LOGAWA SUWAR-SUWIR
Rp2,000,000,000 Rp2,000,000,000
Rp10,000,000 Rp10,000,000
Rp10,000,000 Rp10,000,000
Rp500,000,000 Rp500,000,000
Rp1,000,000 Rp1,000,000
Rp983,345,000 Rp983,345,000
Rp491,672,500 Rp491,672,500
Rp12,637 Rp21,735,451
Rp45,320 Rp4,985,200
Rp1,110,000 Rp1,110,000
Rp217,829 Rp43,565,749
Rp1,254,854 Rp31,371,339
Rp1,254,854 Rp37,645,607
Rp1,254,854 Rp12,548,536
Rp650,000 Rp3,250,000
Rp1,680,000 Rp613,200,000
Rp144,000 Rp52,560,000
Rp30,000,000 Rp30,000,000
Rp1,191,232,151 Rp1,191,232,151
Rp1,318,500 Rp2,637,000
Rp1,569,014 Rp1,569,014
Rp74,244 Rp127,699,783
Rp77,403,492 Rp77,403,492
Rp1,274,897,498 Rp1,274,897,498
Rp1,082,030,280 Rp1,082,030,280
Rp14,030,000 Rp14,030,000
Rp15,000,000 Rp45,000,000
Rp25,725 Rp441,219,765
Rp163,702,431 Rp163,702,431
Rp663,739,290 Rp663,739,290
Rp900,993,259 Rp900,993,259
Rp6,010,981 Rp6,010,981
Rp14,052 Rp120,845,480
Rp18,340 Rp136,541,300
Rp12,045 Rp54,479,535
Rp7,430 Rp25,113,400
Rp2,803,602,859 Rp2,803,602,859
Rp11,132,000 Rp111,320,000
Rp1,140,340 Rp34,210,200
Rp3,254,488,914 Rp3,254,488,914
Rp1,295,402,165 Rp1,295,402,165
Rp2,033,372,036 Rp2,033,372,036
Rp91,385,164 Rp91,385,164
Rp128,899,326 Rp128,899,326
Rp267,800,817 Rp267,800,817
Rp200,461,974 Rp200,461,974
Rp70,409,186 Rp70,409,186
Rp206,931,105 Rp206,931,105
Rp280,871 Rp509,276,022
Rp430,964,782 Rp430,964,782
Rp245,010,512 Rp245,010,512
Rp153,744 Rp811,550,775
Rp89,200 Rp1,172,583,101
Rp97,276 Rp153,501,528
Rp80,000 Rp122,560,000
Rp149,090 Rp958,492,328
Rp133,841 Rp29,684,818
Rp397,796 Rp163,363,601
Rp83,989 Rp192,791,945
Rp35,180 Rp181,970,309
Rp25,018 Rp471,468,356
Rp28,118 Rp89,190,994
Rp116,859 Rp883,921,688
Rp259,676 Rp548,306,170
Rp47,876 Rp37,343,389
Rp37,876 Rp17,044,263
Rp152,625 Rp64,865,778
Rp323,928 Rp48,589,134
Rp185,000 Rp4,255,000
Rp500,000 Rp12,500,000
Rp350,000 Rp245,189,700
Rp1,356,433,000 Rp1,356,433,000
Rp2,633,955,000 Rp2,633,955,000
Rp1,454,559,000 Rp1,454,559,000
TOTAL PEKERJAAN Rp34,514,788,977
PPN 10% Rp37,966,267,874
listrik
600 kwh/hari
2800/kwh
1680000
air
3000
pria
wanita
/m3
60 liter 0.06 m3/hari
100 liter 0.1 m3/hari
0.16 m3/hari
480 m3/hari/orang
misal di proyek ada 300 orang 144000
Pembersihan 1 m2 lapangan dan perataan
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.005
JUMLAH TENAGA
B BAHAN
JUMLAH HARGA B
C PERALATAN
bh
JUMLAH HARG
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pekerjaan Pengukuran
No Uraian Kode Hari kerja Kuantitas
A TENAGA
Pekerja 2 5.000
Mandor 2 1.000
JUMLAH TENAGA
B BAHAN
JUMLAH HARGA B
C PERALATAN
bh
JUMLAH HARG
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Penulangan pilecap
No Uraian kuantitas Satuan hari kerja
A TENAGA
Pekerja 15 orang 15.0000
tukang besi 30 orang 15.000
Mandor 3 orang 15.000
JUMLAH TENAGA KERJA
B BAHAN
besi beton ( ulir) 24570 m3 1.050
kawat beton 24570 kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
bar cuter 1 unit 15.000
bar bender 1 unit 15.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pengecoran pilecap
No Uraian kuantitas Satuan hari kerja
A TENAGA
Pekerja 4 orang 3.0000
Mandor 1 orang 3.000
JUMLAH TENAGA KERJA
B BAHAN
beton ready mix k350 571.4352 m3 1.100
JUMLAH HARGA BAHAN
C PERALATAN
concrete bucket 1 unit 3.000
concrete vibrator 1 unit 3.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Penulangan plat
No Uraian kuantitas Satuan hari kerja
A TENAGA
Pekerja 5 orang 2.0000
tukang besi 10 orang 2.000
Mandor 1 orang 2.000
JUMLAH TENAGA KERJA
B BAHAN
besi beton ( ulir) 1.050
210000 KG
kawat beton 0.050
JUMLAH HARGA BAHAN
C PERALATAN
bar cuter 1 unit 2.000
bar bender 1 unit 2.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
bekisting plat
No Uraian kuantitas Satuan hari kerja
A TENAGA
pekerja 5 orang 4.0000
tukang kayu 10 orang 4.000
mandor 1 orang 4.000
JUMLAH TENAGA KERJA
B ALAT
JUMLAH HARGA ALAT
C BAHAN koef
kayu kelas III (kayu lokal) 0.015
paku 5-12 cm 0.800
minyak bekisting 0.400
10979 m2
Formite/ penjaga jarak bekisting 0.009
plywood tebal 9mmm 0.175
dolken kayu galam D (8-10)cm 3.000
JUMLAH HARGA BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pengecoran tangga
No Uraian kuantitas Satuan hari kerja
A TENAGA
Pekerja 4 orang 2.0000
Mandor 1 orang 2.000
JUMLAH TENAGA KERJA
B BAHAN
beton ready mix k350 114.72 m3 1.050
JUMLAH HARGA BAHAN
C PERALATAN
concrete bucket 2 unit 2.000
concrete vibrator 2 unit 2.000
trowel 2 unit 2.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pembesian tangga
No Uraian kuantitas Satuan hari kerja
A TENAGA
Pekerja 5 orang 2.0000
tukang besi 10 orang 2.000
Mandor 1 orang 2.000
JUMLAH TENAGA KERJA
B BAHAN
besi beton ( ulir) 1.050
12552 KG
kawat beton 0.050
JUMLAH HARGA BAHAN
C PERALATAN
bar cuter 1 unit 2.000
bar bender 1 unit 2.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
bekisting tangga
No Uraian kuantitas Satuan hari kerja
A TENAGA
pekerja 5 orang 5.0000
tukang kayu 10 orang 5.000
mandor 1 orang 5.000
JUMLAH TENAGA KERJA
B ALAT
JUMLAH HARGA ALAT
C BAHAN koef
kayu kelas III (kayu lokal) 0.015
paku 5-12 cm 0.800
minyak bekisting 0.400
513.8 m2
Formite/ penjaga jarak bekisting 0.009
plywood tebal 9mmm 0.175
dolken kayu galam D (8-10)cm 3.000
JUMLAH HARGA BAHAN
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m2 langit langit gypsum board ukuran ( 120 x 240 x 9) mm, tebal 9mm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100
Tukang batu L.02 OH 0.050
Kepala tukang L.03 OH 0.0050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
gypsum board BT27 Bh 0.100
paku skrup BPS20 kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pengecatan 1 m2 tembok baru interior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur P18 Kg 0.100
Cat dasar BT85 Kg 0.100
Cat penutup BT88 Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Pengecatan 1 m2 tembok baru eksterior (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur P18 Kg 0.100
Cat dasar BT85 Kg 0.100
Cat penutup BT88 Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
101,036.00 Rp 10,103.60
177,000.00 Rp 885.00
JUMLAH TENAGA KERJA Rp 10,988.60
0 Rp -
JUMLAH HARGA ALAT Rp -
Rp 10,988.60
Rp 1,648.29
Rp 12,636.89
101,036.00 Rp 1,010,360.00
177,000.00 Rp 354,000.00
JUMLAH TENAGA KERJA Rp 1,364,360.00
0 Rp -
JUMLAH HARGA ALAT Rp -
Rp 1,364,360.00
Rp 204,654.00
Rp 1,569,014.00
nggi 2 meter
Harga Satuan (Rp) Jumlah Harga (Rp)
101,036.00 Rp 20,207.20
126,300.00 Rp 50,520.00
151,600.00 Rp 3,032.00
177,000.00 Rp 3,540.00
H TENAGA KERJA Rp 77,299.20
24,970.00 Rp 31,212.50
66,560.00 Rp 79,872.00
17,210.00 Rp 1,032.60
H HARGA BAHAN Rp 112,117.10
H HARGA ALAT Rp -
Rp 189,416.30
Rp 28,412.45
Rp 217,828.75
ang sementara
Harga Satuan (Rp) Jumlah Harga (Rp)
101,036.00 Rp 404,144.00
126,300.00 Rp 378,900.00
177,000.00 Rp 177,000.00
H TENAGA KERJA Rp 960,044.00
845000 Rp 845.00
13000 Rp 6,500.00
660 Rp 26,400.00
236,300.00 Rp 59,075.00
68,790.00 Rp 13,758.00
58,300.00 Rp 58,300.00
63,000.00 Rp 75,600.00
71,000.00 Rp 142,000.00
H HARGA BAHAN Rp 131,133.00
H HARGA ALAT Rp -
Rp 1,091,177.00
Rp 163,676.55
Rp 1,254,853.55
101,036.00 Rp 404,144.00
156,000.00 Rp 46,800,000.00
126,300.00 Rp 505,200.00
177,000.00 Rp 708,000.00
126,300.00 Rp 1,136,700.00
H TENAGA KERJA Rp 49,554,044.00
640000000 Rp 640,000,000.00
85000000 Rp 85,000,000.00
75000000 Rp 75,000,000.00
70,800,000.00 Rp 70,800,000.00
7,500,000.00 Rp 7,500,000.00
25,000,000.00 Rp 25,000,000.00
75,000,000.00 Rp 75,000,000.00
8,000,000.00 Rp 8,000,000.00
H HARGA ALAT Rp -
Rp 1,035,854,044.00
Rp 155,378,106.60
Rp 1,191,232,150.60
Rp 156,000 Rp 780,000.00
Rp 101,036 Rp 5,051,800.00
Rp 177,000 Rp 885,000.00
H TENAGA KERJA Rp 6,716,800.00
Rp -
Rp165,000 Rp 825,000.00
Rp110,000 Rp 3,300,000.00
Rp6,500 Rp 16,900,000.00
Rp6,500 Rp 6,500,000.00
Rp 27,525,000.00
Rp 34,241,800.00
Rp 5,136,270.00
Rp 39,378,070.00
101,036.00 Rp 10,103.60
126,300.00 Rp 12,630.00
151,600.00 Rp 1,516.00
177,000.00 Rp 885.00
Rp 25,134.60
2,250,000.00 Rp 27,000.00
15,500.00 Rp 310.00
2,150,000.00 Rp 15,050.00
Rp 42,360.00
Rp -
Rp 67,494.60
Rp 6,749.46
Rp 74,244.06
Rp12,630 Rp 125.03
Rp15,788 Rp 78.94
Rp22,125 Rp 37.61
H TENAGA KERJA Rp 241.58
Rp1,245,000 Rp 625,861.50
Rp12,500 Rp 942,477.50
Rp13,250 Rp 33,301.23
H HARGA BAHAN Rp 1,601,640.23
Rp312,000 Rp 530.40
Rp562,500 Rp 42,581.25
Rp10,000 Rp 10,000.00
H HARGA ALAT Rp 53,111.65
Rp 1,654,993.46
Rp 248,249.02
Rp 1,903,242.48
Rp101,036 Rp 10,507,744.00
Rp156,000 Rp 4,056,000.00
Rp177,000 Rp 4,602,000.00
H TENAGA KERJA Rp 19,165,744.00
Rp1,245,000 Rp 625,861.50
Rp12,500 Rp 942,477.50
Rp13,250 Rp 33,301.23
H HARGA BAHAN Rp 1,601,640.23
Rp490,000 Rp 12,740,000.00
Rp6,500 Rp 33,800,000.00
H HARGA ALAT Rp 46,540,000.00
Rp 67,307,384.23
Rp 10,096,107.63
Rp 77,403,491.86
Rp101,036 Rp 27,279,720.00
Rp126,300 Rp 68,202,000.00
Rp177,000 Rp 9,558,000.00
H TENAGA KERJA Rp 105,039,720.00
Rp12,000 Rp 926,654,400.00
Rp17,000 Rp 62,512,400.00
H HARGA BAHAN Rp 989,166,800.00
Rp1,200,000 Rp 7,200,000.00
Rp1,200,000 Rp 7,200,000.00
H HARGA ALAT Rp 14,400,000.00
Rp 1,108,606,520.00
Rp 166,290,978.00
Rp 1,274,897,498.00
Rp101,036 Rp 15,155,400.00
Rp177,000 Rp 2,655,000.00
H TENAGA KERJA Rp 17,810,400.00
Rp1,147,538 Rp 849,585,495.99
H HARGA BAHAN Rp 849,585,495.99
Rp4,500,000 Rp 67,500,000.00
Rp400,000 Rp 6,000,000.00
H HARGA ALAT Rp 73,500,000.00
Rp 940,895,895.99
Rp 141,134,384.40
Rp 1,082,030,280.39
Rp126,300 Rp 10,104,000.00
Rp177,000 Rp 1,416,000.00
H TENAGA KERJA Rp 11,520,000.00
H HARGA BAHAN
Rp85,000 Rp 680,000.00
H HARGA ALAT Rp 680,000.00
Rp 12,200,000.00
Rp 1,830,000.00
Rp 14,030,000.00
Rp101,036 Rp 16,670,940.00
Rp126,300 Rp 41,679,000.00
Rp177,000 Rp 5,841,000.00
H TENAGA KERJA Rp 58,349,940.00
H HARGA ALAT
Rp600 Rp 84,000,000.00
Rp63,000 Rp 63,000,000.00
Rp144,000 Rp 11,520,000.00
H HARGA BAHAN Rp 84,000,000.00
Rp 142,349,940.00
Rp 21,352,491.00
Rp 163,702,431.00
Harga Satuan (Rp) Jumlah Harga (Rp)
Rp156,000 Rp 7,800.00
Rp177,000 Rp 4,425.00
H TENAGA KERJA Rp 12,225.00
Rp -
Rp180,000 Rp 13,500.00
Rp 13,500.00
Rp 25,725.00
Rp -
Rp 25,725.00
Rp101,036 Rp 22,733,100.00
Rp400,000 Rp 180,000,000.00
Rp177,000 Rp 7,965,000.00
H TENAGA KERJA Rp 210,698,100.00
Rp12,000 Rp 309,582,000.00
Rp17,000 Rp 20,884,500.00
H HARGA BAHAN Rp 330,466,500.00
Rp1,200,000 Rp 18,000,000.00
Rp1,200,000 Rp 18,000,000.00
H HARGA ALAT Rp 36,000,000.00
Rp 577,164,600.00
Rp 86,574,690.00
Rp 663,739,290.00
Rp101,036 Rp 1,212,432.00
Rp177,000 Rp 531,000.00
H TENAGA KERJA Rp 1,743,432.00
Rp1,147,538 Rp 721,317,967.19
H HARGA BAHAN Rp 721,317,967.19
Rp20,000,000 Rp 60,000,000.00
Rp137,000 Rp 411,000.00
H HARGA ALAT Rp 60,411,000.00
Rp 783,472,399.19
Rp 117,520,859.88
Rp 900,993,259.07
Rp101,036 Rp 1,010,360.00
Rp177,000 Rp 177,000.00
H TENAGA KERJA Rp 1,187,360.00
Rp100,000 Rp 3,490,080.00
H HARGA BAHAN Rp 3,490,080.00
Rp400,000 Rp 400,000.00
Rp6,500 Rp 149,500.00
H HARGA ALAT Rp 549,500.00
Rp 5,226,940.00
Rp 784,041.00
Rp 6,010,981.00 Rp 189,453.51
101,036.00 Rp 5,051.80
Rp 5,051.80
Rp -
180000 Rp 9,000.00
Rp 9,000.00
Rp 14,051.80
Rp -
Rp 14,051.80
Jumlah Harga (Rp)
Rp 3,718,023.12
Rp 3,718,023.12
Rp 48,288.00
Rp 48,288.00
Rp 9,000.00
Rp 8,448.00
Rp 791.66
Rp 970.20
Rp 2,600.00
Rp -
Rp 404.14
Rp 4,799.40
Rp 606.40
Rp 177.00 28.6 30 3400
Rp 27,796.80 Rp 833,904.12
Rp 7,173.56
Rp 3,031.20
Rp 885.00
Rp 11,089.76
Rp 16,351.00
Rp 45,523.50
Rp 77,000.00
Rp -
Rp 8,385.99
Rp 10,482.90
Rp 606.40
Rp 177.00
Rp 14,691.00
Rp 8,385.99
Rp 20,965.80
Rp 181,603.78
Rp 51,938,679.94
Rp 59,729,481.93
Rp 3,743.00
Rp 10,433.50
Rp 3,363.00
Rp 1,919.68
Rp 4,799.40
Rp 1,919.68
Rp 24,258.58
Rp 6,937,955.02
Rp 7,978,648.28
Rp 11,100,000.00
Rp 32,000.00
Rp 11,132,000.00
Rp 46,352.10
Rp 11,218.40
Rp 6,549.00
Rp 57,570.50
Rp 575,705.00
Rp 12,075.00
Rp 255.00
Rp 707.25
Rp 884.10
Rp 106.12
Rp 70.80
Rp 14,027.47
Jumlah Harga (Rp)
Rp 1,561,569.71
Rp 48,288.00
Rp 2,961,479.89
Rp 3,735,890.46
Rp 11,089.76
Rp 115,141.00
Rp 8,318,317.81
Rp 9,566,065.48
Rp 2,735,894,728.58
Rp 59,729,481.93
Rp 7,978,648.28
Rp 2,803,602,858.78
Rp 450,000.00
Rp 151,600.00
Rp 390,000.00
Rp 991,600.00
Rp 148,740.00
Rp 1,140,340.00
Harga Satuan (Rp) Jumlah Harga (Rp)
Rp101,036 Rp 404,144.00
Rp177,000 Rp 177,000.00
H TENAGA KERJA Rp 581,144.00
Rp1,147,538 Rp 313,759,839.96
H HARGA BAHAN Rp 313,759,839.96
Rp20,000,000 Rp 60,000,000.00
Rp137,000 Rp 411,000.00
H HARGA ALAT Rp 60,411,000.00
Rp 374,751,983.96
Rp 56,212,797.59
Rp 430,964,781.55
Rp101,036 Rp 1,010,360.00
Rp126,300 Rp 2,526,000.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 3,890,360.00
Rp12,000 Rp 191,447,172.00
Rp17,000 Rp 12,915,087.00
H HARGA BAHAN Rp 204,362,259.00
Rp1,200,000 Rp 2,400,000.00
Rp1,200,000 Rp 2,400,000.00
H HARGA ALAT Rp 4,800,000.00
Rp 213,052,619.00
Rp 31,957,892.85
Rp 245,010,511.85
Rp101,036 Rp 101,036.00
Rp126,300 Rp 126,300.00
Rp177,000 Rp 177,000.00
H TENAGA KERJA Rp 227,336.00
H HARGA ALAT
Rp845,000 Rp 16,900.00
Rp13,000 Rp 10,400.00
Rp13,000 Rp 5,200.00
Rp845,000 Rp 7,605.00
Rp240,000 Rp 42,000.00
Rp10,500 Rp 21,000.00
H HARGA BAHAN Rp 16,900.00
Rp 244,236.00
Rp 36,635.40
Rp 280,871.40 Rp 365,132,820.00
Rp101,036 Rp 808,288.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 1,162,288.00
Rp1,147,538 Rp 191,433,987.52
H HARGA BAHAN Rp 191,433,987.52
Rp20,000,000 Rp 40,000,000.00
Rp137,000 Rp 274,000.00
H HARGA ALAT Rp 40,274,000.00
Rp 232,870,275.52
Rp 34,930,541.33
Rp 267,800,816.84
Rp101,036 Rp 1,010,360.00
Rp126,300 Rp 2,526,000.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 3,890,360.00
Rp12,000 Rp 69,300,000.00
Rp17,000 Rp 4,675,000.00
H HARGA BAHAN Rp 73,975,000.00
Rp12,000,000 Rp 800,000.00
Rp12,000,000 Rp 800,000.00
H HARGA ALAT Rp 1,600,000.00
Rp 79,465,360.00
Rp 11,919,804.00
Rp 91,385,164.00
Rp101,036 Rp 2,020,720.00
Rp126,300 Rp 5,052,000.00
Rp177,000 Rp 708,000.00
H TENAGA KERJA Rp 7,072,720.00
H HARGA ALAT
Rp845,000 Rp 13,055,250.00
Rp13,000 Rp 10,712,000.00
Rp13,000 Rp 5,356,000.00
Rp20,000 Rp 185,400.00
Rp240,000 Rp 43,260,000.00
Rp10,500 Rp 32,445,000.00
H HARGA BAHAN Rp 105,013,650.00
Rp 112,086,370.00
Rp 16,812,955.50
Rp 128,899,325.50
Harga Satuan (Rp) Jumlah Harga (Rp)
Rp101,036 Rp 10,103,600.00
Rp177,000 Rp 1,770,000.00
H TENAGA KERJA Rp 11,873,600.00
Rp1,147,538 Rp 1,716,001,996.38
H HARGA BAHAN Rp 1,716,001,996.38
Rp20,000,000 Rp 40,000,000.00
Rp137,000 Rp 274,000.00
H HARGA ALAT Rp 40,274,000.00
Rp 1,768,149,596.38
Rp 265,222,439.46
Rp 2,033,372,035.83
Rp101,036 Rp 1,010,360.00
Rp126,300 Rp 2,526,000.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 3,890,360.00
Rp12,000 Rp 2,646,000,000.00
Rp17,000 Rp 178,500,000.00
H HARGA BAHAN Rp 2,824,500,000.00
Rp12,000,000 Rp 800,000.00
Rp12,000,000 Rp 800,000.00
H HARGA ALAT Rp 1,600,000.00
Rp 2,829,990,360.00
Rp 424,498,554.00
Rp 3,254,488,914.00
Rp101,036 Rp 2,020,720.00
Rp126,300 Rp 5,052,000.00
Rp177,000 Rp 708,000.00
H TENAGA KERJA Rp 7,072,720.00
H HARGA ALAT
Rp845,000 Rp 139,158,825.00
Rp13,000 Rp 114,181,600.00
Rp13,000 Rp 57,090,800.00
Rp20,000 Rp 1,976,220.00
Rp240,000 Rp 461,118,000.00
Rp10,500 Rp 345,838,500.00
H HARGA BAHAN Rp 1,119,363,945.00
Rp 1,126,436,665.00
Rp 168,965,499.75
Rp 1,295,402,164.75
Rp101,036 Rp 808,288.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 1,162,288.00
Rp1,147,538 Rp 138,229,803.73
H HARGA BAHAN Rp 138,229,803.73
Rp20,000,000 Rp 40,000,000.00
Rp137,000 Rp 548,000.00
Rp290,000 Rp 1,160,000.00
H HARGA ALAT Rp 40,548,000.00
Rp 179,940,091.73
Rp 26,991,013.76
Rp 206,931,105.49
Rp101,036 Rp 1,010,360.00
Rp126,300 Rp 2,526,000.00
Rp177,000 Rp 354,000.00
H TENAGA KERJA Rp 3,890,360.00
Rp12,000 Rp 158,155,200.00
Rp17,000 Rp 10,669,200.00
H HARGA BAHAN Rp 168,824,400.00
Rp12,000,000 Rp 800,000.00
Rp12,000,000 Rp 800,000.00
H HARGA ALAT Rp 1,600,000.00
Rp 174,314,760.00
Rp 26,147,214.00
Rp 200,461,974.00
Rp101,036 Rp 2,525,900.00
Rp126,300 Rp 6,315,000.00
Rp177,000 Rp 885,000.00
H TENAGA KERJA Rp 8,840,900.00
H HARGA ALAT
Rp845,000 Rp 6,512,415.00
Rp13,000 Rp 5,343,520.00
Rp13,000 Rp 2,671,760.00
Rp20,000 Rp 92,484.00
Rp240,000 Rp 21,579,600.00
Rp10,500 Rp 16,184,700.00
H HARGA BAHAN Rp 52,384,479.00
Rp 61,225,379.00
Rp 9,183,806.85
Rp 70,409,185.85
Rp101,036 Rp 30,310.80
Rp126,300 Rp 12,630.00
Rp151,600 Rp 1,516.00
Rp177,000 Rp 1,770.00
H TENAGA KERJA Rp 42,940.80
H HARGA ALAT
Rp700,000 Rp 70,000.00
Rp150,000 Rp 15,750.00
Rp5,000 Rp 5,000.00
H HARGA BAHAN Rp 90,750.00
Rp 133,690.80
Rp 20,053.62
Rp 153,744.42
Rp101,036 Rp 30,310.80
126,300.00 Rp 18,945.00
151,600.00 Rp 2,274.00
177,000.00 Rp 2,655.00
TENAGA KERJA Rp 54,184.80
1,250.00 Rp 19,380.00
250,000.00 Rp 4,000.00
HARGA BAHAN Rp 23,380.00
HARGA ALAT Rp -
Rp 77,564.80
Rp 11,634.72
Rp 89,199.52
101,036.00 Rp 25,259.00
126,300.00 Rp 15,787.50
151,600.00 Rp 1,970.80
177,000.00 Rp 2,301.00
TENAGA KERJA Rp 45,318.30
7,500.00 Rp 49,725.00
1,250.00 Rp 12,250.00
12,000.00 Rp 15,600.00
150,000.00 Rp 6,750.00
HARGA BAHAN Rp 84,325.00
HARGA ALAT Rp -
Rp 129,643.30
Rp 19,446.50
Rp 149,089.80
101,036.00 Rp 25,259.00
126,300.00 Rp 15,787.50
151,600.00 Rp 1,970.80
177,000.00 Rp 2,301.00
TENAGA KERJA Rp 45,318.30
5,500.00 Rp 36,465.00
1,250.00 Rp 12,250.00
12,000.00 Rp 15,600.00
150,000.00 Rp 6,750.00
HARGA BAHAN Rp 71,065.00
HARGA ALAT Rp -
Rp 116,383.30
Rp 17,457.50
Rp 133,840.80
101,036.00 Rp 90,932.40
126,300.00 Rp 56,835.00
151,600.00 Rp 6,822.00
177,000.00 Rp 7,965.00
TENAGA KERJA Rp 162,554.40
5,500.00 Rp 145,750.00
1,250.00 Rp 11,625.00
12,000.00 Rp 23,280.00
150,000.00 Rp 2,700.00
HARGA BAHAN Rp 183,355.00
HARGA ALAT Rp -
Rp 345,909.40
Rp 51,886.41
Rp 397,795.81
101,036.00 Rp 12,124.32
126,300.00 Rp 15,156.00
151,600.00 Rp 18,192.00
177,000.00 Rp 1,062.00
TENAGA KERJA Rp 46,534.32
5,000.00 Rp 25,000.00
1,500.00 Rp 1,500.00
HARGA BAHAN Rp 26,500.00
HARGA ALAT Rp -
Rp 73,034.32
Rp 10,955.15
Rp 83,989.47
101,036.00 Rp 10,103.60
126,300.00 Rp 6,315.00
151,600.00 Rp 758.00
177,000.00 Rp 885.00
TENAGA KERJA Rp 18,061.60
125,000.00 Rp 12,500.00
300.00 Rp 30.00
HARGA BAHAN Rp 12,530.00
HARGA ALAT Rp -
Rp 30,591.60
Rp 4,588.74
Rp 35,180.34
Harga Satuan (Rp) Jumlah Harga (Rp)
101,036.00 Rp 2,020.72
126,300.00 Rp 7,956.90
151,600.00 Rp 909.60
177,000.00 Rp 531.00
TENAGA KERJA Rp 11,418.22
20,000.00 Rp 2,000.00
25,000.00 Rp 2,500.00
35,000.00 Rp 9,100.00
HARGA BAHAN Rp 13,600.00
HARGA ALAT
Rp 25,018.22
Rp -
Rp 25,018.22
101,036.00 Rp 2,020.72
126,300.00 Rp 7,956.90
151,600.00 Rp 909.60
177,000.00 Rp 531.00
TENAGA KERJA Rp 11,418.22
20,000.00 Rp 2,000.00
30,000.00 Rp 3,000.00
45,000.00 Rp 11,700.00
HARGA BAHAN Rp 16,700.00
HARGA ALAT
Rp 28,118.22
Rp -
Rp 28,118.22
95,000.00 Rp 104,500.00
600.00 Rp 1,200.00
6,000.00 Rp 360.00
HARGA BAHAN Rp 106,060.00
HARGA ALAT
Rp 116,859.03
Rp -
Rp 116,859.03
101,036.00 Rp 1,515.54
126,300.00 Rp 18,945.00
151,600.00 Rp 2,274.00
177,000.00 Rp 141.60
TENAGA KERJA Rp 22,876.14
215,000.00 Rp 236,500.00
6,000.00 Rp 300.00
HARGA BAHAN Rp 236,800.00
HARGA ALAT
Rp 259,676.14
Rp -
Rp 259,676.14
101,036.00 Rp 1,515.54
126,300.00 Rp 18,945.00
151,600.00 Rp 2,274.00
177,000.00 Rp 141.60
TENAGA KERJA Rp 22,876.14
25,000.00 Rp 25,000.00
HARGA BAHAN Rp 25,000.00
HARGA ALAT
Rp 47,876.14
Rp -
Rp 47,876.14
101,036.00 Rp 1,515.54
126,300.00 Rp 18,945.00
151,600.00 Rp 2,274.00
177,000.00 Rp 141.60
TENAGA KERJA Rp 22,876.14
15,000.00 Rp 15,000.00
HARGA BAHAN Rp 15,000.00
HARGA ALAT
Rp 37,876.14
Rp -
Rp 37,876.14
101,036.00 Rp 1,010.36
126,300.00 Rp 63,150.00
151,600.00 Rp 7,580.00
177,000.00 Rp 885.00
TENAGA KERJA Rp 72,625.36
80,000.00 Rp 80,000.00
HARGA BAHAN Rp 80,000.00
HARGA ALAT
Rp 152,625.36
Rp -
Rp 152,625.36
Harga Satuan (Rp) Jumlah Harga (Rp)
101,036.00 Rp 1,515.54
126,300.00 Rp 18,945.00
151,600.00 Rp 2,274.00
177,000.00 Rp 141.60
TENAGA KERJA Rp 22,876.14
235,000.00 Rp 258,500.00
6,000.00 Rp 300.00
HARGA BAHAN Rp 258,800.00
HARGA ALAT
Rp 281,676.14
Rp 42,251.42
Rp 323,927.56
Penggalian
No Uraian kuantitas Satuan hari kerja
A TENAGA
Operator 1 orang 7.000
pekerja 10 orang 7.000
mandor 1 orang 7.000
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
Excavator 1 unit 7.000
dump truck 6 unit 7.000
solar excavator 520 ltr/hr 7.000
solar dump truck 200 lt/hr 7.000
penggalian
Harga Satuan (Rp) Jumlah Harga (Rp)
Rp 156,000 Rp 1,092,000.00
Rp 101,036 Rp 7,072,520.00
Rp 177,000 Rp 1,239,000.00
LAH TENAGA KERJA Rp 9,403,520.00
RGA BAHAN Rp -
Rp165,000 Rp 1,155,000.00
Rp110,000 Rp 4,620,000.00
Rp6,500 Rp 23,660,000.00
Rp6,500 Rp 9,100,000.00
Rp 94,507,368.00
AHS KOLOM PRECAST
a) Beton siap pakai (readymix), volume 1m3, mutu f'c = 31,2 Mpa ( K 350)
No Uraian Satuan Koefisien Harga Satuan (Rp)
A BAHAN
Ready mix K 350 m3 1.000 Rp1,147,538
JUMLAH HARGA BAHAN
Rp 1,147,538.00
Rp 1,147,538.00
Rp 48,288.00
Rp 48,288.00
2 kali pakai)
Jumlah Harga (Rp)
Rp 9,000.00
Rp 8,448.00
Rp 791.66
Rp 970.20
Rp 2,600.00
Rp -
Rp 404.14
Rp 4,799.40
Rp 606.40
Rp 177.00
Rp 27,796.80
Rp 7,173.56
Rp 3,031.20
Rp 885.00
Rp 11,089.76
Rp 16,351.00
Rp 45,523.50
Rp 77,000.00
Rp -
Rp 8,385.99
Rp 10,482.90
Rp 606.40
Rp 177.00
Rp 14,691.00
Rp 8,385.99
Rp 20,965.80
Rp 181,603.78
Rp 3,743.00
Rp 10,433.50
Rp 3,363.00
Rp 1,919.68
Rp 4,799.40
Rp 1,919.68
Rp 24,258.58
Rp 11,100,000.00
Rp 32,000.00
Rp 11,132,000.00
Rp 707.25
Rp 884.10 VOLUME GROUTING
Rp 106.12 LANGSIR DAN EREKSI
Rp 70.80
Rp 14,027.47
m pracetak analisa harga satuannya :
Sumber
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Sumber
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
Jurnal Harga Satuan Bahan Bangunan, Konstruksi, dan Interior
1720 1806
110 115.5
1 1.05
200 210
25 26.25
30 31.5
10 10.5
5 5.25
365 383.25
365 383.25
1 1.05
2 2.1
1720 1806
1720 1806
102 107.1
73544.1 77221.305
705.1 740.355
3 3.15
102 107.1
1000 1050
17151.4 18008.97
24570 25798.5
571.44 600.012
31.728 33.3144
8600 9030
7445 7817.25
4523 4749.15
3380 3549
0
286 300.3
10 10.5
30 31.5
210000 220500
10979 11527.95
1424.2 1495.41
5500 5775
1030 1081.5
158.88 166.824
12552 13179.6
513.8 539.49
114.72 120.456
1813.2 1903.86
260.4 273.42
15194.22 15953.931
5278.5706 5542.49913
13145.6212 13802.90226
1578 1656.9
1532 1608.6
6428.96 6750.408
221.792 232.8816
410.672 431.2056
2295.43 2410.2015
5172.5 5431.125
18845 19787.25
3172 3330.6
7564 7942.2
2111.5 2217.075
780 819
450 472.5
425 446.25
150 157.5
23 24.15
25 26.25
700.542 735.5691
1 1.05
1 1.05
1 1.05
SCHEDULLING
no PEKERJAAN
1 PERSIAPAN
3 TANAH DAN PONDASI
A Site Measurement
C Stacking Out/Bowplank
16.962% D Pekerjaan Bored Pile - Loading Test- Penggalian- retaining Wall- Pilecap
0.746% I Earth Back Filling - Pembuangan Tanah
0.231% K Pemadatan Tanah + Termite Control
4 PEKERJAAN STRUKTUR
8.545% A. Pekerjaan Kolom Precast
19.074% B Pekerjaan Plat Lantai dan Drop Panel
1.414% C Pekerjaan Shear Wall
1.384% D Pekerjaan Tangga
5 PEKERJAAN ARSITEKTUR
A Pekerjaan Dinding
B Pekerjaan Lantai
C Pekerjaan Pintu dan Jendela
D Pekerjaan Plafond
E Pekerjaan Pengecatan
6 PEKERJAAN MEP
A Pekerjaan Mekanikal
B Pekerjaan Elektrikal
C Pekerjaan Plumbing
71.5
35.75
71.5
Jan-19 Feb-19
Durasi (minggu)
BOBOT 1 2 3 4 5 6
0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398%
1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413%
1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413%
1.943% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943%
6.513% 8.456% 10.399% 12.342% 14.285% 16.228% 18.171% 20.114% 22.057% 24.000%
May-19 Jun-19 Jul-19
17 18 19 20 21 22 23 24 25 26
0.373% 0.373%
0.115% 0.115%
0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398%
0.546% 0.546%
0.546% 0.546% 0.546% 0.546% 0.546% 0.546% 0.546% 0.546% 0.546% 0.546%
0.325% 0.325% 0.325% 0.325% 0.325% 0.325% 0.325% 0.325% 0.325% 0.325%
0.899% 0.899% 0.899% 0.899% 0.899% 0.899%
0.066% 0.066% 0.066% 0.066%
0.135% 0.135%
0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404%
0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318%
0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351%
2.209% 2.209% 2.209% 3.108% 3.108% 3.108% 3.174% 3.174% 2.959% 1.662%
68.113% 70.322% 72.532% 75.640% 78.749% 81.857% 85.032% 88.206% 91.165% 92.826%
Dec-19 Jan-20 Feb-20
47 48 49 50 51 52 53 54 55 56
0.325% 0.325%
0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404%
0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318%
0.984% 0.984% 0.660% 0.594% 0.594% 0.594% 0.594% 0.594% 0.594% 0.594%
93.810% 94.795% 95.454% 96.048% 96.642% 97.625% 98.219% 98.813% 99.406% 100.000%
KURVA S
Jan-19
Durasi (minggu)
no PEKERJAAN BOBOT 1 2
0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398%
0.005% 0.370% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413%
0.005%
0.370%
1.413% 1.413% 1.413% 1.413% 1.413% 1.413% 1.413%
0.398% 0.534% 0.900% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943% 1.943%
1.194% 1.728% 2.627% 4.570% 6.513% 8.456% 10.399% 12.342% 14.285% 16.228%
Apr-19 May-19 Jun-19
13 14 15 16 17 18 19 20 21 22
0.854%
0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398%
2.444% 2.576% 2.576% 2.576% 2.576% 2.716% 3.188% 3.188% 3.649% 2.641%
30.923% 33.499% 36.075% 38.651% 41.228% 43.944% 47.132% 50.320% 53.969% 56.610%
Sep-19 Oct-19 NOVEMBER 2019
33 34 35 36 37 38 39 40 41 42
0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398% 0.398%
1.192% 1.192%
0.461%
0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404%
0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318%
0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351% 0.351%
2.993% 2.531% 1.885% 1.885% 2.209% 2.209% 2.209% 3.108% 3.108% 3.108%
59.603% 62.134% 64.019% 65.904% 68.113% 70.322% 72.532% 75.640% 78.749% 81.857%
NOVEMBER 2019 Dec-19 Jan-20
43 44 45 46 47 48 49 50 51 52
0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404% 0.1404%
0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318% 0.318%
0.351% 0.351%
3.174% 3.174% 2.959% 1.662% 0.984% 0.984% 0.660% 0.594% 0.594% 0.594%
85.032% 88.206% 91.165% 92.826% 93.810% 94.795% 95.454% 96.048% 96.642% 97.625%
Feb-20
53 54 55 56