Studi Analisis Debit Air Pada Pembangkit Listrik Tenaga Mini Hidro (PLTM)
Lubuk Sao Untuk Penentuan Jenis Turbin
SUPRIADI
Kata Kunci : Energi Air, Debit Air, Turbin Air, Generator Listrik
vii
STUDI ANALISIS DEBIT AIR PADA PEMBANGKIT
LISTRIK TENAGA MINI HIDRO (PLTM) LUBUK
SAO UNTUK PENENTUAN JENIS TURBIN
TUGAS AKHIR
SUPRIADI
BP: 1301031003
xii
DAFTAR ISI
Hal
HALAMAN PERSETUJUAN . ............................................................... ii
HALAMAN PENGESAHAN. .................................................................. iii
HALAMAN SAMBUTAN . ...................................................................... iv
ABSTRAK . ............................................................................................... vii
KATA PENGANTAR ............................................................................... viii
DAFTAR ISI ............................................................................................. x
DAFTAR GAMBAR . ............................................................................... xii
DAFTAR TABEL . ................................................................................... xiii
BAB I PENDAHULUAN
1.1 LatarBelakang ..................................................................... 1
1.2 Perumusan Masalah ............................................................. 2
1.3 Tujuan Penelitian . ............................................................... 2
1.4 BatasanMasalah ................................................................... 3
1.5 Manfaat Penelitian ............................................................... 3
1.6 Metode Penulisan ................................................................ 3
1.7 Sistematika Penulisan . ........................................................ 4
1.8 Metodologi . ........................................................................ 4
BAB II TINJAUAN PUSTAKA
2.1 Pembangkit Listrik Tenaga Mini Hidro .............................. 6
2.2 Sungai ................................................................................. 7
2.2.1 Pengukuran Debit Air . .............................................. 8
2.3 Turbin ................................................................................. 10
2.3.1 Jenis Turbin . .............................................................. 10
2.3.2 Komponen Turbin . .................................................... 12
2.4 Turbin Air ............................................................................ 14
2.4.1 Klasifikasi Turbin Air . .............................................. 15
2.4.2 Jenis Turbin Air . ....................................................... 17
2.4.3 Pemilihan Tipe Turbin Pada PLTM . ......................... 20
2.5 Generator . ........................................................................... 22
2.5.1 Prinsip Kerja Generator . ........................................... 22
2.5.2 Bagian-bagian Generator . ......................................... 23
2.6 Aplikasi Pembangkit Listrik Mini Hidro (PLTM) . ............ 28
x
3.3 Metode Penelitiaan....................................... ....................... 33
3.3.1 Metode Observasi . .................................................... 33
3.3.2 Metode Wawancara ................................................... 33
3.3.3 Studi Pustaka . ............................................................ 34
3.3.4 Dokumentasi . ............................................................ 34
3.4 Tahap Pelaksanaan Penelitian ............................................. 34
3.4.1 Berkenalan Dengan Seluruh Staff .............................. 34
3.4.2 Melakukan Pengamatan ke Lapangan ....................... 34
3.5 Flowchart Tugas Akhir . ...................................................... 35
BAB V PENUTUP
5.1 Kesimpulan ......................................................................... 44
5.2 Saran . .................................................................................. 45
DAFTAR PUSTAKA
LAMPIRAN
xi
DAFTAR PUSTAKA
49
DAFTAR TABEL
xiii
HALAMAN PERSEMBAHAN
Alhamdulillahirobbil’alamin..
Sujud syukurku kusembahkan kepadamu Tuhan yang Maha Agung nan Maha Tinggi nan
Maha Adil nan Maha Penyayang, atas takdirMu telah Engkau jadikan aku manusia yang
senantiasa berpikir, berilmu, beriman dan bersabar dalam menjalani kehidupan ini. Semoga
keberhasilan ini menjadi satu langkah awal bagiku untuk meraih cita-cita besarku.
Lantunan Al-fatihah beriring Shalawat dalam silahku merintih, menadahkan doa dalam
syukur yang tiada terkira, terima kasihku untukmu. Kupersembahkan sebuah karya kecil ini untuk
Ayahanda dan Ibundaku tercinta, yang tiada pernah hentinya selama ini memberiku semangat,
doa, dorongan, nasehat dan kasih sayang serta pengorbanan yang tak tergantikan hingga aku
selalu kuat menjalani setiap rintangan yang ada didepanku.,, Ayah,.. Ibu...terimalah bukti kecil ini
sebagai kado keseriusanku untuk membalas semua pengorbananmu.. dalam hidupmu demi
hidupku kalian ikhlas mengorbankan segala perasaan tanpa kenal lelah, dalam lapar berjuang
separuh nyawa hingga segalanya.. Maafkan anakmu Ayah,,, Ibu,, masih saja ananda
menyusahkanmu..
Dalam silah di lima waktu mulai fajar terbit hingga terbenam.. seraya tangaku
menadah”.. ya Allah ya Rahman ya Rahim... Terimakasih telah kau tempatkan aku diantara kedua
malaikatmu yang setiap waktu ikhlas menjagaku,, mendidikku,,membimbingku dengan baik,, ya
Allah berikanlah balasan setimpal syurga firdaus untuk mereka dan jauhkanlah mereka nanti dari
panasnya sengat hawa api nerakamu..
Untukmu Ayah (Hasanuddin),,,Ibu (Nurmi Yusmi)...Terimakasih....
we always loving you... ( ttd.Anakmu)
Dalam setiap langkahku aku berusaha mewujudkan harapan-harapan yang kalian impikan
didiriku, meski belum semua itu kuraih’ insyallah atas dukungan doa dan restu semua mimpi itu
kan terjawab di masa penuh kehangatan nanti. Untuk itu kupersembahkan ungkapan
terimakasihku.
iv
Kepada Uda dan Adiak (Muhammad Yamin Dan Muhammad Irsad) Makasih ya buat
segala dukungan dan doa doanya.
... i love you all” :* ...
"Hidupku terlalu berat untuk mengandalkan diri sendiri tanpa melibatkan bantuan ALLAH dan orang lain.
"Tak ada tempat terbaik untuk berkeluh kesah selain bersama sahabat-sahabat terbaik”..
Terimakasih kuucapkan Kepada Teman sejawat Saudara seperjuangan POLITEKNIK NEGERI
PADANG.
“Tanpamu teman aku tak pernah berarti,,tanpamu teman aku bukan siapa-siapa yang takkan jadi
apa-apa”, buat temanku Denal Akbar (Ketua Analisa), M. Guntur Himawan, Firman Adi, Indra
Rama, Alfi Zikri, Angga sentosa, Abdul latif, semuanya teman lokal D III Teknik Listrik.
Diantara yang diatas ada pula ucapan terimaksih saya sampaikan kepadaK.a prodi ,K.a jurusan
dosen pembimbing,dosen penguji yang sudah saya anggap sebagi pengganti orang tua saya selama
saya di padang dan kemudian yang ada di kampus politeknik negeri padang yakni kepada:Bapak
Afrizal Yuhanef,ST., M.Kom sebagai ketua jurusan elektro, Bapak Herisajani, ST., M.Kom sebagai
Kaprodi terimakasih banyak ya buk ,Bapak Desmiwrman,ST., M.Si sebagai pembimbing I,Bapak
Dasrul Yunus,ST., M.Kom sebagai pembimbing II terimakasih banyak pak telah banyak
memberikan saran dan masukannya.
Terima kasih banyak saya ucapkan kepada tim penguji, bapak Yefriadi, ST.,MT sebagai
penguji dan sekaligus telah memberikan pelajaran yang sangat penting dalam hidup saya, terima
kasih banyak pak. Kepada bapak Herisajani, ST., M.Kom sebagai penguji, terima kasih Pak. Bapak
Nasrul Harun, ST.,M.Kom sebagai penguji, Terima Kasih banyak pak. Kepada Bapak
Desmiwarman, ST., M.Si dan sekaligus pebimbing saya yang telah memberikan banyak masukan
berupa ilmu-ilmu yang bermanfaat bagi saya, terima kasih pak.
v
Terimakasih kepada Anggota kos, Tri Rahmi Hendika, M. Guntur Himawan, Gustri Romi
Wahyudi, Arbi Jauza, Bang Toni, Bang Sakai, Yu’am dll.
Untuk ribuan tujuan yang harus dicapai, untuk jutaan impian yang akan dikejar, untuk sebuah
pengharapan, agar hidup jauh lebih bermakna, hidup tanpa mimpi ibarat arus sungai. Mengalir
tanpa tujuan. Teruslah belajar, berusaha, dan berdoa untuk menggapainya.
Jatuh berdiri lagi. Kalah mencoba lagi. Gagal Bangkit lagi.
Never give up!
Sampai Allah SWT berkata “waktunya pulang”
Hanya sebuah karya kecil dan untaian kata-kata ini yang dapat
kupersembahkan kepada kalian semua,, Terimakasih beribu terimakasih kuucapkan..
Atas segala kekhilafan salah dan kekuranganku,
kurendahkan hati serta diri menjabat tangan meminta beribu-ribu kata maaf tercurah.
Tugas Akhir ini kupersembahkan. -by” SUPRIADI, A.Md
vi
HALAMAN PERSETUJUAN
Turbin
Oleh
SUPRIADI
BP. 1301031003
Pembimbing I Pembimbing II
i
KATA PENGANTAR
Tiada rangkaian kata yang pantas diucapkan selain puji dan syukur Penulis
ucapkan kehadirat Allah SWT yang telah memberikan rahmat dan karuniaNya
sehingga Penulis dapat menyelesaikan Tugas Akhir serta penulisan laporan Tugas
Akhir dengan judul “Studi Analisis Debit Air Pada Pembangkit Listrik Tenaga
Mini Hidro (PLTM) Lubuk Sao Untuk Penentuan Jenis Turbin”. Salawat
beriring salam tidak lupa pula Penulis do’akan kehadirat Allah SWT, semoga
Penulisan Tugas Akhir ini merupakan salah satu syarat untuk menyelesaikan
studi pada Politeknik Negeri Padang program Diploma III Program Studi Teknik
Listrik Jurusan Teknik Elektro. Adapun penyusunan laporan Tugas Akhir ini
pedoman, serta data-data dan keterangan dari pembimbing. Penulis menyadari bahwa
dalam penyusunan laporan Tugas Akhir ini tidak lepas dari dukungan berbagai
pihak, oleh karena itu pada kesempatan ini Penulis menyampaikan ucapan terima
kasih kepada :
2. Bapak Aidil Zamri, ST, MT, sebagai Direktur Politeknik Negeri Padang.
viii
4. Bapak Herisajani, ST.,M.Kom Selaku Ketua Program Studi Teknik Listrik.
Laporan ini disusun oleh penulis dengan segala upaya agar menghasilkan
laporan yang baik. Untuk itu dalam pembuatan laporan ini tidak luput dari kekhilafan
dan kesalahan. Oleh karena itu penulis mengharapkan kritikan dan saran kepada
Akhir kata, penulis berharap laporan ini bermanfaat bagi penulis dan pembaca,
serta menjadi semangat dan motivasi bagi rekan-rekan yang akan melaksanakan
penelitian. Semoga Allah SWT senantiasa membalas kebaikan yang dilakukan oleh
semua pihak yang telah membantu penulis dalam menyelesaikan laporan ini.
Supriadi
Lampiran 2
teknisi Pembangkit Listrik Tenaga Mini Hidro (PLTM) Lubuk Sao (Tanggal 24
Agustus 2016 sampai tanggal 15 September 2016) dan Team dari PT. PLN
a. Kenapa debit air yang masuk ke Turbin Kaplan pada PLTM sebesar 11,6
d. Berapa daya yang dihasilkan oleh Pembangkit Listrik Tenaga Mini Hidro ?
b. Jenis Turbin Kaplan dengan Tinggi Head sebesar 15,77 m, turbin yang
c. Debit air yang kurang dari 11,6 membuat turbin hanya sekedar
e. Generator yang digunakan pada PLTM Lubuk Sao adalah jenis generator
f. Data daya harian PLTM sudah terlampir dalam bentuk tabel yang didapat
2. Pak Arman
c. Nama karyawan yang terdapat di PLTM Lubuk Sao adalah pak Arman, Pak
kerjanya.
3. Pak Riki (Asmen OPHAR) di PT. PLN (Persero) Area Pembangkitan
a. debit air dapat ditentukan dengan mengetahui pola operasi dari PLTA
Tugas akhir yang berjudul Studi Analisis Debit Air Pada Pembangkit Listrik
Tenaga Mini Hidro (PLTM) Lubuk Sao Untuk Penentuan Jenis Turbin yang
berikut pada hari Senin, 3 Oktober 2016 di Program Studi Teknik Listrik
Mengetahui
iii
iv
BAB I
PENDAHULUAN
Kabupaten Agam mencapai 65,99% atau 73,089 rumah tangga dari 110.754
rumah tangga, angka ini masih dibawah rasio elektrifikasi Propinsi Sumatera
meningkatkan fungsi dari pada energi tersebut yang selama ini hanya di
tenaga listrik untuk daerah yang terpencil atau pedesaan yang masih belum
langkah yang sangat tepat untuk memenuhi kebutuhan tenaga listrik bagi
1
2
masalah yang ada. Penulis bermaksud untuk mengambil judul ”Studi Analisis
Debit Air Pada Pembangkit Listrik Tenaga Mini Hidro (PLTM) Lubuk Sao
Tujuan yang ingin dicapai pada pembuatan tugas akhir ini adalah untuk
Listrik Tenaga Mini Hidro (PLTM) Lubuk Sao di Kabupaten Agam melalui
Kabupaten Agam.
3
Batasan masalah dalam pembuatan tugas akhir ini adalah sebagai berikut :
dibahas.
1. BAB I PENDAHULUAN
Penulisan.
Dalam bab ini berisi tentang : Tinjauan Pustaka atau teori yang
Dalam bab ini berisi tentang : Perhitungan dan hasil dari penilitian
5. BAB V PENUTUP
1.8 Metodologi
Untuk mendapatkan sistem yang baik, tentu tidak terlepas dari cara atau
keberadaan penulisan tugas akhir ini. Dan dalam penulisan ini digunakan tiga
1. PenelitianPerpustakaan(Library Research)
5
2. Pengumpulan data
diperlukan sebagai arahan pembuatan tugas akhir ini yang bersumber dari
- Analisa data.
6
BAB II
TINJAUAN PUSTAKA
1000 kW. Pada beberapa PLTM bak pengendap yang berfungsi untuk
fungsi pengendap dan pemisah partikel pasir dari air dapat dilakukan oleh bak
penstock dan saluran pembawa (headrace). Selain itu juga berfungsi sebagai
pemisah akhir kotoran dalam air seperti pasir, daun-daunan dan kayu-kayuan.
kontur sisi bukit untuk menjaga elevasi dari air yang disalurkan. Saluran
2.2 Sungai
Sungai adalah massa air yang secara alami mengalir melalui suatu
mengikuti saluran tertentu yang di kanan kirinya dibatasi tebing yang curam.
Debit air sungai adalah jumlah air yang mengalir dari suatu penampang
tertentu (sungai, saluran, mata air) persatuan waktu (L/s). Dalam kegiatan
pengukuran debit air Sungai Cisalak ini digunakan metoda Apung. Metode
ini adalah metode tidak langsung dalam pengukuran debit air, karena hanya
dibutuhkan benda apung untuk melewati jarak yang telah di tentukan pada
suatu aliran sungai. Metode ini juga tidak membutuhkan peralatan yang
fungsi strategis tersebut telah menempatkan air sebagai sarana yang vital
1. Kelas satu, air yang peruntukannya dapat digunakan untuk air baku air
minum, dan atau peruntukan lain yang mensyaratkan mutu air yang
kegunaan tersebut.
pertanaman dan atau peruntukan lain yang mensyaratkan mutu air yang
banyak metode pengukuran debit air. Sistem konversi energi air skala
untuk sistem konversi energi air skala kecil waktu pengukuran dapat lebih
9
sungai.
10
2.3 Turbin
fluida.Dimana fluida itu sendiri adalah suatu bagian dari fase benda, termasuk
cairan, gas dan plasma yang dapat mengalir.Pada pembangkit listrik tenaga
air, yang berfungsi sebagia fluida itu sendiri adalah air itu sendiri.Turbin
1. Turbin Uap
Turbin uap adalah suatu alat yang memamfaatkan uap sebagai fluida
pemancar, yaitu dengan jalan merubah tekanan uap yang tinggi menjadi
11
kecepatan uap yang sangat cepat. Dengan kecepatan uap ini, digunakan
2. Turbin Gas
Turbin gas adalah suatu alat yang memamfaatkan gas sebagai fluida
turbin gas yang paling sederhana terdiri dari tiga komponen yaitu
dari bentuk tenaga shaft, udara terkompresi dan dorongan, dalam segala
3. Turbin Angin
4. Turbin Air
Turbin air dikembangkan pada abad 19 dan digunakan secara luas untuk
susunan mekanis yang lebih baik dan semua turbin reaksi modern
menggunakan desain ini. Putaran massa air berputar hingga putaran yang
energy. Jenis turbin air yang banyak digunakan asalah turbin crossflow,
karena turbin cocok dengan skala pembangkit listrik tenaga air di Indonesia.
Contoh turbin air sederhana adalah kincir air atau roda air.Turbin air
putaran poros turbin akan diubah oleh generator menjadi energi listrik.
1. Stator
Stator turbin terdiri dari dua bagian, yaitu casing dan sudu diam (fixed
dipasang difragma.
2. Casing
tabung dimana rotor ditempatkan. Pada ujung casing terdapat ruang besar
mengelilingi poros turbin disebut exhaust hood, dan diluar casing dipasang
terdiri dari bagian akar sudu, badan sudu dan ujung sudu.Sudu kemudian
sudu.Diafragma terdiri dari dua bagian (atas dan bawah) dipasang pada
4. Rotor
Rotor adalah bagian yang berputar terdiri dari poros dan sudu-sudu gerak
yang terpasang mengelilingi rotor. Jumlah baris sudu gerak pada rotor
sama dengan jumlah baris sudu diam pada casing. Pasangan antara sudu
5. Poros
Poros dapat berupa silinder panang yang solid (pejal) atau berongga
7. Bantalan (Bearing)
dapat stabil/lurus pada posisinya didalm casing dan rotor dapat berputar
radial maupun dalam arah aksial. Karena itu rotor harus ditumpu secara
(bearing).
Turbin air adalah turbin dengan media kerja air.Secara umum, turbin
adalah alat mekanik yang terdiri atas poros dan sudusudu.Sudu tetap atau
mengubah arah dan kecepatan aliran fluida sehingga timbul gaya memutar
poros. Air biasanya dianggap sebagai fluida tak kompresibel, yaitu fluida
yang secara virtual massa jenisnya tidak berubah dengan tekanan. (Wibowo
yang bernama Claude Bourdin pada awal abad 19, yang diambil dari
15
terjemahan bahasa Latin dari kata "whirling" (putaran) atau "vortex" (pusaran
air). Perbedaan dasar antara turbin air awal dengan kincir air adalah
daya yang lebih besar dengan komponen yang lebih kecil.Turbin dapat
memanfaatkan air dengan putaran lebih cepat dan dapat memanfaatkan head
1. Berdasarkan Tekanan
4. Berdasarkan Debit
6. Berdasarkan Efisiensi
1. Berdasarkan Tekanan
Turbin impuls atau turbin aksi disebut turbin tak bertekanan karena
yang telah dibuat, namun yang paling banyak ditemukan pada saat
jenis rekasi adalah bahwa sebagian tekanan jatuh terjadi pada sudu
masuk memenuhi seluruh seksi sudu, maka untuk daya dan putaran
Jenis Turbin Tinggi Tekan Arah Aliran Debit ( /s) Kec. Spesifik
(m) (rpm)
Kaplan 2 - 50 Aksial 2 – 80 300 – 1100
1. Turbin Kaplan
Prinsip kerja turbin Kaplan adalah air yang mengalir dari water
Kemudian akibat bentuk volute dari spiral casing, air diarahkan untuk
memasuki guide vane (sudu arah) secara tangensial. Setelah keluar dari
guide vane aliran air bergerak kearah aksial karena pengaruh whirl
chamber (ruang pusar) kemudian air akan memasuki runner (sudu gerak).
Keterangan :
P = 9,81*Q*H* t η
Dimana :
t η = Efesiansi turbin
Turbin Crossflow Salah satu jenis turbin impuls ini juga dikenal
sesuai dengan lebar runner.Pancaran air masuk turbin dan mengenai sudu
19
dibuat dari beberapa sudu yang di pasang pada sepasang piringan pararel.
3. Turbin Pelton
Turbin Pelton adalah turbin untuk tinggi terjun yang tinggi, yaitu
energi mekanik pada roda air turbin dilakukan melalui proses impuls
beberapa bahan.
2.4.3 Pemilihan Tipe Turbin pada Pembangkit Listrik Tenaga Mini Hidro
(PLTM)
pembangkit listrik skala kecil yang mengubah energi potensial air menjadi
listrik skala kecil, yaitu sekitar 0-1000 kW. Turbin merupakan salah satu
poros.Terdapat dua jenis utama turbin, yaitu turbin aksi/impuls dan turbin
reaksi. Pada turbin impuls, pancaran (jet) air bebas mendorong bagian
pada turbin reaksi, aliran air terjadi pada tekanan tertutup. Sebagai contoh
turbin ini adalah turbin kaplan, propeller dan turbin francis. Kedua jenis
gaya dinamiklah yang mengenai bagian yang berputar (Runner) dari turbin
tersebut. Pada dasarnya pemilihan tipe turbin untuk PLTM sama seperti
21
pemilihan tipe turbin pada PLTA konvensional yang pernah ada. Dasar
setinggi mungkin, karena dengan kecepatan putar yang tinggi akan didapat
momen punter (kopel) yang kecil, poros yang kecil, dan diameter roda
turbin yang kecil, sehingga akan membuat ukuran Generator lebih kecil.
√ √
√
2.5 Generator
Generator adalah sebuah alat yang memproduksi energy listrik dari sumber
mekanik ini diperoleh melalui prime over (penggerak utama dari sumber
dari dua medan vector yang berhubungan : medan listrik dan medan magnet.
1. Rotor, adalah bagian yang berputar yang mempunyai bagian terdiri dari
2. Stator, adalah bagian yang tak berputar (diam) yang mempunyai bagian
terdiri dari rangka stator yang merupakan salah satu bagian utama dari
generator yang terbuat dari besi tuang dan ini merupakan rumah dari
dapat dibedakan atas generator keluaran arus bolak-balik (AC) dan generator
tegangan yang dibangkitkan. Jika generator mempunyai dua kutub (utara dan
selatan) dan kumparan berputar pada kecepatan satu putaran perdetik, maka
f=
Sistem satu fasa digunakan untuk tuntutan daya kecil hampir semua sistem
pembangkitan dan distribusi yang digunakan adalah utiliy daya adalah tiga
fasa dapat dihubungkan dalam bentuk bintang atau bentuk delta. Sistem
bintang tiga fasa empat kawat adalah sangat umum dan merupakan system
standar yang diberikan oleh utility daya yang dapat memberikan daya pada
dayadapat memeberikan daya satu fasa atau tiga fasa pada sistem emepat
kawat itu.
Pada generator tiga fasa yang dihubungkan bintang, tegangan fasake netral
sama dengan tegangan yang dibangkitkan pada tiap kumparan. Tegangan fasa
25
tiga fasa yang dihubungkan pada generator, arus masuk sama dengan arus
pada lilitan kumparan (fasa). Pada sistem tiga fasa hubungan delta, tegangan
yang diukur antara setiap dual in sama dengan tegangan yang dibangkitkan
remenensi magnet (magnet sisa) dari sumber lain. Sisa magnet kecil ini
c. Generator Shunt
Ciri utama dari generator shunt adalah kumparan penguat medan dipasang
d. Generator Seri
e. Generator Kompon
generator seri, yang dilengkapi dengan kumparan shunt dan seri dengan sifat
Perbedaan dari kedua hubungan ini adalah hamper tidak ada. Karena
kumparan seri kecik, sehingga tegangan drop pada kumparan ini ditinjau
(P) yang dibangkitkan dari suatu pembangkit PLTM adalah (Dipl dkk 1996) :
P = 9,8 × Q × H × η (1)
Dimana :
η : efisiensi turbin
Dimana :
Dimana :
t = Waktu (s)
Dimana :
29
C = Faktor Koreksi, untuk sungai dangkal 0,45 Untuk mencari Debit air,
Dimana :
Q = Debit (m³/s)
υ1 = C 2 g h (6)
Dimana :
g = 9.8
h = head (m)
u1 = 0,48 × υ1 (7)
Dimana:
persamaan : D1 = u₁ × 60 π ×n (8)
jarak antara sudu turbin yang akan digunakan, dapat dihitung dengan
Dimana :
s = Tebal pancaran air (m) Sedangkan jarak antar sudu dapat dihitung,
Dimana :
Dimana :
n = Jumlah sudu
Dimana :
Dimana :
H = head (m)
Selain itu gambar 2.4 menunjukan pemilihan turbin berdasarkan debit dan
BAB III
METODE PENELITIAN
Alat yang digunakan dalam penelitian adalah sepatu safety, kamera, alat
tulisan seperti buku, jurnal dan berbagai literatur lain yang berkaitan
Tenaga Listrik.
3.3.4 Dokumentasi
disusun.
Start
Proposal ACC
Penelitian
Pengumpulan
Data
Analisa dan
Input Data
Analisa dan
N Revisi
Data OK
Sidang TA
End
BAB IV
Di Kabupaten Agam saat ini pembangkit listrik tenaga air yang sudah
beroperasi yaitu PLTA Batang Agam dengan daya terpasang 10,5 MW,
(PLTM) Lubuak Sao menggunakan aliran dari air danau Maninjau namun
tidak secara langsung melainkan memamfaatkan aliran air yang keluar dari
Saat ini pembangunan PLTM Lubuak Sao telah selesai dikerjakan dan
Menghitung debit air yang masuk ke PLTM Lubuk Sao, dapat ditentukan
PLTA Maninjau beroperasi jam 00.00 WIB sampai dan 17.00 WIB,
sebagai berikut :
37
Q = 1 x 8,73
= 8,73
Daya yang dihasilkan pada beban luar waktu beban puncak adalah :
P = 1 x 17500 KW
= 17500 KW
PLTA Maninjau beroperasi jam 17.00 WIB sampai dan 22.00 WIB,
sebagai berikut :
Q = 4 x 8,73
= 34,92
P = 4 x 17500 KW
= 70.000 KW
Pola operasi diatas adalah pola normal pada saat tidak terjadi defisit
rusaknya pembangkit lain seperti PLTU Sijantang, PLTU Teluk Sirih, Dan
Danau Maninjau.
38
4.3 Pengaruh Debit Air Terhadap Jenis Turbin Untuk PLTM Lubuk Sao
Berdasarkan debit air (Q) sebesar 11,6 m³/det dengan tinggi jatuh air (h)
15,77 m dan gaya grafitasi (g) sebesar 9,8. Maka dapat dihitung daya teoritis
persamaan :
P = g .Q .h
= 1792, 73 KW.
turbin(Ƞt= 90% atau 0,9 untuk turbin Kaplan). Maka didapat daya sebagai
berikut :
Pt = P . Ƞt
= 1792,73 x 0,9
= 1613, 45 KW
P = efisiensi generator x Pt
= 0,9 x 1613,45 KW
= 1452,10 KW
daya ouput total yang didapat secara teoritis untuk dua buah pembangkit
adalah :
2generator = 2P
= 2 x 1452,10
= 2904,21 KW
= 3630 KVA
Berdasarkan debit air (Q) sebesar 11,6 m³/det dengan tinggi jatuh air (h)
15,77 m dan gaya grafitasi (g) sebesar 9,8. Maka dapat dihitung daya teoritis
persamaan :
P = g .Q .h
= 1792, 73 KW.
40
turbin(Ƞt= 80% atau 0,8 untuk turbin Crossflow). Maka didapat daya
sebagai berikut :
Pt = P . Ƞt
= 1792,73 x 0,8
= 1434,18 KW
P = efisiensi generator x Pt
= 0,9 x 1434,18 KW
=1290,76 KW
daya ouput total yang didapat secara teoritis untuk dua buah pembangkit
adalah :
2generator = 2P
= 2 x 1290,76
= 2581,52 KW
= 3226 KVA
41
Berdasarkan debit air (Q) sebesar 11,6 m³/det dengan tinggi jatuh air (h)
15,77 m dan gaya grafitasi (g) sebesar 9,8. Maka dapat dihitung daya teoritis
persamaan :
P = g .Q .h
= 1792, 73 KW.
turbin(Ƞt= 85% atau 0,85 untuk turbin Pelton). Maka didapat daya sebagai
berikut :
Pt = P . Ƞt
= 1792,73 x 0,85
= 1523,82 KW
P = efisiensi generator x Pt
= 0,9 x 1523,82 KW
= 1371,44 KW
42
daya ouput total yang didapat secara teoritis untuk dua buah pembangkit
adalah :
2generator = 2P
= 2 x 1371,44
= 2742,88 KW
= 3427 KVA
Dari grafik dibawah dapat dilihat bahwa daya yang didapat dari hasil teori,
data dan perhitungan berada dibawah daya rated capacity atau kapasitas daya
Jadi turbin yang dioperasikan adalah turbin Kaplan karena sesuai dengan
karakteristik potensi energi hidro yang tersedia. Penentuan jenis turbin yang
1900
1800
1700
1600 Nilai (KVA)
1500
1400
Rate Teori Data Perhitungan
Capacity
1900
1800
1700
1600 Nilai (KVA)
1500
1400
Rate Teori Data Perhitungan
Capacity
Analisa Perhitungan:
Dari tabel Daya (PLTM) Lubuk Sao rata-rata total daya yang
terbangkitkan dalam satu hari untuk turbin unit 1 adalah 1269 KW (1586.25
Adapun daya rata-rata yang terbangkitkan dalam satu hari dari hasil data
= 1269 + 1164
= 2433 KW
=3041.25 KVA
Pada tabel dapat kita menganalisa perhitungan daya yang terpakai yaitu
P = V . I . Cos Ҩ
a. Unit 1
P=√ . V . I . Cos Ҩ
= 1340723 W
= 1340 KW
= 1675 KVA
b. Unit 2
P=√ . V . I . Cos Ҩ
= 1103039 W
= 1103 KW
= 1412.5 KVA
Adapun daya rata-rata yang terpakai dari hasil perhitungan dalam satu
= 1340 + 1103
= 2443 KW
46
= 3053.75 KVA
Dari total daya rata-rata yang terbangkitkan dalam satu hari terlihat jauh
Dari hasil perhitungan, daya yang terpakai jika dibandingkan dengan data
hasil rata-rata harian PLTM Lubuak Sao memiliki selisih ± 10 KW. Apabila
dibandingkan antara daya rata-rata harian PLTM Lubuak Sao dengan daya yang
BAB V
PENUTUP
5.1 KESIMPULAN
berikut :
2. PLTM Lubuk Sao mendapatkan suplai air dari PLTA Maninjau, jadi debit
air yang yang masuk ke PLTM Lubuk Sao adalah sebanyak debit air yang
dengan jenis-jenis turbin yang biasa digunakan pada PLTM seperti Turbin
turbin, maka untuk PLTM Lubuk Sao yang memilih turbin jenis Kaplan
5.2 Saran
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
00.00 400 12.00
00.30 400 12.30
01.00 400 13.00
01.30 400 13.30
02.00 400 14.00
02.30 400 14.30
03.00 400 15.00
03.30 400 15.30
04.00 400 16.00
04.30 400 16.30
05.00 400 17.00
05.30 400 17.30
06.00 400 18.00
06.30 400 18.30
07.00 400 19.00
07.30 400 19.30
08.00 400 20.00
08.30 400 20.30
09.00 400 21.00
09.30 400 21.30
10.00 400 22.00
10.30 400 22.30
11.00 400 23.00
11.30 400 23.30
CATATAN:
MAIN TRANSFORMER
MAIN TRANSFORMER
GENERATOR LEVEL (m)
FREKUENSI (Hz)
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
S (kV)
T (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
00.00 400 12.00
00.30 400 12.30
01.00 400 13.00
01.30 400 13.30
02.00 400 14.00
02.30 400 14.30
03.00 400 15.00
03.30 400 15.30
04.00 400 16.00
04.30 400 16.30
05.00 400 17.00
05.30 400 17.30
06.00 400 18.00
06.30 400 18.30
07.00 400 19.00
07.30 400 19.30
08.00 400 20.00
08.30 400 20.30
09.00 400 21.00
09.30 400 21.30
10.00 400 22.00
10.30 400 22.30
11.00 400 23.00
11.30 400 23.30
CATATAN:
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
400
400
400
400
400
400
400
400
400
400
400
400
20,5 20,4 20,5 24,5 25,4 25,4 400
20,5 20,4 20,5 25,5 27,3 26,8 400
20,5 20,4 20,5 26,5 26,2 26,7 400
20,8 20,7 20,7 29,2 30,3 30,4 400
20,9 20,8 20,9 400
21 20,9 20,9 400
21 20,9 21 400
21 20,9 21 400
21,1 21 21 400
400
400
400
CATATAN:
S (kV)
SHIFT PAGI
T (kV)
TEGANGAN TRAFO
R (A)
S (A)
PLTM Lubuk Sao (2 x 1500 kW)
ARUS TRAFO
T (A)
PT BAJRADIKA RANGKIANG ENERGI
R (kV)
SHIFT SORE
S (kV)
TEGANGAN
GENERATOR
T (kV)
R (A)
S (A)
T (A)
ARUS GENERATOR
SHIFT MALAM
TEGANGAN (V)
ARUS (A)
EXCITASI
DAYA (kW)
kVAR
COS Ϥ
PUTARAN (%)
Hari / Tanggal :
FREKUENSI (Hz)
UPPER BEARING
THRUST BEARING 1
UNIT : 2
14
CATATAN:
THRUST BEARING 2
LOWER BEARING
DATA HARIAN PEMBANGKIT
Juni
TURBINE BEARING
STATOR WINDING 1
2016
STATOR WINDING 2
TEMPERATURE ( 0 C )
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
MAIN TRANSFORMER
THRUST BEARING
LOWER BEARING
TURBINE BEARING
OIL LEVEL
MAIN TRANSFORMER
GOVERNOR
SPIRAL CASING
RUNNER
PRESSURE (Mpa)
DRAFT TUBE
BAK PENENANG
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
400
WATER
TAIL RACE
LEVEL (m)
kWH
PT BAJRADIKA RANGKIANG ENERGI DATA HARIAN PEMBANGKIT
PLTM Lubuk Sao (2 x 1500 kW) DAYA TOTAL
Hari / Tanggal : Selasa 14 Juni 2016
400
11.00 0 400 0 400 0 4000 400 2400
11.30 0 400 0 400 0 4000 400
12.00 0 400 0 400 0 4000 2200
400
12.30 0 400 0 400 0 4000 400 2000
13.00 0 400 0 400 0 4000 400
13.30 0 400 0 400 0 4000 400 1800
14.00 0 400 0 400 0 4000 400
14.30 0 400 0 400 0 4000
1600
400
15.00 0 400 0 400 0 4000 400 1400
15.30 0 400 0 400 0 4000 400
16.00 0 400 0 400 0 4000 400 1200
16.30 0 400 0 400 0 4000 400
1000
17.00 0 400 0 400 0 4000 400
17.30 0 400 0 400 0 4000 400 800
18.00 0 400 0 400 0 4000 400
18.30 0 400 0 400 0 4000 400
600
19.00 0 400 0 400 0 4000 400
400
19.30 0 400 0 400 0 4000 400
20.00 0 400 0 400 0 4000 400 200
20.30 0 400 0 400 0 4000 400
21.00 0 400 0 400 0 4000 400
0
00.00
00.30
01.00
01.30
02.00
02.30
03.00
03.30
04.00
04.30
05.00
05.30
06.00
06.30
07.00
07.30
08.00
08.30
09.00
09.30
10.00
10.30
11.00
11.30
12.00
12.30
13.00
13.30
14.00
14.30
15.00
15.30
16.00
16.30
17.00
17.30
18.00
18.30
19.00
19.30
20.00
20.30
21.00
21.30
22.00
22.30
23.00
23.30
21.30 0 400 0 400 0 4000 400
22.00 0 400 0 400 0 4000 400
22.30 0 400 0 400 0 4000 400
23.00 0 400 0 400 0 4000 400 Jam Operasi
23.30 0 400 0 400 0 4000 400
PT BAJRADIKA RANGKIANG ENERGI DATA HARIAN PEMBANGKIT
PLTM Lubuk Sao (2 x 1500 kW) UNIT : 1
Hari / Tanggal : Minggu 17 Juli 2016
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
00.00 21 20,8 20,9 7 8,1 7,2 6,1 6,1 6,2 24 25 25 55 110 145 855 0,9 100 50,3 38,6 58,3 56,5 59,4 49,4 55,3 40,8 41,2 42,7 40,3 42,7 41,3 38 11 0,1 0,08 0 420 40
00.30 21 21 21 11,4 13 12 6,2 6,2 6,2 52 51 50 60 110 404 183 0,9 100 50,3 42,6 60,2 56,9 59,7 49,4 54,7 40,7 42,1 40,7 40,7 41,1 40,7 38 11 0,1 0,08 0 419 40
01.00 20,9 20,4 20,8 5,1 6,1 4,7 6,1 6,1 6,1 32 31 32 55 110 196 144 0,9 100 50,3 35,7 61,2 56,7 59,6 49,4 50 40,9 42,1 43,1 40,6 40,9 41,7 38 11 0,1 0,08 0 428 40
01.30 20,9 20,7 20,8 7,3 8,7 8,1 6,1 6,1 6,1 35 34 34 55 110 256 144 0,9 100 50,3 42,7 62,5 56,8 59,7 49,5 54,7 40,9 42,4 42,3 40,7 41,2 41,7 38 11 0,1 0,08 0 415 40
02.00 20,9 20..8 20,8 9,8 10,9 10,6 6,1 6,1 6,2 51 52 50 55 110 402 165 0,9 100 50,2 43,9 62,6 56,9 59,8 49,5 54,4 40,9 42,1 43,2 40,7 41,2 41,7 38 11 0,1 0,08 0 410 40
02.30 20,9 20,8 20,8 12,3 13,4 12,5 6,1 6,1 6,1 53 52 51 55 110 408 197 0,9 100 50,0 44,1 63,8 56,7 59,6 49,3 54,5 40,5 41,6 42,8 40,4 40,9 41,7 38 11 0,1 0,08 0 420 40
03.00 20,8 20,7 20,8 7,9 8,3 8,2 6,1 6,1 6,1 37 36 34 50 100 327 121 0,9 100 50,3 40,6 64 56,6 59,5 49,4 54,7 40,5 41,6 42,6 40,2 40,6 41,4 34 11 0,1 0,07 0 410 40
03.30 20,8 20,6 20,7 3,4 2,3 3,2 6,1 6,1 6,1 21 21 21 50 100 162 116 0,9 100 50,4 55,5 64,6 56 58,9 49,3 55,4 40,5 41,1 42,1 39,6 39,9 40,4 34 11 0,1 0,07 0 384 40
04.00 384
04.30 384
05.00 384
05.30 20,7 20,6 20,6 13 14,2 13,3 6,1 6,1 6,1 58 55 52 50 100 443 181 0,9 100 50,1 45 53,8 55,3 58,1 47,7 50,2 38,7 39,6 40,5 38,6 39,3 39,9 30 12,5 0,1 0,07 0 425 40
06.00 21 20,8 20,8 10,8 12 11,1 6,2 6,2 6,2 511 50 48 55 110 379 161 0,9 100 50,3 412 56,5 55,7 58,5 48,5 51,9 39,6 40,7 41,6 39,3 39,6 40,3 30 13,5 0,1 0,07 0 435 40
06.30 20,8 20,4 20,7 5,8 6 6 6,2 6,2 6,2 36 35 34 55 110 256 112 0,9 100 50,4 41 58,4 55,6 58,5 48,5 53,2 39,8 41,1 41,7 39,3 39,8 40,4 30 12 0,1 0,07 0 432 40
07.00 20,6 20,4 20,5 7,2 8,2 8,2 6,1 6,1 6,1 18 22 24 50 100 226 127 0,89 100 50,4 38,9 60,1 55,5 58,3 48,8 54 39,7 40,6 41,6 39,2 39,5 40 30 13,5 0,1 0,07 0 428 40
07.30 20,6 20,4 20,5 6,1 7 7 6 6 6 31 30 29 50 100 241 119 0,8 100 50,4 37,5 60,9 55,5 58,3 48,9 54,2 39,8 40,7 41,7 39,2 39,6 40,1 30 12,5 0,1 0,07 0 431 40
08.00 20,6 20,4 20,5 9,4 10,8 10,4 6,1 6,1 6,1 25 25 25 50 100 360 181 0,9 100 50,4 38,2 61,3 55,5 58,2 48,9 54,2 39,8 40,6 41,9 39,2 39,6 41,1 30 11 0,1 0,07 0 432 40
08.30 20,4 20,3 20,4 5,7 6,6 5,9 6 6 6 23 21 21 50 100 210 100 0,9 100 50,2 36,8 62 56 58,7 49 54,1 40,4 41,5 42,3 40,2 40,8 41,3 35 12 0,1 0,07 0 427 40
09.00 20,4 20,3 20,3 6,6 8,3 7,9 6 6 6 35 34 33 50 100 262 103 0,9 100 50,2 36,9 62,9 55,7 58,5 49,1 54,7 40,4 41,4 42,5 40 40,4 41,1 40 13 0,1 0,07 0 428 40
09.30 20,4 20,3 20,3 8 8,9 8,6 6 6 6 33 32 31 50 100 264 113 0,9 100 50,3 37,1 63,4 56 58,8 49,1 54,8 40,8 41,7 42,6 40,4 40,8 41,5 40 14 0,1 0,07 0 431 40
10.00 20,3 20,2 20,2 9,3 10,8 10,2 6 6 6 54 52 51 50 100 443 143 0,9 100 50,2 43 63,6 56,2 59 9,2 54,5 41 41,9 43,1 40,7 41,1 42,5 40 11 0,1 0,07 0 432 40
10.30 20,3 20,2 20,2 13 14,4 14,1 6 6 6 57 55 54 50 100 455 147 0,9 100 50,2 45,1 63,3 56,6 59,4 49,4 54 41,5 42,6 43,4 41,4 41,9 42,7 40 10 0,1 0,07 0 426 40
11.00 20,1 20 20 4,1 5 4,3 5,9 5,9 5,9 24 23 21 50 100 225 104 0,9 100 50,4 37,2 63,5 55,9 58,9 49,5 55,5 41,3 42,1 43,5 40,8 41,2 41,8 40 12 0,1 0,07 0 429 40
11.30 20,6 20,5 20,6 6,1 7,2 6,4 6 6 6 28 27 25 50 100 230 113 0,9 100 50,4 37,2 63,7 56 59 49,5 55,6 41,6 42,4 43,6 41,1 41,5 42,2 40 13 0,1 0,07 0 427 40
CATATAN:
MAIN TRANSFORMER
MAIN TRANSFORMER
GENERATOR LEVEL (m)
FREKUENSI (Hz)
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
S (kV)
T (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
00.00
00.30
01.00
01.30
02.00
02.30
03.00
03.30
04.00
04.30 20,8 20,7 20,7 12,3 13,4 13,2 6,1 6,1 6,1 39 38 38 55 95 373 230 0,8 100 50,2 39,7 46,6 31,3 36,7 40 32,6 35 35,3 35,2 34,8 35,3 34,9 25 11 0,1 0,07 0 429 40
05.00
05.30
06.00
06.30
07.00
07.30
08.00
08.30
09.00
09.30
10.00
10.30
11.00
11.30
CATATAN:
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
12.00 20,8 20,7 20,7 9,8 10,5 10,3 6,1 6,1 6,1 43 41 40 50 100 351 113 0,9 100 50,3 42,2 63,8 56 59 49,6 55,7 41,8 42,7 43,7 41,4 41,5 42,2 40 11,5 0,1 0,07 0 433 40
12.30 21,1 20,9 21 6,7 7,6 7,2 6,2 6,2 6,2 29 28 27 50 100 245 87,4 0,9 100 50,5 39,2 63,9 55,8 58,8 49,5 56,1 41,5 42,6 43,9 41,1 41,3 42,5 40 12 0,1 0,07 0 431 40
13.00 21,1 20,9 21 9,4 11,7 11,5 6,2 6,2 6,2 52 50 49 50 100 443 115 0,9 100 50,4 42,9 64 56 55 49,5 55,8 41,8 42,7 43,7 41,2 41,5 41,6 40 14 0,1 0,07 0 431 40
13.30 21,1 20,9 21 12 13,3 12,7 6,2 6,2 6,2 58 57 56 50 100 470 211 0,9 100 50,3 44,5 65,5 56,8 59,6 49,5 54,4 42,1 43,5 44,5 42 42,5 43,5 40 13 0,1 0,07 0 430 40
14.00 21 20,9 21 7,4 8,3 7,9 6,2 6,2 6,2 25 24 23 50 100 240 100 0,9 100 50,3 38,9 63,2 56,3 59,2 49,6 55,1 41,8 43,1 44,3 41,5 41,9 42,6 40 12 0,1 0,07 0 424 40
14.30 20,7 20,6 20,6 7,1 8,6 5,8 6,1 6,1 6,1 31 30 28 50 100 279 103 0,9 100 50,4 38,5 63,1 56,3 59,3 49,6 55,1 42,5 43 44,3 41,8 42,1 42,6 40 11 0,1 0,07 0 431 40
15.00 20,6 20,5 20,6 9 10,3 9,5 6,0 6,0 6,0 34 32 31 50 100 275 75 0,9 100 50,4 42,7 63 56,3 59,3 49,7 55,1 41,7 43,1 43,9 411 41,6 42,6 40 14,5 0,1 0,07 0 430 40
15.30 20,7 20,6 20,6 9,6 11,1 10,2 6,0 6,0 6,0 55 54 53 50 100 446 155 0,9 100 50,1 41,4 62,5 56,9 59,7 49,7 53,9 42,1 43,1 44,5 42,1 42,5 43,8 40 12 0,1 0,07 0 417 40
16.00 20,6 20,5 20,5 3,8 5,1 4,2 6,1 6,1 6,1 62 60 69 50 100 469 201 0,9 100 49,9 34,7 62,3 56,8 59,7 49,6 53,7 42 43,2 41,9 42 42,4 43,4 40 10,5 0,1 0,07 0 426 40
16.30 20,6 20,5 20,6 5,6 6,9 6,3 6 6 6 26 24 22 50 100 205 93 0,9 100 50 37,2 62,8 55,9 58,9 49,5 55,2 41,1 42,1 43,3 40,6 41 41,8 38 12 0,1 0,04 0 423 40
17.00 20,7 20,5 20,6 8,6 9,4 9,2 6,1 6,1 6,1 37 35 34 55 110 273 139 0,9 100 50,4 40,2 63,1 56,3 59,1 49,3 54,8 40,8 42,1 43 40,4 40,7 41,7 38 11 0,1 0,04 0 435 40
17.30 20,7 20,6 20,6 38 39,2 38,2 6,2 6,2 6,2 174 172 171 80 160 1263 563 0,9 100 50,2 70,8 62,5 57,8 60,6 48,7 52,9 42,4 43,4 44,5 44,4 45,3 46,5 40 11 0,1 0,08 0 439 60
18.00 20,7 20,6 20,6 39,3 40,3 39,7 6,2 6,2 6,2 177 175 174 80 160 1301 629 0,9 100 50,1 72 48,5 59,5 62,2 48,4 51,6 47,1 49,1 50,5 52,5 53,7 55,4 40 11 0,1 0,08 0 438 60
18.30 21,1 21 21,1 36,4 37,1 36,5 6,3 6,3 6,3 160 159 158 85 160 1230 561 0,9 100 49,9 71,5 43,1 560 62,2 49,7 51,3 46,8 49,1 50,9 51,3 52,4 54 40 12 0,1 0,08 0 442 80
19.00 21 20,9 21 36,6 37,2 36,8 6,3 6,3 6,3 150 178 147 80 160 1130 507 0,9 100 50,4 72,3 41,8 59,1 61,9 49,7 50,8 46 47,8 50,2 49,4 50,4 52,2 42 11 0,1 0,08 0 444 80
19.30 21 20,9 21 35,8 36,7 35,9 6,3 6,3 6,3 1164 162 160 80 160 1273 612 0,9 100 50 70,5 41,5 59,6 62,2 49,6 50,4 46,1 48 50,2 50,5 51,7 53 40 14 0,1 0,08 0 444 80
20.00 21,1 21 21,1 38,1 38,7 37,3 6,3 6,3 6,3 145 143 141 80 160 1142 533 0,9 100 50,4 71,5 41,1 59,3 62 49,8 50,2 46,7 48,7 49,9 49,9 50,9 52,6 40 11 0,1 0,08 0 437 80
20.30 437
21.00 437
21.30 437
22.00 437
22.30 437
23.00 437
23.30 437
CATATAN:
MAIN TRANSFORMER
MAIN TRANSFORMER
GENERATOR LEVEL (m)
FREKUENSI (Hz)
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
S (kV)
T (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
12.00
12.30
13.00
13.30
14.00
14.30
15.00
15.30
16.00
16.30
17.00
17.30
18.00
18.30 21,1 21 21,1 39,3 39,9 39,4 6,3 6,3 6,3 131 131 130 80 120 1321 544 0,9 100 49,9 64,5 48 38,3 35,9 37,2 32,6 37,5 36,7 37,2 39,8 41,2 39,7 30 11 0,1 0,08 0 442 80
19.00 21 20,9 21 41,4 42,3 41,7 6,3 6,3 6,3 118 117 116 80 120 1160 524 0,9 100 50,4 70,5 54,5 45 42,9 42,7 33,3 47,1 46 46,2 48,6 50,3 50,1 34 11 0,1 0,08 0 444 80
19.30 21 20,9 21 36,8 38,7 35,9 6,3 6,3 6,3 145 144 146 80 120 1541 608 0,9 100 50 71,5 56,1 46,7 44,3 44,4 33 49,8 48,7 49 5,24 56 53,9 36 14 0,1 0,08 0 443 80
20.00 21,2 21 21,1 42,1 43 43,7 6,3 6,3 6,3 130 129 128 80 120 1241 642 0,8 100 50,4 711 56,6 41,3 45,2 46,2 32,9 51,7 50,2 50,3 5,25 56,6 54,5 36 11 0,1 0,08 0 441 80
20.30 21,1 20,9 21 41,9 41,6 41,2 6,3 6,3 6,3 137 137 136 80 120 1361 575 0,9 100 50,3 67,2 57,1 41,9 45,5 46,8 32,9 51,8 51 51,5 52,3 56,9 54,2 36 12 0,1 0,08 0 441 80
21.00 21,1 21 21 37,6 37,5 37,1 6,3 6,3 6,3 124 123 122 80 120 1267 550 0,9 100 50,4 61,1 57 41,7 45,7 47,3 33 51,1 50,3 50,2 52,4 56,5 54,2 36 11 0,1 0,08 0 450 55
21.30
22.00 21,1 21 21,1 3,1 4 3,4 6,2 6,2 6,2 23 22 21 50 80 220 102 0,9 100 50,2 32,5 53,2 44,4 44 46,3 33,6 41,4 41,2 40,9 38,8 40,6 39,3 34 13 0,1 0,04 0 416 40
22.30
23.00
23.30
CATATAN:
426
11.00 225 429 0 0 225 4290 429 2400
11.30 230 427 0 0 230 4270 427
12.00 351 433 0 0 351 4330 2200
433
12.30 245 431 0 0 245 4310 431 2000
13.00 443 431 0 0 443 4310 431
13.30 470 430 0 0 470 4300 430 1800
14.00 240 424 0 0 240 4240 424
14.30 279 431 0 0 279 4310
1600
431
15.00 275 430 0 0 275 4300 430 1400
15.30 446 417 0 0 446 4170 417
16.00 469 426 0 0 469 4260 426 1200
16.30 205 423 0 0 205 4230 423
1000
17.00 273 435 0 0 273 4350 435
17.30 1263 439 0 0 1263 4390 439 800
18.00 1301 438 0 0 1301 4380 438
18.30 1230 442 1321 442 2551 4420 442
600
19.00 1130 444 1160 444 2290 4440 444
400
19.30 1273 444 1541 443 2814 4440 444
20.00 1142 437 1241 441 2383 4410 441 200
20.30 0 437 1361 441 1361 4410 441
21.00 0 437 1267 450 1267 4500 450
0
00.00
00.30
01.00
01.30
02.00
02.30
03.00
03.30
04.00
04.30
05.00
05.30
06.00
06.30
07.00
07.30
08.00
08.30
09.00
09.30
10.00
10.30
11.00
11.30
12.00
12.30
13.00
13.30
14.00
14.30
15.00
15.30
16.00
16.30
17.00
17.30
18.00
18.30
19.00
19.30
20.00
20.30
21.00
21.30
22.00
22.30
23.00
23.30
21.30 0 437 0 0 0 4370 437
22.00 0 437 220 416 220 4370 437
22.30 0 437 0 0 0 4370 437
23.00 0 437 0 0 0 4370 437 Jam Operasi
23.30 0 437 0 0 0 4370 437
PT BAJRADIKA RANGKIANG ENERGI DATA HARIAN PEMBANGKIT
PLTM Lubuk Sao (2 x 1500 kW) UNIT : 1
Hari / Tanggal : Rabu 31 Agustus 2016
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
00.00 20,9 20,8 20,9 9,2 10,6 10,3 6,1 6,1 6,1 38 37 36 50 100 393 134 0,9 100 50,28 42,1 45,3 48,9 49,2 47,6 42,3 44,1 46,3 47,3 43,8 44,8 45,5 50 10,5 0,1 0,07 0 433 35 221,106
00.30 20,7 20,6 20,5 12,2 13,5 13,1 6,1 6,1 6,1 44 43 42 50 100 435 174 0,9 100 49,87 45,2 44,3 48 48,2 47,4 44,9 40,8 42,4 43,1 40,6 41,3 41,8 48 11,5 0,1 0,07 0 433 35 221,145
01.00 20,8 20,7 20,8 10,2 11,9 11,3 6,1 6,1 6,1 37 36 35 50 100 372 170 0,9 100 50,31 42,4 44 47,7 47,9 47,1 46,3 40,3 41,9 42,5 40 40,8 41,3 47 12 0,1 0,07 0 434 35 221,175
01.30 20,8 20,7 20,8 9,9 10,6 11,1 6,11 6,11 6,11 35 34 33 50 100 377 143 0,9 100 50,32 42,7 43,7 47,3 47,6 47 47,3 39,6 40,9 41,6 39 39,7 40,2 46 12,5 0,1 0,07 0 435 35 221,203
02.00 6,1 6,1 6,1 13,1 14,6 14,2 6,1 6,1 6,1 41 40 39 50 100 427 261 0,9 100 50,23 45,2 43,6 47,4 47,7 46,8 47,9 39,1 40,9 41,6 39 40 40,4 46 13 0,1 0,07 0 435 35 221,323
02.30 20,6 20,4 20,5 9,8 11,2 10,4 6 6 6 36 35 34 50 100 310 101 0,9 100 50,34 40,7 43,7 47,2 47,5 46,7 48,4 39,3 40,8 41,4 39,2 40,1 40,4 46 11 0,1 0,08 0 432 35 221,259
03.00 20,8 20,6 20,7 12,5 13,6 12,9 6,1 6,1 6,1 43 42 41 50 100 418 187 0,9 100 50,15 44,5 43,6 47,4 47,7 46,6 48,8 39,3 40,4 41,2 39,1 39,8 40,3 46 11,5 0,1 0,07 0 433 35 221,289
03.30 20 19,9 20 12,7 14,7 13,6 6,1 6,1 6,1 42 41 40 50 100 424 199 0,9 100 50,19 45,4 43,6 47,4 47,7 46,5 49,1 39,1 40,6 41,5 39 39,8 40,3 46 12 0,1 0,08 0 423 35 221,321
04.00 20,9 20,8 20,9 13,4 14,7 13,9 6,1 6,1 6,1 52 51 50 60 120 490 201 0,9 100 50,39 4605 44,4 48,3 48,5 46,8 49,9 39,8 41 41,8 40,2 41,2 41,8 47 13 0,1 0,08 0 442 40 2211,359
04.30 21 20,8 20,9 14,3 15,6 15 6,2 6,2 6,2 52 51 50 60 120 510 216 0,9 100 50,29 51,6 44,5 48,2 48,4 46,8 50,4 40 42 42,2 40,3 41,3 41,8 48 13 0,1 0,08 0 420 40 221,402
05.00 20,7 20,6 20,6 12,5 14 13,3 6,1 6,1 6,1 46 45 44 60 120 440 189 0,9 100 50,08 43,9 43,7 47,6 47,8 46,4 50,3 39,7 41,3 42 39,6 40,5 40,7 48 12,5 0,1 0,08 0 426 40 221,434
05.30 20,9 20,7 20,8 12,1 13,7 12,9 6,1 6,1 6,1 43 42 41 60 120 424 187 0,9 100 49,97 44,7 43,7 475 47,8 46,3 50,2 39,6 41,4 42 39,4 40,3 40,7 48 11 0,1 0,08 0 429 40 221,466
06.00 20,9 20,8 20,9 9 10,3 9,4 6,1 6,1 6,1 32 31 30 55 110 322 140 0,9 100 50,37 40 43,6 47,2 47,6 46,4 50,2 39,7 41 41,4 39,2 40,2 40,4 48 11,5 0,1 0,08 0 429 40 221,498
06.30 20,8 20,7 20,7 10,8 12 110 6,1 6,1 6,1 39 38 37 55 110 393 159 0,9 100 50,29 42,9 43,7 47,6 47,8 46,3 50,2 39,8 41,5 41,6 39,6 40,6 40,7 38 12 0,1 0,08 0 433 40 221,532
07.00 20,9 20,7 20,8 9,7 11,1 10,4 6,1 6,1 6,1 30 29 29 50 100 370 155 0,9 100 50,38 41,2 43,6 47,2 47,5 46,2 50,2 39,4 40,9 41,5 39,2 40,1 40,3 40 13 0,1 0,08 0 433 40 221,563
07.30 20,7 20,5 20,6 9 10,6 10,1 6,1 6,1 6,1 31 30 29 50 100 319 115 0,9 100 50,43 39 43,4 47 47,4 46,2 50,1 39,2 40,9 41,3 38,9 39,6 40 40 13,5 0,1 0,08 0 435 40 221,586
08.00 20,5 20,3 20,4 15,2 16,4 15,6 6 6 6 54 52 511 60 110 521 557 0,9 100 49,89 50,5 43,8 47,6 48 46,4 50,2 39,7 40,8 41,6 39,6 40,6 40,9 40 14 0,1 0,08 0 429 40 221,625
08.30 20,8 20,6 20,7 40,4 41,8 40,7 6,2 6,2 6,2 140 138 136 85 160 1393 596 0,9 100 50,08 83,2 44,5 51,8 51,3 46,2 46 44,9 47,3 48 50,6 52,9 53,4 38 13 0,1 0,09 0 438 50 221,716
09.00 21 20,8 20,9 38,8 39,9 38,6 6,2 6,2 6,2 135 133 132 80 160 1373 513 0,9 100 50,25 82,4 45,2 52,3 51,9 46,4 41,8 47 49,9 51,1 52,7 54,9 55,6 42 12 0,1 0,09 0 435 50 221,813
09.30 21 20,9 21 40 41,1 40,2 6,3 6,3 6,3 137 135 134 85 160 1383 594 0,9 100 50,27 83,4 45,7 52,8 52,3 45,9 40,7 48,4 51,2 52,4 53,8 55,9 56,8 48 11 0,1 0,09 0 437 50 221,933
10.00 20,6 20,5 20,6 41,1 42,3 41,6 6,2 6,2 6,2 143 142 141 85 160 1394 580 0,9 100 49,93 83,3 45,9 53,2 52,7 47,2 39,9 49,1 52 53,3 55 57,4 58,2 50 14 0,1 0,09 0 441 50 222,05
10.30 20,5 20,4 20,5 40 41,2 40,4 6,2 6,2 6,2 143 141 140 85 160 1389 656 0,9 100 50,14 82,9 46,2 53,3 52,9 47,5 40,6 49,7 52,7 54,1 55,7 58,1 59 54 12 0,1 0,09 0 434 50 222,157
11.00 20,3 20,2 20,3 41,1 42,3 41,3 6,1 6,1 6,1 146 145 144 85 160 1386 691 0,9 100 49,88 84 46,3 53,6 53 47,7 40,9 50,4 53,3 54,5 56,4 58,8 59,8 58 12 0,1 0,09 0 440 50 222,266
11.30 20,3 20,2 20,3 42,2 43,1 42,1 6,1 6,1 6,1 147 145 144 85 160 1395 673 0,9 100 49,86 83,5 46,6 53,7 53,3 47,9 41,2 50 53,5 54,6 56,3 58,7 59,6 60 11 0,1 0,09 0 447 50 222,433
CATATAN:
11.30
11.00
10.30
10.00
09.30
09.00
08.30
08.00
07.30
07.00
06.30
06.00
05.30
05.00
04.30
04.00
03.30
03.00
02.30
02.00
01.30
01.00
00.30
00.00
R (kV)
S (kV)
SHIFT PAGI
T (kV)
TEGANGAN TRAFO
R (A)
S (A)
PLTM Lubuk Sao (2 x 1500 kW)
ARUS TRAFO
T (A)
R (kV)
SHIFT SORE
S (kV)
TEGANGAN
GENERATOR
T (kV)
R (A)
S (A)
T (A)
ARUS GENERATOR
SHIFT MALAM
TEGANGAN (V)
ARUS (A)
EXCITASI
DAYA (kW)
kVAR
COS Ϥ
PUTARAN (%)
Hari / Tanggal :
FREKUENSI (Hz)
UPPER BEARING
UNIT : 2
THRUST BEARING 1
31
CATATAN:
THRUST BEARING 2
LOWER BEARING
DATA HARIAN PEMBANGKIT
Agustus
TURBINE BEARING
STATOR WINDING 1
2016
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
MAIN TRANSFORMER
THRUST BEARING
LOWER BEARING
TURBINE BEARING
OIL LEVEL
MAIN TRANSFORMER
GOVERNOR
SPIRAL CASING
RUNNER
PRESSURE (Mpa)
DRAFT TUBE
BAK PENENANG
WATER
TAIL RACE
LEVEL (m)
kWH
PLTM Lubuk Sao (2 x 1500 kW) DAYA TOTAL
Hari / Tanggal : Rabu 31 Agustus 2016
434
11.00 1386 440 0 0 1386 4400 440 2400
11.30 1395 447 0 0 1395 4470 447
12.00 1403 445 0 0 1403 4450 2200
445
12.30 1405 451 0 0 1405 4510 451 2000
13.00 1404 450 0 0 1404 4500 450
13.30 1409 452 0 0 1409 4520 452 1800
14.00 1396 451 0 0 1396 4510 451
14.30 1375 450 0 0 1375 4500
1600
450
15.00 0 0 0 0 0 0 0 1400
15.30 0 0 0 0 0 0 0
16.00 1401 450 0 0 1401 4500 450 1200
16.30 1375 450 0 0 1375 4500 450
1000
17.00 1372 451 0 0 1372 4510 451
17.30 1386 451 0 0 1386 4510 451 800
18.00 1387 452 0 0 1387 4520 452
18.30 1422 451 0 0 1422 4510 451
600
19.00 1397 453 0 0 1397 4530 453
400
19.30 1418 451 0 0 1418 4510 451
20.00 1404 451 0 0 1404 4510 451 200
20.30 1410 451 0 0 1410 4510 451
21.00 1379 450 0 0 1379 4500 450
0
00.00
00.30
01.00
01.30
02.00
02.30
03.00
03.30
04.00
04.30
05.00
05.30
06.00
06.30
07.00
07.30
08.00
08.30
09.00
09.30
10.00
10.30
11.00
11.30
12.00
12.30
13.00
13.30
14.00
14.30
15.00
15.30
16.00
16.30
17.00
17.30
18.00
18.30
19.00
19.30
20.00
20.30
21.00
21.30
22.00
22.30
23.00
23.30
21.30 1405 451 0 0 1405 4510 451
22.00 1425 452 0 0 1425 4520 452
22.30 1375 448 0 0 1375 4480 448
23.00 1385 435 0 0 1385 4350 435 Jam Operasi
23.30 278 433 0 0 278 4330 433
PT BAJRADIKA RANGKIANG ENERGI DATA HARIAN PEMBANGKIT
PLTM Lubuk Sao (2 x 1500 kW) UNIT : 1
Hari / Tanggal : Rabu 31 Agustus 2016
TEGANGAN WATER
FREKUENSI (Hz)
MAIN TRANSFORMER
MAIN TRANSFORMER
THRUST BEARING 1
THRUST BEARING 2
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
DAYA (kW)
BAK PENENANG
SPIRAL CASING
TEGANGAN (V)
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
kVAR
TAIL RACE
kWH
ARUS (A)
RUNNER
R (kV)
R (kV)
S (kV)
T (kV)
S (kV)
T (kV)
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
12.00 20,3 20,3 20,3 41,9 42,7 41,8 6,1 6,1 6,1 144 142 141 85 160 1403 647 0,9 100 50,2 82,2 46,6 53,6 53,2 48,1 41,2 50,4 53,4 55,1 56,4 59 59,9 62 12 0,1 0,09 0 445 50 222,512
12.30 20,3 20,2 20,3 42,4 43,3 42,2 6,1 6,11 6,11 146 144 142 85 160 1405 625 0,9 100 50,08 83,3 46,9 54 53,4 48,3 41,2 50,7 54 55,1 56,8 59,3 60,3 62 11 0,1 0,09 0 451 50 222,634
13.00 20,5 20,4 20,5 41,2 42,2 40,8 6,1 6,1 6,1 141 138 137 85 160 1404 562 0,9 100 50,28 83 46,8 53,8 53,3 48,4 40,9 50,7 53,8 55 56,1 58,4 59,4 62 13 0,1 0,09 0 450 50 222,754
13.30 20,2 20,1 20,3 42,4 43,4 42,2 6,1 6,1 6,1 148 147 141 85 160 1409 672 0,9 100 50,05 83 46,9 54,2 57,6 48,4 40,7 51 54,4 55,5 57,5 60,1 61,1 62 13 0,1 0,09 0 452 50 222,873
14.00 20,4 20,3 20,4 41,9 42,5 41,5 6,1 6,1 6,1 144 143 142 85 160 1396 674 0,9 100 50,3 79,3 47,1 54,2 53,6 48,5 40,7 51,1 54,1 55,8 57,2 59,9 60,1 62 11 0,1 0,09 0 451 50 222,971
14.30 20,5 20,4 20,5 40,8 40 40,1 6,1 6,1 6,2 142 140 139 85 160 1375 625 0,9 100 50,35 78 47,1 54,1 53,6 48,6 40,5 51,3 54,4 55,1 57,2 59,6 60,2 62 11 0,1 0,09 0 450 50 223,071
15.00
15.30
16.00 20,5 20,4 20,5 41,6 42,5 41,5 6,1 6,1 6,1 143 141 140 85 160 1401 611 0,9 100 50,21 81,8 43,4 50 49,8 45,3 39,1 47,1 49,9 50,6 51,2 53,1 53,8 52 14 0,1 0,09 0 450 55 223,159
16.30 20,3 20,2 20,3 41,9 42,7 41,8 6,1 6,1 6,1 143 141 140 85 160 1375 631 0,9 100 50,36 80,2 46 53,2 52,6 46,8 40,7 48,9 52,4 53,3 55,7 57,9 59 52 11,5 0,1 0,09 0 450 55 223,274
17.00 20,3 20,2 20,3 41,8 42,3 41,4 6,1 6,1 6,1 142 140 139 85 160 1372 634 0,9 100 50,37 77,5 46,8 53,9 53,4 47,7 41,4 50,3 52,9 54,3 55,9 58,3 59 52 12,5 0,1 0,09 0 451 55 223,376
17.30 20,7 20,6 20,7 40,8 41,8 41,9 6,2 6,2 6,2 139 138 137 85 160 1386 599 0,9 100 50,35 84 46,9 53,9 53,4 48 41,6 50,3 53,4 54,4 55,6 57,9 58,6 52 14 0,1 0,09 0 451 55 233,496
18.00 20,8 20,7 20,8 40,4 41,4 40,2 6,2 6,2 6,2 139 138 137 85 160 1387 569 0,9 100 50,34 81,2 46,9 53,9 53,4 48,3 41,8 50,5 53,4 55 56,2 58,6 59,3 52 11 0,1 0 0 452 55 233,604
18.30 20,5 20,4 20,5 41,9 42,6 41,1 6,2 6,2 6,2 144 143 142 85 160 1422 667 0,9 100 49,97 83,5 46,9 53,9 53,3 48,3 41,7 50,7 53,6 55 56,5 58,8 59,9 52 10,5 0,1 0,09 0 451 55 233,716
19.00 20,5 20,5 20,5 41,2 41,6 41,1 6,2 6,2 6,2 141 138 138 85 160 1397 605 0,9 100 50,33 79,3 46,7 53,7 53,2 48,4 41,8 50,4 53,7 54,7 56,1 58,5 59,6 60 13 0,1 0,09 0 453 55 233,863
19.30 20,6 20,5 20,6 40 41,7 41 6,2 6,2 6,2 140 139 138 85 160 1418 629 0,9 100 50,05 83 46,7 53,7 53,1 48,4 41,6 50,1 53,3 54,4 55,9 57,9 59,9 60 10 0,1 0,09 0 451 55 223,911
20.00 20,7 20,6 20,7 40,3 41 40,2 6,2 6,2 6,2 140 138 137 85 160 1404 524 0,9 100 50,03 81,2 46,5 53,5 53 48,3 40,9 49,6 52,5 53,8 5 57,2 58,1 60 12 0,1 0,09 0 451 55 224,07 3
20.30 20,7 20,7 20,7 41,7 42,3 41,5 6,2 6,2 6,2 144 143 141 85 160 1410 641 0,9 100 50,07 82,7 46,4 53,4 52,9 48,3 41,1 49,4 52,8 54,1 55,6 57,9 59 60 11,5 0,1 0,09 0 451 55 224,188
21.00 20,8 20,7 20,7 39,7 40,6 39,4 6,2 6,2 6,2 137 135 134 85 160 1379 520 0,9 100 50,3 80,3 46,3 53,3 52,7 48,3 411 49,7 52,9 54,6 55,7 58 59,1 60 13 0,1 0,09 0 450 55 224,296
21.30 20,8 20,7 20,8 41,2 41,9 40,8 6,3 6,2 6,3 140 139 137 85 160 1405 584 0,9 100 50,3 81,2 46,3 53,3 52,7 48,3 41,5 49,4 52,6 53 55 57,1 58,2 60 10,5 0,1 0,09 0 451 55 224,415
22.00 20,8 20,7 20,8 41,1 41,7 41,9 6,2 6,2 6,2 141 13 138 85 160 1425 558 0,9 100 49,94 85,9 46,3 53,3 52,8 48,3 41,5 49,5 52,4 53,8 55,1 57,2 58,3 60 11,5 0,1 0,09 0 452 55 224,517
22.30 20,8 20,7 20,8 40,3 41,2 40,4 6,2 6,2 6,2 139 138 137 80 160 1375 612 0,9 100 50,42 82 46,1 53,2 52,7 48,2 41,5 49,7 52,4 53,8 55,4 57,6 58,3 60 12,5 0,1 0,09 0 448 55 224,647
23.00 20,7 20,6 20,6 40 41,2 40,9 6,2 6,2 6,2 140 139 138 80 160 1385 631 0,9 100 50,07 82,7 46,1 53,1 52,6 48,2 41,4 49,1 52,4 53,6 54,8 57,1 58 60 11 0,1 0,09 0 435 55 224,763
23.30 20,7 20,6 20,6 8,8 10 9,4 6,1 6,1 6,1 29 28 27 50 100 278 121 0,8 100 50,51 38,7 44,7 47,8 48,1 48,1 43,5 43,3 44,2 45,8 42,2 43 43,8 48 11,5 0,1 0,09 0 433 40 224,794
CATATAN:
23.30
23.00
22.30
22.00
21.30
21.00
20.30
20.00
19.30
19.00
18.30
18.00
17.30
17.00
16.30
16.00
15.30
15.00
14.30
14.00
13.30
13.00
12.30
12.00
R (kV)
S (kV)
SHIFT PAGI
T (kV) TEGANGAN TRAFO
R (A)
S (A)
PLTM Lubuk Sao (2 x 1500 kW)
ARUS TRAFO
T (A)
PT BAJRADIKA RANGKIANG ENERGI
R (kV)
SHIFT SORE
S (kV)
TEGANGAN
GENERATOR
T (kV)
R (A)
S (A)
T (A)
ARUS GENERATOR
SHIFT MALAM
TEGANGAN (V)
ARUS (A)
EXCITASI
DAYA (kW)
kVAR
COS Ϥ
PUTARAN (%)
Hari / Tanggal :
FREKUENSI (Hz)
UPPER BEARING
UNIT : 2
THRUST BEARING 1
31
CATATAN:
THRUST BEARING 2
DATA HARIAN PEMBANGKIT
LOWER BEARING
Agustus
TURBINE BEARING
STATOR WINDING 1
2016
STATOR WINDING 2
TEMPERATURE ( 0 C )
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
MAIN TRANSFORMER
THRUST BEARING
LOWER BEARING
TURBINE BEARING
OIL LEVEL
MAIN TRANSFORMER
GOVERNOR
SPIRAL CASING
RUNNER
PRESSURE (Mpa)
DRAFT TUBE
BAK PENENANG
WATER
TAIL RACE
LEVEL (m)
kWH
PT BAJRADIKA RANGKIANG ENERGI DATA HARIAN PEMBANGKIT
PLTM Lubuk Sao (2 x 1500 kW) UNIT : 1
Hari / Tanggal : Kamis 08 September 2016
TEGANGAN WATER
PEMBANGKITAN (Kwh)
TEMPERATURE ( 0 C )
FREKUENSI (Hz)
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
THRUST BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
BAK PENENANG
SPIRAL CASING
TRANSFORMER
TRANSFORMER
TEGANGAN (V)
ENERGI
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
TAIL RACE
ARUS (A)
(%)
RUNNER
R (kV)
R (kV)
S (kV)
S (kV)
T (kV)
T (kV)
MAIN
MAIN
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
2
00.00 20,9 20,7 20,8 8,9 9,9 8,5 6,1 6,1 6,1 32 31 30 50 100 304 105 0,9 100 50,27 38,7 43,8 47,2 47,7 46,4 45,8 40,1 41,5 42,5 39,7 40,6 41 52 10,5 0,1 0,07 0 435 40 255,917
01.00 21,11 20,9 21,1 6,1 7,3 6 6,2 6,1 6,2 22 21 20 50 100 211 101 0,9 100 50,37 36,9 43,6 46,5 47 46,4 47,8 39,4 41,1 41,4 39,8 36,9 38,9 50 12 0,1 0,07 0 437 35 255,953
02.00 21,2 21 21,11 9,4 10,7 10 6,2 6,2 6,2 36 35 34 50 100 370 121 0,9 100 50,18 41,4 43,5 47 47,4 46,3 48,9 39,5 41,1 41,8 39,3 40,2 40,6 50 13 0,1 0,07 0 434 40 256,003
03.00 21,1 20,9 21,1 6,9 9,6 8,6 6,2 6,2 6,2 28 27 26 50 100 279 106 0,9 100 50,3 38,2 43,5 46,9 47,3 46,3 49,7 39,9 41,1 41,7 39,11 40 39,9 48 13,5 0,1 0,07 0 437 40 256,056
04.00 20,5 20,4 20,5 8,8 9,4 8,6 6 6 6 29 28 27 50 100 247 102 0,9 100 50,31 38,6 43,4 47 47,3 46,2 50,1 39 40,8 41,6 39 40 40,2 46 13 0,1 0,07 0 435 40 256,094
05.00 20,7 20,6 20,6 12,5 13,6 12,3 6,1 6,1 6,1 43 42 40 50 100 434 131 0,9 100 50,26 44,7 43,6 47,2 47,7 46 50,4 39,2 40,9 41,2 38,9 39,8 40 44 12,5 0,1 0,07 0 433 40 256,161
06.00 20,6 20,5 20,6 40,4 41 40 6,2 6,2 6,2 139 138 137 80 160 1351 624 0,9 100 50 78,7 44,7 51,8 51,5 46 50,9 45,7 48,7 49,6 51,2 53,5 54 50 11 0,1 0,08 0 438 40 256,372
07.00 20,8 20,7 20,8 37,6 38,2 37,9 6,2 6,2 6,2 131 130 129 80 160 1316 552 0,9 100 50,29 75,2 44,9 51,8 51,5 46,4 43,1 46,5 49 50,2 51 53,1 53,8 46 12,5 0,1 0,08 0 439 60 256,592
08.00 20,7 20,5 20,6 35,7 36,5 35,2 6,2 6,2 6,2 122 121 120 80 160 1271 581 0,9 100 50,37 73,5 45,1 51,7 51,5 46,6 41,4 46,9 49,6 50,4 51,5 53,7 54,3 46 14 0,11 0,08 0 439 60 256,794
09.00
10.00
11.00 20,7 20,7 20,7 38,5 39,1 38 6,2 6,2 6,2 131 130 128 80 160 1307 564 0,9 100 50,19 78,2 38,9 46,1 46,1 40,3 39,7 38,6 38 38,3 40,11 42 42,1 36 14 0,1 0,09 0 441 70 257,405
12.00 20,5 20,4 20,5 39,3 39,9 39,9 6,1 6,1 6,1 140 138 137 80 160 1370 586 0,9 100 50,23 76,3 44,4 51,6 51,3 44,7 42,1 45,8 48,9 49,5 51,2 53,6 53,9 44 12 0,1 0,09 0 450 70 257,707
13.00 20,5 20,4 20,5 39,2 40,8 39,8 6,1 6,1 6,1 144 142 140 85 160 1375 656 0,9 100 50,01 78,8 45,5 52,7 52,3 46,6 411,1 52,1 53,1 53,2 54,8 57,3 57,9 45 12 0,1 0,09 0 452 70 257,962
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
CATATAN:
Pukul 08.40 Shutdown normal dengan beban 37 A , tukar dengan unit 2, karena unit 1 penambahan oli bearing
TEGANGAN WATER
PEMBANGKITAN (Kwh)
TEMPERATURE ( 0 C )
FREKUENSI (Hz)
STATOR WINDING 1
STATOR WINDING 2
STATOR WINDING 3
STATOR WINDING 4
STATOR WINDING 5
STATOR WINDING 6
PUTARAN (%)
TURBINE BEARING
TURBINE BEARING
THRUST BEARING
THRUST BEARING
THRUST BEARING
LOWER BEARING
LOWER BEARING
UPPER BEARING
BAK PENENANG
SPIRAL CASING
TRANSFORMER
TRANSFORMER
TEGANGAN (V)
ENERGI
DRAFT TUBE
COS Ϥ
GOVERNOR
JAM
TAIL RACE
ARUS (A)
(%)
RUNNER
R (kV)
R (kV)
S (kV)
S (kV)
T (kV)
T (kV)
MAIN
MAIN
R (A)
R (A)
S (A)
S (A)
T (A)
T (A)
2
00.00
01.00
02.00
03.00
04.00
05.00
06.00
07.00
08.00
09.00 20,6 20,5 20,5 36,1 37,1 36,5 6,1 6,1 6,1 138 138 136 70 100 1353 556 0,9 100 50,06 71 38,8 38,9 46,1 38,2 35,8 34,6 34,7 34,9 37,6 38,3 37,6 28 14 0,1 0,09 0 432 55 256,947
10.00 20,7 20,6 20,7 40,1 10,8 40,2 6,2 6,2 6,2 138 138 136 80 120 1369 589 0,9 100 50,01 74,8 47,6 48,8 55,1 44,2 42,2 48,4 47,9 48,1 51,4 54,4 52,6 38 12 0,1 0,09 0 452 55 257,146
11.00 20,7 20,7 20,7 39,8 40,4 39,7 6,2 6,2 6,2 135 135 134 80 120 1349 549 0,9 100 49,93 76 48,7 49,8 55,8 45,9 43,9 49,6 48,9 48,8 51,7 55 52,7 42 12 0,1 0,09 0 441 70 257,405
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
CATATAN:
11.00
Level Air (mm)
441
2400
12.00 1370 450 0 0 1370 4500 450 2200
13.00 1375 452 0 0 1375 4520 452 2000
14.00 0 0 0 0 0 0 0 1800
15.00 0 0 0 0 0 0 0 1600
16.00 0 0 0 0 0 0 0
1400
17.00 0 0 0 0 0 0 1200
0
18.00 0 0 0 0 0 0 1000
0
19.00 0 0 0 0 0 0
800
0
600
20.00 0 0 0 0 0 0 0
400
21.00 0 0 0 0 0 0 0 200
22.00 0 0 0 0 0 0 0 0
00.00
01.00
02.00
03.00
04.00
05.00
06.00
07.00
08.00
09.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
23.00 0 0 0 0 0 0 0
Jam Operasi
LEGEND: CATATAN:
Daya Total 1# + 2# UNIT 1# UNIT 2#
Daya Unit 1#
Daya Unit 2# Pukul 08.40 Shutdown normal dengan beban 37 A , Pukul 08.53 Unit 2 syncrone dengan beban 33 A
Level Bal Penenang tukar dengan unit 2, karena unit 1 penambahan oli bearing
Pukul 10.04 Unit 2 trip, karena reverce power
Pukul 10.46 unit 1 syncrone dengan beban 36 A
Pkul 10.10 Unit 2 syncrone dengan bebean 39 A
Type SF 150-16/2150
Phase/Connection 3/ Y
Frequency 50 Hz
Insulation Grade F/ F
Date of Production 13
Dari data dapat dilihat kapasitas dari daya generator adalah 1875 KVA atau sama
dengan 1500 kW. Untuk dua buah generator maka didapat daya generator adalah 3750 KVA