
SAT. HARGA SURVEY (Rp.) 2015

lbr 51,450
lbr 61,850
lbr 50,000
lbr 99,500
m² 91,500
lbr 128,000
lbr 156,100
lbr 103,400
lbr 125,000
lbr 77,225
lbr 90,000
lbr 97,000
lbr 93,075
lbr 175,000
m² 53,300
m² 52,000
m² 53,300
m² 57,750
m² 43,350
m² 55,000
m² 49,350
m² 57,000
m² 50,000
m² 25,375
m² 45,675
bh 15,500

bh 19,000
bh 35,000
bh 31,700
bh 43,200
bh 68,500
bh 38,000
bh 53,300
bh 63,400
bh 86,275

21
SAT. HARGA SURVEY (Rp.) 2015

3
kg 5,675
bh 182,700
bh 210,000
bh 3,662,985
bh 4,740,284
bh 5,612,059
bh 6,146,952
bh 8,457,398
bh

kg 9,500
kg 9,500
kg 10,200
m² 175,000
m² 210,000
m² 134,000
kg 14,000
kg 15,500
kg 11,200
kg 11,200
btg 381,000
btg 240,000
btg 177,625
kg 11,175
kg 10,650
kg 12,700
kg 17,600
kg 81,675
kg 175,000
lbr 295,000
m² 24,000
bt 43,000
m² 36,550
m² 45,675
m1 -
m 1
177,625
m1 -
m1 197,925

22
SAT. HARGA SURVEY (Rp.) 2015

3
bh 200,000
bh 40,600
kg 42,950
kg 40,700
kg 17,775
m' 18,000
m' 22,000

m² 85,000
m² 95,000
m² 120,000
m² 220,000
m² 334,950
m² 812,000
m² 2,030,000
m² 1,141,875
bh 19,000
m² 51,000
m² -
m² -
m² -

kg 20,714
kg 15,000
kg 15,000
bh 500
bh 800
bh 2,000
kg 66,250
kg 20,000
lsn 40,000
lsn 13,625
kg 19,250
bh 11,670
bh 43,650
bh 1,675
bh 9,150

23
SAT. HARGA SURVEY (Rp.) 2015

3
bh 1,675
bh 7,500

bt 157,325
bt 177,625
bt 203,000
bt 289,275
bt 416,150
bt 558,250
bt 761,250
bt 1,218,000
bt 110,000
bt 160,000
bt 223,300
bt 360,000
bt 390,000
bt 1,450,000
bt 139,500
bt 178,000
bt 255,000
bt 310,000
bt 330,000
bt 365,400
bt 456,750
bt 636,400
bt 837,375
bt 1,218,000
bt 253,750
bt 365,000
bt 435,000
bt 523,500
bh 7,500
bh 8,750
bh 12,500
bh 16,250
bh 20,000
bh 21,250
bh 51,500

24
SAT. HARGA SURVEY (Rp.) 2015

3
bh 82,500
bh 123,000
bh 177,500
bt 32,500
bt 40,500
bt 57,800
bt 62,500
bt 77,500
bt 115,000
bt 145,000
bt 221,000
bt 355,000
bt 670,000
bt 1,076,000
bt 26,900
bt 31,700
bt 39,800
bt 54,625
bt 73,350
bt 107,700
bt 137,500
bt 193,900
bt 275,250
bt 620,000
bt 35,500
bt 50,650
bt 149,250
bt 320,000
bt 66,000
bt 40,600
bt 133,775
bt 246,000
bh 2,500
bh 3,100
bh 3,600
bh 4,500
bh 5,625
bh 6,100
bh 7,100

25
SAT. HARGA SURVEY (Rp.) 2015

3
bh 8,625
bh 11,850
bh 16,625
bh 39,100
tb 10,875
gl 3,000
m1 54,450
bt 16,250
bt 22,500
bt 30,000
bt 69,500
bt 96,000
bt 138,000
bt 228,500
bh 2,625
bh 3,200
bh 3,875
bh 6,000
bh 9,625
bh 11,650
bh 22,350
bh 26,000

bh 91,350
bh 73,350
bh 139,550
bh 100,000
bh 248,675
bh 195,375
bh 355,250
bh 251,200
bh 825,000
bh 502,425
bh 1,395,625
bh 669,900
bh 10,000
bh 47,450
bh 357,575

26
SAT. HARGA SURVEY (Rp.) 2015

3
bh 5,000
bh 7,150
bh 15,225
bh 15,000
bh 50,250
bh 50,250
bh 307,000
bh 23,000
bh 44,650
bh 61,400
bh 106,100
bh 22,500
bh 40,000
bh 95,000
bh 71,050
bh 83,725
bh 16,750
bh 126,675

27
SAT. HARGA SURVEY (Rp.) 2015

3
bh 35,000
bh 380,625
bh 115,000
bh 1,900,000
bh 307,000
bh 120,000
bh 167,475
bh 234,475
bh 225,000
bh 250,000
unit 1,228,150
bh 50,000
bh 47,500
unit 1,784,100
unit 650,000
unit 133,575
unit 140,000
unit 1,741,700
unit 395,000
bh 1,341,650
unit 1,004,850
lbr 334,950
bh 177,625
bh 195,400
bh 558,250
unit 1,065,750
bh 279,125
bh 279,125
bh 150,000
bh 38,000
bh 110,000
bh 145,000
unit 450,000
unit 167,000
unit 50,750
unit 525,000

lbr 108,000

28
SAT. HARGA SURVEY (Rp.) 2015

3
lbr 62,500
lbr 83,350
bh 1,825
bh 2,000
bh 1,800
m² 1,525
bh 6,100
bh 3,550
bh 10,600
bh Err:504
bh Err:504
bh Err:504
bh Err:504
bh Err:504
bh Err:504
bh 30,250
bh 30,250
bh 30,250
bh 30,250
bh 30,250
bh 30,250
bh 30,250
bh 60,500
bh 60,500
bh 71,500
bh 198,000
bh 137,500
ltr 82,500
m 1
87,300
m1 71,050
bh 1,750
bh 2,550
bh 2,050
bh 2,750
bh 2,150
bh 3,550
m2 96,500
m2 116,725
bh 5,600

29
SAT. HARGA SURVEY (Rp.) 2015

3
bh 6,600
bh 6,100
bh 8,650
bh 7,600
bh
m² 40,000
lbr 46,000
m 28,000
m 40,500
roll 2,400,000
m² 252,000
m² 2,325,000
bh 2,050
lt 79,200

unit 52,780,000
unit 177,625,000
unit 36,540,000
unit 25,375,000
unit 4,872,000
unit 3,755,500
unit 1,319,500
unit 893,200
unit -
unit -
unit -
unit -
1 BTU -

ROLL 183,350
ROLL 277,500
m 1
7,050
m 1
8,600
m 1
9,550
m 1
11,550
m1 20,300
m1 12,280

30
SAT. HARGA SURVEY (Rp.) 2015

3
m1 51,750
m 1
75,100
m 1
75,100
m 1
75,100
m 1
26,400
m1 8,650
m1 9,350
m 1
26,400
m 1
17,250
m 1
45,000
m 1
44,675
bh 761,250
bh 1,928,500
unt 131,950
unt 253,750
unt 1,482,250
unt 186,725
unt 392,150
bh 43,000
bh 160,000
bh 446,600
bh 14,125
bh 15,250
bh 13,200
bh 17,500
bh 21,500
bh 53,800
bh 14,225
bh 12,200
bh 19,300
bh 18,275
bh 40,600
ttk 162,400
bh 24,500
bh 30,000
bh 35,500
bh 35,500
bh 36,250
bh 47,000

31
SAT. HARGA SURVEY (Rp.) 2015

3
bh 45,000
bh 55,000
bh 20,625
bh 7,300
bh 3,250
bh 45,000
bh 101,500
bh 177,625
bh 136,000
bh 314,650
bh 250,000
kg 250,000
ttk 329,875
ttk 436,450
bh 12,285.00
bh 16,135.00
bh 50,000
bh 91,350
bh 10,150
bh 90,000
m' 500,000
m' 300,000
bh 355,250
bh 152,250
bh 177,625
bh 48,125
bh 55,825
bh 483,450
bh 60,000
bh 89,300
ps 47,700
bh 20,300
bh 10,000
ps 15,250
ps 21,400
bh 25,000
dn 75,000
bh 35,500
bh 12,250

32
SAT. HARGA SURVEY (Rp.) 2015

3
ps 40,000
ps 25,850
ps 15,000
m 1
30,000
unt 130,350
unt 497,750
unt 91,350
bh 12,000
bh 200,000
unit 120,000
unit 85,000
bh 15,850
ps 42,500
unit 334,950
bh 15,000
bh 142,500
bh 28,350
bh 16,500

unit 250,000
unit 387,500
unit 517,650
unit 1,100,000
unit 450,000
unit 1,100,000
unit 4,950,000
unit 1,950,000
unit 3,751,550
unit 7,600,000

bh 685,000
bh 1,200,000
bh 2,131,500
bh 2,791,250
bh 3,298,750
bh 7,105,000
bh 4,060,000

33
SAT. HARGA SURVEY (Rp.) 2015

3
bh 2,300,000
bh 1,573,250
bh 1,433,350
bh 251,675
bh 142,100
bh 182,700
bh 16,747,500
bh 9,490,250
bh 170,000
bh 989,625
bh 475,000
bh 5,300,000

bh 60,900
bh 49,250
bh 66,875
bh 67,500
bh 19,625
bh 71,100
bh 76,125
bh 20,000
m1 11,000
bh 43,650
bh 7,250
bh 11,375
bh 17,200

34
DAFTAR UPAH
PROGRAM PERENCANAAN PEMBANGUNAN RUMAH DUA LANTAI

NO. JENIS PEKERJA BANGUNAN HARGA UPAH


Rp.

1 Pekerja 78,500
2 Tukang Gali 92,500
3 Tukang Batu 92,500
4 Tukang Kayu 92,500
5 Tukang Cat / Pelitur 92,500
6 Tukang Besi Beton 92,500
7 Tukang Besi Profil 92,500
8 Tukang Allumunium 92,500
8 Tukang Las 92,500
9 Tukang Las Konstruksi 92,500
9 Kepala Tukang 101,500
10 Mandor 110,500

KOTA CIMAHI Halaman : 35


2014
DAFTAR UPAH
NAAN PEMBANGUNAN RUMAH DUA LANTAI

SATUAN WAKTU

1 ORANG/ HR/ 8 JAM


1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM
1 ORANG/ HR/ 8 JAM

KOTA CIMAHI Halaman : 36


2014
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LANTAI
JANGAN DIHAPUS

NO. URAIAN+E575 KOEF/INDEKS SAT. HARGA SAT. (Rp.)

1 2 3 4 5

ABK Bangunan Gedung dan Perumahan Pekerjaan Persiapan


Lebih darisementara
=30
50m'kg: = 40dari a = 0.04
: Upah
m3 = Pekerjam3Setempat
A002 1
1 m'zak PC
Pagar literseng gelombang 1/25tinggi 2 meter( rupiah )
maka setiap jarak : (1 / (275 L / ( L: +Jarak
75 )))angkut
/25 x adalam m1
1 m3 Beton memerlukan =k …………. : Harga(bb) ……………..kg
angkutan a (Hasil
per m3 Perhitungan
= 1.2500 ) Setempat (rupiah )
Upah Pekerja
Dolken 7 s/d 10 Btg
L = 10 m1 = ( Termasuk harga
0,01236 x bahan
a L dan = peralatan angkut:dalam
Jarak angkut bambu,m1dll)
(bb)
Semen
L kg
= besi
PC Tigabeton
50Roda
m1 Rp.
/ 50……………………………………………..
kg
= 0,01818 x a k = 0.0500 Zak
Harga angkutan per m3
kL = =a /275 100( m1
L + = 75 ) 0,02545 x a (termasuk harga bahan dan peralatan angkut,
Seng
L Gelombang
= 200 BJLS
m1 28= 0,04000 x a 1.2000 Lbr
L beton
Pasir = 300 m1 = 0,05454 x a 0.0050 M3
Koral
Ket.beton
: L = Jarak angkut dalam m1 0.0090 M3
a = Upah pekerja setempat ( Rupiah )
Kayu Albasia 0.0720 M3
Paku 4 cm s/d 7 cm 0.0600 Kg
Meni Besi 0.4500 Kg
Tukang kayu 0.2000 OH
Pekerja 0.4000 OH
Kepala tukang 0.0200 OH
Mandor 0.0200 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A004 1 m' Pengukuran dan pemasangan bouwplank

Kayu Balok Borneo Super 0.0120 M3


Paku 4 cm s/d 7 cm 0.0200 Kg
Kayu Albasia 0.0070 M3
Tukang kayu 0.1000 OH
Pekerja 0.1000 OH
Kepala tukang 0.0100 OH
Mandor 0.0050 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan
1 2 3 4 5

A005 1 m2 Pembuatan kantor sementara, dengan lantai plesteran

Dolken 7 s/d 10 1.2500 Btg


Kayu Balok Borneo Super 0.1800 M3
Kayu Albasia 0.8500 Kg
Plat Besi 2 mm s/d 5 mm 1.1000 Kg
Semen PC Tiga Roda / 50 kg 0.7000 Zak
Pasir pasang 0.1500 M3
Pasir beton 0.1000 M3
Koral beton 0.1500 M3
Bata Merah Bakar Kelas II 30.0000 Bh
Seng Gelombang BJLS 28 0.2500 Lbr
Nako Lengkap Tralis 1 Daun 2.0000 Bh
Kaca Polos 5 mm ( ASAHI ) 0.0800 M2
Kunci 2 Slaag ROYAL 0.1500 Bh
Triplek 4 mm 120 x 240 0.0600 Lbr
Tukang kayu 2.0000 OH
Tukang batu 1.0000 OH
Pekerja 2.0000 OH
Kepala tukang 0.3000 OH
Mandor 0.0500 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A006 1 m2 Pembuatan gudang semen dan alat-alat

Dolken 7 s/d 10 1.7000 Btg


Kayu Albasia 0.2100 M3
Paku 4 cm s/d 7 cm 0.3000 Kg
Semen PC Tiga Roda / 50 kg 0.2100 Zak
Pasir beton 0.0300 M3
Koral beton 0.0500 M3
Seng Gelombang BJLS 28 1.5000 Lbr
Tukang kayu 2.0000 OH
Pekerja 1.0000 OH
Kepala tukang 0.2000 OH
Mandor 0.0500 OH
Jumlah
1 2 3 4 5

Keuntungan Max.
Jumlah
Dibulatkan

A008 1 m2 Membersihkan lapangan dan peralatan

Pekerja 0.1000 OH
Mandor 0.0500 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

A011 1 m2 Pembuatan Stegger dari bambu, ukuran (40 x 50 x 20) cm

Bambu Ø 5 s.d 7 1.0000 Btg


Injuk 0.2500 Kg
Tukang kayu 0.0170 OH
Pekerja 0.0020 OH
Kepala tukang 0.2500 OH
Mandor 0.0130 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

ABK bangunan gedung dan perumahan pekerjaan tanah

B001 1 m3 Galian tanah biasa sedalam 1 meter

Pekerja 0.7500 OH
Mandor 0.0250 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

B002 1 m3 Galian tanah biasa sedalam 2 meter

Pekerja 0.9000 OH
Mandor 0.0450 OH
Jumlah
Keuntungan Max.
Jumlah
Dibulatkan

B009 1 m3 Urugan kembali galian

Pekerja 0.3333 OH
Mandor 0.0107 OH
Jumlah
HARGA SATUAN PEKERJAAN
NCANA PEMBANGUNAN RUMAH 2 LANTAI

HARGA SAT. (Rp.) JUMLAH (Rp.)

5 6=(3x5)

Upah
m3 = Pekerja
1/25 m3Setempat ( rupiah )
Jarak
75 )))angkut
/25 x adalam m1
…. (bb)
Harga ……………..kg
angkutan a (Hasil
per m3 = Perhitungan ) Setempat (rupiah )
Upah Pekerja 31,000.00 38,750.00
Termasuk
1236 harga
x bahan
a L dan
= peralatan angkut:dalam
Jarak angkut bambu,
m1dll)
………………………………..
1818 x a k = Harga angkutan per m3 73,750.00 3,687.50
545 x a (termasuk harga bahan dan peralatan angkut, bambu, dll)
000 x a 46,000.00 55,200.00
454 x a 258,000.00 1,290.00
195,000.00 1,755.00
( Rupiah )
1,260,000.00 90,720.00
15,000.00 900.00
32,000.00 14,400.00
92,500.00 18,500.00
78,500.00 31,400.00
101,500.00 2,030.00
110,500.00 2,210.00
260,842.50
26,084.25
286,926.75
286,920.00

4,700,000.00 56,400.00
15,000.00 300.00
1,260,000.00 8,820.00
92,500.00 9,250.00
78,500.00 7,850.00
101,500.00 1,015.00
110,500.00 552.50
84,187.50
8,418.75
92,606.25
92,600.00
5 6=(3x5)

31,000.00 38,750.00
4,700,000.00 846,000.00
1,260,000.00 1,071,000.00
- -
73,750.00 51,625.00
195,000.00 29,250.00
258,000.00 25,800.00
195,000.00 29,250.00
700.00 21,000.00
46,000.00 11,500.00
75,000.00 150,000.00
95,000.00 7,600.00
90,000.00 13,500.00
61,850.00 3,711.00
92,500.00 185,000.00
92,500.00 92,500.00
78,500.00 157,000.00
101,500.00 30,450.00
110,500.00 5,525.00
2,769,461.00
276,946.10
3,046,407.10
3,046,400.00

31,000.00 52,700.00
1,260,000.00 264,600.00
15,000.00 4,500.00
73,750.00 15,487.50
258,000.00 7,740.00
195,000.00 9,750.00
46,000.00 69,000.00
92,500.00 185,000.00
78,500.00 78,500.00
101,500.00 20,300.00
110,500.00 5,525.00
713,102.50
5 6=(3x5)

71,310.25
784,412.75
784,410.00

78,500.00 7,850.00
110,500.00 5,525.00
13,375.00
1,337.50
14,712.50
14,710.00

15,500.00 15,500.00
5,675.00 1,418.75
92,500.00 1,572.50
78,500.00 157.00
101,500.00 25,375.00
110,500.00 1,436.50
45,459.75
4,545.98
50,005.73
50,000.00

78,500.00 58,875.00
110,500.00 2,762.50
61,637.50
6,163.75
67,801.25
67,800.00

78,500.00 70,650.00
110,500.00 4,972.50
75,622.50
7,562.25
83,184.75
83,180.00

78,500.00 26,166.67
110,500.00 1,178.67
27,345.33
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

I PEKERJAAN PERSIAPAN
1 Pengukuran Lahan M2
2 Pembersihan Lahan M2
3 Direksi Keet M2
5 Gudang M2
6 Pemasangan Bowplang M1
7 Pagar Pengaman M1
8 Papan Proyek M2
9 Air Proyek M2
10 Listrik Kerja Kwh/bln

II PEKERJAAN TANAH
1 Galian Pondasi Utuh (Batu Kali) M3
2 Galian Pondasi Setengah Tipe 1 (Batu Kali) M3
3 Galian Pondasi Setengah Tipe 2 (Batu Kali) M3
4 Galian Pondasi Rollag M3
5 Galian Pondasi Footplat M3
6 Galian Septic Tank M3
7 Galian Sumur Resapan M3
8 Urugan M3

III PEKERJAAN PONDASI


1 Pasir Urug M3
2 Aanstamping M3
3 Pondasi Utuh (Batu Kali) M3
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

4 Pondasi Setengah Tipe 1 (Batu Kali) M3


5 Pondasi Setengah Tipe 2 (Batu Kali) M3
6 Pondasi Rollag M3
7 Pondasi Footplat M3
8 Lantai Kerja M3

IV PEKERJAAN STRUKTUR LANTAI 1


1 Sloof M3
2 Kolom K1 M3
3 Kolom K2 M3
4 Balok B1 M3
5 Balok B2 M3
6 Tangga M3

V PEKERJAAN STRUKTUR LANTAI 2


1 Plat Lantai M3
2 Dak Beton M3
3 Balok Ampig M3
4 Kolom K2 M3
5 Balok B2 M3
6 Ring Balok M3

VI PEKERJAAN KUSEN LANTAI 1


1 Kusen Pintu 1 M3
2 Kusen Pintu 2 M3
3 Kusen Pintu 3 M3
4 Kusen Jendela 1 M3
5 Kusen Jendela 3 M3
6 Kusen Jendela 4 M3
7 Kusen Bouvenli M3
8 Kusen Pintu Jendela 1 M3
9 Kusen Pintu Jendela 3 M3

VII PEKERJAAN KUSEN LANTAI 2


1 Kusen Pintu 1 M3
2 Kusen Pintu 2 M3
3 Kusen Jendela 1 M3
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

4 Kusen Jendela 2 M3
5 Kusen Jendela 3 M3
6 Kusen Jendela 4 M3
7 Kusen Pintu Jendela 1 M3
8 Bouvenli M3
9 Kaca M2
10 Daun Pintu M3
11 Daun Jendela M3

VIII PEKERJAAN DINDING LANTAI 1


1 Pas. Dinding Bata Merah 1:4 M2
Pas. Dinding Bata Merah 1:2 (Trasraam) M2
2 Pas. Dinding Pagar Bata Merah 1:4 M2
3 Plesteran Dinding 1:4 M2
4 Plesteran Dinding1:2 M2
5 Plesteran Dinding1:4 M2
6 Acian Dinding 1:4 M2
7 Acian Dinding 1:2 M2

IX PEKERJAAN DINDING LANTAI 2


1 Pas. Dinding Bata Merah 1:4 M2
2 Pas. Dinding Bata Merah 1:2 (Trasraam) M2
3 Plesteran Dinding 1:4 M2
4 Plesteran Dinding1:2 M2
5 Acian Dinding 1:4 M2
6 Acian Dinding 1:2 M2

X PEKERJAAN PENUTUP LANTAI 1


1 Pasangan Keramik Polos 40x40 M2
2 Pasangan Keramik Granit 50x50 M2
3 Pasangan Keramik 30x30 M2
4 Pasangan Keramik Tangga M2
5 Pasangan Keramik 20x20 M2
6 Batu Sikat M2
7 Plin Lantai Keramik Polos M2

XI PEKERJAAN PENUTUP LANTAI 2


1 Pasangan Keramik Polos 40x40 M2
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

2 Pasangan Keramik 20x20 M2


3 Plin Lantai Keramik Polos M2

XII PEKERJAAN PLAFOND LANTAI 1


1 Rangka Plafond M2
2 Penutup Plafond M2
3 List Plafond M1

XIII PEKERJAAN PLAFOND LANTAI 2


1 Rangka Plafond M2
2 Penutup Plafond M2
3 List Plafond M1

XIV PEKERJAAN ATAP GENTENG


1 Penutup Atap Genteng M2
2 Rangka Atap M2
3 Bubungan M1
4 Talang M1
5 Lisplang M3
6 Papan Ruiter M3
7 Balok Nook M3
8 Gording M3
9 Balok Tembok M3
10 Kuda-kuda M3
11 Plat bh
12 Baut bh

XV PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2
2 Batu Alam M2
3 Pengecatan Plafond M2
4 Pengecatan Lisplang M1
5 Pengecatan Kusen Pintu Dan Jendela M1
6 Pengecatan Daun Pintu M2
7 Pengecatan Daun Jendela M2

XVI PEKERJAAN ME
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

1 Penangkal Petir bh
2 Penyambung PLN Ls
3 Stop Kontak bh
4 Saklar Tunggal bh
5 Saklar Seri bh
6 Lampu Down Light bh
7 Lampu TL bh
8 Baret Bulat bh
9 Lampu Taman bh

XVII PEKERJAAN SANITASI


1 Pemasangan Instalasi Air Bersih M1
2 Pemasangan Instalasi Air Kotor M1
3 WC Duduk bh
4 WC Jongkok bh
5 Wastafel bh
6 Bak Fiber Unit
7 Kran Air bh
8 Floor Drain bh
9 Pompa Air bh
10 Tempat Sabun bh
11 Knee D 1/2" bh
12 Tee 1/2" bh
13 Pipa D 1/2" M1
14 Elbow D3" bh
15 Tee D 3" bh
16 Pipa D 3" M1
17 Kitcheb Sinks bh
18 Bathtube bh

XVIII PEKERJAAN ALAT PENGGANTUNG


1 Kunci Tanam Pintu Depan Dan Belakang bh
2 Pegangan Pintu Depan Dan Belakang bh
3 Kunci Tanam Pintu Depan Utama bh
4 Kunci Tanam Pintu KM/WC bh
5 Engsel Pintu bh
6 Engsel Jendela bh
7 Slot Pintu Depan Dan Belakang bh
BILL OF QUANTITY
PERHITUNGAN VOLUME/KUANTITAS PEKER
PROGRAM RENCANA PEMBANGUNAN RUMAH 2 LAN

No. Uraian Pekerjaan Satuan

8 Slot Pintu KM/WC bh


9 Slot Jendela bh
10 Rel Handerson bh
11 Railing Tangga Unit
12 Hak Angin bh

XIX PEKERJAAN RUANG LUAR


1 Kolam Unit
2 Gazebo Unit
3 Tanaman semak hias M2
4 Pohon Pelindung Btg
5 Atap Carport M2
6 Carport M2
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)

459.00
459.00
19.50
6.00
85.00
40.50
1.50
480.00
480.00
- -

137.15
35.89
23.63
9.75
1 72.80
/ 4.65
4
1.57
G
69.81
a
l
i
a
n 8.63
21.11
58.03
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)
21.75
20.55
0.10
5.80
1.00

1
5
3x
02 5.87
1x 6.00
503
1x 1.70
05
11x 2.40
55
4
x0 2.05
2
0 4.30
-
1
2
1 14.18
2C
1 2.64
5M
1C
xM 0.39
52
1x 1.89
05
11
x5 1.32
52
x0 5.87
2
0

0.12
0.12
0.01
0.05
0.20
0.11
0.06
0.291
0.126
-

0.12
0.04
0.05
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)
0.04
0.13
0.06
0.07
0.02
44.27
1.58
0.84

240.80
64.80
54.75
481.60
129.60
109.50
481.60
129.60

217.95
13.50
435.90
27.00
435.90
27.00

120.5
42
12.25
3.5
21.75
12
28.69

101.75
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)
5
11.1

1
2
243.50
0
x 243.50
2
196.50
4
0
1
2
176.00
0
x 176.00
2
100.50
4
0

D
i 327.70
m 327.70
e
nD 17.50
si 69.50
D
im
i 0.44
e
D
m
2in 0.08
e
s
m 0.18
n/
ei
s 0.83
n
i2
s8 0.65
0i
8 2.33
/
8 54.00
/
1
153.00
/2
1
2
1
2
587.30
4.50
419.50
150.00
120.90
79.06
41.84
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)
3
1
14
13
10
43
23
4
4

80
162
3
1
3
3
10
4
1
1
13
8
90
26
8
70
1
1
-

2
4
13
3
48
62
4
OF QUANTITY
OLUME/KUANTITAS PEKERJAAN
A PEMBANGUNAN RUMAH 2 LANTAI

Perhitungan Volume
Pekerjaan Volume
Keterangan
Panjang Lebar Tinggi /Kuantitas
(m) (m) (m)
3
45
1
1
30

1
1
27
3
24
36
NO URAIAN PEKERJAAN PENJELASAN PEKERJAAN VOLUME SAT

I. PEKERJAAN PERSIAPAN
1 Pengukuran Lahan Keseluruhan luas lahan 459 M2
2 Pembersihan Lahan Keseluruhan luas lahan 459 M2
3 Direksi Keet Direksi keet terletak muka lahan 19.5 M2
5 Gudang Gudang terletak di muka lahan 6 M2
6 Pemasangan Bowplang 85 M1
7 Pagar Pengaman Mengelilingi lahan 40.5 M1
8 Papan Proyek Ditempatkan di depan pada akses masuk ke proyek 1.5 M2
9 Air Proyek Dari PDAM 480 M2
10 Listrik Kerja Dari PLN 480 Kwh/bln

II PEKERJAAN TANAH
1 Galian Pondasi Utuh (Batu Digali sesuai kedalaman pondasi 137.15 M3
Kali)
2 Galian Pondasi Setengah Digali sesuai kedalaman pondasi 35.89 M3
Tipe 1 (Batu Kali)
3 Galian Pondasi Setengah Tipe Digali sesuai kedalaman pondasi 23.63 M3
4 Galian Pondasi Rollag Digali sesuai kedalaman pondasi 9.75 M3
5 Galian Pondasi Footplat Digali pada titik kolom Struktur 72.80 M3
6 Galian Septic Tank Dibuat dihalaman belakang 4.65 M3
7 Galian Sumur Resapan Dibuat dihalaman belakang 1.57 M3
8 Urugan Tanah galian dimasukkan kembali 69.81 M3

III PEKERJAAN PONDASI


1 Pasir Urug Terdapat di pondasi pasangan batu kali 8.63 M3
2 Aanstamping Terdapat di pondasi pasangan batu kali 21.11 M3
3 Pondasi Utuh (Batu Kali) Pasangan batu kali 58.03 M3
4 Pondasi Setengah Tipe 1 (BatuPasangan batu kali 21.75 M3
5 Pondasi Setengah Tipe 2 (BatuPasangan batu kali 20.55 M3
6 Pondasi Rollag Tumpukan Bata 0.10 M3
7 Pondasi Footplat Beton bertulang 5.80 M3
8 Lantai Kerja Beton bertulang 1.00 M3

IV PEKERJAAN STRUKTUR LANTAI 1


1 Sloof Beton struktur bertulang 5.87 M3
2 Kolom K1 Beton struktur bertulang 6.00 M3
3 Kolom K2 Beton struktur bertulang 1.70 M3
4 Balok B1 Beton struktur bertulang 2.40 M3
5 Balok B2 Beton struktur bertulang 2.05 M3
6 Tangga Beton struktur bertulang 4.30 M3

V PEKERJAAN STRUKTUR LANTAI 2


1 Plat Lantai Beton struktur bertulang 14.18 M3
2 Dak Beton Beton struktur bertulang 2.64 M3
3 Balok Ampig Beton struktur bertulang 0.39 M3
4 Kolom K2 Beton struktur bertulang 1.89 M3
5 Balok B2 Beton struktur bertulang 1.32 M3
6 Ring Balok Beton bertulang 5.87 M3

VI PEKERJAAN KUSEN LANTAI 1


1 Kusen Pintu 1 Bahan kayu 0.117 M3
2 Kusen Pintu 2 Bahan kayu 0.115 M3
3 Kusen Pintu 3 Bahan kayu 0.0075 M3
4 Kusen Jendela 1 Bahan kayu 0.0534 M3
5 Kusen Jendela 3 Bahan kayu 0.1962 M3
6 Kusen Jendela 4 Bahan kayu 0.106 M3
7 Kusen Bouvenli Bahan kayu 0.06 M3
8 Kusen Pintu Jendela 1 Bahan kayu 0.291 M3
9 Kusen Pintu Jendela 3 Bahan kayu 0.126 M3

VII PEKERJAAN KUSEN LANTAI 2


1 Kusen Pintu 1 Bahan kayu 0.12 M3
2 Kusen Pintu 2 Bahan kayu 0.04 M3
3 Kusen Jendela 1 Bahan kayu 0.05 M3
4 Kusen Jendela 2 Bahan kayu 0.04 M3
5 Kusen Jendela 3 Bahan kayu 0.13 M3
6 Kusen Jendela 4 Bahan kayu 0.06 M3
7 Kusen Pintu Jendela 1 Bahan kayu 0.07 M3
8 Bouvenli Bahan kayu 0.02 M3
9 Kaca Tebal kaca 5 mm 44.27 M2
10 Daun Pintu Bahan kayu 1.58 M3
11 Daun Jendela Bahan kayu 0.84 M3

VIII PEKERJAAN DINDING LANTAI 1


Pas. Dinding Bata Merah 1:4
1 Dipasang pada ruangan biasa 240.80 M2

Pas. Dinding Bata Merah 1:2


(Trasraam) Dipasang pada KM/WC 64.80 M2

2 Pas. Dinding Pagar Bata Dipasang pada pagar rumah 54.75 M2


Merah 1:4
3 Plesteran Dinding 1:4 Dipasang pada ruangan biasa 481.60 M2
4 Plesteran Dinding1:2 Dipasang pada KM/WC 129.60 M2
5 Plesteran Dinding1:4 Dipasang pada pagar rumah 109.50 M2
6 Acian Dinding 1:4 Dipasang pada ruangan biasa 481.60 M2
7 Acian Dinding 1:2 Dipasang pada KM/WC 129.60 M2

IX PEKERJAAN DINDING LANTAI 2


Pas. Dinding Bata Merah 1:4
1 Dipasang pada ruangan biasa 217.95 M2

Pas. Dinding Bata Merah 1:2


2 (Trasraam) Dipasang pada KM/WC 13.50 M2

3 Plesteran Dinding 1:4 Dipasang pada ruangan biasa 435.90 M2


4 Plesteran Dinding1:2 Dipasang pada KM/WC 27.00 M2
5 Acian Dinding 1:4 Dipasang pada ruangan biasa 435.90 M2
6 Acian Dinding 1:2 Dipasang pada KM/WC 27.00 M2
X PEKERJAAN PENUTUP LANTAI 1
Pasangan Keramik Polos
1 40x40 Glossy 120.5 M2

Pasangan Keramik Granit


2 50x50 Granit 42 M2

3 Pasangan Keramik 30x30 Glossy 12.25 M2


4 Pasangan Keramik Tangga Glossy 3.5 M2
5 Pasangan Keramik 20x20 Glossy 21.75 M2
6 Batu Sikat Penutup lantai Carport 12 M2
7 Plin Lantai Keramik Polos 10 CM dari muka lantai 28.69 M2

XI PEKERJAAN PENUTUP LANTAI 2


Pasangan Keramik Polos
1 40x40 Glossy 101.75 M2

2 Pasangan Keramik 20x20 Glossy 5 M2


3 Plin Lantai Keramik Polos Menutupi setiap celah pasangan keramik 11.1 M2

XII PEKERJAAN PLAFOND LANTAI 1


1 Rangka Plafond Bahan Gypsum Board tebal 9 mm 243.50 M2
2 Penutup Plafond Dibuat 60x60 243.50 M2
3 List Plafond Bahan Gypsum 196.50 M1

XIII PEKERJAAN PLAFOND LANTAI 2


1 Rangka Plafond Bahan Gypsum Board tebal 9 mm 176.00 M2
2 Penutup Plafond Dibuat 60x60 176.00 M2
3 List Plafond Bahan Gypsum 100.50 M1

XIV PEKERJAAN ATAP GENTENG


1 Penutup Atap Genteng Genteng 327.70 M2
2 Rangka Atap Kayu borneo (Kelas II) 327.70 M2
3 Bubungan Genteng palentong super 17.50 M1
4 Talang 69.50 M1
5 Lisplang Bahan kayu 0.44 M3
6 Papan Ruiter Bahan kayu 0.08 M3
7 Balok Nook 0.18 M3
8 Gording 0.83 M3
9 Balok Tembok Penumpu kaki kuda-kuda 0.65 M3
10 Kuda-kuda Kayu borneo (Kelas II) 2.33 M3
11 Plat Pengikat rangka atap 54.00 bh
12 Baut Penguat rangka atap 153.00 bh

XV PEKERJAAN PENGECATAN
1 Pengecatan Dinding Di cat diluar dan didalam 587.30 M2
2 Batu Alam Hanya pada eksterior 4.50 M2
3 Pengecatan Plafond Bahan cat tembok 419.50 M2
4 Pengecatan Lisplang Bahan cat kayu 150.00 M1
5 Pengecatan Kusen Pintu Dan JBahan cat kayu 120.90 M1
6 Pengecatan Daun Pintu Bahan cat kayu 79.06 M2
7 Pengecatan Daun Jendela Bahan cat kayu 41.84 M2

XVI PEKERJAAN ME
1 Penangkal Petir Dipasang diatas atap 3 bh
2 Penyambung PLN 1600-2400 Watt 1 Ls
3 Stop Kontak Terletak di Lantai 1 & 2 14 bh
4 Saklar Tunggal 160 cm dari permukaan lantai 13 bh
5 Saklar Seri 160 cm dari permukaan lantai 10 bh
6 Lampu Down Light Terletak di Lantai 1 & 2 43 bh
7 Lampu TL Terletak di Lantai 1 & 2 23 bh
8 Baret Bulat Terletak di Lantai 1 & 2 4 bh
9 Lampu Taman Di halaman luar 4 bh

XVII PEKERJAAN SANITASI


Pemasangan Instalasi Air
1 Bersih Dipasang hanya untuk air bersih 80 M1
Pemasangan Instalasi Air
2 Kotor Dipasang hanya untuk air kotor 162 M1
3 WC Duduk KM/WC lantai 1 & 2 3 bh
4 WC Jongkok KM/WC luar 1 bh
5 Wastafel KM/WC lantai 1 & 2 3 bh
6 Bak Fiber KM/WC lantai 1 & 2 3 Unit
7 Kran Air KM/WC lantai 1 & 2 10 bh
8 Floor Drain Terletak di setiap KM/WC 4 bh
9 Pompa Air Ditanam ditanah dengan beton 1 bh
10 Tempat Sabun KM/WC lantai 1 & 2 1 bh
11 Knee D 1/2" 13 bh
12 Tee 1/2" 8 bh
13 Pipa D 1/2" Dipasang hanya untuk air bersih 90 M1
14 Elbow D3" 26 bh
15 Tee D 3" 8 bh
16 Pipa D 3" Dipasang hanya untuk air kotor 70 M1
17 Kitcheb Sinks Dipasang hanya dilantai 1 pada bagian dapur 1 bh
18 Bathtube Di lantai 1 1 bh

XVIIIPEKERJAAN ALAT PENGGANTUNG


Kunci Tanam Pintu Depan
1 Dan Belakang Dipasang disetiap pintu Lantai 1 & 2 2 bh
Pegangan Pintu Depan Dan
2 Belakang Dipasang disetiap pintu Lantai 1 & 2 4 bh

3 Kunci Tanam Pintu Depan Ut Dipasang pada pintu masuk utama 13 bh


4 Kunci Tanam Pintu KM/WC Dipasang disetiap pintu Lantai 1 & 2 3 bh
5 Engsel Pintu Engsel kupu-kupu 48 bh
6 Engsel Jendela Engsel kupu-kupu 62 bh
7 Slot Pintu Depan Dan BelakanDipasang disetiap pintu Lantai 1 & 2 4 bh
8 Slot Pintu KM/WC Dipasang disetiap pintu Lantai 1 & 2 3 bh
9 Slot Jendela Dipasang disetiap jendela Lantai 1 & 2 45 bh
10 Rel Handerson Untuk Pintu Garasi 1 bh
11 Railing Tangga Dari Besi Plat 1 Unit
12 Hak Angin Dipasang disetiap jendela Lantai 1 & 2 30 bh
XIX PEKERJAAN RUANG LUAR
1 Kolam Ditempatkan di ruang luar/taman 1 Unit
2 Gazebo Ditempatkan di ruang luar/taman 1 Unit
3 Tanaman semak hias Ditempatkan di ruang luar/taman 27 M2
4 Pohon Pelindung Ditempatkan di ruang luar/taman 3 Btg
5 Atap Carport 24 M2
6 Carport Rabat beton adukan plesteran 36 M2
HARGA SATUAN TOTAL HARGA KETERANGAN
SUB TOTAL
(RP) (RP)

14,710 6,751,890.00 1,628,904,514.39


14,710 6,751,890.00 1,628,904,514.39
3,046,400 59,404,800.00 1,628,904,514.39
784,410 4,706,460.00 1,628,904,514.39
92,600 7,871,000.00 1,628,904,514.39
1,392 56,376.00 1,628,904,514.39
500,000 750,000.00 1,628,904,514.39
1,392 668,160.00 1,628,904,514.39
3,500 1,680,000.00 1,628,904,514.39

88,640,576.00

67,800 9,298,770.00 1,628,904,514.39


67,800 2,433,342.00 1,628,904,514.39
67,800 1,602,114.00 1,628,904,514.39
67,800 661,050.00 1,628,904,514.39
83,180 6,055,504.00 1,628,904,514.39
83,180 386,787.00 1,628,904,514.39
83,180 130,592.60 1,628,904,514.39
1,676,703 117,042,252.92 1/4 Galian 1,628,904,514.39
137,610,412.52

159,120 1,373,205.60 1,628,904,514.39


434,250 9,167,017.50 1,628,904,514.39
869,930 50,482,037.90 1,628,904,514.39
869,930 18,920,977.50 1,628,904,514.39
869,930 17,877,061.50 1,628,904,514.39
869,930 86,993.00 1,628,904,514.39
3,696,990 21,442,542.00 1,628,904,514.39
886,430 886,430.00 120,236,265.00 Tebal 10 CM 1,628,904,514.39

120,236,265.00

4,471,380.00 26,224,643.70 15x20 1,628,904,514.39


8,012,660.00 48,075,960.00 30x30 1,628,904,514.39
8,012,660.00 13,621,522.00 15x15 1,628,904,514.39
6,322,520.00 15,174,048.00 15x40 1,628,904,514.39
6,322,520.00 12,935,875.92 15x20 1,628,904,514.39
1,205,920.00 5,181,838.24 121,213,887.86 1,628,904,514.39

121,213,887.86

6,025,650 85,413,588.75 12 CM 1,628,904,514.39


1,205,920 3,183,628.80 12 CM 1,628,904,514.39
6,322,520 2,465,782.80 15x20 1,628,904,514.39
8,012,660 15,143,927.40 15x15 1,628,904,514.39
6,322,520 8,345,726.40 15x20 1,628,904,514.39
97,130 569,667.45 115,122,321.60 15x20 1,628,904,514.39

115,122,321.60

8,828,710 1,032,959.07 1,628,904,514.39


8,828,710 1,015,301.65 1,628,904,514.39
8,828,710 66,215.33 1,628,904,514.39
8,828,710 471,453.11 1,628,904,514.39
8,828,710 1,732,192.90 1,628,904,514.39
8,828,710 935,843.26 1,628,904,514.39
8,828,710 529,722.60 1,628,904,514.39
8,828,710 2,569,154.61 1,628,904,514.39
8,828,710 1,112,417.46 9,465,259.99 1,628,904,514.39

9,465,259.99
8,828,710 1,032,959.07 1,628,904,514.39
8,828,710 353,148.40 1,628,904,514.39
8,828,710 471,453.11 1,628,904,514.39
8,828,710 331,076.63 1,628,904,514.39
8,828,710 1,147,732.30 1,628,904,514.39
8,828,710 529,722.60 1,628,904,514.39
8,828,710 618,009.70 1,628,904,514.39
8,828,710 176,574.20 1,628,904,514.39
133,270 5,899,596.36 1,628,904,514.39
8,828,710 13,958,190.51 1,628,904,514.39
8,828,710 7,387,864.53 31,906,327.41 1,628,904,514.39

31,906,327.41

126,570 1,628,904,514.39
30,478,056.00
137,590 1,628,904,514.39
8,915,832.00
126,570 6,929,707.50 1,628,904,514.39
59,930 28,862,288.00 1,628,904,514.39
32,270 4,182,192.00 1,628,904,514.39
59,930 6,562,335.00 1,628,904,514.39
35,050 16,880,080.00 1,628,904,514.39
35,050 4,542,480.00 107,352,970.50 1,628,904,514.39

107,352,970.50

126,570 1,628,904,514.39
27,585,931.50
137,590 1,628,904,514.39
1,857,465.00
59,930 26,123,487.00 1,628,904,514.39
32,270 871,290.00 1,628,904,514.39
35,050 15,278,295.00 1,628,904,514.39
35,050 946,350.00 72,662,818.50 1,628,904,514.39

72,662,818.50
415,380 1,628,904,514.39
50,053,290.00
165,700 1,628,904,514.39
6,959,400.00
199,800 2,447,550.00 1,628,904,514.39
212,010 742,035.00 1,628,904,514.39
212,010 4,611,217.50 1,628,904,514.39
871,730 10,460,760.00 1,628,904,514.39
35,050 1,005,584.50 76,279,837.00 1,628,904,514.39

76,279,837.00

415,380 1,628,904,514.39
42,264,915.00
212,010 1,060,050.00 1,628,904,514.39
212,010 2,353,311.00 45,678,276.00 1,628,904,514.39

45,678,276.00

140,750 34,272,625.00 1,628,904,514.39


43,630 10,623,905.00 120x240 1,628,904,514.39
55,220 10,850,730.00 55,747,260.00 1,628,904,514.39

55,747,260.00

140,750 24,772,000.00 1,628,904,514.39


43,630 7,678,880.00 120x240 1,628,904,514.39
55,220 5,549,610.00 38,000,490.00 1,628,904,514.39

38,000,490.00

47,750 15,647,675.00 1,628,904,514.39


115,650 37,898,505.00 1,628,904,514.39
90,410 1,582,175.00 1,628,904,514.39
166,925 11,601,287.50 1,628,904,514.39
81,200 36,052.80 Dimensi 2 / 20 1,628,904,514.39
115,650 9,714.60 1,628,904,514.39
115,650 21,094.56 1,628,904,514.39
115,650 95,989.50 Dimensi 8 / 12 1,628,904,514.39
115,650 75,403.80 Dimensi 8 / 12 1,628,904,514.39
7,821,710 18,224,584.30 Dimensi 8 / 12 1,628,904,514.39
45,000 2,430,000.00 1,628,904,514.39
45,000 6,885,000.00 94,507,482.06 1,628,904,514.39

94,507,482.06

44,770 26,293,421.00 1,628,904,514.39


247,550 1,113,975.00 1,628,904,514.39
44,770 18,781,015.00 1,628,904,514.39
45,590 6,838,500.00 1,628,904,514.39
60,580 7,324,122.00 1,628,904,514.39
60,580 4,789,454.80 1,628,904,514.39
60,580 2,534,667.20 67,675,155.00 1,628,904,514.39

67,675,155.00

400,000 1,200,000.00 1,628,904,514.39


2,000,000 2,000,000.00 1,628,904,514.39
237,500 3,325,000.00 1,628,904,514.39
12,285 159,705.00 1,628,904,514.39
16,135 161,350.00 1,628,904,514.39
147,070 6,324,010.00 1,628,904,514.39
45,000 1,035,000.00 1,628,904,514.39
136,000 544,000.00 1,628,904,514.39
140,000 560,000.00 15,309,065.00 1,628,904,514.39

15,309,065.00

400,690 1,628,904,514.39
32,055,200.00
64,170 1,628,904,514.39
10,395,540.00
1,909,900 5,729,700.00 1,628,904,514.39
1,623,110 1,623,110.00 1,628,904,514.39
1,026,800 3,080,400.00 1,628,904,514.39
525,000 1,575,000.00 1,628,904,514.39
167,475 1,674,750.00 1,628,904,514.39
90,910 363,640.00 1,628,904,514.39
375,000 375,000.00 1,628,904,514.39
50,000 50,000.00 1,628,904,514.39
95,000 1,235,000.00 1,628,904,514.39
2,500 20,000.00 1,628,904,514.39
16,250 1,462,500.00 1,628,904,514.39
2,500 65,000.00 1,628,904,514.39
2,500 20,000.00 1,628,904,514.39
138,000 9,660,000.00 1,628,904,514.39
342,030 342,030.00 1,628,904,514.39
3,106,500 3,106,500.00 72,833,370.00 1,628,904,514.39

72,833,370.00

679,800 1,628,904,514.39
1,359,600.00
131,026 1,628,904,514.39
524,104.00
166,790 2,168,270.00 1,628,904,514.39
679,800 2,039,400.00 1,628,904,514.39
62,320 2,991,360.00 1,628,904,514.39
40,650 2,520,300.00 1,628,904,514.39
35,500 142,000.00 1,628,904,514.39
35,500 106,500.00 1,628,904,514.39
15,850 713,250.00 1,628,904,514.39
740,200 740,200.00 1,628,904,514.39
2,500,000 2,500,000.00 1,628,904,514.39
31,520 945,600.00 16,750,584.00 1,628,904,514.39

16,750,584.00
77,000,000 77,000,000.00 1,628,904,514.39
4,400,000 4,400,000.00 1,628,904,514.39
191,663.70 5,138,982.96 1,628,904,514.39
102,951 308,853.00 1,628,904,514.39
7,875,000 189,000,000.00 1,628,904,514.39
1,835,120 66,064,320.00 341,912,155.96 1,628,904,514.39

341,912,155.96
Total 1,628,904,514.39
Dibulatkan 1,628,900,000.00
RENCANA ANGGARAN BIAYA

M
BOBOT
1 2 3 4 5 6 7 8 9 10
`
0.00415 0.00415
0.00415 0.00415
0.03647 0.03647
0.00289 0.00289
0.00483 0.00483
0.00003 0.00003
0.00046 0.00046
0.00041 0.00041
0.00103 0.00103

0.00571 0.00571
0.00149 0.00149
0.00098 0.00098
0.00041 0.00041
0.00372 0.00372
0.00024 0.00024
0.00008 0.00008
0.07185 0.07185

0.00084 0.00084
0.00563 0.00563
0.03099 0.03099
0.01162 0.01162
0.01097 0.01097
0.00005 0.00005
0.01316 0.01316
0.00054 0.00054

0.01610 0.0161
0.02951 0.02951
0.00836 0.00836
0.00932 0.00932
0.00794 0.00794
0.00318 0.00318

0.05244 0.05244
0.00195 0.00195
0.00151 0.00151
0.00930 0.0093
0.00512 0.00512
0.00035 0.00035

0.00063 0.00063
0.00062 0.00062
0.00004 0.00004
0.00029 0.00029
0.00106 0.00106
0.00057 0.00057
0.00033 0.00033
0.00158 0.00158
0.00068 0.00068
0.00063 0.00063
0.00022 0.00063
0.00029 0.00029
0.00020 0.00022
0.00070 0.0007
0.00033 0.00033
0.00038 0.00038
0.00011 0.00011
0.00362 0.00362
0.00857 0.00857
0.00454 0.00454

0.01871
0.01871
0.00547
0.00547
0.00425 0.00425
0.01772 0.01772
0.00257 0.00257
0.00403 0.00403
0.01036 0.01036
0.00279 0.00279

0.01694
0.01694
0.00114
0.00114
0.01604
0.00053
0.00938
0.00058
0.03073
0.03073
0.00427
0.03073
0.00150 0.0015
0.00046 0.00046
0.00283 0.00283
0.00642
0.00062 0.00062

0.02595
0.002595
0.00065 0.00065
0.00144 0.00144

0.02104
0.00652
0.00666

0.01521
0.00471
0.00341

0.00961
0.02327
0.00097
0.00712
0.00002
0.00001
0.00001
0.00006
0.00005
0.01119
0.00149
0.00423

0.01614
0.00068
0.01153
0.00420
0.00450
0.00294
0.00156

0.00074
0.00123
0.00204
0.00010
0.00010
0.00388
0.00064
0.00033
0.00034

0.01968
0.01968
0.00638
0.00638
0.00352 0.00352
0.00100 0.001
0.00189 0.00189
0.00097 0.00097
0.00103 0.00103
0.00022 0.000222
0.00023 0.00023
0.00003 0.00003
0.00076 0.00076
0.00001 0.00001
0.00090 0.0009
0.00004 0.00004
0.00001 0.00001
0.00593 0.00593
0.00021
0.00191 0.00191

0.00083
0.00083
0.00032
0.00032
0.00133 0.00133
0.00125 0.00125
0.00184 0.00184
0.00155 0.00155
0.00009 0.00009
0.00007 0.00007
0.00044 0.00044
0.00045 0.00045
0.00153 0.00153
0.00058 0.00058
0.04727
0.00270
0.00315
0.00019
0.11603
0.04056

BOBOT RENCANA 0.05442 0.11428 0.08616 0.056322 0.02044 0.06625 0.03 0.09 0.01 0.06
KOMULATIF BOBOT RENCANA 0.05442 0.1687 0.25486 0.311182 0.331622 0.397872 0.43 0.52 0.53 0.59
PELAKSANAAN
KOMULATIF PELAKSANAAN
RENCANA ANGGARAN BIAYA (RAB)

MINGGU KE
KETERANGAN
11 12 13 14 15 16 17 18 19 20 21
0.01604
0.00053
0.00938
0.00058
0.00642

0.02104
0.00652
0.00666

0.01521
0.00471
0.00341

0.00961
0.0237
0.00097
0.00712
0.00002
0.00001
0.00001
0.00006
0.00005
0.01119
0.00149
0.00423

0.01614
0.00068
0.01153
0.0042
0.0045
0.00294
0.00156

0.00074
0.00123
0.00204
0.0001
0.0001
0.00388
0.00064
0.00033
0.00034
0.00021
0.04727
0.0027
0.0035
0.00019
0.11603
0.04056

0.01604 0.00053 0.01828 0.03422 0.04073 0.01794 0.00108 0.02 0.04 0.16 0.05
0.61 0.61 0.63 0.66 0.70 0.72 0.72 0.75 0.79 0.95 1.00
REKAPITULASI
RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN HARGA(Rp)

1 Pekerjaan Persiapan 88,640,576.00


2 Pekerjaan Tanah 137,610,412.52
3 Pekerjaan Pondasi 120,236,265.00
4 Pekerjaan Struktur Lantai 1 121,213,887.86
5 Pekerjaan Struktur Lantai 2 115,122,321.60
6 Pekerjaan Kusen Lantai 1 9,465,259.99
7 Pekerjaan Kusen Lantai 2 31,906,327.41
8 Pekerjaan Dinding Lantai 1 107,352,970.50
9 Pekerjaan Dinding Lantai 2 72,662,818.50
10 Pekerjaan Penutup Lantai 1 76,279,837.00
11 Pekerjaan Penutup Lantai 2 45,678,276.00
12 Pekerjaan Plafon Lantai 1 55,747,260.00
13 Pekerjaan Plafon Lantai 2 38,000,490.00
14 Pekerjaan Atap Genteng 94,507,482.06
15 Pekerjaan Pengecatan 67,675,155.00
16 Pekerjaan ME 15,309,065.00
17 Pekerjaan Sanitasi 72,833,370.00
18 Pekerjaan Alat Penggantung 16,750,584.00
19 Pekerjaan Ruang Luar 341,912,155.96

JUMLAH 1,628,904,514

TOTAL 1,628,904,514
DIBULATKAN 1,628,900,000
PPN 10% 162,890,000
JUMLAH TOTAL 1,791,790,000

TERBILANG SATU MILYAR TUJUH RATUS SEMBILAN PULUH SATU JUTA TUJUH RATUS SEMBILAN
PULUH RIBU
ULASI
GARAN BIAYA

KETERANGAN

N PULUH SATU JUTA TUJUH RATUS SEMBILAN