Timika,
SEKERTARIS DPDR KABUPATEN MIMIKA
CV. AURA TAHTA MANDIRI
PAULUS DUMAIS,SPd,MM
NIP. 196311021997121001
L/ELEKTRIKA
JUMLAH
Rp 90,909,091
Rp 72,456,091
Rp 696,000.00
Rp 1,392,000.00
Rp 2,088,000.00
Rp 2,784,000.00
Rp 3,480,000.00
Rp 4,182,000.00
Rp 4,878,000.00
Rp 5,574,000.00
Rp 6,270,000.00
Rp 6,966,000.00
Rp 7,664,000.00
Rp 7,664,000.00
Rp 6,966,000.00
Rp 6,278,090.91
Rp 5,574,000.00
Rp 18,453,000
Rp 4,872,000.00
Rp 4,176,000.00
Rp 3,480,000.00
Rp 2,787,000.00
Rp 2,092,000.00
Rp 1,046,000.00
Rp 90,909,091
Rp 54,864,000.00
Rp 5,486,000.00
Rp 1,957,000.00
Rp 2,195,000.00
Rp 1,317,000.00
Rp 4,389,000.00
Rp 4,840,000.00
Rp 3,936,000.00
Rp 2,853,000.00
Rp 3,599,000.00
Rp 5,473,090.91
Rp 136,363,636.36
Rp 20,053,000.00
Rp 25,067,000.00
Rp 20,053,000.00
Rp 7,019,636.36
Rp 16,043,000.00
Rp 48,128,000.00
Rp 3,732,636.36
Rp 4,479,000.00
Rp 12,442,000.00
Rp 8,710,000.00
Rp 31,105,000.00
Rp 16,797,000.00
Rp 9,330,000.00
Rp 37,326,000.00
Rp 12,442,000.00
IKAL/ELEKTRIKA
JUMLAH
Rp 90,909,090.91
Rp 90,909,090.91
Rp 136,363,636.36
Rp 318,181,818.18
Rp 31,818,181.82
Rp 350,000,000.00
Rp 350,000,000.00
………………………2016
R KABUPATEN MIMIKA
TAHTA MANDIRI
DUMAIS,SPd,MM
11021997121001
ANALISA HARGA SATUAN
KEGIATAN : PEMELIHARAAN RUTIN/BERKALA GEDUNG KANTOR
PEKERJAAN : PERBAIKAN DAN PENGGANTIAN INSTALASI MECANICAL/ELECTRICAL
LOKASI : KANTOR DPRD KABUPATEN MIMIKA
TAHUN ANGGARAN : 2015
HARGA
NO. ITEM PEKERJAAN VOL UNIT SATUAN
JUMLAH HARGA
Rp 6,750,000.00
Rp 7,050,000.00
Rp 13,200,000.00
Rp 4,725,000.00
Rp 57,751,200.00
Rp 12,696,000.00
Rp 2,965,800.00
Rp 2,567,400.00
Rp 14,175,000.00
Rp 1,575,000.00
Rp 1,277,400.00
Rp 1,277,400.00
Rp 1,575,000.00
Rp 750,000.00
Rp 2,250,000.00
Rp 1,020,000.00
Rp 9,750,000.00
Rp 14,250,000.00
Rp 7,500,000.00
Rp 7,500,000.00
Rp 25,590,780.00
Rp 196,195,980.00
6,473,600
4,644,640
7,128,000
616,000
1,176,000
3,150,000
1,142,400
1,680,000
4,725,000
1,020,000
6,473,600
1,568,000
3,920,000
7,280,000
2,240,000
6,500,000
8,960,586
6,473,600
7,128,000
3,150,000
84,000
1,020,000
3,000,000
7,200,000
1,750,000
1,000,000
3,000,000
4,200,000
2,400,000
2,250,000
6,398,340
Rp 49,053,940.00
NO. URAIAN
HARGA BAHAN
1 AMF Module lengkap dengan Digital metering dan proteksi OCR, OVR, UVR, UF Buah
2 Ampere Meter 0 - 200A Buah
3 Ampere Meter 0 - 800A Buah
4 Battrey Charger 24V/10A Buah
5 Box Panel 1000 (H) x 600 (W) x 800 mm (D) Buah
6 Box Panel 700 x 900 x 200 mm Buah
7 Box Panel Existing Buah
8 Busbar Copp3P + N + PE 50 x 10 Ex import Buah
9 Change Over Switch, 200A, 4P Buah
10 Current Transformer Buah
11 Current Transformer 200/5A Buah
12 DC Ampere meter Buah
13 DC Volt meter Ex. Buah
14 Door Switch Buah
15 Emergency Stop Push Button Buah
16 Fault Indicator Light Buah
17 Frekwensi meter Buah
18 Fuse Control 2A Buah
19 Fuse Control 2A Buah
20 Indicator Light (Red, Yellow, Blue), 1PH/220V Buah
21 Magnetic Contaktor Buah
22 MCCB 4P 200A, 36kA Buah
23 MCCB 4P 32A, 36kA Buah
24 MCCB 4P 800A, 50kA Buah
25 MCCB 4P 80A, 25kA Buah
26 Motorized Selenoid MOS Type, Buah
27 Power Factor Meter Buah
28 Power Outlet 13A/1PH/220V Buah
29 Residual Current Release Buah
30 Thermal Overload Buah
31 Timer switch Buah
32 Volt Selector Switch (VSS) 3P 7 Posisi 12A Buah
33 Voltmeter 0 - 500V Buah
34 Kabel NYY 4 x 240 MM M
35 Kabel NYYFGBY 4x16 MM M
36 Kabel NYY SPLN 43-1 LMK ukuran 4x35 M
37 Kabel NYY SPLN 43-1 LMK ukuran 4x16 M
38 Kabel NYY ukuran 4x4 mm M
39 Kabel NYY ukuran 3x2,5 mm M
40 Kabel Bc uk.70 mm M
41 Lampu sorot Halogen SET
42 Straight Hose Nozzle ( Untuk Fire Hydrant) 2" Buah
43 Radar Hydrant UNIT
44 Slang Hydran 2 " x 30 meter M
45 Pompa Sirkulasi + assesori UNIT
46 Pompa Hisap 2 kw UNIT
HARGA UPAH KERJA
1 Mandor
2 Kepala Tukang
3 Tukang
4 Pekerja
aftar Harga Bahan Dan Upah
###
Rp 57,751,200.00
Rp 392,000.00
Rp 4,725,000.00
Rp 750,000.00
Rp 14,250,000.00
Rp 3,920,000.00
Rp 3,000,000.00
Rp 9,750,000.00
Rp 4,644,640.00
Rp 3,174,000.00
Rp 380,800.00
Rp 1,277,400.00
Rp 1,277,400.00
Rp 1,020,000.00
Rp 1,575,000.00
Rp 2,250,000.00
Rp 2,567,400.00
Rp 308,000.00
Rp 3,300,000.00
Rp 1,575,000.00
Rp 2,400,000.00
Rp 6,473,600.00
Rp 1,568,000.00
Rp 6,750,000.00
Rp 3,000,000.00
Rp 7,050,000.00
Rp 2,965,800.00
Rp 84,000.00
Rp 7,128,000.00
Rp 500,000.00
Rp 1,750,000.00
Rp 840,000.00
Rp 1,575,000.00
Rp 1,500,000.00
Rp 352,000.00
Rp 270,000.00
Rp 352,000.00
Rp 65,000.00
Rp 39,500.00
Rp 150,000.00
Rp 475,000.00
Rp 910,000.00
Rp 750,000.00
Rp 1,125,000.00
Rp 4,350,000.00
Rp 15,000,000.00
Rp 175,000.00
Rp 160,000.00
Rp 145,000.00
Rp 135,000.00
DAFTAR HARGA BAHAN
HARGA
NO JENIS BAHAN SAT
SATUAN (Rp)
HARGA
NO URAIAN SAT
SATUAN (Rp)
JUMLAH
HARGA (Rp)
4
Rp 103,500.00
Rp 200,000.00
Rp 45,000.00
Rp 21,000.00
Rp 12,000.00
Rp 12,000.00
Rp 3,440.00
Rp 2,400.00
Rp 5,100.00
Rp 2,500.00
Rp 108,750.00
Rp 80,000.00
Rp 8,750.00
Rp 1,900.00
Rp 606,340.00
Rp 34,500.00
Rp 66,666.67
Rp 15,000.00
Rp 7,000.00
Rp 4,000.00
Rp 4,000.00
Rp 1,146.67
Rp 800.00
Rp 1,700.00
Rp 833.33
Rp 36,250.00
Rp 26,666.67
Rp 2,916.67
Rp 633.33
Rp 202,113.33
Rp 276,000.00
Rp 108,000.00
Rp 21,000.00
Rp 12,000.00
Rp 12,000.00
Rp 3,440.00
Rp 7,200.00
Rp 5,100.00
Rp 2,500.00
JUMLAH
HARGA (Rp)
4
Rp 108,750.00
Rp 80,000.00
Rp 8,750.00
Rp 1,900.00
Rp 100,000.00
Rp 746,640.00
JUMLAH
HARGA (Rp)
4
Rp 990,000.00
Rp 270,000.00
Rp 12,000.00
Rp 24,000.00
Rp 25,800.00
Rp 108,750.00
Rp 80,000.00
Rp 8,750.00
Rp 1,900.00
Rp 1,521,200.00
Rp 1,470,000.00
Rp 270,000.00
Rp 12,000.00
Rp 24,000.00
Rp 25,800.00
Rp 108,750.00
Rp 80,000.00
Rp 8,750.00
Rp 1,900.00
Rp 2,001,200.00
-
-
69,600.00
7,680.00
8,400.00
85,680.00
6,000,000.00
900,000.00
50,000.00
185,700.00
253,000.00
746,640.00
67,570.00
7,840.00
8,575.00
8,219,325.00
150,000.00
29,000.00
3,200.00
3,500.00
185,700.00
-
JUMLAH
HARGA (Rp)
4
29,000.00
3,200.00
3,500.00
35,700.00
Rp 46,000.00
Rp 28,395.83
JUMLAH
HARGA (Rp)
4
Rp 4,000.00
Rp 4,375.00
Rp 2,000.00
Rp 84,770.83
Rp 115,000.00
Rp 28,395.83
Rp 4,000.00
Rp 4,375.00
Rp 2,000.00
Rp 153,770.83
Rp 63,000.00
Rp 28,395.83
Rp 4,000.00
Rp 437.50
Rp 2,000.00
Rp 97,833.33
Rp 144,000.00
Rp 85,187.50
Rp 12,000.00
Rp 1,312.50
Rp 2,000.00
Rp 244,500.00
Rp 480,000.00
Rp 283,958.33
Rp 156,666.67
Rp 85,677.08
Rp 399,111.06
Rp 1,405,413.14
Rp 384,000.00
Rp 227,166.67
Rp 25,066.67
Rp 5,483.33
Rp 220,000.00
861,716.67
DAFTAR KWANTITAS DAN HARGA
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARTUR
PEKERJAAN : PENYEDIAAN KOMPONEN INSTALASI LISTRIK/PENERANGAN BANGUNAN KA
LOKASI : KANTOR DPRD KABUPATEN MIMIKA
TAHUN ANGGARAN : 2015
HARGA SATUAN
NO JENIS PEKERJAAN SAT VOLUME
(Rp)
1 2 3 4
JUMLAH
Rp 5,870,000.00
Rp 16,106,458.33
Rp 2,200,500.00
Rp 307,541.67
Rp 869,100.00
Rp 25,353,600.00
Rp 16,954,166.67
Rp 1,405,413.14
Rp 3,446,866.67
Rp 307,541.67
Rp 869,100.00
Rp 4,479,840.00
Rp 27,462,928.14
Rp 4,577,625.00
Rp 978,000.00
Rp 1,383,937.50
Rp 6,939,562.50
Rp 9,783,333.33
Rp 978,000.00
Rp 16,954,166.67
Rp 27,715,500.00
Rp 2,034,500.00
Rp 615,083.33
Rp 2,808,000.00
Rp 5,457,583.33
Rp 1,521,200.00
Rp 1,735,500.00
Rp 1,525,875.00
Rp 742,000.00
Rp 5,524,575.00
OWNER ESTIMATE
(EE)
PEKERJAAN
PERBAIKAN DAN PENGGANTIAN INSTALASI MEKANIKAL/ELEKTRIKA
KEGIATAN
PEMELIHARAAN RUTIN/ BERKALA GEDUNG KANTOR
LOKASI
KANTOR DPRD KABUPATEN MIMIKA
KONSULTAN PERENCANA
11/1/2015
KDK RP / PCS
10-EGKA Exhaust Kamar Mandi 4in 5.5W 406,560
10-EGSA Exhaust Kamar Mandi 4in 5.5W 371,470
10-ELK Air Curtain 120cm 96W 6,747,510
10-ESK Air Curtain 90cm 71.5W 6,362,160
12-ELK Air Curtain 120cm 224W 8,604,225
12-ESK Air Curtain 90cm 175W 7,448,175
14-ELK Air Curtain 10,110,660
14-ESK Air Curtain 9,276,855
15-AAQ Exhaust Dinding 6 in 579,590
15-EGKA Exhaust Kamar Mandi 6in 6.2W 525,690
15-EGSA Exhaust Kamar Mandi 6in 6.2W 490,600
15-WHA Exhaust Dinding 6 in 643,060
15-WHC Exhaust Kamar Mandi 6in 15W 680,020
15-WUD Exhaust Dinding 6 in 579,590
17-CUF Exhaust Ceiling Sirrocco 4in 1,069,215
18-NFB Exhaust Ceiling 200mm 4,941,615
20-CQT Exhaust Ceiling 8 in 373,010
20-NSB Exhaust Ceiling 200mm 5,826,660
20-RLF Exhaust Dinding 8 in 618,200
20-TGQ Exhaust Ceiling 8 in 246,215
20-WHA Exhaust Dinding 8 in 774,290
20-WHC Exhaust Kamar Mandi 8in 22W 834,570
20-WUD Exhaust Dinding 8 in 695,420
23-NLB Exhaust Cabinet Fan 23cm 6,674,850
24-CDF Exhaust Ceiling Sirrocco 6 in 1,457,295
24-CDQN Exhaust Ceiling Sirrocco 6 in 606,210
24-CHF Exhaust Ceiling Sirrocco 6 in 1,587,180
24-CUF Exhaust Ceiling Sirrocco 6 in 1,346,205
24-JAA/24JAB Exhaust Ceiling Sirrocco 6 in 2,515,065
24-JRA/24JRB Exhaust Ceiling Sirrocco 6 in 2,839,620
25-ASB Exhaust Dinding 10 in 772,750
25-AUFA Exhaust 10 in Metal Louver 540,870
25-GSC Exhaust Windows 10in 2,092,755
25-NFB Exhaust Ceiling 10in Twin Flow 8,776,845
25-NSB Exhaust Ceiling 250mm 8,186,850
25-RQN5 Exhaust Dinding 10 in 343,235
25-SWC Exhaust Ceiling 250mmX500mm 20,061,300
25-TGQ Exhaust Ceiling 10 in 262,493
27-CHH Exhaust Ceiling Sirrocco 6in 2,581,425
30-GSC Exhaust Windows 12in 2,559,480
30-RQN5 Exhaust Dinding 12 in 362,639
32-CDH Exhaust Ceiling Sirrocco 6in 3,024,000
32-CHH Exhaust Ceiling Sirrocco 6in 3,319,050
35-GSC Exhaust Windows 14in 3,142,965
38-CDG Industrial Exhaust 16in 4,351,620
38-CHG Industrial Exhaust 16in 4,499,775
40-AAS Exhaust Dinding 16 in 592,038
40-GSC Exhaust Windows 16in 4,618,425
40-XPQ Industrial Exhaust Fan 16in 13,309,275
45-GSC Exhaust Windows 18in 6,399,435
45-GTC Industrial Exhaust 18in 6,572,475
50-GSC Exhaust Windows 20in 6,998,985
50-GTC Industrial Exhaust 16in 7,188,090
60-GSC Industrial Exhaust 16in 11,599,980
60-GTC Industrial Exhaust 16in 11,913,510
90-HQUA Cooker Hood 3,835,335
K-14CG1 Mini Sirocco Ventilating Fan 2,728,950
K-19CG1 Mini Sirocco 4,572,855
K-25DSF2 Compact Axial Flow 25Cm 4,277,805
K-35DSM Compact Axial Flow Vent 30Cm 9,735,600
K-40DSH Compact Axial Flow Vent 35Cm 13,349,595
K-45DSL Compact Axial Flow Vent 40Cm 20,634,705
K-45DST Compact Axial Flow Vent 40Cm 20,946,345
K-50RA Industrial Fan 20in 3,097,710
K-55DTH Compact Axial Flow Vent 45Cm 27,291,075
K-55DTL Compact Axial Flow Vent 45Cm 26,958,225
S44XU Baby Ceiling Fan 2,469,600
T-09AB Pengering Tangan 2,942,835
WA30V Desk Fan 12 in 3-Speed 346,500
WA40V Desk Fan 16 in 3-Speed 284,484
WB40L Floor Fan & Wall fan 58Watt 606,375
WG30X Box Fan 12 in 3-Speed 329,976
WK-40E Standfan 16 in Timer 3-Speed 524,124
WK-40X Standfan 16 in Timer 3-Speed 500,623
WM-40X Standfan 16 in 3-Speed 463,863
WM-40Z Standfan 16 in 3-Speed 494,910
WN-30B Wall Fan 12 in 3-Speed 346,038
WN-40B Wall Fan 16 in 3-Speed 377,516
WR-40U Autofan 16 in 5-Speed 445,106
WZ-56P Ceiling fan 56 in 5-Speed 583,000
WZ-56PH Ceiling fan 56 in 5-Speed Dark 605,000
http://www.senenindah.com/kdk
http://www.pusatexhaustfan.com/product/axial-compact-kdk-p66279.aspx
Product Description
Features :
Motor dilengkapi dengan “thermal fuse” dan “drain” agar debu dan air yang masuk ke dalam mo
Desain lekukan baling-baling yang diperbaharui sehingga menghasilkan exhaust fan dengan ka
Setiap unit tersedia 2 pilihan kecepatan “hi & low”
Setiap unit disediakan “T-shape clamps” untuk mempermudah instalasi
Single Phase
Cocok dipakai pada setiap ruangan gedung yang pemasangannya harus menggunakan ductin
Dapat dioperasikan pada suhu ruangan -100 C sampai +400 C dengan tingkat kelembaban dib
Hanya dapat dipasang secara Horisontal dan tidak disarankan untuk dipakai pada ruangan yan
Warna abu-abu
SPECIFICATIONS
Model K25DS-F2
Frequency 50 / 60 Hz
Daya Listrik 60 Watt
Kecepatan Motor 720 CFM
Air Volume 2016 m3/h
Noise(db) 56 (db)
Weight 8.5 Kg
Voltase 230 V
Ukuran baling-baling 25 cm
Additional Information
Weight 10 kg
ang masuk ke dalam motor dapat segera keluar
n exhaust fan dengan kapasitas udara besar, konsumsi listrik rendah serta hembusan udara halus [low noise]
us menggunakan ducting atau pipa untuk menyalurkan udara kotor ke luar gedung
tingkat kelembaban dibawah 86%
pakai pada ruangan yang asapnya berminyak
Flexible Duct Aluminium Isolasi & Non
Flexible Duct Aluminium Isolasi & Non Isolasi.
NON ISOLASI :
Aluminium Foil : 2 Apply.
Compression : Up to 90%.
Temperature Range : -30 sampai 110 derajat C.
Kawat : 1-1.2mm.
Panjang : 10m /roll.
Ukuran : 4inch – 14inch.
Harga :
4inch : rp. 130.000 /roll.
6inch : rp. 170.000 /roll.
8inch : rp. 205.000 /roll.
10inch : rp. 240.000 /roll.
12inch : rp. 275.000 /roll.
14inch : rp. 315.000 /roll.
* Harga di atas berlaku untuk kuantiti tertentu.
ISOLASI :
Glasswool : High Quality, 24K, 1inch.
Aluminium Foil : 2 Apply.
Temperature Range : -30 sampai 110 derajat C.
Kawat : 1-1.2mm.
Panjang : 10m /roll.
Ukuran : 6inch – 14inch.
Harga :
6inch : rp. 290.000 /roll.
8inch : rp. 345.000 /roll. 517,500 86,250
10inch : rp. 445.000 /roll.
12inch : rp. 535.000 /roll.
14inch : rp. 675.000 /roll.
* Harga di atas berlaku untuk kuantiti tertentu.
B. PEKERJAAN ELEKTRIKAL LT.01 s/d LT. 03
I PEKERJAAN ELEKTRIKAL LANTAI 01
a. PEKERJAAN PANEL dan DAYA
1 Pek. Penyambungan Daya dan KWH meter Digital Unit 1.00
2 Pek. Panel LVMDP 1 Utama + AMF Unit 1.00
3 Pek. Panel LVMDP 2 Unit 1.00
4 Pek. Panel Pompa (Hydrant) Star Delta Unit 1.00
14 Pek. Panel Pompa Hydrant Unit 1.00
15 Pek. Panel Power Hose / Genset Unit 1.00
5 Pek. Panel Penerangan, Stop Kontak Lantai 01 Unit 1.00
6 Pek. Panel AC Lantai 01 Unit 1.00
7 Pek. Panel Penerangan, Stop Kontak Lantai 02 Unit 1.00
8 Pek. Panel AC Lantai 02 Unit 1.00
9 Pek. Panel Penerangan, Stop Kontak Lantai 03 Unit 1.00
10 Pek. Panel AC Lantai 03 Unit 1.00
11 Pek. Panel Penerangan Outdoor Unit 1.00
12 Pek. Panel Penerangan Gedung Serba Guna Unit 1.00
13 Pek. Panel AC Gedung Serba Guna Unit 1.00
350,000,000.00 350,000,000.00
200,000,000.00 200,000,000.00
85,000,000.00 85,000,000.00 285,000,000.00 57.46%
45,000,000.00 45,000,000.00
35,000,000.00 35,000,000.00
5,000,000.00 5,000,000.00 85,000,000.00 17.14%
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00 31,000,000.00 6.25%
15,000,000.00 15,000,000.00
16,000,000.00 16,000,000.00 31,000,000.00 6.25%
13,000,000.00 13,000,000.00
14,000,000.00 14,000,000.00 27,000,000.00 5.44%
15,000,000.00 15,000,000.00 15,000,000.00 3.02%
12,000,000.00 12,000,000.00
10,000,000.00 10,000,000.00 22,000,000.00 4.44%
Jumlah (a) 846,000,000.00 496,000,000.00 100.00% 15%
Jasa Kontrak Maintenance Genset secara berkala selama setahun
Monitoring Genset Tiap 3 Bulan
PERAWATAAN MESIN:
1Pemeriksaan Batteray charger di panel listrik
2Pemeriksaan dynamo charger
3Pemeriksaan tegangan battery dan air accu
4Pemeriksaan oli mesin dan tekanan oli mesin
5Pemeriksaan air radiator dan temperature air radiator
6Pemeriksaan Safety shut down engine
7Pemeriksaan rpm engine
8Pemeriksaan injection pump,tali kipas (v-belt), general cleaning
9Pembuangan kotoran atau air dari tanki bahan bakar dan filtemya
1Pemeriksaan kapasitas bahan baker dan menginformasikan penggantian bila pertu penambahan
1Penggantian Oli pelumas (setiap 6 bulan atau 250 Jam)
1Pemeriksaan filter oli (gantij ika pertu)
1Pemeriksaan sa ingan bahan bakar (gantij ika perlu)
1Bersihkan saringan udara (gantij ika perlu)
1Pengukuran konsentrasi DCA
1Pengecekan tegangan tali kipas (V_belt)
PERAWATAN GENERATOR:
1Pemeriksaan tegangan output
2Pemeriksaan frekwensi / hert
3Pemeriksaan AVR
4Pemeriksaan insulation dan bearing
5Pemeriksaan panel control AC dan DC
Tune Up Genset
Preventive Maintenance (PM) atau Service Ringan (Tune UP) Genset
I. Ruang Lingkup :
Pemeliharaan
Ganti filter solar pada 8? jam pertama" kemudian ganti setiap 2?? jam operasi atau sekitar 9 bulan.
Ganti filter oil dan oil mesin pada 8? jam pertama" kemudian ganti setiap 2?? jam operasi atau sekitar 9 bula
Setiap 2?? jam operasi bersihkan:filter udara
Setiap ;?? jam operasi atau satu tahun sekali bersihkan atau kuras tangki solar. 'ntuk membersihkannya" gun
Mengatasi masalah ketika mesin tidak hidup
$eriksa saluran pada bahan bakar" apakah tidak tersumbat dan sudah mengalir dengan baik. !iasanya saluran p
Ganti filter solar pada 8 jam pertama" kemudian ganti setiap 2 jam operasi atau sekitar 9 bulan.
Ganti filter oil dan oil mesin pada 8 jam pertama" kemudian ganti setiap 2 jam operasi atau sekitar 9 bula
Setiap 2 jam operasi bersihkan:filter udara
Setiap ; jam operasi atau satu tahun sekali bersihkan atau kuras tangki solar. 'ntuk membersihkannya" gun
Mengatasi masalah ketika mesin tidak hidup
$eriksa saluran pada bahan bakar" apakah tidak tersumbat dan sudah mengalir dengan baik. !iasanya saluran p
ertu penambahan
ar. 'ntuk membersihkannya" gunakan air kandungan <at kapur" garam" serta air yang kadar besinya rendah.
dengan baik. !iasanya saluran pada bahan bakar akan tersumbat oleh
atau sekitar 9 bulan.
am operasi atau sekitar 9 bulan.
. 'ntuk membersihkannya" gunakan air kandungan <at kapur" garam" serta air yang kadar besinya rendah.
dengan baik. !iasanya saluran pada bahan bakar akan tersumbat oleh
Waktu Service
Jenis Perawatan
Harian Mingguan
Periksa Level Coolant 150,000
Periksa Level Oli 175,000
Periksa Level Solar 100,000
Periksa Saluran Udara 200,000
Periksa/Bersihkan Filter Udara 250,000
Periksa Charger Baterai 75,000
Buang Solar Pada Filter 225,000
Buang Air Pada Tangki Solar 250,000
Periksa Konsentrasi Coolant
Periksa Tegangan Belt2
Periksa Pengembunan Knalpot
Periksa Baterai
Ganti Oli & Filter
Ganti Filter Coolant
Bersihkan Crankcase Breather
Ganti Filter Udara
Periksa Selang2 Radiator
Ganti Filter Solar
Bersihkan Sistem Pendingin
625,000 800,000
Waktu Service
Bulana 6 Tahun
n Bulan an 365 Rp 90,909,090.91
Rp 4,434,589.80
Rp 5,173,688.10
Rp 2,956,393.20
Rp 5,912,786.40
Rp 7,390,983.00
Rp 2,217,294.90
Rp 6,651,884.70
Rp 7,390,983.00
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000 Rp -
150,000